leo q/u) y'lant*TAY

Date : Sept -2013

Summary oq the project


Up to DPC

15973635.00
9227138.00
12132613.00
14392463.00
7367053.00

Ground floor =
First floor =
Second floor =
Top floor =

Total
Sanitaryworks
Electrical works @7.5o/o
Total

@7.5%=
=

59092902.00
4431967,65
4431967.65
67956837.30

Roof floor, gajur, parapet etc = 4500000.00


Decorative works for puja hall = 7500000.00
5000000.00
Outer decorative works =

Total
Contingency charge @ 4o/o

80456837.30
3218273.49

Grand total = NRs.


836751 1f .00
ln words :
(Rupees eighty three millions six hundred seventy five thousands
one hundred eleven)

IUS$ = 836751

.1

1 @ 1$ = NRs. 100I