CONTENTS
I. II. III. IV. V. VI. VII. PLANS WORK 1 40mm THK CONCRETE COVER STRIPPING WORK 2 PEDESTAL CORE TEST (3 COLUMNS) WORK 3 REBOUND HAMMER TEST (3 COLUMNS) WORK 4 EXPLORATORY WORKS FOR ANCHOR BOLTS WORK 5 EXPLORATORY WORKS FOR FOOTING WORK 6 EXPLORATORY WORKS FOR PILE
P L A N S
Universal Testing Laboratory and Inspection, Inc. 147 Pasig Boulevard, Pasig City
FIELD REPORT
CLIENT : PROJECT : LOCATION : ACTIVITIES :
NORTHERN CEMENT CORPORATION PREHEATER LINE 1 AND 2 Labayug, Sison, Pangasinan As shown 40mm THK. CONCRETE COVER STRIPPING
DATA GATHERED :
a. 40mm thk concrete cover was stripped. b. Three (3) vertical 25mm bars were revealed at one side of the column. c. 10mm ties were found spaced at 300mm on center.
SITE PHOTOGRAPH/s :
Universal Testing Laboratory and Inspection, Inc. 147 Pasig Boulevard, Pasig City
FIELD REPORT
CLIENT : PROJECT : LOCATION : ACTIVITIES :
NORTHERN CEMENT CORPORATION PREHEATER LINE 1 AND 2 Labayug, Sison, Pangasinan As shown PEDESTAL CORE TEST (3 COLUMNS)
DATA GATHERED :
a. Three concrete columns were subjected for core extraction. b. The cored samples were tested for compressive strength determination. * Compressive strength test results are attached herewith.
SITE PHOTOGRAPH/s :
Universal Testing Laboratory and Inspection, Inc. 147 Pasig Boulevard, Pasig City
Universal Testing Laboratory and Inspection, Inc. 147 Pasig Boulevard, Pasig City
FIELD REPORT
CLIENT : PROJECT : LOCATION : ACTIVITIES :
NORTHERN CEMENT CORPORATION PREHEATER LINE 1 AND 2 Labayug, Sison, Pangasinan As shown REBOUND HAMMER TEST (3 COLUMNS)
DATA GATHERED :
a. Three concrete columns were tested by Rebound Hammer. b. Test results are attached herewith.
SITE PHOTOGRAPH/s :
UNIVERSAL TESTING LABORATORY AND INSPECTION, INC 147 Pasig Boulevard, Pineda Extension, Pasig City
NORTHERN CEMENT CORPORATION PREHEATER LINE 1 AND 2 COLUMNS (C6, E7, A8) EXPLORATORY WORKS
COLUMN C6
40 35 35 32 39 38 36 35 36 35 34 34 35.75
E7
34 36 32 34 33 35 34 35 37 36 34 32 34.33
A8
36 35 36 35 34 34 32 35 34 35 34 33 34.42 152.4 152.4
REMARKS
Universal Testing Laboratory and Inspection, Inc. 147 Pasig Boulevard, Pasig City
FIELD REPORT
CLIENT : PROJECT : LOCATION : ACTIVITIES :
NORTHERN CEMENT CORPORATION PREHEATER LINE 1 AND 2 Labayug, Sison, Pangasinan As shown EXPLORATORY WORKS FOR ANCHOR BOLTS
DATA GATHERED :
a. Concrete encasement of column E8 was removed to reveal the anchor bolts. b. Two (2) bolts were exposed at one side and a total of four (4) for both sides. c. Depth of bolt on the concrete is 1000mm as determined by rebar scanner.
SITE PHOTOGRAPH/s :
Universal Testing Laboratory and Inspection, Inc. 147 Pasig Boulevard, Pasig City
FIELD REPORT
CLIENT : PROJECT : LOCATION : ACTIVITIES :
NORTHERN CEMENT CORPORATION PREHEATER LINE 1 AND 2 Labayug, Sison, Pangasinan As shown EXPLORATORY WORKS FOR FOOTING
DATA GATHERED :
a. The quadrant depth of Footing E8 is excavated to reveal the existing foundation. b. The Isolated Footing is found out to measure 2200mm x 2600mm.
SITE PHOTOGRAPH/s :
Universal Testing Laboratory and Inspection, Inc. 147 Pasig Boulevard, Pasig City
FIELD REPORT
CLIENT : PROJECT : LOCATION : ACTIVITIES :
NORTHERN CEMENT CORPORATION PREHEATER LINE 1 AND 2 Labayug, Sison, Pangasinan As shown EXPLORATORY WORKS FOR FOOTING
DATA GATHERED :
c. The footing is 1000mm thick. d. Exising mountain soil material is clay and reddish brown in color.
SITE PHOTOGRAPH/s :
Universal Testing Laboratory and Inspection, Inc. 147 Pasig Boulevard, Pasig City
FIELD REPORT
CLIENT : PROJECT : LOCATION : ACTIVITIES :
NORTHERN CEMENT CORPORATION PREHEATER LINE 1 AND 2 Labayug, Sison, Pangasinan As shown EXPLORATORY WORKS FOR PILE
DATA GATHERED :
a. The isolated footing is supported by 400mm x 400mm concrete piles. b. No visible cracks and no significant deteriotation are observed on the pile.
SITE PHOTOGRAPH/s :
Universal Testing Laboratory and Inspection, Inc. 147 Pasig Boulevard, Pasig City
FIELD REPORT
CLIENT : PROJECT : LOCATION : ACTIVITIES :
NORTHERN CEMENT CORPORATION PREHEATER LINE 1 AND 2 Labayug, Sison, Pangasinan As shown THICKNESS DETERMINATION OF STRUCTURAL STEEL AND WELD TEST
DATA GATHERED :
a. Thickness gaging were conducted on specified colums and beams using UT apparatus.
b. Existing welds were already corroded. c. Test reports are attached herewith.
SITE PHOTOGRAPH/s :
Client : Project :
Area Inspected: Ultrasonic Unit: Serial No.: Calibration Block: Couplant Used: Probe Details: Probe Frequency: Date of Examination:
COLUMN USM GO
USMGO10020029
V2 BLOCK WALL PAPER PASTE DUAL NORMAL PROBE 4 MHZ AUGUST 8-17, 2012 Page 1 of 1
Client : Project :
Area Inspected: Ultrasonic Unit: Serial No.: Calibration Block: Couplant Used: Probe Details: Probe Frequency: Date of Examination:
COLUMN USM GO
USMGO10020029
V2 BLOCK WALL PAPER PASTE DUAL NORMAL PROBE 4 MHZ AUGUST 8-17, 2012 Page 1 of 1
Client : Project :
Area Inspected: Ultrasonic Unit: Serial No.: Calibration Block: Couplant Used: Probe Details: Probe Frequency: Date of Examination:
COLUMN USM GO
USMGO10020029
V2 BLOCK WALL PAPER PASTE DUAL NORMAL PROBE 4 MHZ AUGUST 8-17, 2012 Page 1 of 1
Client : Project :
Area Inspected: Ultrasonic Unit: Serial No.: Calibration Block: Couplant Used: Probe Details: Probe Frequency: Date of Examination:
COLUMN USM GO
USMGO10020029
V2 BLOCK WALL PAPER PASTE DUAL NORMAL PROBE 4 MHZ AUGUST 8-17, 2012 Page 1 of 1
Client : Project :
Area Inspected: Ultrasonic Unit: Serial No.: Calibration Block: Couplant Used: Probe Details: Probe Frequency: Date of Examination:
COLUMN USM GO
USMGO10020029
V2 BLOCK WALL PAPER PASTE DUAL NORMAL PROBE 4 MHZ AUGUST 8-17, 2012 Page 1 of 1
Client : Project :
Area Inspected: Ultrasonic Unit: Serial No.: Calibration Block: Couplant Used: Probe Details: Probe Frequency: Date of Examination:
COLUMN USM GO
USMGO10020029
V2 BLOCK WALL PAPER PASTE DUAL NORMAL PROBE 4 MHZ AUGUST 8-17, 2012 Page 1 of 1
Client : Project :
Area Inspected: Ultrasonic Unit: Serial No.: Calibration Block: Couplant Used: Probe Details: Probe Frequency: Date of Examination:
COLUMN USM GO
USMGO10020029
V2 BLOCK WALL PAPER PASTE DUAL NORMAL PROBE 4 MHZ AUGUST 8-17, 2012 Page 1 of 1
Client : Project :
Area Inspected: Ultrasonic Unit: Serial No.: Calibration Block: Couplant Used: Probe Details: Probe Frequency: Date of Examination:
COLUMN USM GO
USMGO10020029
V2 BLOCK WALL PAPER PASTE DUAL NORMAL PROBE 4 MHZ AUGUST 8-17, 2012 Page 1 of 1
Client : Project :
Area Inspected: Ultrasonic Unit: Serial No.: Calibration Block: Couplant Used: Probe Details: Probe Frequency: Date of Examination:
COLUMN USM GO
USMGO10020029
V2 BLOCK WALL PAPER PASTE DUAL NORMAL PROBE 4 MHZ AUGUST 8-17, 2012 Page 1 of 1
Client : Project :
Area Inspected: Ultrasonic Unit: Serial No.: Calibration Block: Couplant Used: Probe Details: Probe Frequency: Date of Examination:
COLUMN USM GO
USMGO10020029
V2 BLOCK WALL PAPER PASTE DUAL NORMAL PROBE 4 MHZ AUGUST 8-17, 2012 Page 1 of 1
Client : Project :
Area Inspected: Ultrasonic Unit: Serial No.: Calibration Block: Couplant Used: Probe Details: Probe Frequency: Date of Examination:
COLUMN USM GO
USMGO10020029
V2 BLOCK WALL PAPER PASTE DUAL NORMAL PROBE 4 MHZ AUGUST 8-17, 2012 Page 1 of 1
Client : Project :
Area Inspected: Ultrasonic Unit: Serial No.: Calibration Block: Couplant Used: Probe Details: Probe Frequency: Date of Examination:
COLUMN USM GO
USMGO10020029
V2 BLOCK WALL PAPER PASTE DUAL NORMAL PROBE 4 MHZ AUGUST 8-17, 2012 Page 1 of 1
Client : Project :
Area Inspected: Ultrasonic Unit: Serial No.: Calibration Block: Couplant Used: Probe Details: Probe Frequency: Date of Examination:
COLUMN USM GO
USMGO10020029
V2 BLOCK WALL PAPER PASTE DUAL NORMAL PROBE 4 MHZ AUGUST 8-17, 2012 Page 1 of 1
Client : Project :
Area Inspected: Ultrasonic Unit: Serial No.: Calibration Block: Couplant Used: Probe Details: Probe Frequency: Date of Examination:
COLUMN USM GO
USMGO10020029
V2 BLOCK WALL PAPER PASTE DUAL NORMAL PROBE 4 MHZ AUGUST 8-17, 2012 Page 1 of 1
Client : Project :
Area Inspected: Ultrasonic Unit: Serial No.: Calibration Block: Couplant Used: Probe Details: Probe Frequency: Date of Examination:
COLUMN USM GO
USMGO10020029
V2 BLOCK WALL PAPER PASTE DUAL NORMAL PROBE 4 MHZ AUGUST 8-17, 2012 Page 1 of 1
Client : Project :
Area Inspected: Ultrasonic Unit: Serial No.: Calibration Block: Couplant Used: Probe Details: Probe Frequency: Date of Examination:
COLUMN USM GO
USMGO10020029
V2 BLOCK WALL PAPER PASTE DUAL NORMAL PROBE 4 MHZ AUGUST 8-17, 2012 Page 1 of 1
Client : Project :
Area Inspected: Ultrasonic Unit: Serial No.: Calibration Block: Couplant Used: Probe Details: Probe Frequency: Date of Examination:
COLUMN USM GO
USMGO10020029
V2 BLOCK WALL PAPER PASTE DUAL NORMAL PROBE 4 MHZ AUGUST 8-17, 2012 Page 1 of 1
Client : Project :
Area Inspected: Ultrasonic Unit: Serial No.: Calibration Block: Couplant Used: Probe Details: Probe Frequency: Date of Examination:
COLUMN USM GO
USMGO10020029
V2 BLOCK WALL PAPER PASTE DUAL NORMAL PROBE 4 MHZ AUGUST 8-17, 2012 Page 1 of 1
Client : Project :
Area Inspected: Ultrasonic Unit: Serial No.: Calibration Block: Couplant Used: Probe Details: Probe Frequency: Date of Examination:
COLUMN USM GO
USMGO10020029
V2 BLOCK WALL PAPER PASTE DUAL NORMAL PROBE 4 MHZ AUGUST 8-17, 2012 Page 1 of 1
Client : Project :
Area Inspected: Ultrasonic Unit: Serial No.: Calibration Block: Couplant Used: Probe Details: Probe Frequency: Date of Examination:
COLUMN USM GO
USMGO10020029
V2 BLOCK WALL PAPER PASTE DUAL NORMAL PROBE 4 MHZ AUGUST 8-17, 2012 Page 1 of 1
Client : Project :
Area Inspected: Ultrasonic Unit: Serial No.: Calibration Block: Couplant Used: Probe Details: Probe Frequency: Date of Examination:
COLUMN USM GO
USMGO10020029
V2 BLOCK WALL PAPER PASTE DUAL NORMAL PROBE 4 MHZ AUGUST 8-17, 2012 Page 1 of 1