BBS Gebeng

Column No.
Bay 6 West C-Clamp

Air Line
missing items/comment Corrosion Handle Gauge Status Status C-Clamp T-Piece

LPG Line
missing items/comment Quick Coupl Corrosion end cap

numbering of Columns starts for all from the office side

C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 PW 1 PW 2 C11 C12 C13 C14 C15 C16

ok ok ok ok ok ok ok ok

X X

The Header- & Machine-Shop are completely connected. Only some C-Clamps have to be fixed and the final pressure test has to be done.

X X X X X pressure gauge & Valve pressure gauge & Valve pressure gauge & Valve X X X X X X

X X X Main Gas Line to be connected

ok ok

PW = Panel Welder

Column No.
Bay 5/6 Center C-Clamp

Air Line
missing items/comment Corrosion Handle Gauge Status Status C-Clamp T-Piece

LPG Line
missing items/comment Quick Coupl Corrosion end cap X

C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16

X ok ok ok ok ok ok ok ok X X X X X

X X X X X X X

Note: All newly installed gas flow valves are assembled against the gas flow arrow. It has to be checked and corrected, if any. That's the case in Bay 5 and 6 as well as in the Header Shop!

Line to be removed and plugged Line to be removed and plugged pressure gauge & Valve X X X X X X

Main Gas Line to be connected

Note: All vent pipes have to be lead to the outer side of the shop

Column No.
Bay 5 East Handle

Air Line
missing items/comment C-Clamp Gauge Status Status C-Clamp T-Piece

LPG Line
missing items/comment Quick Coupl Corrosion X end cap

C1 C2 C3 C4 C5 C6 C7 C8 C9 C10 C11 C12 C13 C14 C15 C16 C1 - C9 C10 - C 16

ok nut of handle ok ok ok ok ok ok X ok Gauge X X

X X Main-Line not connected X X X X X Note: In all Bays is a certain quantity of loose electrical cables, PCB's, Fuses and switches which ends are not isolated. It has to be checked whether any of this cabling is still alive! Cabling not is use should be dismantled and removed.

old Shop new Shop

Hans-J. Leister

09.02.2012

Punch List Air & LPG - Line, Bay 5 & 6