Sie sind auf Seite 1von 10

ANALISIS UNITARIOS

INS. SANITARIAS

ANLISIS DE PRECIOS UNITARIOS

UNIDAD

ML

PROYECTO

URBANIZACION VILLA MARIANGEL

NOMBRE DEL UNITARIO:

TUBERIA PVC 4" AGUAS RESIDUALES

I. EQUIPO DESCRIPCIN HERRAMIENTA MENOR TIPO VARIAS TARIFA/HORA 4,666.67 RENDIMIEN 5% V/ UNITARIO 233.33

SUBTOTAL 233.33 II. MATERIALES EN OBRA DESCRIPCIN TUBO SANITARIO 4" CODO 4" TEE 4" UNION 4" YEE 4" LIMPIADOR SOLDALURA LIQUIDA DESPERDICIO 5% UNIDAD ML UN. UN. UN. UN Lt Lt % PRECIO UNIT 10,826.7 5,250.00 6,300.00 3,150.00 6,300.00 8,700.00 80,000.00 CANTIDAD 1.00 0.10 0.10 0.10 0.10 0.02 0.02 5% V/ UNITARIO 10,826.67 525.00 630.00 315.00 630.00 174.00 1,600.00 735.03 SUBTOTAL 15,435.70 III. TRANSPORTES CONCEPTO M3-TON-KM TARIFA CAN VOL-PES VR UNITARIO

SUBTOTAL 0.00 IV. MANO DE OBRA TRABAJADOR OFICIAL (1) AYUDANTE (1) JORNAL 29,914.53 17,948.72 % PREST 95% 95% JORNAL TOTAL RENDIMIEN 58,333.33 35,000.00 20.00 20.00 VR UNITARIO 2,916.67 1,750.00

4,666.67 TOTAL COSTO DIRECTO 20,335.70

ANALISIS UNITARIOS INS. SANITARIAS

ANLISIS DE PRECIOS UNITARIOS

UNIDAD

ML

PROYECTO

URBANIZACION VILLA MARIANGEL

NOMBRE DEL UNITARIO:

TUBERIA PVC 3" AGUAS RESIDUALES

I. EQUIPO DESCRIPCIN HERRAMIENTA MENOR TIPO VARIAS TARIFA/HORA 5,185.19 RENDIMIEN 5% V/ UNITARIO 259.26

SUBTOTAL 259.26 II. MATERIALES EN OBRA DESCRIPCIN TUBO SANITARIO 3" CODO 3" TEE 3" UNION 3" LIMPIADOR SOLDALURA LIQUIDA DESPERDICIO 5% UNIDAD ML UN. UN. UN. Lt Lt % PRECIO UNIT 7,840.00 3,210.00 4,200.00 2,140.00 8,700.00 80,000.00 CANTIDAD 1.00 0.02 0.02 0.03 0.02 0.02 5% V/ UNITARIO 7,840.00 64.20 84.00 64.20 174.00 1,600.00 491.32 SUBTOTAL 10,317.72 III. TRANSPORTES CONCEPTO M3-TON-KM TARIFA CAN VOL-PES VR UNITARIO

SUBTOTAL 0.00 IV. MANO DE OBRA TRABAJADOR OFICIAL (1) AYUDANTE (1) JORNAL 29,914.53 17,948.72 % PREST 95% 95% JORNAL TOTAL RENDIMIEN 58,333.33 35,000.00 18.00 18.00 VR UNITARIO 3,240.74 1,944.44

5,185.19 TOTAL COSTO DIRECTO 15,762.16

ANALISIS UNITARIOS INS. SANITARIAS

ANLISIS DE PRECIOS UNITARIOS

UNIDAD

ML

PROYECTO

URBANIZACION VILLA MARIANGEL

NOMBRE DEL UNITARIO:

TUBERIA PVC 2" AGUAS RESIDUALES

I. EQUIPO DESCRIPCIN HERRAMIENTA MENOR TIPO VARIAS TARIFA/HORA 4,666.67 RENDIMIEN 5% V/ UNITARIO 233.33

SUBTOTAL 233.33 II. MATERIALES EN OBRA DESCRIPCIN TUBO SANITARIO 2" CODO 2" TEE 2" UNION 2" LIMPIADOR SOLDALURA LIQUIDA DESPERDICIO 5% UNIDAD ML UN. UN. UN. Lt Lt % PRECIO UNIT 5,226.67 2,300.00 3,150.00 2,140.00 8,700.00 80,000.00 CANTIDAD 1.02 0.02 0.02 0.03 0.02 0.02 5% V/ UNITARIO 5,331.20 46.00 63.00 64.20 174.00 1,600.00 363.92 SUBTOTAL 7,642.32 III. TRANSPORTES CONCEPTO M3-TON-KM TARIFA CAN VOL-PES VR UNITARIO

SUBTOTAL 0.00 IV. MANO DE OBRA TRABAJADOR OFICIAL (1) AYUDANTE (1) JORNAL 29,914.53 17,948.72 % PREST 95% 95% JORNAL TOTAL RENDIMIEN 58,333.33 35,000.00 20.00 20.00 VR UNITARIO 2,916.67 1,750.00

4,666.67 TOTAL COSTO DIRECTO 12,542.32

ANALISIS UNITARIOS INS. SANITARIAS

ANLISIS DE PRECIOS UNITARIOS

UNIDAD

UND.

PROYECTO

URBANIZACION VILLA MARIANGEL

NOMBRE DEL UNITARIO:

SALIDA P.V.C. SANITARIA 4"

I. EQUIPO DESCRIPCIN HERRAMIENTA MENOR TIPO VARIAS TARIFA/HORA 7,777.78 RENDIMIEN 5% V/ UNITARIO 388.89

SUBTOTAL 388.89 II. MATERIALES EN OBRA DESCRIPCIN TUBO SANITARIO 4" CODO 4" TEE 4" TAPON DE PRUEBA 4" LIMPIADOR SOLDALURA LIQUIDA DESPERDICIO 5% UNIDAD ML UN. UN. UN. Lt Lt % PRECIO UNIT 10,826.67 5,250.00 6,300.00 2,100.00 8,700.00 80,000.00 CANTIDAD 0.60 1.00 1.00 1.00 0.08 0.08 5% V/ UNITARIO 6,496.00 5,250.00 6,300.00 2,100.00 696.00 6,400.00 1,362.10 SUBTOTAL 28,604.10 III. TRANSPORTES CONCEPTO M3-TON-KM TARIFA CAN VOL-PES VR UNITARIO

0.00 IV. MANO DE OBRA TRABAJADOR OFICIAL (1) AYUDANTE (1) JORNAL 29,914.53 17,948.72 % PREST 95% 95% JORNAL TOTAL RENDIMIEN 58,333.33 35,000.00 12.00 12.00 VR UNITARIO 4,861.11 2,916.67

7,777.78 TOTAL COSTO DIRECTO 36,770.77

ANALISIS UNITARIOS INS. SANITARIAS

ANLISIS DE PRECIOS UNITARIOS

UNIDAD

UND.

PROYECTO

URBANIZACION VILLA MARIANGEL

NOMBRE DEL UNITARIO:

SALIDA P.V.C. 2" SANITARIA

I. EQUIPO DESCRIPCIN HERRAMIENTA MENOR TIPO VARIAS TARIFA/HORA 7,777.78 RENDIMIEN 5% V/ UNITARIO 388.89

SUBTOTAL 388.89 II. MATERIALES EN OBRA DESCRIPCIN TUBO SANITARIO 2" CODO 2" UNION 2" BUJE DE 4" A 2" LIMPIADOR SOLDALURA LIQUIDA DESPERDICIO 5% UNIDAD ML UN. UN. UN. Lt Lt % PRECIO UNIT 5,226.67 2,300.00 2,140.00 4,200.00 8,700.00 80,000.00 CANTIDAD 1.20 2.00 0.05 1.00 0.30 0.01 5% V/ UNITARIO 6,272.00 4,600.00 107.00 4,200.00 2,610.00 800.00 929.45 SUBTOTAL 19,518.45 III. TRANSPORTES CONCEPTO M3-TON-KM TARIFA CAN VOL-PES VR UNITARIO

SUBTOTAL 0.00 IV. MANO DE OBRA TRABAJADOR OFICIAL (1) AYUDANTE (1) HORA 29,914.53 17,948.72 % PREST 95% 95% JORNAL TOTAL RENDIMIEN 58,333.33 35,000.00 12.00 12.00 VR UNITARIO 4,861.11 2,916.67

7,777.78 TOTAL COSTO DIRECTO 27,685.12

ANALISIS UNITARIOS INS. SANITARIAS

ANLISIS DE PRECIOS UNITARIOS

UNIDAD

UND.

PROYECTO

URBANIZACION VILLA MARIANGEL

NOMBRE DEL UNITARIO:

SIFON 3" INCLUYE REJILLA

I. EQUIPO DESCRIPCIN HERRAMIENTA MENOR TIPO VARIAS TARIFA/HORA 5,833.33 RENDIMIEN 5% V/ UNITARIO 291.67

SUBTOTAL 291.67 II. MATERIALES EN OBRA DESCRIPCIN SIFON 3" TUBO 3" REJILLA DE PISO LIMPIADOR SOLDALURA LIQUIDA DESPERDICIO 5% UNIDAD UN ML UN LTS LTS % PRECIO UNIT 4,410.00 7,840.00 4,500.00 8,700.00 80,000.00 CANTIDAD 1.00 0.40 1.00 0.01 0.01 5% V/ UNITARIO 4,410.00 3,136.00 4,500.00 87.00 229.35 618.12 SUBTOTAL 12,980.47 III. TRANSPORTES CONCEPTO M3-TON-KM TARIFA CAN VOL-PES VR UNITARIO

SUBTOTAL 0.00 IV. MANO DE OBRA TRABAJADOR OFICIAL (1) AYUDANTE (1) JORNAL 29,914.53 17,948.72 % PREST 95% 95% JORNAL TOTAL RENDIMIEN 58,333.33 35,000.00 16.00 16.00 VR UNITARIO 3,645.83 2,187.50

5,833.33 TOTAL COSTO DIRECTO 19,105.47

ANALISIS UNITARIOS INS. SANITARIAS

ANLISIS DE PRECIOS UNITARIOS

UNIDAD

UND.

PROYECTO

URBANIZACION VILLA MARIANGEL

NOMBRE DEL UNITARIO:

SIFON 2" INCLUYE REJILLA

I. EQUIPO DESCRIPCIN HERRAMIENTA MENOR TIPO VARIAS TARIFA/HORA 5,833.33 RENDIMIEN 5% V/ UNITARIO 291.67

SUBTOTAL 291.67 II. MATERIALES EN OBRA DESCRIPCIN SIFON 180 2" TUBO 2" REJILLA DE PISO LIMPIADOR SOLDALURA LIQUIDA DESPERDICIO 5% UNIDAD UN ML UN LTS LTS % PRECIO UNIT 4,410.00 5,226.67 4,500.00 8,700.00 8,000.00 CANTIDAD 1.00 0.40 1.00 0.01 0.01 5% V/ UNITARIO 4,410.00 2,090.67 4,500.00 87.00 229.35 565.85 SUBTOTAL 11,882.87 III. TRANSPORTES CONCEPTO M3-TON-KM TARIFA CAN VOL-PES VR UNITARIO

SUBTOTAL 0.00 IV. MANO DE OBRA TRABAJADOR OFICIAL (1) AYUDANTE (1) JORNAL 29,914.53 17,948.72 % PREST 95% 95% JORNAL TOTAL RENDIMIEN 58,333.33 35,000.00 16.00 16.00 VR UNITARIO 3,645.83 2,187.50

5,833.33 TOTAL COSTO DIRECTO 18,007.87

ANALISIS UNITARIOS PRELIMINARES

ANLISIS DE PRECIOS UNITARIOS

UNIDAD

UND.

PROYECTO

URBANIZACION VILLA MARIANGEL

NOMBRE DEL UNITARIO:

CAJA DE INSPECCION DE 50X50 EN MAMPOSTERIA

I. EQUIPO DESCRIPCIN HERRAMIENTA MENOR TIPO VARIAS TARIFA/HORA 116,666.67 RENDIMIEN 5% V/ UNITARIO 5,833.33

SUBTOTAL 5,833.33 II. MATERIALES EN OBRA DESCRIPCIN EXCAVACIN MATERIAL COMUN PISO Y TAPA EN CONCRETO LADRILLO TOLETE COMUN MORTERO IMPERMEBEALIZADO ACERO DE REFUERZO FORMALETA DESPERDICIO 5% UNIDAD M3 M3 M2 M3 KG M2 % PRECIO UNIT 24,062.50 261,515.14 33,782.00 276,540.59 4,214.56 2,600.00 CANTIDAD 0.15 0.05 0.84 0.01 4.80 1.44 5% V/ UNITARIO 3,714.05 13,454.95 28,376.88 3,318.49 20,229.90 3,744.00 3,641.91 SUBTOTAL 76,480.18 III. TRANSPORTES CONCEPTO M3-TON-KM TARIFA CAN VOL-PES VR UNITARIO

SUBTOTAL 0.00 IV. MANO DE OBRA TRABAJADOR OFICIAL (1) AYUDANTE (1) JORNAL 29,914.53 17,948.72 % PREST 95% 95% JORNAL TOTAL RENDIMIEN 58,333.33 35,000.00 0.80 0.80 VR UNITARIO 72,916.67 43,750.00

116,666.67 TOTAL COSTO DIRECTO 198,980.18

ANALISIS UNITARIOS PRELIMINARES


ANLISIS DE PRECIOS UNITARIOS UNIDAD UND.

PROYECTO

URBANIZACION VILLA MARIANGEL

NOMBRE DEL UNITARIO:

CAJA DE INSPECCION DE 60X60 EN MAMPOSTERIA

I. EQUIPO DESCRIPCIN HERRAMIENTA MENOR TIPO VARIAS TARIFA/HORA 125,448.03 RENDIMIEN 5% V/ UNITARIO 6,272.40

SUBTOTAL 6,272.40 II. MATERIALES EN OBRA DESCRIPCIN EXCAVACIN MATERIAL COMUN PISO Y TAPA EN CONCRETO LADRILLO TOLETE COMUN MORTERO IMPERMEBEALIZADO ACERO DE REFUERZO TAPA FORMALETA DESPERDICIO 5% UNIDAD M3 M3 M2 M3 KG M2 % PRECIO UNIT 24,062.50 261,515.14 33,782.00 276,540.59 4,214.56 2,600.00 CANTIDAD 0.20 0.07 0.96 0.01 6.00 1.68 5% V/ UNITARIO 4,851.00 17,573.82 32,430.72 3,982.18 25,287.38 4,368.00 4,424.65 SUBTOTAL 92,917.75 III. TRANSPORTES CONCEPTO M3-TON-KM TARIFA CAN VOL-PES VR UNITARIO

SUBTOTAL 0.00 IV. MANO DE OBRA TRABAJADOR OFICIAL (1) AYUDANTE (1) JORNAL 29,914.53 17,948.72 % PREST 95% 95% JORNAL TOTAL RENDIMIEN 58,333.33 35,000.00 0.74 0.74 VR UNITARIO 78,405.02 47,043.01

125,448.03 TOTAL COSTO DIRECTO 224,638.18

ANALISIS UNITARIOS BAJANTES LLUVIAS


ANLISIS DE PRECIOS UNITARIOS UNIDAD ML

PROYECTO

URBANIZACION VILLA MARIANGEL

NOMBRE DEL UNITARIO:

BAJANTE DE AGUAS LLUVIAS

I. EQUIPO DESCRIPCIN HERRAMIENTA MENOR TIPO VARIAS TARIFA/HORA 6,222.22 RENDIMIEN 5% V/ UNITARIO 311.11

SUBTOTAL 311.11 II. MATERIALES EN OBRA DESCRIPCIN TUBERIA P.V.C. B AGUAS LLUVUAS CODO DE 3" UNION 3" LIMPIADOR SOLDALURA LIQUIDA UNIDAD ML UND. UND. LTS LTS PRECIO UNIT 7,840.00 3,210.00 2,140.00 8,700.00 8,000.00 CANTIDAD 1.00 0.40 0.40 0.01 0.01 V/ UNITARIO 7,840.00 1,284.00 856.00 87.00 111.35

DESPERDICIO 5%

5%

508.92

SUBTOTAL 10,687.27

III. TRANSPORTES CONCEPTO M3-TON-KM TARIFA CAN VOL-PES VR UNITARIO

SUBTOTAL 0.00 IV. MANO DE OBRA TRABAJADOR OFICIAL (1) AYUDANTE (1) JORNAL 29,914.53 17,948.72 % PREST 95% 95% JORNAL TOTAL RENDIMIEN 58,333.33 35,000.00 15.00 15.00 VR UNITARIO 3,888.89 2,333.33

6,222.22 TOTAL COSTO DIRECTO 17,220.60

Das könnte Ihnen auch gefallen