SM CENTER LAS PIAS

Engineering Weekly Report October 15-21, 2012

Prepared by: Julius O. Salacup Resident Engineer SM Center Las Pias


SM EDD OPERATIONS
Engineering Design & Development

SMPN GENERAL INFORMATION SHEET

ALABANG-ZAPOTE ROAD, BRGY. PAMPLONA DOS, LAS PIAS CITY

DATE OF OPENING:

OCTOBER 02, 2009

LAND AREA:

28,626 sq. m.

CFA:

40,267 sq. m.

TOTAL LEASABLE AREA:

16,308.54 sq. m.

FOOD TENANTS:

12

NON-FOOD TENANTS:

41

OPEN PARKING:

311 slots

MOTORCYCEL PARKING:

80 slots

PARKING FOR PWD:

6 slots

CINEMA SEATING CAPACITY (NO CINEMA)

CINEMA N/A

CINEMA N/A

CINEMA N/A

CINEMA N/A

SM CENTER LAS PIAS WEEKLY REPORT (15OCT TO 21OCT 2012)

Engineering Design & Development

SMPN GENERAL INFORMATION SHEET


ALABANG-ZAPOTE ROAD, BRGY. PAMPLONA DOS, LAS PIAS CITY

ELECTRICITY DISTRIBUTOR:
SUBSTATION CAPACITY: GENSETS CAPACITY: DIESEL TANK CAPACITY: CHILLERS CAPACITY: COOLING TOWER CAPACITY: TOTAL NO OF AHU: TOTAL NO OF FCU: TOTAL NO OF KEF: TOTAL NO OF KSF: TOTAL NO OF FAF: TOTAL NO OF EF: TOTAL NO OF SF TOTAL NO OF SEF: TOTAL NO OF PB: TOTAL NO OF LEF: WALKALATOR: (HYUNDAI): FREIGHT ELEVATORS (HYUNDAI): PASSENGER ELEVATORS (HYUNDAI):

MERALCO CKT. #49xd


1x3MVA; 13.5KV/460V; 3; 60Hz; ELETTROMECCANICA COLOMBO 2x21.25MVA; 460V; 3; 60Hz; CAT 2x4642gal. (9284L GROSS) 2x500TR; CVHF485; 275KW; TRANE 2x500TR; 50Hp; BAC 24 UNITS 5 UNITS 8UNITS 6 UNITS 7 UNITS 6 UNITS 2 UNITS 4 UNITS STP CAPACITY: PRIMARY AERATION BLOWERS: SECONDARY AERATION BLOWERS: TTP FILTER PUMPS LPG FARM CAPACITY: FDAS CPS PUMP (POTABLE): CPS PUMP (NON-POTABLE): FIRE PUMP: JOCKEY PUMP: CISTERN TANK CAPACITY: 2x7.5Hp; 4x15Hp; 1200kg cap. 1x15Hp; 60m/min. 1200kg cap. FIRE TANK CAPACITY: NON-POTABLE TANK CAPACITY: SBR TYPE; 142 cu.m. 1x7.5Hp TECO 2x7.5Hp TECO 2x2Hp 8x250kg(MACRO) ADDRESSABLE TYPE 2x7.5Hp 2x7.5Hp 1x75Hp 1x5Hp 363.8cu.m. 459.8cu.m. 21 cu.m. SYNCHRO PANEL:Ed. Ent. SHOCKBLOCK: YES

SM CENTER LAS PIAS WEEKLY REPORT (15OCT TO 21OCT 2012)

Engineering Design & Development

REPORT OUTLINE:

1. 2. 3. 4.

FACILITIES STATUS UPDATES. EQUIPMENTS BREAKDOWN REPORT. UTILITIES CONSUMPTION, PRODUCTION AND DELIVERIES UPDATES. ENGINEERING AND MAINTENANCE ACTIVITIES SUMMARY AND UPDATES. (BUILDING AND PERIMETER) 5. BUSTED LIGHTS MONITORING UPDATES. 6. ISSUES AND NEEDS LIST. 7. PUNCHLISTS UPDATES.

SM CENTER LAS PIAS WEEKLY REPORT (15OCT TO 21OCT 2012)

Engineering Design & Development

1. FACILITIES STATUS UPDATES.


CATEGORY POWER INTERRUPTIONS WATER SUPPLY INTERRUPTIONS GAS SUPPLY INTERRUPTIONS TOTAL INCIDENTS:
1OCT 2OCT 3OCT 4OCT 5OCT 6OCT 7OCT

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

0 0 0 0

DESCRIPTION OF INTERRUPTION INCIDENTS


CATEGORY
POWER INTERRUPTIONS WATER SUPPLY INTERRUPTIONS GAS SUPPLY INTERRUPTIONS .

DESCRIPTION

SM CENTER LAS PIAS WEEKLY REPORT (15OCT TO 21OCT 2012)

Engineering Design & Development

2. EQUIPMNENTS BREAKDOWN REPORT.


EQUIPMENT DESCRIPTION
CAUSE OF DOWNTIME
DATE OF DOWNTIME DAYS NONOPERATIONAL

STATUS/REMARKS
CARE OF HYPERMARKET, ENGINEERING ALREADY SENT MESSAGE TO ADMIN TO INFORM HYPER FOR THE IMMEDIATE RECTIFICATION OF THE SAID ELEVATOR THE PAT AND EQ TANK ALREADY DECLOGGED BY MMRC, THE PUMP WILL BE FIXED ON WENESDAY OCT. 24, 2012.

FREIGHT ELEVATOR 1 (HYPERMARKET)

DAMAGE CAR DOOR

25SEP2012

28

TRANSFER PUMP FROM PRE-AERATION TANK TO EQUALIZATION TANK

CLOGGED

17SEP2012

35

SM CENTER LAS PIAS WEEKLY REPORT (15OCT TO 21OCT 2012)

Engineering Design & Development

3. UTILITIES CONSUMPTION, PRODUCTION AND DELIVERIES UPDATES


DESCRIPTION ELECTRICITY CONSUMPTION DIESEL FUEL CONSUMPTION DIESEL FUEL DELIVERIES POTABLE WATER CONSUMPTION RE-USE WATER CONSUMPTION RE-USE WATER PRODUCTION COOLING TOWER POTABLE WATER CONSUMPTION COOLING TOWER RE-USE WATER CONSUMPTION LPG CONSUMPTION LPG DELIVERIES 316 cu.m. 53 cu.m. 166 cu. m. 28 cu.m. 70 cu.m. 427.9kg 582 cu.m. 38 cu.m. 162 cu. m 24 cu.m. 67 cu.m. 219.9kg 317 cu.m. 49 cu.m. 163 cu. m 3 cu.m. 84 cu.m. 358.3kg 702kg 292 cu.m. 52 cu.m. 134 cu. m 45 cu.m. 53cu.m. 488.2kg 113 cu.m. 43 cu.m. 157cu. m 42 cu.m. 39 cu.m. 489.9kg 264cu. m. 36 cu.m. 185 cu. m 1O cu.m. 45 cu.m. 555kg 436cu. m. 38 cu.m. 198 cu. m 17 cu.m. 56 cu.m. 408.2kg
15-OCT 16-OCT 17-OCT 18-OCT 19-OCT 20-OCT 21-OCT

182kWh

189kWh 43.81L

203kWh

223kWh

219kWh

238kWh

316kWh

SM CENTER LAS PIAS WEEKLY REPORT (15OCT TO 21OCT 2012)

Engineering Design & Development

4A. ENGINEERING AND MAINTENANCE ACTIVITIES SUMMARY - TENANTS


CATEGORY ELECTRICAL AND AUXILLIARY PLUMBING AND SANITARY AIR CONDITIONING AND VENTILATION LPG SUPPLY WATER LEAKS
TENANT SERVICE CALLS SERVICE REQUESTS

5 0 2 0 0

0 0 0 0 0

4B. ENGINEERING AND MAINTENANCE ACTIVITIES SUMMARY BUILDING AND PERIMETER


CATEGORY ELECTRICAL AND AUXILLIARY PLUMBING AND SANITARY AIR CONDITIONING AND VENTILATION LPG SUPPLY CIVIL
NEW INSTALLATION PREVENTIVE CORRECTIVE

0 0 1 0 0

0 1 0 0 0

1 2 1 0 1

SM CENTER LAS PIAS WEEKLY REPORT (15OCT TO 21OCT 2012)

Engineering Design & Development

4B. ENGINEERING AND MAINTENANCE ACTIVITIES UPDATES BUILDING AND PERIMETER

DESCRIPTION
De-clogging the manhole at Cover car park (exit)

DESCRIPTION
Bio-Augmentation/de-clogging the stub-out of tenants

SM CENTER LAS PIAS WEEKLY REPORT (15OCT TO 21OCT 2012)

Engineering Design & Development

4B. ENGINEERING AND MAINTENANCE ACTIVITIES UPDATES BUILDING AND PERIMETER

DESCRIPTION
General Cleaning of Cooling Tower

DESCRIPTION
General Cleaning of Cooling Tower

SM CENTER LAS PIAS WEEKLY REPORT (15OCT TO 21OCT 2012)

Engineering Design & Development

4B. ENGINEERING AND MAINTENANCE ACTIVITIES UPDATES BUILDING AND PERIMETER

DESCRIPTION
De-Clogging the drainage at south parking

DESCRIPTION
De-Clogging the drainage at south parking

SM CENTER LAS PIAS WEEKLY REPORT (15OCT TO 21OCT 2012)

Engineering Design & Development

4B. ENGINEERING AND MAINTENANCE ACTIVITIES UPDATES BUILDING AND PERIMETER

DESCRIPTION
De-Clogging Pre Aerobic Tank and Equalization Tank by MMRC SM CENTER LAS PIAS WEEKLY REPORT (15OCT TO 21OCT 2012)

DESCRIPTION
De-Clogging Pre Aerobic Tank and Equalization Tank by MMRC
Engineering Design & Development

4B. ENGINEERING AND MAINTENANCE ACTIVITIES UPDATES BUILDING AND PERIMETER

DESCRIPTION
Replacement of Defective Emergency Light Battery

DESCRIPTION
Replacement of Defective Emergency Light Battery

SM CENTER LAS PIAS WEEKLY REPORT (15OCT TO 21OCT 2012)

Engineering Design & Development

4B. ENGINEERING AND MAINTENANCE ACTIVITIES UPDATES BUILDING AND PERIMETER

DESCRIPTION
Rectification of Leak Sources By Esicor

DESCRIPTION
Rectification of Leak Sources By Esicor

SM CENTER LAS PIAS WEEKLY REPORT (15OCT TO 21OCT 2012)

Engineering Design & Development

4B. ENGINEERING AND MAINTENANCE ACTIVITIES UPDATES BUILDING AND PERIMETER

DESCRIPTION
Upgrading of Hi-Land Coffee Feeder Line

DESCRIPTION
Upgrading of Hi-Land Coffee Feeder Line

SM CENTER LAS PIAS WEEKLY REPORT (15OCT TO 21OCT 2012)

Engineering Design & Development

4B. ENGINEERING AND MAINTENANCE ACTIVITIES UPDATES BUILDING AND PERIMETER

DESCRIPTION
FDAS Preventive Maintenance by JTY

DESCRIPTION
FDAS Preventive Maintenance by JTY

SM CENTER LAS PIAS WEEKLY REPORT (15OCT TO 21OCT 2012)

Engineering Design & Development

4B. ENGINEERING AND MAINTENANCE ACTIVITIES UPDATES BUILDING AND PERIMETER

DESCRIPTION
Testing the fixed breaker of Freight Elevator

DESCRIPTION
Fixing the loose breaker terminal lugs of Freight Elevator
Engineering Design & Development

SM CENTER LAS PIAS WEEKLY REPORT (15OCT TO 21OCT 2012)

4B. ENGINEERING AND MAINTENANCE ACTIVITIES UPDATES BUILDING AND PERIMETER

DESCRIPTION
Replacement of the worn out Drive wheel of MW downstream SM CENTER LAS PIAS WEEKLY REPORT (15OCT TO 21OCT 2012)

DESCRIPTION
Replacement of the worn out Drive wheel of MW downstream
Engineering Design & Development

5. BUSTED LIGHT MONITORING UPDATES


LOCATION
MALL INTERIOR AREA
MALL AREA 1F MALL AREA 2F TENANT FRONT SIGNAGES AD BOXES OFFICES UTILITY ROOMS COMFORT ROOMS ELEVATORS MALL NIGHT LIGHTS 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0

QTTY. OF BUSTED LIGHTS

QTTY OF REPLACED BUSTED LIGHTS

REMARKS

TENANT NIGHT LIGHTS


BACK ALLEYS, HALLWAYS AND STAIRCASES. TOTAL:

0
0 0

0
0 0

SM CENTER LAS PIAS WEEKLY REPORT (15OCT TO 21OCT 2012)

Engineering Design & Development

5. BUSTED LIGHT MONITORING UPDATES


LOCATION
MALL EXTERIOR AREA CANOPY LIGHTS, AL FRESCO LIGHTS. SM LOGO (FAADE) LIGHTED SIGNAGES (FAADE) DROPDOWN SIGNAGES ACCENT LIGHTS SM LOGO (PYLON TOWER) SIGNAGES (PYLON TOWER) CINEMA SIGNAGES COVERED WALKWAYS AND PEDESTRIAN OVERPASS PARKING LIGHTS PARKING TOWER LIGHTS TRANSPORTATION TERMINAL LIGHTS PEDESTRIAN OVERPASS TOTAL: 0 0 0 0 0 0 0 N/A 0 0 0 0 0 0 0 0 0 0 0 0 0 N/A 0 0 0 0 0 0

QTTY. OF BUSTED LIGHTS

QTTY OF REPLACED BUSTED LIGHTS

REMARKS

SM CENTER LAS PIAS WEEKLY REPORT (15OCT TO 21OCT 2012)

Engineering Design & Development

5. ISSUES AND NEEDS LIST


DESCRIPTION
REPLACEMENT OF THE BURN-OUT DRUM EXTENSION BY SOUTHERNSTAR(JANITORIAL)
DEFECTIVE LADDER LIFT BY (TRIPPLE SEVEN AND SOUHTERNSTAR) DEFECTIVE DRIVE WHEEL OF MOVING WALK DOWNSTREAM TROUBLE SHOOTING OF PYLON TOWER SPOT LIGHTS STATUS REMARKS ALREADY SENT MESSAGE TO BAOS FOR THE REPLACEMENT OF THE SAID EXTENSION ALREADY SENT MESSAGE TO BAOS FOR THE REPLACEMENT OF THE SAID EXTENSION ALREADY REPLCED LAST OCTOBER 10, 2012 WAITING FOR THE QUOTATION UNTIL OCTOBER 24, 2012

NOT YET REPLACED

NO INITIATED REPAIR DRIVE WHEEL IS SUBJECT FOR REPLACEMENT ALREADY REQUESTED FOR QUOTATION

SM CENTER LAS PIAS WEEKLY REPORT (15OCT TO 21OCT 2012)

Engineering Design & Development

END OF PRESENTATION
-THANK YOU-

SM CENTER LAS PIAS WEEKLY REPORT (15OCT TO 21OCT 2012)

Engineering Design & Development

Das könnte Ihnen auch gefallen