Sie sind auf Seite 1von 111

A.

ANALISA HARGA SATUAN PEKERJAAN PERSIAPAN


No.
A-01

A-02

A-03

A-04

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M' Pagar Sementara Dari Kayu Tinggi 2 m
- Dolken Kayu 8-10 / 400 cm
Btg
1.2500
30,800.00
- Semen Portland
Kg
2.5000
1,548.00
- Pasir beton
M3
0.0050
281,000.00
- Koral Beton 2/3
M3
0.0090
232,200.00
- Kayu balok terentang
M3
0.0720
2,905,000.00
- Paku Biasa 2" - 5"
Kg
0.0600
20,700.00
- Residu
Kg
0.4000
9,000.00
- Pekerja
Oh
0.4000
50,000.00
- Tukang Kayu
Oh
0.2000
70,000.00
- Kepala Tukang
Oh
0.0200
80,000.00
- Mandor
Oh
0.0200
85,000.00
Jumlah
Dibulatkan
1 M' Pagar Sementara Seng Gelombang Tinggi 2 m
- Dolken Kayu 8-10 / 400 cm
Btg
1.2500
30,800.00
- Semen Portland
Kg
2.5000
1,548.00
- Seng Gelombang BJLS-30
Lbr
1.2000
69,500.00
- Pasir beton
M3
0.0050
281,000.00
- Koral Beton 2/3
M3
0.0090
232,200.00
- Kayu balok terentang
M3
0.0720
2,905,000.00
- Paku Biasa 2" - 5"
Kg
0.0600
20,700.00
- Meni Besi
Kg
0.4500
33,500.00
- Pekerja
Oh
0.4000
50,000.00
- Tukang Kayu
Oh
0.2000
70,000.00
- Kepala Tukang
Oh
0.0200
80,000.00
- Mandor
Oh
0.0200
85,000.00
Jumlah
Dibulatkan
1 M' Pagar SementaraKawat Duri Tinggi 1,80 m
- Dolken Kayu 8-10 / 400 cm
Btg
1.0000
30,800.00
- Semen Portland
Kg
2.0000
1,548.00
- Kawat Duri
Kg
2.5000
70,000.00
- Pasir beton
M3
0.0050
281,000.00
- Koral Beton 2/3
M3
0.0090
232,200.00
- Paku Biasa 2" - 5"
Kg
0.0600
20,700.00
- Pekerja
Oh
0.3000
50,000.00
- Tukang Kayu
Oh
0.2000
70,000.00
- Kepala Tukang
Oh
0.0200
80,000.00
- Mandor
Oh
0.0200
85,000.00
Jumlah
Dibulatkan
1 M2 Pengukuran Dan Pasang Bouwplnk
- Kayu kaso 5/7
M3
0.0120
3,692,500.00
- Paku Biasa 2" - 5"
Kg
0.0200
20,700.00
- Kayu papan albasia
M3
0.0070
2,279,000.00
- Pekerja
Oh
0.1000
50,000.00

HARGA
(Rp)
38,500.00
3,870.00
1,405.00
2,089.80
209,160.00
1,242.00
3,600.00
20,000.00
14,000.00
1,600.00
1,700.00
297,166.80
297,167.00
38,500.00
3,870.00
83,400.00
1,405.00
2,089.80
209,160.00
1,242.00
15,075.00
20,000.00
14,000.00
1,600.00
1,700.00
392,041.80
392,042.00
30,800.00
3,096.00
175,000.00
1,405.00
2,089.80
1,242.00
15,000.00
14,000.00
1,600.00
1,700.00
245,932.80
245,933.00
44,310.00
414.00
15,953.00
5,000.00

Page 1

No.

URAIAN
- Tukang Kayu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan

SATUAN VOLUME HARGA SATUAN


(Rp)
Oh
0.1000
70,000.00
Oh
0.0100
80,000.00
Oh
0.0050
85,000.00

HARGA
(Rp)
7,000.00
800.00
425.00
73,902.00
73,902.00

Page 2

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
A-05 1 M2 Pembuatan Kantor Sementara dgn Lantai Diplester
- Dolken Kayu 8-10 / 400 cm
Btg
1.2500
30,800.00
- Kayu Balok terentang
M3
0.1800
2,905,000.00
- Paku Biasa
Kg
0.8500
20,700.00
- Besi Strip
Kg
1.1000
29,500.00
- Semen Portland
Kg
35.0000
1,548.00
- Pasir Pasang
M3
0.1500
256,800.00
- Pasir beton
M3
0.1000
281,000.00
- Koral Beton2/3
M3
0.1500
232,200.00
- Bata Merah
Bh
30.0000
850.00
- Seng Plat
m'
0.2500
17,400.00
- Kawat harmonika
M2
2.0000
40,000.00
- Kaca Polos 3mm
M2
0.0800
96,200.00
- Kunci Tanam
Bh
0.1500
104,000.00
- Plywood 120 x 240 x 0,4 cm
Lbr
0.0600
145,000.00
- Pekerja
Oh
2.0000
50,000.00
- Tukang Kayu
Oh
2.0000
70,000.00
- Tukang Batu
Oh
1.0000
70,000.00
- Kepala Tukang
Oh
0.3000
80,000.00
- Mandor
Oh
0.0500
85,000.00
Jumlah
Dibulatkan
A-06 1 M2 Pembuatan Gudang Semen dan Alat-alat
- Dolken Kayu 8-10 / 400 cm
Btg
1.7000
30,800.00
- Kayu balok terentang
M3
0.2100
2,905,000.00
- Paku Biasa
Kg
0.3000
20,700.00
- Semen Portland
Kg
10.5000
1,548.00
- Pasir Beton
M3
0.0300
281,000.00
- Koral Beton 2/3
M3
0.0500
232,200.00
- Seng Gelombang BJLS 30
Lbr
1.5000
69,500.00
- Pekerja
Oh
1.0000
50,000.00
- Tukang Kayu
Oh
2.0000
70,000.00
- Kepala Tukang
Oh
0.2000
80,000.00
- Mandor
Oh
0.0500
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
38,500.00
522,900.00
17,595.00
32,450.00
54,180.00
38,520.00
28,100.00
34,830.00
25,500.00
4,350.00
80,000.00
7,696.00
15,600.00
8,700.00
100,000.00
140,000.00
70,000.00
24,000.00
4,250.00
1,247,171.00
1,247,171.00
52,360.00
610,050.00
6,210.00
16,254.00
8,430.00
11,610.00
104,250.00
50,000.00
140,000.00
16,000.00
4,250.00
1,019,414.00
1,019,414.00

Page 3

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)

A-07 1 M2 Pembuatan Bedeng Buruh


- Dolken Kayu 8-10 / 400 cm
Btg
- Kayu balok terentang
M3
- Paku Biasa
Kg
- Semen Portland
Kg
- Pasir Beton
M3
- Koral Beton 2/3
M3
- Seng Gelombang BJLS 30
Lbr
- Pekerja
Oh
- Tukang Kayu
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
A-08 1 M2 Membersihkan Lapangan dan Perataan
- Pekerja
Oh
- Mandor
Oh
Jumlah
Dibulatkan
A-09 1M2 Pembuatan Jalan Sementara
- Batu Belah 15/20
M3
- Batu Pecah 5/7
M3
- Pasir Pasang
M3
- Pekerja
Oh
- Mandor
Oh
Jumlah
Dibulatkan
A-10 1 M3 Bongkaran Beton Bertulang
- Pekerja
Oh
- Mandor
Oh
Jumlah
Dibulatkan
A-11 1 M3 Bongkaran Dinding Tembok Bata Merah
- Pekerja
Oh
- Mandor
Oh
Jumlah
Dibulatkan

HARGA
(Rp)

1.2500
0.1860
0.3000
18.0000
0.0300
0.0500
1.5000
1.0000
2.0000
0.2000
0.0500

30,800.00
2,905,000.00
20,700.00
1,548.00
281,000.00
232,200.00
69,500.00
50,000.00
70,000.00
80,000.00
85,000.00

38,500.00
540,330.00
6,210.00
27,864.00
8,430.00
11,610.00
104,250.00
50,000.00
140,000.00
16,000.00
4,250.00
947,444.00
947,444.00

0.1000
0.0500

50,000.00
85,000.00

5,000.00
4,250.00
9,250.00
9,250.00

0.1500
0.0900
0.0100
1.0000
0.0500

226,100.00
215,600.00
256,800.00
50,000.00
85,000.00

33,915.00
19,404.00
2,568.00
50,000.00
4,250.00
110,137.00
110,137.00

6.6670
0.3330

50,000.00
85,000.00

333,350.00
28,305.00
361,655.00
361,655.00

6.6670
0.0330

50,000.00
85,000.00

333,350.00
2,805.00
336,155.00
336,155.00

Page 4

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
A-12 1 M Pagar beton Pracetak ( 5 x 50 x 213 ) cm
- Panel Beton Pracetak
Lbr
0.9860
200,900.00
- Kolom Beton Pracetak
Btg
0.5250
290,500.00
- Pasir Beton
M3
0.0740
281,000.00
- Koral 2/3
M3
0.1460
232,200.00
- Semen abu - abu
Kg
45.0000
1,548.00
- Pekerja
Oh
0.3750
50,000.00
- Tukang Batu
Oh
0.1250
70,000.00
- Kepala Tukang
Oh
0.0120
80,000.00
- Mandor
Oh
0.0190
85,000.00
Jumlah
Dibulatkan
A-13 1 M Pagar kawat ayam tiang besi L50.50.5, tinggi 1 m'
- Kawat ram ayam
Lbr
0.4340
16,500.00
- Besi siku L 50.50.5
Kg
6.7860
20,200.00
- Besi pelat (1,2 x 3) mm
Kg
0.0424
20,200.00
- Baut
bh
4.0000
700.00
- Semen Portland
Kg
2.5000
1,548.00
- Pasir beton
M3
0.0050
281,000.00
- Koral Beton 2/3
M3
0.0090
232,200.00
- Pekerja
Oh
0.3750
50,000.00
- Tukang Batu
Oh
0.1250
70,000.00
- Kepala Tukang
Oh
0.0120
80,000.00
- Mandor
Oh
0.0190
85,000.00
Jumlah
Dibulatkan
A-14 1 M2 Pagar BRC lengkap dengan tiang
- BRC lengkap dengan tiang
Lbr
0.4340
188,500.00
- Semen Portland
Kg
2.0000
1,548.00
- Kawat Duri
Kg
2.5000
70,000.00
- Pasir beton
M3
0.0050
281,000.00
- Koral Beton 2/3
M3
0.0090
232,200.00
- Pekerja
Oh
0.3750
50,000.00
- Tukang Batu
Oh
0.1250
70,000.00
- Kepala Tukang
Oh
0.0120
80,000.00
- Mandor
Oh
0.0190
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
198,087.40
152,512.50
20,794.00
33,901.20
69,660.00
18,750.00
8,750.00
960.00
1,615.00
505,030.10
505,030.00
7,161.00
137,077.20
856.28
2,800.00
3,870.00
1,405.00
2,089.80
18,750.00
8,750.00
960.00
1,615.00
185,334.28
185,334.00
81,809.00
3,096.00
175,000.00
1,405.00
2,089.80
18,750.00
8,750.00
960.00
1,615.00
293,474.80
293,475.00

Page 5

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
A-15 1 M2 Steiger Werk / perancah dari Bambu
btng
1.0000
- Bambu 6 - 10 (600) cm
27,500.00
kg
0.2500
- Tali ijuk
25,800.00
org
0.2500
- Pekerja
50,000.00
org
0.0170
- Tukang kayu
70,000.00
org
0.0020
- Kepala tukang
80,000.00
org
0.0130
- Mandor
85,000.00
Jumlah
Dibulatkan
A-16 1 M' Cerucuk Bambu
btng
1.2500
- Bambu 7 -10 (400) cm
27,500.00
org
0.5000
- Pekerja
50,000.00
org
0.0250
- Mandor
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
27,500.00
6,450.00
12,500.00
1,190.00
160.00
1,105.00
48,905.00
48,905.00
34,375.00
25,000.00
2,125.00
61,500.00
61,500.00

Page 6

B. ANALISA HARGA SATUAN PEKERJAAN TANAH


No.
B-01

B-02

B-03

B-04

B-05

B-06

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M3 Galian Tanah Biasa sedalam 1 m
- Pekerja
Oh
0.4000
50,000.00
- Mandor
Oh
0.0400
85,000.00
Jumlah
Dibulatkan
1 M3 Galian Tanah Biasa Sedalam 2 m
- Pekerja
Oh
0.5260
50,000.00
- Mandor
Oh
0.0520
85,000.00
Jumlah
Dibulatkan
1 M3 Galian Tanah Biasa Sedalam 3 m
- Pekerja
Oh
0.7350
50,000.00
- Mandor
Oh
0.0730
85,000.00
Jumlah
Dibulatkan
1 M3 Galian Tanah Keras Sedalam 1 m
- Pekerja
Oh
0.6250
50,000.00
- Mandor
Oh
0.0620
85,000.00
Jumlah
Dibulatkan
1 M3 Galian Tanah Lumpur Sedalam 1 m
- Pekerja
Oh
0.8230
50,000.00
- Mandor
Oh
0.0830
85,000.00
Jumlah
Dibulatkan
1 M2 Pekerjaan Stripping Setinggi 10 cm
- Pekerja
Oh
0.0500
50,000.00
- Mandor
Oh
0.0050
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
20,000.00
3,400.00
23,400.00
23,400.00
26,300.00
4,420.00
30,720.00
30,720.00
36,750.00
6,205.00
42,955.00
42,955.00
31,250.00
5,270.00
36,520.00
36,520.00
41,150.00
7,055.00
48,205.00
48,205.00
2,500.00
425.00
2,925.00
2,925.00

Page 7

No.
B-07

B-08

B-09

B-10

B-11

B-12

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M3 Pembuangan Tanah sejauh 150 m
- Pekerja
Oh
0.5160
50,000.00
- Mandor
Oh
0.0500
85,000.00
Jumlah
Dibulatkan
1 M3 Urugan Kembali
- Pekerja
Oh
0.1920
50,000.00
- Mandor
Oh
0.0190
85,000.00
Jumlah
Dibulatkan
1 M3 Pemadatan Tanah
- Pekerja
Oh
0.5000
50,000.00
- Mandor
Oh
0.0500
85,000.00
Jumlah
Dibulatkan
1 M3 Urugaan Pasir
- Pasir Urug
M3
1.2000
192,800.00
- Pekerja
Oh
0.3000
50,000.00
- Mandor
Oh
0.0100
85,000.00
Jumlah
Dibulatkan
1 M2 Pemasangan Lapisan Ijuk Tebal 10 cm
- Ijuk
m2
1.2000
24,500.00
- Pekerja
Oh
0.1500
50,000.00
- Mandor
Oh
0.0150
85,000.00
Jumlah
Dibulatkan
1 M3 Urugan Sirtu
- Sirtu
M3
1.2000
224,500.00
- Pekerja
Oh
0.2500
50,000.00
- Mandor
Oh
0.0250
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
25,800.00
4,250.00
30,050.00
30,050.00
9,600.00
1,615.00
11,215.00
11,215.00
25,000.00
4,250.00
29,250.00
29,250.00
231,360.00
15,000.00
850.00
247,210.00
247,210.00
29,400.00
7,500.00
1,275.00
38,175.00
38,175.00
269,400.00
12,500.00
2,125.00
284,025.00
284,025.00

Page 8

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)

B-13 1 M3 Urugan Tanah Pilihan


- Tanah urug pilihan
M3
- Pekerja
Oh
- Mandor
Oh
Jumlah
Dibulatkan
B-14 1 M2 Pembuatan jalan sementara, tebal 25 cm
- Batu belah
M3
- Kerikil
M3
- Pasir Urug
M3
- Pekerja
Oh
- Mandor
Oh
Jumlah
Dibulatkan

HARGA
(Rp)

1.2000
0.2500
0.0250

98,200.00
50,000.00
85,000.00

117,840.00
12,500.00
2,125.00
132,465.00
132,465.00

0.2750
0.0300
0.0500
1.0000
0.1000

226,100.00
190,000.00
192,800.00
50,000.00
85,000.00

62,177.50
5,700.00
9,640.00
50,000.00
8,500.00
136,017.50
136,018.00

Page 9

C. ANALISA HARGA SATUAN PEKERJAAN PONDASI


No.
C-01

C-02

C-03

C-04

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M3 Pasanag Pondasi batu Kali adk 1pc : 3 ps
- Batu Belah
M3
1.1000
226,100.00
- Semen Portland
Kg
202.0000
1,548.00
- Pasir Pasang
M3
0.4850
256,800.00
- Pekerja
Oh
1.5000
50,000.00
- Tukang Batu
Oh
0.6000
70,000.00
- Kepala Tukang
Oh
0.0600
80,000.00
- Mandor
Oh
0.0750
85,000.00
Jumlah
Dibulatkan
1 M3 Pasang Pondasi Batu kali adk 1pc : 4ps
- Batu Belah
M3
1.1000
226,100.00
- Semen Portland
Kg
163.0000
1,548.00
- Pasir Pasang
M3
0.5200
256,800.00
- Pekerja
Oh
1.5000
50,000.00
- Tukang Batu
Oh
0.6000
70,000.00
- Kepala Tukang
Oh
0.0600
80,000.00
- Mandor
Oh
0.0750
85,000.00
Jumlah
Dibulatkan
1 M3 Pasang Pondasi Batu kali adk 1pc : 5ps
- Batu Belah
M3
1.1000
226,100.00
- Semen Portland
Kg
136.0000
1,548.00
- Pasir Pasang
M3
0.5440
256,800.00
- Pekerja
Oh
1.5000
50,000.00
- Tukang Batu
Oh
0.6000
70,000.00
- Kepala Tukang
Oh
0.0600
80,000.00
- Mandor
Oh
0.0750
85,000.00
Jumlah
Dibulatkan
1 M3 Pasang Pondasi Batu Kosong (aanstamping)
- Batu Belah
M3
1.2000
226,100.00
- Pasir Urug
M3
0.3000
192,800.00
- Pekerja
Oh
0.7800
50,000.00
- Tukang Batu
Oh
0.3900
70,000.00
- Kepala Tukang
Oh
0.0390
80,000.00
- Mandor
Oh
0.0390
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
248,710.00
312,696.00
124,548.00
75,000.00
42,000.00
4,800.00
6,375.00
814,129.00
814,129.00
248,710.00
252,324.00
133,536.00
75,000.00
42,000.00
4,800.00
6,375.00
762,745.00
762,745.00
248,710.00
210,528.00
139,699.20
75,000.00
42,000.00
4,800.00
6,375.00
727,112.20
727,112.00
271,320.00
57,840.00
39,000.00
27,300.00
3,120.00
3,315.00
401,895.00
401,895.00

Page 10

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
C-05 1 M3 Beton siklop adk 1pc : 2ps : 3kr + 40 % Batu Belah dgn besi tulangan
- Besi Beton
Kg
75.0000
22,800.00
- Semen Portland
Kg
202.0000
1,548.00
- Pasir Beton
m3
0.3200
281,000.00
- Koral Beton 2/3
m3
0.4900
232,200.00
- Kawat Beton
Kg
0.8000
30,500.00
- Batu Belah
m3
0.4500
226,100.00
- Pekerja
Oh
3.0000
50,000.00
- Tukang Batu
Oh
0.8500
70,000.00
- Kepala Tukang
Oh
0.0850
80,000.00
- Mandor
Oh
0.1500
85,000.00
Jumlah
Dibulatkan
C-06 1 M3 Pasang Pondasi Sumuran adk 1pc:2ps:3kr + 40 % Batu Belah (D= 1m)
- Batu Belah
M3
0.4500
226,100.00
- Semen Portland
Kg
280.0000
1,548.00
- Pasir Beton
M3
0.4500
281,000.00
- Koral Beton
M3
0.6700
232,200.00
- Pekerja
Oh
2.3800
50,000.00
- Tukang Batu
Oh
0.3000
70,000.00
- Kepala Tukang
Oh
0.0300
80,000.00
- Mandor
Oh
0.0800
85,000.00
Jumlah
Dibulatkan
C-07 1 M3 Pondasi siklop adk 1pc:2ps:3kr + 40 % Batu Belah
- Batu Belah
M3
0.4500
226,100.00
- Semen Portland
Kg
202.0000
1,548.00
- Pasir Beton
M3
0.3200
281,000.00
- Koral Beton
M3
0.4900
232,200.00
- Pekerja
Oh
3.0000
50,000.00
- Tukang Batu
Oh
0.8500
70,000.00
- Kepala Tukang
Oh
0.0850
80,000.00
- Mandor
Oh
0.1500
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
1,710,000.00
312,696.00
89,920.00
113,778.00
24,400.00
101,745.00
150,000.00
59,500.00
6,800.00
12,750.00
2,581,589.00
2,581,589.00
101,745.00
433,440.00
126,450.00
155,574.00
119,000.00
21,000.00
2,400.00
6,800.00
966,409.00
966,409.00
101,745.00
312,696.00
89,920.00
113,778.00
150,000.00
59,500.00
6,800.00
12,750.00
847,189.00
847,189.00

Page 11

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
C-08 1 M' Pembuatan Tiang Pancang (40x40) cm, Beton Tulang
- Pasir Urug
M3
0.0190
192,800.00
- Pasir Beton
M3
0.0940
281,000.00
- Koral Beton
M3
0.1500
232,200.00
- Semen Portland
Kg
60.5000
1,548.00
- Besi Beton
Kg
45.0000
22,800.00
- Kawat Beton
Kg
0.9000
30,500.00
- Kayu balok terentang
M3
0.0320
2,905,000.00
- Paku
Kg
0.1200
20,700.00
- Minyak Bekisting
Ltr
0.0900
60,500.00
- Plamir Tembok
Kg
0.2400
27,500.00
- Pekerja
Oh
1.0000
50,000.00
- Tukang Batu
Oh
0.6700
70,000.00
- Kepala Tukang
Oh
0.0670
80,000.00
- Mandor
Oh
0.0500
85,000.00
Jumlah
Dibulatkan
C-09 1 M' Pembuatan Tiang Pancang (35x35) cm, Beton Tulang
- Pasir Urug
M3
0.0160
192,800.00
- Pasir Beton
M3
0.0800
281,000.00
- Koral Beton
M3
0.1250
232,200.00
- Semen Portland
Kg
49.0000
1,548.00
- Besi Beton
Kg
34.5000
22,800.00
- Kawat Beton
Kg
0.7000
30,500.00
- Kayu balok terentang
M3
0.0270
2,905,000.00
- Paku
Kg
0.1200
20,700.00
- Minyak Bekisting
Ltr
0.0900
60,500.00
- Plamir Tembok
Kg
0.2000
27,500.00
- Pekerja
Oh
0.8000
50,000.00
- Tukang Batu
Oh
0.5000
70,000.00
- Kepala Tukang
Oh
0.0500
80,000.00
- Mandor
Oh
0.0400
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
3,663.20
26,414.00
34,830.00
93,654.00
1,026,000.00
27,450.00
92,960.00
2,484.00
5,445.00
6,600.00
50,000.00
46,900.00
5,360.00
4,250.00
1,426,010.20
1,426,010.00
3,084.80
22,480.00
29,025.00
75,852.00
786,600.00
21,350.00
78,435.00
2,484.00
5,445.00
5,500.00
40,000.00
35,000.00
4,000.00
3,400.00
1,112,655.80
1,112,656.00

Page 12

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
C-10 1 M' Pembuatan Tiang Pancang f 40 cm, Beton Tulang
- Pasir Urug
M3
0.0149
192,800.00
- Pasir Beton
M3
0.0738
281,000.00
- Koral Beton
M3
0.1178
232,200.00
- Semen Portland
Kg
47.4925
1,548.00
- Besi Beton
Kg
45.0000
22,800.00
- Kawat Beton
Kg
0.9000
30,500.00
- Kayu balok terentang
M3
0.0320
2,905,000.00
- Paku
Kg
0.1200
20,700.00
- Minyak Bekisting
Ltr
0.0900
60,500.00
- Plamir Tembok
Kg
0.2400
27,500.00
- Pekerja
Oh
1.0000
50,000.00
- Tukang Batu
Oh
0.6700
70,000.00
- Kepala Tukang
Oh
0.0670
80,000.00
- Mandor
Oh
0.0500
85,000.00
Jumlah
Dibulatkan
C-11 1 M' Memancang Tiang Pancang Beton Tulang
jam
0.1170
- Crawler crane lengkap
1,078,774.00
0.0400
- Pekerja
Oh
50,000.00
0.0020
- Mandor
Oh
85,000.00
Jumlah
Dibulatkan
C-12 1 Buah Memotong Tiang Pancang (40x40) cm Beton Tulang
jam
3.3200
- Pekerja
50,000.00
jam
0.0700
- Kepala Tukang
80,000.00
jam
0.2000
- Mandor
85,000.00
lot
0.3500
- Alat bantu
188,600.00
Jumlah
Dibulatkan
C-13 1 M' Menyambung Tiang Pancang Beton Bertulang
kg
18.3700
- Besi pelat
15,600.00
kg
6.06
- Besi beton
22,800.00
kg
2.20
26,000.00
- Kawat las
org
1.00
70,000.00
- Tukang las
org
2.0000
50,000.00
- Pembantu tukang las
org
0.2000
- Mandor
85,000.00
jam
2.0000
- Mesin las
26,325.00
Jumlah
Dibulatkan

HARGA
(Rp)
2,875.61
20,734.99
27,341.55
73,518.39
1,026,000.00
27,450.00
92,960.00
2,484.00
5,445.00
6,600.00
50,000.00
46,900.00
5,360.00
4,250.00
1,391,919.54
1,391,920.00
126,216.56
2,000.00
170.00
128,386.56
128,387.00
166,000.00
5,600.00
17,000.00
66,010.00
254,610.00
254,610.00
286,572.00
138,168.00
57,200.00
70,000.00
100,000.00
17,000.00
52,650.00
721,590.00
721,590.00

Page 13

D. ANALISA HARGA SATUAN PEKERJAAN BETON


No.
D-01

D-02

D-03

D-04

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M3 Membuat Beton Tumbuk adk 1pc:3ps:5kr
- Semen Portland
Kg
218.0000
1,548.00
- Pasir Beton
M3
0.5200
281,000.00
- Koral Beton
M3
0.8700
232,200.00
- Pekerja
Oh
1.6500
50,000.00
- Tukang Batu
Oh
0.2500
70,000.00
- Kepala Tukang
Oh
0.0250
80,000.00
- Mandor
Oh
0.0800
85,000.00
Jumlah
Dibulatkan
1 M3 Membuat Beton Tumbuk adk 1pc:3ps:6kr
- Semen Portland
Kg
197.0000
1,548.00
- Pasir Beton
M3
0.4700
281,000.00
- Koral Beton
M3
0.9400
232,200.00
- Pekerja
Oh
1.6500
50,000.00
- Tukang Batu
Oh
0.2500
70,000.00
- Kepala Tukang
Oh
0.0250
80,000.00
- Mandor
Oh
0.0800
85,000.00
Jumlah
Dibulatkan
1 M3 Membuat Beton Tumbuk 1pc:2ps:3kr
- Semen Portland
Kg
336.0000
1,548.00
- Pasir Beton
M3
0.5400
281,000.00
- Koral Beton
M3
0.8100
232,200.00
- Pekerja
Oh
2.0000
50,000.00
- Tukang Batu
Oh
0.3500
70,000.00
- Kepala Tukang
Oh
0.0350
80,000.00
- Mandor
Oh
1.0000
85,000.00
Jumlah
Dibulatkan
1 M3 Membuat Tiang Pancang Beton Prestressed
- Semen Portland
Kg
440.0000
1,548.00
- Pasir Beton
M3
0.5000
281,000.00
- Koral Beton
M3
0.8000
232,200.00
- Rapidrant
Gln
2.4600
17,500.00
- Pekerja
Oh
1.6500
50,000.00
- Tukang Batu
Oh
0.2500
70,000.00
- Kepala Tukang
Oh
0.0250
80,000.00
- Mandor
Oh
0.0800
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
337,464.00
146,120.00
202,014.00
82,500.00
17,500.00
2,000.00
6,800.00
794,398.00
794,398.00
304,956.00
132,070.00
218,268.00
82,500.00
17,500.00
2,000.00
6,800.00
764,094.00
764,094.00
520,128.00
151,740.00
188,082.00
100,000.00
24,500.00
2,800.00
85,000.00
1,072,250.00
1,072,250.00
681,120.00
140,500.00
185,760.00
43,050.00
82,500.00
17,500.00
2,000.00
6,800.00
1,159,230.00
1,159,230.00

Page 14

No.
D-05

D-06

D-07

D-08

D-09

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M3 Membuat Beton Tumbuk adk 1pc:2ps:4kr
- Semen Portland
Kg
291.0000
1,548.00
- Pasir Beton
M3
0.4700
281,000.00
- Koral Beton
M3
0.9300
232,200.00
- Pekerja
Oh
2.0000
50,000.00
- Tukang Batu
Oh
0.3500
70,000.00
- Kepala Tukang
Oh
0.0350
80,000.00
- Mandor
Oh
1.0000
85,000.00
Jumlah
Dibulatkan
1 M Memasang PVC Waterstop Lebar 200 mm
- Waterstop Lebar 200 mm
M
1.0500
65,000.00
- Pekerja
Oh
0.0500
50,000.00
- Tukang Batu
Oh
0.0350
70,000.00
- Kepala Tukang
Oh
0.0035
80,000.00
- Mandor
Oh
0.0020
85,000.00
Jumlah
Dibulatkan
1 Kg Pembesian Dengan Besi Polos/ulir
- Besi Beton ( Polos / Ulir )
Kg
1.0500
22,800.00
- Kawat Beton
Kg
0.0150
30,500.00
- Pekerja
Oh
0.0070
50,000.00
- Tukang Besi
Oh
0.0070
70,000.00
- Kepala Tukang
Oh
0.0007
80,000.00
- Mandor
Oh
0.0003
85,000.00
Jumlah
Dibulatkan
1 M2 Pasang Bekesting Untuk Pondasi
- Kayu papan terentang
M3
0.0400
3,135,000.00
- Paku Biasa 2" - 5"
Kg
0.3000
20,700.00
- Minyak Bekisting
Ltr
0.1000
60,500.00
- Pekerja
Oh
0.3000
50,000.00
- Tukang Kayu
Oh
0.2600
70,000.00
- Kepala Tukang
Oh
0.0260
80,000.00
- Mandor
Oh
0.0050
85,000.00
Jumlah
Dibulatkan
1 M2 Pasang Bekisting Untuk Sloof
- Kayu papan terentang
M3
0.0450
3,135,000.00
- Paku Biasa 2" - 5"
Kg
0.3000
20,700.00
- Minyak Bekisting
Ltr
0.1000
60,500.00
- Pekerja
Oh
0.3000
50,000.00
- Tukang Kayu
Oh
0.2600
70,000.00
- Kepala Tukang
Oh
0.0260
80,000.00
- Mandor
Oh
0.0050
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
450,468.00
132,070.00
215,946.00
100,000.00
24,500.00
2,800.00
85,000.00
1,010,784.00
1,010,784.00
68,250.00
2,500.00
2,450.00
280.00
170.00
73,650.00
73,650.00
23,940.00
457.50
350.00
490.00
56.00
25.50
25,319.00
25,319.00
125,400.00
6,210.00
6,050.00
15,000.00
18,200.00
2,080.00
425.00
173,365.00
173,365.00
141,075.00
6,210.00
6,050.00
15,000.00
18,200.00
2,080.00
425.00
189,040.00
189,040.00

Page 15

No.

URAIAN

D-10 1 M2 Pasang Bekesting Untuk Kolom


- Kayu papan terentang
- Paku Biasa 2" - 5"
- Minyak Bekisting
- Kayu balok terentang
- Plywood Tebal 9 mm
- Dolken -8-10/4m
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
D-11 1 M2 Pasang Bekesting Untuk Balok
- Kayu papan terentang
- Paku Biasa 2" - 5"
- Minyak Bekisting
- Kayu balok terentang
- Plywood Tebal 9 mm
- Dolken -8-10/4m
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
D-12 1 M2 Pasang Bekesting Untuk Lantai
- Kayu papan terentang
- Paku Biasa 2" - 5"
- Minyak Bekisting
- Kayu balok terentang
- Plywood Tebal 9 mm
- Dolken -8-10/4m
- Pekerja
- Tukang Kayu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan

SATUAN VOLUME HARGA SATUAN


(Rp)

HARGA
(Rp)

M3
Kg
Ltr
M3
Lbr
Btg
Oh
Oh
Oh
Oh

0.0400
0.4000
0.2000
0.0150
0.3500
2.0000
0.3000
0.3300
0.0330
0.0060

3,135,000.00
20,700.00
60,500.00
2,905,000.00
260,000.00
30,800.00
50,000.00
70,000.00
80,000.00
85,000.00

125,400.00
8,280.00
12,100.00
43,575.00
91,000.00
61,600.00
15,000.00
23,100.00
2,640.00
510.00
383,205.00
383,205.00

M3
Kg
Ltr
M3
Lbr
Btg
Oh
Oh
Oh
Oh

0.0400
0.4000
0.2000
0.0180
0.3500
2.0000
0.3000
0.3300
0.0330
0.0060

3,135,000.00
20,700.00
60,500.00
2,905,000.00
260,000.00
30,800.00
50,000.00
70,000.00
80,000.00
85,000.00

125,400.00
8,280.00
12,100.00
52,290.00
91,000.00
61,600.00
15,000.00
23,100.00
2,640.00
510.00
391,920.00
391,920.00

M3
Kg
Ltr
M3
Lbr
Btg
Oh
Oh
Oh
Oh

0.0400
0.4000
0.2000
0.0150
0.3500
6.0000
0.3000
0.3300
0.0330
0.0060

3,135,000.00
20,700.00
60,500.00
2,905,000.00
260,000.00
30,800.00
50,000.00
70,000.00
80,000.00
85,000.00

125,400.00
8,280.00
12,100.00
43,575.00
91,000.00
184,800.00
15,000.00
23,100.00
2,640.00
510.00
506,405.00
506,405.00

Page 16

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
D-13 1 M2 Pasang Bekesting Untuk Tangga
- Kayu papan terentang
M3
0.0300
3,135,000.00
- Paku Biasa 2" - 5"
Kg
0.4000
20,700.00
- Minyak Bekisting
Ltr
0.1500
60,500.00
- Kayu balok terentang
M3
0.0150
2,905,000.00
- Plywood Tebal 9 mm
Lbr
0.3500
260,000.00
- Dolken -8-10/4m
Btg
2.0000
30,800.00
- Pekerja
Oh
0.3200
50,000.00
- Tukang Kayu
Oh
0.3300
70,000.00
- Kepala Tukang
Oh
0.0330
80,000.00
- Mandor
Oh
0.0060
85,000.00
Jumlah
Dibulatkan
D-14 1 M3 Membuat Beton Cor Mutu K-225
- Semen Portland
Kg
388.0000
1,548.00
- Pasir Beton
m3
0.6500
281,000.00
- Koral Beton 2/3
M3
0.6500
232,200.00
- Air
ltr
215.0000
3,500.00
- Pekerja
Oh
6.0000
50,000.00
- Tukang Batu
Oh
1.0000
70,000.00
- Kepala Tukang
Oh
0.1000
80,000.00
- Mandor
Oh
0.3000
85,000.00
Jumlah
Dibulatkan
D-15 1 M3 Membuat Beton Cor Mutu K-275
- Semen Portland
Kg
400.0000
1,548.00
- Pasir Beton
M3
0.4000
281,000.00
- Koral Beton 2/3
M3
0.8200
232,200.00
- Air
ltr
215.0000
3,500.00
- Pekerja
Oh
6.0000
50,000.00
- Tukang Batu
Oh
1.0000
70,000.00
- Kepala Tukang
Oh
0.1000
80,000.00
- Mandor
Oh
0.3000
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
94,050.00
8,280.00
9,075.00
43,575.00
91,000.00
61,600.00
16,000.00
23,100.00
2,640.00
510.00
349,830.00
349,830.00
600,624.00
182,650.00
150,930.00
752,500.00
300,000.00
70,000.00
8,000.00
25,500.00
2,090,204.00
2,090,204.00
619,200.00
112,400.00
190,404.00
752,500.00
300,000.00
70,000.00
8,000.00
25,500.00
2,078,004.00
2,078,004.00

Page 17

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
D-16 1 M3 Pondasi Beton Tulang (150 kg besi + bekisting)
- Kayu papan terentang
M3
0.2000
3,135,000.00
- Paku Biasa 2" - 5"
Kg
1.5000
20,700.00
- Minyak Bekisting
Ltr
0.4000
60,500.00
- Besi Beton
Kg
150.0000
22,800.00
- Kawat Beton
Kg
2.2500
30,500.00
- Semen Portland
Kg
323.0000
1,548.00
- Pasir Beton
M3
0.5200
281,000.00
- Koral Beton 2/3
M3
0.7800
232,200.00
- Pekerja
Oh
3.9000
50,000.00
- Tukang Batu
Oh
0.3500
70,000.00
- Tukang Kayu
Oh
1.0400
75,000.00
- Tukang Besi
Oh
1.0500
75,000.00
- Kepala Tukang
Oh
0.2450
80,000.00
- Mandor
Oh
0.1650
85,000.00
Jumlah
Dibulatkan
D-17 1 M3 Sloof Beton Tulang (200 kg besi + bekisting)
- Kayu papan terentang
M3
0.2700
3,135,000.00
- Paku Biasa 2" - 5"
Kg
2.0000
20,700.00
- Minyak Bekisting
Ltr
0.6000
60,500.00
- Besi Beton
Kg
200.0000
22,800.00
- Kawat Beton
Kg
3.0000
30,500.00
- Semen Portland
Kg
323.0000
1,548.00
- Pasir Beton
M3
0.5200
281,000.00
- Koral Beton 2/3
M3
0.7800
232,200.00
- Pekerja
Oh
4.8500
50,000.00
- Tukang Batu
Oh
0.3500
70,000.00
- Tukang Kayu
Oh
1.5600
75,000.00
- Tukang Besi
Oh
1.4000
75,000.00
- Kepala Tukang
Oh
0.3310
80,000.00
- Mandor
Oh
0.1700
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
627,000.00
31,050.00
24,200.00
3,420,000.00
68,625.00
500,004.00
146,120.00
181,116.00
195,000.00
24,500.00
78,000.00
78,750.00
19,600.00
14,025.00
5,407,990.00
5,407,990.00
846,450.00
41,400.00
36,300.00
4,560,000.00
91,500.00
500,004.00
146,120.00
181,116.00
242,500.00
24,500.00
117,000.00
105,000.00
26,480.00
14,450.00
6,932,820.00
6,932,820.00

Page 18

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
D-18 1 M3 Kolom Beton Tulang (120 kg besi + bekisting)
- Kayu papan terentang
M3
0.4000
3,135,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
20,700.00
- Minyak Bekisting
Ltr
2.0000
60,500.00
- Besi Beton
Kg
120.0000
22,800.00
- Kawat Beton
Kg
1.8000
30,500.00
- Semen Portland
Kg
323.0000
1,548.00
- Pasir Beton
M3
0.5200
281,000.00
- Koral Beton 2/3
M3
0.7800
232,200.00
- Kayu Balok Terentang
M3
0.1500
2,905,000.00
- Plywood Tebal 9 mm
Lbr
3.5000
260,000.00
- Dolken -8-10/4m
Btg
20.0000
30,800.00
- Pekerja
Oh
7.3000
50,000.00
- Tukang Batu
Oh
0.3500
70,000.00
- Tukang Kayu
Oh
3.3000
75,000.00
- Tukang Besi
Oh
2.1000
75,000.00
- Kepala Tukang
Oh
0.5700
80,000.00
- Mandor
Oh
0.2500
85,000.00
Jumlah
Dibulatkan
D-19 1 M3 Kolom Beton Tulang (140 kg besi + bekisting)
- Kayu papan terentang
M3
0.4000
3,135,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
20,700.00
- Minyak Bekisting
Ltr
2.0000
60,500.00
- Besi Beton
Kg
140.0000
22,800.00
- Kawat Beton
Kg
2.1000
30,500.00
- Semen Portland
Kg
323.0000
1,548.00
- Pasir Beton
M3
0.5200
281,000.00
- Koral Beton 2/3
M3
0.7800
232,200.00
- Kayu Balok Terentang
M3
0.1500
2,905,000.00
- Plywood Tebal 9 mm
Lbr
3.5000
260,000.00
- Dolken -8-10/4m
Btg
20.0000
30,800.00
- Pekerja
Oh
7.3000
50,000.00
- Tukang Batu
Oh
0.3500
70,000.00
- Tukang Kayu
Oh
3.3000
75,000.00
- Tukang Besi
Oh
2.1000
75,000.00
- Kepala Tukang
Oh
0.5700
80,000.00
- Mandor
Oh
0.2500
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
1,254,000.00
82,800.00
121,000.00
2,736,000.00
54,900.00
500,004.00
146,120.00
181,116.00
435,750.00
910,000.00
616,000.00
365,000.00
24,500.00
247,500.00
157,500.00
45,600.00
21,250.00
7,899,040.00
7,899,040.00
1,254,000.00
82,800.00
121,000.00
3,192,000.00
64,050.00
500,004.00
146,120.00
181,116.00
435,750.00
910,000.00
616,000.00
365,000.00
24,500.00
247,500.00
157,500.00
45,600.00
21,250.00
8,364,190.00
8,364,190.00

Page 19

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
D-20 1 M3 Kolom Beton Tulang (150 kg besi + bekisting)
- Kayu papan terentang
M3
0.4000
3,135,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
20,700.00
- Minyak Bekisting
Ltr
2.0000
60,500.00
- Besi Beton
Kg
150.0000
22,800.00
- Kawat Beton
Kg
2.4000
30,500.00
- Semen Portland
Kg
323.0000
1,548.00
- Pasir Beton
M3
0.5200
281,000.00
- Koral Beton 2/3
M3
0.7800
232,200.00
- Kayu Balok Terentang
M3
0.1500
2,905,000.00
- Plywood Tebal 9 mm
Lbr
3.5000
260,000.00
- Dolken -8-10/4m
Btg
20.0000
30,800.00
- Pekerja
Oh
7.3000
50,000.00
- Tukang Batu
Oh
0.3500
70,000.00
- Tukang Kayu
Oh
3.3000
75,000.00
- Tukang Besi
Oh
2.1000
75,000.00
- Kepala Tukang
Oh
0.5700
80,000.00
- Mandor
Oh
0.2500
85,000.00
Jumlah
Dibulatkan
D-21 1 M3 Kolom Beton Tulang (180 kg besi + bekisting)
- Kayu papan terentang
M3
0.4000
3,135,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
20,700.00
- Minyak Bekisting
Ltr
2.0000
60,500.00
- Besi Beton
Kg
180.0000
22,800.00
- Kawat Beton
Kg
2.7000
30,500.00
- Semen Portland
Kg
323.0000
1,548.00
- Pasir Beton
M3
0.5200
281,000.00
- Koral Beton 2/3
M3
0.7800
232,200.00
- Kayu Balok Terentang
M3
0.1500
2,905,000.00
- Plywood Tebal 9 mm
Lbr
3.5000
260,000.00
- Dolken -8-10/4m
Btg
20.0000
30,800.00
- Pekerja
Oh
7.3000
50,000.00
- Tukang Batu
Oh
0.3500
70,000.00
- Tukang Kayu
Oh
3.3000
75,000.00
- Tukang Besi
Oh
2.1000
75,000.00
- Kepala Tukang
Oh
0.5700
80,000.00
- Mandor
Oh
0.2500
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
1,254,000.00
82,800.00
121,000.00
3,420,000.00
73,200.00
500,004.00
146,120.00
181,116.00
435,750.00
910,000.00
616,000.00
365,000.00
24,500.00
247,500.00
157,500.00
45,600.00
21,250.00
8,601,340.00
8,601,340.00
1,254,000.00
82,800.00
121,000.00
4,104,000.00
82,350.00
500,004.00
146,120.00
181,116.00
435,750.00
910,000.00
616,000.00
365,000.00
24,500.00
247,500.00
157,500.00
45,600.00
21,250.00
9,294,490.00
9,294,490.00

Page 20

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
D-22 1 M3 Kolom Beton Tulang (200 kg besi + bekisting)
- Kayu papan terentang
M3
0.4000
3,135,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
20,700.00
- Minyak Bekisting
Ltr
2.0000
60,500.00
- Besi Beton
Kg
200.0000
22,800.00
- Kawat Beton
Kg
3.0000
30,500.00
- Semen Portland
Kg
323.0000
1,548.00
- Pasir Beton
M3
0.5200
281,000.00
- Koral Beton 2/3
M3
0.7800
232,200.00
- Kayu Balok Terentang
M3
0.1500
2,905,000.00
- Plywood Tebal 9 mm
Lbr
3.5000
260,000.00
- Dolken -8-10/4m
Btg
20.0000
30,800.00
- Pekerja
Oh
7.3000
50,000.00
- Tukang Batu
Oh
0.3500
70,000.00
- Tukang Kayu
Oh
3.3000
75,000.00
- Tukang Besi
Oh
2.1000
75,000.00
- Kepala Tukang
Oh
0.5700
80,000.00
- Mandor
Oh
0.2500
85,000.00
Jumlah
Dibulatkan
D-23 1 M3 Kolom Beton Tulang (250 kg besi + bekisting)
- Kayu papan terentang
M3
0.4000
3,135,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
20,700.00
- Minyak Bekisting
Ltr
2.0000
60,500.00
- Besi Beton
Kg
250.0000
22,800.00
- Kawat Beton
Kg
3.7500
30,500.00
- Semen Portland
Kg
323.0000
1,548.00
- Pasir Beton
M3
0.5200
281,000.00
- Koral Beton 2/3
M3
0.7800
232,200.00
- Kayu Balok Terentang
M3
0.1500
2,905,000.00
- Plywood Tebal 9 mm
Lbr
3.5000
260,000.00
- Dolken -8-10/4m
Btg
20.0000
30,800.00
- Pekerja
Oh
7.3000
50,000.00
- Tukang Batu
Oh
0.3500
70,000.00
- Tukang Kayu
Oh
3.3000
75,000.00
- Tukang Besi
Oh
2.1000
75,000.00
- Kepala Tukang
Oh
0.5700
80,000.00
- Mandor
Oh
0.2500
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
1,254,000.00
82,800.00
121,000.00
4,560,000.00
91,500.00
500,004.00
146,120.00
181,116.00
435,750.00
910,000.00
616,000.00
365,000.00
24,500.00
247,500.00
157,500.00
45,600.00
21,250.00
9,759,640.00
9,759,640.00
1,254,000.00
82,800.00
121,000.00
5,700,000.00
114,375.00
500,004.00
146,120.00
181,116.00
435,750.00
910,000.00
616,000.00
365,000.00
24,500.00
247,500.00
157,500.00
45,600.00
21,250.00
10,922,515.00
10,922,515.00

Page 21

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
D-24 1 M3 Kolom Beton Tulang (300 kg besi + bekisting)
- Kayu papan terentang
M3
0.4000
3,135,000.00
- Paku Biasa 2" - 5"
Kg
4.0000
20,700.00
- Minyak Bekisting
Ltr
2.0000
60,500.00
- Besi Beton
Kg
300.0000
22,800.00
- Kawat Beton
Kg
4.5000
30,500.00
- Semen Portland
Kg
323.0000
1,548.00
- Pasir Beton
M3
0.5200
281,000.00
- Koral Beton 2/3
M3
0.7800
232,200.00
- Kayu Balok Terentang
M3
0.1500
2,905,000.00
- Plywood Tebal 9 mm
Lbr
3.5000
260,000.00
- Dolken -8-10/4m
Btg
20.0000
30,800.00
- Pekerja
Oh
7.3000
50,000.00
- Tukang Batu
Oh
0.3500
70,000.00
- Tukang Kayu
Oh
3.3000
75,000.00
- Tukang Besi
Oh
2.1000
75,000.00
- Kepala Tukang
Oh
0.5700
80,000.00
- Mandor
Oh
0.2500
85,000.00
Jumlah
Dibulatkan
D-25 1 M3 Balok Beton Tulang (120 kg besi + bekisting)
- Kayu papan terentang
M3
0.3200
3,135,000.00
- Paku Biasa 2" - 5"
Kg
3.2000
20,700.00
- Minyak Bekisting
Ltr
1.6000
60,500.00
- Besi Beton
Kg
120.0000
22,800.00
- Kawat Beton
Kg
1.8000
30,500.00
- Semen Portland
Kg
323.0000
1,548.00
- Pasir Beton
M3
0.5200
281,000.00
- Koral Beton 2/3
M3
0.7800
232,200.00
- Kayu Balok Terentang
M3
0.1400
2,905,000.00
- Plywood Tebal 9 mm
Lbr
2.8000
260,000.00
- Dolken -8-10/4m
Btg
16.0000
30,800.00
- Pekerja
Oh
5.9600
50,000.00
- Tukang Batu
Oh
0.3500
70,000.00
- Tukang Kayu
Oh
2.8000
75,000.00
- Tukang Besi
Oh
1.4000
75,000.00
- Kepala Tukang
Oh
0.4550
80,000.00
- Mandor
Oh
0.2080
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
1,254,000.00
82,800.00
121,000.00
6,840,000.00
137,250.00
500,004.00
146,120.00
181,116.00
435,750.00
910,000.00
616,000.00
365,000.00
24,500.00
247,500.00
157,500.00
45,600.00
21,250.00
12,085,390.00
12,085,390.00
1,003,200.00
66,240.00
96,800.00
2,736,000.00
54,900.00
500,004.00
146,120.00
181,116.00
406,700.00
728,000.00
492,800.00
298,000.00
24,500.00
210,000.00
105,000.00
36,400.00
17,680.00
7,103,460.00
7,103,460.00

Page 22

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
D-26 1 M3 Balok Beton Tulang (150 kg besi + bekisting)
- Kayu papan terentang
M3
0.3200
3,135,000.00
- Paku Biasa 2" - 5"
Kg
3.2000
20,700.00
- Minyak Bekisting
Ltr
1.6000
60,500.00
- Besi Beton
Kg
150.0000
22,800.00
- Kawat Beton
Kg
2.2500
30,500.00
- Semen Portland
Kg
323.0000
1,548.00
- Pasir Beton
M3
0.5200
281,000.00
- Koral Beton 2/3
M3
0.7800
232,200.00
- Kayu Balok Terentang
M3
0.1400
2,905,000.00
- Plywood Tebal 9 mm
Lbr
2.8000
260,000.00
- Dolken -8-10/4m
Btg
16.0000
30,800.00
- Pekerja
Oh
5.9600
50,000.00
- Tukang Batu
Oh
0.3500
70,000.00
- Tukang Kayu
Oh
2.8000
75,000.00
- Tukang Besi
Oh
1.4000
75,000.00
- Kepala Tukang
Oh
0.4550
80,000.00
- Mandor
Oh
0.2080
85,000.00
Jumlah
Dibulatkan
D-27 1 M3 Balok Beton Tulang (200 kg besi + bekisting)
- Kayu papan terentang
M3
0.3200
3,135,000.00
- Paku Biasa 2" - 5"
Kg
3.2000
20,700.00
- Minyak Bekisting
Ltr
1.6000
60,500.00
- Besi Beton
Kg
200.0000
22,800.00
- Kawat Beton
Kg
3.0000
30,500.00
- Semen Portland
Kg
323.0000
1,548.00
- Pasir Beton
M3
0.5200
281,000.00
- Koral Beton 2/3
M3
0.7800
232,200.00
- Kayu Balok Terentang
M3
0.1400
2,905,000.00
- Plywood Tebal 9 mm
Lbr
2.8000
260,000.00
- Dolken -8-10/4m
Btg
16.0000
30,800.00
- Pekerja
Oh
5.9600
50,000.00
- Tukang Batu
Oh
0.3500
70,000.00
- Tukang Kayu
Oh
2.8000
75,000.00
- Tukang Besi
Oh
1.4000
75,000.00
- Kepala Tukang
Oh
0.4550
80,000.00
- Mandor
Oh
0.2080
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
1,003,200.00
66,240.00
96,800.00
3,420,000.00
68,625.00
500,004.00
146,120.00
181,116.00
406,700.00
728,000.00
492,800.00
298,000.00
24,500.00
210,000.00
105,000.00
36,400.00
17,680.00
7,801,185.00
7,801,185.00
1,003,200.00
66,240.00
96,800.00
4,560,000.00
91,500.00
500,004.00
146,120.00
181,116.00
406,700.00
728,000.00
492,800.00
298,000.00
24,500.00
210,000.00
105,000.00
36,400.00
17,680.00
8,964,060.00
8,964,060.00

Page 23

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
D-28 1 M3 Balok Beton Tulang (230 kg besi + bekisting)
- Kayu papan terentang
M3
0.3200
3,135,000.00
- Paku Biasa 2" - 5"
Kg
3.2000
20,700.00
- Minyak Bekisting
Ltr
1.6000
60,500.00
- Besi Beton
Kg
230.0000
22,800.00
- Kawat Beton
Kg
3.4500
30,500.00
- Semen Portland
Kg
323.0000
1,548.00
- Pasir Beton
M3
0.5200
281,000.00
- Koral Beton 2/3
M3
0.7800
232,200.00
- Kayu Balok Terentang
M3
0.1400
2,905,000.00
- Plywood Tebal 9 mm
Lbr
2.8000
260,000.00
- Dolken -8-10/4m
Btg
16.0000
30,800.00
- Pekerja
Oh
5.9600
50,000.00
- Tukang Batu
Oh
0.3500
70,000.00
- Tukang Kayu
Oh
2.8000
75,000.00
- Tukang Besi
Oh
1.4000
75,000.00
- Kepala Tukang
Oh
0.4550
80,000.00
- Mandor
Oh
0.2080
85,000.00
Jumlah
Dibulatkan
D-29 1 M3 Tangga Beton Tulang (200 kg besi + bekisting)
- Kayu papan terentang
M3
0.2500
3,135,000.00
- Paku Biasa 2" - 5"
Kg
3.0000
20,700.00
- Minyak Bekisting
Ltr
1.2000
60,500.00
- Besi Beton
Kg
200.0000
22,800.00
- Kawat Beton
Kg
3.0000
30,500.00
- Semen Portland
Kg
323.0000
1,548.00
- Pasir Beton
M3
0.5200
281,000.00
- Koral Beton 2/3
M3
0.7800
232,200.00
- Kayu Balok Terentang
M3
0.1050
2,905,000.00
- Plywood Tebal 9 mm
Lbr
2.5000
260,000.00
- Dolken -8-10/4m
Btg
14.0000
30,800.00
- Pekerja
Oh
5.6000
50,000.00
- Tukang Batu
Oh
0.3500
70,000.00
- Tukang Kayu
Oh
2.3000
75,000.00
- Tukang Besi
Oh
1.4000
75,000.00
- Kepala Tukang
Oh
0.4050
80,000.00
- Mandor
Oh
0.2020
85,000.00
Jumlah
Dibulatkan
D-30 1 M3 Pelat Lantai Beton Tulang T= 10 cm (90 kg besi + bekisting)
- Beton tulang ad. 1Pc : 2Ps : 3Kr
M3
1.0000
1,010,784.00
- Pasang Bekisting untuk lantai
M2
10.0000
506,405.00
- Besi Beton Polos
Kg
90.0000
25,319.00
Jumlah
Dibulatkan

HARGA
(Rp)
1,003,200.00
66,240.00
96,800.00
5,244,000.00
105,225.00
500,004.00
146,120.00
181,116.00
406,700.00
728,000.00
492,800.00
298,000.00
24,500.00
210,000.00
105,000.00
36,400.00
17,680.00
9,661,785.00
9,661,785.00
783,750.00
62,100.00
72,600.00
4,560,000.00
91,500.00
500,004.00
146,120.00
181,116.00
305,025.00
650,000.00
431,200.00
280,000.00
24,500.00
172,500.00
105,000.00
32,400.00
17,170.00
8,414,985.00
8,414,985.00
1,010,784.00
5,064,050.00
2,278,710.00
8,353,544.00
8,353,544.00

Page 24

No.
D-31

D-32

D-33

D-34

D-35

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M3 Pelat Lantai Beton Tulang T= 12 cm (110 kg besi + bekisting)
- Beton bertulang ad. 1Pc : 2Ps : 3Kr
M3
1.0000
1,010,784.00
- Pasang Bekisting untuk lantai
M2
8.3300
506,405.00
- Besi Beton Polos
Kg
110.0000
25,319.00
Jumlah
Dibulatkan
1 M3 Pelat Lantai Beton Tulang T= 12 cm (130 kg besi + bekisting)
- Beton bertulang ad. 1Pc : 2Ps : 3Kr
M3
1.0000
1,010,784.00
- Pasang Bekisting untuk lantai
M2
8.3300
506,405.00
- Besi Beton Polos
Kg
130.0000
25,319.00
Jumlah
Dibulatkan
1 M3 Pelat Lantai Beton Tulang T= 15 cm (90 kg besi + bekisting)
- Beton bertulang ad. 1Pc : 2Ps : 3Kr
M3
1.0000
1,010,784.00
- Pasang Bekisting untuk lantai
M2
6.6700
506,405.00
- Besi Beton Polos
Kg
90.0000
25,319.00
Jumlah
Dibulatkan
1 M3 Pelat Lantai Beton Tulang T= 15 cm (115 kg besi + bekisting)
- Beton bertulang ad. 1Pc : 2Ps : 3Kr
M3
1.0000
1,010,784.00
- Pasang Bekisting untuk lantai
M2
6.6700
506,405.00
- Besi Beton Polos
Kg
115.0000
25,319.00
Jumlah
Dibulatkan
1 M' Kolom Praktis Beton Tulang (11x11) cm
- Kayu papan terentang
M3
0.0020
3,135,000.00
- Paku Biasa 2" - 5"
Kg
0.0100
20,700.00
- Besi Beton Polos
Kg
3.0000
22,800.00
- Kawat Beton
Kg
0.0450
30,500.00
- Semen Portland
Kg
4.0000
1,548.00
- Pasir Beton
M3
0.0060
281,000.00
- Koral Beton
M3
0.0090
232,200.00
- Pekerja
Oh
0.0600
50,000.00
- Tukang Batu
Oh
0.0200
70,000.00
- Tukang Kayu
Oh
0.0200
75,000.00
- Tukang Besi
Oh
0.0200
75,000.00
- Kepala Tukang
Oh
0.0060
80,000.00
- Mandor
Oh
0.0030
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
1,010,784.00
4,218,353.65
2,785,090.00
8,014,227.65
8,014,228.00
1,010,784.00
4,218,353.65
3,291,470.00
8,520,607.65
8,520,608.00
1,010,784.00
3,377,721.35
2,278,710.00
6,667,215.35
6,667,215.00
1,010,784.00
3,377,721.35
2,911,685.00
7,300,190.35
7,300,190.00
6,270.00
207.00
68,400.00
1,372.50
6,192.00
1,686.00
2,089.80
3,000.00
1,400.00
1,500.00
1,500.00
480.00
255.00
94,352.30
94,352.00

Page 25

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
D-36 1 M' Ring Balok Beton Tulang (10x15) cm
- Kayu papan terentang
M3
0.0030
3,135,000.00
- Paku Biasa 2" - 5"
Kg
0.0200
20,700.00
- Besi Beton Polos
Kg
3.6000
22,800.00
- Kawat Beton
Kg
0.0500
30,500.00
- Semen Portland
Kg
5.5000
1,548.00
- Pasir Beton
M3
0.0090
281,000.00
- Koral Beton
M3
0.0150
232,200.00
- Pekerja
Oh
0.1000
50,000.00
- Tukang Batu
Oh
0.0330
70,000.00
- Tukang Kayu
Oh
0.0330
75,000.00
- Tukang Besi
Oh
0.0330
75,000.00
- Kepala Tukang
Oh
0.0100
80,000.00
- Mandor
Oh
0.0050
85,000.00
Jumlah
Dibulatkan
D-37 1 M2 Pasang Bekesting Untuk Dinding
- Kayu papan terentang
M3
0.0300
3,135,000.00
- Paku Biasa 2" - 5"
Kg
0.4000
1,548.00
- Minyak Bekisting
Ltr
0.2000
60,500.00
- Kayu balok terentang
M3
0.0200
2,905,000.00
- Plywood Tebal 9 mm
Lbr
0.3500
260,000.00
- Dolken -8-10/4m
Btg
3.0000
30,800.00
- Formite/spacer
Buah
4.0000
2,800.00
- Pekerja
Oh
0.3200
50,000.00
- Tukang Kayu
Oh
0.0330
70,000.00
- Kepala Tukang
Oh
0.0330
80,000.00
- Mandor
Oh
0.0060
85,000.00
Jumlah
Dibulatkan
D-38 1 M3 Pelat Beton Tulang (150 kg besi + bekisting)
- Kayu papan terentang
M3
0.3200
3,135,000.00
- Paku Biasa 2" - 5"
Kg
3.2000
20,700.00
- Minyak Bekisting
Ltr
1.6000
60,500.00
- Besi Beton
Kg
150.0000
22,800.00
- Kawat Beton
Kg
2.2500
30,500.00
- Semen Portland
Kg
323.0000
1,548.00
- Pasir Beton
M3
0.5200
281,000.00
- Koral Beton 2/3
M3
0.7800
232,200.00
- Kayu Balok Terentang
M3
0.1200
2,905,000.00
- Plywood Tebal 9 mm
Lbr
2.8000
260,000.00
- Dolken -8-10/4m
Btg
32.0000
30,800.00
- Pekerja
Oh
5.3000
50,000.00
- Tukang Batu
Oh
0.3500
70,000.00
- Tukang Kayu
Oh
1.3000
75,000.00
- Tukang Besi
Oh
1.0500
75,000.00
- Kepala Tukang
Oh
0.2650
80,000.00
- Mandor
Oh
0.2650
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
9,405.00
414.00
82,080.00
1,525.00
8,514.00
2,529.00
3,483.00
5,000.00
2,310.00
2,475.00
2,475.00
800.00
425.00
121,435.00
121,435.00
94,050.00
619.20
12,100.00
58,100.00
91,000.00
92,400.00
11,200.00
16,000.00
2,310.00
2,640.00
510.00
380,929.20
380,929.00
1,003,200.00
66,240.00
96,800.00
3,420,000.00
68,625.00
500,004.00
146,120.00
181,116.00
348,600.00
728,000.00
985,600.00
265,000.00
24,500.00
97,500.00
78,750.00
21,200.00
22,525.00
8,053,780.00
8,053,780.00

Page 26

No.
D-39

D-40

D-41

D-42

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M3 Dinding Beton Tulang (150 kg besi + bekisting)
- Kayu papan terentang
M3
0.2400
3,135,000.00
- Paku Biasa 2" - 5"
Kg
3.2000
20,700.00
- Minyak Bekisting
Ltr
1.6000
60,500.00
- Besi Beton
Kg
150.0000
22,800.00
- Kawat Beton
Kg
2.2500
30,500.00
- Semen Portland
Kg
323.0000
1,548.00
- Pasir Beton
M3
0.5200
281,000.00
- Koral Beton 2/3
M3
0.7800
232,200.00
- Kayu Balok Terentang
M3
0.1600
2,905,000.00
- Plywood Tebal 9 mm
Lbr
2.8000
260,000.00
- Dolken -8-10/4m
Btg
24.0000
30,800.00
- Pekerja
Oh
5.6000
50,000.00
- Tukang Batu
Oh
0.3500
70,000.00
- Tukang Kayu
Oh
2.6400
75,000.00
- Tukang Besi
Oh
1.0500
75,000.00
- Kepala Tukang
Oh
0.4000
80,000.00
- Mandor
Oh
0.1930
85,000.00
Jumlah
Dibulatkan
1 M3 Dinding Beton Tulang (200 kg besi + bekisting)
- Kayu papan terentang
M3
0.2500
3,135,000.00
- Paku Biasa 2" - 5"
Kg
3.0000
20,700.00
- Minyak Bekisting
Ltr
1.2000
60,500.00
- Besi Beton
Kg
200.0000
22,800.00
- Kawat Beton
Kg
3.0000
30,500.00
- Semen Portland
Kg
323.0000
1,548.00
- Pasir Beton
M3
0.5200
281,000.00
- Koral Beton 2/3
M3
0.7800
232,200.00
- Kayu Balok Terentang
M3
0.1050
2,905,000.00
- Plywood Tebal 9 mm
Lbr
2.8000
260,000.00
- Dolken -8-10/4m
Btg
14.0000
30,800.00
- Pekerja
Oh
5.6500
50,000.00
- Tukang Batu
Oh
0.3500
70,000.00
- Tukang Kayu
Oh
1.5600
75,000.00
- Tukang Besi
Oh
1.4000
75,000.00
- Kepala Tukang
Oh
0.3230
80,000.00
- Mandor
Oh
0.2830
85,000.00
Jumlah
Dibulatkan
1 M3 Membuat Beton Cor Mutu K-300
- Semen Portland
Kg
413.0000
1,548.00
- Pasir Beton
M3
0.4256
281,000.00
- Koral Beton 2/3
M3
0.6807
232,200.00
- Pekerja
Oh
1.6500
50,000.00
- Tukang Batu
Oh
0.2750
70,000.00
- Kepala Tukang
Oh
0.0280
80,000.00
- Mandor
Oh
0.0830
85,000.00
Jumlah
Dibulatkan
1 M3 Membuat Beton Cor Mutu K-200
- Semen Portland
Kg
352.0000
1,548.00
- Pasir Beton
M3
0.4569
281,000.00
- Koral Beton 2/3
M3
0.6873
232,200.00
- Pekerja
Oh
1.6500
50,000.00
- Tukang Batu
Oh
0.2750
70,000.00
- Kepala Tukang
Oh
0.0280
80,000.00

HARGA
(Rp)
752,400.00
66,240.00
96,800.00
3,420,000.00
68,625.00
500,004.00
146,120.00
181,116.00
464,800.00
728,000.00
739,200.00
280,000.00
24,500.00
198,000.00
78,750.00
32,000.00
16,405.00
7,792,960.00
7,792,960.00
783,750.00
62,100.00
72,600.00
4,560,000.00
91,500.00
500,004.00
146,120.00
181,116.00
305,025.00
728,000.00
431,200.00
282,500.00
24,500.00
117,000.00
105,000.00
25,840.00
24,055.00
8,440,310.00
8,440,310.00
639,324.00
119,600.63
158,050.80
82,500.00
19,250.00
2,240.00
7,055.00
1,028,020.43
1,028,020.00
544,896.00
128,381.88
159,598.80
82,500.00
19,250.00
2,240.00

Page 27

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
Oh
0.0830
85,000.00

- Mandor
Jumlah
Dibulatkan
D-43 1 M3 Membuat Beton Cor Mutu K-250
- Semen Portland
- Pasir Beton
- Koral Beton 2/3
- Pekerja
- Tukang Batu
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan

Kg
M3
M3
Oh
Oh
Oh
Oh

384.0000
0.4325
0.6927
1.6500
0.2750
0.0280
0.0830

1,548.00
281,000.00
232,200.00
50,000.00
70,000.00
80,000.00
85,000.00

HARGA
(Rp)
7,055.00
943,921.68
943,922.00
594,432.00
121,532.50
160,837.20
82,500.00
19,250.00
2,240.00
7,055.00
987,846.70
987,847.00

Page 28

E. ANALISA HARGA SATUAN PEKERJAAN DINDING


No.
E-01

E-02

E-03

E-04

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 3ps
- Bata Merah
Bh
#######
850.00
- Semen Portland
Kg
32.9500
1,548.00
- Pasir Pasang
M3
0.0910
256,800.00
- Pekerja
Oh
0.6500
50,000.00
- Tukang Batu
Oh
0.2000
70,000.00
- Kepala Tukang
Oh
0.0200
80,000.00
- Mandor
Oh
0.0300
85,000.00
Jumlah
Dibulatkan
1 M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 4ps
- Bata Merah
Bh
#######
850.00
- Semen Portland
Kg
26.5500
1,548.00
- Pasir Pasang
M3
0.0930
256,800.00
- Pekerja
Oh
0.6500
50,000.00
- Tukang Batu
Oh
0.2000
70,000.00
- Kepala Tukang
Oh
0.0200
80,000.00
- Mandor
Oh
0.0300
85,000.00
Jumlah
Dibulatkan
1 M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 5ps
- Bata Merah
Bh
#######
850.00
- Semen Portland
Kg
22.2000
1,548.00
- Pasir Pasang
M3
0.1020
256,800.00
- Pekerja
Oh
0.6500
50,000.00
- Tukang Batu
Oh
0.2000
70,000.00
- Kepala Tukang
Oh
0.0200
80,000.00
- Mandor
Oh
0.0300
85,000.00
Jumlah
Dibulatkan
1 M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 3ps
- Bata Merah
Bh
70.0000
850.00
- Semen Portland
Kg
14.3700
1,548.00
- Pasir Pasang
M3
0.0400
256,800.00
- Pekerja
Oh
0.3200
50,000.00
- Tukang Batu
Oh
0.1000
70,000.00
- Kepala Tukang
Oh
0.0100
80,000.00
- Mandor
Oh
0.0150
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
119,000.00
51,006.60
23,368.80
32,500.00
14,000.00
1,600.00
2,550.00
244,025.40
244,025.00
119,000.00
41,099.40
23,882.40
32,500.00
14,000.00
1,600.00
2,550.00
234,631.80
234,632.00
119,000.00
34,365.60
26,193.60
32,500.00
14,000.00
1,600.00
2,550.00
230,209.20
230,209.00
59,500.00
22,244.76
10,272.00
16,000.00
7,000.00
800.00
1,275.00
117,091.76
117,092.00

Page 29

No.
E-05

E-06

E-07

E-08

E-09

E-10

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 4ps
- Bata Merah
Bh
70.0000
850.00
- Semen Portland
Kg
11.5000
1,548.00
- Pasir Pasang
M3
0.0430
256,800.00
- Pekerja
Oh
0.3200
50,000.00
- Tukang Batu
Oh
0.1000
70,000.00
- Kepala Tukang
Oh
0.0100
80,000.00
- Mandor
Oh
0.0150
85,000.00
Jumlah
Dibulatkan
1 M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 5ps
- Bata Merah
Bh
70.0000
850.00
- Semen Portland
Kg
9.6800
1,548.00
- Pasir Pasang
M3
0.0450
256,800.00
- Pekerja
Oh
0.3200
50,000.00
- Tukang Batu
Oh
0.1000
70,000.00
- Kepala Tukang
Oh
0.0100
80,000.00
- Mandor
Oh
0.0150
85,000.00
Jumlah
Dibulatkan
1 M2 Pasang Dinding Roster Beton 20 x 20 adk 1pc : 3ps
- Roster / Terawang
Bh
36.0000
9,400.00
- Semen Portland
Kg
12.8000
1,548.00
- Pasir Pasang
M3
0.0350
256,800.00
- Pekerja
Oh
0.3000
50,000.00
- Tukang Batu
Oh
0.1000
70,000.00
- Kepala Tukang
Oh
0.0100
80,000.00
- Mandor
Oh
0.0150
85,000.00
Jumlah
Dibulatkan
1 M2 Pasang Dinding Roster Beton 20 x 20 adk 1pc : 4ps
- Roster / Terawang
Bh
36.0000
9,400.00
- Semen Portland
Kg
11.0000
1,548.00
- Pasir Pasang
M3
0.0350
256,800.00
- Pekerja
Oh
0.3000
50,000.00
- Tukang Batu
Oh
0.1000
70,000.00
- Kepala Tukang
Oh
0.0100
80,000.00
- Mandor
Oh
0.0150
85,000.00
Jumlah
Dibulatkan
1 M2 Pasang Dinding Roster/terawng (12 x 11 x 24) cm
- Roster / Terawang
Bh
36.0000
9,400.00
- Semen Portland
Kg
12.8000
1,548.00
- Pasir Pasang
M3
0.0350
256,800.00
- Pekerja
Oh
0.3000
50,000.00
- Tukang Batu
Oh
0.1000
70,000.00
- Kepala Tukang
Oh
0.0100
80,000.00
- Mandor
Oh
0.0150
85,000.00
Jumlah
Dibulatkan
1 M2 Pasang Dinding Batako Besar Pres uk. 8x20x30 adk. 1pc:4ps
- Batako
bh
13.0000
2,700.00

HARGA
(Rp)
59,500.00
17,802.00
11,042.40
16,000.00
7,000.00
800.00
1,275.00
113,419.40
113,419.00
59,500.00
14,984.64
11,556.00
16,000.00
7,000.00
800.00
1,275.00
111,115.64
111,116.00
338,400.00
19,814.40
8,988.00
15,000.00
7,000.00
800.00
1,275.00
391,277.40
391,277.00
338,400.00
17,028.00
8,988.00
15,000.00
7,000.00
800.00
1,275.00
388,491.00
388,491.00
338,400.00
19,814.40
8,988.00
15,000.00
7,000.00
800.00
1,275.00
391,277.40
391,277.00
35,100.00

Page 30

No.

URAIAN
-

SATUAN VOLUME HARGA SATUAN


(Rp)
kg
12.0000
1,548.00
M3
0.0380
256,800.00
Oh
0.3000
50,000.00
Oh
0.1000
70,000.00
Oh
0.0100
80,000.00
Oh
0.0150
85,000.00

PC
Pasir Pasang
Pekerja
Tukang Batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan
E-11 1 M2 Pasang Dinding hollowblock (HB-20)
- HB-20
Bh
- PC (50 kg)
Kg
- Pasir Pasang
m3
- Besi angkur f 8 mm
Kg
-

Pekerja
Oh
Tukang Batu
Oh
Kepala Tukang
Oh
Mandor
Oh
Jumlah
Dibulatkan
E-12 1 M2 Pasang Dinding hollowblock (HB-15)
- HB-15
Bh
- PC (50 kg)
Kg
- Pasir Pasang
m3
- Besi angkur f 8 mm
Kg
- Pekerja
Oh
- Tukang Batu
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
E-13 1 M2 Pasang Dinding hollowblock (HB-10)
- HB-10
Bh
- PC (50 kg)
Kg
- Pasir Pasang
m3
- Besi angkur f 8 mm
Kg
- Pekerja
Oh
- Tukang Batu
Oh
- Kepala Tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan

HARGA
(Rp)
18,576.00
9,758.40
15,000.00
7,000.00
800.00
1,275.00
52,409.40
52,409.00

12.5000
13.5000
0.0480
1.9500
0.3500
0.1500
0.0150
0.0170

5,700.00
1,548.00
256,800.00
22,800.00
50,000.00
70,000.00
80,000.00
85,000.00

71,250.00
20,898.00
12,326.40
44,460.00
17,500.00
10,500.00
1,200.00
1,445.00
179,579.40
179,579.00

12.5000
10.4500
0.0380
1.9500
0.3200
0.1200
0.0120
0.0150

6,500.00
1,548.00
256,800.00
22,800.00
50,000.00
70,000.00
80,000.00
85,000.00

81,250.00
16,176.60
9,758.40
44,460.00
16,000.00
8,400.00
960.00
1,275.00
178,280.00
178,280.00

12.5000
7.5000
0.0270
1.9500
0.3200
0.1200
0.0120
0.0150

3,500.00
1,548.00
256,800.00
22,800.00
50,000.00
70,000.00
80,000.00
85,000.00

43,750.00
11,610.00
6,933.60
44,460.00
16,000.00
8,400.00
960.00
1,275.00
133,388.60
133,389.00

Page 31

No.
E-14

E-15

E-16

E-17

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M2 Pasang Dinding Conblock (CB-20)
- CB-20
Bh
12.5000
5,700.00
- PC (50 kg)
Kg
14.0500
1,548.00
- Pasir beton
M3
0.0040
281,000.00
- Pasir Pasang
M3
0.0420
256,800.00
Besi
angkur
f
8
mm
Kg
3.8700
22,800.00
- Paku Biasa 2" - 5"
kg
0.0060
20,700.00
- Kayu terentang
M3
0.0010
3,135,000.00
- Kawat beton
kg
0.0300
30,500.00
- Koral beton
M3
0.0050
232,200.00
- Pekerja
Oh
0.3700
50,000.00
- Tukang Batu
Oh
0.1570
70,000.00
- Tukang Besi
Oh
0.0070
80,000.00
- Kepala Tukang
Oh
0.0164
80,000.00
- Mandor
Oh
0.0185
85,000.00
Jumlah
Dibulatkan
1 M2 Pasang Dinding Conblock (CB-15)
- CB-15
Bh
12.5000
6,500.00
- PC (50 kg)
Kg
10.4600
1,548.00
- Pasir beton
M3
0.0030
281,000.00
- Pasir Pasang
M3
0.0320
256,800.00
Besi
angkur
f
8
mm
Kg
0.8700
22,800.00
- Paku Biasa 2" - 5"
kg
0.0040
20,700.00
- Kayu terentang
M3
0.0010
3,135,000.00
- Kawat beton
kg
0.0200
30,500.00
- Koral beton
M3
0.0040
232,200.00
- Pekerja
Oh
0.3400
50,000.00
- Tukang Batu
Oh
0.1300
70,000.00
- Tukang Besi
Oh
0.0070
80,000.00
- Kepala Tukang
Oh
0.0137
80,000.00
- Mandor
Oh
0.0170
85,000.00
Jumlah
Dibulatkan
1 M2 Pasang Dinding Conblock (CB-10)
- CB-10
Bh
12.5000
3,500.00
- PC (50 kg)
Kg
10.4600
1,548.00
- Pasir beton
M3
0.0030
281,000.00
- Pasir Pasang
M3
0.0320
256,800.00
- Besi angkur f 8 mm
Kg
0.8700
22,800.00
- Paku Biasa 2" - 5"
kg
0.0040
20,700.00
- Kayu terentang
M3
0.0010
3,135,000.00
- Kawat beton
kg
0.0200
30,500.00
- Koral beton
M3
0.0040
232,200.00
- Pekerja
Oh
0.3400
50,000.00
- Tukang Batu
Oh
0.1300
70,000.00
- Tukang Besi
Oh
0.0070
80,000.00
- Kepala Tukang
Oh
0.0137
80,000.00
- Mandor
Oh
0.0170
85,000.00
Jumlah
Dibulatkan
1 M2 Dinding Keramik Corak 10 x 20 cm

HARGA
(Rp)
71,250.00
21,749.40
1,124.00
10,785.60
88,236.00
124.20
3,135.00
915.00
1,161.00
18,500.00
10,990.00
560.00
1,312.00
1,572.50
231,414.70
231,415.00
81,250.00
16,192.08
843.00
8,217.60
19,836.00
82.80
3,135.00
610.00
928.80
17,000.00
9,100.00
560.00
1,096.00
1,445.00
160,296.28
160,296.00
43,750.00
16,192.08
843.00
8,217.60
19,836.00
82.80
3,135.00
610.00
928.80
17,000.00
9,100.00
560.00
1,096.00
1,445.00
122,796.28
122,796.00

Page 32

No.

URAIAN
-

Keramik Corak 10 x 20 cm
Semen abu-abu
Pasir pasang
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor
Jumlah
Dibulatkan

SATUAN VOLUME HARGA SATUAN


(Rp)
m2
1.0000
62,500.00
Kg
9.3000
1,548.00
M3
0.0180
256,800.00
Kg
1.5000
15,000.00
Oh
0.6000
50,000.00
Oh
0.4500
75,000.00
Oh
0.0450
80,000.00
Oh
0.0300
85,000.00

HARGA
(Rp)
62,500.00
14,396.40
4,622.40
22,500.00
30,000.00
33,750.00
3,600.00
2,550.00
173,918.80
173,919.00

Page 33

No.
E-18

E-19

E-20

E-21

E-22

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M2 Dinding Keramik polos 10 x 20 cm
- Keramik 10 x 20 cm
m2
1.0000
60,000.00
- Semen abu-abu
Kg
9.3000
1,548.00
- Pasir pasang
M3
0.0180
256,800.00
- Semen warna
Kg
1.5000
15,000.00
- Pekerja
Oh
0.6000
50,000.00
- Tukang batu
Oh
0.4500
75,000.00
- Kepala tukang
Oh
0.0450
80,000.00
- Mandor
Oh
0.0300
85,000.00
Jumlah
Dibulatkan
1 M2 Dinding Keramik corak 20 x 20 cm
- Keramik 20 x 20 cm
m2
1.0000
70,000.00
- Semen abu-abu
Kg
9.3000
1,548.00
- Pasir pasang
M3
0.0180
256,800.00
- Semen warna
Kg
1.5000
15,000.00
- Pekerja
Oh
0.6000
50,000.00
- Tukang batu
Oh
0.4500
75,000.00
- Kepala tukang
Oh
0.0450
80,000.00
- Mandor
Oh
0.0300
85,000.00
Jumlah
Dibulatkan
1 M2 Dinding Keramik polos 20 x 20 cm
- Keramik 20 x 20 cm
m2
1.0000
60,000.00
- Semen abu-abu
Kg
9.3000
1,548.00
- Pasir pasang
M3
0.0180
256,800.00
- Semen warna
Kg
1.5000
15,000.00
- Pekerja
Oh
0.6000
50,000.00
- Tukang batu
Oh
0.4500
75,000.00
- Kepala tukang
Oh
0.0450
80,000.00
- Mandor
Oh
0.0300
85,000.00
Jumlah
Dibulatkan
1 M2 Dinding Keramik polos 20 x 25 cm
- Keramik 20 x 25 cm
m2
1.0000
77,500.00
- Semen abu-abu
Kg
9.3000
1,548.00
- Pasir pasang
M3
0.0180
256,800.00
- Semen warna
Kg
1.5000
15,000.00
- Pekerja
Oh
0.6000
50,000.00
- Tukang batu
Oh
0.4500
75,000.00
- Kepala tukang
Oh
0.0450
80,000.00
- Mandor
Oh
0.0300
85,000.00
Jumlah
Dibulatkan
1 M2 Dinding Keramik Corak 20 x 25 cm
- Keramik corak 20 x 25 cm
m2
1.0000
64,000.00
- Semen abu-abu
Kg
9.3000
1,548.00
- Pasir pasang
M3
0.0180
256,800.00
- Semen warna
Kg
1.5000
15,000.00
- Pekerja
Oh
0.6000
50,000.00
- Tukang batu
Oh
0.4500
75,000.00
- Kepala tukang
Oh
0.0450
80,000.00

HARGA
(Rp)
60,000.00
14,396.40
4,622.40
22,500.00
30,000.00
33,750.00
3,600.00
2,550.00
171,418.80
171,419.00
70,000.00
14,396.40
4,622.40
22,500.00
30,000.00
33,750.00
3,600.00
2,550.00
181,418.80
181,419.00
60,000.00
14,396.40
4,622.40
22,500.00
30,000.00
33,750.00
3,600.00
2,550.00
171,418.80
171,419.00
77,500.00
14,396.40
4,622.40
22,500.00
30,000.00
33,750.00
3,600.00
2,550.00
188,918.80
188,919.00
64,000.00
14,396.40
4,622.40
22,500.00
30,000.00
33,750.00
3,600.00

Page 34

No.

E-23

E-24

E-25

E-26

E-27

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
Oh
0.0300
85,000.00

- Mandor
Jumlah
Dibulatkan
1 M2 Dinding Marmer
- Marmer
M2
1.0200
605,000.00
- Paku pancing 60 x 230
Bh
2.0000
1,000.00
- Semen abu-abu
Kg
12.4400
1,548.00
- Pasir pasang
M3
0.0250
256,800.00
- Semen warna
Kg
1.5000
15,000.00
- Pekerja
Oh
0.7200
50,000.00
- Tukang batu
Oh
0.6500
75,000.00
- Kepala tukang
Oh
0.0650
80,000.00
- Mandor
Oh
0.0350
85,000.00
Jumlah
Dibulatkan
1 M2 Dinding Batu Tempel Hitam
- Batu tempel hitam
M2
1.0500
106,500.00
- Semen abu-abu
Kg
11.7500
1,548.00
- Pasir pasang
M3
0.0350
256,800.00
- Pekerja
Oh
0.6200
50,000.00
- Tukang batu
Oh
0.3500
75,000.00
- Kepala tukang
Oh
0.0350
80,000.00
- Mandor
Oh
0.0300
85,000.00
Jumlah
Dibulatkan
1 M2 Dinding Porselen (11 x 11) cm
- Porselen
M2
1.0000
70,000.00
- Semen abu-abu
Kg
9.3000
1,548.00
- Pasir pasang
M3
0.0180
256,800.00
- Semen warna
Kg
1.5000
15,000.00
- Pekerja
Oh
0.6000
50,000.00
- Tukang batu
Oh
0.4500
75,000.00
- Kepala tukang
Oh
0.0450
80,000.00
- Mandor
Oh
0.0300
85,000.00
Jumlah
Dibulatkan
1 M2 Wall paper
- Wall paper
M2
1.0500
61,500.00
- Lem
Kg
0.2500
39,300.00
- Pekerja
Oh
0.3500
50,000.00
- Tukang batu
Oh
0.1750
75,000.00
- Kepala tukang
Oh
0.0170
80,000.00
- Mandor
Oh
0.0020
85,000.00
Jumlah
Dibulatkan
1 M2 Dinding Pemisah Teakwood Rangkap, Rangka Kayu Kamper Medan
- Kayu Balok Kamper Medan
M3
0.0280
6,262,000.00
- Paku Biasa 2" - 5"
Kg
0.1500
20,700.00
- Lem Kayu
Ltr
0.5600
26,300.00
- Teakwood 120 x 240 x 0,4 cm
Lbr
0.8600
145,000.00
- Pekerja
Oh
0.1500
50,000.00
- Tukang Kayu
Oh
0.4500
75,000.00

HARGA
(Rp)
2,550.00
175,418.80
175,419.00
617,100.00
2,000.00
19,257.12
6,420.00
22,500.00
36,000.00
48,750.00
5,200.00
2,975.00
760,202.12
760,202.00
111,825.00
18,189.00
8,988.00
31,000.00
26,250.00
2,800.00
2,550.00
201,602.00
201,602.00
70,000.00
14,396.40
4,622.40
22,500.00
30,000.00
33,750.00
3,600.00
2,550.00
181,418.80
181,419.00
64,575.00
9,825.00
17,500.00
13,125.00
1,360.00
170.00
106,555.00
106,555.00
175,336.00
3,105.00
14,728.00
124,700.00
7,500.00
33,750.00

Page 35

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
Oh
0.0450
80,000.00
Oh
0.0080
85,000.00

- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
E-28 1 M2 Dinding Pemisah Plywood Rangkap, Rangka Kayu Kamper Medan
- Kayu Balok Kamper Medan
M3
0.0280
6,262,000.00
- Paku Biasa 2" - 5"
Kg
0.1500
20,700.00
- Lem Kayu
Ltr
0.5600
26,300.00
- Plywood 120 x 240 x 9 mm
Lbr
0.8600
260,000.00
- Pekerja
Oh
0.2000
50,000.00
- Tukang Kayu
Oh
0.6000
75,000.00
- Kepala Tukang
Oh
0.0600
80,000.00
- Mandor
Oh
0.0100
85,000.00
Jumlah
Dibulatkan
E-29 1 M2 Dinding Pemisah Triplek 4 mm Rangkap, Rangka Kayu Kamper Medan
- Kayu Balok Kamper Medan
M3
0.0280
6,262,000.00
- Paku Biasa 2" - 5"
Kg
0.1500
20,700.00
- Lem Kayu
Ltr
0.5600
26,300.00
- Triplek (120x240x0,4) cm
Lbr
0.8600
72,500.00
- Pekerja
Oh
0.2000
50,000.00
- Tukang Kayu
Oh
0.6000
75,000.00
- Kepala Tukang
Oh
0.0600
80,000.00
- Mandor
Oh
0.0100
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
3,600.00
680.00
363,399.00
363,399.00
175,336.00
3,105.00
14,728.00
223,600.00
10,000.00
45,000.00
4,800.00
850.00
477,419.00
477,419.00
175,336.00
3,105.00
14,728.00
62,350.00
10,000.00
45,000.00
4,800.00
850.00
316,169.00
316,169.00

Page 36

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
E-30 1 M2 Dinding Pemisah GRC t = 4 mm + rangka besi hollow
- Hollow 4/4 Zincromate
Btg
0.4150
32,200.00
- Hollow 2/4 Zincromate
Btg
0.1500
25,000.00
- GRC ( 120 x 240 x 4 ) mm
Lbr
0.3640
74,500.00
- Paku GRC
kg
0.1100
38,500.00
- Ramset / dina bolt
Bh
4.0000
8,000.00
- Cotton plaster
Bh
0.0720
26,300.00
- Compoun
Zak
0.1250
83,000.00
- Pekerja
Oh
0.1000
50,000.00
- Tukang kayu
Oh
0.0500
75,000.00
- Kepala tukang
Oh
0.0050
80,000.00
- Mandor
Oh
0.0050
85,000.00
Jumlah
Dibulatkan
E-31 1 M2 Dinding Pemisah Plywood t = 4 mm + rangka besi hollow
- Hollow 4/4 Zincromate
Btg
0.4150
32,200.00
- Hollow 2/4 Zincromate
Btg
0.1500
25,000.00
- Plywood 120 x 240, 9 mm
Lbr
0.3640
260,000.00
- Paku
kg
0.1100
20,700.00
- Ramset / dina bolt
Bh
4.0000
8,000.00
- Pekerja
Oh
0.1000
50,000.00
- Tukang kayu
Oh
0.0500
75,000.00
- Kepala tukang
Oh
0.0050
80,000.00
- Mandor
Oh
0.0050
85,000.00
Jumlah
Dibulatkan
E-32 1 M2 Dinding Pemisah teakwood t = 4 mm + rangka besi hollow
- Hollow 4/4 Zincromate
Btg
0.4150
32,200.00
- Hollow 2/4 Zincromate
Btg
0.1500
25,000.00
- Teakwood ( 120 x 240 x 4 ) mm
Lbr
0.3640
145,000.00
- Paku
kg
0.1100
20,700.00
- Ramset / dina bolt
Bh
4.0000
8,000.00
- Pekerja
Oh
0.1000
50,000.00
- Tukang kayu
Oh
0.0500
75,000.00
- Kepala tukang
Oh
0.0050
80,000.00
- Mandor
Oh
0.0050
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
13,363.00
3,750.00
27,118.00
4,235.00
32,000.00
1,893.60
10,375.00
5,000.00
3,750.00
400.00
425.00
102,309.60
102,310.00
13,363.00
3,750.00
94,640.00
2,277.00
32,000.00
5,000.00
3,750.00
400.00
425.00
155,605.00
155,605.00
13,363.00
3,750.00
52,780.00
2,277.00
32,000.00
5,000.00
3,750.00
400.00
425.00
113,745.00
113,745.00

Page 37

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
E-33 1 M2 Pasang Dinding Glass Block 20 x 20 adk 1pc : 4ps
- Glass block 20 x 20
Bh
36.0000
24,200.00
- Semen Portland
Kg
11.0000
1,548.00
- Pasir Pasang
M3
0.0350
256,800.00
- Pekerja
Oh
0.3000
50,000.00
- Tukang Batu
Oh
0.1000
75,000.00
- Kepala Tukang
Oh
0.0100
80,000.00
- Mandor
Oh
0.0150
85,000.00
Jumlah
Dibulatkan
E-34 1 M2 Pasang Dinding anyaman bambu, rangka kayu
- Bilik bambu
M2
1.5000
25,000.00
- Kayu kaso 5/7
M3
0.0140
3,692,500.00
- Paku
Kg
0.0112
20,700.00
- List kayu 2/4
m3
0.0030
5,810,000.00
- Pekerja
Oh
0.1000
50,000.00
- Tukang Batu
Oh
0.0500
75,000.00
- Kepala Tukang
Oh
0.0050
80,000.00
- Mandor
Oh
0.0020
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
871,200.00
17,028.00
8,988.00
15,000.00
7,500.00
800.00
1,275.00
921,791.00
921,791.00
37,500.00
51,695.00
231.84
17,430.00
5,000.00
3,750.00
400.00
170.00
116,176.84
116,177.00

Page 38

F. ANALISA HARGA SATUAN PEKERJAAN PLESTERAN


No.
F-01

F-02

F-03

F-04

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M2 Plesteran adk. 1pc : 2ps Tebal 15 mm
- Semen Portland
Kg
8.5200
1,548.00
- Pasir Pasang
M3
0.0170
256,800.00
- Pekerja
Oh
0.2000
50,000.00
- Tukang Batu
Oh
0.1500
70,000.00
- Kepala Tukang
Oh
0.0150
80,000.00
- Mandor
Oh
0.0100
85,000.00
Jumlah
Dibulatkan
1 M2 Plesteran adk. 1pc : 3ps Tebal 15 mm
- Semen Portland
Kg
6.4800
1,548.00
- Pasir Pasang
M3
0.0190
256,800.00
- Pekerja
Oh
0.2000
50,000.00
- Tukang Batu
Oh
0.1500
70,000.00
- Kepala Tukang
Oh
0.0150
80,000.00
- Mandor
Oh
0.0100
85,000.00
Jumlah
Dibulatkan
1 M2 Plesteran adk. 1pc : 4ps Tebal 15 mm
- Semen Portland
Kg
5.2000
1,548.00
- Pasir Pasang
M3
0.0200
256,800.00
- Pekerja
Oh
0.2000
50,000.00
- Tukang Batu
Oh
0.1500
70,000.00
- Kepala Tukang
Oh
0.0150
80,000.00
- Mandor
Oh
0.0100
85,000.00
Jumlah
Dibulatkan
1 M2 Plesteran adk. 1pc : 3ps Tebal 20 mm
- Semen Portland
Kg
10.8000
1,548.00
- Pasir Pasang
M3
0.0260
256,800.00
- Pekerja
Oh
0.2500
50,000.00
- Tukang Batu
Oh
0.2000
70,000.00
- Kepala Tukang
Oh
0.0200
80,000.00
- Mandor
Oh
0.0125
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
13,188.96
4,365.60
10,000.00
10,500.00
1,200.00
850.00
40,104.56
40,105.00
10,031.04
4,879.20
10,000.00
10,500.00
1,200.00
850.00
37,460.24
37,460.00
8,049.60
5,136.00
10,000.00
10,500.00
1,200.00
850.00
35,735.60
35,736.00
16,718.40
6,676.80
12,500.00
14,000.00
1,600.00
1,062.50
52,557.70
52,558.00

Page 39

No.
F-05

F-06

F-07

F-08

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M2 Plesteran adk. 1pc : 4ps Tebal 20 mm
- Semen Portland
Kg
8.6800
1,548.00
- Pasir Pasang
M3
0.0280
256,800.00
- Pekerja
Oh
0.2500
50,000.00
- Tukang Batu
Oh
0.2000
70,000.00
- Kepala Tukang
Oh
0.0200
80,000.00
- Mandor
Oh
0.0125
85,000.00
Jumlah
Dibulatkan
1 M2 Plesteran adk. 1pc:5ps tebal 20 mm
- Semen Portland
Kg
7.2900
1,548.00
- Pasir Pasang
M3
0.0260
256,800.00
- Pekerja
Oh
0.2500
50,000.00
- Tukang Batu
Oh
0.2000
70,000.00
- Kepala Tukang
Oh
0.0200
80,000.00
- Mandor
Oh
0.0125
85,000.00
Jumlah
Dibulatkan
1 M2 Berapen adk. 1pc : 5ps Tebal 15 mm
- Semen Portland
Kg
5.6700
1,548.00
- Pasir Pasang
M3
0.0230
256,800.00
- Pekerja
Oh
0.1500
50,000.00
- Tukang Batu
Oh
0.0700
70,000.00
- Kepala Tukang
Oh
0.0070
80,000.00
- Mandor
Oh
0.0080
85,000.00
Jumlah
Dibulatkan
1 M2 Plesteran Beton adk. 1pc : 2ps Tebal 15 mm
- Semen Portland
Kg
9.3000
1,548.00
- Pasir Pasang
M3
0.0180
256,800.00
- Pekerja
Oh
0.2600
50,000.00
- Tukang Batu
Oh
0.2000
70,000.00
- Kepala Tukang
Oh
0.0200
80,000.00
- Mandor
Oh
0.0130
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
13,436.64
7,190.40
12,500.00
14,000.00
1,600.00
1,062.50
49,789.54
49,790.00
11,284.92
6,676.80
12,500.00
14,000.00
1,600.00
1,062.50
47,124.22
47,124.00
8,777.16
5,906.40
7,500.00
4,900.00
560.00
680.00
28,323.56
28,324.00
14,396.40
4,622.40
13,000.00
14,000.00
1,600.00
1,105.00
48,723.80
48,724.00

Page 40

No.
F-09

F-10

F-11

F-12

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M2 Plesteran Beton adk. 1pc : 3ps Tebal 15 mm
- Semen Portland
Kg
7.0700
1,548.00
- Pasir Pasang
M3
0.0210
256,800.00
- Pekerja
Oh
0.2600
50,000.00
- Tukang Batu
Oh
0.2000
70,000.00
- Kepala Tukang
Oh
0.0200
80,000.00
- Mandor
Oh
0.0130
85,000.00
Jumlah
Dibulatkan
1 M2 Plesteran Skoning adk. 1pc : 2ps, tebal 10mm
- Semen Portland
Kg
0.5000
1,548.00
- Pasir Pasang
M3
0.0130
256,800.00
- Pekerja
Oh
0.0800
50,000.00
- Tukang Batu
Oh
0.4000
70,000.00
- Kepala Tukang
Oh
0.0400
80,000.00
- Mandor
Oh
0.0040
85,000.00
Jumlah
Dibulatkan
1 M2 Acian Plesteran
- Semen Portland
Kg
4.0000
1,548.00
- Pekerja
Oh
0.1430
50,000.00
- Tukang batu
Oh
0.1070
70,000.00
- Kepala Tukang
Oh
0.0105
80,000.00
- Mandor
Oh
0.0105
85,000.00
Jumlah
Dibulatkan
1 M2 Plesteran Siar adk. 1pc : 2ps batu belah
- Semen Portland
Kg
6.3400
1,548.00
- Pasir Pasang
M3
0.0120
256,800.00
- Pekerja
Oh
0.3000
50,000.00
- Tukang Batu
Oh
0.1500
70,000.00
- Kepala Tukang
Oh
0.0150
80,000.00
- Mandor
Oh
0.0150
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
10,944.36
5,392.80
13,000.00
14,000.00
1,600.00
1,105.00
46,042.16
46,042.00
774.00
3,338.40
4,000.00
28,000.00
3,200.00
340.00
39,652.40
39,652.00
6,192.00
7,150.00
7,490.00
840.00
892.50
22,564.50
22,565.00
9,814.32
3,081.60
15,000.00
10,500.00
1,200.00
1,275.00
40,870.92
40,871.00

Page 41

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
F-13 1 M2 Plesteran Siar adk. 1pc : 2ps dinding bata merah
- Semen Portland
Kg
4.3200
1,548.00
- Semen Portland
M3
0.0160
256,800.00
- Pekerja
Oh
0.1500
50,000.00
- Tukang Batu
Oh
0.0700
70,000.00
- Kepala Tukang
Oh
0.0070
80,000.00
- Mandor
Oh
0.0080
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
6,687.36
4,108.80
7,500.00
4,900.00
560.00
680.00
24,436.16
24,436.00

Page 42

G. ANALISA HARGA SATUAN PEKERJAAN PENUTUP ATAP


No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)

G-01 1 M2 Pasang Atap Genteng Palentong


- Genteng palentong
Bh
25.0000
- Pekerja
Oh
0.1500
- Tukang kayu
Oh
0.0750
- Kepala tukang
Oh
0.0080
- Mandor
Oh
0.0080
Jumlah
Dibulatkan
G-02 1 M2 Pasang Genteng Bubung Palentong
- Genteng bubung palentong
Bh
5.0000
- Semen Portland
Kg
8.0000
- Pasir pasang
M3
0.0320
- Pekerja
Oh
0.4000
- Tukang kayu
Oh
0.2000
- Kepala tukang
Oh
0.0200
- Mandor
Oh
0.0020
Jumlah
Dibulatkan
G-03 1 M2 Pasang Roof Light Fibreglass ( 180 x 90 ) cm
- Roof light fibreglass
Lbr
0.6000
- Paku biasa " - 1"
Kg
0.0500
- Pekerja
Oh
0.1400
- Tukang kayu
Oh
0.0670
- Kepala tukang
Oh
0.0070
- Mandor
Oh
0.0070
Jumlah
Dibulatkan
G-04 1 M2 Pasang Atap Asbes Gelombang ( 3,00 x 1,05 m ) x 4 mm
- Asbes gelombang
Lbr
0.3500
- Paku seng
Kg
0.1200
- Pekerja
Oh
0.1400
- Tukang kayu
Oh
0.0700
- Kepala tukang
Oh
0.0070
- Mandor
Oh
0.0070
Jumlah
Dibulatkan

HARGA
(Rp)

2,500.00
50,000.00
75,000.00
80,000.00
85,000.00

62,500.00
7,500.00
5,625.00
640.00
680.00
76,945.00
76,945.00

7,000.00
1,548.00
256,800.00
50,000.00
75,000.00
80,000.00
85,000.00

35,000.00
12,384.00
8,217.60
20,000.00
15,000.00
1,600.00
170.00
92,371.60
92,372.00

110,000.00
20,700.00
50,000.00
75,000.00
80,000.00
85,000.00

66,000.00
1,035.00
7,000.00
5,025.00
560.00
595.00
80,215.00
80,215.00

88,000.00
20,700.00
50,000.00
75,000.00
80,000.00
85,000.00

30,800.00
2,484.00
7,000.00
5,250.00
560.00
595.00
46,689.00
46,689.00

Page 43

No.
G-05

G-06

G-07

G-08

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M2 Pasang Atap Asbes Gelombang ( 2,70 x 1,05 m ) x 4 mm
- Asbes gelombang
Lbr
0.4200
81,000.00
- Paku seng
Kg
0.1200
20,700.00
- Pekerja
Oh
0.1400
50,000.00
- Tukang kayu
Oh
0.0700
75,000.00
- Kepala tukang
Oh
0.0070
80,000.00
- Mandor
Oh
0.0070
85,000.00
Jumlah
Dibulatkan
1 M2 Pasang Atap Asbes Gelombang ( 2,40 x 1,05 m ) x 4 mm
- Asbes gelombang
Lbr
0.4400
72,500.00
- Paku seng
Kg
0.1200
20,700.00
- Pekerja
Oh
0.1400
50,000.00
- Tukang kayu
Oh
0.0670
75,000.00
- Kepala tukang
Oh
0.0070
80,000.00
- Mandor
Oh
0.0070
85,000.00
Jumlah
Dibulatkan
1 M2 Pasang Atap Asbes Gelombang ( 2,10 x 1,05 m ) x 4 mm
- Asbes gelombang
Lbr
0.5100
65,500.00
- Paku seng
Kg
0.1200
20,700.00
- Pekerja
Oh
0.1400
50,000.00
- Tukang kayu
Oh
0.0670
75,000.00
- Kepala tukang
Oh
0.0070
80,000.00
- Mandor
Oh
0.0070
85,000.00
Jumlah
Dibulatkan
1 M2 Pasang Atap Asbes Gelombang ( 1,50 x 1,05 m ) x 4 mm
- Asbes gelombang
Lbr
0.8000
47,000.00
- Paku seng
Kg
0.1200
20,700.00
- Pekerja
Oh
0.1400
50,000.00
- Tukang kayu
Oh
0.0670
75,000.00
- Kepala tukang
Oh
0.0070
80,000.00
- Mandor
Oh
0.0070
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
34,020.00
2,484.00
7,000.00
5,250.00
560.00
595.00
49,909.00
49,909.00
31,900.00
2,484.00
7,000.00
5,025.00
560.00
595.00
47,564.00
47,564.00
33,405.00
2,484.00
7,000.00
5,025.00
560.00
595.00
49,069.00
49,069.00
37,600.00
2,484.00
7,000.00
5,025.00
560.00
595.00
53,264.00
53,264.00

Page 44

No.
G-09

G-10

G-11

G-12

G-13

G-14

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M Pasang Nok Stel Gelombang 1,05 m
- Nok stel gelombang
Lbr
2.1000
42,000.00
- Paku sekrup 3,5"
Bh
6.0000
1,000.00
- Pekerja
Oh
0.0840
50,000.00
- Tukang kayu
Oh
0.1250
75,000.00
- Kepala tukang
Oh
0.0130
80,000.00
- Mandor
Oh
0.0040
85,000.00
Jumlah
Dibulatkan
1 M2 Pasang Atap Genteng Beton
- Genteng beton
bh
11.0000
9,500.00
- Paku biasa 2" - 5"
Kg
0.0300
20,700.00
- Pekerja
Oh
0.2000
50,000.00
- Tukang kayu
Oh
0.1000
75,000.00
- Kepala tukang
Oh
0.0100
80,000.00
- Mandor
Oh
0.0100
85,000.00
Jumlah
Dibulatkan
1 M2 Pasang Atap Genteng Murando Natural
- Genteng murando natural
bh
18.0000
3,000.00
- Pekerja
Oh
0.1500
50,000.00
- Tukang kayu
Oh
0.0750
75,000.00
- Kepala tukang
Oh
0.0080
80,000.00
- Mandor
Oh
0.0080
85,000.00
Jumlah
Dibulatkan
1 M2 Pasang Atap Genteng Murando Glazur
- Genteng murando glazur
bh
18.0000
4,500.00
- Pekerja
Oh
0.1500
50,000.00
- Tukang kayu
Oh
0.0750
75,000.00
- Kepala tukang
Oh
0.0080
80,000.00
- Mandor
Oh
0.0080
85,000.00
Jumlah
Dibulatkan
1 M2 Pasang Atap Genteng Metal
- Genteng metal
m2
1.0200
225,000.00
- Paku biasa 2" - 5"
Kg
0.2000
20,700.00
- Pekerja
Oh
0.2000
50,000.00
- Tukang kayu
Oh
0.1000
75,000.00
- Kepala tukang
Oh
0.0100
80,000.00
- Mandor
Oh
0.0010
85,000.00
Jumlah
Dibulatkan
1 M Pasang Nok Genteng Beton
- Nok genteng beton
Bh
3.5000
12,000.00
- Paku biasa 2" - 5"
Kg
0.0500
20,700.00
- Semen abu-abu
Kg
10.8000
1,548.00

HARGA
(Rp)
88,200.00
6,000.00
4,200.00
9,375.00
1,040.00
340.00
109,155.00
109,155.00
104,500.00
621.00
10,000.00
7,500.00
800.00
850.00
124,271.00
124,271.00
54,000.00
7,500.00
5,625.00
640.00
680.00
68,445.00
68,445.00
81,000.00
7,500.00
5,625.00
640.00
680.00
95,445.00
95,445.00
229,500.00
4,140.00
10,000.00
7,500.00
800.00
85.00
252,025.00
252,025.00
42,000.00
1,035.00
16,718.40

Page 45

No.

URAIAN
-

Pasir pasang
Semen warna
Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah
Dibulatkan

SATUAN VOLUME HARGA SATUAN


(Rp)
M3
0.0320
256,800.00
Kg
1.0000
15,000.00
Oh
0.4000
50,000.00
Oh
0.2000
75,000.00
Oh
0.0200
80,000.00
Oh
0.0200
85,000.00

HARGA
(Rp)
8,217.60
15,000.00
20,000.00
15,000.00
1,600.00
1,700.00
121,271.00
121,271.00

Page 46

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)

G-15 1 M Pasang Nok Genteng Metal


- Nok genteng metal
- Paku biasa " - 1"
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
G-16 1 M2 Pasang Atap Seng Gelombang
- Seng gelombang 180x80, 5mm
- Paku biasa " - 1"
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
G-17 1 M2 Pasang Atap Nok Seng
- Seng plat 3" x 6" BJLS 30
- Paku biasa " - 1"
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
G-18 1 M2 Pasang Alluminium Foil / Sisalation
- Sisalation / alluminium foil
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
G-19 1 M2 Pasang Atap Alluminium Natural
- Atap Alumunium Natural USR 26
- Paku hak panjang 15 cm
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
G-20 1 M2 Pasang Atap Alluminium warna
- Atap Alumunium Warna USR 26
- Paku hak panjang 15 cm

HARGA
(Rp)

Lbr
Kg
Oh
Oh
Oh
Oh

1.1000
0.0500
0.2500
0.1500
0.0150
0.0130

152,500.00
20,700.00
50,000.00
75,000.00
80,000.00
85,000.00

167,750.00
1,035.00
12,500.00
11,250.00
1,200.00
1,105.00
194,840.00
194,840.00

Lbr
Kg
Oh
Oh
Oh
Oh

0.7000
0.0200
0.1200
0.0600
0.0060
0.0060

91,500.00
20,700.00
50,000.00
75,000.00
80,000.00
85,000.00

64,050.00
414.00
6,000.00
4,500.00
480.00
510.00
75,954.00
75,954.00

Lbr
Kg
Oh
Oh
Oh
Oh

0.3000
0.0400
0.1500
0.0700
0.0080
0.0060

41,500.00
20,700.00
50,000.00
75,000.00
80,000.00
85,000.00

12,450.00
828.00
7,500.00
5,250.00
640.00
510.00
27,178.00
27,178.00

M2
Oh
Oh
Oh
Oh

1.0500
0.1500
0.0500
0.0050
0.0080

22,500.00
50,000.00
75,000.00
80,000.00
85,000.00

23,625.00
7,500.00
3,750.00
400.00
680.00
35,955.00
35,955.00

Lbr
Kg
Oh
Oh
Oh
Oh

1.0500
0.0200
0.1500
0.7500
0.0080
0.0060

155,000.00
18,400.00
50,000.00
75,000.00
80,000.00
85,000.00

162,750.00
368.00
7,500.00
56,250.00
640.00
510.00
228,018.00
228,018.00

Lbr
Kg

1.0500
0.0200

182,500.00
18,400.00

191,625.00
368.00

Page 47

No.

URAIAN
-

Pekerja
Tukang kayu
Kepala tukang
Mandor
Jumlah
Dibulatkan
G-21 1 M2 Pasang Nok Alluminium
- Nok standar
- Paku hak panjang 15 cm
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan

SATUAN VOLUME HARGA SATUAN


(Rp)
Oh
0.1500
50,000.00
Oh
0.7500
75,000.00
Oh
0.0080
80,000.00
Oh
0.0060
85,000.00

M2
Kg
Oh
Oh
Oh
Oh

1.2000
0.0400
0.1000
1.0000
0.0100
0.0100

82,500.00
18,400.00
50,000.00
75,000.00
80,000.00
85,000.00

HARGA
(Rp)
7,500.00
56,250.00
640.00
510.00
256,893.00
256,893.00
99,000.00
736.00
5,000.00
75,000.00
800.00
850.00
181,386.00
181,386.00

Page 48

H. ANALISA HARGA SATUAN PEKERJAAN PENUTUP LANGIT-LANGIT


No.
H-01

H-02

H-03

H-04

H-05

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M2 Langit-langit Asbes ( 1,00 x 1,00 ) m, tebal 5 mm
- Pelat asbes tebal 4 mm
m2
1.1000
25,000.00
- Paku seng
Kg
0.0100
20,700.00
- Pekerja
Oh
0.0300
50,000.00
- Tukang kayu
Oh
0.0700
75,000.00
- Kepala tukang
Oh
0.0070
80,000.00
- Mandor
Oh
0.0015
85,000.00
Jumlah
Dibulatkan
1 M2 Langit-langit Asbes ( 1,00 x 1,00 ) m, tebal 3,5 mm
- Pelat asbes tebal 3,5 mm
Lbr
1.1000
21,500.00
- Paku seng
Kg
0.0100
20,700.00
- Pekerja
Oh
0.0300
50,000.00
- Tukang kayu
Oh
0.0700
75,000.00
- Kepala tukang
Oh
0.0070
80,000.00
- Mandor
Oh
0.0015
85,000.00
Jumlah
Dibulatkan
1 M2 Langit-langit Akustik ( 60 x 120 ) cm
- Akustik 600 x 1200
Lbr
1.5000
146,500.00
- Paku
Kg
0.0500
20,700.00
- Pekerja
Oh
0.0600
50,000.00
- Tukang kayu
Oh
0.1000
75,000.00
- Kepala tukang
Oh
0.0100
80,000.00
- Mandor
Oh
0.0030
85,000.00
Jumlah
Dibulatkan
1 M2 Langit-langit Akustik ( 60 x 120 ) cm + Rangka Alluminium
- Profil Alluminium "T"
M
3.6000
13,500.00
- Kawat f 4 mm
Kg
0.1500
31,100.00
- Ramset / dina bolt
Bh
1.0500
8,000.00
- Akustik 600 x 1200
Lbr
1.5000
146,500.00
- Pekerja
Oh
0.1500
50,000.00
- Tukang kayu
Oh
0.5000
75,000.00
- Kepala tukang
Oh
0.0500
80,000.00
- Mandor
Oh
0.0075
85,000.00
Jumlah
Dibulatkan
1 M2 Langit-langit teakwood (60 x 120) cm, t = 4 mm + rangka kayu borneo super
- Kayu Balok Borneo Super
M3
0.0230
2,905,000.00
- Paku biasa 2" - 5"
Kg
0.0600
20,700.00
- Teakwood 120 cm x 240 cm x 0,4 cm
Lbr
0.3900
145,000.00
- Pekerja
Oh
0.2700
50,000.00
- Tukang kayu
Oh
0.4000
75,000.00
- Kepala tukang
Oh
0.0400
80,000.00
- Mandor
Oh
0.0135
85,000.00

HARGA
(Rp)
27,500.00
207.00
1,500.00
5,250.00
560.00
127.50
35,144.50
35,145.00
23,650.00
207.00
1,500.00
5,250.00
560.00
127.50
31,294.50
31,295.00
219,750.00
1,035.00
3,000.00
7,500.00
800.00
255.00
232,340.00
232,340.00
48,600.00
4,665.00
8,400.00
219,750.00
7,500.00
37,500.00
4,000.00
637.50
331,052.50
331,053.00
66,815.00
1,242.00
56,550.00
13,500.00
30,000.00
3,200.00
1,147.50

Page 49

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)

Jumlah
Dibulatkan
H-06 1 M2 Langit-langit Teakwood 3 mm + Rangka Kayu Borneo Super
- Kayu Balok Borneo Super
M3
0.0230
2,905,000.00
- Paku biasa 2" - 5"
Kg
0.0600
20,700.00
- Teakwood (120 x 240x 0,3) cm
Lbr
0.3900
142,500.00
- Pekerja
Oh
0.2700
50,000.00
- Tukang kayu
Oh
0.4000
75,000.00
- Kepala tukang
Oh
0.0400
80,000.00
- Mandor
Oh
0.0135
85,000.00
Jumlah
Dibulatkan
H-07 1 M2 Langit-langit Triplek 4 mm + Rangka Kayu Borneo Super
- Kayu Balok Borneo Super
M3
0.0230
2,905,000.00
- Paku biasa 2" - 5"
Kg
0.0600
20,700.00
- Triplek 120 cm x 240 cm x 0,4 cm
Lbr
0.3900
72,500.00
- Pekerja
Oh
0.2700
50,000.00
- Tukang kayu
Oh
0.4000
75,000.00
- Kepala tukang
Oh
0.0400
80,000.00
- Mandor
Oh
0.0135
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
172,454.50
172,455.00
66,815.00
1,242.00
55,575.00
13,500.00
30,000.00
3,200.00
1,147.50
171,479.50
171,480.00
66,815.00
1,242.00
28,275.00
13,500.00
30,000.00
3,200.00
1,147.50
144,179.50
144,180.00

Page 50

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
H-08 1 M2 Langit-langit Gypsum Board, tebal 9 mm + rangka besi hollow
- Hollow 4/4 Zincromate
Btg
0.4150
32,200.00
- Hollow 2/4 Zincromate
Btg
0.1500
25,000.00
- Gypsum board ( 120 x 240 x 9 ) mm
Lbr
0.3640
87,800.00
- Paku gypsum
kg
0.1100
19,500.00
- Ramset / dina bolt
Bh
4.0000
8,000.00
- Cotton plaster
Bh
0.0720
16,500.00
- Compoun
Zak
0.1250
83,000.00
- Pekerja
Oh
0.1000
50,000.00
- Tukang kayu
Oh
0.0500
75,000.00
- Kepala tukang
Oh
0.0050
80,000.00
- Mandor
Oh
0.0050
85,000.00
Jumlah
Dibulatkan
H-09 1 M2 Langit-langit GRC t = 4 mm + rangka besi hollow
- Hollow 4/4 Zincromate
Btg
0.4150
32,200.00
- Hollow 2/4 Zincromate
Btg
0.1500
25,000.00
- GRC ( 120 x 240 x 4 ) mm
Lbr
0.3640
74,500.00
- Paku GRC
kg
0.1100
38,500.00
- Ramset / dina bolt
Bh
4.0000
8,000.00
- Cotton plaster
Bh
0.0720
16,500.00
- Compoun
Zak
0.1250
83,000.00
- Pekerja
Oh
0.1000
50,000.00
- Tukang kayu
Oh
0.0500
75,000.00
- Kepala tukang
Oh
0.0050
80,000.00
- Mandor
Oh
0.0050
85,000.00
Jumlah
Dibulatkan
H-10 1 M2 Langit-langit gypsum t = 9 mm + Rangka Kayu Borneo Super
- Kayu Balok Borneo Super
M3
0.0230
2,905,000.00
- Paku biasa 2" - 5"
Kg
0.0600
20,700.00
- Gypsum board ( 120 x 240 x 9 ) mm
Lbr
0.3900
87,800.00
- Paku sekrup
kg
0.1100
19,500.00
- Pekerja
Oh
0.2700
50,000.00
- Tukang kayu
Oh
0.4000
75,000.00
- Kepala tukang
Oh
0.0400
80,000.00
- Mandor
Oh
0.0135
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
13,363.00
3,750.00
31,959.20
2,145.00
32,000.00
1,188.00
10,375.00
5,000.00
3,750.00
400.00
425.00
104,355.20
104,355.00
13,363.00
3,750.00
27,118.00
4,235.00
32,000.00
1,188.00
10,375.00
5,000.00
3,750.00
400.00
425.00
101,604.00
101,604.00
66,815.00
1,242.00
34,242.00
2,145.00
13,500.00
30,000.00
3,200.00
1,147.50
152,291.50
152,292.00

Page 51

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
H-11 1 M2 Langit-langit GRC t = 4 mm + Rangka Kayu Borneo Super
- Kayu Balok Borneo Super
M3
0.0230
2,905,000.00
- Paku biasa 2" - 5"
Kg
0.0600
20,700.00
- GRC ( 120 x 240 x 4 ) mm
Lbr
0.3900
74,500.00
- Paku GRC
kg
0.1100
38,500.00
- Pekerja
Oh
0.2700
50,000.00
- Tukang kayu
Oh
0.4000
75,000.00
- Kepala tukang
Oh
0.0400
80,000.00
- Mandor
Oh
0.0135
85,000.00
Jumlah
Dibulatkan
H-12 1 M List Langit-langit Kayu Profil 10 cm
- List Kayu profil
M
1.0500
32,400.00
- Paku
Kg
0.0100
20,700.00
- Pekerja
Oh
0.0500
50,000.00
- Tukang kayu
Oh
0.0500
75,000.00
- Kepala tukang
Oh
0.0050
80,000.00
- Mandor
Oh
0.0030
85,000.00
Jumlah
Dibulatkan
H-13 1 M List Langit-langit Gypsum 10 cm
- List gypsum
M
1.0500
9,500.00
- Tepung gypsum
Kg
0.1500
13,800.00
- Pekerja
Oh
0.0500
50,000.00
- Tukang kayu
Oh
0.0500
75,000.00
- Kepala tukang
Oh
0.0050
80,000.00
- Mandor
Oh
0.0030
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
66,815.00
1,242.00
29,055.00
4,235.00
13,500.00
30,000.00
3,200.00
1,147.50
149,194.50
149,195.00
34,020.00
207.00
2,500.00
3,750.00
400.00
255.00
41,132.00
41,132.00
9,975.00
2,070.00
2,500.00
3,750.00
400.00
255.00
18,950.00
18,950.00

Page 52

I. ANALISA HARGA SATUAN PEKERJAAN PENUTUP LANTAI DAN DINDING


No.
I-01

I-02

I-03

I-04

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M2 Lantai Ubin Granito ukuran 40 x 40 cm
- Granito 40 x 40 cm
m2
1.0500
380,000.00
- Semen portland
Kg
9.8000
1,548.00
- Pasir pasang
M3
0.0215
256,800.00
- Semen warna
Kg
1.3000
15,000.00
- Pekerja
Oh
0.2500
50,000.00
- Tukang batu
Oh
0.1200
75,000.00
- Kepala tukang
Oh
0.0120
80,000.00
- Mandor
Oh
0.0125
85,000.00
Jumlah
Dibulatkan
1 M2 Lantai Ubin Granito ukuran 30 x 30 cm
- Granito 30 x 30 cm
m2
1.0500
355,500.00
- Semen portland
Kg
10.0000
1,548.00
- Pasir pasang
M3
0.0215
256,800.00
- Semen warna
Kg
1.5000
15,000.00
- Pekerja
Oh
0.2600
50,000.00
- Tukang batu
Oh
0.1250
75,000.00
- Kepala tukang
Oh
0.0125
80,000.00
- Mandor
Oh
0.0130
85,000.00
Jumlah
Dibulatkan
1 M Plint Ubin Granito ukuran 10 x 40 cm
- Plint granito 10 x 40 cm
Bh
2.6500
52,500.00
- Semen portland
Kg
1.2000
1,548.00
- Pasir pasang
M3
0.0030
256,800.00
- Semen warna
Kg
0.1000
15,000.00
- Pekerja
Oh
0.0600
50,000.00
- Tukang batu
Oh
0.0300
75,000.00
- Kepala tukang
Oh
0.0030
80,000.00
- Mandor
Oh
0.0030
85,000.00
Jumlah
Dibulatkan
1 M Plint Ubin Granito ukuran 10 x 30 cm
- Plint granito 10 x 30 cm
Bh
3.3300
47,500.00
- Semen portland
Kg
1.6500
1,548.00
- Pasir pasang
M3
0.0032
256,800.00
- Semen warna
Kg
0.1000
15,000.00
- Pekerja
Oh
0.0600
50,000.00
- Tukang batu
Oh
0.0300
75,000.00
- Kepala tukang
Oh
0.0030
80,000.00
- Mandor
Oh
0.0030
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
399,000.00
15,170.40
5,521.20
19,500.00
12,500.00
9,000.00
960.00
1,062.50
462,714.10
462,714.00
373,275.00
15,480.00
5,521.20
22,500.00
13,000.00
9,375.00
1,000.00
1,105.00
441,256.20
441,256.00
139,125.00
1,857.60
770.40
1,500.00
3,000.00
2,250.00
240.00
255.00
148,998.00
148,998.00
158,175.00
2,554.20
821.76
1,500.00
3,000.00
2,250.00
240.00
255.00
168,795.96
168,796.00

Page 53

No.
I-05

I-06

I-07

I-08

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M2 Lantai Keramik Corak 10 x 20 cm setara Mulia
- Keramik corak 10 x 20 cm
m2
1.0000
62,500.00
- Semen portland
Kg
11.3800
1,548.00
- Pasir pasang
M3
0.0420
256,800.00
- Semen warna
Kg
1.5000
15,000.00
- Pekerja
Oh
0.6200
50,000.00
- Tukang batu
Oh
0.3500
75,000.00
- Kepala tukang
Oh
0.0350
80,000.00
- Mandor
Oh
0.0300
85,000.00
Jumlah
Dibulatkan
1 M2 Lantai Keramik corak 20 x 20 cm setara Mulia
- Keramik corak 20 x 20 cm
m2
1.0000
70,000.00
- Semen portland
Kg
11.3800
1,548.00
- Pasir pasang
M3
0.0420
256,800.00
- Semen warna
Kg
1.5000
15,000.00
- Pekerja
Oh
0.6200
50,000.00
- Tukang batu
Oh
0.3500
75,000.00
- Kepala tukang
Oh
0.0350
80,000.00
- Mandor
Oh
0.0300
85,000.00
Jumlah
Dibulatkan
1 M2 Lantai Keramik polos 30 x 30 cm setara Mulia
- Keramik polos 30 x 30 cm
m2
1.0000
58,500.00
- Semen portland
Kg
11.3800
1,548.00
- Pasir pasang
M3
0.0420
256,800.00
- Semen warna
Kg
1.5000
15,000.00
- Pekerja
Oh
0.6200
50,000.00
- Tukang batu
Oh
0.3500
75,000.00
- Kepala tukang
Oh
0.0350
80,000.00
- Mandor
Oh
0.0300
85,000.00
Jumlah
Dibulatkan
1 M2 Lantai Keramik corak 30 x 30 cm Setara Mulia
- Keramik corak 30 x 30 cm
m2
1.0000
64,000.00
- Semen portland
Kg
11.3800
1,548.00
- Pasir pasang
M3
0.0420
256,800.00
- Semen warna
Kg
1.5000
15,000.00
- Pekerja
Oh
0.6200
50,000.00
- Tukang batu
Oh
0.3500
75,000.00
- Kepala tukang
Oh
0.0350
80,000.00
- Mandor
Oh
0.0300
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
62,500.00
17,616.24
10,785.60
22,500.00
31,000.00
26,250.00
2,800.00
2,550.00
176,001.84
176,002.00
70,000.00
17,616.24
10,785.60
22,500.00
31,000.00
26,250.00
2,800.00
2,550.00
183,501.84
183,502.00
58,500.00
17,616.24
10,785.60
22,500.00
31,000.00
26,250.00
2,800.00
2,550.00
172,001.84
172,002.00
64,000.00
17,616.24
10,785.60
22,500.00
31,000.00
26,250.00
2,800.00
2,550.00
177,501.84
177,502.00

Page 54

No.
I-09

I-10

I-11

I-12

I-13

I-14

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M2 Lantai Keramik polos 40 x 40 cm Setara Mulia
- Keramik polos 40 x 40 cm
m2
1.0000
62,500.00
- Semen portland
Kg
11.3800
1,548.00
- Pasir pasang
M3
0.0420
256,800.00
- Semen warna
Kg
1.5000
15,000.00
- Pekerja
Oh
0.6200
50,000.00
- Tukang batu
Oh
0.3500
75,000.00
- Kepala tukang
Oh
0.0350
80,000.00
- Mandor
Oh
0.0300
85,000.00
Jumlah
Dibulatkan
1 M2 Lantai Keramik corak 40 x 40 cm Setara Mulia
- Keramik corak 40 x 40 cm
m2
1.0000
72,500.00
- Semen portland
Kg
11.3800
1,548.00
- Pasir pasang
M3
0.0420
256,800.00
- Semen warna
Kg
1.5000
15,000.00
- Pekerja
Oh
0.6200
50,000.00
- Tukang batu
Oh
0.3500
75,000.00
- Kepala tukang
Oh
0.0350
80,000.00
- Mandor
Oh
0.0300
85,000.00
Jumlah
Dibulatkan
1 M2 Lantai Keramik Corak 10 x 20 cm setara Roman
- Keramik corak 10 x 20 cm
m2
1.0000
80,000.00
- Semen portland
Kg
11.3800
1,548.00
- Pasir pasang
M3
0.0420
256,800.00
- Semen warna
Kg
1.5000
15,000.00
- Pekerja
Oh
0.6200
50,000.00
- Tukang batu
Oh
0.3500
75,000.00
- Kepala tukang
Oh
0.0350
80,000.00
- Mandor
Oh
0.0300
85,000.00
Jumlah
Dibulatkan
1 M2 Lantai Keramik corak 20 x 20 cm setara Roman
- Keramik corak 20 x 20 cm
m2
1.0000
83,000.00
- Semen portland
Kg
11.3800
1,548.00
- Pasir pasang
M3
0.0420
256,800.00
- Semen warna
Kg
1.5000
15,000.00
- Pekerja
Oh
0.6200
50,000.00
- Tukang batu
Oh
0.3500
75,000.00
- Kepala tukang
Oh
0.0350
80,000.00
- Mandor
Oh
0.0300
85,000.00
Jumlah
Dibulatkan
1 M2 Lantai Keramik polos 30 x 30 cm setara Roman
- Keramik polos 30 x 30 cm
m2
1.0000
76,000.00
- Semen portland
Kg
11.3800
1,548.00
- Pasir pasang
M3
0.0420
256,800.00
- Semen warna
Kg
1.5000
15,000.00
- Pekerja
Oh
0.6200
50,000.00
- Tukang batu
Oh
0.3500
75,000.00
- Kepala tukang
Oh
0.0350
80,000.00
- Mandor
Oh
0.0300
85,000.00
Jumlah
Dibulatkan
1 M2 Lantai Keramik corak 30 x 30 cm Setara Roman
- Keramik corak 30 x 30 cm
m2
1.0000
84,500.00

HARGA
(Rp)
62,500.00
17,616.24
10,785.60
22,500.00
31,000.00
26,250.00
2,800.00
2,550.00
176,001.84
176,002.00
72,500.00
17,616.24
10,785.60
22,500.00
31,000.00
26,250.00
2,800.00
2,550.00
186,001.84
186,002.00
80,000.00
17,616.24
10,785.60
22,500.00
31,000.00
26,250.00
2,800.00
2,550.00
193,501.84
193,502.00
83,000.00
17,616.24
10,785.60
22,500.00
31,000.00
26,250.00
2,800.00
2,550.00
196,501.84
196,502.00
76,000.00
17,616.24
10,785.60
22,500.00
31,000.00
26,250.00
2,800.00
2,550.00
189,501.84
189,502.00
84,500.00

Page 55

No.

URAIAN
-

I-15

I-16

I-17

I-18

SATUAN VOLUME HARGA SATUAN


(Rp)
Kg
11.3800
1,548.00
M3
0.0420
256,800.00
Kg
1.5000
15,000.00
Oh
0.6200
50,000.00
Oh
0.3500
75,000.00
Oh
0.0350
80,000.00
Oh
0.0300
85,000.00

Semen portland
Pasir pasang
Semen warna
Pekerja
Tukang batu
Kepala tukang
Mandor
Jumlah
Dibulatkan
1 M2 Lantai Keramik polos 40 x 40 cm setara Roman
- Keramik polos 40 x 40 cm
m2
1.0000
- Semen portland
Kg
11.3800
- Pasir pasang
M3
0.0420
- Semen warna
Kg
1.5000
- Pekerja
Oh
0.6200
- Tukang batu
Oh
0.3500
- Kepala tukang
Oh
0.0350
- Mandor
Oh
0.0300
Jumlah
Dibulatkan
1 M2 Lantai Keramik corak 40 x 40 cm Setara Roman
- Keramik corak 40 x 40 cm
m2
1.0000
- Semen portland
Kg
11.3800
- Pasir pasang
M3
0.0420
- Semen warna
Kg
1.5000
- Pekerja
Oh
0.6200
- Tukang batu
Oh
0.3500
- Kepala tukang
Oh
0.0350
- Mandor
Oh
0.0300
Jumlah
Dibulatkan
1 M2 Lantai Marmer
- Marmer
m2
1.0520
- Semen portland
Kg
14.1500
- Pasir pasang
M3
0.0390
- Semen warna
Kg
2.0000
- Pekerja
Oh
0.6200
- Tukang batu
Oh
0.3500
- Kepala tukang
Oh
0.0350
- Mandor
Oh
0.0300
Jumlah
Dibulatkan
1 M2 Lantai Parquet Jati
- Parquet jati
M2
1.0500
- Lem vinyl
Kg
0.6000
- Pekerja
Oh
0.6500
- Tukang
Oh
0.3500
- Kepala tukang
Oh
0.0350
- Mandor
Oh
0.0325
Jumlah
Dibulatkan

HARGA
(Rp)
17,616.24
10,785.60
22,500.00
31,000.00
26,250.00
2,800.00
2,550.00
198,001.84
198,002.00

80,000.00
1,548.00
256,800.00
15,000.00
50,000.00
75,000.00
80,000.00
85,000.00

80,000.00
17,616.24
10,785.60
22,500.00
31,000.00
26,250.00
2,800.00
2,550.00
193,501.84
193,502.00

85,000.00
1,548.00
256,800.00
15,000.00
50,000.00
75,000.00
80,000.00
85,000.00

85,000.00
17,616.24
10,785.60
22,500.00
31,000.00
26,250.00
2,800.00
2,550.00
198,501.84
198,502.00

605,000.00
1,548.00
256,800.00
15,000.00
50,000.00
75,000.00
80,000.00
85,000.00

636,460.00
21,904.20
10,015.20
30,000.00
31,000.00
26,250.00
2,800.00
2,550.00
760,979.40
760,979.00

413,500.00
48,500.00
50,000.00
75,000.00
80,000.00
85,000.00

434,175.00
29,100.00
32,500.00
26,250.00
2,800.00
2,762.50
527,587.50
527,588.00

Page 56

No.
I-19

I-20

I-21

I-22

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M Plint Keramik ukuran (10 x 40) cm
- Plint keramik (10 x 40) cm
Bh
2.6500
4,500.00
- Semen portland
Kg
1.2000
1,548.00
- Pasir pasang
M3
0.0030
256,800.00
- Semen warna
Kg
0.1000
15,000.00
- Pekerja
Oh
0.0600
50,000.00
- Tukang batu
Oh
0.0300
75,000.00
- Kepala tukang
Oh
0.0030
80,000.00
- Mandor
Oh
0.0030
85,000.00
Jumlah
Dibulatkan
1 M Plint Keramik ukuran (10 x 30) cm
- Plint keramik (10 x 30) cm
Bh
3.5000
4,000.00
- Semen portland
Kg
1.6500
1,548.00
- Pasir pasang
M3
0.0032
256,800.00
- Semen warna
Kg
0.1000
15,000.00
- Pekerja
Oh
0.0600
50,000.00
- Tukang batu
Oh
0.0300
75,000.00
- Kepala tukang
Oh
0.0030
80,000.00
- Mandor
Oh
0.0030
85,000.00
Jumlah
Dibulatkan
1 M' Plint kayu kamper Samarinda (2 x 10) cm
- Papan kayu kamper samarinda
M3
0.0024
9,596,800.00
- Paku
Kg
0.0500
20,700.00
- Pekerja
Oh
0.1200
50,000.00
- Tukang batu
Oh
0.1200
75,000.00
- Kepala tukang
Oh
0.0120
80,000.00
- Mandor
Oh
0.0060
85,000.00
Jumlah
Dibulatkan
1 M' Plint keramik ukuran (10 x 20) cm
- Plint keramik
Bh
5.3000
3,500.00
- Semen abu-abu
Kg
1.6500
1,548.00
- Pasir pasang
M3
0.0032
256,800.00
- Semen warna
Kg
0.1000
15,000.00
- Pekerja
Oh
0.0900
50,000.00
- Tukang batu
Oh
0.0900
75,000.00
- Kepala tukang
Oh
0.0090
80,000.00
- Mandor
Oh
0.0045
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
11,925.00
1,857.60
770.40
1,500.00
3,000.00
2,250.00
240.00
255.00
21,798.00
21,798.00
14,000.00
2,554.20
821.76
1,500.00
3,000.00
2,250.00
240.00
255.00
24,620.96
24,621.00
23,032.32
1,035.00
6,000.00
9,000.00
960.00
510.00
40,537.32
40,537.00
18,550.00
2,554.20
821.76
1,500.00
4,500.00
6,750.00
720.00
382.50
35,778.46
35,778.00

Page 57

No.

URAIAN

I-23 1 M2 Lantai karpet


- Karpet
- Lem
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
I-24 1 M2 Paving block natural 8 cm
- Paving block natural
- Pasir pasang
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
I-25 1 M2 Paving block warna 8 cm
- Paving block warna
- Pasir pasang
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
I-26 1 M2 Paving block natural 6 cm
- Paving block natural
- Pasir pasang
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
I-27 1 M2 Paving block warna 6 cm
- Paving block warna
- Pasir pasang
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan

SATUAN VOLUME HARGA SATUAN


(Rp)

HARGA
(Rp)

M2
Kg
Oh
Oh
Oh
Oh

1.0500
0.3500
0.1700
0.1700
0.0170
0.0085

389,000.00
39,300.00
50,000.00
75,000.00
80,000.00
85,000.00

408,450.00
13,755.00
8,500.00
12,750.00
1,360.00
722.50
445,537.50
445,538.00

M2
Kg
Oh
Oh
Oh
Oh

1.050
0.100
0.2500
0.5000
0.0250
0.00250

89,300.00
256,800.00
50,000.00
75,000.00
80,000.00
85,000.00

93,765.00
25,680.00
12,500.00
37,500.00
2,000.00
212.50
171,657.50
171,658.00

M2
Kg
Oh
Oh
Oh
Oh

1.050
0.100
0.2500
0.5000
0.0250
0.00250

119,500.00
256,800.00
50,000.00
75,000.00
80,000.00
85,000.00

125,475.00
25,680.00
12,500.00
37,500.00
2,000.00
212.50
203,367.50
203,368.00

M2
Kg
Oh
Oh
Oh
Oh

1.050
0.100
0.2500
0.5000
0.0250
0.00250

83,600.00
256,800.00
50,000.00
75,000.00
80,000.00
85,000.00

87,780.00
25,680.00
12,500.00
37,500.00
2,000.00
212.50
165,672.50
165,673.00

M2
Kg
Oh
Oh
Oh
Oh

1.050
0.100
0.2500
0.5000
0.0250
0.00250

94,600.00
256,800.00
50,000.00
75,000.00
80,000.00
85,000.00

99,330.00
25,680.00
12,500.00
37,500.00
2,000.00
212.50
177,222.50
177,223.00

Page 58

No.

URAIAN

I-28 1 M2 Grass Block 20 x 20


- Grass block
- Pasir pasang
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
I-29 1 M2 Grass Block 30 x 30
- Grass block
- Pasir pasang
- Pekerja
- Tukang batu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan

SATUAN VOLUME HARGA SATUAN


(Rp)

HARGA
(Rp)

Bh
Kg
Oh
Oh
Oh
Oh

26.250
0.100
0.2500
0.5000
0.0250
0.00250

10,700.00
256,800.00
50,000.00
75,000.00
80,000.00
85,000.00

280,875.00
25,680.00
12,500.00
37,500.00
2,000.00
212.50
358,767.50
358,768.00

Bh
Kg
Oh
Oh
Oh
Oh

11.670
0.100
0.2500
0.5000
0.0250
0.00250

14,900.00
256,800.00
50,000.00
75,000.00
80,000.00
85,000.00

173,883.00
25,680.00
12,500.00
37,500.00
2,000.00
212.50
251,775.50
251,776.00

Page 59

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)

HARGA
(Rp)

Page 60

J. ANALISA HARGA SATUAN PEKERJAAN KAYU


No.
J-01

J-02

J-03

J-04

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M3 Kusen Pintu & jendela kayu Kamper Samarinda
- Kayu Balok Kamper Samarinda
m3
1.2000
9,500,000.00
- Pekerja
Oh
6.0000
50,000.00
- Tukang Kayu
Oh
18.0000
75,000.00
- Kepala Tukang
Oh
2.0000
80,000.00
- Mandor
Oh
0.3000
85,000.00
Jumlah
Dibulatkan
1 M3 Kusen Pintu & jendela kayu Kamper Medan/Kruing
- Kayu Balok Kamper Medan
M3
1.2000
6,262,000.00
- Pekerja
Oh
6.0000
50,000.00
- Tukang Kayu
Oh
18.0000
75,000.00
- Kepala Tukang
Oh
2.0000
80,000.00
- Mandor
Oh
0.3000
85,000.00
Jumlah
Dibulatkan
1 M3 Kusen Pintu & jendela kayu Borneo Super
- Kayu Borneo Balok Super
M3
1.2000
5,810,000.00
- Pekerja
Oh
6.0000
50,000.00
- Tukang Kayu
Oh
18.0000
75,000.00
- Kepala Tukang
Oh
2.0000
80,000.00
- Mandor
Oh
0.3000
85,000.00
Jumlah
Dibulatkan
1 M2 Pintu Panel Kayu Kamper Samarinda
- Kayu Papan Kamper Samarinda
M3
0.0400
9,500,000.00
- Paku Biasa 2" - 5"
Kg
0.0500
20,700.00
- Pekerja
Oh
1.0000
50,000.00
- Tukang Kayu
Oh
2.5000
75,000.00
- Kepala Tukang
Oh
0.2500
80,000.00
- Mandor
Oh
0.0500
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
11,400,000.00
300,000.00
1,350,000.00
160,000.00
25,500.00
13,235,500.00
13,235,500.00
7,514,400.00
300,000.00
1,350,000.00
160,000.00
25,500.00
9,349,900.00
9,349,900.00
6,972,000.00
300,000.00
1,350,000.00
160,000.00
25,500.00
8,807,500.00
8,807,500.00
380,000.00
1,035.00
50,000.00
187,500.00
20,000.00
4,250.00
642,785.00
642,785.00

Page 61

No.
J-05

J-06

J-07

J-08

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M2 Pintu Panel Kayu Kamper Medan/Kruing
- Kayu Papan Kamper Medan
M3
0.0400
6,262,000.00
- Paku Biasa 2" - 5"
Kg
0.0500
20,700.00
- Pekerja
Oh
1.0000
50,000.00
- Tukang Kayu
Oh
2.5000
75,000.00
- Kepala Tukang
Oh
0.2500
80,000.00
- Mandor
Oh
0.0500
85,000.00
Jumlah
Dibulatkan
1 M2 Pintu & Jendela Kaca Kayu Kamper Medan
- Kayu Papan Kamper Medan
M3
0.0350
6,262,000.00
- Pekerja
Oh
0.8000
50,000.00
- Tukang Kayu
Oh
2.0000
75,000.00
- Kepala Tukang
Oh
0.2000
80,000.00
- Mandor
Oh
0.0400
85,000.00
Jumlah
Dibulatkan
1 M2 Pintu & Jendela Kaca Kayu Borneo
- Kayu Papan Borneo Super
M3
0.0350
6,155,500.00
- Pekerja
Oh
0.8000
50,000.00
- Tukang Kayu
Oh
2.0000
75,000.00
- Kepala Tukang
Oh
0.2000
80,000.00
- Mandor
Oh
0.0400
85,000.00
Jumlah
Dibulatkan
1 M2 Pintu & Jendela Jalusi Kayu Kamper Medan
- Kayu Papan Kamper Medan
M3
0.0640
6,262,000.00
- Pekerja
Oh
1.0000
50,000.00
- Tukang Kayu
Oh
3.0000
75,000.00
- Kepala Tukang
Oh
0.3000
80,000.00
- Mandor
Oh
0.5000
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
250,480.00
1,035.00
50,000.00
187,500.00
20,000.00
4,250.00
513,265.00
513,265.00
219,170.00
40,000.00
150,000.00
16,000.00
3,400.00
428,570.00
428,570.00
215,442.50
40,000.00
150,000.00
16,000.00
3,400.00
424,842.50
424,843.00
400,768.00
50,000.00
225,000.00
24,000.00
42,500.00
742,268.00
742,268.00

Page 62

No.
J-09

J-10

J-11

J-12

J-13

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M2 Pintu Triplek Rangkap, Rangka Tertutup Kayu Kamper Medan
- Kayu Papan Kamper Medan
M3
0.0196
6,262,000.00
- Paku Biasa " - 1"
Kg
0.0300
20,700.00
- Lem Kayu
Ltr
0.3000
26,300.00
- Triplek 120 x 240 x 0,4 cm
Lbr
1.0000
72,500.00
- Pekerja
Oh
0.6000
50,000.00
- Tukang Kayu
Oh
2.0000
75,000.00
- Kepala Tukang
Oh
0.2000
80,000.00
- Mandor
Oh
0.0300
85,000.00
Jumlah
Dibulatkan
1 M2 Jalusi Mati Kusen Kayu kamper Medan
- Kayu Papan Kamper Medan
M3
0.0600
6,262,000.00
- Paku Biasa " - 1"
Kg
0.1500
20,700.00
- Pekerja
Oh
0.5000
50,000.00
- Tukang Kayu
Oh
2.0000
75,000.00
- Kepala Tukang
Oh
0.2000
80,000.00
- Mandor
Oh
0.0250
85,000.00
Jumlah
Dibulatkan
1 M2 Pintu Triplek Rangkap, Rangka Kayu Borneo Super
- Kayu Papan Borneo Super
M3
0.0196
6,155,500.00
- Paku Biasa " - 1"
Kg
0.0300
20,700.00
- Lem Kayu
Ltr
0.3000
26,300.00
- Triplek 120 x 240 x 0,4 cm
Lbr
1.0000
72,500.00
- Pekerja
Oh
0.6000
50,000.00
- Tukang Kayu
Oh
2.0000
75,000.00
- Kepala Tukang
Oh
0.2000
80,000.00
- Mandor
Oh
0.0300
85,000.00
Jumlah
Dibulatkan
1 M2 Pintu Teakwood Rangkap, rangka Kayu Kamper Medan
- Kayu Papan Kamper Medan
M3
0.0196
6,262,000.00
- Paku Biasa " - 1"
Kg
0.3000
20,700.00
- Lem Kayu
Ltr
0.3000
26,300.00
- Teakwood 4 mm
Lbr
1.0000
145,000.00
- Pekerja
Oh
0.6000
50,000.00
- Tukang Kayu
Oh
2.0000
75,000.00
- Kepala Tukang
Oh
0.2000
80,000.00
- Mandor
Oh
0.0300
85,000.00
Jumlah
Dibulatkan
1 M2 Pintu Triplek & Formika, Rangka Kayu Kamper Medan
- Kayu Papan Kamper Medan
M3
0.0196
6,262,000.00
- Paku Biasa " - 1"
Kg
0.3000
20,700.00
- Lem Kayu
Ltr
0.8000
26,300.00
- Triplek 120 x 240 x 0,4 cm
Lbr
1.0000
72,500.00
- Formica 3" x 6"
Lbr
0.5000
147,500.00
- Pekerja
Oh
0.8000
50,000.00
- Tukang Kayu
Oh
2.5000
75,000.00

HARGA
(Rp)
122,735.20
621.00
7,890.00
72,500.00
30,000.00
150,000.00
16,000.00
2,550.00
402,296.20
402,296.00
375,720.00
3,105.00
25,000.00
150,000.00
16,000.00
2,125.00
571,950.00
571,950.00
120,647.80
621.00
7,890.00
72,500.00
30,000.00
150,000.00
16,000.00
2,550.00
400,208.80
400,209.00
122,735.20
6,210.00
7,890.00
145,000.00
30,000.00
150,000.00
16,000.00
2,550.00
480,385.20
480,385.00
122,735.20
6,210.00
21,040.00
72,500.00
73,750.00
40,000.00
187,500.00

Page 63

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
Oh
0.2500
80,000.00
Oh
0.0400
85,000.00

- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
J-14 1 M2 Pintu Teakwood & Formika, Rangka Kayu Kamper Medan (dipolitur)
- Kayu Papan Kamper Medan
M3
0.0196
6,262,000.00
- Paku Biasa " - 1"
Kg
0.3000
20,700.00
- Lem Kayu
Ltr
0.8000
26,300.00
- Teakwood 120 x 240 x 0,4 cm
Lbr
1.0000
145,000.00
- Formica 4" x 8"
Lbr
0.5000
262,500.00
- Pekerja
Oh
0.8000
50,000.00
- Tukang Kayu
Oh
2.5000
75,000.00
- Kepala Tukang
Oh
0.2500
80,000.00
- Mandor
Oh
0.0400
85,000.00
Jumlah
Dibulatkan
J-15 1 M3 Kuda-kuda Kayu Kamper Medan
- Kayu Balok Kamper Medan
M3
1.1000
6,262,000.00
- Besi Strip
Kg
15.0000
29,500.00
- Paku Biasa 2" - 5"
Kg
0.8000
20,700.00
- Pekerja
Oh
4.0000
50,000.00
- Tukang Kayu
Oh
12.0000
75,000.00
- Kepala Tukang
Oh
1.2000
80,000.00
- Mandor
Oh
0.2000
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
20,000.00
3,400.00
547,135.20
547,135.00
122,735.20
6,210.00
21,040.00
145,000.00
131,250.00
40,000.00
187,500.00
20,000.00
3,400.00
677,135.20
677,135.00
6,888,200.00
442,500.00
16,560.00
200,000.00
900,000.00
96,000.00
17,000.00
8,560,260.00
8,560,260.00

Page 64

No.
J-16

J-17

J-18

J-19

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
1 M3 Kuda-kuda Kayu Borneo Super
- Kayu balok Borneo super
M3
1.1000
5,810,000.00
- Besi Strip
Kg
15.0000
29,500.00
- Paku Biasa 2" - 5"
Kg
0.8000
20,700.00
- Pekerja
Oh
4.0000
50,000.00
- Tukang Kayu
Oh
12.0000
75,000.00
- Kepala Tukang
Oh
1.2000
80,000.00
- Mandor
Oh
0.2000
85,000.00
Jumlah
Dibulatkan
1 M2 Kaso + Reng Genteng Plentong Kayu Borneo Super
- Kayu balok Borneo super
m3
0.0120
5,810,000.00
- Paku Biasa 2" - 5"
Kg
0.1500
20,700.00
- Pekerja
Oh
0.1000
50,000.00
- Tukang Kayu
Oh
0.1000
75,000.00
- Kepala Tukang
Oh
0.0100
80,000.00
- Mandor
Oh
0.0050
85,000.00
Jumlah
Dibulatkan
1 M2 Kaso + Reng Genteng Beton Kayu Borneo Super
- Kayu balok Borneo super
M3
0.0140
5,810,000.00
- Paku Biasa 2" - 5"
Kg
0.1500
20,700.00
- Pekerja
Oh
0.1000
50,000.00
- Tukang Kayu
Oh
0.1000
75,000.00
- Kepala Tukang
Oh
0.0100
80,000.00
- Mandor
Oh
0.0050
85,000.00
Jumlah
Dibulatkan
1 M' Lisplang uk (3x20)cm, Kayu Kamper Medan
- Kayu Papan Kamper Medan
M3
0.0072
6,405,800.00
- Paku Biasa 2" - 5"
Kg
0.0500
20,700.00
- Pekerja
Oh
0.1000
50,000.00
- Tukang Kayu
Oh
0.2000
75,000.00
- Kepala Tukang
Oh
0.0200
80,000.00
- Mandor
Oh
0.0050
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
6,391,000.00
442,500.00
16,560.00
200,000.00
900,000.00
96,000.00
17,000.00
8,063,060.00
8,063,060.00
69,720.00
3,105.00
5,000.00
7,500.00
800.00
425.00
86,550.00
86,550.00
81,340.00
3,105.00
5,000.00
7,500.00
800.00
425.00
98,170.00
98,170.00
46,121.76
1,035.00
5,000.00
15,000.00
1,600.00
425.00
69,181.76
69,182.00

Page 65

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
J-20 1 M' Lisplang uk (3x30)cm, Kayu Kamper Medan
- Kayu Papan Kamper Medan
M3
0.0110
6,262,000.00
- Paku Biasa 2" - 5"
Kg
0.0500
20,700.00
- Pekerja
Oh
0.1100
50,000.00
- Tukang Kayu
Oh
0.2200
75,000.00
- Kepala Tukang
Oh
0.0220
80,000.00
- Mandor
Oh
0.0050
85,000.00
Jumlah
Dibulatkan
J-21 1 M List Plafond + kayu Profil 10 cm
- Kayu Profil 10 cm
M'
1.0500
32,400.00
- Pekerja
Oh
0.0210
50,000.00
- Tukang Kayu
Oh
0.0210
75,000.00
- Kepala Tukang
Oh
0.0020
80,000.00
- Mandor
Oh
0.0010
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
68,882.00
1,035.00
5,500.00
16,500.00
1,760.00
425.00
94,102.00
94,102.00
34,020.00
1,050.00
1,575.00
160.00
85.00
36,890.00
36,890.00

Page 66

No.
J-22

J-23

J-24

J-25

J-26

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
7,26 M2 Kusen Partisi Dobel Triplek
- Kayu balok borneo super
M3
0.1050
5,810,000.00
- Triplek 120 x 240 x 0,4 cm
Lbr
5.0000
72,500.00
- Paku 1 s/d 3 cm
Kg
2.0000
20,700.00
- Ampelas
Lbr
2.0000
5,500.00
- Engsel
Bh
4.0000
23,100.00
- Slot
Bh
4.0000
35,000.00
- Pekerja
Oh
0.3000
50,000.00
- Tukang Kayu terampil
Oh
1.3000
75,000.00
- Kepala Tukang kayu
Oh
0.1300
80,000.00
- Mandor
Oh
0.0130
85,000.00
Jumlah
1 M2 Pekerjaan partisi
Dibulatkan
1 M2 Rangka Langit-langit (1,00 x 1,00) m, Kayu borneo super
m
0.0120
- Kayu Borneo super
2,905,000.00
Paku 5 s.d. 7 cm
kg
0.1000
20,700.00
0.1500
- Pekerja
Oh
50,000.00
0.2500
- Tukang Kayu
Oh
75,000.00
0.0250
- Kepala Tukang
Oh
80,000.00
0.0750
- Mandor
Oh
85,000.00
Jumlah
Dibulatkan
1 M2 Rangka langit-langit ( 0,50 x 1,00 ) m, Kayu Borneo Super
- Kayu Balok Borneo Super
m3
0.0154
2,905,000.00
- Paku Biasa 2" - 5"
kg
0.2000
20,700.00
- Pekerja
Oh
0.1500
50,000.00
- Tukang Kayu
Oh
0.3000
75,000.00
- Kepala Tukang
Oh
0.0300
80,000.00
- Mandor
Oh
0.0750
85,000.00
Jumlah
Dibulatkan
1 M' Reuter Kayu kamper Medan
m
0.0040
- Kayu kamper Medan
2,905,000.00
0.1000
- Pekerja
Oh
50,000.00
0.2000
- Tukang Kayu
Oh
75,000.00
0.0200
- Kepala Tukang
Oh
80,000.00
0.0050
- Mandor
Oh
85,000.00
Jumlah
Dibulatkan
1 M3 Gording kayu kelas II
m
1.1000
- Balok kayu
6,262,000.00
- Besi Strip
Kg
15.0000
29,500.00
- Paku Biasa 2" - 5"
Kg
3.0000
20,700.00
2.4000
- Pekerja
Oh
50,000.00
7.2000
- Tukang Kayu
Oh
75,000.00
0.7200
- Kepala Tukang
Oh
80,000.00
0.1200
- Mandor
Oh
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
610,050.00
362,500.00
41,400.00
11,000.00
92,400.00
140,000.00
15,000.00
97,500.00
10,400.00
1,105.00
1,381,355.00
190,269.28
190,269.00
34,860.00
2,070.00
7,500.00
18,750.00
2,000.00
6,375.00
71,555.00
71,555.00
44,737.00
4,140.00
7,500.00
22,500.00
2,400.00
6,375.00
87,652.00
87,652.00
11,620.00
5,000.00
15,000.00
1,600.00
425.00
33,645.00
33,645.00
6,888,200.00
442,500.00
62,100.00
120,000.00
540,000.00
57,600.00
10,200.00
8,120,600.00
8,120,600.00

Page 67

No.

URAIAN

SATUAN VOLUME HARGA SATUAN


(Rp)
J-27 1 M2 Dinding bilik, rangka kayu borneo
m2
1.1000
- Bilik bambu
25,000.00
- Kaso 5/7
m3
0.0140
2,905,000.00
- Paku Biasa 2" - 5"
Kg
0.0120
20,700.00
- List kayu 2/4
m3
0.0030
11,500.00
0.1000
- Pekerja
Oh
50,000.00
0.0500
- Tukang Kayu
Oh
75,000.00
0.0050
- Kepala Tukang
Oh
80,000.00
0.0050
- Mandor
Oh
85,000.00
Jumlah
Dibulatkan

HARGA
(Rp)
27,500.00
40,670.00
248.40
34.50
5,000.00
3,750.00
400.00
425.00
78,027.90
78,028.00

Page 68

K. ANALISA HARGA SATUAN PEKERJAAN PENUTUP BESI & ALLUMINIUM


No.

URAIAN

K-01 1 Kg Besi profil


- Besi profil WF
- Meni besi
- Pekerja
- Tukang besi
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
K-02 1 Kg Perakitan baja
- Solar
- Minyak pelumas
- Sewa alat
- Pekerja
- Tukang besi
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
K-03 1 Cm Pengelasan dengan las listrik
- kawat las
- Solar
- Minyak pelumas
- Sewa alat
- Pekerja
- Tukang
- Kepala Tukang
- Mandor
Jumlah
Dibulatkan
K-04 1 m2 Pintu Rolling Door
- Rolling door
- Pekerja
- Tukang besi
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
K-05 1 m2 Pintu Alluminium Natural
- Pintu alluminium natural
- Pekerja
- Tukang besi
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
K-06 1 m2 Terali Besi
- Besi strip 2 x 3
- Pekerja
- Tukang las
- Kepala tukang

SAT

VOLUME

HARGA SAT
(Rp)

HARGA
(Rp)

Kg
Kg
Oh
Oh
Oh
Oh

1.1000
0.0800
0.0600
0.0060
0.0060
0.0003

26,400.00
33,500.00
50,000.00
75,000.00
80,000.00
85,000.00

29,040.00
2,680.00
3,000.00
450.00
480.00
25.50
35,675.50
35,676.00

m'
m'
jam
Oh
Oh
Oh
Oh

0.0100
0.0010
0.0080
0.0010
0.00001
0.00001
0.00005

8,000.0000
60,500.0000
100,000.0000
50,000.0000
75,000.0000
80,000.0000
85,000.0000

80.00
60.50
800.00
50.00
0.75
0.80
4.25
996.30
996.00

kg
ltr
ltr
jam
org
org
org
org

0.0400
0.0300
0.0040
0.0170
0.0040
0.0020
0.0002
0.0002

26,000.00
8,000.00
60,500.00
100,000.00
50,000.00
75,000.00
80,000.00
85,000.00

1,040.00
240.00
242.00
1,700.00
200.00
150.00
16.00
17.00
2,565.00
2,565.00

M2
Oh
Oh
Oh
Oh

1.0000
1.0500
1.5000
0.1050
0.0052

337,300.00
50,000.00
75,000.00
80,000.00
85,000.00

337,300.00
52,500.00
112,500.00
8,400.00
442.00
511,142.00
511,142.00

m2
Oh
Oh
Oh
Oh

1.0000
1.0500
1.0500
0.1050
0.0052

233,000.00
50,000.00
75,000.00
80,000.00
85,000.00

233,000.00
52,500.00
78,750.00
8,400.00
442.00
373,092.00
373,092.00

m'
Oh
Oh
Oh

11.5000
1.2000
1.2000
0.0120

6,050.00
50,000.00
75,000.00
80,000.00

69,575.00
60,000.00
90,000.00
960.00

Page 69

No.

K-07

K-08

K-09

K-10

K-11

URAIAN

SAT

VOLUME

- Mandor
Oh
0.0006
Jumlah
Dibulatkan
1 m2 Kawat Harmonika 4 cm
- Kawat harmonika
M2
1.1000
- Paku biasa " - 1"
kg
0.0200
- Papan kayu kamper
M2
0.0018
- Pekerja
Oh
0.1000
- Tukang kayu
Oh
0.1000
- Kepala tukang
Oh
0.0100
- Mandor
Oh
0.0050
Jumlah
Dibulatkan
1 m' Talang Datar, Seng BJLS 28 lebar 90 cm
- Seng plat 3' x 6' BJLS 30
m'
1.0500
- Paku biasa " - 1"
Kg
0.0150
- Kayu papan borneo super
M3
0.0096
- Flincote / meni besi
Kg
0.2500
- Pekerja
Oh
0.1500
- Tukang kayu
Oh
0.4000
- Kepala tukang
Oh
0.0250
- Mandor
Oh
0.0013
Jumlah
Dibulatkan
1 m' Talang Miring, Seng BJLS 28 lebar 90 cm
- Seng plat 3' x 6' BJLS 30
m'
1.0500
- Paku biasa " - 1"
Kg
0.0150
- Kayu papan borneo super
M3
0.0190
- Flincote / meni besi
Kg
0.3000
- Pekerja
Oh
0.2000
- Tukang kayu
Oh
0.4000
- Kepala tukang
Oh
0.0250
- Mandor
Oh
0.0013
Jumlah
Dibulatkan
1 m' Talang 1/2 lingkaran D-15 cm, seng pelat BJLS 28 lebar 90 cm
- Seng plat 3' x 6' BJLS 30
m'
1.0500
- Paku biasa " - 1"
Kg
0.1000
- Kayu papan borneo super
kg
0.0190
- Besi strip
Kg
0.5000
- Pekerja
Oh
0.1500
- Tukang kayu
Oh
0.3000
- Kepala tukang
Oh
0.0300
- Mandor
Oh
0.0080
Jumlah
Dibulatkan
1 m' Pasang kusen pintu/jendela alluminium natural 4"
- Alumunium profil natural 4"
m'
1.1000
- Skrup fixer
bh
2.0000
- Sealant
m'
1.0000
- Pekerja
Oh
0.0430
- Tukang kayu
Oh
0.0430
- Kepala tukang
Oh
0.0043

HARGA SAT
(Rp)
85,000.00

HARGA
(Rp)
51.00
220,586.00
220,586.00

40,000.00
20,700.00
6,262,000.00
50,000.00
75,000.00
80,000.00
85,000.00

44,000.00
414.00
11,271.60
5,000.00
7,500.00
800.00
425.00
69,410.60
69,411.00

22,885.00
20,700.00
6,155,500.00
33,500.00
50,000.00
75,000.00
80,000.00
85,000.00

24,029.25
310.50
59,092.80
8,375.00
7,500.00
30,000.00
2,000.00
110.50
131,418.05
131,418.00

22,885.00
20,700.00
6,155,500.00
33,500.00
50,000.00
75,000.00
80,000.00
85,000.00

24,029.25
310.50
116,954.50
10,050.00
10,000.00
30,000.00
2,000.00
106.25
193,450.50
193,451.00

22,885.00
20,700.00
6,155,500.00
29,500.00
50,000.00
75,000.00
80,000.00
85,000.00

24,029.25
2,070.00
116,954.50
14,750.00
7,500.00
22,500.00
2,400.00
680.00
190,883.75
190,884.00

166,500.00
300.00
8,300.00
50,000.00
75,000.00
80,000.00

183,150.00
600.00
8,300.00
2,150.00
3,225.00
344.00

Page 70

No.

K-12

K-13

K-14

K-15

K-16

K-17

URAIAN

SAT

VOLUME

- Mandor
Oh
Jumlah
Dibulatkan
1 m' Pasang kusen pintu/jendela alluminium warna 4"
- Alumunium profil warna 4"
m'
- Skrup fixer
bh
- Sealant
m'
- Pekerja
Oh
- Tukang kayu
Oh
- Kepala tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
1 m' Pasang kusen pintu/jendela alluminium natural 3"
- Alumunium profil natural 3"
m'
- Skrup fixer
bh
- Sealant
m'
- Pekerja
Oh
- Tukang kayu
Oh
- Kepala tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
1 m' Pasang kusen pintu/jendela alluminium warna 3"
- Alumunium profil warna 3"
m'
- Skrup fixer
bh
- Sealant
m'
- Pekerja
Oh
- Tukang kayu
Oh
- Kepala tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
1 m2 Pintu alluminium strip lebar 8 cm
- Alumunium profil 4" natural
m'
- Alumunium strip 6mm
m2
- Pekerja
Oh
- Tukang kayu
Oh
- Kepala tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
1 m2 Pintu/jendela kaca rangka alluminium natural 4"
- Alumunium profil natural 4"
m'
- Profil alluminium T
m'
- Sealant
tube
- Pekerja
Oh
- Tukang kayu
Oh
- Kepala tukang
Oh
- Mandor
Oh
Jumlah
Dibulatkan
1 m2 Pintu/jendela kaca rangka alluminium warna 4"

0.0021

HARGA SAT
(Rp)
85,000.00

HARGA
(Rp)
178.50
197,947.50
197,948.00

1.1000
2.0000
1.0000
0.0430
0.0430
0.0043
0.0021

179,500.00
300.00
8,300.00
50,000.00
75,000.00
80,000.00
85,000.00

197,450.00
600.00
8,300.00
2,150.00
3,225.00
344.00
178.50
212,247.50
212,248.00

1.1000
2.0000
1.0000
0.0430
0.0430
0.0043
0.0021

89,100.00
300.00
8,300.00
50,000.00
75,000.00
80,000.00
85,000.00

98,010.00
600.00
8,300.00
2,150.00
3,225.00
344.00
178.50
112,807.50
112,808.00

1.1000
2.0000
1.0000
0.0430
0.0430
0.0043
0.0021

112,200.00
300.00
8,300.00
50,000.00
75,000.00
80,000.00
85,000.00

123,420.00
600.00
8,300.00
2,150.00
3,225.00
344.00
178.50
138,217.50
138,218.00

4.4000
1.0500
0.0850
0.0850
0.0085
0.0042

166,500.00
189,000.00
50,000.00
75,000.00
80,000.00
85,000.00

732,600.00
198,450.00
4,250.00
6,375.00
680.00
357.00
942,712.00
942,712.00

4.4000
4.5000
0.2700
0.0850
0.0850
0.0085
0.0050

166,500.00
13,500.00
8,300.00
50,000.00
75,000.00
80,000.00
85,000.00

732,600.00
60,750.00
2,241.00
4,250.00
6,375.00
680.00
425.00
807,321.00
807,321.00

Page 71

No.

URAIAN

SAT

VOLUME

- Alumunium profil warna 4"


m'
4.4000
- Profil alluminium T
m'
4.5000
- Sealant
tube
0.2700
- Pekerja
Oh
0.0850
- Tukang kayu
Oh
0.0850
- Kepala tukang
Oh
0.0085
- Mandor
Oh
0.0050
Jumlah
Dibulatkan
K-18 1 m2 Jendela nako & teralis (10 klips)
- Jendela nako (rangka + kaca 5 mm)
m2
1.1000
- Paku skrup 1cm - 2,5cm
bh
10.0000
- Besi strip
m'
7.0000
- Pekerja
Oh
0.2000
- Tukang kayu
Oh
0.2000
- Kepala tukang
Oh
0.0200
- Mandor
Oh
0.0010
Jumlah
Dibulatkan
K-19 1 m2 Pintu pelat baja tebal 2mm rangkap, rangka baja siku
- Besi siku L 30.30.3
Kg
15.0000
- Baja pelat
Kg
32.8000
- kawat las
Kg
0.0500
- Pekerja
Oh
0.2000
- Tukang kayu
Oh
0.2000
- Kepala tukang
Oh
0.0200
- Mandor
Oh
0.0010
Jumlah
Dibulatkan
K-20 1 m2 Rangka jendela besi square tube (5 x 5) cm
- Besi square tube
M
4.7600
- Besi lis kaca (1 x 1) cm
Kg
4.5220
- Pengelasan
Cm
20.0000
- Pekerja
Oh
0.6500
- Tukang kayu
Oh
0.6500
- Kepala tukang
Oh
0.0650
- Mandor
Oh
0.0320
Jumlah
Dibulatkan
K-21 1 m2 Pintu lipat (folding door) bahan besi
- Pintu lipat
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor
Jumlah
Dibulatkan
K-22 1 m2 Tirai (venetions blinds and vertical blinds)
- Tirai
- Pekerja
- Tukang kayu
- Kepala tukang
- Mandor

HARGA SAT
(Rp)
179,500.00
13,500.00
8,300.00
50,000.00
75,000.00
80,000.00
85,000.00

HARGA
(Rp)
789,800.00
60,750.00
2,241.00
4,250.00
6,375.00
680.00
425.00
864,521.00
864,521.00

330,000.00
300.00
6,050.00
50,000.00
75,000.00
80,000.00
85,000.00

363,000.00
3,000.00
42,350.00
10,000.00
15,000.00
1,600.00
85.00
435,035.00
435,035.00

26,400.00
26,400.00
26,000.00
50,000.00
75,000.00
80,000.00
85,000.00

396,000.00
865,920.00
1,300.00
10,000.00
15,000.00
1,600.00
85.00
1,289,905.00
1,289,905.00

8,050.00
26,400.00
2,565.00
50,000.00
75,000.00
80,000.00
85,000.00

38,318.00
119,380.80
51,300.00
32,500.00
48,750.00
5,200.00
2,720.00
298,168.80
298,169.00

M2
Oh
Oh
Oh
Oh

1.0000
1.0500
1.0500
0.1050
0.0052

551,900.00
50,000.00
75,000.00
80,000.00
85,000.00

551,900.00
52,500.00
78,750.00
8,400.00
442.00
691,992.00
691,992.00

M2
Oh
Oh
Oh
Oh

1.0000
0.3500
0.3500
0.0350
0.0018

592,000.00
50,000.00
75,000.00
80,000.00
85,000.00

592,000.00
17,500.00
26,250.00
2,800.00
153.00

Page 72

No.

URAIAN

SAT

VOLUME

Jumlah
Dibulatkan

HARGA SAT
(Rp)

HARGA
(Rp)
638,703.00
638,703.00

Page 73

L. ANALISA HARGA SATUAN PEKERJAAN KUNCI & KACA


No.

URAIAN

SAT

VOLUME

HARGA SAT
(Rp)

L-01 1 Buah Pasang Kunci Tanam 2 slaag


- Kunci tanam
Bh
1.0000
- Pekerja
Oh
0.0600
- Tukang kayu
Oh
0.6000
- Kepala tukang
Oh
0.0600
- Mandor
Oh
0.0030
Jumlah
Dibulatkan
L-02 1 Buah Pasang Kunci Tanam Biasa
- Kunci tanam biasa
Bh
1.0000
- Pekerja
Oh
0.0100
- Tukang kayu
Oh
0.5000
- Kepala tukang
Oh
0.0100
- Mandor
Oh
0.0050
Jumlah
Dibulatkan
L-03 1 Buah Pasang Kunci Tanam Kamar Mandi
- Kunci tanam km mandi
Bh
1.0000
- Pekerja
Oh
0.0050
- Tukang kayu
Oh
0.5000
- Kepala tukang
Oh
0.0050
- Mandor
Oh
0.0025
Jumlah
Dibulatkan
L-04 1 Buah Pasang Engsel Pintu
- Engsel pintu
Bh
1.0000
- Pekerja
Oh
0.0150
- Tukang kayu
Oh
0.1500
- Kepala tukang
Oh
0.0150
- Mandor
Oh
0.0008
Jumlah
Dibulatkan
L-05 1 Buah Pasang Engsel Jendela Kupu-kupu
- Engsel jendela
Bh
1.0000
- Pekerja
Oh
0.0100
- Tukang kayu
Oh
0.1000
- Kepala tukang
Oh
0.0100
- Mandor
Oh
0.0005
Jumlah
Dibulatkan

HARGA
(Rp)

369,500.00
50,000.00
75,000.00
80,000.00
85,000.00

369,500.00
3,000.00
45,000.00
4,800.00
255.00
422,555.00
422,555.00

182,500.00
50,000.00
75,000.00
80,000.00
85,000.00

182,500.00
500.00
37,500.00
800.00
425.00
221,725.00
221,725.00

104,000.00
50,000.00
75,000.00
80,000.00
85,000.00

104,000.00
250.00
37,500.00
400.00
212.50
142,362.50
142,363.00

23,100.00
50,000.00
75,000.00
80,000.00
85,000.00

23,100.00
750.00
11,250.00
1,200.00
68.00
36,368.00
36,368.00

16,500.00
50,000.00
75,000.00
80,000.00
85,000.00

16,500.00
500.00
7,500.00
800.00
42.50
25,342.50
25,343.00

Page 74

No.

URAIAN

SAT

VOLUME

HARGA SAT
(Rp)

L-06 1 Buah Pasang Kait Angin


- Kait angin
Bh
1.0000
- Pekerja
Oh
0.0150
- Tukang kayu
Oh
0.1500
- Kepala tukang
Oh
0.0150
- Mandor
Oh
0.0008
Jumlah
Dibulatkan
L-07 1 Buah Pasang Door Closer
- Door closer
Bh
1.0000
- Pekerja
Oh
0.0500
- Tukang kayu
Oh
0.5000
- Kepala tukang
Oh
0.0500
- Mandor
Oh
0.0025
Jumlah
Dibulatkan
L-08 1 Buah Pasang Pegangan Pintu / Door Holder
- Door holder
Bh
1.0000
- Pekerja
Oh
0.0500
- Tukang kayu
Oh
0.5000
- Kepala tukang
Oh
0.0500
- Mandor
Oh
0.0025
Jumlah
Dibulatkan
L-09 1 M2 Pasang Kaca , tebal 3 mm
- Kaca
M2
1.1000
- Pekerja
Oh
0.0150
- Tukang kayu
Oh
0.1500
- Kepala tukang
Oh
0.0150
- Mandor
Oh
0.0008
Jumlah
Dibulatkan
L-10 1 M2 Pasang Kaca , tebal 5 mm
- Kaca
M2
1.1000
- Pekerja
Oh
0.0150
- Tukang kayu
Oh
0.1500
- Kepala tukang
Oh
0.0150
- Mandor
Oh
0.0008
Jumlah
Dibulatkan

HARGA
(Rp)

4,000.00
50,000.00
75,000.00
80,000.00
85,000.00

4,000.00
750.00
11,250.00
1,200.00
68.00
17,268.00
17,268.00

462,000.00
50,000.00
75,000.00
80,000.00
85,000.00

462,000.00
2,500.00
37,500.00
4,000.00
212.50
506,212.50
506,213.00

226,000.00
50,000.00
75,000.00
80,000.00
85,000.00

226,000.00
2,500.00
37,500.00
4,000.00
212.50
270,212.50
270,213.00

96,200.00
50,000.00
75,000.00
80,000.00
85,000.00

105,820.00
750.00
11,250.00
1,200.00
63.75
119,083.75
119,084.00

122,100.00
50,000.00
75,000.00
80,000.00
85,000.00

134,310.00
750.00
11,250.00
1,200.00
68.00
147,578.00
147,578.00

Page 75

M. PEKERJAAN SANITASI
No.

URAIAN

M-01

1 Buah Closet jongkok Porselen Standar


Closet jongkok
P.C (50 gk)
Pasir pasang
Pekerja
Tukang batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan
1 Buah Urinoir
Urinoir
P.C (50 gk)
Pasir pasang
Pekerja
Tukang batu
Kepala Tukang
Mandor
Perlengkapan 30 % harga urinoir
Jumlah
Dibulatkan
1 Buah Wastafel
wastafel standar
P.C (50 gk)
Pasir pasang
Pekerja
Tukang batu
Kepala Tukang
Mandor
Perlengkapan 12 % harga wastafel
Jumlah
Dibulatkan

M-02

M-03

SAT VOLUME

HARGA SAT
(Rp)

HARGA
(Rp)

bh
Kg
m3
org
org
org
org

1.00
6.00
0.01
1.0000
1.5000
1.5000
0.1600

207,500.00
1,548.00
256,800.00
50,000.00
75,000.00
80,000.00
85,000.00

207,500.00
9,288.00
2,568.00
50,000.00
112,500.00
120,000.00
13,600.00
515,456.00
515,456.00

bh
Kg
m3
org
org
org
org
lot

1.00
6.00
0.01
1.0000
1.0000
0.1000
0.0010
0.3000

1,952,500.00
1,548.00
256,800.00
50,000.00
75,000.00
80,000.00
85,000.00
1,952,500.00

1,952,500.00
9,288.00
2,568.00
50,000.00
75,000.00
8,000.00
85.00
585,750.00
2,683,191.00
2,683,191.00

unit
Kg
m3
org
org
org
org
lot

1.00
6.00
0.01
1.2000
1.4500
0.1500
0.1000
0.1200

1,115,000.00
1,548.00
256,800.00
50,000.00
75,000.00
80,000.00
85,000.00
1,952,500.00

1,115,000.00
9,288.00
2,568.00
60,000.00
108,750.00
12,000.00
8,500.00
234,300.00
1,550,406.00
1,550,406.00

Page 76

No.
M-04

M-05

M-06

URAIAN

SAT VOLUME

1 Buah bak Mandi Fibreglass Volume 0,30 m3


Bak fibreglass 0.60m x 0.60m
bh
1.00
Pekerja
org
1.8000
Tukang batu
org
2.7000
Kepala Tukang
org
0.5400
Mandor
org
0.1100
Perlengkapan 18 % harga bak
lot
0.1800
Jumlah
Dibulatkan
1 M' Saluran Air Limbah Buis beton d = 30 cm - 60 cm
Buis beton 30 cm
bh
1.10
Bata merah
bh
25.00
P.C (50 gk)
Kg
10.300
Pasir pasang
m3
0.061
Pasir urug
m3
0.069
Pekerja
org
0.3800
Tukang batu
org
0.1900
Kepala Tukang
org
0.0190
Mandor
org
0.0190
Jumlah
Dibulatkan
1 Buah Bak Kontrol Pas Bata Merah Uk (60 x 60) cm
Bata merah
bh
186.00
P.C (50 gk)
Kg
114.000
Pasir pasang
m3
0.184
Batu pecah 2/3
m3
0.033
Besi beton
m3
4.850
Pasir beton
m3
0.120
Pekerja
org
2.1600
Tukang batu
org
0.7200
Kepala Tukang
org
0.0720
Mandor
org
0.1080
Tukang gali
org
0.1000
Jumlah
Dibulatkan

HARGA SAT
(Rp)

HARGA
(Rp)

281,000.00
50,000.00
75,000.00
80,000.00
85,000.00
281,000.00

281,000.00
90,000.00
202,500.00
43,200.00
9,350.00
50,580.00
676,630.00
676,630.00

68,000.00
850.00
1,548.00
256,800.00
192,800.00
50,000.00
75,000.00
80,000.00
85,000.00

74,800.00
21,250.00
15,944.40
15,664.80
13,303.20
19,000.00
14,250.00
1,520.00
1,615.00
177,347.40
177,347.00

850.00
1,548.00
256,800.00
232,200.00
22,800.00
281,000.00
50,000.00
75,000.00
80,000.00
85,000.00
50,000.00

158,100.00
176,472.00
47,251.20
7,662.60
110,580.00
33,720.00
108,000.00
54,000.00
5,760.00
9,180.00
5,000.00
715,725.80
715,726.00

Page 77

No.
M-07

M-08

M-09

M-10

M-11

URAIAN

SAT VOLUME

1 Buah Bak Kontrol Pas Bata Merah Uk (30 x 30) cm


Bata merah
bh
53.00
P.C (50 gk)
Kg
44.000
Pasir pasang
m3
0.070
Batu pecah 2/3
m3
0.070
Besi beton
m3
1.600
Pasir beton
m3
0.060
Pekerja
org
3.2000
Tukang batu
org
1.0150
Kepala Tukang
org
0.0015
Mandor
org
0.0160
Jumlah
Dibulatkan
1 M' Pipa PVC 1/2" (AW)
Pipa pvc 1/2"
m'
1.2000
Pekerja
org
0.0360
Tukang batu
org
0.0600
Kepala Tukang
org
0.0060
Mandor
org
0.0018
Perlengkapan 35 % harga pipa
lot
0.3500
Jumlah
Dibulatkan
1 M' Pipa PVC 1" (AW)
Pipa pvc 1"
m'
1.2000
Pekerja
org
0.0360
Tukang batu
org
0.0600
Kepala Tukang
org
0.0060
Mandor
org
0.0018
Perlengkapan 35 % harga pipa
lot
0.3500
Jumlah
Dibulatkan
1 M' Pipa PVC 11/2" (AW)
Pipa pvc 11/2"
m'
1.2000
Pekerja
org
0.0360
Tukang batu
org
0.0600
Kepala Tukang
org
0.0060
Mandor
org
0.0018
Perlengkapan 35 % harga pipa
lot
0.3500
Jumlah
Dibulatkan
1 M' Pipa PVC 2" (AW)
Pipa pvc 2"
m'
1.2000
Pekerja
org
0.0360
Tukang batu
org
0.0600
Kepala Tukang
org
0.0060
Mandor
org
0.0018
Perlengkapan 35 % harga pipa
lot
0.3500
Jumlah

HARGA SAT
(Rp)

HARGA
(Rp)

850.00
1,548.00
256,800.00
232,200.00
22,800.00
281,000.00
50,000.00
75,000.00
80,000.00
85,000.00

45,050.00
68,112.00
17,976.00
16,254.00
36,480.00
16,860.00
160,000.00
76,125.00
120.00
1,360.00
438,337.00
438,337.00

16,625.00
50,000.00
75,000.00
80,000.00
85,000.00
19,950.00

19,950.00
1,800.00
4,500.00
480.00
153.00
6,982.50
33,865.50
33,866.00

26,075.00
50,000.00
75,000.00
80,000.00
85,000.00
31,290.00

31,290.00
1,800.00
4,500.00
480.00
153.00
10,951.50
49,174.50
49,175.00

43,700.00
50,000.00
75,000.00
80,000.00
85,000.00
52,440.00

52,440.00
1,800.00
4,500.00
480.00
153.00
18,354.00
77,727.00
77,727.00

45,675.00
50,000.00
75,000.00
80,000.00
85,000.00
52,440.00

54,810.00
1,800.00
4,500.00
480.00
153.00
18,354.00
80,097.00

Page 78

No.

M-12

M-13

M-14

URAIAN
Dibulatkan
1 M' Pipa PVC 4" (AW)
Pipa pvc 4"
Pekerja
Tukang batu
Kepala Tukang
Mandor
Perlengkapan 35 % harga pipa
Jumlah
Dibulatkan
1 M' Pipa PVC 3/4" (AW)
Pipa pvc 3/4"
Pekerja
Tukang batu
Kepala Tukang
Mandor
Perlengkapan 35 % harga pipa
Jumlah
Dibulatkan
1 Buah Bak Cuci piring Stainless steel
Bak cuci stainless steel + asesoris lengkap
Pekerja
Tukang batu
Kepala Tukang
Mandor
Jumlah
Dibulatkan

SAT VOLUME

HARGA SAT
(Rp)

HARGA
(Rp)
80,097.00

m'
org
org
org
org
lot

1.2000
0.0810
0.1350
0.0135
0.0041
0.3500

143,625.00
50,000.00
75,000.00
80,000.00
85,000.00
172,350.00

172,350.00
4,050.00
10,125.00
1,080.00
348.50
60,322.50
248,276.00
248,276.00

m'
org
org
org
org
lot

1.2000
0.0810
0.1350
0.0135
0.0041
0.3500

21,550.00
50,000.00
75,000.00
80,000.00
85,000.00
25,860.00

25,860.00
4,050.00
10,125.00
1,080.00
348.50
9,051.00
50,514.50
50,515.00

bh
org
org
org
org

1.0000
0.0300
0.3000
0.0300
0.0015

438,500.00
50,000.00
75,000.00
80,000.00
85,000.00

438,500.00
1,500.00
22,500.00
2,400.00
127.50
465,027.50
465,028.00

Page 79

No.
M-15

M-16

M-17

M-18

URAIAN

SAT VOLUME

1 Buah Kran 1/2" - 3/4"


Kran air
bh
Seal tape
bh
Pekerja
org
Tukang batu
org
Kepala Tukang
org
Mandor
org
Jumlah
Dibulatkan
1 Buah Floor Drain
Floor drain
bh
Pekerja
org
Tukang batu
org
Kepala Tukang
org
Mandor
org
Jumlah
Dibulatkan
1 M' Grafel beton U 30 cm -60 cm
Pipa beton U
bh
Bata merah
bh
P.C (50 gk)
zak
Pasir pasang
m3
Pasir urug
m3
Pekerja
org
Tukang batu
org
Kepala Tukang
org
Mandor
org
Jumlah
Dibulatkan
1 M' Pasang Talang Plastik PVC U 15 cm (AW)
Talang plastik PVC
m'
Perlengkapan 35 % harga talang
lot
Pekerja
org
Tukang batu
org
Kepala Tukang
org
Mandor
org
Jumlah
Dibulatkan

HARGA SAT
(Rp)

HARGA
(Rp)

1.0000
0.0250
0.0100
0.1000
0.0100
0.0050

45,000.00
5,000.00
50,000.00
75,000.00
80,000.00
85,000.00

45,000.00
125.00
500.00
7,500.00
800.00
425.00
54,350.00
54,350.00

1.0000
0.0100
0.1000
0.0100
0.0050

73,500.00
50,000.00
75,000.00
80,000.00
85,000.00

73,500.00
500.00
7,500.00
800.00
425.00
82,725.00
82,725.00

1.1000
12.0000
0.1030
0.0305
0.0345
0.0100
0.1000
0.0100
0.0050

50,000.00
850.00
1,548.00
256,800.00
192,800.00
50,000.00
75,000.00
80,000.00
85,000.00

55,000.00
10,200.00
159.44
7,832.40
6,651.60
500.00
7,500.00
800.00
425.00
89,068.44
89,068.00

1.05000
0.3500
0.1500
0.4000
0.0250
0.0013

66,000.00
69,300.00
50,000.00
75,000.00
80,000.00
85,000.00

69,300.00
24,255.00
7,500.00
30,000.00
2,000.00
106.25
133,161.25
133,161.00

Page 80

No.
M-19

M-20

M-21

M-22

URAIAN

SAT VOLUME

1 M' Saluran Air Limbah Buis Beton 60 cm


Buis beton 60 cm
bh
Bata merah
bh
P.C (50 gk)
zak
Pasir pasang
m3
Pasir urug
m3
Pekerja
org
Tukang batu
org
Kepala Tukang
org
Mandor
org
Jumlah
Dibulatkan
1 M' Pasang Talang Seng Datar
Seng pelat 3" x 6"
lbr
Paku
kg
Kayu kelas II
m3
Meni besi
kg
Pekerja
org
Tukang batu
org
Kepala Tukang
org
Mandor
org
Jumlah
Dibulatkan
1 Buah Closet Duduk
Closet duduk
bh
Pekerja
org
Tukang batu
org
Kepala Tukang
org
Mandor
org
Perlengkapan 6 % harga closet
lot
Jumlah
Dibulatkan
1 Buah Tangki Air fibreglass Volume 1 m3
Bak fibreglass kapasitas 1 m3
bh
Pekerja
org
Tukang batu
org
Kepala Tukang
org
Mandor
org
Perlengkapan 6 % harga bak
lot
Jumlah
Dibulatkan

HARGA SAT
(Rp)

HARGA
(Rp)

1.10
25.00
0.206
0.061
0.069
0.3800
0.1900
0.0190
0.0190

145,000.00
850.00
1,548.00
256,800.00
192,800.00
50,000.00
75,000.00
80,000.00
85,000.00

159,500.00
21,250.00
318.89
15,664.80
13,303.20
19,000.00
14,250.00
1,520.00
1,615.00
246,421.89
246,422.00

0.50000
0.01500
0.00960
0.2500
0.1500
0.4000
0.0250
0.0013

22,885.00
20,700.00
3,135,000.00
33,500.00
50,000.00
75,000.00
80,000.00
85,000.00

11,442.50
310.50
30,096.00
8,375.00
7,500.00
30,000.00
2,000.00
106.25
89,830.25
89,830.00

1.00
3.3000
1.1000
0.0010
0.1600
0.0600

1,897,500.00
50,000.00
75,000.00
80,000.00
85,000.00
1,897,500.00

1,897,500.00
165,000.00
82,500.00
80.00
13,600.00
113,850.00
2,272,530.00
2,272,530.00

1.00
3.3000
1.1000
0.0010
0.1600
0.0600

1,448,500.00
50,000.00
75,000.00
80,000.00
85,000.00
1,448,500.00

1,448,500.00
165,000.00
82,500.00
80.00
13,600.00
86,910.00
1,796,590.00
1,796,590.00

Page 81

No.
M-23

M-24

URAIAN

SAT VOLUME

1 Unit Septictank 2x1,50x1,50 m + Rembesan


Galian tanah
m3
Pasir urug
m3
lantai kerja
m3
Pas bata adk 1pc : 3ps
m2
Pelat beton K-225
m3
Plesteran adk 1pc : 3ps
m2
Pipa PVC 4" jenis AW
m'
Pipa GIP 1 1/2"
m'
Galian tanah untuk rembesan
m3
Pas ijuk
kg
Urugan kerikil 3/5
m3
Pipa PVC 4" berlubang jenis AW
m'
Urugan dan perataan tanah
m3
Jumlah
Dibulatkan
1 Unit Septictank 1x1,50x1,50 m + Rembesan
Galian tanah
m3
Pasir urug
m3
lantai kerja
m3
Pas bata adk 1pc : 3ps
m2
Pelat beton K-225
m3
Plesteran adk 1pc : 3ps
m2
Pipa PVC 4" jenis AW
m'
Pipa GIP 1 1/2"
m'
Galian tanah untuk rembesan
m3
Pas ijuk
kg
Urugan kerikil 3/5
m3
Pipa PVC 4" berlubang jenis AW
m'
Urugan dan perataan tanah
m3
Jumlah
Dibulatkan

HARGA SAT
(Rp)

HARGA
(Rp)

4.500
0.214
2.250
15.000
0.300
15.000
5.400
5.000
3.375
5.400
1.050
9.000
1.125

30,720.00
192,800.00
794,398.00
244,025.40
8,053,780.00
46,042.16
424,000.00
51,433.33
23,400.00
25,800.00
225,500.00
40,500.00
40,465.00

138,240.00
41,259.20
1,787,395.50
3,660,381.00
2,416,134.00
690,632.40
2,289,600.00
257,166.67
78,975.00
139,320.00
236,775.00
364,500.00
45,523.13
12,145,901.89
12,145,902.00

2.250
0.107
1.125
7.500
0.150
7.500
9.000
2.500
1.688
2.700
0.525
9.000
0.563

23,400.00
192,800.00
794,398.00
244,025.40
8,053,780.00
46,042.16
424,000.00
51,433.33
23,400.00
25,800.00
225,500.00
40,500.00
40,465.00

52,650.00
20,629.60
893,697.75
1,830,190.50
1,208,067.00
345,316.20
3,816,000.00
128,583.33
39,499.20
69,660.00
118,387.50
364,500.00
22,781.80
8,909,962.88
8,909,963.00

Page 82

M. ANALISA HARGA SATUAN PEKERJAAN PENGECATAN


No.

URAIAN

SAT

VOLUME

HARGA SAT

N-01 1 M2 Mengikis / Mengerok Permukaan Cat Tembok Lama


- Soda api
Kg
0.0500
- Pekerja
Oh
0.1500
- Mandor
Oh
0.0025
Jumlah
Dibulatkan
N-02 1 M2 Mendempul Dan Menggosok Kayu
- Dempul
Kg
0.0800
- Minyak cat
Kg
0.0200
- Batu apung
Kg
0.0100
- Pekerja
Oh
0.0400
- Tukang cat
Oh
0.0400
- Kepala tukang
Oh
0.0040
- Mandor
Oh
0.0025
Jumlah
Dibulatkan
N-03 1 M2 Pengecatan Bidang Kayu Lama Setara Sieve
- Plamir
Kg
0.1500
- Cat dasar
Kg
0.1700
- Cat penutup setara sieve 2x
Kg
0.1700
- Pekerja
Oh
0.0700
- Tukang cat
Oh
0.0750
- Kepala tukang
Oh
0.0075
- Mandor
Oh
0.0025
Jumlah
Dibulatkan
N-04 1 M2 Pengecatan Bidang Kayu Baru Setara Sieve
- Cat meni
Kg
0.2000
- Plamir
Kg
0.1500
- Cat dasar
Kg
0.1700
- Cat penutup 3x setara sieve
Kg
0.3500
- Pekerja
Oh
0.0700
- Tukang cat
Oh
0.1050
- Kepala tukang
Oh
0.0040
- Mandor
Oh
0.0025
Jumlah
Dibulatkan

HARGA

39,500.00
50,000.00
85,000.00

1,975.00
7,500.00
212.50
9,687.50
9,688.00

40,000.00
42,300.00
32,600.00
50,000.00
75,000.00
80,000.00
85,000.00

3,200.00
846.00
326.00
2,000.00
3,000.00
320.00
212.50
9,904.50
9,905.00

27,500.00
35,000.00
45,900.00
50,000.00
75,000.00
80,000.00
85,000.00

4,125.00
5,950.00
7,803.00
3,500.00
5,625.00
600.00
212.50
27,815.50
27,816.00

33,500.00
27,500.00
35,000.00
45,900.00
50,000.00
75,000.00
80,000.00
85,000.00

6,700.00
4,125.00
5,950.00
16,065.00
3,500.00
7,875.00
320.00
212.50
44,747.50
44,748.00

Page 83

No.

URAIAN

SAT

VOLUME

HARGA SAT

N-05 1 M2 Pelaburan Bidang Kayu dengan Politur


- Politur
Ltr
0.1500
- Politur jadi
Ltr
0.3720
- Ampelas
Lbr
2.0000
- Tukang cat
Oh
0.0600
- Kepala tukang
Oh
0.0160
- Mandor
Oh
0.0025
Jumlah
Dibulatkan
N-06 1 M2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter
- Residu atau ter
Ltr
0.3500
- Pekerja
Oh
0.1000
- Mandor
Oh
0.0060
Jumlah
Dibulatkan
N-07 1 M2 Pengecatan Tembok Baru Setara ICI
- Plamir tembok
Kg
0.1000
- Cat dasar
Kg
0.1000
- Cat penutup 2x setara ICI
Kg
0.2600
- Pekerja
Oh
0.0200
- Tukang cat
Oh
0.0630
- Kepala tukang
Oh
0.0063
- Mandor
Oh
0.0025
Jumlah
Dibulatkan
N-08 1 M2 Pengecatan Tembok Lama Setara ICI
- Cat dasar
Kg
0.1200
- Cat penutup 2 x
Kg
0.1800
- Pekerja
Oh
0.0280
- Tukang cat
Oh
0.0420
- Kepala tukang
Oh
0.0042
- Mandor
Oh
0.0025
Jumlah
Dibulatkan

HARGA

55,000.00
125,000.00
5,500.00
75,000.00
80,000.00
85,000.00

8,250.00
46,500.00
11,000.00
4,500.00
1,280.00
212.50
71,742.50
71,743.00

9,000.00
50,000.00
85,000.00

3,150.00
5,000.00
510.00
8,660.00
8,660.00

27,500.00
35,000.00
82,500.00
50,000.00
75,000.00
80,000.00
85,000.00

2,750.00
3,500.00
21,450.00
1,000.00
4,725.00
504.00
212.50
34,141.50
34,142.00

35,000.00
82,500.00
50,000.00
75,000.00
80,000.00
85,000.00

4,200.00
14,850.00
1,400.00
3,150.00
336.00
212.50
24,148.50
24,149.00

Page 84

No.

URAIAN

SAT

VOLUME

HARGA SAT

HARGA

N-09 1 M2 Pengecatan Plafond ( 3x ) Setara ICI


- Cat tembok setara ICI
Kg
0.2000
82,500.00
16,500.00
- Plamir tembok
Kg
0.1600
27,500.00
4,400.00
- Rol cat
Bh
0.0100
35,000.00
350.00
- Steger werk
Ls
1.0000
1,000.00
1,000.00
- Ampelas
Lbr
0.5000
5,500.00
2,750.00
- Pekerja
Oh
0.2000
50,000.00
10,000.00
- Tukang cat
Oh
0.3000
75,000.00
22,500.00
- Kepala tukang
Oh
0.0300
80,000.00
2,400.00
- Mandor
Oh
0.0100
85,000.00
850.00
Jumlah
60,750.00
Dibulatkan
60,750.00
N-10 1 M2 Memasang Wallpaper
- Wallpaper
m2
1.2000
61,500.00
73,800.00
- Lem Perekat
Kg
0.2500
39,300.00
9,825.00
- Pekerja
Oh
0.3500
50,000.00
17,500.00
- Tukang cat
Oh
0.1750
75,000.00
13,125.00
- Kepala tukang
Oh
0.0170
80,000.00
1,360.00
- Mandor
Oh
0.0017
85,000.00
144.50
Jumlah
115,754.50
Dibulatkan
115,755.00
N-11 1 M2 Pengecatan Permukaan Baja dengan Meni Besi
- Meni besi
Kg
0.1000
33,500.00
3,350.00
- Kuas 3"
Bh
0.0100
18,000.00
180.00
- Pekerja
Oh
0.0200
50,000.00
1,000.00
- Tukang cat
Oh
0.2000
75,000.00
15,000.00
- Kepala tukang
Oh
0.0200
80,000.00
1,600.00
- Mandor
Oh
0.0100
85,000.00
850.00
Jumlah
21,980.00
Dibulatkan
21,980.00
N-12 1 M2 Pengecatan Permukaan Baja dengan Meni Besi dan Perancah
- Meni besi
Kg
0.1000
33,500.00
3,350.00
- Kuas 3"
Bh
0.0100
18,000.00
180.00
- Kayu perancah
m3
0.0020
2,276,800.00
4,553.60
- Pekerja
Oh
0.2500
50,000.00
12,500.00
- Tukang cat
Oh
0.2250
75,000.00
16,875.00
- Kepala tukang
Oh
0.0225
80,000.00
1,800.00
- Mandor
Oh
0.0075
85,000.00
637.50
Jumlah
39,896.10
Dibulatkan
39,896.00
N-13 1 M2 Pengecatan Permukaan Baja Lapis seng (galbani) secara manual 1 lps cat 2 um
- Cat besi setara ICI
Kg
0.3000
74,500.00
22,350.00
- Pekerja
Oh
0.0060
50,000.00
300.00
- Tukang cat
Oh
0.0600
75,000.00
4,500.00
- Kepala tukang
Oh
0.0120
80,000.00
960.00
- Mandor
Oh
0.0060
85,000.00
510.00
Jumlah
28,620.00
Dibulatkan
28,620.00
N-14 1 M2 Pengecatan Tembok Baru Setara Vinilex
- Plamir tembok
Kg
0.1000
27,500.00
2,750.00
- Cat dasar
Kg
0.1000
35,000.00
3,500.00

Page 85

No.

URAIAN

SAT

VOLUME

HARGA SAT

- Cat penutup 2x setara vinilex


Kg
0.2600
- Pekerja
Oh
0.0200
- Tukang cat
Oh
0.0630
- Kepala tukang
Oh
0.0063
- Mandor
Oh
0.0025
Jumlah
Dibulatkan
N-15 1 M2 Pengecatan Tembok Lama Setara Vinilex
- Cat dasar
Kg
0.1200
- Cat penutup 2 x
Kg
0.1800
- Pekerja
Oh
0.0280
- Tukang cat
Oh
0.0420
- Kepala tukang
Oh
0.0042
- Mandor
Oh
0.0025
Jumlah
Dibulatkan

27,500.00
50,000.00
75,000.00
80,000.00
85,000.00

7,150.00
1,000.00
4,725.00
504.00
212.50
19,841.50
19,842.00

35,000.00
27,500.00
50,000.00
75,000.00
80,000.00
85,000.00

4,200.00
4,950.00
1,400.00
3,150.00
336.00
212.50
14,248.50
14,249.00

HARGA

Page 86

O. PEKERJAAN PENANAMAN POHON


NO.
O-01

URAIAN
Pupuk kandang
Furadan
Pohon pelindung
Pekerja
Mandor
Jumlah
Dibulatkan

O-02

HARGA SAT. (Rp)

HARGA (Rp)

0.0800
0.0010
1.0000
0.0250
0.0025

krg
kg
btng
org
org

27,500.00
26,500.00
27,500.00
50,000.00
85,000.00

2,200.00
26.50
27,500.00
1,250.00
212.50
31,189.00
31,189.00

0.0800
0.0010
1.0000
0.0250
0.0025

krg
kg
btng
org
org

27,500.00
26,500.00
55,000.00
50,000.00
85,000.00

2,200.00
26.50
55,000.00
1,250.00
212.50
58,689.00
58,689.00

krg
kg
btng
org
org

27,500.00
26,500.00
11,500.00
50,000.00
85,000.00

1,100.00
26.50
11,500.00
1,000.00
170.00
13,796.50
13,797.00

krg
m2
org
org

27,500.00
16,500.00
50,000.00
85,000.00

1,100.00
8,250.00
2,000.00
340.00
11,690.00
11,690.00

1 Lubang (40x40x40) cm, tanam pohon perdu (polibag)

Pupuk kandang
Furadan
Pohon perdu
Pekerja
Mandor
Jumlah
Dibulatkan
O-04

SAT.

1 Lubang (70x70x70) cm, tanam bambu krisik/jepang

Pupuk kandang
Furadan
Bambu krisik/jepang
Pekerja
Mandor
Jumlah
Dibulatkan
O-03

KOEF

1 Lubang (70x70x70) cm, tanam pohon pelindung tinggi 2m

0.0400
0.0010
1.0000
0.0200
0.0020

1 M2 Tanam rumput gajah (silang papan catur)

Pupuk kandang
Rumput gajah mini
Pekerja
Mandor
Jumlah
Dibulatkan

0.0400
0.5000
0.0400
0.0040

Page 87

DAFTAR HARGA SATUAN UPAH

NO

UPAH

URAIAN
Org/jam

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25

Mandor
Kepala Tukang Batu
Kepala Tukang Kayu
Kepala Tukang Besi/Alumunium
Kepala Tukang Cat
Kepala Tukang Listrik
Tukang Batu
Tukang Kayu
Tukang Besi/Baja
Tukang Alumunium
Tukang Cat
Tukang Listrik
Tukang Pipa
Tukang Plitur
Tukang Taman
Tukang
Pembantu Tukang
Pekerja Biasa
Penjaga Malam
Sopir
Operator
Mekanik
Pembantu Sopir
Pembantu Operator
Pembantu Mekanik

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

10,625.00
10,000.00
10,000.00
10,000.00
10,000.00
10,000.00
8,750.00
9,375.00
8,750.00
9,375.00
8,750.00
8,750.00
8,750.00
8,750.00
8,750.00
8,750.00
6,250.00
6,250.00
6,250.00
8,750.00
10,000.00
8,750.00
7,500.00
7,500.00
7,500.00

KETERANGAN
Org/hr

Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp
Rp

85,000.00
80,000.00
80,000.00
80,000.00
80,000.00
80,000.00
70,000.00
75,000.00
70,000.00
75,000.00
70,000.00
70,000.00
70,000.00
70,000.00
70,000.00
70,000.00
50,000.00
50,000.00
50,000.00
70,000.00
80,000.00
70,000.00
60,000.00
60,000.00
60,000.00

DAFTAR HARGA SATUAN BAHAN BANGUNAN

NO
A.

MATERIAL

SAT

HARGA (Rp)

AGREGAT KASAR,BAHAN PEREKAT & BAHAN JADINYA


1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43

Pasir Urug
Tanah Urug Pilihan
Sirtu
Pasir Teras
Pasir Pasang Kali
Pasir Beton
Abu Batu
Batu Gosok ( Apung )
Batu Pecah Mesin 1/2
Batu Pecah Mesin 2/3
Batu Pecah Mesin 3/5
Batu Pecah Mesin 5/7
Batu Belah Pondasi
Batu Bronjol ( Untuk Bronjong )
Batu Koral Beton Kali
Batu Tempel Hitam
Batu Pinggir Beton 10 x 20 x 35
Batu Pinggir Beton 15 x 35 x 50 ( K-225 )
Batu Telor
Batako Kecil 8 x 10 x 20
Batako Besar 8 x 20 x 30
Con Blok 8 x 20 x 40
Bata Merah Bakar kelas I
Bata Merah Bakar kelas II
Bata Merah Oven ( Klingker )
Roster Beton 20 x 20
Roster Beton 30 x 30
Grass Blok 20 x 20
Grass Blok 30 x 30
Paving Blok Natural 8 cm
Paving Blok Warna 8 cm
Paving Blok Natural 6 cm
Paving Blok Warna 6 cm
Canstin Paving Blok
Semen PC /50 kg
Semen Putih
Kanstin Jalan Ukuran Besar ( Bina Marga ) 1bh =60cm
Readymix Beton K500, Tanpa Pompa ( Selang )
Readymix Beton K400, Tanpa Pompa ( Selang )
Readymix Beton K350, Tanpa Pompa ( Selang )
Readymix Beton K300, Tanpa Pompa ( Selang )
Readymix Beton K225, Tanpa Pompa ( Selang )
Readymix Beton K175, Tanpa Pompa ( Selang )

Page 89

m3
m3
m3
m3
m3
m3
m3
kg
m3
m3
m3
m3
m3
m3
m3
m3
bh
bh
m3
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m2
m2
m2
m2
m1
zak
zak
bh
m3
m3
m3
m3
m3
m3

192,800.00
98,200.00
224,500.00
192,000.00
256,800.00
281,000.00
284,900.00
32,600.00
246,000.00
232,200.00
225,500.00
215,600.00
226,100.00
199,000.00
190,000.00
106,500.00
15,600.00
81,100.00
108,000.00
2,500.00
2,700.00
6,000.00
850.00
750.00
2,000.00
9,400.00
9,000.00
10,700.00
14,900.00
89,300.00
119,500.00
83,600.00
94,600.00
38,400.00
77,400.00
102,000.00
64,800.00
1,105,000.00
903,500.00
877,500.00
845,000.00
760,500.00
692,800.00

BHN

44
45
46
47
48
49
50
51
52
B
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39

Kapur Pasang / Kapur Tembok


Kapur Sirih
Semen Warna
Tanah liat
Air
Formite/spacer
Hollow/Con Blok 8 x 20 x 40
Hollow/Con Blok 8 x 15 x 40
Hollow/Con Blok 8 x 10 x 40

m3
kg
kg
m3
ltr
bh
bh
bh
bh

388,700.00
20,200.00
15,000.00
34,500.00
3,500.00
2,800.00
5,700.00
6,500.00
3,500.00

LABURAN,PENGISI DAN ALATNYA


Plamir Tembok
Cat Tembok ICI Eksterior ( Beton )
Cat Tembok ICI Interior ( Plafon Dan Dinding )
Cat Tembok Vinilex
Cat Dasar ICI untuk Interior ( 2 Pelapis )
Cat Tembok Sanlek
Cat Dasar
Cat Tahan Asam
Pelapis Alkali ICI ( Cat Dasar Beton Ekterior )
Cat Marka / Spotlight
Water Profing Emulsion
Water Profing Membrance
Rool Cat Tembok
Kape Tembok
Kape Kayu
Soligneum 1 Blek
Plincote
Penawetan Kayu
Pegopenan Kayu
Kwas 3"
Oker
Oyan
Oten ( Pewarna Plitur )
Spirtus
Bahan Pelitur Kripik ( Sirlak India )
Dempul Lilin
Dempul Plitur
Dempul Halus / Imfra ( Wood Filler )
Dempul Jadi
Politur
Politur Jadi
Terpentin
Tiner A
Tiner B
Kumpon
Melamik
Dempul Plastik
Dempul Duco
Ampelas

kg
lt
lt
kg
lt
kg
kg
lt
kg
kg
ml
bh
bh
bh
5 lt
kg
m3
m3
bh
bh
bks
bks
lt
kg
kg
kg
kg
lt
kg
lt
lt
kg
kg
kg
lbr
kg
kg
kg
lbr

27,500.00
135,000.00
82,500.00
27,500.00
92,500.00
22,500.00
35,000.00
45,000.00
100,000.00
205,000.00
80,000.00
90,000.00
35,000.00
9,500.00
12,000.00
27,500.00
32,000.00
425,000.00
410,000.00
18,000.00
25,000.00
6,000.00
7,000.00
17,500.00
125,000.00
40,000.00
45,000.00
42,000.00
40,000.00
55,000.00
125,000.00
25,000.00
26,300.00
23,700.00
34,000.00
57,800.00
43,200.00
40,000.00
5,500.00

Page 90

BHN

40
41
42
43
44
45
46
47
48
49
50

Dempul Kayu Cap Kucing


Meni Kayu / Besi
Sincromat
Cat Kayu Sieve
Cat Besi
Cat Besi Duco Danaglos / ICI
Cat Bron
Karet lis
Minyak cat
Glass beet
Residu

kg
kg
kg
lt
lt
bh
kg
bh
kg
kg
lt

26,900.00
33,500.00
45,000.00
45,900.00
48,400.00
84,000.00
74,500.00
3,700.00
42,300.00
55,500.00
9,000.00

C
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37

BAHAN KAYU BERIKUT BAHAN JADINYA


Bambu 5 s.d 7
Bambu 7 s.d 10
Bambu Gombong
Kayu Kamper Singkil / Kapur ( Kayu Samarinda kls II )
Kayu Balok Borneo Super
Kayu Papan Borneo Super
Kayu Balok Kamper Medan (Kruing )
Kayu Papan Kamper Medan (Kruing )
Kayu Balok Kamper Banjar
Kayu Papan Kamper Banjar
Kayu Balok Kamper Samarinda
Kayu Papan Kamper Samarinda
Kayu Balok Rasamala
Kayu Jati Jatim Tua dia. 40 cm
Kayu Jati Jateng Tua dia. 40 cm
Kayu Jati Jabar Tua dia. 40 cm
Kayu Jati Jabar Tua dia. 40 cm kebawah
Kayu Hutan Kelas I ( Segeng,Mahoni, Laban )
Kayu Balok Albasia
Kayu Papan Albasia
Dolken 5 s/d 7
Dolken 7 s/d 10
List Profil Kamper 1 cm
List Profil Kamper 2 cm
List Profil Kamper 4 cm
List Profil Kamper 5 cm
List Profil Kamper 10 cm
Pegangan Tangga Profil Jati
Pegangan Tangga Profil Kamper
Kayu Kaso 4/6
Kayu Kaso 5/7
Kayu Reng 2/3 Borneo Super
Kayu Reng 2/3 Kamper Banjar
Kayu Reng 3/4 Kamper Banjar
Kayu Papan Terentang
Kayu Balok Terentang
Batang Kelapa

bt
bt
bt
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
m3
bt
bt
m1
m1
m1
m1
m1
m1
m1
m3
m3
m1
m1
m3
m3
m3
bt

19,500.00
27,500.00
42,500.00
7,805,000.00
5,810,000.00
6,155,500.00
6,262,000.00
6,405,800.00
7,000,000.00
7,310,000.00
9,500,000.00
9,596,800.00
2,923,800.00
22,850,000.00
24,410,000.00
15,000,000.00
14,010,000.00
2,276,800.00
2,058,000.00
2,279,000.00
24,900.00
30,800.00
9,800.00
11,500.00
15,800.00
19,000.00
32,400.00
176,500.00
135,000.00
3,049,500.00
3,692,500.00
3,000.00
4,000.00
4,500.00
3,135,000.00
2,905,000.00
153,500.00

Page 91

BHN

38
39
40
41

Tali Ijuk
lapisan Ijuk tebal 10 cm
Venetion Blind
Vertikal Blind

kg
m2
m2
m2

25,800.00
24,500.00
592,000.00
386,500.00

D
1
2
3
4
5
6
7
8
9
10
11
12

BAHAN PENUTUP RANGKA PLAFOND


Plafond Enternit 4 mm
Plafond hardpleks 5 mm 120 x 240
Plafond Asbes Semen 5 mm
Plafond Asbes Semen 3,5 mm
Gypsum 120 x 240 t= 9 mm ex DN
Gypsum 120 x 240 t= 9 mm ex Luar
Tepung gypsum
Acustik Amstrong 60 x 120
Cotton Plester
GRC (120 x 240) cm, t = 4 mm
Cornice Coumpound
List gypsum

m2
lbr
m2
m2
lbr
lbr
kg
lbr
bh
lbr
zak
m'

19,500.00
68,700.00
25,000.00
21,500.00
87,800.00
92,200.00
13,800.00
146,500.00
16,500.00
74,500.00
83,000.00
9,500.00

E
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27

BAHAN KAYU LAPIS


Triplek 3 mm 120 x 240
Triplek 4 mm 120 x 240
Triplek 4 mm ukuran Pintu
Triplek 6 mm 120 x 240
Triplek 9 mm 120 x 240
Jabar Wood 4 mm
Bilik Bambu ( tanpa kulit )
Bilik Bambu ( dengan kulit )
Bilik Bambu Hitam Variasi
Wall paper
MultiPlek 9 mm 120 x 240
MultiPlek 12 mm 120 x 240
MultiPlek 18 mm 120 x 240
Ply Wood 18 mm 120 x 240
Ply Wood 9 mm 120 x 240
Ply Wood 4 mm 120 x 240
Teak Wood 3 mm 120 x 240
Teak Wood 4 mm 120 x 240
Teak Wood 3 mm 120 x 240 ukuran Pintu
Teak Wood ukuran Pintu 4 mm
Tacon ( Tahan Bakar )
Supercon
Melamin 4 mm 120 x 240
Melamin TOK 4 mm
Formika 120 x 240
Formika ukuran Pintu
Formika Warna 4" x 8"

lbr
lbr
lbr
lbr
lbr
lbr
m2
m2
m2
m2
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
m2
m2
lbr
lbr
lbr
lbr
lbr

68,000.00
72,500.00
62,500.00
102,500.00
183,500.00
132,500.00
22,500.00
25,000.00
37,700.00
61,500.00
166,500.00
215,000.00
282,500.00
357,500.00
260,000.00
145,000.00
142,500.00
145,000.00
140,000.00
127,500.00
142,500.00
65,000.00
98,500.00
147,000.00
165,000.00
147,500.00
262,500.00

F
1

BAHAN LANTAI DAN PELAPIS DINDING


Tegel PC 20 x 20

bh

3,800.00

Page 92

BHN

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51

Plin Tegel PC 10 x 20
Tegel PC 30 x 30
Plin Tegel PC 15 x 30
Tegel Warna 20 x 20
Plin Tegel Warna 10 x 20
Tegel Warna 30 x 30
Plin Tegel Warna 15 x 30
Tegel Wafel PC 20 x 20
Tegel Wafel Warna 20 x 20
Tegel Badak PC 30 x 30
Poslin 11 x 11 Warna Standar DN
Poslin 11 x 11 Warna khusus DN
Keramik 10 x 20 dan 20 x 20 KW I DN Putih / Polos Mulia
Keramik 10 x 20 KW I DN Corak/Warna/Anti Slip Mulia
Keramik 20 x 20 (KM) KW I DN Corak/Warna /Anti Slip Mulia
Keramik 20 x 20 (KM) KW I DN Putih Polos Mulia
Keramik 20 x 25 Dinding KM KW I DN Corak Mulia
Keramik 30 x 30 KWI DN Putih Polos Mulia
Keramik 30 x 30 KWI DN Warna/Corak (ANTI SLIP) Mulia
Keramik 40 x 40 KWI DN Putih Polos Mulia
Keramik 40 x 40 KWI DN Warna/Corak (ANTI SLIP) Mulia
Keramik 10 x 20 dan 20 x 20 KW I DN Putih / Polos Roman
Keramik 10 x 20 KW I DN Corak/Warna/Anti Slip Roman
Keramik 20 x 20 (KM) KW I DN Corak/Warna/Anti Slip Roman
Keramik 20 x 20 (KM) KW I DN Putih Polos Roman
Keramik 20 x 25 Dinding KM KW I DN Corak Roman
Keramik 30 x 30 KW I DN Polos Roman
Keramik 30 x 30 KW I DN Warna/Corak (ANTI SLIP) Roman
Keramik 40 x 40 KW I DN Polos Roman
Keramik 40 x 40 KW I DN Warna/Corak (ANTI SLIP) Roman
Vinyl Lantai Standar
Karpet Kelas Baik LN
Karpet Kelas Sedang LN
Parquet Jati
Stairnosing Keramik 10/20
Stairnosing Fiber
Taraso Kerang 30 x 30
Plin Taraso 10 x 30
Granit Alam LN Ukuran Besar
Granit Alam LN Ukuran Kecil
Granit Alam DN Ukuran Besar
Granit Alam DN Ukuran Kecil
Granito Tile Essenza Ukuran 40 x 40 Polis
Granito Tile Essenza Ukuran 30 x 30
Granito Tile Essenza Ukuran 40 x 40 UnPolis
Marmer
Marmer Alam Lampung Ukuran Besar
Marmer Alam Lampung Ukuran kecil
Marmer Alam Citatah Ukuran Besar
Marmer Alam Citatah Ukuran Kecil

Page 93

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
bh
m
m2
bh
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2

2,700.00
3,800.00
3,200.00
4,000.00
3,800.00
6,500.00
7,000.00
3,600.00
2,800.00
4,600.00
70,000.00
75,000.00
60,000.00
62,500.00
70,000.00
66,500.00
77,500.00
58,500.00
64,000.00
62,500.00
72,500.00
71,500.00
80,000.00
83,000.00
81,500.00
91,500.00
76,000.00
84,500.00
80,000.00
85,000.00
62,500.00
1,128,500.00
389,000.00
413,500.00
15,500.00
27,500.00
35,000.00
15,000.00
2,033,500.00
1,774,500.00
1,464,500.00
1,429,500.00
380,000.00
355,500.00
225,500.00
605,000.00
605,500.00
380,500.00
375,000.00
262,500.00

BHN

52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67

Marmer Sintetis
Granito Tile Essenza 60 x 60 Polis
Granito Tile Essenza 60 x 60 UnPolis
Batu Tempel Hitam
Bata Karawang
Campuran untuk Kedap Air ( AM )
Plint keramik 10 x 20
Plint keramik 10 x 25
Plint keramik 10 x 30
Plint keramik 10 x 40
Plint keramik 15 x 30
Plint keramik 15 x 40
Plint granito 10 x 30
Plint granito 10 x 40
Plint granito 15 x 30
Plint granito 15 x 40

m2
bh
ltr
m2
bh
ltr
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

175,000.00
395,000.00
255,000.00
106,500.00
700.00
41,500.00
3,500.00
4,000.00
4,000.00
4,500.00
5,000.00
6,000.00
47,500.00
52,500.00
25,500.00
33,500.00

G
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

BAHAN SALURAN AIR KOTOR / BERSIH


Grafel U 20 cm'
Grafel U 30 cm'
Grafel U 40 cm'
Buis Beton 20 cm ( 1 M' )
Buis Beton 30 cm ( 1 M' )
Buis Beton 40 cm ( 1 M' )
Buis Beton 50 cm ( 1 M' )
Buis Beton 60 cm ( 1 M' )
Buis Beton 100 cm ( 0.50 M' )
Buis Beton 80 cm ( 0.50 M' )
BuisTanah 10 cm ( 0.50 M' )
BuisTanah 15 cm ( 0.50 M' )
BuisTanah 20 cm ( 0.50 M' )
BuisTanah 25 cm ( 0.50 M' )
Injuk

m1
m1
m1
m1
m1
m1
stk
stk
stk
stk
stk
stk
stk
stk
kg

50,000.00
62,500.00
82,500.00
55,000.00
68,000.00
90,000.00
105,000.00
145,000.00
330,000.00
330,000.00
11,000.00
14,000.00
18,500.00
25,500.00
19,500.00

H
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

BAHAN LOGAM DAN BAHAN JADINYA


Besi Beton U-24 Rata-rata
Besi Beton U-39 / U-32 Rata-rata
Pagar BRC lengkap tiang ( Tanpa Pondasi )
Bondek
Besi WF Ex DN SII
Besi WF Ex Jepang
Besi Profil DN SII
Besi Profil Ex LN
Besi C Lip Chanel
Ongkos Galfanis Besi
Kawat Beton
Kawat Duri
Kawat Pengikat
Kawat Bronjong 4 mm
Kawat Tembaga

kg
kg
m2
m2
kg
kg
kg
kg
kg
kg
kg
kg
m1
kg
kg

18,500.00
22,800.00
188,500.00
203,500.00
26,400.00
26,300.00
20,200.00
23,800.00
21,200.00
11,700.00
30,500.00
70,000.00
1,200.00
31,100.00
45,600.00

Page 94

BHN

16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65

Ram Nyamuk Hijau


Ram Kawat 1 x 1 cm
Ram Ayam
Kawat Kasa 1 x 1 ( Putih )
Kawat Harmonika 4 cm
Kawat Harmonika 2 cm
Kawat Las Listrik
Wiremesh M8
Wiremesh M6
Timah
Timah Hitam
Ram nyamuk Alumunium
Plat Srip 2 x 30 mm ( 6 m1 )
Plat Srip 3 x 30 mm ( 6 m1 )
Plat Strip
Besi Strip
Plat Alumunium 0.2 mm
Plat Alumunium 0.3 mm
Plat Alumunium 0.4 mm
Plat Alumunium 0.5 mm
Plat Alumunium 0.6 mm
Plat Alumunium 0.1 mm
Kusen Alumunium Natural 1.3 mm t= 1,3 mm ( 4 " )
Kusen Alumunium Warna 1.3 mm t= 1,3 mm ( 4 " )
Kusen Alumunium Natural 1.3 mm t= 1,3 mm ( 3 " )
Kusen Alumunium Warna 1.3 mm t= 1,3 mm ( 3 " )
Daun Jendela Alumunium Natural ( tanpa kaca dan accessories )
Daun Jendela Alumunium Warna ( tanpa kaca dan accessories )
Daun Pintu Alumunium Natural ( tanpa kaca dan accessories )
Daun Pintu Alumunium Warna ( tanpa kaca dan accessories )
Handle Alumunium ( Tarikan Pintu Alumunium )
Kait Angin Alumunium
Karet Asisoris Kusen / Pintu Alumunium
Jalusi Alluminium
Sunscreen Almunium
Seng Plat BJLS 30 60 cm ( 100 m1 )
Seng Plat BJLS 30 90 cm ( 100 m1 )
Plat Besi Tipis 1 mm
Plat Besi Tipis 0.5 mm
Plat Besi 2 mm s/d 5 mm
Plat Besi 6 mms/d 10 mm
Plat Besi 10 mm keatas
Kabel presstressed polos
Jaring Kawat Baja
Lem Kuning ( Aibond )
Lem Fox
Lem Vinyl
Besi Strip Kaca Nako
Profil alumunium "T"
Besi Hallow ( 2 x 4 x 4) cm (400cm)

Page 95

m2
m2
m2
m2
m2
m2
kg
m2
m2
kg
kg
m2
bt
bt
bt
kg
m2
m2
m2
m2
m2
m2
m1
m1
m1
m1
m2
m2
m2
m2
bh
ps
m1
m'
m2
roll
roll
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
kg
m1
btg

14,800.00
17,000.00
16,500.00
35,500.00
40,000.00
31,500.00
26,000.00
57,500.00
42,600.00
51,000.00
47,700.00
35,700.00
36,300.00
36,500.00
20,100.00
29,500.00
98,800.00
122,000.00
155,600.00
157,500.00
189,000.00
62,000.00
166,500.00
179,500.00
89,100.00
112,200.00
108,700.00
163,700.00
233,000.00
228,500.00
379,800.00
115,000.00
8,300.00
38,500.00
418,300.00
1,740,000.00
2,288,500.00
18,500.00
19,500.00
15,600.00
15,600.00
16,200.00
29,400.00
31,800.00
39,300.00
26,300.00
48,500.00
12,100.00
13,500.00
25,000.00

BHN

66
67
68
69
70
71
72
73
74
75
76
77
78
79
80
81

Besi Hallow ( 4 x 4) cm (400 cm)


Besi Rail Pengamanan
Jendela Besi
Jendela Besi tahan api
Pintu gulung besi
Pintu Roliing Door
Jendela nako kaca ryben + tralis 6 klips
Jendela nako kaca ryben + tralis 7 klips
Jendela nako kaca ryben + tralis 8 klips
Jendela nako kaca ryben + tralis 10 klips
Jendela nako kaca bening + tralis 4 klips
Jendela nako kaca bening + tralis 5 klips
Jendela nako kaca bening + tralis 6 klips
Jendela nako kaca bening + tralis 7 klips
Jendela nako kaca bening + tralis 8 klips
Jendela nako kaca bening + tralis 10 klips

btg
kg
m2
m2
m2
m2
set
set
set
set
set
set
set
set
set
set

32,200.00
505,300.00
429,300.00
551,900.00
551,900.00
337,300.00
187,000.00
220,000.00
253,000.00
319,000.00
132,000.00
154,000.00
187,000.00
231,000.00
253,000.00
330,000.00

I
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

BAHAN KACA
Kaca Polos 2 mm ( ASAHI )
Kaca Polos 3 mm ( ASAHI )
Kaca Polos 5 mm ( ASAHI )
Kaca Polos 8 mm ( ASAHI )
Kaca Rayband 5 mm ( ASAHI )
Kaca Rayband 8 mm ( ASAHI )
Kaca Rayband 12 mm ( ASAHI )
Kaca cermin 5 mm
Kaca cermin 6 mm
Kaca cermin 8 mm
Kaca Patri Lokal Terpasang ( ASAHI )
Kaca Patri Ex Luar Negeri Terpasang
Kaca 6 mm Gravver
Glass Block DN 20 x 20 ( Kedawung )
Glass Block DN 20 x 20 Ex LN
Sealant
Jendela Nako

m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
m2
bh
bh
kg
bh

75,900.00
96,200.00
122,100.00
201,500.00
163,600.00
355,800.00
689,700.00
165,600.00
205,100.00
257,800.00
1,783,300.00
3,768,300.00
1,390,300.00
24,200.00
138,300.00
233,000.00
120,200.00

J
1
2
3
4
5
6
7
8
9
10
11
12
13

BAHAN PAKU DAN MUR BAUT


Paku 1/2" s/d 2"
Paku 2" s/d 5"
Paku 8 cm s/d 15 cm
Paku Beton 2 cm s/d 5 cm
Paku Kait Lengkap
Paku Cacing
Besi Beugel Kuda - Kuda
Duk Angker
Angker Mur Baut dia. 19 / Panjang 60 cm
Mur Baut HTB dia. 19 s/d 16 ( 5 cm )
Mur Baut Biasa dia. 19 s/d 16 ( 5 cm )
Piser dia.12 s/d 20 cm
Paku skrup 3"

kg
kg
kg
bh
bh
kg
kg
bh
bh
bh
bh
bh
bh

21,800.00
20,700.00
18,400.00
1,800.00
1,000.00
63,000.00
24,000.00
8,300.00
79,000.00
17,500.00
10,300.00
6,000.00
1,000.00

Page 96

BHN

14
15
16
17
18
19

Ramset / Dinabolt
Baut Besar
Baut Kecil
Paku GRC
Paku gypsum
Sekrup fixer

bh
bh
bh
kg
kg
bh

8,000.00
700.00
300.00
38,500.00
19,500.00
300.00

K
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42

BAHAN PERPIPAAN
Besi Pipa Untuk Hydrant BSP 1"
Besi Pipa Untuk Hydrant BSP 1.25"
Besi Pipa Untuk Hydrant BSP 1.5"
Besi Pipa Untuk Hydrant BSP 2"
Besi Pipa Untuk Hydrant BSP 2.5"
Besi Pipa Untuk Hydrant BSP 3"
Besi Pipa Untuk Hydrant BSP 4"
Besi Pipa Untuk Hydrant BSP 6"
Besi Pipa Hitam 1" t = 2 mm
Besi Pipa Hitam 2" t = 2 mm
Besi Pipa Hitam 3" t = 2mm
Besi Pipa Hitam 4" t = 2 mm
Besi Pipa Hitam 6" t = 2 mm
Pipa GIP Medium A 1/2" ( 6 m1 )
Pipa GIP Medium A 3/4" ( 6 m1 )
Pipa GIP Medium A 1" ( 6 m1 )
Pipa GIP Medium A 1 1/4" ( 6 m1 )
Pipa GIP Medium A 1 1/2" ( 6 m1 )
Pipa GIP Medium A 1 3/4" ( 6 m1 )
Pipa GIP Medium A 2" ( 6 m1 )
Pipa GIP Medium A 2 1/2" ( 6 m1 )
Pipa GIP Medium A 3" ( 6 m1 )
Pipa GIP Medium A 4" ( 6 m1 )
Macam2 Sambungan GIP 1/2"
Macam2 Sambungan GIP 3/4"
Macam2 Sambungan GIP 1"
Macam2 Sambungan GIP 1 1/4"
Macam2 Sambungan GIP 1 1/2"
Macam2 Sambungan GIP 1 3/4"
Macam2 Sambungan GIP 2"
Macam2 Sambungan GIP 2 1/2"
Macam2 Sambungan GIP 3"
Macam2 Sambungan GIP 4"
Pipa PVC RUCIKA type AW 1/2"
Pipa PVC RUCIKA type AW 3/4"
Pipa PVC RUCIKA type AW 1"
Pipa PVC RUCIKA type AW 1 1/4"
Pipa PVC RUCIKA type AW 1 1/2"
Pipa PVC RUCIKA type AW 2"
Pipa PVC RUCIKA type AW 2 1/2"
Pipa PVC RUCIKA type AW 3"
Pipa PVC RUCIKA type AW 4"

bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bt
bt
bt
bt
bt
bt
bt
bt
bt

183,500.00
231,300.00
327,800.00
387,000.00
483,500.00
654,500.00
956,600.00
1,565,800.00
189,600.00
250,700.00
402,500.00
630,500.00
850,000.00
120,500.00
175,500.00
199,700.00
785,500.00
308,600.00
359,100.00
514,200.00
739,500.00
934,900.00
1,012,500.00
7,000.00
9,500.00
18,500.00
21,800.00
23,000.00
25,000.00
56,500.00
66,500.00
83,500.00
130,500.00
66,500.00
86,200.00
104,300.00
131,900.00
174,800.00
182,700.00
275,800.00
338,500.00
574,500.00

Page 97

BHN

43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61
62
63
64
65
66
67
68
69
70
71
72
73

Pipa PVC RUCIKA type AW 6"


Pipa PVC RUCIKA type AW 8"
Pipa PVC MASPION ABU ( AW ) 1/2"
Pipa PVC MASPION ABU ( AW ) 3/4"
Pipa PVC MASPION ABU ( AW ) 1"
Pipa PVC MASPION ABU ( AW ) 1 1/4"
Pipa PVC MASPION ABU ( AW ) 1 1/2"
Pipa PVC MASPION ABU ( AW ) 2"
Pipa PVC MASPION ABU ( AW ) 2 1/2"
Pipa PVC MASPION ABU ( AW ) 3"
Pipa PVC MASPION ABU ( AW ) 4"
Macam2 Sambungan Paralon 1/2"
Macam2 Sambungan Paralon 3/4"
Macam2 Sambungan Paralon 1"
Macam2 Sambungan Paralon 1 1/4"
Macam2 Sambungan Paralon 1 1/2"
Macam2 Sambungan Paralon 1 3/4"
Macam2 Sambungan Paralon 2"
Macam2 Sambungan Paralon 2 1/2"
Macam2 Sambungan Paralon 3"
Macam2 Sambungan Paralon 4"
Sambungan Pipa PVC Jenis AW 4" TY
Lem Paralon
Solatip Ledeng
Pipa PVC 4" Berlobang Jenis AW
PVC Waterstop lebar 150
PVC Waterstop lebar 200
PVC Waterstop lebar 230
PVC Waterstop lebar 250
PVC Waterstop lebar 300
PVC Waterstop lebar 320

bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bt
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
tb
gl
m1
m1
m1
m1
m1
m1
m1

1,056,000.00
1,350,500.00
30,500.00
46,000.00
58,500.00
97,000.00
99,500.00
118,500.00
208,500.00
240,500.00
424,000.00
5,000.00
5,500.00
5,500.00
8,000.00
10,500.00
15,000.00
17,500.00
29,500.00
33,000.00
38,000.00
99,000.00
11,500.00
5,000.00
40,500.00
60,000.00
65,000.00
72,500.00
82,500.00
92,500.00
102,000.00

L
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

BAHAN SANITAIR
Stop Kran 3/4" KIT
Stop Kran 1" KIT
Stop Kran 1 1/2" KIT
Stop Kran 2" KIT
Stop Kran 2 1/2" KIT
Stop Kran 3" KIT
Check Valve 1/2"
Double Neple 1/2"
Water Mur 1/2"
Gate walve 1/2"
Saringan Air Lt. KM Stainless Steel
Apooer Bath Tube
Kran Stainless Lokal Kait
Shower Dengan Tiang
Shower Tanpa Tiang
Kran Tembok Sun Eui dia. 1/2"
Kran Tembok ITAP dia. 1/2"

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
bh

115,000.00
137,500.00
230,000.00
295,000.00
785,000.00
915,000.00
95,500.00
36,000.00
44,500.00
61,500.00
73,500.00
295,000.00
51,500.00
245,000.00
150,000.00
96,000.00
45,000.00

Page 98

BHN

18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36

Kran Bebek Sun Eui 1/2"


Kran Bebek ITAP 1/2"
Kran Panas Dingin San Eui Standard
Bath Cape Washteren
Tempat Sabun Poslin
Wastafel Lengkap TOTO LW 230
Wastafel Lengkap INA
Closet Jongkok Poslin Warna TOTO
Closet Jongkok Standard Putih Poslin TOTO
Closet Jongkok Lengkap Sistem Jet TOTO
Closet Duduk Warna Standard TOTO C 240 Lengkap
Wastafel Bulat Warna Standard Lengkap
Closet Duduk Warna Standard INA Lengkap
Urinoir Lengkap TOTO Warna Standard Lengkap
Penyekat Poslin Urinoar TOTO
Kitchen Zink Stainless Standard Lokal ( 1 Lubang )
Kitchen Zink Stainless Non Standard Franke ( 1 Lubang )
Kitchen Zink Stainless Non Standard Franke ( 2 Lubang )
Talang PVC U - 15 cm

bh
bh
bh
unit
bh
unit
unit
unit
unit
unit
unit
unit
bh
unit
lbr
bh
bh
bh
btng

160,000.00
57,500.00
252,000.00
2,310,000.00
51,500.00
1,115,000.00
800,000.00
227,500.00
207,500.00
2,236,500.00
1,897,500.00
1,002,000.00
1,399,500.00
1,952,500.00
545,500.00
438,500.00
1,400,000.00
1,815,500.00
66,000.00

M
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

BAHAN PENUTUP ATAP


Atap Plastik Gelombang 80 x 180
Atap Fiber Glass Tipis 80 x 180 ( Gelombang )
Atap Fiber Glass Tebal 80 x 180 ( Gelombang )
Atap Alumunium Natural USR 26 ( JAINDO )
Atap Alumunium Warna USR 26 ( JAINDO )
Atap Asbes Gel. Kecil 80 x 180 x 4 mm
Atap Asbes Gel. Besar 80 x 180 x 5 mm
Atap Seng Gelombang 80 cm x 180 cm x 3 mm
Atap Seng Gelombang 80 cm x 180 cm x 5 mm
Atap Seng Gelombang 270 cm x 105 cm x 4mm
Atap Seng Gelombang 240 cm x 105 cm x 4mm
Atap Seng Gelombang 210 cm x 105 cm x 4mm
Atap Seng Gelombang 150 cm x 105 cm x 4mm
Atap Seng Gelombang 150 cm x 102 cm x 5mm
Atap Seng Gelombang 180 cm x 102 cm x 5mm
Atap Asbes Gelombang 300 cm x 105 cm x 4 mm
Atap Tegola Kubota, lengkap
Atap Tegola Kwalitas Sedang
Alumunium Foile
Atap Genteng Plentong pres Bakar KW I
Atap Genteng Plentong pres Molen Oven KW I
Atap Genteng Flam pres Molen Oven Jatiwangi
Bubung Genteng pres Bulat Ex Jatiwangi
Genteng Bubungan Ex Jatiwangi Segi Tiga
Genteng Bubungan Beton
Genteng Metal ( Rainbow Roof )
Genteng Metal Hana
Nok Atas Metal ( Rainbow Roof )
Nok Atas Metal Hana

lbr
lbr
lbr
m2
m2
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
lbr
m2
m2
m2
bh
bh
bh
bh
bh
bh
m2
m2
lbr
lbr

36,500.00
52,000.00
110,000.00
155,000.00
182,500.00
85,000.00
122,500.00
69,500.00
91,500.00
81,000.00
72,500.00
65,500.00
47,000.00
86,500.00
107,500.00
88,000.00
536,000.00
312,000.00
22,500.00
2,500.00
3,000.00
2,700.00
8,500.00
5,500.00
12,000.00
225,000.00
190,000.00
152,500.00
89,000.00

Page 99

BHN

30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51
52
53
54
55
56
57
58
59
60
61

Nok Pingir Metal ( Rainbow Roof )


Nok Pingir Metal Hana
Wall Flasing ( Rainbow Roof )
Wall Flasing Hana
Atap Genteng Beton Warna 14.5/m2
Genteng Beton Natural
Sirap Kelas I ( 80 / m2 )
Genteng Keramik Natural Intan 14.5 / m2
Genteng Keramik Glasur Standard 14.5 /m2
Genteng Keramik Glasur Special 14.5 /m2
Genteng Keramik Glasur Premium 14.5 /m2
Genteng Murando Natural 1m2 = 18 bh
Genteng Murando Glasur 1m2 = 18 bh
Bubung Murando Natural
Bubung Murando Glasur
Bubungan Genteng Keramik
Atap Genteng Kodok
Bubungan Genteng Kodok
Bubungan Genteng Plentong
Bubungan Stel Gelombang
Nok Stel Gelombang
Nok Atap Seng
Nok standar 40 cm 18, SWG 22
Pelat Asbes tebal 4 mm
Pelat Asbes tebal 3.5 mm
Trusses ZAM-75 t=0.8 Rangka Utama
Trusses ZAM-75 t=0.5 Rangka Utama
Reng 16-DB Roof Battens t=0.48 mm
Foot Plate t= 1.22 mm
PLD - Diafragma Plate
WIND Bracing
Tensioner ( Pengaku Tali angin )

lbr
lbr
lbr
lbr
m2
bh
m2
m2
m2
m2
m2
bh
bh
bh
bh
bh
bh
bh
bh
bh
lbr
lbr
m2
lbr
lbr
m1
m1
m1
m1
bh
m1
bh

N
1
2
3
4
5
6
7
8
9
10
11
12
13

BAHAN MEKANIKAL
Jockey Pump kap. 80 gln/menit 100 m1 ( 18.6 kW )
Electrical Pump kap. 750 gln/menit 120 m1 ( 90 kW )
Diesel Pump kap. 750 gln/menit 120 m1 ( 105 kW )
Presure Tank kap. 500 liter lengkap
Hydran Box dlm Gedung ( Lengkap )
Fire House 1.5 x 30 m + nose
Exhose Fan H 360 W 60 x 60 cm
Exhose Fan H 380 W CFM 55 x 55 cm
Exhose Fan H 100 W 40 x 40 cm
AC Split 3 PK Setara TOSHIBA
AC Split 2 PK Setara TOSHIBA
AC Split 1 PK Setara TOSHIBA
Mesin AC Split DAIKIN ( Indoor / Outdoor Unit )

O BAHAN ELEKTRIKAL
1 Kabel NYA 1 x 1.5 Prima ( 1 rol = 50 m' )

Page 100

115,900.00
110,900.00
92,300.00
97,600.00
106,500.00
9,500.00
29,500.00
125,000.00
156,500.00
155,000.00
160,000.00
3,000.00
4,500.00
8,500.00
12,000.00
11,000.00
3,500.00
5,000.00
7,000.00
8,500.00
42,000.00
41,500.00
82,500.00
23,500.00
18,500.00
38,500.00
25,000.00
12,500.00
8,000.00
2,500.00
2,000.00
8,000.00

unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
1 BTU

78,536,500.00
237,995,000.00
650,812,000.00
40,698,000.00
7,540,000.00
5,353,000.00
7,550,000.00
6,040,500.00
1,202,500.00
33,871,500.00
24,119,500.00
5,692,000.00
5,000.00

ROLL

113,500.00

BHN

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
41
42
43
44
45
46
47
48
49
50
51

Kabel NYA 1 x 2.5 Prima ( 1 rol = 50 m' )


Kabel NYM 2 x 1.5 Prima ( 1 rol = 50 m' )
Kabel NYM 3 x 1.5 Prima ( 1 rol = 50 m' )
Kabel NYM 2 x 2.5 Prima ( 1 rol = 50 m' )
Kabel NYM 3 x 2.5 Prima ( 1 rol = 50 m' )
Kabel NYM 4 x 2.5 Prima ( 1 rol = 50 m' )
Kabel NYM 2 x 4 Prima ( 1 rol = 50 m' )
Kabel NYM 3 x 4 Prima ( 1 rol = 50 m' )
Kabel NYM 4 x 4 Prima ( 1 rol = 50 m' )
Kabel NYM 2 x 6 Supreme ( 1 rol = 50 m' )
Kabel NYM 3 x 6 Supreme ( 1 rol = 50 m' )
Kabel NYM 4 x 6 Supreme ( 1 rol = 50 m' )
Kabel NYM 2 x 10 Supreme ( 1 rol = 50 m' )
Kabel NYM 3 x 10 Supreme ( 1 rol = 50 m' )
Kabel NYM 4 x 10 Supreme ( 1 rol = 50 m' )
Kabel NYM 4 x 16 Supreme ( 1 rol = 50 m' )
Kabel NYY 2 x 4 Supreme ( 1 rol = 50 m' )
Kabel NYY 3 x 4 Supreme ( 1 rol = 50 m' )
Kabel NYY 4 x 4 Supreme ( 1 rol = 50 m' )
Kabel NYY 2 x 6 Supreme ( 1 rol = 50 m' )
Kabel NYY 3 x 6 Supreme ( 1 rol = 50 m' )
Kabel NYY 4 x 6 Supreme ( 1 rol = 50 m' )
Kabel NYY 2 x 10 Supreme ( 1 rol = 50 m' )
Kabel NYY 3 x 10 Supreme ( 1 rol = 50 m' )
Kabel NYY 4 x 10 Supreme ( 1 rol = 50 m' )
Kabel NYY 4 x 16 Supreme ( 1 rol = 50 m' )
NSFB FUJI EA - 100 A
NSFB FUJI EA - 150 A
Rumah Panel 30 x 60 cm ( Kosong )
Skring Kas 2 grop Biasa
Skring Kas 3 grop Biasa
Skring Kas 5 grop Biasa
MCB 1 PAS
MCB 3 PAS
Tahanan 50 A Merk Fuji
Saklar Broko Tunggal Standard ( 1 Phase )
Saklar Broko Seri Standard ( 1 Phase )
Stop Kontak Broko Standard ( 1 Phase )
Stop Kontak Broko 3 Phase (Out Bow)
Stop Kontak Broko 3 Phase ( In Bow)
Stop Kontak Handle 3 Phase
Instalas Titik Lampu / Stop Kontak (Upah dan Alat)
Lampu pijar 25 Watt s/d 100 Watt
Lampu Neon Phillips 20 Watt
Lampu Neon Phillips 40 Watt
Trapo TL 20 W (Phillips)
Trapo TL 40 W (Phillips)
Trapo TL 20 W (Sinar)
Trapo TL 40 W (sinar)
Stater Neon Phillips

Page 101

ROLL
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
m'
bh
bh
unt
unt
unt
unt
bh
bh
bh
bh
bh
bh
bh
bh
bh
ttk
bh
bh
bh
bh
bh
bh
bh
bh

167,000.00
7,500.00
8,500.00
5,500.00
12,000.00
8,500.00
7,000.00
17,500.00
23,000.00
13,000.00
15,500.00
20,500.00
19,500.00
132,500.00
29,500.00
33,500.00
13,500.00
21,500.00
26,500.00
16,000.00
21,500.00
20,500.00
22,500.00
28,500.00
39,500.00
46,500.00
926,500.00
2,401,000.00
169,500.00
225,500.00
245,000.00
516,000.00
61,500.00
117,500.00
573,500.00
26,500.00
29,000.00
26,500.00
96,500.00
160,000.00
97,500.00
198,000.00
67,500.00
33,000.00
39,000.00
46,000.00
42,500.00
45,000.00
45,500.00
9,500.00

BHN

52
53
54
55
56
57
58
59
60
61
62
63
64

Stater Neon Biasa


Rumah TL In Bow / Out Bow 2 x 20 W (kosongan)
Down Light + SL 25 W
Lampu SL Philip 25 W
Lampu Sirkel TL 20 W Lengkap
Lampu Mercuri 80 W
Lampu Taman + Tiang + Lampu 1 Buah
Lampu Baret 30 cm + Neon
Lampu Neon Arcrilik 2 x 40 W Lengkap
Jarum Penangkal Petir 16
Kawat BC ( Tembaga )
Pentanahan Penangkal Petir
Pentanahan Panel

bh
bh
bh
bh
bh
bh
bh
bh
bh
bh
kg
ttk
ttk

7,500.00
158,500.00
338,000.00
338,000.00
75,000.00
163,000.00
338,500.00
245,000.00
812,000.00
112,000.00
72,500.00
466,500.00
326,000.00

P
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35

BAHAN ALAT PENGANTUNG DAN KUNCI


Kunci Silinder ALFA untuk Pintu Alumunium
Tarikan Pintu Alumunium
Kunci 2 Slaag ROYAL
Rel Henderson Lengkap
Rel maraton I Pintu
Kunci 2 Slaag Silinder SEIS Asli type 210 s/d type 226
Kunci 2 Slaag Ancor Asli
Kunci 2 Slaag ISO
Kunci KM Bulat Kualitas Biasa
Kunci kM Bulat ALFA
Kunci 2 Slaag Silinder Utama Standard
Kunci Gembok Besar
Kunci 2 Slaag Kuda Terbang
Kunci Lemari
Espangolet
Grendel 15 cm
Grendel 5 cm
Hak Angin Kait Jendela Biasa
Hak Angin Jendela Antik
Hak Angin Sendok Stainless / Kuningan
Sloot Pintu Berikut Rantai
Sloot Jendela Tunggal
Engsel Pintu Unilon Standard
Engsel Jendela Unilon
Engsel Patrun
Engsel Harmonika
Door Closer Kelas Standard ( Kelas Sedang )
Door Closer Kelas Standard ( Kelas Baik )
Door Closer Kelas Rendah
Door Holder
Door Stoper
Tarikan Almari Rata-rata
Seng BJLS 30 Lebar 60 cm ( 1 rol 50 m' )
Seng BJLS 30 Lebar 90 cm ( 1 rol 50 m' )
Seng BJLS 30 / 3 x 0.3 mm

bh
bh
bh
bh
unt
bh
bh
bh
bh
bh
bh
bh
bh
bh
ps
bh
bh
ps
ps
bh
bh
bh
ps
ps
ps
m1
unt
unt
unt
unt
unt
bh
m1
m1
lbr

452,500.00
450,000.00
139,500.00
951,000.00
212,500.00
369,500.00
182,500.00
228,500.00
59,900.00
113,100.00
645,300.00
93,800.00
104,000.00
51,500.00
56,800.00
54,800.00
6,500.00
8,000.00
31,900.00
35,500.00
35,000.00
36,300.00
23,100.00
16,500.00
15,100.00
10,100.00
462,000.00
657,300.00
220,000.00
226,000.00
281,500.00
21,500.00
48,000.00
59,000.00
96,500.00

Page 102

BHN

36 Seng Plat
37 Waterstop Lebar 200 mm

lbr
m1

55,500.00
64,500.00

Q
1
2
3
4
5
6
7

BAHAN PENGIKAT UNTUK KONSTRUKSI JALAN


Hotmix Jadi Berikut alat dan bahan bakar ( T=5 cm => 9 m2 )
Aspal ( ESO ) 1 Drum 155 kg
Aspal Curah
Aspal RC 70 ( Cilacap )
Aspal Concrete ( AC )
Aspal Threated Base ( ATB )
Hot Rols Sheet ( HRS )

ton
kg
kg
kg
ton
ton
ton

1,483,500.00
13,800.00
12,000.00
12,000.00
1,483,500.00
1,320,500.00
1,833,600.00

R
1
2
3
4
5
6
7
8
9
10
11

BAHAN PENGISAP AIR SUMUR DALAM


Pompa Kodok
Pompa Dragon Tegal
Pompa Dragon Asli
Mesin Pompa Air 100 W - Sanyo
Mesin Pompa Air 150 W - Sanyo
Pompa Zet Pump 250 W - Sanyo
Pompa Zet Pump 450 W - Sanyo
Pompa Submersible kap. 150 liter / menit 3 KW
Gear Pump Kap. 60 liter / menit
Deep Well dengan kelengkapannya kap. 150 liter / menit
Hand Oil Pump

unit
unit
unit
unit
unit
unit
unit
unit
unit
unit
unit

189,900.00
268,200.00
790,500.00
1,210,500.00
2,080,000.00
5,458,000.00
8,666,000.00
29,866,500.00
17,273,000.00
189,258,000.00
5,715,000.00

S
1
2
3
4
5
6

BAHAN PENAMPUNG AIR


Tangki Air Fiber Glass 0.5 m3 ( Excel )
Tangki Air Fiber Glass 1 m3 ( Excel )
Tangki Air Fiber Glass 2 m3 ( Excel )
Bak KM Fiber 60 x 60
Bak Taraso WC 40 x 40
Bak KM Taraso 60 x 60

bh
bh
bh
bh
bh
bh

1,290,000.00
1,448,500.00
2,150,000.00
281,000.00
130,500.00
177,500.00

T
1
2
3
4
5
6
7
8
9
10

ALAT TUKANG
Palu 0.5 kg
Cangkul
Singkup
Sekrop
Pengki
Linggis
Rool Meter 30 meter ( Bahan Plastik )
Rool Meter 5 meter ( Bahan Besi )
Selang Plastik untuk Water Pas dia. 0.5 cm
Water Pas Alumunium 60 cm

bh
bh
bh
bh
bh
bh
bh
bh
m
bh

43,500.00
27,500.00
46,000.00
55,500.00
14,000.00
46,000.00
111,100.00
42,000.00
1,800.00
97,500.00

U
1
2
3
4

BAHAN BAKAR DAN PELUMAS


Minyak Tanah
Kayu Bakar dari Kayu Karet
Bahan Bakar Residu
Minyak Solar

lt
m3
lt
lt

19,800.00
184,500.00
31,500.00
8,000.00

Page 103

BHN

5
6
7
8
9
10
11
12
13
14
15
16
17

Bensin Premium
Plus Oil
Oil Mesran 40 SAE
Elpiji / botol
Asitilin / Botol
Angin ( O2 ) / botol
Karbit
Minyak Bekisting
Rapidrant
Soda Api
Sabun
Arang Kayu
Kawat Las

V
1
2

BAHAN PAGAR
Panel Beton Pracetak
Kolom Beton Pracetak

B.
1
2
3
4
5
6
7
8
9
10

BIDANG PERTAMANAN
Aglonema
Bambu krisik/jepang
Furadan
Kompos/pupuk kandang
M atoa (2 m)
Palm (botol, ekor tupai, putri, dll) tinggi 2 m
Philo
Pohon pelindung (angsana, mahoni, kamboja dll) tinggi 2m
Pohon perdu (kaca piring, puring, mawar, melati, dll)
Rumput gajah mini

Page 104

lt
lt
lt
15 kg
15.1 kg btl
btl
kg
ltr
Gln
kg
kg
kg
bh

8,600.00
3,700.00
60,500.00
112,500.00
98,000.00
73,500.00
21,500.00
45,000.00
17,500.00
39,500.00
2,700.00
12,500.00
1,600.00

lbr
btg

200,900.00
290,500.00

batang
batang
kg
karung
batang
batang
batang
batang
batang
m2

55,000.00
55,000.00
26,500.00
27,500.00
44,500.00
110,500.00
83,000.00
27,500.00
11,500.00
16,500.00

BHN

DAFTAR HARGA SATUAN PEKERJAAN


KEGIATAN
PEKERJAAN
LOKASI
TAHUN

NO
A.

:
:
:
:

URAIAN PEKERJAAN

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16

PEKERJAAN PERSIAPAN
1 M' Pagar Sementara Dari Kayu Tinggi 2 m
1 M' Pagar Sementara Seng Gelombang Tinggi 2 m
1 M' Pagar SementaraKawat Duri Tinggi 1,80 m
1 M2 Pengukuran Dan Pasang Bouwplnk
1 M2 Pembuatan Kantor Sementara dgn Lantai Diplester
1 M2 Pembuatan Gudang Semen dan Alat-alat
1 M2 Pembuatan Bedeng Buruh
1 M2 Membersihkan Lapangan dan Perataan
1M2 Pembuatan Jalan Sementara
1 M3 Bongkaran Beton Bertulang
1 M3 Bongkaran Dinding Tembok Bata Merah
1 M Pagar beton Pracetak ( 5 x 50 x 213 ) cm
1 M Pagar kawat ayam tiang besi L50.50.5, tinggi 1 m'
1 M2 Pagar BRC lengkap dengan tiang
1 M2 Steiger Werk / perancah dari Bambu
1 M' Cerucuk Bambu

1
2
3
4
5
6
7
8
9
10
11
12
13
14

B.

C.
1
2
3
4
5
6

KODE
ANL

HARGA
(Rp)

A-01

297,167.00

A-02
A-03
A-04
A-05
A-06
A-07
A-08
A-09
A-10
A-11
A-12
A-13
A-14
A-15
A-16

392,042.00
245,933.00
73,902.00
1,247,171.00
1,019,414.00
947,444.00
9,250.00
110,137.00
361,655.00
336,155.00
505,030.00
185,334.00
293,475.00
48,905.00
61,500.00

PEKERJAAN TANAH
1 M3 Galian Tanah Biasa sedalam 1 m
1 M3 Galian Tanah Biasa Sedalam 2 m
1 M3 Galian Tanah Biasa Sedalam 3 m
1 M3 Galian Tanah Keras Sedalam 1 m
1 M3 Galian Tanah Lumpur Sedalam 1 m
1 M2 Pekerjaan Stripping Setinggi 10 cm
1 M3 Pembuangan Tanah sejauh 150 m
1 M3 Urugan Kembali
1 M3 Pemadatan Tanah
1 M3 Urugaan Pasir
1 M2 Pemasangan Lapisan Ijuk Tebal 10 cm
1 M3 Urugan Sirtu
1 M3 Urugan Tanah Pilihan
1 M2 Pembuatan jalan sementara, tebal 25 cm

B-01
B-02
B-03
B-04
B-05
B-06
B-07
B-08
B-09
B-10
B-11
B-12
B-13
B-14

23,400.00
30,720.00
42,955.00
36,520.00
48,205.00
2,925.00
30,050.00
11,215.00
29,250.00
247,210.00
38,175.00
284,025.00
132,465.00
136,018.00

PEKERJAAN PONDASI
1 M3 Pasanag Pondasi batu Kali adk 1pc : 3 ps
1 M3 Pasang Pondasi Batu kali adk 1pc : 4ps
1 M3 Pasang Pondasi Batu kali adk 1pc : 5ps
1 M3 Pasang Pondasi Batu Kosong (aanstamping)
1 M3 Beton siklop adk 1pc : 2ps : 3kr + 40 % Batu Belah dgn besi tulangan
1 M3 Pasang Pondasi Sumuran adk 1pc:2ps:3kr + 40 % Batu Belah (D= 1m)

C-01
C-02
C-03
C-04
C-05
C-06

814,129.00
762,745.00
727,112.00
401,895.00
2,581,589.00
966,409.00

HRGST

Page 105

NO
7
8
9
10
11
12
13
D.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39

URAIAN PEKERJAAN
1 M3 Pondasi siklop adk 1pc:2ps:3kr + 40 % Batu Belah
1 M' Pembuatan Tiang Pancang (40x40) cm, Beton Tulang
1 M' Pembuatan Tiang Pancang (35x35) cm, Beton Tulang
1 M' Pembuatan Tiang Pancang f 40 cm, Beton Tulang

KODE
ANL

HARGA
(Rp)

1 M' Memancang Tiang Pancang Beton Tulang


1 Buah Memotong Tiang Pancang (40x40) cm Beton Tulang
1 M' Menyambung Tiang Pancang Beton Bertulang

C-07
C-08
C-09
C-10
C-11
C-12
C-13

847,189.00
1,426,010.00
1,112,656.00
1,391,920.00
128,387.00
254,610.00
721,590.00

PEKERJAAN BETON
1 M3 Membuat Beton Tumbuk adk 1pc:3ps:5kr
1 M3 Membuat Beton Tumbuk adk 1pc:3ps:6kr
1 M3 Membuat Beton Tumbuk 1pc:2ps:3kr
1 M3 Membuat Tiang Pancang Beton Prestressed
1 M3 Membuat Beton Tumbuk adk 1pc:2ps:4kr
1 M Memasang PVC Waterstop Lebar 200 mm
1 Kg Pembesian Dengan Besi Polos/ulir
1 M2 Pasang Bekesting Untuk Pondasi
1 M2 Pasang Bekisting Untuk Sloof
1 M2 Pasang Bekesting Untuk Kolom
1 M2 Pasang Bekesting Untuk Balok
1 M2 Pasang Bekesting Untuk Lantai
1 M2 Pasang Bekesting Untuk Tangga
1 M3 Membuat Beton Cor Mutu K-225
1 M3 Membuat Beton Cor Mutu K-275
1 M3 Pondasi Beton Tulang (150 kg besi + bekisting)
1 M3 Sloof Beton Tulang (200 kg besi + bekisting)
1 M3 Kolom Beton Tulang (120 kg besi + bekisting)
1 M3 Kolom Beton Tulang (140 kg besi + bekisting)
1 M3 Kolom Beton Tulang (150 kg besi + bekisting)
1 M3 Kolom Beton Tulang (180 kg besi + bekisting)
1 M3 Kolom Beton Tulang (200 kg besi + bekisting)
1 M3 Kolom Beton Tulang (250 kg besi + bekisting)
1 M3 Kolom Beton Tulang (300 kg besi + bekisting)
1 M3 Balok Beton Tulang (120 kg besi + bekisting)
1 M3 Balok Beton Tulang (150 kg besi + bekisting)
1 M3 Balok Beton Tulang (200 kg besi + bekisting)
1 M3 Balok Beton Tulang (230 kg besi + bekisting)
1 M3 Tangga Beton Tulang (200 kg besi + bekisting)
1 M3 Pelat Lantai Beton Tulang T= 10 cm (90 kg besi + bekisting)
1 M3 Pelat Lantai Beton Tulang T= 12 cm (110 kg besi + bekisting)
1 M3 Pelat Lantai Beton Tulang T= 12 cm (130 kg besi + bekisting)
1 M3 Pelat Lantai Beton Tulang T= 15 cm (90 kg besi + bekisting)
1 M3 Pelat Lantai Beton Tulang T= 15 cm (115 kg besi + bekisting)
1 M' Kolom Praktis Beton Tulang (11x11) cm
1 M' Ring Balok Beton Tulang (10x15) cm
1 M2 Pasang Bekesting Untuk Dinding
1 M3 Pelat Beton Tulang (150 kg besi + bekisting)
1 M3 Dinding Beton Tulang (150 kg besi + bekisting)

D-01
D-02
D-03
D-04
D-05
D-06
D-07
D-08
D-09
D-10
D-11
D-12
D-13
D-14
D-15
D-16
D-17
D-18
D-19
D-20
D-21
D-22
D-23
D-24
D-25
D-26
D-27
D-28
D-29
D-30
D-31
D-32
D-33
D-34
D-35
D-36
D-37
D-38
D-39

794,398.00
764,094.00
1,072,250.00
1,159,230.00
1,010,784.00
73,650.00
25,319.00
173,365.00
189,040.00
383,205.00
391,920.00
506,405.00
349,830.00
2,090,204.00
2,078,004.00
5,407,990.00
6,932,820.00
7,899,040.00
8,364,190.00
8,601,340.00
9,294,490.00
9,759,640.00
10,922,515.00
12,085,390.00
7,103,460.00
7,801,185.00
8,964,060.00
9,661,785.00
8,414,985.00
8,353,544.00
8,014,228.00
8,520,608.00
6,667,215.00
7,300,190.00
94,352.00
121,435.00
380,929.00
8,053,780.00
7,792,960.00

HRGST

Page 106

NO

URAIAN PEKERJAAN

KODE
ANL

HARGA
(Rp)

40
41
42
43

1 M3 Dinding Beton Tulang (200 kg besi + bekisting)


1 M3 Membuat Beton Cor Mutu K-300
1 M3 Membuat Beton Cor Mutu K-200
1 M3 Membuat Beton Cor Mutu K-250

D-40
D-41
D-42
D-43

8,440,310.00
1,028,020.00
943,922.00
987,847.00

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34

PEKERJAAN PASANGAN DINDING


1 M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 3ps
1 M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 4ps
1 M2 Pasang Bata Merah Tebal 1 Bata, 1pc : 5ps
1 M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 3ps
1 M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 4ps
1 M2 Pasang Bata Merah Tebal 1/2 Bata, 1pc : 5ps
1 M2 Pasang Dinding Roster Beton 20 x 20 adk 1pc : 3ps
1 M2 Pasang Dinding Roster Beton 20 x 20 adk 1pc : 4ps
1 M2 Pasang Dinding Roster/terawng (12 x 11 x 24) cm
1 M2 Pasang Dinding Batako Besar Pres uk. 8x20x30 adk. 1pc:4ps
1 M2 Pasang Dinding hollowblock (HB-20)
1 M2 Pasang Dinding hollowblock (HB-15)
1 M2 Pasang Dinding hollowblock (HB-10)
1 M2 Pasang Dinding Conblock (CB-20)
1 M2 Pasang Dinding Conblock (CB-15)
1 M2 Pasang Dinding Conblock (CB-10)
1 M2 Dinding Keramik Corak 10 x 20 cm
1 M2 Dinding Keramik polos 10 x 20 cm
1 M2 Dinding Keramik corak 20 x 20 cm
1 M2 Dinding Keramik polos 20 x 20 cm
1 M2 Dinding Keramik polos 20 x 25 cm
1 M2 Dinding Keramik Corak 20 x 25 cm
1 M2 Dinding Marmer
1 M2 Dinding Batu Tempel Hitam
1 M2 Dinding Porselen (11 x 11) cm
1 M2 Wall paper
1 M2 Dinding Pemisah Teakwood Rangkap, Rangka Kayu Kamper Medan
1 M2 Dinding Pemisah Plywood Rangkap, Rangka Kayu Kamper Medan
1 M2 Dinding Pemisah Triplek 4 mm Rangkap, Rangka Kayu Kamper Medan
1 M2 Dinding Pemisah GRC t = 4 mm + rangka besi hollow
1 M2 Dinding Pemisah Plywood t = 4 mm + rangka besi hollow
1 M2 Dinding Pemisah teakwood t = 4 mm + rangka besi hollow
1 M2 Pasang Dinding Glass Block 20 x 20 adk 1pc : 4ps
1 M2 Pasang Dinding anyaman bambu, rangka kayu

E-01
E-02
E-03
E-04
E-05
E-06
E-07
E-08
E-09
E-10
E-11
E-12
E-13
E-14
E-15
E-16
E-17
E-18
E-19
E-20
E-21
E-22
E-23
E-24
E-25
E-26
E-27
E-28
E-29
E-30
E-31
E-32
E-33
E-34

244,025.00
234,632.00
230,209.00
117,092.00
113,419.00
111,116.00
391,277.00
388,491.00
391,277.00
52,409.00
179,579.00
178,280.00
133,389.00
231,415.00
160,296.00
122,796.00
173,919.00
171,419.00
181,419.00
171,419.00
188,919.00
175,419.00
760,202.00
201,602.00
181,419.00
106,555.00
363,399.00
477,419.00
316,169.00
102,310.00
155,605.00
113,745.00
921,791.00
116,177.00

17
18
19
20
21
22

PEKERJAAN PLESTERAN DAN SIARAN


1 M2 Plesteran adk. 1pc : 2ps Tebal 15 mm
1 M2 Plesteran adk. 1pc : 3ps Tebal 15 mm
1 M2 Plesteran adk. 1pc : 4ps Tebal 15 mm
1 M2 Plesteran adk. 1pc : 3ps Tebal 20 mm
1 M2 Plesteran adk. 1pc : 4ps Tebal 20 mm
1 M2 Plesteran adk. 1pc:5ps tebal 20 mm

F-01
F-02
F-03
F-04
F-05
F-06

40,105.00
37,460.00
35,736.00
52,558.00
49,790.00
47,124.00

E.

F.

HRGST

Page 107

NO

KODE
ANL

HARGA
(Rp)

23
24
25
26
27
28
29

1 M2 Berapen adk. 1pc : 5ps Tebal 15 mm


1 M2 Plesteran Beton adk. 1pc : 2ps Tebal 15 mm
1 M2 Plesteran Beton adk. 1pc : 3ps Tebal 15 mm
1 M2 Plesteran Skoning adk. 1pc : 2ps, tebal 10mm
1 M2 Acian Plesteran
1 M2 Plesteran Siar adk. 1pc : 2ps batu belah
1 M2 Plesteran Siar adk. 1pc : 2ps dinding bata merah

F-07
F-08
F-09
F-10
F-11
F-12
F-13

28,324.00
48,724.00
46,042.00
39,652.00
22,565.00
40,871.00
24,436.00

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21

PEKERJAAN ATAP
1 M2 Pasang Atap Genteng Palentong
1 M2 Pasang Genteng Bubung Palentong
1 M2 Pasang Roof Light Fibreglass ( 180 x 90 ) cm
1 M2 Pasang Atap Asbes Gelombang ( 3,00 x 1,05 m ) x 4 mm
1 M2 Pasang Atap Asbes Gelombang ( 2,70 x 1,05 m ) x 4 mm
1 M2 Pasang Atap Asbes Gelombang ( 2,40 x 1,05 m ) x 4 mm
1 M2 Pasang Atap Asbes Gelombang ( 2,10 x 1,05 m ) x 4 mm
1 M2 Pasang Atap Asbes Gelombang ( 1,50 x 1,05 m ) x 4 mm
1 M Pasang Nok Stel Gelombang 1,05 m
1 M2 Pasang Atap Genteng Beton
1 M2 Pasang Atap Genteng Murando Natural
1 M2 Pasang Atap Genteng Murando Glazur
1 M2 Pasang Atap Genteng Metal
1 M Pasang Nok Genteng Beton
1 M Pasang Nok Genteng Metal
1 M2 Pasang Atap Seng Gelombang
1 M2 Pasang Atap Nok Seng
1 M2 Pasang Alluminium Foil / Sisalation
1 M2 Pasang Atap Alluminium Natural
1 M2 Pasang Atap Alluminium warna
1 M2 Pasang Nok Alluminium

G-01
G-02
G-03
G-04
G-05
G-06
G-07
G-08
G-09
G-10
G-11
G-12
G-13
G-14
G-15
G-16
G-17
G-18
G-19
G-20
G-21

76,945.00
92,372.00
80,215.00
46,689.00
49,909.00
47,564.00
49,069.00
53,264.00
109,155.00
124,271.00
68,445.00
95,445.00
252,025.00
121,271.00
194,840.00
75,954.00
27,178.00
35,955.00
228,018.00
256,893.00
181,386.00

1
2
3
4
5
6
7
8
9
10
11
12
13

PEKERJAAN LANGIT-LANGIT
1 M2 Langit-langit Asbes ( 1,00 x 1,00 ) m, tebal 5 mm
1 M2 Langit-langit Asbes ( 1,00 x 1,00 ) m, tebal 3,5 mm
1 M2 Langit-langit Akustik ( 60 x 120 ) cm
1 M2 Langit-langit Akustik ( 60 x 120 ) cm + Rangka Alluminium
1 M2 Langit-langit teakwood (60 x 120) cm, t = 4 mm + rangka kayu borneo super
1 M2 Langit-langit Teakwood 3 mm + Rangka Kayu Borneo Super
1 M2 Langit-langit Triplek 4 mm + Rangka Kayu Borneo Super
1 M2 Langit-langit Gypsum Board, tebal 9 mm + rangka besi hollow
1 M2 Langit-langit GRC t = 4 mm + rangka besi hollow
1 M2 Langit-langit gypsum t = 9 mm + Rangka Kayu Borneo Super
1 M2 Langit-langit GRC t = 4 mm + Rangka Kayu Borneo Super
1 M List Langit-langit Kayu Profil 10 cm
1 M List Langit-langit Gypsum 10 cm

H-01
H-02
H-03
H-04
H-05
H-06
H-07
H-08
H-09
H-10
H-11
H-12
H-13

35,145.00
31,295.00
232,340.00
331,053.00
172,455.00
171,480.00
144,180.00
104,355.00
101,604.00
152,292.00
149,195.00
41,132.00
18,950.00

I-01

462,714.00

G.

H.

I.

URAIAN PEKERJAAN

PEKERJAAN LANTAI
1 1 M2 Lantai Ubin Granito ukuran 40 x 40 cm

HRGST

Page 108

NO

URAIAN PEKERJAAN

KODE
ANL

HARGA
(Rp)

2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29

1 M2 Lantai Ubin Granito ukuran 30 x 30 cm


1 M Plint Ubin Granito ukuran 10 x 40 cm
1 M Plint Ubin Granito ukuran 10 x 30 cm
1 M2 Lantai Keramik Corak 10 x 20 cm setara Mulia
1 M2 Lantai Keramik corak 20 x 20 cm setara Mulia
1 M2 Lantai Keramik polos 30 x 30 cm setara Mulia
1 M2 Lantai Keramik corak 30 x 30 cm Setara Mulia
1 M2 Lantai Keramik polos 40 x 40 cm Setara Mulia
1 M2 Lantai Keramik corak 40 x 40 cm Setara Mulia
1 M2 Lantai Keramik Corak 10 x 20 cm setara Roman
1 M2 Lantai Keramik corak 20 x 20 cm setara Roman
1 M2 Lantai Keramik polos 30 x 30 cm setara Roman
1 M2 Lantai Keramik corak 30 x 30 cm Setara Roman
1 M2 Lantai Keramik polos 40 x 40 cm setara Roman
1 M2 Lantai Keramik corak 40 x 40 cm Setara Roman
1 M2 Lantai Marmer
1 M2 Lantai Parquet Jati
1 M Plint Keramik ukuran (10 x 40) cm
1 M Plint Keramik ukuran (10 x 30) cm
1 M' Plint kayu kamper Samarinda (2 x 10) cm
1 M' Plint keramik ukuran (10 x 20) cm
1 M2 Lantai karpet
1 M2 Paving block natural 8 cm
1 M2 Paving block warna 8 cm
1 M2 Paving block natural 6 cm
1 M2 Paving block warna 6 cm
1 M2 Grass Block 20 x 20
1 M2 Grass Block 30 x 30

I-02
I-03
I-04
I-05
I-06
I-07
I-08
I-09
I-10
I-11
I-12
I-13
I-14
I-15
I-16
I-17
I-18
I-19
I-20
I-21
I-22
I-23
I-24
I-25
I-26
I-27
I-28
I-29

441,256.00
148,998.00
168,796.00
176,002.00
183,502.00
172,002.00
177,502.00
176,002.00
186,002.00
193,502.00
196,502.00
189,502.00
198,002.00
193,502.00
198,502.00
760,979.00
527,588.00
21,798.00
24,621.00
40,537.00
35,778.00
445,538.00
171,658.00
203,368.00
165,673.00
177,223.00
358,768.00
251,776.00

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18

PEKERJAAN KAYU
1 M3 Kusen Pintu & jendela kayu Kamper Samarinda
1 M3 Kusen Pintu & jendela kayu Kamper Medan/Kruing
1 M3 Kusen Pintu & jendela kayu Borneo Super
1 M2 Pintu Panel Kayu Kamper Samarinda
1 M2 Pintu Panel Kayu Kamper Medan/Kruing
1 M2 Pintu & Jendela Kaca Kayu Kamper Medan
1 M2 Pintu & Jendela Kaca Kayu Borneo
1 M2 Pintu & Jendela Jalusi Kayu Kamper Medan
1 M2 Pintu Triplek Rangkap, Rangka Tertutup Kayu Kamper Medan
1 M2 Jalusi Mati Kusen Kayu kamper Medan
1 M2 Pintu Triplek Rangkap, Rangka Kayu Borneo Super
1 M2 Pintu Teakwood Rangkap, rangka Kayu Kamper Medan
1 M2 Pintu Triplek & Formika, Rangka Kayu Kamper Medan
1 M2 Pintu Teakwood & Formika, Rangka Kayu Kamper Medan (dipolitur)
1 M3 Kuda-kuda Kayu Kamper Medan
1 M3 Kuda-kuda Kayu Borneo Super
1 M2 Kaso + Reng Genteng Plentong Kayu Borneo Super
1 M2 Kaso + Reng Genteng Beton Kayu Borneo Super

J-01
J-02
J-03
J-04
J-05
J-06
J-07
J-08
J-09
J-10
J-11
J-12
J-13
J-14
J-15
J-16
J-17
J-18

13,235,500.00
9,349,900.00
8,807,500.00
642,785.00
513,265.00
428,570.00
424,843.00
742,268.00
402,296.00
571,950.00
400,209.00
480,385.00
547,135.00
677,135.00
8,560,260.00
8,063,060.00
86,550.00
98,170.00

J.

HRGST

Page 109

URAIAN PEKERJAAN

NO

KODE
ANL

HARGA
(Rp)

19
20
21
22
23
24
25
26
27

1 M' Lisplang uk (3x20)cm, Kayu Kamper Medan


1 M' Lisplang uk (3x30)cm, Kayu Kamper Medan
1 M List Plafond + kayu Profil 10 cm
1 M2 Pekerjaan partisi
1 M2 Rangka Langit-langit (1,00 x 1,00) m, Kayu borneo super
1 M2 Rangka langit-langit ( 0,50 x 1,00 ) m, Kayu Borneo Super
1 M' Reuter Kayu kamper Medan
1 M3 Gording kayu kelas II
1 M2 Dinding bilik, rangka kayu borneo

J-19
J-20
J-21
J-22
J-23
J-24
J-25
J-26
J-27

69,182.00
94,102.00
36,890.00
190,269.00
71,555.00
87,652.00
33,645.00
8,120,600.00
78,028.00

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23

PEKERJAAN BESI DAN ALLUMINIUM


1 Kg Besi profil
1 Kg Perakitan baja
1 Cm Pengelasan dengan las listrik
1 m2 Pintu Rolling Door
1 m2 Pintu Alluminium Natural
1 m2 Terali Besi
1 m2 Kawat Harmonika 4 cm
1 m' Talang Datar, Seng BJLS 28 lebar 90 cm
1 m' Talang Miring, Seng BJLS 28 lebar 90 cm
1 m' Talang 1/2 lingkaran D-15 cm, seng pelat BJLS 28 lebar 90 cm
1 m' Pasang kusen pintu/jendela alluminium natural 4"
1 m' Pasang kusen pintu/jendela alluminium warna 4"
1 m' Pasang kusen pintu/jendela alluminium natural 3"
1 m' Pasang kusen pintu/jendela alluminium warna 3"
1 m2 Pintu alluminium strip lebar 8 cm
1 m2 Pintu/jendela kaca rangka alluminium natural 4"
1 m2 Pintu/jendela kaca rangka alluminium warna 4"
1 m2 Jendela nako & teralis (10 klips)
1 m2 Pintu pelat baja tebal 2mm rangkap, rangka baja siku
1 m2 Rangka jendela besi square tube (5 x 5) cm
1 m2 Pintu lipat (folding door)bahan besi
1 m2 Tirai (venetions blinds and vertical blinds)
1 m2 Rangka atap baja ringan

K-01
K-02
K-03
K-04
K-05
K-06
K-07
K-08
K-09
K-10
K-11
K-12
K-13
K-14
K-15
K-16
K-17
K-18
K-19
K-20
K-21
K-22

35,676.00
996.00
2,565.00
511,142.00
373,092.00
220,586.00
69,411.00
131,418.00
193,451.00
190,884.00
197,948.00
212,248.00
112,808.00
138,218.00
942,712.00
807,321.00
864,521.00
435,035.00
1,289,905.00
298,169.00
691,992.00
638,703.00
196,000.00

1
2
3
4
5
6
7
8
9
10

PEKERJAAN KACA DAN KUNCI


1 Buah Pasang Kunci Tanam 2 slaag
1 Buah Pasang Kunci Tanam Biasa
1 Buah Pasang Kunci Tanam Kamar Mandi
1 Buah Pasang Engsel Pintu
1 Buah Pasang Engsel Jendela Kupu-kupu
1 Buah Pasang Kait Angin
1 Buah Pasang Door Closer
1 Buah Pasang Pegangan Pintu / Door Holder
1 M2 Pasang Kaca , tebal 3 mm
1 M2 Pasang Kaca , tebal 5 mm

L-01
L-02
L-03
L-04
L-05
L-06
L-07
L-08
L-09
L-10

422,555.00
221,725.00
142,363.00
36,368.00
25,343.00
17,268.00
506,213.00
270,213.00
119,084.00
147,578.00

K.

L.

M.

PEKERJAAN SANITASI

HRGST

Page 110

NO

URAIAN PEKERJAAN

KODE
ANL

HARGA
(Rp)

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24

1 Buah Closet jongkok Porselen Standar


1 Buah Urinoir
1 Buah Wastafel
1 Buah bak Mandi Fibreglass Volume 0,30 m3
1 M' Saluran Air Limbah Buis beton d = 30 cm - 60 cm
1 Buah Bak Kontrol Pas Bata Merah Uk (60 x 60) cm
1 Buah Bak Kontrol Pas Bata Merah Uk (30 x 30) cm
1 M' Pipa PVC 1/2" (AW)
1 M' Pipa PVC 1" (AW)
1 M' Pipa PVC 11/2" (AW)
1 M' Pipa PVC 2" (AW)
1 M' Pipa PVC 4" (AW)
1 M' Pipa PVC 3/4" (AW)
1 Buah Bak Cuci piring Stainless steel
1 Buah Kran 1/2" - 3/4"
1 Buah Floor Drain
1 M' Grafel beton U 30 cm -60 cm
1 M' Pasang Talang Plastik PVC U 15 cm (AW)
1 M' Saluran Air Limbah Buis Beton 60 cm
1 M' Pasang Talang Seng Datar
1 Buah Closet Duduk
1 Buah Tangki Air fibreglass Volume 1 m3
1 Unit Septictank 2x1,50x1,50 m + Rembesan
1 Unit Septictank 1x1,50x1,50 m + Rembesan

M-01
M-02
M-03
M-04
M-05
M-06
M-07
M-08
M-09
M-10
M-11
M-12
M-13
M-14
M-15
M-16
M-17
M-18
M-19
M-20
M-21
M-22
M-23
M-24

515,456.00
2,683,191.00
1,550,406.00
676,630.00
177,347.00
715,726.00
438,337.00
33,866.00
49,175.00
77,727.00
80,097.00
248,276.00
50,515.00
465,028.00
54,350.00
82,725.00
89,068.00
133,161.00
246,422.00
89,830.00
2,272,530.00
1,796,590.00
12,145,902.00
8,909,963.00

1
2
3
4
5
6
7
8
9
10
11
12
13
14
15

PEKERJAAN PENGECATAN
1 M2 Mengikis / Mengerok Permukaan Cat Tembok Lama
1 M2 Mendempul Dan Menggosok Kayu
1 M2 Pengecatan Bidang Kayu Lama Setara Sieve
1 M2 Pengecatan Bidang Kayu Baru Setara Sieve
1 M2 Pelaburan Bidang Kayu dengan Politur
1 M2 Pelaburan Bidang Kayu dengan Cat Residu dan Ter
1 M2 Pengecatan Tembok Baru Setara ICI
1 M2 Pengecatan Tembok Lama Setara ICI
1 M2 Pengecatan Plafond ( 3x ) Setara ICI
1 M2 Memasang Wallpaper
1 M2 Pengecatan Permukaan Baja dengan Meni Besi
1 M2 Pengecatan Permukaan Baja dengan Meni Besi dan Perancah
1 M2 Pengecatan Permukaan Baja Lapis seng (galbani) secara manual 1 lps cat 2 um
1 M2 Pengecatan Tembok Baru Setara Vinilex
1 M2 Pengecatan Tembok Lama Setara Vinilex

N-01
N-02
N-03
N-04
N-05
N-06
N-07
N-08
N-09
N-10
N-11
N-12
N-13
N-14
N-15

9,688.00
9,905.00
27,816.00
44,748.00
71,743.00
8,660.00
34,142.00
24,149.00
60,750.00
115,755.00
21,980.00
39,896.00
28,620.00
19,842.00
14,249.00

PEKERJAAN PERTAMANAN
1 Lubang (70x70x70) cm, tanam pohon pelindung tinggi 2m
1 Lubang (70x70x70) cm, tanam bambu krisik/jepang
1 Lubang (40x40x40) cm, tanam pohon perdu (polibag)
1 M2 Tanam rumput gajah (silang papan catur)

O-01
O-02
O-03
O-04

31,189.00
58,689.00
13,797.00
11,690.00

O.
1
2
3
4

HRGST

Page 111