Beruflich Dokumente
Kultur Dokumente
= 4.00 deg/100ft ENTER A VALUE IN EITHER THE KICKOFF POINT OR THE HOLD INCLINATION CELL, ENTER A ZERO IN THE OTHER CELL HOLD INCLINATION = KICKOFF POINT = HOLD INCLINATION = KICKOFF POINT = 90.00 degrees 0 feet #N/A degrees 3068 feet
BUILD, HOLD AND DROP TO VERTICAL - TYPE II TARGET TVD = HORIZONTAL DISPLACEMENT = DEPTH TO BE VERTICAL = KICKOFF POINT = BUILD DOGLEG SEVERITY = DROP DOGLEG SEVERITY = HOLD INCLINATION = 9800 2926 9800 2000 2.50 1.50 feet feet feet feet deg/100ft deg/100ft
24.28 degrees
BUILD, HOLD, DROP ,AND HOLD - MODIFIED TYPE II DEPTH TO START FINAL HOLD = 11000 feet HORIZONTAL DISP. AT START OF FINAL HOLD = 6000 feet BUILD DOGLEG SEVERITY = 3.00 deg/100ft DROP DOGLEG SEVERITY = 2.00 deg/100ft KICKOFF POINT = 2500 feet FINAL HOLD INCLINATION = 25.00 degrees HOLD INCLINATION = 37.82 degrees
CONTINUOUS BUILD TO TARGET - TYPE III TARGET TVD = HORIZONTAL DISPLACEMENT = KICKOFF POINT = FINAL INCLINATION = BUILD DOGLEG SEVERITY = 4098 feet 251.4 feet 3739 feet 70.00 degrees 15.00 degrees/100ft
HORIZONTAL WELL TARGET TVD = DISPLACEMENT AT HORIZONTAL = TVD OF TANGENT SECTION = INCLINATION OF TANGENT SECTION = FINAL INCLINATION AT END OF BUILD = 4060 0 50 60.00 74.00 feet feet feet degrees degrees
FIRST BUILD RATE = SECOND BUILD RATE = FIRST BUILD RATE = KICKOFF POINT = KICKOFF POINT = DISPLACEMENT AT HORIZONTAL =
12.00 deg/100ft 12.00 deg/100ft #N/A deg/100ft #N/A feet 3551 feet 432 feet
To calculate KOP and displacement at horizontal , enter 0 for displacement at horizontal and planned first and second build rate To calculate build rate and KOP, enter displacement at hoizontal and 0 for first build rate
R D X L C
= = = = =
R D X L r1 r2
= = = = = =
R D X L C R1 R2 D4 X4
= = = = = = = = =
R D X L
= = = =
DISPLACEMENT OF BUILD =
-193.727812