Beruflich Dokumente
Kultur Dokumente
Column No.
Bay 6 West C-Clamp
Air Line
missing items/comment Corrosion Handle Gauge Status Status C-Clamp T-Piece
LPG Line
missing items/comment Quick Coupl Corrosion end cap
ok ok ok ok ok ok ok ok
X X
The Header- & Machine-Shop are completely connected. Only some C-Clamps have to be fixed and the final pressure test has to be done.
X X X X X pressure gauge & Valve pressure gauge & Valve pressure gauge & Valve X X X X X X
ok ok
PW = Panel Welder
Column No.
Bay 5/6 Center C-Clamp
Air Line
missing items/comment Corrosion Handle Gauge Status Status C-Clamp T-Piece
LPG Line
missing items/comment Quick Coupl Corrosion end cap X
X ok ok ok ok ok ok ok ok X X X X X
X X X X X X X
Note: All newly installed gas flow valves are assembled against the gas flow arrow. It has to be checked and corrected, if any. That's the case in Bay 5 and 6 as well as in the Header Shop!
Line to be removed and plugged Line to be removed and plugged pressure gauge & Valve X X X X X X
Note: All vent pipes have to be lead to the outer side of the shop
Column No.
Bay 5 East Handle
Air Line
missing items/comment C-Clamp Gauge Status Status C-Clamp T-Piece
LPG Line
missing items/comment Quick Coupl Corrosion X end cap
X X Main-Line not connected X X X X X Note: In all Bays is a certain quantity of loose electrical cables, PCB's, Fuses and switches which ends are not isolated. It has to be checked whether any of this cabling is still alive! Cabling not is use should be dismantled and removed.
Hans-J. Leister