Preservation of Spare Parts and Tools

B 98 01 0 General

Spare parts and tools.


Preservation of supplied spare parts and tools are made as follows: overall machined parts are dipped in Dinitrol 25B partly machined parts are sprayed with Dinitrol 3850 special tools in boxes are protected by a volatile corrosion inhibitor tape Smaller boxes containing special tools such as: grinding machine for valve seats indicator test equipment for fuel valves measuring equipment etc. must be removed from the shipment, inspected for corrosion and stored in a dry place. After inspection the boxes with the spare parts must be closed and covered with tarpaulin.

Storage conditions
The boxes must always be stored under roof, protected from direct rain, sea-fog and dust. The boxes must be covered with tarpaulin.

Maintenance of preservation
Immediately upon arrival the boxes are to be opened and the parts examined for damage to the preservation, and if necessary repaired. This procedure must be repeated every 2-4 months depending on the storage conditions.

Cleaning of parts can be made with petroleum, turpentine or similar solvents.

Notice:Special preservation can be made on request.