IBS (INDUSTRIALISED BUILDING SYSTEM) VERSUS CONVENTIONAL BUILDING METHOD

IBS METHOD TIME TAKEN AROUND HALF OF YEAR OR LESS CHEAP BECAUSE THE COMPONENT ARE PRODUCED IN FACTORY THUS REDUCE THE WASTAGE OF COST FOR FORMWORK ALL WORK IS DONE BY USING MACHINE AND ONLY NEED FEW WORKER THAT PROFESSIONAL IN IBS SYSTEM THE USE IBS WILL DECREASE THE USING OF TIMBER ON CONSTRUCTION PROJECT AN IBS COMPONENT HAVE HIGHER QUALITY AND BETTER FINISHES DUE TO CAREFUL SELECTION OF MATERIALS AND USE OF ADVANCE TECHNOLOGY LARGE WORKING AREA NEEDED,FOR TRANSFER AND STORAGE OF IBS COMPONENT LEAKAGE IS OFTEN THE MAJOR PROBLEM IN BUILDING CONSTRUCTED USING IBS.THIS PROBLEM IS OBVIOUS IN MALAYSIA WHERE RAINING RAPIDLY OCCUR THROUGHT OUT YEAR

FEATURE TIME USED FOR COMPLETION OF PROJECT COSTING

CONVENTIONAL METHOD USUALLY TAKING 1-2 YEARS TO COMPLETE,DEPENDING TO THE SCALE OF THE PROJECT A LARGE AMOUNT NEEDED FOR CONSTRUCTION USES SUCH AS COST FOR MAKING FORMWORK etc. THIS METHOD NEED MANY LABOUR WORKER DUE TO ALL WORK ARE DONE MANUALLY LESS-ENVIRONMENTAL FRIENDLY DUE TO HIGH AMOUNT OF TIMBER USED ON CONSTRUCTION GOOD QUALITY BUT THE RATE OF FINISHES WOULD AFFECTED WITH THE WEATHER CONDITION

REDUCE LABOUR WORKER

ENVIRONMENTAL FRIENDLY

QUALITY AND FINISHES OF PROJECT

SIZE OF THE WORKING AREA

PROBLEMS OF JOINTS

OPTIMUM WORKING AREA NEEDED DUE TO CONSTRUCTION DONE PHASE BY PHASE THIS METHOD DOES NOT USE JOINTING WHERE THE STRUCTURE BUILD MANUALLY AND LESS LEAKING PROBLEM OCCUR

BY: GROUP 2 MOHAMAD SAFUAN BIN ABDUL KHARIS 15DKA12F1035

MUHAMMAD SYAFIQ BIN MOHD EDROSS 15DKA12F1032 ZAINARUL ASWAD BIN RAZALI LEW JIAN HUAN MUHD HAIRR BIN MOKHTAR SRI VISHNU A/L REDDY 15DKA12F1038 15DKA12F1020 15QKA13F1004 15DKA12F10