AMSC PRODUCTIVITY RATE

I
tem

Activity

Activity

SUB

ID

Description

ACTIVIT
Y

Unit

Prod.
Rate

QTY

Tot.
Man

Days

Manpo
Crew Tot. MOD (O) wer/da
Desc. days
y

(unit/day
)

SITEWORKS
Z0U34-0000

Site Clearing

Z0U34-0010

Setting-out / Layout

1,502.00

4,200.00

0.36

2.000

1 Operator
1 Helper

0.72

0.72

160.08

76.00

2.11

3.000

2 Carpenter
1 Helper

6.32

6.32

M3

953.00

409.50

2.33

2.000

1 Operator
1 Helper

4.65

2.33

1.61

0.75
Operator
8.250 6 Driver
1.5 Helper

13.25

4.42

M2

SUBSTRUCTURE
Z0U34-0020

Excavation for footings + Disposal of Materials

For
Excavation
For
Disposal

M3

555.00

345.60

Z0U34-0030

Formation Level & Compaction

M3

238

252.00

0.94

.75
Operator

6.250 4 Driver

5.90

2.95

1.5 Helper

Z0U34-0040

Anti-Termite Applications (Under PCC Footings)

M2

571

202.50

2.82

1.000

2 Technican

2.82

2.82

Z0U34-0050

Backfill & Compaction upto bot. of PCC Tie-Beam

M3

268

252.00

1.06

8.250

0.75
Operator
6 Driver
1.5 Helper

8.77

1.25

Z0U34-0060

Anti-Termite Applications (Under PCC Tie-Beam)

M2

37

202.50

0.18

1.000

2 Technican

0.18

0.18

Z0U34-0070

Backfill & Compaction up to bot of PCC Grd. Slab

M3

2,332.00

252.00

9.25

8.250

0.75
Operator
6 Driver
1.5 Helper

76.35

25.45

Z0U34-0080

Anti-Termite Applications (Under PCC Grade Slab)

M2

894

202.50

4.41

1.000

2 Technican

4.41

4.41

1 Mason
10 Helper
1 Mason
10 Helper

40.01

20.00

91.50

45.75

Z0U34-0090

Shutters + 50mm Thk. PCC Under Footings

M2

982

270.00

3.64

11.000

Z0U34-0100

50mm Protection Screed (Over W.P. Membrane-Ftg.)

M2

2,246.00

270.00

8.32

11.000

Z0U34-0110

RCC For Footings

Casting

M3

244

180.00

1.36

26.000

1 Carpenter
18 Helper
6 Mason
1 Steel
Fixer

35.24

35.24

Formworks

M2

976.00

12.00

81.33

3.056

2 Carpenter
1 Helper
.056
Operator

248.55

62.14

Rebars

kg

43,920.00

250.00

175.68

2.056

1 Steel
Fixer 1
Helper
.056
Operator

361.20

120.40

Page 1 of 63

Deshutterin
g

M2

976.00

35.00

27.89

3.056

2 Carpenter
1 Helper
.056
Operator

85.22

42.61

10
Z0U34-0120

RCC Necks Columns / Walls + MEP Sleeves

81.00

1.90

22.000

616.00

4.00

154.00

3.056

kg

27,720.00

200.00

138.60

M2

616.00

28.00

Casting

M3

Formworks

M2

Rebars

Deshutterin
g

154

2 Carpenter
16 Helper
4 Mason

41.83

41.83

2 Carpenter
1 Helper
.056
Operator

470.62

94.12

2.056

1 Steel
Fixer 1
Helper
.056
Operator

284.96

71.24

22.00

3.056

2 Carpenter
1 Helper
.056
Operator

67.23

33.62

12
Z0U34-0130

Shutters + 50mm Thk. PCC Under Tie-Beams

M2

63

270.00

0.23

11.000

Z0U34-0140

50mm Screed (Over W.P. Membrane-T.B.)

M2

144

270.00

0.53

11.000

Z0U34-0150

RCC Tie Beams + MEP Sleeves

Casting

M3

Formworks

M2

33

132.00

1 Mason
10 Helper
1 Mason
10 Helper

2.57

1.28

5.87

2.93

4.03

4.03

180.00

0.18

22.000

1 Carpenter
16 Helper
4 Mason
1 Steel
Fixer

4.00

33.00

3.056

2 Carpenter
1 Helper
.056
Operator

100.85

25.21

48.85

16.28

14.41

7.20

Rebars

kg

5,940.00

250.00

23.76

2.056

1 Steel
Fixer 1
Helper
.056
Operator

Deshutterin
g

M2

132.00

28.00

4.71

3.056

2 Carpenter
1 Helper
.056
Operator

0.12

0.12

10

Z0U34-0160

RCC Kickers Over Tie-Beam

Casting

M3

Formworks

M2

Rebars

kg

Page 2 of 63

4.00

180.00

180.00

0.01

22.000

1 Carpenter
16 Helper
4 Mason
1 Steel
Fixer

4.00

1.00

3.056

2 Carpenter
1 Helper
.056
Operator

3.06

3.06

2.056

1 Steel
Fixer 1
Helper
.056
Operator

1.48

1.48

250.00

0.72

Deshutterin
g

M2

4.00

28.00

0.14

3.056

2 Carpenter
1 Helper
.056
Operator

0.44

0.44

4
Z0U34-0170

50mm Thk. PCC Under Grade Slab

M2

1,537.00

270.00

5.69

11.000

1 Mason
10 Helper

62.62

31.31

Z0U34-0180

Mesh + Filler Board & RCC For Grade Slab

M3

208

180.00

1.16

26.000

1 Carpenter
18 Helper
6 Mason
1 Steel
Fixer

30.04

10.01

Z0U34-0190

50mm Thk. PCC Steps & Ramps

M2

10

270.00

0.04

11.000

1 Mason
10 Helper

0.41

0.20

Z0U34-0200

Steps & Ramps Works + Place Conc.

M3

180.00

0.03

26.000

1 Carpenter
18 Helper
6 Mason
1 Steel
Fixer

0.72

0.09

Z0U34-0210

Waterproofing Membrane (Over PCC Footings)

M2

1,047.00

152.00

6.89

6.000

4
Waterproofe
r 2 Helper

41.33

20.66

Z0U34-0220

Water Proofing For Neck Column & Wall & Footing

M2

2,021.00

152.00

13.30

6.000

4
Waterproofe
r 2 Helper

79.78

26.59

Z0U34-0230

Waterproofing Membrane (Over PCC Tie-beams)

M2

67

152.00

0.44

6.000

4
Waterproofe
r 2 Helper

2.64

1.32

Z0U34-0240

Waterproofing Membrane For Tie Beams

M2

121

152.00

0.80

6.000

4
Waterproofe
r 2 Helper

4.78

1.59

Z0U34-0250

50mm Thk. PCC Under Base of Tank

M2

77

270.00

0.29

11.000

1 Mason
10 Helper

3.14

3.14

Z0U34-0260

Waterproofing Membrane (Over PCC - Base)

M2

82

152.00

0.54

6.000

4
Waterproofe
r 2 Helper

3.24

3.24

Z0U34-0270

50mm Protect'n Screed (Over W.P. Membrane-Base)

M2

176

270.00

0.65

11.000

1 Mason
10 Helper

7.17

7.17

5.49

5.49

Z0U34-0280

RCC Water Tank Base + Deshuttering

Casting

M3

Formworks

M2

38

152.00

180.00

0.21

26.000

1 Carpenter
18 Helper
6 Mason
1 Steel
Fixer

12.00

12.67

3.056

2 Carpenter
1 Helper
.056
Operator

38.71

38.71

56.25

56.25

13.27

13.27

Rebars

kg

6,840.00

250.00

27.36

2.056

1 Steel
Fixer 1
Helper
.056
Operator

Deshutterin
g

M2

152.00

35.00

4.34

3.056

2 Carpenter
1 Helper
.056
Operator

4
Z0U34-0290

RCC Wall W/MEP Pipes & Water Stop + Deshuttering

Casting

M3

Page 3 of 63

34

81.00

0.42

22.000

2 Carpenter
16 Helper
4 Mason

9.23

9.23

Formworks

M2

136.00

4.00

34.00

3.056

2 Carpenter
1 Helper
.056
Operator

103.90

51.95

62.91

62.91

14.84

14.84

Rebars

kg

6,120.00

200.00

30.60

2.056

1 Steel
Fixer 1
Helper
.056
Operator

Deshutterin
g

M2

136.00

28.00

4.86

3.056

2 Carpenter
1 Helper
.056
Operator

1.16

1.16

Z0U34-0300

RCC Top Slab + Deshuttering for Water Tank

Casting

M3

8.00

180.00

0.04

26.000

1 Carpenter
18 Helper
6 Mason
1 Steel
Fixer

Formworks

M2

40.00

16.00

2.50

3.056

2 Carpenter
1 Helper
.056
Operator

7.64

3.82

14.80

14.80

3.82

3.82

Rebars

kg

1,440.00

200.00

7.20

2.056

1 Steel
Fixer 1
Helper
.056
Operator

Deshutterin
g

M2

40.00

32.00

1.25

3.056

2 Carpenter
1 Helper
.056
Operator

6.79

3.39

5
Z0U34-0310

Water Proofing Membrane all around outside surfc

M2

172

152.00

1.13

6.000

4
Waterproofe
r 2 Helper

Z0U34-0320

Protection Board all around outside surface

M2

172

152.00

1.13

6.000

4
Waterproofe
r 2 Helper

6.79

3.39

Z0U34-0330

Backfill around Water tank walls

M3

252.00

0.02

8.250

0.75
Operator
6 Driver
1.5 Helper

0.20

0.07

Z0U34-0340

G.R.P. Lining around inside + S.S. Lader & Door

M2

221

20.00

11.05

2.000

22.10

7.37

Z0U34-0350

50mm Thk. PCC Under Base of Elevator Shaft

M2

14

270.00

0.05

11.000

0.57

0.57

Z0U34-0360

Waterproofing Membrane (Over PCC - Base)

M2

15

152.00

0.10

6.000

4
Waterproofe
r 2 Helper

0.59

0.59

Z0U34-0370

50mm Protect'n Screed (Over W.P. Membrane-Base)

M2

32

270.00

0.12

11.000

1 Mason
10 Helper

1.30

1.30

Z0U34-0380

RCC Elevator Shaft Base + Deshuttering

Casting

M3

180.00

0.04

26.000

1 Carpenter
18 Helper
6 Mason
1 Steel
Fixer

1.01

1.01

Formworks

M2

12.00

2.33

3.056

2 Carpenter
1 Helper
.056
Operator

7.13

7.13

Page 4 of 63

28.00

1 Mason
1 Helper
1 Mason
10 Helper

Rebars

kg

1,260.00

250.00

5.04

2.056

1 Steel
Fixer 1
Helper
.056
Operator

Deshutterin
g

M2

28.00

35.00

0.80

3.056

2 Carpenter
1 Helper
.056
Operator

10.36

10.36

2.44

2.44

4
Z0U34-0390

RCC Wall W/ MEP Cond. + Deshuttering

Casting

M3

Formworks

M2

16.00

81.00

0.05

22.000

4.00

4.00

3.056

2 Carpenter
16 Helper
4 Mason

1.09

1.09

2 Carpenter
1 Helper
.056
Operator

12.22

6.11

7.40

7.40

1.75

1.75

Rebars

kg

720.00

200.00

3.60

2.056

1 Steel
Fixer 1
Helper
.056
Operator

Deshutterin
g

M2

16.00

28.00

0.57

3.056

2 Carpenter
1 Helper
.056
Operator

2.37

0.79

5
Z0U34-0400

Water Proofing Membrane all around outside surfc

M2

60

152.00

0.39

6.000

4
Waterproofe
r 2 Helper

Z0U34-0410

Protection Board all around outside surface

M2

216

152.00

1.42

6.000

4
Waterproofe
r 2 Helper

8.53

4.26

Z0U34-0420

Backfill around the Lift's Pit wall

M3

9.89

252.00

0.04

8.250

0.75
Operator
6 Driver
1.5 Helper

0.32

0.11

Z0U34-0430

RCC For Wall/Col. From Top of Grade Slab-1L

Casting

M3

251

81.00

3.10

22.000

68.17

68.17

Formworks

M2

1,004.00

4.00

251.00

3.056

2 Carpenter
1 Helper
.056
Operator

767.06

153.41

Rebars

kg

45,180.00

200.00

225.90

2.056

1 Steel
Fixer 1
Helper
.056
Operator

464.45

116.11

Deshutterin
g

M2

1,004.00

28.00

35.86

3.056

2 Carpenter
1 Helper
.056
Operator

109.58

54.79

2 Carpenter
16 Helper
4 Mason

12
Z0U34-0440

Columns From Top of Grade Slab-1L (Canopy)

Casting

M3

Page 5 of 63

81.00

0.01

22.000

2 Carpenter
16 Helper
4 Mason

0.27

0.27

Formworks

M2

4.00

4.00

1.00

3.056

2 Carpenter
1 Helper
.056
Operator

3.06

1.53

1.85

0.93

0.44

0.44

Rebars

kg

180.00

200.00

0.90

2.056

1 Steel
Fixer 1
Helper
.056
Operator

Deshutterin
g

M2

4.00

28.00

0.14

3.056

2 Carpenter
1 Helper
.056
Operator

33.37

33.37

Z0U34-0450

RCC Slab / Beam - 1L

Casting

M3

231.00

180.00

1.28

26.000

1 Carpenter
18 Helper
6 Mason
1 Steel
Fixer

Formworks

M2

1,155.00

16.00

72.19

3.056

2 Carpenter
1 Helper
.056
Operator

220.61

36.77

427.44

85.49

110.30

55.15

Rebars

kg

41,580.00

200.00

207.90

2.056

1 Steel
Fixer 1
Helper
.056
Operator

Deshutterin
g

M2

1,155.00

32.00

36.09

3.056

2 Carpenter
1 Helper
.056
Operator

14
Z0U34-0460

RCC For Stair/Landings @ G.L. - 1L

81.00

0.10

22.000

40.00

4.00

10.00

3.056

kg

1,440.00

200.00

7.20

M2

40.00

28.00

1.43

Casting

M3

Formworks

M2

Rebars

Deshutterin
g

2 Carpenter
16 Helper
4 Mason

2.17

2.17

2 Carpenter
1 Helper
.056
Operator

30.56

7.64

2.056

1 Steel
Fixer 1
Helper
.056
Operator

14.80

4.93

3.056

2 Carpenter
1 Helper
.056
Operator

4.37

2.18

1.16

1.16

7.64

1.91

10

Z0U34-0470

RCC Canopy

Casting

M3

8.00

180.00

0.04

26.000

1 Carpenter
18 Helper
6 Mason
1 Steel
Fixer

Formworks

M2

40.00

16.00

2.50

3.056

2 Carpenter
1 Helper
.056
Operator

Page 6 of 63

Rebars

kg

1,440.00

200.00

7.20

2.056

1 Steel
Fixer 1
Helper
.056
Operator

Deshutterin
g

M2

40.00

32.00

1.25

3.056

2 Carpenter
1 Helper
.056
Operator

14.80

4.93

3.82

3.82

9
Z0U34-0480

RCC For Wall/Col. From Top of 1L-2L

Casting

M3

Formworks

M2

237

948.00

81.00

2.93

22.000

4.00

237.00

3.056

2 Carpenter
16 Helper
4 Mason

64.37

64.37

2 Carpenter
1 Helper
.056
Operator

724.27

144.85

438.54

109.64

103.47

51.73

Rebars

kg

42,660.00

200.00

213.30

2.056

1 Steel
Fixer 1
Helper
.056
Operator

Deshutterin
g

M2

948.00

28.00

33.86

3.056

2 Carpenter
1 Helper
.056
Operator

33.80

33.80

12

Z0U34-0490

RCC Slab / Beam - 2L

Casting

M3

234.00

180.00

1.30

26.000

1 Carpenter
18 Helper
6 Mason
1 Steel
Fixer

Formworks

M2

1,170.00

16.00

73.13

3.056

2 Carpenter
1 Helper
.056
Operator

223.47

37.25

Rebars

kg

42,120.00

200.00

210.60

2.056

1 Steel
Fixer 1
Helper
.056
Operator

432.99

86.60

Deshutterin
g

M2

1,170.00

32.00

36.56

3.056

2 Carpenter
1 Helper
.056
Operator

111.74

55.87

14
Z0U34-0500

RCC for Stair/Landings @ 1L-2L

Casting

M3

Formworks

M2

Rebars

kg

Page 7 of 63

81.00

0.09

22.000

35.00

4.00

8.75

3.056

1,260.00

200.00

6.30

2.056

2 Carpenter
16 Helper
4 Mason

1.90

1.90

2 Carpenter
1 Helper
.056
Operator

26.74

6.69

1 Steel
Fixer 1
Helper
.056
Operator

12.95

4.32

Deshutterin
g

M2

35.00

28.00

1.25

3.056

1,879.00

10.00

187.90

2.056

2 Carpenter
1 Helper
.056
Operator

3.82

1.91

386.32

14

14.32

241.30

12

20.11

141.52

14

10.11

23.23

11.62

145.35

14

10.38

269.34

14

19.24

22.74

14

1.62

64.03

10

6.40

FINISHES
1 Mason
1 Helper
.056
Operator
1 Mason
1 Helper
1 Mason
1 Helper
1 Mason
1 Helper
.056
Operator
1 Mason
1 Helper
.056
Operator

Z0U34-2710

I. Hollow Block Works + Lintels @ Grnd Flr.

M2

Z0U34-2720

I. Internal Plaster Accessories & Rush @ GL

M2

347.00

48.46

7.16

2.000

Z0U34-2730

I. Internal Plaster Works @ GL

M2

2,413.00

20.00

120.65

2.000

Z0U34-2740

I. Glazed Ceramic Tile @ GL

M2

826

12.00

68.83

2.056

Z0U34-2750

I. Block Works For Ducts @ Grnd Flr.

M2

113

10.00

11.30

2.056

Z0U34-2760

I. Install False Ceiling (Susp. + Boarding) @ GL

M2

509

7.20

70.69

2.056

Z0U34-2770

I. Screed + Ceramic Tiles & Skirtings @ GL

M2

1572

12.00

131.00

2.056

Z0U34-2780

I. Screed + Non-Slip Ceramic Tiles &Skirtings@GL

M2

354

32.00

11.06

2.056

Z0U34-2790

I. Water Proofing + Screed on Wet Areas - GL

M2

683

64.00

10.67

6.000

Z0U34-2800

I. Frames Installations @ GL

Nos.

59

4.80

12.29

2.056

1 Carpenter
1 Helper
.056
Operator

25.27

14

1.81

Z0U34-2810

I. Doors w/ Ironmongery @ GL

Nos.

59

4.80

12.29

2.056

1 Carpenter
1 Helper
.056
Operator

25.27

12

2.11

Z0U34-2820

I. Frames Installation Works @ GL

M2

108

4.80

22.50

2.056

1 Carpenter
1 Helper
.056
Operator

46.26

14

3.30

138.78

12

11.57

1 Carpenter
1 Helper
.056
Operator
1 Mason
1 Helper
.056
Operator
1 Mason
1 Helper
.056
Operator
4Waterproof
er
2 Helper

27.59
2.05

108

1.60

67.50

2.056

1 Alum.
Tech 1
Helper
.056
Operator

Nos.

14

0.60

23.33

2.056

1 Carpenter
1 Helper
.056
Operator

47.97

14

3.43

I. Wardrobes @ GL

Nos.

17

0.75

22.67

2.056

1 Carpenter
1 Helper
.056
Operator

46.60

14

3.33

I. Primer Application Works @ GL


I. Stucco Application Works @ GL

M2
M2

54.60
16.40

15.82
52.68

1.000
1.000

15.82
52.68

10
14

1.58
3.76

Z0U34-2830

I.Aluminum + Glass & Other Associated Works @ GL

M2

Z0U34-2840

I. Kitchen Cabinets @ GL

Z0U34-2850
Z0U34-2860
Z0U34-2870

Page 8 of 63

864.00
864.00

1 Painter
1 Painter

Z0U34-2880

I. Emulsion Paint Works @ GL

M2

1,626.00

32.20

50.50

1.000

Z0U34-2890

O. Plaster Accessories & Rush @ GL

M2

52

48.46

1.07

2.000

Z0U34-2900

O. Plaster Works @ GL

M2

316

20.00

15.80

2.000

Z0U34-2910

O. Polished Marble & Ceramic for Wall @ GL

M2

37

10.00

3.70

2.056

Z0U34-2920

O. Blk Wks For Garbage Chutes+Plaster@ Grnd Flr.

M2

16

10.00

1.60

2.056

Z0U34-2930

O. Gypsum Board +Washable Paint @ GL

M2

66

16.00

4.13

2.056

Z0U34-2940

O. Semi Recessed G.R.G. Tiles @ GL

M2

36

16.00

2.25

2.056

Z0U34-2950

O. Sreed + Graniti Tiles & Skirtings @ GL

M2

514

12.00

42.83

2.056

Z0U34-2960

O. Screed + Polished Marble & Skirtings @ GL

M2

148

12.00

12.33

2.056

Z0U34-2970

O. G. Stl, Powdr coated Railin to Staircase @ GL

LM

24

20.00

1.20

2.056

Z0U34-2980
Z0U34-2990
Z0U34-3000

O. Primer ApplicationWorks @ GL.


O. Stucco Application Works @ GL
O. Emulsion Paint Works @ GL

M2
M2
M2

109
109
58

54.60
16.40
32.20

2.00
6.65
1.80

1.000
1.000
1.000

Z0U34-3010

I. Hollow Block Works + Lintels @ 1st Flr.

M2

1,950.00

10.00

195.00

2.056

Z0U34-3020

I. Internal Plaster Accessories & Rush @ 1L

M2

347.00

48.46

7.16

2.000

Z0U34-3030

I. Internal Plaster Works @ 1L

M2

2,581.00

20.00

129.05

2.000

Z0U34-3040

I. Glazed Ceramic Tile @ 1L

M2

735

12.00

61.25

2.056

Z0U34-3050

I. Block Works For Ducts @ 1st Flr.

M2

93

10.00

9.30

2.056

Z0U34-3060

I. Install False Ceiling (Susp. + Boarding) @ 1L

M2

476

7.20

66.11

2.056

Z0U34-3070

I. Screed + Ceramic Tiles & Skirtings @ 1L

M2

1746

12.00

145.50

2.056

Z0U34-3080

I. Screed + Non-Slip Ceramic Tiles &Skirtings@1L

M2

269

32.00

8.41

2.056

Z0U34-3090

I. Water Proofing + Screed on Wet Areas - 1L

M2

683

64.00

10.67

6.000

Page 9 of 63

50.50

12

4.21

2.15

0.31

31.60

12

2.63

7.61

14

0.54

3.29

1.64

1 Carpenter
1 Helper
.056
Operator

8.48

14

0.61

1 Carpenter
1 Helper
.056
Operator

4.63

14

0.33

88.07

14

6.29

25.36

14

1.81

2.47

10

0.25

2.00
6.65
1.80

8
12
10

0.25
0.55
0.18

400.92

14

28.64

14.32

258.10

12

21.51

125.93

14

9.00

19.12

9.56

135.92

14

9.71

299.15

14

21.37

17.28

2.16

64.03

10

6.40

1 Painter
1 Mason
1 Helper
1 Mason
1 Helper
1 Mason
1 Helper
.056
Operator
1 Mason
1 Helper
.056
Operator

1 Mason
1 Helper
.056
Operator
1 Mason
1 Helper
.056
Operator
1 Alum.
Tech 1
Helper
.056
Operator
1 Painter
1 Painter
1 Painter
1 Mason
1 Helper
.056
Operator
1 Mason
1 Helper
1 Mason
1 Helper
1 Mason
1 Helper
.056
Operator
1 Mason
1 Helper
.056
Operator
1 Carpenter
1 Helper
.056
Operator
1 Mason
1 Helper
.056
Operator
1 Mason
1 Helper
.056
Operator
4Waterproof
er
2 Helper

2.05

Z0U34-3100

I. Frames Installations @ 1L

Nos.

72

4.80

15.00

2.056

1 Carpenter
1 Helper
.056
Operator

30.84

14

2.20

Z0U34-3110

I. Doors w/ Ironmongery @ 1L

Nos.

72

4.80

15.00

2.056

1 Carpenter
1 Helper
.056
Operator

30.84

12

2.57

Z0U34-3120

I. Frames Installation Works @ GL

M2

100

4.80

20.83

2.056

1 Carpenter
1 Helper
.056
Operator

42.83

14

3.06

128.50

12

10.71

100

1.60

62.50

2.056

1 Alum.
Tech 1
Helper
.056
Operator

Nos.

17

0.75

22.67

2.056

1 Carpenter
1 Helper
.056
Operator

46.60

14

3.33

I. Kitchen Cabinets @ 1L

Nos.

15

0.60

25.00

2.056

1 Carpenter
1 Helper
.056
Operator

51.40

14

3.67

I. Primer Application Works @ 1L


I. Stucco Application Works @ 1L
I. Emulsion Paint Works @ 1L

M2
M2
M2

54.60
16.40
32.20

15.66
52.13
51.21

1.000
1.000
1.000

1 Painter

15.66
52.13
51.21

12
14
14

1.30
3.72
3.66

1 Mason
1 Helper
1 Mason
1 Helper
1 Mason
1 Helper
.056
Operator
1 Mason
1 Helper
.056
Operator

Z0U34-3130

I. Aluminum+Glass & Other Associated Works @ 1L

M2

Z0U34-3140

I. Wardrobes @ 1L

Z0U34-3150
Z0U34-3160
Z0U34-3170
Z0U34-3180

855.00
855.00
1,649.00

Z0U34-3190

O. Plaster Accessories & Rush @ 1L

M2

52

48.46

1.07

2.000

Z0U34-3200

O. Plaster Works @ 1L

M2

297

20.00

14.85

2.000

Z0U34-3210

O. Polished Marble & Ceramic for Wall @ 1L

M2

36

10.00

3.60

2.056

Z0U34-3220

O. Blk Wks For Garbage Chutes+Plasters@ 1st Flr.

M2

14

10.00

1.40

2.056

Z0U34-3230

O. Gypsum Board +Washable Paint @ 1L

M2

66

16.00

4.13

2.056

Z0U34-3240

O. Semi Recessed G.R.G. Tiles @ 1L

M2

36

16.00

2.25

2.056

Z0U34-3250

O. Sreed + Graniti Tiles & Skirtings @ 1L

M2

425

12.00

35.42

2.056

Z0U34-3260

O. Screed + Polished Marble & Skirtings @ 1L

M2

48

12.00

4.00

2.056

Z0U34-3270

O. G. Stl, Powdr coated Railin to Staircase @ 1L

LM

26

20.00

1.30

2.056

Z0U34-3280
Z0U34-3290
Z0U34-3300

O. Primer Application Works @ 1L


O. Stucco Application Works @ 1L
O. Emulsion Paint Works @ 1L

M2
M2
M2

103
103
58

54.60
16.40
32.20

1.89
6.28
1.80

1.000
1.000
1.000

Page 10 of 63

1 Painter
1 Painter

2.15

0.31

29.70

12

2.48

7.40

14

0.53

2.88

1.44

1 Carpenter
1 Helper
.056
Operator

8.48

14

0.61

1 Carpenter
1 Helper
.056
Operator

4.63

14

0.33

72.82

14

5.20

8.22

14

0.59

2.67

10

0.27

1.89
6.28
1.80

8
10
12

0.24
0.63
0.15

1 Mason
1 Helper
.056
Operator
1 Mason
1 Helper
.056
Operator
1 Alum.
Tech 1
Helper
.056
Operator
1 Painter
1 Painter
1 Painter

Z0U34-4240
Z0U34-4250
Z0U34-4260
Z0U34-4270
Z0U34-4280
Z0U34-4290
Z0U34-4300
Z0U34-4310
Z0U34-4320
Z0U34-4330
Z0U34-4340
Z0U34-4350
Z0U34-4360
Z0U34-4370
Z0U34-4380
Z0U34-4390
Z0U34-4400
Z0U34-4410
Z0U34-4420
Z0U34-4430
Z0U34-4440
Z0U34-4450
Z0U34-4460
Z0U34-4470

Roof Drain & Access.+ Lightweight Concrete


One Coat Cold Bituminous Primer
2 Layers of SBS W.P. Membrane + Water Test
Alum. Foil Covering Fixed to Upstand w/ Sealant
50mm Thk. Extruded Polystyrene Insulation
Protection Layer
18mm-25mm Round Aggregates (50mm Thk.)
1mm Thk. Alum. Flashing Fixed into Conc. Upstand
Sealant Application Around top of Alum. Flashing
Channel & Rails Installation for Lifts
Cabin Assembly / Installation for lifts
Machine Installation for lifts
Doors Installation for lifts
Connections To Ele + Finishing Touches for lifts
Installation of Chute Tubes and Intake Throats
Install Intake Doors, Chute Vent & Accessories
Install Ground Floor Offset + Fire Shutter Door
Install Compactor with MCP
Installation of Garbage Container
Final Test & Comm.
Installation of Window Cleaning Eqmt.
Primer Application Works @ Roof Deck
Stucco Application Works @ Roof Deck
Emulsion / Epoxy Paint Works @ Roof Deck

M2
M2
M2
LM
M2
M2
M2
M2
M2
Items
Items
Items
Items
Items
Item
Item
Item
Item
Item
Item
Item
M2
M2
M2

281.00
13.00
268.00
107
268.00
268.00
268.00
107
107
2
2
2
2
2
1
1
1
1
1
1
1
50
50
55

7
2
6
3
2
2
4
3
2
14
10
7
10
12
8
4
2
1
1
3
14

54.60
16.40
32.20

0.92
3.05
1.71

1.000
1.000
1.000

1 Painter
1 Painter
1 Painter

315.00

22.66

2.000

1 Operator
1 Helper

5.63

9.60

5.000

2 Carpenter
1 Mason
1 Helper 1
Operator

91.07

76.00

1.20

6.000

M2

13.21

60.00

0.22

1.250

Backfilling Works

M3

7,125.36

601.00

11.86

7.500

Z0U34-4530
Z0U34-4540
Z0U34-4550
Z0U34-4560
Z0U34-4570
Z0U34-4580
Z0U34-4590
Z0U34-4600

Instl Drainage Pipes &Con. To Existing Chambers


Instl Water Supply Pipes&Con. To Existg Chambers
Instl Chilled Water Pipes&Con. To Existg Chamber
Instl Central Gas Pipes &Con. To Existg Chambers
Instl Telephone Ducts &Con. To Existing Chambers
Laying of Power cables (By Others)
Hardscaping Works
Landscaping Works

Item
Item
Item
Item
Item
Item
Item
Item

Z0U34-4610

Ext. Plaster Accessories & Rush on Front Elev.

M2

1,484.00

Z0U34-4620

Ext. Plaster Works on Front Elevation

M2

19.00

Z0U34-4630

Install Balcony Handrail on Front Elev.

Nos.

Z0U34-4640

Decorative GRC Panels W/ Epoxy Paint @ F. Elev.

Nos.

Z0U34-4480

Excavation Works External

M3

Z0U34-4490

RCC Manholes / Gully Traps

Nos.

Z0U34-4500

Water Proofing

M2

Z0U34-4510

Sand Bedding

Z0U34-4520

Page 11 of 63

7,137.50

54

4Waterproof
er
2 Helper
1 Helper
0.25
Operator

1.5
Operator
3 Driver 3
Helper

0.92
3.05
1.71

8
10
12

0.11
0.30
0.14

45.32

9.06

48.00

14

3.43

7.19

12

0.60

0.28

10

0.03

88.92

14

6.35

1
1
1
1
1
1
1
1

14
12
14
12
10
7
14
12

48.46

30.62

2.000

8.00

2.38

2.000

35

15.00

2.33

2.250

17

2.00

8.50

2.500

1 Mason
1 Helper
1 Mason
1 Helper
1 Mason
1 Helper
.25
Operator
1 Carpenter
1 Helper .5
Operator

61.25

30.62

4.75

1.19

5.25

12

0.44

21.25

10

2.13

Z0U34-4650

Wooden Pergola on Front Elev. @ (1st & 2nd) Flr.

LM

Z0U34-4660

External Painting Works on Front Elevation

M2

1,503.00

1 Carpenter
1 Helper
.5 Operator

1.56

12

0.13

3.000

3 Painter

140.03

14

10.00

1 Mason
1 Helper
1 Mason
1 Helper
1 Mason
1 Helper
.25
Operator

25.01

12.51

4.75

1.19

10

0.00

0.00

8.00

0.63

2.500

32.20

46.68

48.46

12.51

2.000

19

8.00

2.38

2.000

Nos.

15.00

2.250

Decorative GRC Panels W/ Epoxy Paint @ LS. Elev.

Nos.

2.00

2.500

Z0U34-4710

External Painting Works on Left Side Elevation

M2

625

32.20

19.41

3.000

Z0U34-4720

Ext. Plaster Accessories & Rush on Rear Elev.

M2

1,503.00

48.46

31.02

2.000

Z0U34-4730

Ext. Plaster Works on Rear Elevation

M2

19.00

8.00

2.38

2.000

Z0U34-4740

Install Balcony Handrail on Rear Elev.

Nos.

35

15.00

2.33

2.250

Z0U34-4750

Decorative GRC Panels W/ Epoxy Paint @ R. Elev.

Nos.

17

2.00

8.50

2.500

Z0U34-4760

Wooden Pergola on Rear Elev. @ (1st & 2nd) Flr.

LM

8.00

0.63

2.500

Z0U34-4770

External Painting Works on Rear Elevation

M2

1,503.00

32.20

46.68

Z0U34-4780

Ext. Plaster Access. & Rush on Rightside Elev.

M2

606

48.46

12.51

Z0U34-4790

Ext. Plaster Works on Right Side Elevation

M2

19

8.00

2.38

2.000

Z0U34-4800

Install Balcony Handrail on Rigthside Elev.

Nos.

15.00

2.250

Z0U34-4810

Decorative GRC Panels W/ Epoxy Paint @ RS. Elev.

Nos.

2.00

2.500

1 Carpenter
1 Helper .5
Operator

Z0U34-4820
Z0U34-4830
Z0U34-4840
Z0U34-4850
Z0U34-4860
Z0U34-4870
Z0U34-4880
Z0U34-4890
Z0U34-4900
Z0U34-4910
Z0U34-4920
Z0U34-4930
Z0U34-4940
Z0U34-4950
Z0U34-4960
Z0U34-4970
Z0U34-4980
Z0U34-4990
Z0U34-5000
Z0U34-5010
Z0U34-5020
Z0U34-5030

External Painting Works on Right Side Elevation


Snagging & Desnagging For Finishes @ GF
Handing-Over For Finishes @ GF
Snagging & Desnagging For Finishes @ 1F
Handing-Over For Finishes @ 1F
Snagging & Desnagging For Finishes @ 2F
Handing-Over For Finishes @ 2F
Snagging & Desnagging For Finishes @ 3F
Handing-Over For Finishes @ 3F
Snagging & Desnagging For Finishes @ 4F
Handing-Over For Finishes @ 4F
Snagging & Desnagging For Finishes @ Roof Floor
Handing-Over For Finishes @ Roof Floor
Power On (By DEWA)
Precommissioning & Startup
Availability of Chilled Water (By Others)
Testing & Final Commissioning
Snagging & Desnagging For External Finishes
Handing-Over For External Finishes
Completion of Fdn./Superstructure -Building # 34
Completion of External Works for Building # 34
Completion of MEP Works for Building # 34

M2
Item
Item
Item
Item
Item
Item
Item
Item
Item
Item
Item
Item

625
1
1
1
1
1
1
1
1
1
1
1
1
0
0
0
0
1
1
1
1
0

3.000

3 Painter

Z0U34-4670

Ext. Plaster Access. & Rush on Leftside Elev.

M2

606

Z0U34-4680

Ext. Plaster Works on Left Side Elevation

M2

Z0U34-4690

Install Balcony Handrail on Leftside Elev.

Z0U34-4700

Item
Item
Item
Item

Page 12 of 63

32.20

19.41

1 Carpenter
1 Helper .5
Operator

58.23

12

62.03

31.02

4.75

1.19

5.25

12

0.44

1 Carpenter
1 Helper .5
Operator

21.25

10

2.13

1 Carpenter
1 Helper
.5 Operator

1.56

12

0.13

3.000

3 Painter

140.03

14

10.00

2.000

1 Mason
1 Helper
1 Mason
1 Helper
1 Mason
1 Helper
.25
Operator

25.01

12.51

4.75

1.19

10

0.00

0.00

12

4.85

3 Painter
1 Mason
1 Helper
1 Mason
1 Helper
1 Mason
1 Helper
.25
Operator

58.23

30
10
30
10
30
10
30
10
30
10
30
10
1
21
1
35
12
2
1
1
1

4.85

Z0U34-5040
Z0U34-5050
Z0U34-5060
Z0U34-5070
Z0U34-5080
Z0U34-5090

Completion
Completion
Completion
Completion
Completion
Completion

of Finishes for Building # 34


of Fdn./SuperStruc. for Phase-1 BLDG.
of External Works for Phase-1 BLDG.
of MEP Works for Phase-1 BLDG.
of Finishes for Phase-1 BLDG.
Milestone for Phase-1 Buildings

Item
Item
Item
Item
Item

1
1
1
0
1
1

1
0
0
0
0
0

54.60
16.40
32.20
48.46

Page 13 of 63

Carpenter

Mason

Steel
Fixer

Helper

N - D

Operator

0.4
4.2

Driver

Tot. Eqmt
(X)

S
Technicia
n

Painter

Alum.
Tech

Eqmt
Desc.

Waterpro
ofer

Tot. Edays (Z)


(H x I)

Dozer

0.4

1.000 1 Dozer

0.36

0.36

0.5

0.5

1.000 1 Dozer

2.33

0.47

0.5

0.2

1.9

0.9

0.7

1.9

0.7

0.4

1.9

Shovel

Dump T.

B. Roller

T - D

B. Cat

S. Roller M. Crane

2.1

0.0

0.0

0.0

0.75
6.750 Shovel 6
D. Truck
0.0

0.0

0.0

10.84

0.0

0.47

4.750

0.5 Shovel
4 D.
Truck .25
B. Roller

4.49

0.24

1.93

0.24

1.93

0.24

1.89

0.12

2.8

0.2

0.1

0.9

6.750

0.5 Shovel
6 D.
Truck .25
B. Roller

7.18

0.11

0.86

0.05

6.750

0.5 Shovel
6 D.
Truck .25
B. Roller

62.46

2.19

17.53

1.10

0.500

.5 Vibrator

0.68

0.2

4.6

2.3

18.5

4.4
1.8

18.2

4.2

41.6

16.3

17.6

8.1

0.5

0.056

.056 M.
Crane

4.55

0.46

17.6

1.0

0.056

.056 M.
Crane

9.84

0.98

Page 14 of 63

5.6
21.8

0.0

17.6

25.7

11.6

3.7
29.3

0.0

11.6

0.2

28.5

1.6

0.2

0.0

0.0

1.000

1 Vibrator

1.90

1.60

8.62

0.72

11.6

0.6

0.056

.056 M.
Crane

7.76

0.65

1.8

0.1

0.056

.056 M.
Crane

1.23

0.10

26.2

1.5

0.0

0.0

0.0

0.0

0.0

0.500

.5 Vibrator

0.09

1.47

3.3

0.2

0.056

.056 M.
Crane

1.85

0.18

2.4

0.1

0.056

.056 M.
Crane

1.33

0.13

0.5

0.0

0.056

.056 M.
Crane

0.26

0.03

2.4

0.5

0.0

0.16

.056 M.
Crane

2.7

0.0

0.0

1.56

0.056

0.3

0.9

0.0

.056 M.
Crane

0.7

1.2

2.4

0.056

12.8

0.1

6.6

7.5

2.8

6.1

0.3

0.0

0.0

0.0

0.0

0.0

0.500

.5 Vibrator

0.00

0.34

0.3

0.0

0.056

.056 M.
Crane

0.06

0.01

0.2

0.0

0.056

.056 M.
Crane

0.04

0.01

Page 15 of 63

0.1

0.0
0.6

0.0

0.2

2.8

0.4

2.3

0.0

0.5

0.056

0.4

0.00

0.0

0.03

6.9

0.0

0.1

6.9

13.8

8.9

17.7

0.4

0.9

0.5

1.1

1.000

1 Vibrator

1.16

1.000

1 Vibrator

0.03

0.500

.5 Vibrator

0.11

2.9
1.1

0.7

2.2

6.5

6.3

6.8

2.2
0.0

0.01

0.2

0.3

8.5

.056 M.
Crane

28.5

0.0

0.0

0.0

6.8

3.2

0.2

0.056

.056 M.
Crane

0.71

0.18

6.8

0.4

0.056

.056 M.
Crane

1.53

0.38

1.1

0.1

0.056

.056 M.
Crane

0.24

0.06

11.1

0.6

0.0

0.0

0.0

0.0

0.0

1.000

Page 16 of 63

1 Vibrator

0.42

0.62

13.6

6.1

1.9
15.5

0.0

6.1

1.0

1.4

0.5
1.5

0.0

6.8

0.4

0.056

.056 M.
Crane

1.90

0.38

6.1

0.3

0.056

.056 M.
Crane

1.71

0.34

1.0

0.1

0.056

.056 M.
Crane

0.27

0.05

13.9

0.8

0.0

0.0

0.0

1.000

1 Vibrator

0.04

0.78

0.0

0.056

.056 M.
Crane

0.14

0.03

1.4

0.1

0.056

.056 M.
Crane

0.40

0.08

0.3

0.0

0.056

.056 M.
Crane

0.07

0.01

1.4

2.2

0.1

0.0

0.0

0.0

0.0

0.0

1.1

2.3

1.1

2.3

3.7

3.7

0.1

0.5

0.0

0.2

1.2

0.0

0.5

0.0

0.1

0.0

0.0

6.750

0.5 Shovel
6 D.
Truck .25
B. Roller

0.16

0.500

.5 Vibrator

0.02

0.056

.056 M.
Crane

0.13

0.01

0.05

0.12

0.00

0.4

1.2

0.6

0.0

Page 17 of 63

0.03

1.3

0.4
1.6

0.0

0.7

0.2
0.0

0.1

0.056

.056 M.
Crane

0.28

0.07

0.2

0.0

0.056

.056 M.
Crane

0.04

0.01

1.3

1.6

1.8

1.3

2.0

6.0
47.8

0.0

18.8

0.0

0.0

0.0

0.0

1.000

1 Vibrator

0.05

0.11

0.0

0.056

.056 M.
Crane

0.22

0.04

0.7

0.0

0.056

.056 M.
Crane

0.20

0.04

0.1

0.0

0.056

.056 M.
Crane

0.03

0.01

1.6

0.1

0.0

0.0

0.0

0.0

0.0

0.3

0.5

1.4

2.8

0.0

18.8

0.0

0.8

0.7

41.8

0.1

0.0

0.1

6.750

0.5 Shovel
6 D.
Truck .25
B. Roller

0.26

1.000

1 Vibrator

3.10

0.01

0.07

0.09

0.00

20.9

1.2

0.056

.056 M.
Crane

14.06

1.17

18.8

1.1

0.056

.056 M.
Crane

12.65

1.05

3.0

0.2

0.056

.056 M.
Crane

2.01

0.17

42.7

2.4

0.0

0.0

0.0

0.0

0.0

1.000

Page 18 of 63

1 Vibrator

0.01

2.39

0.3

0.2

0.0
0.4

0.0

14.9

5.2
0.0

14.9

2.0

0.7

0.3
2.3

0.6

0.0

0.0

0.056

.056 M.
Crane

0.06

0.01

0.2

0.0

0.056

.056 M.
Crane

0.05

0.01

0.0

0.0

0.056

.056 M.
Crane

0.01

0.00

0.2

10.3

15.5

0.2

0.3

0.0

0.0

0.0

0.0

0.0

0.0

1.000

1 Vibrator

1.28

0.02

5.2

0.3

0.056

.056 M.
Crane

4.04

0.29

14.9

0.8

0.056

.056 M.
Crane

11.64

0.83

2.6

0.1

0.056

.056 M.
Crane

2.02

0.14

22.6

1.3

0.0

0.0

0.0

0.0

0.0

1.000

1 Vibrator

0.10

1.26

1.0

0.1

0.056

.056 M.
Crane

0.56

0.06

0.7

0.0

0.056

.056 M.
Crane

0.40

0.04

0.1

0.0

0.056

.056 M.
Crane

0.08

0.01

0.7

1.9

0.3

0.1

0.0

0.0

0.0

0.0

0.0

0.0

1.000

1 Vibrator

0.04

0.056

.056 M.
Crane

0.14

Page 19 of 63

0.10

0.02

0.8

0.3
0.8

0.0

17.8

5.6
0.0

17.8

10.4

15.0

5.2
15.7

0.0

0.0

0.056

.056 M.
Crane

0.40

0.04

0.1

0.0

0.056

.056 M.
Crane

0.07

0.01

0.8

39.5

45.1

0.8

15.0

1.8

0.6

1.2

0.1

0.0

0.0

0.0

0.0

0.0

1.000

1 Vibrator

0.07

2.93

19.8

1.1

0.056

.056 M.
Crane

13.27

1.11

17.8

1.0

0.056

.056 M.
Crane

11.94

1.00

2.8

0.2

0.056

.056 M.
Crane

1.90

0.16

40.3

2.3

0.0

0.0

0.0

0.0

0.0

1.000

1 Vibrator

1.30

2.26

5.2

0.3

0.056

.056 M.
Crane

4.10

0.29

15.0

0.8

0.056

.056 M.
Crane

11.79

0.84

2.6

0.1

0.056

.056 M.
Crane

2.05

0.15

22.9

1.3

0.0

0.0

0.0

0.0

0.0

1.000

1 Vibrator

0.09

1.28

0.9

0.0

0.056

.056 M.
Crane

0.49

0.05

0.6

0.0

0.056

.056 M.
Crane

0.35

0.04

Page 20 of 63

0.1

0.0

0.056

.056 M.
Crane

0.07

13.4

13.4

0.8

0.056

.056 T.
Crane

10.52

1.0

1.0

10.1

10.1

4.9

4.9

0.3

0.056

.056 T.
Crane

3.85

5.7

5.7

0.3

0.056

.056 T.
Crane

0.63

5.0

0.3

0.056

.056 T.
Crane

3.96

9.4

9.4

0.5

0.056

.056 T.
Crane

7.34

0.8

0.8

0.0

0.056

.056 T.
Crane

0.62

0.3

5.0

2.1

4.3

0.9

0.9

0.0

0.056

.056 T.
Crane

0.69

1.0

1.0

0.1

0.056

.056 T.
Crane

0.69

1.6

1.6

0.1

0.056

.056 T.
Crane

1.26

5.6

0.3

0.056

.056 T.
Crane

3.78

1.7

1.7

0.1

0.056

.056 T.
Crane

1.31

1.6

1.6

0.1

0.056

.056 T.
Crane

1.27

5.6

1.6
3.8
Page 21 of 63

0.01

4.2
0.2

0.2

1.3

1.3

0.3

0.3

0.0

0.056

.056 T.
Crane

0.21

0.8

0.8

0.0

0.056

.056 T.
Crane

0.09

0.3

0.3

0.0

0.056

.056 T.
Crane

0.23

0.2

0.2

0.0

0.056

.056 T.
Crane

0.13

3.1

3.1

0.2

0.056

.056 T.
Crane

2.40

0.9

0.9

0.0

0.056

.056 T.
Crane

0.69

0.1

0.0

0.056

.056 T.
Crane

0.07

0.8

0.056

.056 T.
Crane

10.92

0.1
0.2
0.6
0.2

13.9

13.9

1.0

1.0

10.8

10.8

4.4

4.4

0.2

0.056

.056 T.
Crane

3.43

4.7

4.7

0.3

0.056

.056 T.
Crane

0.52

4.7

0.3

0.056

.056 T.
Crane

3.70

10.4

10.4

0.6

0.056

.056 T.
Crane

8.15

1.1

1.1

0.1

0.056

.056 T.
Crane

0.47

4.7

2.1

4.3

Page 22 of 63

1.1

1.1

0.1

0.056

.056 T.
Crane

0.84

1.3

1.3

0.1

0.056

.056 T.
Crane

0.84

1.5

1.5

0.1

0.056

.056 T.
Crane

1.17

5.2

0.3

0.056

.056 T.
Crane

3.50

1.6

1.6

0.1

0.056

.056 T.
Crane

1.27

1.8

1.8

0.1

0.056

.056 T.
Crane

1.40

5.2

1.3
3.7
3.7
0.2

0.2

1.2

1.2

0.3

0.3

0.0

0.056

.056 T.
Crane

0.20

0.7

0.7

0.0

0.056

.056 T.
Crane

0.08

0.3

0.3

0.0

0.056

.056 T.
Crane

0.23

0.2

0.2

0.0

0.056

.056 T.
Crane

0.13

2.5

2.5

0.1

0.056

.056 T.
Crane

1.98

0.3

0.3

0.0

0.056

.056 T.
Crane

0.22

0.1

0.0

0.056

.056 T.
Crane

0.07

0.1
0.2
0.6
0.2

Page 23 of 63

0.11
0.30
0.14

1.37

0.69

4.53

4.53

1.000

1
Excavato
r

0.69

0.69

1.000

1 M.
Crane

9.60

0.250

.25 Bob
Cat

0.06

4.500

0.5
Shovel 3
Dump
Truck .5
S. Roller
.5 Bob
Cat

0.20
0.02

2.54

0.85

22.66

0.69

0.40
0.01

1.27

2.54

53.35

0.01

0.42

2.54

0.42

0.42

15.31

15.31

0.59

0.59

0.19

0.19

0.05

0.250

.25 M.
Crane

0.58

0.05

0.85

0.43

0.500

..5 M.
Crane

4.25

0.43

Page 24 of 63

0.05

0.05

0.03

0.500

.5 M.
Crane

0.31

0.03

10.00
6.25

6.25

0.59

0.59

0.250

.25 M.
Crane

0.500

..5 M.
Crane

4.85
15.51

15.51

0.59

0.59

0.19

0.19

0.05

0.250

.25 M.
Crane

0.58

0.05

0.85

0.85

0.43

0.500

..5 M.
Crane

4.25

0.43

0.05

0.05

0.03

0.500

.5 M.
Crane

0.31

0.03

10.00
6.25

6.25

0.59

0.59

0.250

.25 M.
Crane

0.500

..5 M.
Crane

4.85

Page 25 of 63

Page 26 of 63

T - D

Vibrator Excavator

0.07

Page 27 of 63

Tower
Crane

0.07

0.16

0.16

0.01

0.01

0.001

Page 28 of 63

0.39

0.01

0.03

0.03

0.08

Page 29 of 63

0.08

0.01

0.01

0.00

Page 30 of 63

0.00

0.01

0.01

0.26

0.26

0.00

Page 31 of 63

0.00

0.09

0.09
0.01

0.01

0.00

Page 32 of 63

0.00

0.24

0.24

0.09

0.09
0.01

Page 33 of 63

0.75

0.28

0.32

0.28

0.52

0.04

0.05

0.06

0.09

0.32

0.09

0.09

Page 34 of 63

0.01

0.04

0.02

0.01

0.17

0.05

0.01

0.78

0.25

0.26

0.26

0.58

0.06

Page 35 of 63

0.06

0.07

0.08

0.29

0.09

0.10

0.01

0.04

0.02

0.01

0.14

0.02

0.01

Page 36 of 63

4.53

Page 37 of 63

Page 38 of 63

Page 39 of 63

Activity

Activity

SUB

ID

Description

ACTIVITY

Unit

QTY (F)

Prod. Rate (G)

Days (H)

(unit/day)

(F/G)

Item

Tot. Man
(I)

Crew
Desc.

Tot. Mdays (K)

OD (O)

(H x I)

Manpower
/day
(N/O)

M
Carpenter

Mason

Steel
Fixer

Helper

N - D

Operator

Driver

Tot. Eqmt
(X)

S
Technicia
n

Painter

Alum.
Tech

Eqmt
Desc.

Waterpro
ofer

Tot. Edays (Z)


(H x I)

E
Dozer

Shovel

Dump T.

B. Roller

T - D

B. Cat

S. Roller

S
M. Crane

Vibrator Excavator

Tower
Crane

SITEWORKS
Z0U34-0000
Z0U34-0010

Site Clearing

M2

Setting-out / Layout

1,502.00

4,200.00

1 Operator

0.36

2.000 1 Helper

0.72

0.72

6.32

6.32

4.65

2.33

160.08

76.00

2.11

2 Carpenter
3.000 1 Helper

953.00

409.50

2.33

2.000 1 Helper

1.61

0.75
Operator
8.250 6 Driver
1.5 Helper

0.36
4.21

0.36

1.000 1 Dozer

0.36

0.36

0.47

1.000 1 Dozer

2.33

0.47

0.48

0.24

1.93

0.75
6.750 Shovel 6
D. Truck

0.95

0.71

1.93

2.11

SUBSTRUCTURE
Z0U34-0020

Excavation for footings + Disposal of Materials

For
M3
Excavation
For
Disposal

M3

555.00

345.60

1 Operator

13.25

0.47

4.42

Z0U34-0030

Formation Level & Compaction

M3

238

Z0U34-0040

Anti-Termite Applications (Under PCC Footings)

M2

571

252.00

202.50

0.94

2.82

.75
Operator
6.250 4 Driver
1.5 Helper

2.95

2 Technican

2.82

2.82

8.77

1.25

0.18

0.18

76.35

25.45

Z0U34-0050

Backfill & Compaction upto bot. of PCC Tie-Beam

M3

268

252.00

1.06

8.250

Z0U34-0060

Anti-Termite Applications (Under PCC Tie-Beam)

M2

37

202.50

0.18

1.000

2 Technican

8.250

0.75
Operator
6 Driver
1.5 Helper
2 Technican

Z0U34-0070

Backfill & Compaction up to bot of PCC Grd. Slab

M3

2,332.00

252.00

9.25

Z0U34-0080

Anti-Termite Applications (Under PCC Grade Slab)

M2

894

202.50

4.41

1.000

Z0U34-0090

Shutters + 50mm Thk. PCC Under Footings

M2

982

270.00

3.64

11.000

Z0U34-0100

50mm Protection Screed (Over W.P. Membrane-Ftg.)

M2

2,246.00

270.00

8.32

11.000

RCC For Footings

1.000

0.75
Operator
6 Driver
1.5 Helper

Z0U34-0110

5.90

1 Mason
10 Helper
1 Mason
10 Helper

1.82

18.19

4.16

41.59

45.75

35.24

35.24

976.00

12.00

81.33

3.056

2 Carpenter
1 Helper
.056
Operator

248.55

62.14

kg

43,920.00

250.00

175.68

2.056

1 Steel
Fixer 1
Helper
.056
Operator

361.20

120.40

Deshutterin
g

M2

976.00

35.00

27.89

3.056

2 Carpenter
1 Helper
.056
Operator

85.22

42.61

Casting

M3

81.00

1.90

22.000

Formworks

M2

4.00

154.00

3.056

M2

Rebars

10
Z0U34-0120

RCC Necks Columns / Walls + MEP Sleeves

154

616.00

2 Carpenter
16 Helper
4 Mason

41.83

2 Carpenter
1 Helper
.056
Operator

470.62

94.12

284.96

71.24

67.23

33.62

Rebars

kg

27,720.00

200.00

138.60

2.056

Deshutterin
g

M2

616.00

28.00

22.00

3.056

2 Carpenter
1 Helper
.056
Operator

12
Z0U34-0130

Shutters + 50mm Thk. PCC Under Tie-Beams

M2

63

270.00

0.23

11.000

Z0U34-0140

50mm Screed (Over W.P. Membrane-T.B.)

M2

144

270.00

0.53

11.000

Z0U34-0150

RCC Tie Beams + MEP Sleeves

1 Mason
10 Helper
1 Mason
10 Helper

4.03

100.85

25.21

132.00

4.00

33.00

3.056

2 Carpenter
1 Helper
.056
Operator

kg

5,940.00

250.00

23.76

2.056

1 Steel
Fixer 1
Helper
.056
Operator

48.85

16.28

M2

132.00

28.00

4.71

3.056

2 Carpenter
1 Helper
.056
Operator

14.41

7.20

0.12

0.12

Formworks

M2

Rebars

Deshutterin
g

10

Z0U34-0160

RCC Kickers Over Tie-Beam

180.00

0.01

22.000

4.00

4.00

1.00

3.056

2 Carpenter
1 Helper
.056
Operator

3.06

3.06

kg

180.00

250.00

0.72

2.056

1 Steel
Fixer 1
Helper
.056
Operator

1.48

1.48

M2

4.00

28.00

0.14

3.056

2 Carpenter
1 Helper
.056
Operator

0.44

0.44

M3

Formworks

M2

Rebars

Deshutterin
g

4
50mm Thk. PCC Under Grade Slab

M2

1,537.00

270.00

5.69

11.000

1 Mason
10 Helper

62.62

31.31

Z0U34-0180

Mesh + Filler Board & RCC For Grade Slab

M3

208

180.00

1.16

26.000

1 Carpenter
18 Helper
6 Mason
1 Steel
Fixer

30.04

10.01

Z0U34-0190

50mm Thk. PCC Steps & Ramps

M2

10

270.00

0.04

11.000

1 Mason
10 Helper

0.41

0.20

0.72

0.09

41.33

20.66

Z0U34-0200

Steps & Ramps Works + Place Conc.

M3

180.00

0.03

26.000

Z0U34-0210

Waterproofing Membrane (Over PCC Footings)

M2

1,047.00

152.00

6.89

6.000

4
Waterproofe
r 2 Helper

17.57

25.67

11.55

3.67
-

11.55

6.60

2.38

0.94
-

2.38

0.50

0.18

0.07
0.57

Z0U34-0170

1 Carpenter
18 Helper
6 Mason
1 Steel
Fixer

5.58

7.54

1 Carpenter
16 Helper
4 Mason
1 Steel
Fixer

Casting

17.57

0.24

1.89

0.12

0.11

0.91

6.750

0.5 Shovel
6 D.
Truck .25
B. Roller

7.18

0.11

0.86

0.05

2.31

18.51

6.750

0.5 Shovel
6 D.
Truck .25
B. Roller

62.46

2.19

17.53

1.10

0.500

.5 Vibrator

0.68

0.18

2.85

0.39

2.31

0.98

0.056

.056 M.
Crane

9.84

0.98

2.79

0.16

0.056

.056 M.
Crane

1.56

0.16

28.49

1.60

1.000

1 Vibrator

1.90

0.02

1.60

0.72

0.056

.056 M.
Crane

8.62

0.72

11.55

0.65

0.056

.056 M.
Crane

7.76

0.65

1.83

0.10

0.056

.056 M.
Crane

1.23

1.47

.5 Vibrator

0.09

1.47

0.18

0.056

.056 M.
Crane

1.85

0.18

2.38

0.13

0.056

.056 M.
Crane

1.33

0.13

0.47

0.03

0.056

.056 M.
Crane

0.26

0.03

0.34

0.500

.5 Vibrator

0.00

0.34

0.01

0.056

.056 M.
Crane

0.06

0.01

0.18

0.01

0.056

.056 M.
Crane

0.04

0.01

0.04

0.00

0.056

.056 M.
Crane

0.01

0.00

0.03

0.01

0.001

0.25

0.47

0.16

0.01

3.30

6.15

0.10
-

0.500

0.16

12.83

26.22

0.07

0.03

28.46

0.39

0.02

0.01

0.07

17.57

2.67

4.03

0.46

0.27

22.000

33

4.49

1.93

4.55

1.17

0.18

M3

1.89

1.93

0.24

.056 M.
Crane

0.12

2.93

0.5 Shovel
4 D.
4.750
Truck .25
B. Roller

0.24

0.056

1.28

0.47

0.46

5.87

10.84

8.13

2.57

180.00

Casting

16.27

29.33

1 Carpenter
16 Helper
4 Mason
1 Steel
Fixer

4.41

21.84

41.83

1 Steel
Fixer 1
Helper
.056
Operator

4.63

4.41

0.18

20.00

26.000

Formworks

0.23

91.50

0.35

2.82

1.36

244

0.71

4.41

180.00

M3

40.01

1 Carpenter
18 Helper
6 Mason
1 Steel
Fixer

Casting

6.93

1.000

1 Vibrator

1.16

0.39

1.000

1 Vibrator

0.03

0.01

0.19

0.00

0.06

6.89

Page 40 of 63

13.78

Z0U34-0220

Water Proofing For Neck Column & Wall & Footing

M2

2,021.00

152.00

13.30

6.000

4
Waterproofe
r 2 Helper

79.78

26.59

8.86

17.73

Z0U34-0230

Waterproofing Membrane (Over PCC Tie-beams)

M2

67

152.00

0.44

6.000

4
Waterproofe
r 2 Helper

2.64

1.32

0.44

0.88

Z0U34-0240

Waterproofing Membrane For Tie Beams

M2

121

152.00

0.80

6.000

4
Waterproofe
r 2 Helper

4.78

1.59

0.53

1.06

1 Mason
10 Helper

3.14

3.14

4
Waterproofe
r 2 Helper

3.24

3.24

Z0U34-0250

50mm Thk. PCC Under Base of Tank

M2

77

270.00

0.29

11.000

Z0U34-0260

Waterproofing Membrane (Over PCC - Base)

M2

82

152.00

0.54

6.000

Z0U34-0270

50mm Protect'n Screed (Over W.P. Membrane-Base)

M2

176

270.00

0.65

11.000

1 Mason
10 Helper

7.17

7.17

5.49

5.49

Z0U34-0280

RCC Water Tank Base + Deshuttering

Casting

M3

Formworks

M2

38

152.00

180.00

0.21

26.000

1 Carpenter
18 Helper
6 Mason
1 Steel
Fixer

12.00

12.67

3.056

2 Carpenter
1 Helper
.056
Operator

38.71

38.71

56.25

56.25

13.27

13.27

Rebars

kg

6,840.00

250.00

27.36

2.056

1 Steel
Fixer 1
Helper
.056
Operator

Deshutterin
g

M2

152.00

35.00

4.34

3.056

2 Carpenter
1 Helper
.056
Operator

4
Z0U34-0290

RCC Wall W/MEP Pipes & Water Stop + Deshuttering

81.00

0.42

22.000

136.00

4.00

34.00

3.056

2 Carpenter
1 Helper
.056
Operator

kg

6,120.00

200.00

30.60

2.056

M2

136.00

28.00

4.86

Casting

M3

Formworks

M2

Rebars

Deshutterin
g

34

2 Carpenter
16 Helper
4 Mason

9.23

103.90

51.95

1 Steel
Fixer 1
Helper
.056
Operator

62.91

62.91

3.056

2 Carpenter
1 Helper
.056
Operator

14.84

14.84

1.16

1.16

7.64

3.82

14.80

14.80

3.82

Z0U34-0300

RCC Top Slab + Deshuttering for Water Tank

Casting

M3

8.00

180.00

0.04

26.000

Formworks

M2

40.00

16.00

2.50

3.056

2 Carpenter
1 Helper
.056
Operator

Rebars

kg

1,440.00

200.00

7.20

2.056

1 Steel
Fixer 1
Helper
.056
Operator

Deshutterin
g

M2

40.00

32.00

1.25

3.056

2 Carpenter
1 Helper
.056
Operator

3.82

0.65

6.84

2.17
-

6.84

13.60

6.12

1.94
-

6.12

1.00

1.44

0.50
1.50

2.16

6.52

6.33

15.54

2.85
1.08

8.50

9.23

1 Carpenter
18 Helper
6 Mason
1 Steel
Fixer

0.29

1.44

0.500

.5 Vibrator

0.11

0.03

3.17

0.18

0.056

.056 M.
Crane

0.71

0.18

6.84

0.38

0.056

.056 M.
Crane

1.53

0.38

1.09

0.06

0.056

.056 M.
Crane

0.24

11.09

0.62

0.06
-

1.000

1 Vibrator

0.42

0.62

0.38

0.056

.056 M.
Crane

1.90

0.38

6.12

0.34

0.056

.056 M.
Crane

1.71

0.34

0.97

0.05

0.056

.056 M.
Crane

0.27

0.05

0.78

1.000

1 Vibrator

0.04

0.78

0.03

0.056

.056 M.
Crane

0.14

0.03

1.44

0.08

0.056

.056 M.
Crane

0.40

0.08

0.25

0.01

0.056

.056 M.
Crane

0.07

0.01

0.12

0.08

0.01

0.50

2.19

0.08

6.80

13.89

0.03

0.12

0.01

Z0U34-0310

Water Proofing Membrane all around outside surfc

M2

172

152.00

1.13

6.000

4
Waterproofe
r 2 Helper

6.79

3.39

1.13

2.26

Z0U34-0320

Protection Board all around outside surface

M2

172

152.00

1.13

6.000

4
Waterproofe
r 2 Helper

6.79

3.39

1.13

2.26

Z0U34-0330

Backfill around Water tank walls

M3

252.00

0.02

8.250

0.75
Operator
6 Driver
1.5 Helper

0.20

0.07

0.01

Z0U34-0340

G.R.P. Lining around inside + S.S. Lader & Door

M2

221

20.00

11.05

2.000

22.10

7.37

3.68

3.68

Z0U34-0350

50mm Thk. PCC Under Base of Elevator Shaft

M2

14

270.00

0.05

11.000

0.57

0.57

0.05

0.52

4
Waterproofe
r 2 Helper

1 Mason
1 Helper
1 Mason
10 Helper

Z0U34-0360

Waterproofing Membrane (Over PCC - Base)

M2

15

152.00

0.10

6.000

0.59

0.59

Z0U34-0370

50mm Protect'n Screed (Over W.P. Membrane-Base)

M2

32

270.00

0.12

11.000

1 Mason
10 Helper

1.30

1.30

1.01

1.01

7.13

7.13

10.36

10.36

2.44

2.44

Z0U34-0380

RCC Elevator Shaft Base + Deshuttering

180.00

0.04

26.000

1 Carpenter
18 Helper
6 Mason
1 Steel
Fixer

28.00

12.00

2.33

3.056

2 Carpenter
1 Helper
.056
Operator

kg

1,260.00

250.00

5.04

2.056

1 Steel
Fixer 1
Helper
.056
Operator

Deshutterin
g

M2

28.00

35.00

0.80

3.056

2 Carpenter
1 Helper
.056
Operator

Casting

M3

81.00

0.05

22.000

Formworks

M2

16.00

4.00

4.00

3.056

2 Carpenter
1 Helper
.056
Operator

Rebars

kg

720.00

200.00

3.60

2.056

Deshutterin
g

M2

16.00

28.00

0.57

3.056

Casting

M3

Formworks

M2

Rebars

4
Z0U34-0390

RCC Wall W/ MEP Cond. + Deshuttering

2 Carpenter
16 Helper
4 Mason

1.09

12.22

6.11

1 Steel
Fixer 1
Helper
.056
Operator

7.40

7.40

2 Carpenter
1 Helper
.056
Operator

1.75

1.75

0.05

6.750

0.16

0.01

0.05

0.00

0.39

1.19

1.17

1.26

0.40
-

1.26

1.60

0.72

0.23
1.83

0.5 Shovel
6 D.
Truck .25
B. Roller

0.20
0.12

1.57

1.09

0.01

0.72

0.500

.5 Vibrator

0.02

0.00

0.58

0.03

0.056

.056 M.
Crane

0.13

0.03

1.26

0.07

0.056

.056 M.
Crane

0.28

0.07

0.20

0.01

0.056

.056 M.
Crane

0.04

0.01

1.000

1 Vibrator

0.05

2.04

0.11

0.11

0.80

0.04

0.056

.056 M.
Crane

0.22

0.04

0.72

0.04

0.056

.056 M.
Crane

0.20

0.04

0.11

0.01

0.056

.056 M.
Crane

0.03

1.63

0.09

0.00

0.01

0.01
-

0.09

0.01

Z0U34-0400

Water Proofing Membrane all around outside surfc

M2

60

152.00

0.39

6.000

4
Waterproofe
r 2 Helper

2.37

0.79

0.26

0.53

Z0U34-0410

Protection Board all around outside surface

M2

216

152.00

1.42

6.000

4
Waterproofe
r 2 Helper

8.53

4.26

1.42

2.84

Page 41 of 63

Z0U34-0420

Backfill around the Lift's Pit wall

Z0U34-0430

RCC For Wall/Col. From Top of Grade Slab-1L

M3

9.89

252.00

0.04

8.250

251

81.00

3.10

22.000

0.75
Operator
6 Driver
1.5 Helper
2 Carpenter
16 Helper
4 Mason

0.32

0.11

68.17

68.17

Casting

M3

Formworks

M2

1,004.00

4.00

251.00

3.056

2 Carpenter
1 Helper
.056
Operator

767.06

153.41

Rebars

kg

45,180.00

200.00

225.90

2.056

1 Steel
Fixer 1
Helper
.056
Operator

464.45

116.11

Deshutterin
g

M2

1,004.00

28.00

35.86

3.056

2 Carpenter
1 Helper
.056
Operator

109.58

54.79

Casting

M3

81.00

0.01

22.000

Formworks

M2

4.00

4.00

1.00

3.056

Rebars

kg

180.00

200.00

0.90

Deshutterin
g

M2

4.00

28.00

0.14

12
Z0U34-0440

Columns From Top of Grade Slab-1L (Canopy)

2 Carpenter
16 Helper
4 Mason

RCC Slab / Beam - 1L

0.27

2 Carpenter
1 Helper
.056
Operator

3.06

1.53

2.056

1 Steel
Fixer 1
Helper
.056
Operator

1.85

0.93

3.056

2 Carpenter
1 Helper
.056
Operator

0.44

0.44

Casting

M3

231.00

180.00

1.28

26.000

Formworks

M2

1,155.00

16.00

72.19

3.056

2 Carpenter
1 Helper
.056
Operator

220.61

36.77

Rebars

kg

41,580.00

200.00

207.90

2.056

1 Steel
Fixer 1
Helper
.056
Operator

427.44

85.49

Deshutterin
g

M2

1,155.00

32.00

36.09

3.056

2 Carpenter
1 Helper
.056
Operator

110.30

55.15

33.37

33.37

14
Z0U34-0460

RCC For Stair/Landings @ G.L. - 1L

Casting

M3

Formworks

M2

40.00

81.00

0.10

22.000

4.00

10.00

3.056

2.17

2 Carpenter
1 Helper
.056
Operator

30.56

7.64

14.80

4.93

4.37

2.18

Rebars

kg

1,440.00

200.00

7.20

2.056

1 Steel
Fixer 1
Helper
.056
Operator

Deshutterin
g

M2

40.00

28.00

1.43

3.056

2 Carpenter
1 Helper
.056
Operator

1.16

1.16

7.64

1.91

14.80

4.93

3.82

3.82

10

Z0U34-0470

RCC Canopy

Casting

M3

8.00

180.00

0.04

26.000

Formworks

M2

40.00

16.00

2.50

3.056

2 Carpenter
1 Helper
.056
Operator

Rebars

kg

1,440.00

200.00

7.20

2.056

1 Steel
Fixer 1
Helper
.056
Operator

Deshutterin
g

M2

40.00

32.00

1.25

3.056

2 Carpenter
1 Helper
.056
Operator

Z0U34-0480

RCC For Wall/Col. From Top of 1L-2L

Casting

M3

Formworks

M2

Rebars

Deshutterin
g

237

64.37

2 Carpenter
1 Helper
.056
Operator

724.27

144.85

2.056

1 Steel
Fixer 1
Helper
.056
Operator

438.54

109.64

3.056

2 Carpenter
1 Helper
.056
Operator

103.47

51.73

33.80

33.80

2.93

22.000

948.00

4.00

237.00

3.056

kg

42,660.00

200.00

213.30

M2

948.00

28.00

33.86

12

Z0U34-0490

RCC Slab / Beam - 2L

Casting

M3

234.00

180.00

1.30

26.000

Formworks

M2

1,170.00

16.00

73.13

3.056

2 Carpenter
1 Helper
.056
Operator

223.47

37.25

Rebars

kg

42,120.00

200.00

210.60

2.056

1 Steel
Fixer 1
Helper
.056
Operator

432.99

86.60

Deshutterin
g

M2

1,170.00

32.00

36.56

3.056

2 Carpenter
1 Helper
.056
Operator

111.74

55.87

Casting

M3

81.00

0.09

22.000

14
Z0U34-0500

RCC for Stair/Landings @ 1L-2L

2 Carpenter
16 Helper
4 Mason

1.90

0.05
-

0.15

10.31

14.85

5.16
-

14.85

2.00

0.72

0.29
-

0.72

0.56

0.80

0.28
-

0.80

39.50

17.78

5.64
45.14

1 Carpenter
18 Helper
6 Mason
1 Steel
Fixer

18.83

0.15

0.83

64.37

81.00

0.33

2.29

9
2 Carpenter
16 Helper
4 Mason

5.98

15.47

2.17

1 Carpenter
18 Helper
6 Mason
1 Steel
Fixer

18.83

0.38

1 Carpenter
18 Helper
6 Mason
1 Steel
Fixer

2 Carpenter
16 Helper
4 Mason

41.83

47.81

0.27

Z0U34-0450

0.02

17.78

10.45

15.04

5.22
15.67

1.90

Page 42 of 63

15.04

0.01

0.08

6.750

0.5 Shovel
6 D.
Truck .25
B. Roller

0.26

1.000

1 Vibrator

3.10

0.01

0.07

0.00

0.26

20.92

1.17

0.056

.056 M.
Crane

14.06

1.17

18.83

1.05

0.056

.056 M.
Crane

12.65

1.05

2.99

0.17

0.056

.056 M.
Crane

2.01

0.17

1.000

1 Vibrator

0.01

42.73

2.39

2.39

0.17

0.01

0.056

.056 M.
Crane

0.06

0.01

0.15

0.01

0.056

.056 M.
Crane

0.05

0.01

0.02

0.00

0.056

.056 M.
Crane

0.01

0.34

0.02

1 Vibrator

1.28

0.02

0.29

0.056

.056 M.
Crane

4.04

0.29

14.85

0.83

0.056

.056 M.
Crane

11.64

0.83

2.58

0.14

0.056

.056 M.
Crane

2.02

0.14

1.26

1.000

1 Vibrator

0.10

1.26

0.06

0.056

.056 M.
Crane

0.56

0.06

0.72

0.04

0.056

.056 M.
Crane

0.40

0.04

0.14

0.01

0.056

.056 M.
Crane

0.08

0.01

0.10

1.000

1 Vibrator

0.04

0.10

0.02

0.056

.056 M.
Crane

0.14

0.02

0.80

0.04

0.056

.056 M.
Crane

0.40

0.04

0.14

0.01

0.056

.056 M.
Crane

0.07

0.07

1 Vibrator

0.07

2.93

1.11

0.056

.056 M.
Crane

13.27

1.11

17.78

1.00

0.056

.056 M.
Crane

11.94

1.00

2.82

0.16

0.056

.056 M.
Crane

1.90

0.16

2.26

1.000

1 Vibrator

1.30

2.26

0.29

0.056

.056 M.
Crane

4.10

0.29

15.04

0.84

0.056

.056 M.
Crane

11.79

0.84

2.61

0.15

0.056

.056 M.
Crane

2.05

0.15

1.000

1 Vibrator

0.09

1.28

0.01

0.00

0.24

0.09

5.22

22.88

0.09

0.24

19.75

40.35

0.01
-

1.000

0.00

0.28

1.22

0.00

0.01

1.00

1.86

0.09

5.16

22.58

0.00
-

1.000

0.26
0.00

1.28

0.09
0.01

Z0U34-0510
Z0U34-0520
Z0U34-0530

RCC For Wall/Col. From Top of 2L-3L


RCC Slab / Beam - 3L
RCC For Stair/Landings @ 2L-3L

Z0U34-0540

RCC For Wall/Col. From Top of 3L-4L

Formworks

M2

35.00

4.00

8.75

3.056

2 Carpenter
1 Helper
.056
Operator

26.74

6.69

Rebars

kg

1,260.00

200.00

6.30

2.056

1 Steel
Fixer 1
Helper
.056
Operator

12.95

4.32

Deshutterin
g

M2

35.00

28.00

1.25

3.056

2 Carpenter
1 Helper
.056
Operator

3.82

1.91

M3
M3
M3

10
12
14
10

237
234
7

Casting

M3

Formworks

M2

236

944.00

81.00

2.91

22.000

4.00

236.00

3.056

2 Carpenter
16 Helper
4 Mason

64.10

2 Carpenter
1 Helper
.056
Operator

721.22

144.24

436.69

109.17

103.03

51.52

Rebars

kg

42,480.00

200.00

212.40

2.056

Deshutterin
g

M2

944.00

28.00

33.71

3.056

2 Carpenter
1 Helper
.056
Operator

12

Z0U34-0550

RCC Slab / Beam - 4L

Z0U34-0560

RCC For Stair/Landings @ 3L-4L

Z0U34-0570

RCC For Wall/Col. From Top of 4L-RoofL

Casting

M3

237.00

180.00

1.32

26.000

Formworks

M2

1,185.00

16.00

74.06

3.056

2 Carpenter
1 Helper
.056
Operator

226.34

37.72

Rebars

kg

42,660.00

200.00

213.30

2.056

1 Steel
Fixer 1
Helper
.056
Operator

438.54

87.71

Deshutterin
g

M2

1,185.00

32.00

37.03

3.056

2 Carpenter
1 Helper
.056
Operator

113.17

56.58

34.23

34.23

14
10

Casting

M3

Formworks

M2

Rebars

Deshutterin
g

148

2 Carpenter
16 Helper
4 Mason

40.20

2 Carpenter
1 Helper
.056
Operator

452.29

113.07

2.056

1 Steel
Fixer 1
Helper
.056
Operator

273.86

91.29

3.056

2 Carpenter
1 Helper
.056
Operator

64.61

32.31

1.83

22.000

592.00

4.00

148.00

3.056

kg

26,640.00

200.00

133.20

M2

592.00

28.00

21.14

10

Z0U34-0580

RCC Wall/Col. For Staircase From Top of 4L-RoofL

Casting

M3

Formworks

M2

12.00

81.00

0.04

22.000

4.00

3.00

3.056

2 Carpenter
16 Helper
4 Mason

0.81

2 Carpenter
1 Helper
.056
Operator

9.17

4.58

5.55

2.78

1.31

1.31

Rebars

kg

540.00

200.00

2.70

2.056

1 Steel
Fixer 1
Helper
.056
Operator

Deshutterin
g

M2

12.00

28.00

0.43

3.056

2 Carpenter
1 Helper
.056
Operator

Z0U34-0590

RCC Slab / Beam - RoofL

Casting

M3

152.00

180.00

0.84

26.000

Formworks

M2

760.00

16.00

47.50

3.056

2 Carpenter
1 Helper
.056
Operator

145.16

29.03

Rebars

kg

27,360.00

200.00

136.80

2.056

1 Steel
Fixer 1
Helper
.056
Operator

281.26

70.32

Deshutterin
g

M2

760.00

32.00

23.75

3.056

2 Carpenter
1 Helper
.056
Operator

72.58

36.29

21.96

21.96

12
Z0U34-0600

RCC For Stair/Landings @ 4L-RoofL

81.00

0.04

22.000

15.00

4.00

3.75

3.056

2 Carpenter
1 Helper
.056
Operator

kg

540.00

200.00

2.70

2.056

M2

15.00

28.00

0.54

Casting

M3

Formworks

M2

Rebars

Deshutterin
g

2 Carpenter
16 Helper
4 Mason

0.81

0.81

11.46

3.82

1 Steel
Fixer 1
Helper
.056
Operator

5.55

1.85

3.056

2 Carpenter
1 Helper
.056
Operator

1.64

1.64

26.000

1 Carpenter
18 Helper
6 Mason
1 Steel
Fixer

RCC Slab / Beam for Staircase - RoofL

Casting

M3

4.00

180.00

0.02

0.58

17.70

10.58

15.24

5.29
-

15.24

29.60

13.32

4.23
-

13.32

1.00

0.45

0.14
-

0.45

7.92

11.40

3.96
11.88

Z0U34-0610

5.62

1.14

1 Carpenter
18 Helper
6 Mason
1 Steel
Fixer

0.63

17.70

33.83

0.81

39.33

15.87

40.20

81.00

0.25

44.95

1 Carpenter
18 Helper
6 Mason
1 Steel
Fixer

M3

0.63

2.00

64.10

1 Steel
Fixer 1
Helper
.056
Operator

1.75

11.40

0.94

0.34

0.13
1.07

0.58

0.34

0.88

0.05

0.056

.056 M.
Crane

0.49

0.05

0.63

0.04

0.056

.056 M.
Crane

0.35

0.04

0.13

0.01

0.056

.056 M.
Crane

0.07

0.01

1.63

0.09

1.000

1 Vibrator

0.09

2.91

1.10

0.056

.056 M.
Crane

13.22

1.10

17.70

0.99

0.056

.056 M.
Crane

11.89

0.99

2.81

0.16

0.056

.056 M.
Crane

1.89

40.18

2.25

1 Vibrator

1.32

2.25

0.30

0.056

.056 M.
Crane

4.15

0.30

15.24

0.85

0.056

.056 M.
Crane

11.94

0.85

2.65

0.15

0.056

.056 M.
Crane

2.07

0.15

1.30

1.000

1 Vibrator

1.83

1.30

0.83

0.056

.056 M.
Crane

8.29

0.83

13.32

0.75

0.056

.056 M.
Crane

7.46

0.75

2.11

0.12

0.056

.056 M.
Crane

1.18

0.12

1.69

1.000

1 Vibrator

0.04

1.69

0.03

0.056

.056 M.
Crane

0.17

0.03

0.45

0.03

0.056

.056 M.
Crane

0.15

0.03

0.07

0.00

0.056

.056 M.
Crane

0.02

0.06

1 Vibrator

0.84

0.06

0.22

0.056

.056 M.
Crane

2.66

0.22

11.40

0.64

0.056

.056 M.
Crane

7.66

0.64

1.98

0.11

0.056

.056 M.
Crane

1.33

0.11

0.97

1.000

1 Vibrator

0.04

0.97

0.03

0.056

.056 M.
Crane

0.21

0.03

0.34

0.02

0.056

.056 M.
Crane

0.15

0.02

0.07

0.00

0.056

.056 M.
Crane

0.03

0.00

0.05

1 Vibrator

0.02

0.18

0.01

0.07

0.00

0.47

0.87

0.09

0.07

3.96

17.34

0.00
-

1.000

0.01

0.50

1.02

0.24

0.18

14.80

30.23

0.09

5.29

23.17

0.16
-

1.000

0.01

0.24

19.67

1.000

Page 43 of 63

0.05

0.00

0.00

Formworks

M2

20.00

16.00

1.25

3.056

2 Carpenter
1 Helper
.056
Operator

3.82

1.27

Rebars

kg

720.00

200.00

3.60

2.056

1 Steel
Fixer 1
Helper
.056
Operator

7.40

3.70

Deshutterin
g

M2

20.00

32.00

0.63

3.056

2 Carpenter
1 Helper
.056
Operator

1.91

1.91

Casting

M3

81.00

0.30

22.000

Formworks

M2

96.00

4.00

24.00

3.056

Rebars

kg

4,320.00

200.00

21.60

Deshutterin
g

M2

96.00

28.00

3.43

7
Z0U34-0620

RCC For Lower Parapet

24

2 Carpenter
16 Helper
4 Mason

6.52

2 Carpenter
1 Helper
.056
Operator

73.34

18.34

2.056

1 Steel
Fixer 1
Helper
.056
Operator

44.41

14.80

3.056

2 Carpenter
1 Helper
.056
Operator

10.48

5.24

10
Z0U34-0630

RCC For Wall/Col. From Roof L-Top of Roof L

Casting

M3

Formworks

M2

Rebars

Deshutterin
g

10

2.72

2 Carpenter
1 Helper
.056
Operator

30.56

15.28

2.056

1 Steel
Fixer 1
Helper
.056
Operator

18.50

9.25

3.056

2 Carpenter
1 Helper
.056
Operator

4.37

4.37

2.46

2.46

0.12

22.000

40.00

4.00

10.00

3.056

kg

1,800.00

200.00

9.00

M2

40.00

28.00

1.43

Z0U34-0640

RCC Slab / Beam Top Roof Level

Casting

M3

17.00

180.00

0.09

26.000

Formworks

M2

85.00

16.00

5.31

3.056

2 Carpenter
1 Helper
.056
Operator

16.24

5.41

31.46

15.73

8.12

8.12

Rebars

kg

3,060.00

200.00

15.30

2.056

Deshutterin
g

M2

85.00

32.00

2.66

3.056

2 Carpenter
1 Helper
.056
Operator

Casting

M3

81.00

0.19

22.000

Formworks

M2

60.00

4.00

15.00

3.056

Rebars

kg

2,700.00

200.00

13.50

Deshutterin
g

M2

60.00

28.00

2.14

7
Z0U34-0650

RCC For Upper Parapet

15

2 Carpenter
16 Helper
4 Mason

4.07

2 Carpenter
1 Helper
.056
Operator

45.84

15.28

2.056

1 Steel
Fixer 1
Helper
.056
Operator

27.76

9.25

3.056

2 Carpenter
1 Helper
.056
Operator

6.55

6.55

RCC Eqmt. Pads + Railing

0.43

0.43

180.00

0.02

26.000

12.00

12.00

1.00

3.056

2 Carpenter
1 Helper
.056
Operator

3.06

0.76

kg

540.00

250.00

2.16

2.056

1 Steel
Fixer 1
Helper
.056
Operator

4.44

1.48

M2

12.00

35.00

0.34

3.056

2 Carpenter
1 Helper
.056
Operator

1.05

0.52

Casting

M3

Formworks

M2

Rebars

Deshutterin
g

2.16

0.69
-

10

2.16

3.33

1.50

0.48
-

1.50

1.52

2.19

0.76
-

2.19

3.75

1.69

0.54
4.29

1 Carpenter
18 Helper
6 Mason
1 Steel
Fixer

0.51

4.80

2.28

4.07

Z0U34-0660

3.81

1 Carpenter
18 Helper
6 Mason
1 Steel
Fixer

1 Steel
Fixer 1
Helper
.056
Operator

0.18

5.49

2.72

81.00

0.51

0.54

6.52

2 Carpenter
16 Helper
4 Mason

0.36

1.69

0.20

0.22

0.07
0.27

0.22

0.18

0.01

0.056

.056 M.
Crane

0.07

0.01

0.51

0.03

0.056

.056 M.
Crane

0.20

0.03

0.09

0.00

0.056

.056 M.
Crane

0.04

0.01

1.000

1 Vibrator

0.30

0.78

0.04

0.04

2.40

0.13

0.056

.056 M.
Crane

1.34

0.13

2.16

0.12

0.056

.056 M.
Crane

1.21

0.12

0.34

0.02

0.056

.056 M.
Crane

0.19

4.90

0.27

1 Vibrator

0.12

0.27

0.09

0.056

.056 M.
Crane

0.56

0.09

1.50

0.08

0.056

.056 M.
Crane

0.50

0.08

0.24

0.01

0.056

.056 M.
Crane

0.08

0.01

0.19

1.000

1 Vibrator

0.09

0.19

0.04

0.056

.056 M.
Crane

0.30

0.04

2.19

0.12

0.056

.056 M.
Crane

0.86

0.12

0.38

0.02

0.056

.056 M.
Crane

0.15

0.02

1.000

1 Vibrator

0.19

0.19

0.19

0.11

0.056

.056 M.
Crane

0.84

0.11

1.69

0.09

0.056

.056 M.
Crane

0.76

0.09

0.27

0.02

0.056

.056 M.
Crane

0.12

0.02

0.21

0.500

.5 Vibrator

0.01

0.21

0.01

0.056

.056 M.
Crane

0.06

0.01

0.22

0.01

0.056

.056 M.
Crane

0.12

0.01

0.03

0.00

0.056

.056 M.
Crane

0.02

0.00

0.02

0.02

0.01

0.02

0.00

0.10

0.35

0.02

1.88

3.83

0.03

0.01

0.76

3.32

0.02

1.67

3.40

0.02
-

1.000

0.00
0.03

0.02

0.00

MEP
FINISHES

M2

1,879.00

187.90

2.056

48.46

7.16

2.000

20.00

120.65

2.000

826

12.00

68.83

2.056

M2

113

10.00

11.30

2.056

I. Install False Ceiling (Susp. + Boarding) @ GL

M2

509

7.20

70.69

2.056

Z0U34-2770

I. Screed + Ceramic Tiles & Skirtings @ GL

M2

1572

12.00

131.00

2.056

Z0U34-2780

I. Screed + Non-Slip Ceramic Tiles &Skirtings@GL

M2

354

32.00

11.06

2.056

Z0U34-2790

I. Water Proofing + Screed on Wet Areas - GL

M2

683

64.00

10.67

6.000

Z0U34-2710

I. Hollow Block Works + Lintels @ Grnd Flr.

Z0U34-2720

I. Internal Plaster Accessories & Rush @ GL

M2

347.00

Z0U34-2730

I. Internal Plaster Works @ GL

M2

2,413.00

Z0U34-2740

I. Glazed Ceramic Tile @ GL

M2

Z0U34-2750

I. Block Works For Ducts @ Grnd Flr.

Z0U34-2760

10.00

1 Mason
1 Helper
.056
Operator
1 Mason
1 Helper
1 Mason
1 Helper
1 Mason
1 Helper
.056
Operator
1 Mason
1 Helper
.056
Operator
1 Carpenter
1 Helper
.056
Operator
1 Mason
1 Helper
.056
Operator
1 Mason
1 Helper
.056
Operator
4Waterproof
er
2 Helper

386.32

14

27.59

13.42

2.05

13.42

0.75

0.056

.056 T.
Crane

10.52

0.75

14.32

1.02

1.02

241.30

12

20.11

10.05

10.05

141.52

14

10.11

4.92

4.92

0.28

0.056

.056 T.
Crane

3.85

0.28

23.23

11.62

5.65

5.65

0.32

0.056

.056 T.
Crane

0.63

0.32

145.35

14

10.38

5.05

0.28

0.056

.056 T.
Crane

3.96

0.28

269.34

14

19.24

9.36

9.36

0.52

0.056

.056 T.
Crane

7.34

0.52

22.74

14

1.62

0.79

0.79

0.04

0.056

.056 T.
Crane

0.62

0.04

64.03

10

6.40

5.05

2.13

Page 44 of 63

4.27

Z0U34-2800

I. Frames Installations @ GL

Nos.

59

4.80

12.29

2.056

1 Carpenter
1 Helper
.056
Operator

25.27

14

1.81

0.88

0.88

0.05

0.056

.056 T.
Crane

0.69

0.05

Z0U34-2810

I. Doors w/ Ironmongery @ GL

Nos.

59

4.80

12.29

2.056

1 Carpenter
1 Helper
.056
Operator

25.27

12

2.11

1.02

1.02

0.06

0.056

.056 T.
Crane

0.69

0.06

Z0U34-2820

I. Frames Installation Works @ GL

M2

108

4.80

22.50

2.056

1 Carpenter
1 Helper
.056
Operator

46.26

14

3.30

1.61

1.61

0.09

0.056

.056 T.
Crane

1.26

0.09

Z0U34-2830

I.Aluminum + Glass & Other Associated Works @ GL

M2

108

1.60

67.50

2.056

1 Alum.
Tech 1
Helper
.056
Operator

138.78

12

11.57

5.63

0.32

0.056

.056 T.
Crane

3.78

0.32

Z0U34-2840

I. Kitchen Cabinets @ GL

Nos.

14

0.60

23.33

2.056

1 Carpenter
1 Helper
.056
Operator

47.97

14

3.43

1.67

1.67

0.09

0.056

.056 T.
Crane

1.31

0.09

Z0U34-2850

I. Wardrobes @ GL

Nos.

17

0.75

22.67

2.056

1 Carpenter
1 Helper
.056
Operator

46.60

14

3.33

1.62

1.62

0.09

0.056

.056 T.
Crane

1.27

0.09

Z0U34-2860
Z0U34-2870
Z0U34-2880

I. Primer Application Works @ GL


I. Stucco Application Works @ GL
I. Emulsion Paint Works @ GL

M2
M2
M2

864.00
864.00
1,626.00

54.60
16.40
32.20

15.82
52.68
50.50

1.000
1.000
1.000

15.82
52.68
50.50

10
14
12

1.58
3.76
4.21

Z0U34-2890

O. Plaster Accessories & Rush @ GL

M2

52

48.46

1.07

2.000

Z0U34-2900

O. Plaster Works @ GL

M2

316

20.00

15.80

2.000

Z0U34-2910

O. Polished Marble & Ceramic for Wall @ GL

M2

37

10.00

3.70

2.056

Z0U34-2920

O. Blk Wks For Garbage Chutes+Plaster@ Grnd Flr.

M2

16

10.00

1.60

2.056

Z0U34-2930

O. Gypsum Board +Washable Paint @ GL

M2

66

16.00

4.13

2.056

Z0U34-2940

O. Semi Recessed G.R.G. Tiles @ GL

M2

36

16.00

2.25

2.056

Z0U34-2950

O. Sreed + Graniti Tiles & Skirtings @ GL

M2

514

12.00

42.83

2.056

Z0U34-2960

O. Screed + Polished Marble & Skirtings @ GL

M2

148

12.00

12.33

2.056

Z0U34-2970

O. G. Stl, Powdr coated Railin to Staircase @ GL

LM

24

20.00

1.20

2.056

Z0U34-2980
Z0U34-2990
Z0U34-3000

O. Primer ApplicationWorks @ GL.


O. Stucco Application Works @ GL
O. Emulsion Paint Works @ GL

M2
M2
M2

109
109
58

54.60
16.40
32.20

2.00
6.65
1.80

1.000
1.000
1.000

Z0U34-3010

I. Hollow Block Works + Lintels @ 1st Flr.

M2

1,950.00

10.00

195.00

2.056

Z0U34-3020

I. Internal Plaster Accessories & Rush @ 1L

M2

347.00

48.46

7.16

2.000

Z0U34-3030

I. Internal Plaster Works @ 1L

M2

2,581.00

20.00

129.05

2.000

Z0U34-3040

I. Glazed Ceramic Tile @ 1L

M2

735

12.00

61.25

2.056

Z0U34-3050

I. Block Works For Ducts @ 1st Flr.

M2

93

10.00

9.30

2.056

7.20

66.11

2.056

1746

12.00

145.50

2.056

M2

269

32.00

8.41

2.056

M2

683

64.00

10.67

6.000

Z0U34-3060

I. Install False Ceiling (Susp. + Boarding) @ 1L

M2

476

Z0U34-3070

I. Screed + Ceramic Tiles & Skirtings @ 1L

M2

Z0U34-3080

I. Screed + Non-Slip Ceramic Tiles &Skirtings@1L

Z0U34-3090

I. Water Proofing + Screed on Wet Areas - 1L

1 Painter
1 Painter
1 Painter
1 Mason
1 Helper
1 Mason
1 Helper
1 Mason
1 Helper
.056
Operator
1 Mason
1 Helper
.056
Operator

5.63

1.58
3.76
4.21

2.15

0.31

0.15

0.15

31.60

12

2.63

1.32

1.32

7.61

14

0.54

0.26

0.26

0.01

0.056

.056 T.
Crane

0.21

0.01

3.29

1.64

0.80

0.80

0.04

0.056

.056 T.
Crane

0.09

0.04

1 Carpenter
1 Helper
.056
Operator

8.48

14

0.61

0.29

0.29

0.02

0.056

.056 T.
Crane

0.23

0.02

1 Carpenter
1 Helper
.056
Operator

4.63

14

0.33

0.16

0.16

0.01

0.056

.056 T.
Crane

0.13

0.01

88.07

14

6.29

3.06

3.06

0.17

0.056

.056 T.
Crane

2.40

0.17

25.36

14

1.81

0.88

0.88

0.05

0.056

.056 T.
Crane

0.69

0.05

2.47

10

0.25

0.12

0.01

0.056

.056 T.
Crane

0.07

0.01

2.00
6.65
1.80

8
12
10

0.25
0.55
0.18

400.92

14

28.64

0.78

0.056

.056 T.
Crane

10.92

0.78

1 Mason
1 Helper
.056
Operator
1 Mason
1 Helper
.056
Operator
1 Alum.
Tech 1
Helper
.056
Operator
1 Painter
1 Painter
1 Painter
1 Mason
1 Helper
.056
Operator
1 Mason
1 Helper
1 Mason
1 Helper
1 Mason
1 Helper
.056
Operator
1 Mason
1 Helper
.056
Operator
1 Carpenter
1 Helper
.056
Operator
1 Mason
1 Helper
.056
Operator
1 Mason
1 Helper
.056
Operator
4Waterproof
er
2 Helper

14.32

258.10

12

21.51

125.93

14

19.12

0.12
0.25
0.55
0.18

13.93

2.05

13.93

1.02

1.02

10.75

10.75

9.00

4.38

4.38

0.25

0.056

.056 T.
Crane

3.43

0.25

9.56

4.65

4.65

0.26

0.056

.056 T.
Crane

0.52

0.26

135.92

14

9.71

4.72

0.26

0.056

.056 T.
Crane

3.70

0.26

299.15

14

21.37

10.39

10.39

0.58

0.056

.056 T.
Crane

8.15

0.58

17.28

2.16

1.05

1.05

0.06

0.056

.056 T.
Crane

0.47

0.06

4.72

64.03

10

6.40

2.13

4.27

30.84

14

2.20

1.07

1.07

0.06

0.056

.056 T.
Crane

0.84

0.06

Z0U34-3100

I. Frames Installations @ 1L

Nos.

72

4.80

15.00

2.056

1 Carpenter
1 Helper
.056
Operator

Z0U34-3110

I. Doors w/ Ironmongery @ 1L

Nos.

72

4.80

15.00

2.056

1 Carpenter
1 Helper
.056
Operator

30.84

12

2.57

1.25

1.25

0.07

0.056

.056 T.
Crane

0.84

0.07

Z0U34-3120

I. Frames Installation Works @ GL

M2

100

4.80

20.83

2.056

1 Carpenter
1 Helper
.056
Operator

42.83

14

3.06

1.49

1.49

0.08

0.056

.056 T.
Crane

1.17

0.08

128.50

12

10.71

5.21

0.29

0.056

.056 T.
Crane

3.50

0.29

100

1.60

62.50

2.056

1 Alum.
Tech 1
Helper
.056
Operator

Nos.

17

0.75

22.67

2.056

1 Carpenter
1 Helper
.056
Operator

46.60

14

3.33

1.62

1.62

0.09

0.056

.056 T.
Crane

1.27

0.09

I. Kitchen Cabinets @ 1L

Nos.

15

0.60

25.00

2.056

1 Carpenter
1 Helper
.056
Operator

51.40

14

3.67

1.79

1.79

0.10

0.056

.056 T.
Crane

1.40

0.10

Z0U34-3160
Z0U34-3170
Z0U34-3180

I. Primer Application Works @ 1L


I. Stucco Application Works @ 1L
I. Emulsion Paint Works @ 1L

M2
M2
M2

855.00
855.00
1,649.00

54.60
16.40
32.20

15.66
52.13
51.21

1.000
1.000
1.000

15.66
52.13
51.21

12
14
14

1.30
3.72
3.66

Z0U34-3190

O. Plaster Accessories & Rush @ 1L

M2

52

48.46

1.07

2.000

Z0U34-3200

O. Plaster Works @ 1L

M2

297

20.00

14.85

2.000

Z0U34-3210

O. Polished Marble & Ceramic for Wall @ 1L

M2

36

10.00

3.60

2.056

Z0U34-3220

O. Blk Wks For Garbage Chutes+Plasters@ 1st Flr.

M2

14

10.00

1.40

2.056

Z0U34-3230

O. Gypsum Board +Washable Paint @ 1L

M2

66

16.00

4.13

2.056

Z0U34-3240

O. Semi Recessed G.R.G. Tiles @ 1L

M2

36

16.00

2.25

2.056

Z0U34-3130

I. Aluminum+Glass & Other Associated Works @ 1L

M2

Z0U34-3140

I. Wardrobes @ 1L

Z0U34-3150

1 Painter
1 Painter
1 Painter
1 Mason
1 Helper
1 Mason
1 Helper
1 Mason
1 Helper
.056
Operator
1 Mason
1 Helper
.056
Operator

5.21

1.30
3.72
3.66

2.15

0.31

0.15

0.15

29.70

12

2.48

1.24

1.24

7.40

14

0.53

0.26

0.26

0.01

0.056

.056 T.
Crane

0.20

0.01

2.88

1.44

0.70

0.70

0.04

0.056

.056 T.
Crane

0.08

0.04

1 Carpenter
1 Helper
.056
Operator

8.48

14

0.61

0.29

0.29

0.02

0.056

.056 T.
Crane

0.23

0.02

1 Carpenter
1 Helper
.056
Operator

4.63

14

0.33

0.16

0.16

0.01

0.056

.056 T.
Crane

0.13

0.01

Page 45 of 63

Z0U34-3250

O. Sreed + Graniti Tiles & Skirtings @ 1L

M2

425

12.00

35.42

2.056

Z0U34-3260

O. Screed + Polished Marble & Skirtings @ 1L

M2

48

12.00

4.00

2.056

Z0U34-3270

O. G. Stl, Powdr coated Railin to Staircase @ 1L

LM

26

20.00

1.30

2.056

Z0U34-3280
Z0U34-3290
Z0U34-3300

O. Primer Application Works @ 1L


O. Stucco Application Works @ 1L
O. Emulsion Paint Works @ 1L

M2
M2
M2

103
103
58

54.60
16.40
32.20

1.89
6.28
1.80

1.000
1.000
1.000

Z0U34-3310

I. Hollow Block Works + Lintels @ 2nd Flr.

M2

1,950.00

10.00

195.00

2.056

Z0U34-3320

I. Internal Plaster Accessories & Rush @ 2L

M2

347.00

48.46

7.16

2.000

Z0U34-3330

I. Internal Plaster Works @ 2L

M2

2,581.00

20.00

129.05

2.000

Z0U34-3340

I. Glazed Ceramic Tile @ 2L

M2

735

12.00

61.25

2.056

Z0U34-3350

I. Block Works For Ducts @ 2nd Flr.

M2

93

10.00

9.30

2.056

7.20

66.11

2.056

1746

12.00

145.50

2.056

M2

269

32.00

8.41

2.056

M2

683

64.00

10.67

6.000

Z0U34-3360

I. Install False Ceiling (Susp. + Boarding) @ 2L

M2

476

Z0U34-3370

I. Screed + Ceramic Tiles & Skirtings @ 2L

M2

Z0U34-3380

I. Screed + Non-Slip Ceramic Tiles &Skirtings@2L

Z0U34-3390

I. Water Proofing + Screed on Wet Areas - 2L

1 Mason
1 Helper
.056
Operator
1 Mason
1 Helper
.056
Operator
1 Alum.
Tech 1
Helper
.056
Operator
1 Painter
1 Painter
1 Painter
1 Mason
1 Helper
.056
Operator
1 Mason
1 Helper
1 Mason
1 Helper
1 Mason
1 Helper
.056
Operator
1 Mason
1 Helper
.056
Operator
1 Carpenter
1 Helper
.056
Operator
1 Mason
1 Helper
.056
Operator
1 Mason
1 Helper
.056
Operator
4Waterproof
er
2 Helper

72.82

14

5.20

2.53

2.53

0.14

0.056

.056 T.
Crane

1.98

0.14

8.22

14

0.59

0.29

0.29

0.02

0.056

.056 T.
Crane

0.22

0.02

2.67

10

0.27

0.13

0.01

0.056

.056 T.
Crane

0.07

0.01

1.89
6.28
1.80

8
10
12

0.24
0.63
0.15

400.92

14

28.64

0.78

0.056

.056 T.
Crane

10.92

0.78

14.32

258.10

12

21.51

125.93

14

19.12

0.13
0.24
0.63
0.15

13.93

2.05

13.93

1.02

1.02

10.75

10.75

9.00

4.38

4.38

0.25

0.056

.056 T.
Crane

3.43

0.25

9.56

4.65

4.65

0.26

0.056

.056 T.
Crane

0.52

0.26

135.92

14

9.71

4.72

0.26

0.056

.056 T.
Crane

3.70

0.26

299.15

14

21.37

10.39

10.39

0.58

0.056

.056 T.
Crane

8.15

0.58

17.28

2.16

1.05

1.05

0.06

0.056

.056 T.
Crane

0.47

0.06

4.72

64.03

10

6.40

2.13

4.27

30.84

14

2.20

1.07

1.07

0.06

0.056

.056 T.
Crane

0.84

0.06

Z0U34-3400

I. Frames Installations @ 2L

Nos.

72

4.80

15.00

2.056

1 Carpenter
1 Helper
.056
Operator

Z0U34-3410

I. Doors w/ Ironmongery @ 2L

Nos.

72

4.80

15.00

2.056

1 Carpenter
1 Helper
.056
Operator

30.84

12

2.57

1.25

1.25

0.07

0.056

.056 T.
Crane

0.84

0.07

Z0U34-3420

I. Frames Installation Works @ 2L

M2

100

4.80

20.83

2.056

1 Carpenter
1 Helper
.056
Operator

42.83

14

3.06

1.49

1.49

0.08

0.056

.056 T.
Crane

1.17

0.08

128.50

12

10.71

5.21

0.29

0.056

.056 T.
Crane

3.50

0.29

100

1.60

62.50

2.056

1 Alum.
Tech 1
Helper
.056
Operator

Nos.

17

0.75

22.67

2.056

1 Carpenter
1 Helper
.056
Operator

46.60

14

3.33

1.62

1.62

0.09

0.056

.056 T.
Crane

1.27

0.09

I. Kitchen Cabinets @ 2L

Nos.

15

0.60

25.00

2.056

1 Carpenter
1 Helper
.056
Operator

51.40

14

3.67

1.79

1.79

0.10

0.056

.056 T.
Crane

1.40

0.10

Z0U34-3460
Z0U34-3470
Z0U34-3480

I. Primer Application Works @ 2L


I. Stucco Application Works @ 2L
I. Emulsion Paint Works @ 2L

M2
M2
M2

855.00
855.00
1,649.00

54.60
16.40
32.20

15.66
52.13
51.21

1.000
1.000
1.000

1 Painter

15.66
52.13
51.21

12
14
14

1.30
3.72
3.66

Z0U34-3490

O. Plaster Accessories & Rush @ 2L

M2

52

48.46

1.07

2.000

Z0U34-3500

O. Plaster Works @ 2L

M2

297

20.00

14.85

2.000

Z0U34-3510

O. Polished Marble & Ceramic for Wall @ 2L

M2

36

10.00

3.60

2.056

Z0U34-3520

O. Blk Wks For Garbage Chutes+Plasters@ 2nd Flr.

M2

17

10.00

1.70

2.056

1 Mason
1 Helper
1 Mason
1 Helper
1 Mason
1 Helper
.056
Operator
1 Mason
1 Helper
.056
Operator

Z0U34-3530

O. Gypsum Board +Washable Paint @ 2L

M2

66

16.00

4.13

2.056

Z0U34-3540

O. Semi Recessed G.R.G. Tiles @ 2L

M2

36

16.00

2.25

2.056

Z0U34-3430

I. Aluminum+Glass & Other Associated Works @ 2L

M2

Z0U34-3440

I. Wardrobes @ 2L

Z0U34-3450

Z0U34-3550

O. Sreed + Graniti Tiles & Skirtings @ 2L

M2

425

12.00

35.42

2.056

Z0U34-3560

O. Screed + Polished Marble & Skirtings @ 2L

M2

48

12.00

4.00

2.056

Z0U34-3570

O. G.Steel, Powder coated Railin to Staircase@2L

LM

26

20.00

1.30

2.056

Z0U34-3580
Z0U34-3590
Z0U34-3600

O. Primer Application Works @ 2L


O. Stucco Application Works @ 2L
O. Emulsion Paint Works @ 2L

M2
M2
M2

103
103
58

54.60
16.40
32.20

1.89
6.28
1.80

1.000
1.000
1.000

Z0U34-3610

I. Hollow Block Works + Lintels @ 3rd Flr.

M2

1,950.00

10.00

195.00

2.056

Z0U34-3620

I. Internal Plaster Accessories & Rush @ 3L

M2

347.00

48.46

7.16

2.000

Z0U34-3630

I. Internal Plaster Works @ 3L

M2

2,581.00

20.00

129.05

2.000

Z0U34-3640

I. Glazed Ceramic Tile @ 3L

M2

735

12.00

61.25

2.056

Z0U34-3650

I. Block Works For Ducts @ 3rd Flr.

M2

93

10.00

9.30

2.056

Z0U34-3660

I. Install False Ceiling (Susp. + Boarding) @ 3L

M2

476

7.20

66.11

2.056

Z0U34-3670

I. Screed + Ceramic Tiles & Skirtings @ 3L

M2

1746

12.00

145.50

2.056

Z0U34-3680

I. Screed + Non-Slip Ceramic Tiles &Skirtings@3L

M2

269

32.00

8.41

2.056

Z0U34-3690

I. Water Proofing + Screed on Wet Areas - 3L

M2

683

64.00

10.67

6.000

Z0U34-3700

I. Frames Installations @ 3L

Nos.

72

4.80

15.00

2.056

1 Painter
1 Painter

5.21

1.30
3.72
3.66

2.15

0.31

0.15

0.15

29.70

12

2.48

1.24

1.24

7.40

14

0.53

0.26

0.26

0.01

0.056

.056 T.
Crane

0.20

0.01

3.50

1.75

0.85

0.85

0.05

0.056

.056 T.
Crane

0.10

0.05

1 Carpenter
1 Helper
.056
Operator

8.48

14

0.61

0.29

0.29

0.02

0.056

.056 T.
Crane

0.23

0.02

1 Carpenter
1 Helper
.056
Operator

4.63

14

0.33

0.16

0.16

0.01

0.056

.056 T.
Crane

0.13

0.01

72.82

14

5.20

2.53

2.53

0.14

0.056

.056 T.
Crane

1.98

0.14

8.22

14

0.59

0.29

0.29

0.02

0.056

.056 T.
Crane

0.22

0.02

2.67

10

0.27

0.13

0.01

0.056

.056 T.
Crane

0.07

0.01

1.89
6.28
1.80

8
10
12

0.24
0.63
0.15

400.92

14

28.64

0.78

0.056

.056 T.
Crane

10.92

0.78

14.32

258.10

12

21.51

125.93

14

19.12

1 Mason
1 Helper
.056
Operator
1 Mason
1 Helper
.056
Operator
1 Alum.
Tech 1
Helper
.056
Operator
1 Painter
1 Painter
1 Painter
1 Mason
1 Helper
.056
Operator
1 Mason
1 Helper
1 Mason
1 Helper
1 Mason
1 Helper
.056
Operator
1 Mason
1 Helper
.056
Operator
1 Carpenter
1 Helper
.056
Operator
1 Mason
1 Helper
.056
Operator
1 Mason
1 Helper
.056
Operator
4Waterproof
er
2 Helper
1 Carpenter
1 Helper
.056
Operator

0.13
0.24
0.63
0.15

13.93

13.93

1.02

1.02

10.75

10.75

9.00

4.38

4.38

0.25

0.056

.056 T.
Crane

3.43

0.25

9.56

4.65

4.65

0.26

0.056

.056 T.
Crane

0.52

0.26

135.92

14

9.71

4.72

0.26

0.056

.056 T.
Crane

3.70

0.26

299.15

14

21.37

10.39

10.39

0.58

0.056

.056 T.
Crane

8.15

0.58

17.28

2.16

1.05

1.05

0.06

0.056

.056 T.
Crane

0.47

0.06

64.03

10

6.40

30.84

14

2.20

0.056

.056 T.
Crane

0.84

0.06

2.05

4.72

2.13

1.07

1.07

Page 46 of 63

4.27

0.06

72

4.80

15.00

2.056

1 Carpenter
1 Helper
.056
Operator

30.84

12

2.57

1.25

1.25

0.07

0.056

.056 T.
Crane

0.84

0.07

M2

100

4.80

20.83

2.056

1 Carpenter
1 Helper
.056
Operator

42.83

14

3.06

1.49

1.49

0.08

0.056

.056 T.
Crane

1.17

0.08

I. Aluminum+Glass & Other Associated Works @ 3L

M2

100

1.60

62.50

2.056

1 Alum.
Tech 1
Helper
.056
Operator

128.50

12

10.71

5.21

0.29

0.056

.056 T.
Crane

3.50

0.29

Z0U34-3740

I. Wardrobes @ 3L

Nos.

17

0.75

22.67

2.056

1 Carpenter
1 Helper
.056
Operator

46.60

14

3.33

1.62

1.62

0.09

0.056

.056 T.
Crane

1.27

0.09

Z0U34-3750

I. Kitchen Cabinets @ 3L

Nos.

15

0.60

25.00

2.056

1 Carpenter
1 Helper
.056
Operator

51.40

14

3.67

1.79

1.79

0.10

0.056

.056 T.
Crane

1.40

0.10

Z0U34-3760
Z0U34-3770
Z0U34-3780

I. Primer Appilcation Works @ 3L


I. Stucco Application Works @ 3L
I. Emulsion Paint Works @ 3L

M2
M2
M2

855.00
855.00
1,649.00

54.60
16.40
32.20

15.66
52.13
51.21

1.000
1.000
1.000

15.66
52.13
51.21

12
14
14

1.30
3.72
3.66

Z0U34-3790

O. Plaster Accessories & Rush @ 3L

M2

52

48.46

1.07

2.000

Z0U34-3800

O. Plaster Works @ 3L

M2

297

20.00

14.85

2.000

Z0U34-3810

O. Polished Marble & Ceramic for Wall @ 3L

M2

36

10.00

3.60

2.056

Z0U34-3820

O. Blk Wks For Garbage Chutes+Plasters@ 3rd Flr.

M2

17

10.00

1.70

2.056

Z0U34-3830

O. Gypsum Board +Washable Paint @ 3L

M2

66

16.00

4.13

2.056

Z0U34-3840

O. Semi Recessed G.R.G. Tiles @ 3L

M2

36

16.00

2.25

2.056

Z0U34-3710

I. Doors w/ Ironmongery @ 3L

Nos.

Z0U34-3720

I. Frames Installation Works @ 3L

Z0U34-3730

Z0U34-3850

O. Screed + Polished Marble & Skirtings @ 3L

M2

48

12.00

4.00

2.056

Z0U34-3860

O. Sreed + Graniti Tiles & Skirtings @ 3L

M2

425

12.00

35.42

2.056

Z0U34-3870

O. G.Steel, Powder coated Railin to Staircase@3L

LM

26

20.00

1.30

2.056

Z0U34-3880
Z0U34-3890
Z0U34-3900

O. Primer Application Works @ 3L


O. Stucco Application Works @ 3L
O. Emulsion Paint Works @ 3L

M2
M2
M2

103
103
58

54.60
16.40
32.20

1.89
6.28
1.80

1.000
1.000
1.000

Z0U34-3910

I. Hollow Block Works + Lintels @ 4th Flr.

M2

1,188.00

10.00

118.80

2.056

Z0U34-3920

I. Internal Plaster Accessories & Rush @ 4L

M2

347.00

48.46

7.16

2.000

Z0U34-3930

I. Internal Plaster Works @ 4L

M2

1,252.00

20.00

62.60

2.000

Z0U34-3940

I. Glazed Ceramic Tile @ 4L

M2

808.00

12.00

67.33

2.056

Z0U34-3950

I. Block Works For Ducts @ 4th Flr.

M2

51

10.00

5.10

2.056

Z0U34-3960

I. Install False Ceiling (Susp. + Boarding) @ 4L

M2

303

7.20

42.08

2.056

Z0U34-3970

I. Screed + Ceramic Tiles & Skirtings @ 4L

M2

669

12.00

55.75

2.056

Z0U34-3980

I. Screed + Non-Slip Ceramic Tiles &Skirtings@4L

M2

422

32.00

13.19

2.056

Z0U34-3990

I. Water Proofing + Screed on Wet Areas - 4L

M2

379

64.00

5.92

6.000

1 Painter
1 Painter
1 Painter
1 Mason
1 Helper
1 Mason
1 Helper
1 Mason
1 Helper
.056
Operator
1 Mason
1 Helper
.056
Operator

5.21

1.30
3.72
3.66

2.15

0.31

0.15

0.15

29.70

12

2.48

1.24

1.24

7.40

14

0.53

0.26

0.26

0.01

0.056

.056 T.
Crane

0.20

0.01

3.50

1.75

0.85

0.85

0.05

0.056

.056 T.
Crane

0.10

0.05

1 Carpenter
1 Helper
.056
Operator

8.48

14

0.61

0.29

0.29

0.02

0.056

.056 T.
Crane

0.23

0.02

1 Carpenter
1 Helper
.056
Operator

4.63

14

0.33

0.16

0.16

0.01

0.056

.056 T.
Crane

0.13

0.01

8.22

14

0.59

0.29

0.29

0.02

0.056

.056 T.
Crane

0.22

0.02

72.82

14

5.20

2.53

2.53

0.14

0.056

.056 T.
Crane

1.98

0.14

2.67

10

0.27

0.13

0.01

0.056

.056 T.
Crane

0.07

0.01

1.89
6.28
1.80

8
10
12

0.24
0.63
0.15

244.25

12

20.35

9.90

9.90

0.55

0.056

.056 T.
Crane

6.65

0.55

1 Mason
1 Helper
.056
Operator
1 Mason
1 Helper
.056
Operator
1 Alum.
Tech 1
Helper
.056
Operator
1 Painter
1 Painter
1 Painter
1 Mason
1 Helper
.056
Operator
1 Mason
1 Helper
1 Mason
1 Helper
1 Mason
1 Helper
.056
Operator
1 Mason
1 Helper
.056
Operator
1 Carpenter
1 Helper
.056
Operator
1 Mason
1 Helper
.056
Operator
1 Mason
1 Helper
.056
Operator
4Waterproof
er
2 Helper

0.13
0.24
0.63
0.15

14.32

2.05

1.02

1.02

125.20

10

12.52

6.26

6.26

138.44

12

11.54

5.61

5.61

0.31

0.056

.056 T.
Crane

3.77

0.31

10.49

5.24

2.55

2.55

0.14

0.056

.056 T.
Crane

0.29

0.14

86.52

12

7.21

3.51

0.20

0.056

.056 T.
Crane

2.36

0.20

114.62

12

9.55

4.65

4.65

0.26

0.056

.056 T.
Crane

3.12

0.26

27.11

4.52

2.20

2.20

0.12

0.056

.056 T.
Crane

0.74

0.12

3.51

35.53

4.44

1.48

2.96

19.28

10

1.93

0.94

0.94

0.05

0.056

.056 T.
Crane

0.53

0.05

Z0U34-4000

I. Frames Installations @ 4L

Nos.

45

4.80

9.38

2.056

1 Carpenter
1 Helper
.056
Operator

Z0U34-4010

I. Doors w/ Ironmongery @ 4L

Nos.

45

4.80

9.38

2.056

1 Carpenter
1 Helper
.056
Operator

19.28

2.41

1.17

1.17

0.07

0.056

.056 T.
Crane

0.53

0.07

Z0U34-4020

I. Frames Installation Works @ 4L

M2

61

4.80

12.71

2.056

1 Carpenter
1 Helper
.056
Operator

26.13

12

2.18

1.06

1.06

0.06

0.056

.056 T.
Crane

0.71

0.06

78.39

10

7.84

3.81

0.21

0.056

.056 T.
Crane

2.14

0.21

61

1.60

38.13

2.056

1 Alum.
Tech 1
Helper
.056
Operator

Nos.

0.75

9.33

2.056

1 Carpenter
1 Helper
.056
Operator

19.19

12

1.60

0.78

0.78

0.04

0.056

.056 T.
Crane

0.52

0.04

I. Wardrobes @ 4L

Nos.

0.60

13.33

2.056

1 Carpenter
1 Helper
.056
Operator

27.41

12

2.28

1.11

1.11

0.06

0.056

.056 T.
Crane

0.75

0.06

Z0U34-4060
Z0U34-4070
Z0U34-4080

I. Primer Application Works @ 4L


I. Stucco Installation Works @ 4L
I. Emulsion Paint Works @ 4L

M2
M2
M2

387.00
387.00
876.00

54.60
16.40
32.20

7.09
23.60
27.20

1.000
1.000
1.000

7.09
23.60
27.20

10
12
12

0.71
1.97
2.27

Z0U34-4090

O. Plaster Accessories & Rush @ 4L

M2

48.46

0.02

2.000

0.04

0.01

0.003

0.003

Z0U34-4100

O. Blk Wks For Garbage Chutes+Plasters@ 4th Flr.

M2

14

10.00

1.40

2.056

2.88

1.44

0.70

0.70

0.04

0.056

.056 T.
Crane

0.08

0.04

Z0U34-4110

O. Plaster Works @ 4L

M2

114

20.00

5.70

2.000

11.40

10

1.14

0.57

0.57

Z0U34-4120

O. Polished Marble & Ceramic for Wall @ 4L

M2

42

10.00

4.20

2.056

8.64

12

0.72

0.35

0.35

0.02

0.056

.056 T.
Crane

0.24

0.02

Z0U34-4130

O. Gypsum Board + Washable Paint @ 4L

M2

37

16.00

2.31

2.056

1 Carpenter
1 Helper
.056
Operator

4.75

12

0.40

0.19

0.19

0.01

0.056

.056 T.
Crane

0.13

0.01

Z0U34-4140

O. Semi Recessed G.R.G. Tiles @ 4L

M2

20

16.00

1.25

2.056

1 Carpenter
1 Helper
.056
Operator

2.57

12

0.21

0.10

0.10

0.01

0.056

.056 T.
Crane

0.07

0.01

2.056

1 Mason
1 Helper
.056
Operator

7.20

12

0.60

0.29

0.02

0.056

.056 T.
Crane

0.20

0.02

Z0U34-4030

I. Aluminum+Glass & Other Associated Works @ 4L

M2

Z0U34-4040

I. Kitchen Cabinets @ 4L

Z0U34-4050

Z0U34-4150

O. Screed + Polished Marble & Skirtings @ 4L

M2

42

12.00

3.50

1 Painter
1 Painter
1 Painter
1 Mason
1 Helper
1 Mason
1 Helper
.056
Operator
1 Mason
1 Helper
1 Mason
1 Helper
.056
Operator

3.81

0.71
1.97
2.27

0.29

Page 47 of 63

Z0U34-4160

O. Sreed + Graniti Tiles & Skirtings @ 4L

M2

172

12.00

14.33

2.056

1 Mason
1 Helper
.056
Operator

29.47

12

2.46

1 Alum.
Tech 1
Helper
.056
Operator

1.23

0.15

1.03
3.41
0.99

7
8
10

0.15
0.43
0.10

39.89

10

3.99

1.94

1.94

2.15

0.43

0.215

0.215

14.80

1.85

0.93

0.93

Z0U34-4170

O. G.Steel, Powder coated Railin to Staircase@4L

LM

12

20.00

0.60

2.056

Z0U34-4180
Z0U34-4190
Z0U34-4200

O. Primer Application Works @ 4L


O. Stucco Application Works @ 4L
O. Emulsion Paint Works @ 4L

M2
M2
M2

56
56
32

54.60
16.40
32.20

1.03
3.41
0.99

1.000
1.000
1.000

Z0U34-4210

Hollow Block Works + Lintels @ Roof Floor

M2

194

10.00

19.40

2.056

Z0U34-4220

Plaster Accessories & Rush @ Roof Floor

M2

52

48.46

1.07

2.000

Z0U34-4230

Plastering Works @ Roof Deck Floor

M2

148

20.00

7.40

2.000

Z0U34-4240
Z0U34-4250
Z0U34-4260
Z0U34-4270
Z0U34-4280
Z0U34-4290
Z0U34-4300
Z0U34-4310
Z0U34-4320
Z0U34-4330
Z0U34-4340
Z0U34-4350
Z0U34-4360
Z0U34-4370
Z0U34-4380
Z0U34-4390
Z0U34-4400
Z0U34-4410
Z0U34-4420
Z0U34-4430
Z0U34-4440
Z0U34-4450
Z0U34-4460
Z0U34-4470

Roof Drain & Access.+ Lightweight Concrete


One Coat Cold Bituminous Primer
2 Layers of SBS W.P. Membrane + Water Test
Alum. Foil Covering Fixed to Upstand w/ Sealant
50mm Thk. Extruded Polystyrene Insulation
Protection Layer
18mm-25mm Round Aggregates (50mm Thk.)
1mm Thk. Alum. Flashing Fixed into Conc. Upstand
Sealant Application Around top of Alum. Flashing
Channel & Rails Installation for Lifts
Cabin Assembly / Installation for lifts
Machine Installation for lifts
Doors Installation for lifts
Connections To Ele + Finishing Touches for lifts
Installation of Chute Tubes and Intake Throats
Install Intake Doors, Chute Vent & Accessories
Install Ground Floor Offset + Fire Shutter Door
Install Compactor with MCP
Installation of Garbage Container
Final Test & Comm.
Installation of Window Cleaning Eqmt.
Primer Application Works @ Roof Deck
Stucco Application Works @ Roof Deck
Emulsion / Epoxy Paint Works @ Roof Deck

M2
M2
M2
LM
M2
M2
M2
M2
M2
Items
Items
Items
Items
Items
Item
Item
Item
Item
Item
Item
Item
M2
M2
M2

Z0U34-4480

Excavation Works External

M3

Z0U34-4490

RCC Manholes / Gully Traps

Nos.

Z0U34-4500

Water Proofing

M2

Z0U34-4510

Sand Bedding

M2

281.00
13.00
268.00
107
268.00
268.00
268.00
107
107
2
2
2
2
2
1
1
1
1
1
1
1
50
50
55
7,137.50

1.000
1.000
1.000

1 Painter

315.00

22.66

2.000

91.07

76.00

1.20

6.000

13.21

60.00

0.22

1.250

M3

7,125.36

Z0U34-4530
Z0U34-4540
Z0U34-4550
Z0U34-4560
Z0U34-4570
Z0U34-4580
Z0U34-4590
Z0U34-4600

Instl Drainage Pipes &Con. To Existing Chambers


Instl Water Supply Pipes&Con. To Existg Chambers
Instl Chilled Water Pipes&Con. To Existg Chamber
Instl Central Gas Pipes &Con. To Existg Chambers
Instl Telephone Ducts &Con. To Existing Chambers
Laying of Power cables (By Others)
Hardscaping Works
Landscaping Works

Item
Item
Item
Item
Item
Item
Item
Item

Z0U34-4610

Ext. Plaster Accessories & Rush on Front Elev.

M2

1,484.00

Z0U34-4620

Ext. Plaster Works on Front Elevation

M2

19.00

Z0U34-4630

Install Balcony Handrail on Front Elev.

Nos.

Z0U34-4640

Decorative GRC Panels W/ Epoxy Paint @ F. Elev.

Nos.

Z0U34-4650

Wooden Pergola on Front Elev. @ (1st & 2nd) Flr.

Z0U34-4660

1 Mason
1 Helper
.056
Operator
1 Mason
1 Helper
1 Mason
1 Helper

0.92
3.05
1.71

5.000

Backfilling Works

1 Painter

54.60
16.40
32.20

9.60

Z0U34-4520

1 Painter

601.00

11.86

7.500

0.08

0.00

0.08

0.056

.056 T.
Crane

0.80

0.07

0.056

.056 T.
Crane

0.03

0.00

0.056

.056 T.
Crane

1.09

0.11

0.15
0.43
0.10
0.11

8
10
12

0.11
0.30
0.14

1 Operator
1 Helper

45.32

9.06

2 Carpenter
1 Mason
1 Helper 1
Operator

48.00

14

3.43

7.19

12

0.60

0.20

0.28

10

0.03

0.02

1 Painter

4Waterproof
er
2 Helper
1 Helper
0.25
Operator

1.5
Operator
3 Driver 3
Helper

88.92

14

0.11
0.30
0.14

1.37

0.69

6.35

4.53

4.53

1.000

1
Excavato
r

22.66

0.69

0.69

1.000

1 M.
Crane

9.60

0.250

.25 Bob
Cat

0.06

4.500

0.5
Shovel 3
Dump
Truck .5
S. Roller
.5 Bob
Cat

53.35

2.54

4.53

0.69

0.40
0.01

1.27

2.54

0.01

0.42

2.54

0.42

0.42

14
12
14
12
10
7
14
12

48.46

30.62

2.000

8.00

2.38

2.000

35

15.00

2.33

2.250

17

2.00

8.50

2.500

LM

8.00

0.63

2.500

External Painting Works on Front Elevation

M2

1,503.00

32.20

46.68

3.000

Z0U34-4670

Ext. Plaster Access. & Rush on Leftside Elev.

M2

606

48.46

12.51

2.000

Z0U34-4680

Ext. Plaster Works on Left Side Elevation

M2

19

8.00

2.38

2.000

Z0U34-4690

Install Balcony Handrail on Leftside Elev.

Nos.

0.07

0.92
3.05
1.71

1 Painter

1
1
1
1
1
1
1
1

1.19

7
2
6
3
2
2
4
3
2
14
10
7
10
12
8
4
2
1
1
3
14

5.63

54

1 Painter

1.19

15.00

2.00

2.250

2.500

Z0U34-4700

Decorative GRC Panels W/ Epoxy Paint @ LS. Elev.

Nos.

Z0U34-4710

External Painting Works on Left Side Elevation

M2

625

32.20

19.41

3.000

Z0U34-4720

Ext. Plaster Accessories & Rush on Rear Elev.

M2

1,503.00

48.46

31.02

2.000

Z0U34-4730

Ext. Plaster Works on Rear Elevation

M2

19.00

8.00

2.38

2.000

Z0U34-4740

Install Balcony Handrail on Rear Elev.

Nos.

35

15.00

2.33

2.250

Z0U34-4750

Decorative GRC Panels W/ Epoxy Paint @ R. Elev.

Nos.

17

2.00

8.50

2.500

8.00

0.63

2.500

1,503.00

32.20

46.68

3.000

M2

606

48.46

12.51

2.000

M2

19

8.00

2.38

2.000

1 Mason
1 Helper
1 Mason
1 Helper
1 Mason
1 Helper
.25
Operator

61.25

30.62

15.31

15.31

4.75

1.19

0.59

0.59

5.25

12

0.44

0.19

0.19

0.05

0.250

.25 M.
Crane

0.58

0.05

1 Carpenter
1 Helper .5
Operator

21.25

10

2.13

0.85

0.85

0.43

0.500

..5 M.
Crane

4.25

0.43

1 Carpenter
1 Helper
.5 Operator

1.56

12

0.13

0.05

0.05

0.03

0.500

.5 M.
Crane

0.31

0.03

140.03

14

10.00

25.01

12.51

6.25

6.25

4.75

1.19

0.59

0.59

10

0.00

0.00

3 Painter
1 Mason
1 Helper
1 Mason
1 Helper
1 Mason
1 Helper
.25
Operator
1 Carpenter
1 Helper .5
Operator

58.23

12

62.03

31.02

4.75

5.25

1 Carpenter
1 Helper .5
Operator
1 Carpenter
1 Helper
.5 Operator

3 Painter
1 Mason
1 Helper
1 Mason
1 Helper
1 Mason
1 Helper
.25
Operator

Z0U34-4760

Wooden Pergola on Rear Elev. @ (1st & 2nd) Flr.

LM

Z0U34-4770

External Painting Works on Rear Elevation

M2

Z0U34-4780

Ext. Plaster Access. & Rush on Rightside Elev.

Z0U34-4790

Ext. Plaster Works on Right Side Elevation

Z0U34-4800

Install Balcony Handrail on Rigthside Elev.

Nos.

15.00

2.250

Z0U34-4810

Decorative GRC Panels W/ Epoxy Paint @ RS. Elev.

Nos.

2.00

2.500

1 Carpenter
1 Helper .5
Operator

Z0U34-4820
Z0U34-4830
Z0U34-4840
Z0U34-4850
Z0U34-4860
Z0U34-4870
Z0U34-4880
Z0U34-4890
Z0U34-4900
Z0U34-4910
Z0U34-4920
Z0U34-4930
Z0U34-4940
Z0U34-4950
Z0U34-4960
Z0U34-4970

External Painting Works on Right Side Elevation


Snagging & Desnagging For Finishes @ GF
Handing-Over For Finishes @ GF
Snagging & Desnagging For Finishes @ 1F
Handing-Over For Finishes @ 1F
Snagging & Desnagging For Finishes @ 2F
Handing-Over For Finishes @ 2F
Snagging & Desnagging For Finishes @ 3F
Handing-Over For Finishes @ 3F
Snagging & Desnagging For Finishes @ 4F
Handing-Over For Finishes @ 4F
Snagging & Desnagging For Finishes @ Roof Floor
Handing-Over For Finishes @ Roof Floor
Power On (By DEWA)
Precommissioning & Startup
Availability of Chilled Water (By Others)

M2
Item
Item
Item
Item
Item
Item
Item
Item
Item
Item
Item
Item

625
1
1
1
1
1
1
1
1
1
1
1
1
0
0
0

3.000

3 Painter

32.20

19.41

3 Painter
1 Mason
1 Helper
1 Mason
1 Helper
1 Mason
1 Helper
.25
Operator

10.00

0.250

.25 M.
Crane

0.500

..5 M.
Crane

4.85

4.85
15.51

15.51

1.19

0.59

0.59

12

0.44

0.19

0.19

0.05

0.250

.25 M.
Crane

0.58

0.05

21.25

10

2.13

0.85

0.85

0.43

0.500

..5 M.
Crane

4.25

0.43

1.56

12

0.13

0.05

0.05

0.03

0.500

.5 M.
Crane

0.31

0.03

140.03

14

10.00

25.01

12.51

6.25

6.25

4.75

1.19

0.59

0.59

10

0.00

0.00

12

4.85

58.23

10.00

0.250

.25 M.
Crane

0.500

..5 M.
Crane

4.85

30
10
30
10
30
10
30
10
30
10
30
10
1
21
1

Page 48 of 63

Z0U34-4980
Z0U34-4990
Z0U34-5000
Z0U34-5010
Z0U34-5020
Z0U34-5030
Z0U34-5040
Z0U34-5050
Z0U34-5060
Z0U34-5070
Z0U34-5080
Z0U34-5090

Testing & Final Commissioning


Snagging & Desnagging For External Finishes
Handing-Over For External Finishes
Completion of Fdn./Superstructure -Building # 34
Completion of External Works for Building # 34
Completion of MEP Works for Building # 34
Completion of Finishes for Building # 34
Completion of Fdn./SuperStruc. for Phase-1 BLDG.
Completion of External Works for Phase-1 BLDG.
Completion of MEP Works for Phase-1 BLDG.
Completion of Finishes for Phase-1 BLDG.
Completion Milestone for Phase-1 Buildings

Item
Item
Item
Item
Item
Item
Item
Item
Item

0
1
1
1
1
0
1
1
1
0
1
1

35
12
2
1
1
1
1
0
0
0
0
0

54.60
16.40
32.20
48.46

Page 49 of 63

Activity

Activity

SUB

ID

Description

ACTIVITY

Unit

QTY (F)

Prod. Rate (G)

Days (H)

(unit/day)

(F/G)

Item

Tot. Man
(I)

Crew
Desc.

Tot. Mdays (K)

OD (O)

(H x I)

Manpower
/day
(N/O)

M
Carpenter

Mason

Steel
Fixer

Helper

N - D

Operator

Driver

Tot. Eqmt
(X)

S
Technicia
n

Painter

Alum.
Tech

Eqmt
Desc.

Waterpro
ofer

Tot. Edays (Z)


(H x I)

E
Dozer

Shovel

Dump T.

B. Roller

T - D

B. Cat

S. Roller

S
M. Crane

Vibrator Excavator

Tower
Crane

SITEWORKS
Z2V33-0000

Site Clearing

M2

Z2V33-0010

Setting-out / Layout

Z2V33-0020

Excavation for footings + Disposal of Materials

1 Operator
1 Helper

1,597.00

4,200.00

0.38

2.000

0.76

0.76

163.88

76.00

2.16

2
3.000 Carpenter
1 Helper

6.47

6.47

576.00

409.50

1.41

2.000

1 Operator
1 Helper

2.81

1.41

0.83

0.75
Operator
8.250
6 Driver
1.5 Helper

6.88

2.29

0.77

.75
Operator
6.250
4 Driver
1.5 Helper

0.38

4.31

0.38

1.000 1 Dozer

0.38

0.38

0.28

0.28

1.000 1 Dozer

1.41

0.28

0.25

0.13

1.00

0.75
6.750 Shovel 6
D. Truck

5.63

0.53

0.41

1.00

2.16

SUBSTRUCTURE
For Excavation M3

For Disposal

M3

288.00

345.60

Z2V33-0030

Formation Level & Compaction

M3

194

Z2V33-0040

Anti-Termite Applications (Under PCC Footings)

M2

629

202.50

3.11

1.000

2
Technican

Z2V33-0050

Backfill & Compaction upto bot. of PCC Tie-Beam

M3

286

252.00

1.13

8.250

Z2V33-0060

Anti-Termite Applications (Under PCC Tie-Beam)

M2

47

202.50

0.23

Z2V33-0070

Backfill & Compaction up to bot of PCC Grd. Slab

M3

1,431.00

252.00

Z2V33-0080

Anti-Termite Applications (Under PCC Grade Slab)

M2

921

202.50

Z2V33-0090

Shutters + 50mm Thk. PCC Under Footings

Z2V33-0100

50mm Protection Screed (Over W.P. Membrane-Ftg.)

Z2V33-0110

RCC For Footings

M2

711

M2

252.00

270.00

RCC Necks Columns / Walls + MEP Sleeves

3.11

3.11

0.75
Operator
6 Driver
1.5 Helper

9.36

1.34

1.000

2
Technican

0.23

0.23

5.68

8.250

0.75
Operator
6 Driver
1.5 Helper

46.85

15.62

4.55

1.000

2
Technican

4.55

4.55

11.000

1 Mason
10 Helper

28.97

14.48

1.32

13.17

90.00

45.00

4.09

40.91

2,209.00

270.00

8.18

11.000

1 Mason
10 Helper

296

180.00

1.64

26.000

1
Carpenter
18 Helper
6 Mason
1 Steel
Fixer

42.76

42.76

Casting

M3

Formworks

M2

1,184.00

12.00

98.67

3.056

2
Carpenter
1 Helper
.056
Operator

301.53

75.38

Rebars

kg

53,280.00

250.00

213.12

2.056

1 Steel
Fixer 1
Helper
.056
Operator

438.17

146.06

Deshuttering

M2

1,184.00

35.00

33.83

3.056

2
Carpenter
1 Helper
.056
Operator

103.38

51.69

81.00

1.28

22.000

416.00

4.00

104.00

3.056

kg

18,720.00

200.00

93.60

M2

416.00

28.00

Casting

M3

Formworks

M2

Rebars

Deshuttering

104

2.41

10

Z2V33-0120

2.63

4.81

2
Carpenter
16 Helper
4 Mason

0.58

28.25

2
Carpenter
1 Helper
.056
Operator

317.82

63.56

2.056

1 Steel
Fixer 1
Helper
.056
Operator

192.44

48.11

14.86

3.056

2
Carpenter
1 Helper
.056
Operator

45.40

22.70

12

0.24

2.84

19.73

21.31

6.77

21.31

17.33

7.80

2.48

19.81

M2

128.00

28.00

4.57

3.056

2
Carpenter
1 Helper
.056
Operator

13.97

6.99

Deshuttering

10

7.80

6.40

2.30

0.91

7.31

2.30

0.08

1.000

1 Vibrator

1.28

1.94

0.44

0.056

.056 M.
Crane

5.24

0.44

1.24

0.07

0.056

.056 M.
Crane

0.83

0.07

17.70

0.99

0.500

.5 Vibrator

0.09

0.99

0.18

0.056

.056 M.
Crane

1.79

0.18

2.30

0.13

0.056

.056 M.
Crane

1.29

0.13

0.46

0.03

0.056

.056 M.
Crane

0.26

0.03

0.33

0.11

0.01

3.20

5.96

0.08

0.11

7.80

3.91

15.79

0.82

0.49

.5 Vibrator

5.82

3.91

47.37

0.500

.056 M.
Crane

3.09

1 Steel
Fixer 1
Helper
.056
Operator

0.67

0.056

0.31

2.056

10.76

0.49

3.40

23.04

1.34

8.67

250.00

38.33

1.94

6.80

5,760.00

0.5 Shovel
6 D.
Truck .25
B. Roller

34.56

1 Mason
10 Helper

kg

6.750

0.19

11.000

Rebars

11.36

1.89

0.62

24.45

1.42

.056 M.
Crane

270.00

0.06

0.056

167

97.79

0.92

0.19

M2

2
Carpenter
1 Helper
.056
Operator

0.12

3.38

50mm Screed (Over W.P. Membrane-T.B.)

3.056

7.66

1.19

Z2V33-0140

32.00

0.5 Shovel
6 D.
Truck .25
B. Roller

11.93

1.00

4.00

6.750

.056 M.
Crane

0.10

128.00

0.97

0.056

1.10

M2

0.12

1.19

Formworks

0.10

21.31

2.20

22.000

1.54

0.55

1 Mason
10 Helper

0.18

0.19

5.53

11.000

180.00

.056 M.
Crane

0.20

32

3.66

1.00

0.056

270.00

M3

1.54

0.13

0.55

54

Casting

0.28
0.5 Shovel
4 D.
4.750
Truck .25
B. Roller

9.87

M2

RCC Tie Beams + MEP Sleeves

4.55

Shutters + 50mm Thk. PCC Under Tie-Beams

Z2V33-0150

0.23

Z2V33-0130

1
Carpenter
16 Helper
4 Mason
1 Steel
Fixer

1.00

3.11

26.50

28.25

0.29

0.13

0.33

0.01

Z2V33-0160

RCC Kickers Over Tie-Beam

180.00

0.01

22.000

1
Carpenter
16 Helper
4 Mason
1 Steel
Fixer

0.12

0.12

4.00

4.00

1.00

3.056

2
Carpenter
1 Helper
.056
Operator

3.06

3.06

kg

180.00

250.00

0.72

2.056

1 Steel
Fixer 1
Helper
.056
Operator

1.48

1.48

M2

4.00

28.00

0.14

3.056

2
Carpenter
1 Helper
.056
Operator

0.44

0.44

Casting

M3

Formworks

M2

Rebars

Deshuttering

0.50

0.18

0.07

0.57

0.18

0.500

.5 Vibrator

0.00

0.001

0.25

0.01

0.056

.056 M.
Crane

0.06

0.01

0.18

0.01

0.056

.056 M.
Crane

0.04

0.01

0.04

0.00

0.056

.056 M.
Crane

0.01

0.00

0.47

0.03

0.03

Z2V33-0170

50mm Thk. PCC Under Grade Slab

M2

1,041.00

270.00

3.86

11.000

1 Mason
10 Helper

42.41

21.21

Z2V33-0180

Mesh + Filler Board & RCC For Grade Slab

M3

168

180.00

0.93

26.000

1
Carpenter
18 Helper
6 Mason
1 Steel
Fixer

24.27

8.09

Z2V33-0190

50mm Thk. PCC Steps & Ramps

M2

17

270.00

0.06

11.000

1 Mason
10 Helper

0.69

0.35

Z2V33-0200

Steps & Ramps Works + Place Conc.

M3

180.00

0.04

26.000

1
Carpenter
18 Helper
6 Mason
1 Steel
Fixer

1.01

0.13

Z2V33-0210

Waterproofing Membrane (Over PCC Footings)

M2

1,754.00

152.00

11.54

6.000

4
Waterproo
fer 2
Helper

69.24

34.62

11.54

23.08

Z2V33-0220

Water Proofing For Neck Column & Wall & Footing

M2

2,639.00

152.00

17.36

6.000

4
Waterproo
fer 2
Helper

104.17

34.72

11.57

23.15

5.17

2.59

0.86

1.72

0.59

1.18

Z2V33-0230

Waterproofing Membrane (Over PCC Tie-beams)

M2

131

152.00

0.86

6.000

4
Waterproo
fer 2
Helper

Z2V33-0240

Waterproofing Membrane For Tie Beams

M2

134

152.00

0.88

6.000

4
Waterproo
fer 2
Helper

5.29

1.76

Z2V33-0250

50mm Thk. PCC Under Base of Tank

M2

68

270.00

0.25

11.000

1 Mason
10 Helper

2.77

2.77

4.78

4.78

Z2V33-0260

Waterproofing Membrane (Over PCC - Base)

M2

121

152.00

0.80

6.000

4
Waterproo
fer 2
Helper

Z2V33-0270

50mm Protect'n Screed (Over W.P. Membrane-Base)

M2

210

270.00

0.78

11.000

1 Mason
10 Helper

8.56

8.56

5.63

5.63

Z2V33-0280

RCC Water Tank Base + Deshuttering

180.00

0.22

26.000

1
Carpenter
18 Helper
6 Mason
1 Steel
Fixer

156.00

12.00

13.00

3.056

2
Carpenter
1 Helper
.056
Operator

39.73

39.73

kg

7,020.00

250.00

28.08

2.056

1 Steel
Fixer 1
Helper
.056
Operator

57.73

57.73

M2

156.00

35.00

4.46

3.056

2
Carpenter
1 Helper
.056
Operator

13.62

13.62

Casting

M3

Formworks

M2

Rebars

Deshuttering

39

Z2V33-0290

RCC Wall W/MEP Pipes & Water Stop + Deshuttering

81.00

0.43

22.000

140.00

4.00

35.00

3.056

kg

6,300.00

200.00

31.50

M2

140.00

28.00

5.00

Casting

M3

Formworks

M2

Rebars

Deshuttering

35

2
Carpenter
16 Helper
4 Mason

RCC Top Slab + Deshuttering for Water Tank

0.31

9.51

9.51

2
Carpenter
1 Helper
.056
Operator

106.96

53.48

2.056

1 Steel
Fixer 1
Helper
.056
Operator

64.76

64.76

3.056

2
Carpenter
1 Helper
.056
Operator

15.28

15.28

0.01

1.16

1.16

Casting

M3

8.00

180.00

0.04

26.000

Formworks

M2

40.00

16.00

2.50

3.056

2
Carpenter
1 Helper
.056
Operator

7.64

3.82

Rebars

kg

1,440.00

200.00

7.20

2.056

1 Steel
Fixer 1
Helper
.056
Operator

14.80

14.80

1.87

0.31

5.60

1.000

1 Vibrator

0.93

0.31

1.000

1 Vibrator

0.04

0.01

0.31

0.03

0.00

0.25

0.09

2.52

1.59

0.78

3.18

7.78

6.50

7.02

2.23

7.02

14.00

6.30

2.00

16.00

1
Carpenter
18 Helper
6 Mason
1 Steel
Fixer

19.28

0.03

8.73

Z2V33-0300

1.93

6.30

1.00

1.44

0.500

.5 Vibrator

0.11

0.03

3.25

0.18

0.056

.056 M.
Crane

0.73

0.18

7.02

0.39

0.056

.056 M.
Crane

1.57

0.39

1.11

0.06

0.056

.056 M.
Crane

0.25

0.06

11.38

0.64

1.000

1 Vibrator

0.43

0.64

0.39

0.056

.056 M.
Crane

1.96

0.39

6.30

0.35

0.056

.056 M.
Crane

1.76

0.35

1.00

0.06

0.056

.056 M.
Crane

0.28

0.06

0.80

1.000

1 Vibrator

0.04

0.09

7.00

14.30

0.03

0.80

0.09

0.01

0.50

0.03

0.056

.056 M.
Crane

0.14

0.03

1.44

0.08

0.056

.056 M.
Crane

0.40

0.08

Deshuttering

M2

40.00

32.00

1.25

3.056

2
Carpenter
1 Helper
.056
Operator

3.82

3.82

0.50

0.25

1.50

1.44

2.19

0.01

0.056

0.12

.056 M.
Crane

0.07

0.01

0.12

0.01

Z2V33-0310

Water Proofing Membrane all around outside surfc

M2

235

152.00

1.55

6.000

4
Waterproo
fer 2
Helper

9.28

4.64

1.55

3.09

Z2V33-0320

Protection Board all around outside surface

M2

350

152.00

2.30

6.000

4
Waterproo
fer 2
Helper

13.82

6.91

2.30

4.61

Z2V33-0330

Backfill around Water tank walls

M3

252.00

0.03

8.250

0.75
Operator
6 Driver
1.5 Helper

0.23

0.08

0.01

Z2V33-0340

G.R.P. Lining around inside + S.S. Lader & Door

M2

252

20.00

12.60

2.000

1 Mason
1 Helper

Z2V33-0350

50mm Thk. PCC Under Base of Elevator Shaft

M2

30

270.00

0.11

25.20

8.40

4.20

4.20

11.000

1 Mason
10 Helper

1.22

1.22

0.11

1.11

2.13

2.13

Z2V33-0360

Waterproofing Membrane (Over PCC - Base)

M2

54

152.00

0.36

6.000

4
Waterproo
fer 2
Helper

Z2V33-0370

50mm Protect'n Screed (Over W.P. Membrane-Base)

M2

94

270.00

0.35

11.000

1 Mason
10 Helper

3.83

3.83

Z2V33-0380

RCC Elevator Shaft Base + Deshuttering

14

180.00

0.08

26.000

1
Carpenter
18 Helper
6 Mason
1 Steel
Fixer

2.02

2.02

Casting

M3

Formworks

M2

56.00

12.00

4.67

3.056

2
Carpenter
1 Helper
.056
Operator

14.26

14.26

Rebars

kg

2,520.00

250.00

10.08

2.056

1 Steel
Fixer 1
Helper
.056
Operator

20.72

20.72

Deshuttering

M2

56.00

35.00

1.60

3.056

2
Carpenter
1 Helper
.056
Operator

4.89

4.89

Z2V33-0390

RCC Wall W/ MEP Cond. + Deshuttering

Casting

M3

Formworks

M2

Rebars

Deshuttering

2
Carpenter
16 Helper
4 Mason

1.63

2
Carpenter
1 Helper
.056
Operator

18.34

9.17

2.056

1 Steel
Fixer 1
Helper
.056
Operator

11.10

11.10

0.86

3.056

2
Carpenter
1 Helper
.056
Operator

2.62

2.62

0.07

22.000

24.00

4.00

6.00

3.056

kg

1,080.00

200.00

5.40

M2

24.00

28.00

0.06

6.750

0.35

0.19

0.01

0.05

0.00

1.42

3.48

2.33

2.52

0.80

2.52

2.40

1.08

0.34

2.74

0.5 Shovel
6 D.
Truck .25
B. Roller

0.71

3.13

1.63

81.00

0.01

1.08

0.500

.5 Vibrator

0.04

0.01

1.17

0.07

0.056

.056 M.
Crane

0.26

0.07

2.52

0.14

0.056

.056 M.
Crane

0.56

0.14

0.40

0.02

0.056

.056 M.
Crane

0.09

0.02

4.09

0.23

1.000

1 Vibrator

0.07

0.23

0.07

0.056

.056 M.
Crane

0.34

0.07

1.08

0.06

0.056

.056 M.
Crane

0.30

0.06

0.17

0.01

0.056

.056 M.
Crane

0.05

0.01

0.14

0.01

1.20

2.45

0.01

0.14

0.01

Z2V33-0400

Water Proofing Membrane all around outside surfc

M2

522

152.00

3.43

6.000

4
Waterproo
fer 2
Helper

20.61

6.87

2.29

4.58

Z2V33-0410

Protection Board all around outside surface

M2

50

152.00

0.33

6.000

4
Waterproo
fer 2
Helper

1.97

0.99

0.33

0.66

Z2V33-0420

Backfill around the Lift's Pit wall

M3

252.00

0.03

8.250

0.75
Operator
6 Driver
1.5 Helper

0.23

0.08

0.01

Z2V33-0430

RCC For Wall/Col. From Top of Grade Slab-1L

81.00

3.02

22.000

66.54

66.54

245

2
Carpenter
16 Helper
4 Mason

Casting

M3

Formworks

M2

980.00

4.00

245.00

3.056

2
Carpenter
1 Helper
.056
Operator

748.72

149.74

Rebars

kg

44,100.00

200.00

220.50

2.056

1 Steel
Fixer 1
Helper
.056
Operator

453.35

113.34

Deshuttering

M2

980.00

28.00

35.00

3.056

2
Carpenter
1 Helper
.056
Operator

106.96

53.48

12

Z2V33-0440

Columns From Top of Grade Slab-1L (Canopy)

Casting

M3

Formworks

M2

Rebars

kg

81.00

0.01

22.000

4.00

4.00

1.00

3.056

180.00

200.00

0.90

2.056

2
Carpenter
16 Helper
4 Mason

40.83

18.38

5.83

46.67

0.27

0.27

2
Carpenter
1 Helper
.056
Operator

3.06

1.53

1 Steel
Fixer 1
Helper
.056
Operator

1.85

0.93

18.38

0.33

0.15

0.01

0.06

6.750

0.5 Shovel
6 D.
Truck .25
B. Roller

0.19

1.000

1 Vibrator

3.02

0.01

0.05

0.00

0.25

20.42

1.14

0.056

.056 M.
Crane

13.72

1.14

18.38

1.03

0.056

.056 M.
Crane

12.35

1.03

2.92

0.16

0.056

.056 M.
Crane

1.96

0.16

41.71

2.34

1.000

1 Vibrator

0.01

2.34

0.25

0.00

0.17

0.01

0.056

.056 M.
Crane

0.06

0.01

0.15

0.01

0.056

.056 M.
Crane

0.05

0.01

Deshuttering

M2

28.00

4.00

0.14

3.056

2
Carpenter
1 Helper
.056
Operator

26.14

26.14

0.44

0.44

Z2V33-0450

RCC Slab / Beam - 1L

0.38

Casting

M3

181.00

180.00

1.01

26.000

1
Carpenter
18 Helper
6 Mason
1 Steel
Fixer

Formworks

M2

905.00

16.00

56.56

3.056

2
Carpenter
1 Helper
.056
Operator

172.86

28.81

Rebars

kg

32,580.00

200.00

162.90

2.056

1 Steel
Fixer 1
Helper
.056
Operator

334.92

66.98

Deshuttering

M2

905.00

32.00

28.28

3.056

2
Carpenter
1 Helper
.056
Operator

86.43

43.21

14

Z2V33-0460

RCC For Stair/Landings @ G.L. - 1L

Casting

M3

Formworks

M2

Rebars

Deshuttering

2
Carpenter
16 Helper
4 Mason

2.44

2
Carpenter
1 Helper
.056
Operator

34.38

8.60

2.056

1 Steel
Fixer 1
Helper
.056
Operator

16.65

5.55

3.056

2
Carpenter
1 Helper
.056
Operator

4.91

2.46

1.16

1.16

0.11

22.000

45.00

4.00

11.25

3.056

kg

1,620.00

200.00

8.10

M2

45.00

28.00

1.61

10

Z2V33-0470

RCC Canopy

Casting

M3

8.00

180.00

0.04

26.000

Formworks

M2

40.00

16.00

2.50

3.056

2
Carpenter
1 Helper
.056
Operator

7.64

1.91

Rebars

kg

1,440.00

200.00

7.20

2.056

1 Steel
Fixer 1
Helper
.056
Operator

14.80

4.93

Deshuttering

M2

40.00

32.00

1.25

3.056

2
Carpenter
1 Helper
.056
Operator

3.82

3.82

Z2V33-0480

RCC For Wall/Col. From Top of 1L-2L

81.00

2.90

22.000

940.00

4.00

235.00

3.056

kg

42,300.00

200.00

211.50

M2

940.00

28.00

33.57

Casting

M3

Formworks

M2

Rebars

Deshuttering

235

2
Carpenter
16 Helper
4 Mason

63.83

2
Carpenter
1 Helper
.056
Operator

718.16

143.63

2.056

1 Steel
Fixer 1
Helper
.056
Operator

434.84

108.71

3.056

2
Carpenter
1 Helper
.056
Operator

102.59

51.30

25.71

25.71

12

Z2V33-0490

RCC Slab / Beam - 2L

Casting

M3

178.00

180.00

0.99

26.000

Formworks

M2

890.00

16.00

55.63

3.056

2
Carpenter
1 Helper
.056
Operator

169.99

28.33

Rebars

kg

32,040.00

200.00

160.20

2.056

1 Steel
Fixer 1
Helper
.056
Operator

329.37

65.87

Deshuttering

M2

890.00

32.00

27.81

3.056

2
Carpenter
1 Helper
.056
Operator

85.00

42.50

14

Z2V33-0500

RCC for Stair/Landings @ 1L-2L

Casting

M3

81.00

0.11

22.000

2
Carpenter
16 Helper
4 Mason

2.44

11.64

0.81

0.32

0.81

0.56

0.80

0.28

0.80

39.17

17.63

5.60

17.63

7.95

11.44

3.97

11.92

2.44

2.25

44.76

1
Carpenter
18 Helper
6 Mason
1 Steel
Fixer

0.15

4.04

0.83

63.83

11.64

2.57

1
Carpenter
18 Helper
6 Mason
1 Steel
Fixer

0.02

8.08

12.12

2.44

81.00

0.05

11.44

0.34

0.00

0.02

0.056

.056 M.
Crane

0.01

0.00

1.000

1 Vibrator

1.01

0.02

0.23

0.056

.056 M.
Crane

3.17

0.23

11.64

0.65

0.056

.056 M.
Crane

9.12

0.65

2.02

0.11

0.056

.056 M.
Crane

1.58

0.11

0.99

1.000

1 Vibrator

0.11

0.99

0.06

0.056

.056 M.
Crane

0.63

0.06

0.81

0.05

0.056

.056 M.
Crane

0.45

0.05

0.16

0.01

0.056

.056 M.
Crane

0.09

0.01

0.12

1.000

1 Vibrator

0.04

0.12

0.02

0.056

.056 M.
Crane

0.14

0.02

0.80

0.04

0.056

.056 M.
Crane

0.40

0.04

0.14

0.01

0.056

.056 M.
Crane

0.07

0.01

0.07

1.000

1 Vibrator

0.07

2.90

1.10

0.056

.056 M.
Crane

13.16

1.10

17.63

0.99

0.056

.056 M.
Crane

11.84

0.99

2.80

0.16

0.056

.056 M.
Crane

1.88

0.16

2.24

1.000

1 Vibrator

0.99

2.24

0.22

0.056

.056 M.
Crane

3.12

0.22

11.44

0.64

0.056

.056 M.
Crane

8.97

0.64

1.99

0.11

0.056

.056 M.
Crane

1.56

0.11

0.97

1.000

1 Vibrator

0.11

0.01

0.00

0.24

0.07

3.97

17.40

0.24

19.58

40.01

0.07

0.00

0.28

1.22

0.01

1.13

2.10

0.07

4.04

17.70

0.00

0.97

0.07

0.01

Z2V33-0510
Z2V33-0520
Z2V33-0530

RCC For Wall/Col. From Top of 2L-3L


RCC Slab / Beam - 3L
RCC For Stair/Landings @ 2L-3L

Z2V33-0540

RCC For Wall/Col. From Top of 3L-4L

Formworks

M2

45.00

4.00

11.25

3.056

2
Carpenter
1 Helper
.056
Operator

34.38

8.60

Rebars

kg

1,620.00

200.00

8.10

2.056

1 Steel
Fixer 1
Helper
.056
Operator

16.65

5.55

Deshuttering

M2

45.00

28.00

1.61

3.056

2
Carpenter
1 Helper
.056
Operator

4.91

2.46

M3
M3
M3

10
12
14
10

237
234
7

Casting

M3

Formworks

M2

Rebars

Deshuttering

237

2
Carpenter
16 Helper
4 Mason

64.37

2
Carpenter
1 Helper
.056
Operator

724.27

144.85

2.056

1 Steel
Fixer 1
Helper
.056
Operator

438.54

109.64

3.056

2
Carpenter
1 Helper
.056
Operator

103.47

51.73

25.71

25.71

2.93

22.000

948.00

4.00

237.00

3.056

kg

42,660.00

200.00

213.30

M2

948.00

28.00

33.86

12

Z2V33-0550

RCC Slab / Beam - 4L

Z2V33-0560

RCC For Stair/Landings @ 3L-4L

Z2V33-0570

RCC For Wall/Col. From Top of 4L-RoofL

Casting

M3

178.00

180.00

0.99

26.000

Formworks

M2

890.00

16.00

55.63

3.056

2
Carpenter
1 Helper
.056
Operator

169.99

28.33

Rebars

kg

32,040.00

200.00

160.20

2.056

1 Steel
Fixer 1
Helper
.056
Operator

329.37

65.87

Deshuttering

M2

890.00

32.00

27.81

3.056

2
Carpenter
1 Helper
.056
Operator

85.00

42.50

14
10

Casting

M3

Formworks

M2

Rebars

Deshuttering

235

2
Carpenter
16 Helper
4 Mason

63.83

2
Carpenter
1 Helper
.056
Operator

718.16

179.54

2.056

1 Steel
Fixer 1
Helper
.056
Operator

434.84

144.95

3.056

2
Carpenter
1 Helper
.056
Operator

102.59

51.30

2.90

22.000

940.00

4.00

235.00

3.056

kg

42,300.00

200.00

211.50

M2

940.00

28.00

33.57

10

Z2V33-0580

RCC Wall/Col. For Staircase From Top of 4L-RoofL

Casting

M3

Formworks

M2

Rebars

Deshuttering

2
Carpenter
16 Helper
4 Mason

0.54

2
Carpenter
1 Helper
.056
Operator

6.11

3.06

2.056

1 Steel
Fixer 1
Helper
.056
Operator

3.70

1.85

3.056

2
Carpenter
1 Helper
.056
Operator

0.87

0.87

25.42

25.42

168.08

33.62

0.02

22.000

8.00

4.00

2.00

3.056

kg

360.00

200.00

1.80

M2

8.00

28.00

0.29

Z2V33-0590

RCC Slab / Beam - RoofL

Casting

M3

176.00

180.00

0.98

26.000

1
Carpenter
18 Helper
6 Mason
1 Steel
Fixer

Formworks

M2

880.00

16.00

55.00

3.056

2
Carpenter
1 Helper
.056
Operator

0.81

17.78

5.64

17.78

7.95

11.44

3.97

11.44

47.00

21.15

6.71

53.71

0.54

81.00

39.50

11.92

63.83

81.00

0.32

45.14

1
Carpenter
18 Helper
6 Mason
1 Steel
Fixer

M3

0.81

2.57

64.37

81.00

2.25

21.15

0.67

0.30

0.10

0.76

9.17

0.30

1.13

0.06

0.056

.056 M.
Crane

0.63

0.06

0.81

0.05

0.056

.056 M.
Crane

0.45

0.05

0.16

0.01

0.056

.056 M.
Crane

0.09

0.01

2.10

0.12

1.000

1 Vibrator

0.12

2.93

1.11

0.056

.056 M.
Crane

13.27

1.11

17.78

1.00

0.056

.056 M.
Crane

11.94

1.00

2.82

0.16

0.056

.056 M.
Crane

1.90

0.16

2.26

1.000

1 Vibrator

0.99

2.26

0.22

0.056

.056 M.
Crane

3.12

0.22

11.44

0.64

0.056

.056 M.
Crane

8.97

0.64

1.99

0.11

0.056

.056 M.
Crane

1.56

0.11

0.97

1.000

1 Vibrator

0.97

2.90

1.32

0.056

.056 M.
Crane

13.16

1.32

21.15

1.18

0.056

.056 M.
Crane

11.84

1.18

3.36

0.19

0.056

.056 M.
Crane

1.88

0.19

2.69

1.000

1 Vibrator

0.02

2.69

0.02

0.056

.056 M.
Crane

0.11

0.02

0.30

0.02

0.056

.056 M.
Crane

0.10

0.02

0.05

0.00

0.056

.056 M.
Crane

0.02

0.00

4.58

0.04

0.26

1.000

1 Vibrator

0.98

0.056

.056 M.
Crane

3.08

0.07

0.29

0.00

0.33

0.68

0.24

0.29

23.50

48.01

0.07

3.97

17.40

0.24

19.75

40.35

0.01

0.04

0.00

0.08

0.26

Rebars

kg

31,680.00

200.00

158.40

2.056

1 Steel
Fixer 1
Helper
.056
Operator

325.67

81.42

Deshuttering

M2

880.00

32.00

27.50

3.056

2
Carpenter
1 Helper
.056
Operator

84.04

42.02

12

Z2V33-0600

RCC For Stair/Landings @ 4L-RoofL

81.00

0.11

22.000

45.00

4.00

11.25

3.056

kg

1,620.00

200.00

8.10

M2

45.00

28.00

1.61

Casting

M3

Formworks

M2

Rebars

Deshuttering

2
Carpenter
16 Helper
4 Mason

RCC Slab / Beam for Staircase - RoofL

2.44

2.44

2
Carpenter
1 Helper
.056
Operator

34.38

11.46

2.056

1 Steel
Fixer 1
Helper
.056
Operator

16.65

5.55

3.056

2
Carpenter
1 Helper
.056
Operator

4.91

4.91

0.58

0.58

Casting

M3

4.00

180.00

0.02

26.000

Formworks

M2

20.00

16.00

1.25

3.056

2
Carpenter
1 Helper
.056
Operator

3.82

1.27

Rebars

kg

720.00

200.00

3.60

2.056

1 Steel
Fixer 1
Helper
.056
Operator

7.40

3.70

Deshuttering

M2

20.00

32.00

0.63

3.056

2
Carpenter
1 Helper
.056
Operator

1.91

1.91

Z2V33-0620

RCC For Lower Parapet

81.00

0.23

22.000

76.00

4.00

19.00

3.056

kg

3,420.00

200.00

17.10

M2

76.00

28.00

2.71

Casting

M3

Formworks

M2

Rebars

Deshuttering

19

5.16

2
Carpenter
1 Helper
.056
Operator

58.06

14.52

2.056

1 Steel
Fixer 1
Helper
.056
Operator

35.16

11.72

3.056

2
Carpenter
1 Helper
.056
Operator

8.29

4.15

10

Z2V33-0630

RCC For Wall/Col. From Roof L-Top of Roof L

81.00

0.41

22.000

132.00

4.00

33.00

3.056

kg

5,940.00

200.00

29.70

M2

132.00

28.00

4.71

Casting

M3

Formworks

M2

Rebars

Deshuttering

33

2
Carpenter
16 Helper
4 Mason

8.96

2
Carpenter
1 Helper
.056
Operator

100.85

50.42

2.056

1 Steel
Fixer 1
Helper
.056
Operator

61.06

30.53

3.056

2
Carpenter
1 Helper
.056
Operator

14.41

14.41

5.49

5.49

Z2V33-0640

RCC Slab / Beam Top Roof Level

Casting

M3

38.00

180.00

0.21

26.000

Formworks

M2

190.00

16.00

11.88

3.056

2
Carpenter
1 Helper
.056
Operator

36.29

12.10

Rebars

kg

6,840.00

200.00

34.20

2.056

1 Steel
Fixer 1
Helper
.056
Operator

70.32

35.16

Deshuttering

M2

190.00

32.00

5.94

3.056

2
Carpenter
1 Helper
.056
Operator

18.15

18.15

1.01

0.36

0.51

0.18

0.51

3.80

1.71

0.54

1.71

11.00

4.95

1.57

12.57

1
Carpenter
18 Helper
6 Mason
1 Steel
Fixer

0.40

4.34

8.96

13.20

1.01

0.54

5.16

2.81

3.21

1
Carpenter
18 Helper
6 Mason
1 Steel
Fixer

2
Carpenter
16 Helper
4 Mason

4.58

13.75

Z2V33-0610

13.20

4.95

3.39

4.89

1.70

5.09

4.89

13.20

0.74

0.056

.056 M.
Crane

8.87

0.74

2.29

0.13

0.056

.056 M.
Crane

1.54

0.13

20.08

1.12

1.000

1 Vibrator

0.11

1.12

0.08

0.056

.056 M.
Crane

0.63

0.08

1.01

0.06

0.056

.056 M.
Crane

0.45

0.06

0.20

0.01

0.056

.056 M.
Crane

0.09

0.01

0.15

1.000

1 Vibrator

0.02

0.15

0.01

0.056

.056 M.
Crane

0.07

0.01

0.51

0.03

0.056

.056 M.
Crane

0.20

0.03

0.09

0.00

0.056

.056 M.
Crane

0.04

0.01

0.04

1.000

1 Vibrator

0.23

0.04

0.11

0.056

.056 M.
Crane

1.06

0.11

1.71

0.10

0.056

.056 M.
Crane

0.96

0.10

0.27

0.02

0.056

.056 M.
Crane

0.15

0.02

0.22

1.000

1 Vibrator

0.41

0.22

0.31

0.056

.056 M.
Crane

1.85

0.31

4.95

0.28

0.056

.056 M.
Crane

1.66

0.28

0.79

0.04

0.056

.056 M.
Crane

0.26

0.04

0.63

1.000

1 Vibrator

0.21

0.63

0.09

0.056

.056 M.
Crane

0.67

0.10

4.89

0.27

0.056

.056 M.
Crane

1.92

0.27

0.85

0.05

0.056

.056 M.
Crane

0.33

0.05

0.42

0.00

0.02

0.07

0.03

1.70

7.43

0.07

5.50

11.24

0.01

0.02

1.90

3.88

0.00

0.18

0.78

0.01

1.41

2.62

0.08

0.42

0.03

Z2V33-0650

RCC For Upper Parapet

81.00

0.30

22.000

96.00

4.00

24.00

3.056

kg

4,320.00

200.00

21.60

M2

96.00

28.00

3.43

Casting

M3

Formworks

M2

Rebars

Deshuttering

24

2
Carpenter
16 Helper
4 Mason

6.52

6.52

2
Carpenter
1 Helper
.056
Operator

73.34

24.45

2.056

1 Steel
Fixer 1
Helper
.056
Operator

44.41

14.80

3.056

2
Carpenter
1 Helper
.056
Operator

10.48

10.48

0.14

0.14

Z2V33-0660

RCC Eqmt. Pads + Railing

180.00

0.01

26.000

4.00

12.00

0.33

3.056

2
Carpenter
1 Helper
.056
Operator

1.02

0.25

kg

180.00

250.00

0.72

2.056

1 Steel
Fixer 1
Helper
.056
Operator

1.48

0.49

M2

4.00

35.00

0.11

3.056

2
Carpenter
1 Helper
.056
Operator

0.35

0.17

M3

Formworks

M2

Rebars

Deshuttering

2.70

0.86

6.86

1
Carpenter
18 Helper
6 Mason
1 Steel
Fixer

Casting

6.00

10

2.70

0.07

0.07

0.02

0.09

0.07

1.000

1 Vibrator

0.30

0.04

3.00

0.17

0.056

.056 M.
Crane

1.34

0.17

2.70

0.15

0.056

.056 M.
Crane

1.21

0.15

0.43

0.02

0.056

.056 M.
Crane

0.19

0.02

6.13

0.34

0.500

.5 Vibrator

0.00

0.34

0.00

0.056

.056 M.
Crane

0.02

0.00

0.07

0.00

0.056

.056 M.
Crane

0.04

0.00

0.01

0.00

0.056

.056 M.
Crane

0.01

0.00

0.01

0.00

0.03

0.12

0.04

0.01

0.00

MEP
FINISHES

10.00

151.20

2.056

1 Mason
1
Helper
.056
Operator

72.00

48.46

1.49

2.000

1 Mason
1 Helper

M2

2,436.00

20.00

121.80

2.000

I. Glazed Ceramic Tile @ GL

M2

712

12.00

59.33

2.056

Z2V33-3130

I. Block Works For Ducts @ Grnd Flr.

M2

54

10.00

5.40

2.056

Z2V33-3140

I. Install False Ceiling (Susp. + Boarding) @ GL

M2

373

7.20

51.81

2.056

Z2V33-3150

I. Screed + Ceramic Tiles & Skirtings @ GL

M2

1212

12.00

101.00

2.056

Z2V33-3160

I. Screed + Non-Slip Ceramic Tiles &Skirtings@GL

M2

314

32.00

9.81

2.056

Z2V33-3170

I. Water Proofing + Screed on Wet Areas - GL

M2

683

64.00

10.67

6.000

Z2V33-3180

I. Frames Installations @ GL

Nos.

54

4.80

11.25

2.056

Z2V33-3190

I. Doors w/ Ironmongery @ GL

Nos.

54

4.80

11.25

2.056

Z2V33-3200

I. Frames Installation Works @ GL

M2

183

4.80

38.13

2.056

Z2V33-3210

I.Aluminum + Glass & Other Associated Works @ GL

M2

183

1.60

114.38

2.056

Z2V33-3220

I. Kitchen Cabinets @ GL

Nos.

11

0.60

18.33

2.056

Z2V33-3230

I. Wardrobes @ GL

Nos.

14

0.75

18.67

2.056

Z2V33-3240
Z2V33-3250
Z2V33-3260

I. Primer Application Works @ GL


I. Stucco Application Works @ GL
I. Emulsion Paint Works @ GL

M2
M2
M2

788.00
788.00
971.00

54.60
16.40
32.20

14.43
48.05
30.16

1.000
1.000
1.000

1 Mason
1
Helper
1 Mason
1
Helper
.056
Operator
1 Mason
1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1 Mason
1
Helper
.056
Operator
1 Mason
1
Helper
.056
Operator
4Waterpr
oofer
2
Helper
1
Carpente
r1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1 Alum.
Tech 1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1 Painter
1 Painter
1 Painter

Z2V33-3270

O. Plaster Accessories & Rush @ GL

M2

72

48.46

1.49

2.000

1 Mason
1 Helper

Z2V33-3090

I. Hollow Block Works + Lintels @ Grnd Flr.

M2

Z2V33-3100

I. Internal Plaster Accessories & Rush @ GL

M2

Z2V33-3110

I. Internal Plaster Works @ GL

Z2V33-3120

1,512.00

310.87

14

22.20

2.97

243.60

12

20.30

121.99

14

11.10

10.80

0.42

10.80

0.60

0.056

.056 T.
Crane

8.47

0.60

0.21

0.21

10.15

10.15

8.71

4.24

4.24

0.24

0.056

.056 T.
Crane

3.32

0.24

5.55

2.70

2.70

0.15

0.056

.056 T.
Crane

0.30

0.15

106.51

14

7.61

3.70

0.21

0.056

.056 T.
Crane

2.90

0.21

207.66

14

14.83

7.21

7.21

0.40

0.056

.056 T.
Crane

5.66

0.40

20.17

14

1.44

0.70

0.70

0.04

0.056

.056 T.
Crane

0.55

0.04

64.03

10

6.40

23.13

14

1.65

0.80

0.80

0.05

0.056

.056 T.
Crane

0.63

0.05

23.13

12

1.93

0.94

0.94

0.05

0.056

.056 T.
Crane

0.63

0.05

78.39

14

5.60

2.72

2.72

0.15

0.056

.056 T.
Crane

2.14

0.15

235.16

12

19.60

9.53

0.53

0.056

.056 T.
Crane

6.41

0.53

37.69

14

2.69

1.31

1.31

0.07

0.056

.056 T.
Crane

1.03

0.07

38.38

14

2.74

1.33

1.33

0.07

0.056

.056 T.
Crane

1.05

0.07

14.43
48.05
30.16

10
14
12

1.44
3.43
2.51

2.97

0.42

3.70

2.13

4.27

9.53

1.44
3.43
2.51
0.21

0.21

1 Mason
1
Helper
1 Mason
1
Helper
.056
Operator
1 Mason
1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1 Mason
1
Helper
.056
Operator
1 Mason
1
Helper
.056
Operator
1 Alum.
Tech 1
Helper
.056
Operator
1 Painter
1 Painter
1 Painter
1 Mason
1
Helper
.056
Operator

Z2V33-3280

O. Plaster Works @ GL

M2

370

20.00

18.50

2.000

Z2V33-3290

O. Polished Marble & Ceramic for Wall @ GL

M2

351

10.00

35.10

2.056

Z2V33-3300

O. Blk Wks For Garbage Chutes+Plaster@ Grnd Flr.

M2

27

10.00

2.70

2.056

Z2V33-3310

O. Gypsum Board +Washable Paint @ GL

M2

61

16.00

3.81

2.056

Z2V33-3320

O. Semi Recessed G.R.G. Tiles @ GL

M2

50

16.00

3.13

2.056

Z2V33-3330

O. Sreed + Graniti Tiles & Skirtings @ GL

M2

427

12.00

35.58

2.056

Z2V33-3340

O. Screed + Polished Marble & Skirtings @ GL

M2

196

12.00

16.33

2.056

Z2V33-3350

O. G. Stl, Powdr coated Railin to Staircase @ GL

LM

24

20.00

1.20

2.056

Z2V33-3360
Z2V33-3370
Z2V33-3380

O. Primer ApplicationWorks @ GL.


O. Stucco Application Works @ GL
O. Emulsion Paint Works @ GL

M2
M2
M2

111
111
49

54.60
16.40
32.20

2.03
6.77
1.52

1.000
1.000
1.000

Z2V33-3390

I. Hollow Block Works + Lintels @ 1st Flr.

M2

1,598.00

10.00

159.80

2.056

Z2V33-3400

I. Internal Plaster Accessories & Rush @ 1L

M2

72.00

48.46

1.49

2.000

Z2V33-3410

I. Internal Plaster Works @ 1L

M2

2,395.00

20.00

119.75

2.000

Z2V33-3420

I. Glazed Ceramic Tile @ 1L

M2

755

12.00

62.92

2.056

Z2V33-3430

I. Block Works For Ducts @ 1st Flr.

M2

60

10.00

6.00

2.056

Z2V33-3440

I. Install False Ceiling (Susp. + Boarding) @ 1L

M2

400

7.20

55.56

2.056

Z2V33-3450

I. Screed + Ceramic Tiles & Skirtings @ 1L

M2

1268

12.00

105.67

2.056

Z2V33-3460

I. Screed + Non-Slip Ceramic Tiles &Skirtings@1L

M2

218

32.00

6.81

2.056

Z2V33-3470

I. Water Proofing + Screed on Wet Areas - 1L

M2

547

64.00

8.55

6.000

Z2V33-3480

I. Frames Installations @ 1L

Nos.

62

4.80

12.92

2.056

Z2V33-3490

I. Doors w/ Ironmongery @ 1L

Nos.

62

4.80

12.92

2.056

Z2V33-3500

I. Frames Installation Works @ GL

M2

119

4.80

24.79

2.056

Z2V33-3510

I. Aluminum+Glass & Other Associated Works @ 1L

M2

119

1.60

74.38

2.056

Z2V33-3520

I. Wardrobes @ 1L

Nos.

17

0.75

22.67

2.056

Z2V33-3530

I. Kitchen Cabinets @ 1L

Nos.

16

0.60

26.67

2.056

Z2V33-3540
Z2V33-3550
Z2V33-3560

I. Primer Application Works @ 1L


I. Stucco Application Works @ 1L
I. Emulsion Paint Works @ 1L

M2
M2
M2

758.00
758.00
1,356.00

54.60
16.40
32.20

13.88
46.22
42.11

1.000
1.000
1.000

1 Mason
1
Helper
1 Mason
1
Helper
.056
Operator
1 Mason
1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1 Mason
1
Helper
.056
Operator
1 Mason
1
Helper
.056
Operator
4Waterpr
oofer
2
Helper
1
Carpente
r1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1 Alum.
Tech 1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1 Painter
1 Painter
1 Painter

Z2V33-3570

O. Plaster Accessories & Rush @ 1L

M2

72

48.46

1.49

2.000

1 Mason
1 Helper

2.000

1 Mason
1
Helper

Z2V33-3580

O. Plaster Works @ 1L

M2

397

20.00

19.85

1 Mason
1 Helper

37.00

12

3.08

1.54

1.54

72.17

14

5.15

2.51

2.51

0.14

0.056

.056 T.
Crane

1.97

0.14

5.55

2.78

1.35

1.35

0.08

0.056

.056 T.
Crane

0.15

0.08

7.84

14

0.56

0.27

0.27

0.02

0.056

.056 T.
Crane

0.21

0.02

6.43

14

0.46

0.22

0.22

0.01

0.056

.056 T.
Crane

0.18

0.01

73.16

14

5.23

2.54

2.54

0.14

0.056

.056 T.
Crane

1.99

0.14

33.58

14

2.40

1.17

1.17

0.07

0.056

.056 T.
Crane

0.91

0.07

2.47

10

0.25

0.12

0.01

0.056

.056 T.
Crane

0.07

0.01

2.03
6.77
1.52

8
12
10

0.25
0.56
0.15

328.55

14

23.47

0.64

0.056

.056 T.
Crane

8.95

0.64

0.12
0.25
0.56
0.15

11.41

11.41

2.97

0.42

0.21

0.21

239.50

12

19.96

9.98

9.98

129.36

14

9.24

4.49

4.49

0.25

0.056

.056 T.
Crane

3.52

0.25

12.34

6.17

3.00

3.00

0.17

0.056

.056 T.
Crane

0.34

0.17

114.22

14

8.16

3.97

0.22

0.056

.056 T.
Crane

3.11

0.22

217.25

14

15.52

7.55

7.55

0.42

0.056

.056 T.
Crane

5.92

0.42

14.01

1.75

0.85

0.85

0.05

0.056

.056 T.
Crane

0.38

0.05

51.28

10

5.13

26.56

14

1.90

0.92

0.92

0.05

0.056

.056 T.
Crane

0.72

0.05

26.56

12

2.21

1.08

1.08

0.06

0.056

.056 T.
Crane

0.72

0.06

50.97

14

3.64

1.77

1.77

0.10

0.056

.056 T.
Crane

1.39

0.10

152.92

12

12.74

6.20

0.35

0.056

.056 T.
Crane

4.17

0.35

46.60

14

3.33

1.62

1.62

0.09

0.056

.056 T.
Crane

1.27

0.09

54.83

14

3.92

1.90

1.90

0.11

0.056

.056 T.
Crane

1.49

0.11

13.88
46.22
42.11

12
14
14

1.16
3.30
3.01

2.97

0.42

0.21

0.21

39.70

12

3.31

1.65

1.65

3.97

1.71

3.42

6.20

1.16
3.30
3.01

Z2V33-3590

O. Polished Marble & Ceramic for Wall @ 1L

M2

56

10.00

5.60

2.056

Z2V33-3600

O. Blk Wks For Garbage Chutes+Plasters@ 1st Flr.

M2

14

10.00

1.40

2.056

Z2V33-3610

O. Gypsum Board +Washable Paint @ 1L

M2

68

16.00

4.25

2.056

Z2V33-3620

O. Semi Recessed G.R.G. Tiles @ 1L

M2

51

16.00

3.19

2.056

Z2V33-3630

O. Sreed + Graniti Tiles & Skirtings @ 1L

M2

453

12.00

37.75

2.056

Z2V33-3640

O. Screed + Polished Marble & Skirtings @ 1L

M2

50

12.00

4.17

2.056

Z2V33-3650

O. G. Stl, Powdr coated Railin to Staircase @ 1L

LM

26

20.00

1.30

2.056

Z2V33-3660
Z2V33-3670
Z2V33-3680

O. Primer Application Works @ 1L


O. Stucco Application Works @ 1L
O. Emulsion Paint Works @ 1L

M2
M2
M2

119
119
55

54.60
16.40
32.20

2.18
7.26
1.71

1.000
1.000
1.000

Z2V33-3690

I. Hollow Block Works + Lintels @ 2nd Flr.

1,598.00 M2

1,598.00

10.00

159.80

2.056

Z2V33-3700

I. Internal Plaster Accessories & Rush @ 2L

72.00 M2

72.00

48.46

1.49

2.000

758.00 M2
758.00 M2
1,356.00 M2

758.00
758.00
1,356.00

54.60
16.40
32.20

13.88
46.22
42.11

1.000
1.000
1.000

72 M2

72

48.46

1.49

2.000

1 Mason
1 Helper

397 M2

397

20.00

19.85

2.000

56 M2

56

10.00

5.60

2.056

2,395.00

20.00

119.75

2.000

755 M2

755

12.00

62.92

2.056

60 M2

60

10.00

6.00

2.056

400 M2

400

7.20

55.56

2.056

1268 M2

1268

12.00

105.67

2.056

I. Screed + Non-Slip Ceramic Tiles &Skirtings@2L

218 M2

218

32.00

6.81

2.056

Z2V33-3770

I. Water Proofing + Screed on Wet Areas - 2L

547 M2

547

64.00

8.55

6.000

Z2V33-3780

I. Frames Installations @ 2L

62 Nos.

62

4.80

12.92

2.056

Z2V33-3790

I. Doors w/ Ironmongery @ 2L

62 Nos.

62

4.80

12.92

2.056

Z2V33-3800

I. Frames Installation Works @ 2L

119 M2

119

4.80

24.79

2.056

Z2V33-3810

I. Aluminum+Glass & Other Associated Works @ 2L

119 M2

119

1.60

74.38

2.056

Z2V33-3820

I. Wardrobes @ 2L

17 Nos.

17

0.75

22.67

2.056

Z2V33-3830

I. Kitchen Cabinets @ 2L

16 Nos.

16

0.60

26.67

2.056

Z2V33-3840
Z2V33-3850
Z2V33-3860

I. Primer Application Works @ 2L


I. Stucco Application Works @ 2L
I. Emulsion Paint Works @ 2L

Z2V33-3870

O. Plaster Accessories & Rush @ 2L

Z2V33-3880

O. Plaster Works @ 2L

Z2V33-3890

O. Polished Marble & Ceramic for Wall @ 2L

I. Internal Plaster Works @ 2L

Z2V33-3720

I. Glazed Ceramic Tile @ 2L

Z2V33-3730

I. Block Works For Ducts @ 2nd Flr.

Z2V33-3740

I. Install False Ceiling (Susp. + Boarding) @ 2L

Z2V33-3750

I. Screed + Ceramic Tiles & Skirtings @ 2L

Z2V33-3760

1 Mason
1 Helper

1 Mason
1
Helper
1 Mason
1
Helper
.056
Operator
1 Mason
1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1 Mason
1
Helper
.056
Operator
1 Mason
1
Helper
.056
Operator
4Waterpr
oofer
2
Helper
1
Carpente
r1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1 Alum.
Tech 1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1 Painter
1 Painter
1 Painter

2,395.00 M2

Z2V33-3710

1 Mason
1
Helper
.056
Operator
1 Mason
1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1 Mason
1
Helper
.056
Operator
1 Mason
1
Helper
.056
Operator
1 Alum.
Tech 1
Helper
.056
Operator
1 Painter
1 Painter
1 Painter
1 Mason
1
Helper
.056
Operator

1 Mason
1
Helper
1 Mason
1
Helper
.056
Operator

11.51

14

0.82

0.40

0.40

0.02

0.056

.056 T.
Crane

0.31

0.02

2.88

1.44

0.70

0.70

0.04

0.056

.056 T.
Crane

0.08

0.04

8.74

14

0.62

0.30

0.30

0.02

0.056

.056 T.
Crane

0.24

0.02

6.55

14

0.47

0.23

0.23

0.01

0.056

.056 T.
Crane

0.18

0.01

77.61

14

5.54

2.70

2.70

0.15

0.056

.056 T.
Crane

2.11

0.15

8.57

14

0.61

0.30

0.30

0.02

0.056

.056 T.
Crane

0.23

0.02

2.67

10

0.27

0.13

0.01

0.056

.056 T.
Crane

0.07

0.01

2.18
7.26
1.71

8
10
12

0.27
0.73
0.14

328.55

14

23.47

0.64

0.056

.056 T.
Crane

8.95

0.64

2.97

239.50

0.13
0.27
0.73
0.14

11.41

11.41

0.42

0.21

0.21

12

19.96

9.98

9.98

129.36

14

9.24

4.49

4.49

0.25

0.056

.056 T.
Crane

3.52

0.25

12.34

6.17

3.00

3.00

0.17

0.056

.056 T.
Crane

0.34

0.17

114.22

14

8.16

3.97

0.22

0.056

.056 T.
Crane

3.11

0.22

217.25

14

15.52

7.55

7.55

0.42

0.056

.056 T.
Crane

5.92

0.42

14.01

1.75

0.85

0.85

0.05

0.056

.056 T.
Crane

0.38

0.05

51.28

10

5.13

26.56

14

1.90

0.92

0.92

0.05

0.056

.056 T.
Crane

0.72

0.05

26.56

12

2.21

1.08

1.08

0.06

0.056

.056 T.
Crane

0.72

0.06

50.97

14

3.64

1.77

1.77

0.10

0.056

.056 T.
Crane

1.39

0.10

152.92

12

12.74

6.20

0.35

0.056

.056 T.
Crane

4.17

0.35

46.60

14

3.33

1.62

1.62

0.09

0.056

.056 T.
Crane

1.27

0.09

54.83

14

3.92

1.90

1.90

0.11

0.056

.056 T.
Crane

1.49

0.11

13.88
46.22
42.11

12
14
14

1.16
3.30
3.01

0.056

.056 T.
Crane

0.31

0.02

3.97

1.71

3.42

6.20

1.16
3.30
3.01

2.97

0.42

0.21

0.21

39.70

12

3.31

1.65

1.65

11.51

14

0.82

0.40

0.40

0.02

Z2V33-3900

O. Blk Wks For Garbage Chutes+Plasters@ 2nd Flr.

14 M2

14

10.00

1.40

2.056

Z2V33-3910

O. Gypsum Board +Washable Paint @ 2L

68 M2

68

16.00

4.25

2.056

Z2V33-3920

O. Semi Recessed G.R.G. Tiles @ 2L

51 M2

51

16.00

3.19

2.056

Z2V33-3930

O. Sreed + Graniti Tiles & Skirtings @ 2L

453 M2

453

12.00

37.75

2.056

Z2V33-3940

O. Screed + Polished Marble & Skirtings @ 2L

45 M2

50

12.00

4.17

2.056

Z2V33-3950

O. G.Steel, Powder coated Railin to Staircase@2L

26 LM

26

20.00

1.30

2.056

Z2V33-3960
Z2V33-3970
Z2V33-3980

O. Primer Application Works @ 2L


O. Stucco Application Works @ 2L
O. Emulsion Paint Works @ 2L

119 M2
119 M2
55 M2

119
119
55

54.60
16.40
32.20

2.18
7.26
1.71

1.000
1.000
1.000

Z2V33-3990

I. Hollow Block Works + Lintels @ 3rd Flr.

1,598.00 M2

1,598.00

10.00

159.80

2.056

Z2V33-4000

I. Internal Plaster Accessories & Rush @ 3L

72.00 M2

72.00

48.46

1.49

2.000

Z2V33-4010

I. Internal Plaster Works @ 3L

2,395.00 M2

2,395.00

20.00

119.75

2.000

Z2V33-4020

I. Glazed Ceramic Tile @ 3L

755 M2

735

12.00

61.25

2.056

Z2V33-4030

I. Block Works For Ducts @ 3rd Flr.

60 M2

60

10.00

6.00

2.056

Z2V33-4040

I. Install False Ceiling (Susp. + Boarding) @ 3L

400 M2

400

7.20

55.56

2.056

Z2V33-4050

I. Screed + Ceramic Tiles & Skirtings @ 3L

1268 M2

1268

12.00

105.67

2.056

Z2V33-4060

I. Screed + Non-Slip Ceramic Tiles &Skirtings@3L

218 M2

218

32.00

6.81

2.056

Z2V33-4070

I. Water Proofing + Screed on Wet Areas - 3L

547 M2

547

64.00

8.55

6.000

Z2V33-4080

I. Frames Installations @ 3L

62 Nos.

62

4.80

12.92

2.056

Z2V33-4090

I. Doors w/ Ironmongery @ 3L

62 Nos.

62

4.80

12.92

2.056

Z2V33-4100

I. Frames Installation Works @ 3L

119 M2

119

4.80

24.79

2.056

Z2V33-4110

I. Aluminum+Glass & Other Associated Works @ 3L

119 M2

119

1.60

74.38

2.056

Z2V33-4120

I. Wardrobes @ 3L

17 Nos.

17

0.75

22.67

2.056

Z2V33-4130

I. Kitchen Cabinets @ 3L

16 Nos.

16

0.60

26.67

2.056

Z2V33-4140
Z2V33-4150
Z2V33-4160

I. Primer Appilcation Works @ 3L


I. Stucco Application Works @ 3L
I. Emulsion Paint Works @ 3L

Z2V33-4170

O. Plaster Accessories & Rush @ 3L

758.00 M2
758.00 M2
1,356.00 M2

758.00
758.00
1,356.00

54.60
16.40
32.20

13.88
46.22
42.11

1.000
1.000
1.000

72 M2

72

48.46

1.49

2.000

1 Mason
1 Helper

397

20.00

19.85

2.000

O. Polished Marble & Ceramic for Wall @ 3L

56 M2

56

10.00

5.60

2.056

O. Blk Wks For Garbage Chutes+Plasters@ 3rd Flr.

14 M2

14

10.00

1.40

2.056

O. Plaster Works @ 3L

Z2V33-4190

Z2V33-4200

1 Mason
1 Helper

1 Mason
1
Helper
1 Mason
1
Helper
.056
Operator
1 Mason
1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1 Mason
1
Helper
.056
Operator
1 Mason
1
Helper
.056
Operator
4Waterpr
oofer
2
Helper
1
Carpente
r1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1 Alum.
Tech 1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1 Painter
1 Painter
1 Painter

397 M2

Z2V33-4180

1 Mason
1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1 Mason
1
Helper
.056
Operator
1 Mason
1
Helper
.056
Operator
1 Alum.
Tech 1
Helper
.056
Operator
1 Painter
1 Painter
1 Painter
1 Mason
1
Helper
.056
Operator

1 Mason
1
Helper
1 Mason
1
Helper
.056
Operator
1 Mason
1
Helper
.056
Operator

2.88

1.44

8.74

14

0.62

6.55

14

0.47

77.61

14

5.54

8.57

14

0.61

2.67

10

0.27

2.18
7.26
1.71

8
10
12

0.27
0.73
0.14

328.55

14

23.47

0.70

0.04

0.056

.056 T.
Crane

0.08

0.04

0.30

0.30

0.02

0.056

.056 T.
Crane

0.24

0.02

0.23

0.23

0.01

0.056

.056 T.
Crane

0.18

0.01

2.70

2.70

0.15

0.056

.056 T.
Crane

2.11

0.15

0.30

0.30

0.02

0.056

.056 T.
Crane

0.23

0.02

0.13

0.01

0.056

.056 T.
Crane

0.07

0.01

0.64

0.056

.056 T.
Crane

8.95

0.64

0.70

0.13
0.27
0.73
0.14

11.41

11.41

2.97

0.42

0.21

0.21

239.50

12

19.96

9.98

9.98

125.93

14

9.00

4.38

4.38

0.25

0.056

.056 T.
Crane

3.43

0.25

12.34

6.17

3.00

3.00

0.17

0.056

.056 T.
Crane

0.34

0.17

114.22

14

8.16

3.97

0.22

0.056

.056 T.
Crane

3.11

0.22

217.25

14

15.52

7.55

7.55

0.42

0.056

.056 T.
Crane

5.92

0.42

14.01

1.75

0.85

0.85

0.05

0.056

.056 T.
Crane

0.38

0.05

51.28

10

5.13

26.56

14

1.90

0.92

0.92

0.05

0.056

.056 T.
Crane

0.72

0.05

26.56

12

2.21

1.08

1.08

0.06

0.056

.056 T.
Crane

0.72

0.06

50.97

14

3.64

1.77

1.77

0.10

0.056

.056 T.
Crane

1.39

0.10

152.92

12

12.74

6.20

0.35

0.056

.056 T.
Crane

4.17

0.35

46.60

14

3.33

1.62

1.62

0.09

0.056

.056 T.
Crane

1.27

0.09

54.83

14

3.92

1.90

1.90

0.11

0.056

.056 T.
Crane

1.49

0.11

13.88
46.22
42.11

12
14
14

1.16
3.30
3.01

2.97

0.42

0.21

0.21

39.70

12

3.31

1.65

1.65

11.51

14

0.82

0.40

0.40

0.02

0.056

.056 T.
Crane

0.31

0.02

2.88

1.44

0.70

0.70

0.04

0.056

.056 T.
Crane

0.08

0.04

3.97

1.71

3.42

6.20

1.16
3.30
3.01

Z2V33-4210

O. Gypsum Board +Washable Paint @ 3L

68 M2

68

16.00

4.25

2.056

Z2V33-4220

O. Semi Recessed G.R.G. Tiles @ 3L

51 M2

51

16.00

3.19

2.056

Z2V33-4230

O. Screed + Polished Marble & Skirtings @ 3L

453 M2

453

12.00

37.75

2.056

Z2V33-4240

O. Sreed + Graniti Tiles & Skirtings @ 3L

45 M2

50

12.00

4.17

2.056

Z2V33-4250

O. G.Steel, Powder coated Railin to Staircase@3L

26 LM

26

20.00

1.30

2.056

Z2V33-4260
Z2V33-4270
Z2V33-4280

O. Primer Application Works @ 3L


O. Stucco Application Works @ 3L
O. Emulsion Paint Works @ 3L

119 M2
119 M2
55 M2

119
119
55

54.60
16.40
32.20

2.18
7.26
1.71

1.000
1.000
1.000

Z2V33-4290

I. Hollow Block Works + Lintels @ 4th Flr.

1,598.00 M2

1,598.00

10.00

159.80

2.056

Z2V33-4300

I. Internal Plaster Accessories & Rush @ 4L

72.00 M2

72.00

48.46

1.49

2.000

758.00 M2
758.00 M2
1,356.00 M2

758.00
758.00
1,356.00

54.60
16.40
32.20

13.88
46.22
42.11

1.000
1.000
1.000

72 M2

72

48.46

1.49

2.000

1 Mason
1 Helper

2,395.00

20.00

119.75

2.000

755 M2

755

12.00

62.92

2.056

60 M2

60

10.00

6.00

2.056

400 M2

400

7.20

55.56

2.056

1268 M2

1268

12.00

105.67

2.056

I. Screed + Non-Slip Ceramic Tiles &Skirtings@4L

218 M2

218

32.00

6.81

2.056

Z2V33-4370

I. Water Proofing + Screed on Wet Areas - 4L

547 M2

547

64.00

8.55

6.000

Z2V33-4380

I. Frames Installations @ 4L

62 Nos.

62

4.80

12.92

2.056

Z2V33-4390

I. Doors w/ Ironmongery @ 4L

62 Nos.

62

4.80

12.92

2.056

Z2V33-4400

I. Frames Installation Works @ 4L

119 M2

119

4.80

24.79

2.056

Z2V33-4410

I. Aluminum+Glass & Other Associated Works @ 4L

119 M2

119

1.60

74.38

2.056

Z2V33-4420

I. Kitchen Cabinets @ 4L

17 Nos.

17

0.75

22.67

2.056

Z2V33-4430

I. Wardrobes @ 4L

16 Nos.

16

0.60

26.67

2.056

Z2V33-4440
Z2V33-4450
Z2V33-4460

I. Primer Application Works @ 4L


I. Stucco Installation Works @ 4L
I. Emulsion Paint Works @ 4L

Z2V33-4470

O. Plaster Accessories & Rush @ 4L

I. Internal Plaster Works @ 4L

Z2V33-4320

I. Glazed Ceramic Tile @ 4L

Z2V33-4330

I. Block Works For Ducts @ 4th Flr.

Z2V33-4340

I. Install False Ceiling (Susp. + Boarding) @ 4L

Z2V33-4350

I. Screed + Ceramic Tiles & Skirtings @ 4L

Z2V33-4360

397 M2

397

20.00

19.85

2.000

O. Polished Marble & Ceramic for Wall @ 4L

56 M2

56

10.00

5.60

2.056

Z2V33-4500

O. Blk Wks For Garbage Chutes+Plasters@ 4th Flr.

14 M2

14

10.00

1.40

2.056

Z2V33-4510

O. Gypsum Board + Washable Paint @ 4L

68 M2

68

16.00

4.25

2.056

Z2V33-4480

O. Plaster Works @ 4L

Z2V33-4490

1 Mason
1 Helper

1 Mason
1
Helper
1 Mason
1
Helper
.056
Operator
1 Mason
1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1 Mason
1
Helper
.056
Operator
1 Mason
1
Helper
.056
Operator
4Waterpr
oofer
2
Helper
1
Carpente
r1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1 Alum.
Tech 1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1 Painter
1 Painter
1 Painter

2,395.00 M2

Z2V33-4310

1
Carpente
r1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1 Mason
1
Helper
.056
Operator
1 Mason
1
Helper
.056
Operator
1 Alum.
Tech 1
Helper
.056
Operator
1 Painter
1 Painter
1 Painter
1 Mason
1
Helper
.056
Operator

1 Mason
1
Helper
1 Mason
1
Helper
.056
Operator
1 Mason
1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator

8.74

14

0.62

0.30

0.30

0.02

0.056

.056 T.
Crane

0.24

0.02

6.55

14

0.47

0.23

0.23

0.01

0.056

.056 T.
Crane

0.18

0.01

77.61

14

5.54

2.70

2.70

0.15

0.056

.056 T.
Crane

2.11

0.15

8.57

14

0.61

0.30

0.30

0.02

0.056

.056 T.
Crane

0.23

0.02

2.67

10

0.27

0.13

0.01

0.056

.056 T.
Crane

0.07

0.01

2.18
7.26
1.71

8
10
12

0.27
0.73
0.14

328.55

12

27.38

0.75

0.056

.056 T.
Crane

8.95

0.75

2.97

239.50

10

129.36

12

12.34

0.13
0.27
0.73
0.14

13.32

13.32

0.21

0.21

23.95

11.98

11.98

10.78

5.24

5.24

0.29

0.056

.056 T.
Crane

3.52

0.29

6.17

3.00

3.00

0.17

0.056

.056 T.
Crane

0.34

0.17

114.22

12

9.52

4.63

0.26

0.056

.056 T.
Crane

3.11

0.26

217.25

12

18.10

8.81

8.81

0.49

0.056

.056 T.
Crane

5.92

0.49

14.01

2.33

1.14

1.14

0.06

0.056

.056 T.
Crane

0.38

0.06

51.28

6.41

26.56

10

2.66

1.29

1.29

0.07

0.056

.056 T.
Crane

0.72

0.07

26.56

3.32

1.61

1.61

0.09

0.056

.056 T.
Crane

0.72

0.09

50.97

12

4.25

2.07

2.07

0.12

0.056

.056 T.
Crane

1.39

0.12

152.92

10

15.29

7.44

0.42

0.056

.056 T.
Crane

4.17

0.42

46.60

12

3.88

1.89

1.89

0.11

0.056

.056 T.
Crane

1.27

0.11

54.83

12

4.57

2.22

2.22

0.12

0.056

.056 T.
Crane

1.49

0.12

13.88
46.22
42.11

10
12
12

1.39
3.85
3.51

2.97

0.42

0.21

0.21

39.70

10

3.97

1.99

1.99

11.51

12

0.96

0.47

0.47

0.03

0.056

.056 T.
Crane

0.31

0.03

2.88

1.44

0.70

0.70

0.04

0.056

.056 T.
Crane

0.08

0.04

8.74

12

0.73

0.35

0.02

0.056

.056 T.
Crane

0.24

0.02

0.42

4.63

2.14

4.27

7.44

1.39
3.85
3.51

0.35

51 M2

51

16.00

3.19

2.056

453 M2

453

12.00

37.75

2.056

O. Sreed + Graniti Tiles & Skirtings @ 4L

45 M2

50

12.00

4.17

2.056

Z2V33-4550

O. G.Steel, Powder coated Railin to Staircase@4L

26 LM

26

20.00

1.30

2.056

Z2V33-4560
Z2V33-4570
Z2V33-4580

O. Primer Application Works @ 4L


O. Stucco Application Works @ 4L
O. Emulsion Paint Works @ 4L

119 M2
119 M2
55 M2

119
119
55

54.60
16.40
32.20

2.18
7.26
1.71

1.000
1.000
1.000

Z2V33-4590

I. Hollow Block Works + Lintels @ 5th Flr.

M2

1,598.00

10.00

159.80

2.056

Z2V33-4600

I. Internal Plaster Accessories & Rush @ 5L

M2

72.00

48.46

1.49

2.000

Z2V33-4520

O. Semi Recessed G.R.G. Tiles @ 4L

Z2V33-4530

O. Screed + Polished Marble & Skirtings @ 4L

Z2V33-4540

1
Carpente
r1
Helper
.056
Operator
1 Mason
1
Helper
.056
Operator
1 Mason
1
Helper
.056
Operator
1 Alum.
Tech 1
Helper
.056
Operator
1 Painter
1 Painter
1 Painter
1 Mason
1
Helper
.056
Operator
1 Mason
1 Helper

Z2V33-4610

I. Internal Plaster Works @ 5L

M2

2,395.00

20.00

119.75

2.000

Z2V33-4620

I. Glazed Ceramic Tile @ 5L

M2

755

12.00

62.92

2.056

Z2V33-4630

I. Block Works For Ducts @ 5th Flr.

M2

60

10.00

6.00

2.056

Z2V33-4640

I. Install False Ceiling (Susp. + Boarding) @ 5L

M2

400

7.20

55.56

2.056

Z2V33-4650

I. Screed + Ceramic Tiles & Skirtings @ 5L

M2

1268

12.00

105.67

2.056

Z2V33-4660

I. Screed + Non-Slip Ceramic Tiles &Skirtings@5L

M2

218

32.00

6.81

2.056

Z2V33-4670

I. Water Proofing + Screed on Wet Areas - 5L

M2

547

64.00

8.55

6.000

Z2V33-4680

I. Frames Installations @ 5L

Nos.

62

4.80

12.92

2.056

Z2V33-4690

I. Doors w/ Ironmongery @ 5L

Nos.

62

4.80

12.92

2.056

Z2V33-4700

I. Frames Installation Works @ 5L

M2

119

4.80

24.79

2.056

Z2V33-4710

I. Aluminum+Glass & Other Associated Works @ 5L

M2

119

1.60

74.38

2.056

Z2V33-4720

I. Kitchen Cabinets @ 5L

Nos.

17

0.75

22.67

2.056

Z2V33-4730

I. Wardrobes @ 5L

Nos.

16

0.60

26.67

2.056

Z2V33-4740
Z2V33-4750
Z2V33-4760

I. Primer Application Works @ 5L


I. Stucco Installation Works @ 5L
I. Emulsion Paint Works @ 5L

M2
M2
M2

758.00
758.00
1,356.00

54.60
16.40
32.20

13.88
46.22
42.11

1.000
1.000
1.000

1 Mason
1
Helper
1 Mason
1
Helper
.056
Operator
1 Mason
1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1 Mason
1
Helper
.056
Operator
1 Mason
1
Helper
.056
Operator
4Waterpr
oofer
2
Helper
1
Carpente
r1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1 Alum.
Tech 1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1 Painter
1 Painter
1 Painter

Z2V33-4770

O. Plaster Accessories & Rush @ 5L

M2

72

48.46

1.49

2.000

1 Mason
1 Helper

Z2V33-4780

O. Plaster Works @ 5L

M2

397

20.00

19.85

2.000

Z2V33-4790

O. Polished Marble & Ceramic for Wall @ 5L

M2

56

10.00

5.60

2.056

Z2V33-4800

O. Blk Wks For Garbage Chutes+Plasters@ 5th Flr.

M2

14

10.00

1.40

2.056

Z2V33-4810

O. Gypsum Board + Washable Paint @ 5L

M2

68

16.00

4.25

2.056

Z2V33-4820

O. Semi Recessed G.R.G. Tiles @ 5L

M2

51

16.00

3.19

2.056

1 Mason
1
Helper
1 Mason
1
Helper
.056
Operator
1 Mason
1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator
1
Carpente
r1
Helper
.056
Operator

6.55

12

0.55

77.61

12

6.47

8.57

12

0.71

2.67

0.33

2.18
7.26
1.71

7
8
10

0.31
0.91
0.17

328.55

12

27.38

2.97

239.50

10

129.36

12

12.34

0.27

0.01

0.056

.056 T.
Crane

0.18

0.01

3.15

3.15

0.18

0.056

.056 T.
Crane

2.11

0.18

0.35

0.35

0.02

0.056

.056 T.
Crane

0.23

0.02

0.16

0.01

0.056

.056 T.
Crane

0.07

0.01

0.75

0.056

.056 T.
Crane

8.95

0.75

0.27

0.16
0.31
0.91
0.17

13.32

13.32

0.21

0.21

23.95

11.98

11.98

10.78

5.24

5.24

0.29

0.056

.056 T.
Crane

3.52

0.29

6.17

3.00

3.00

0.17

0.056

.056 T.
Crane

0.34

0.17

114.22

12

9.52

4.63

0.26

0.056

.056 T.
Crane

3.11

0.26

217.25

12

18.10

8.81

8.81

0.49

0.056

.056 T.
Crane

5.92

0.49

14.01

2.33

1.14

1.14

0.06

0.056

.056 T.
Crane

0.38

0.06

51.28

6.41

26.56

10

2.66

1.29

1.29

0.07

0.056

.056 T.
Crane

0.72

0.07

26.56

3.32

1.61

1.61

0.09

0.056

.056 T.
Crane

0.72

0.09

50.97

12

4.25

2.07

2.07

0.12

0.056

.056 T.
Crane

1.39

0.12

152.92

10

15.29

7.44

0.42

0.056

.056 T.
Crane

4.17

0.42

46.60

12

3.88

1.89

1.89

0.11

0.056

.056 T.
Crane

1.27

0.11

54.83

12

4.57

2.22

2.22

0.12

0.056

.056 T.
Crane

1.49

0.12

13.88
46.22
42.11

10
12
12

1.39
3.85
3.51

2.97

0.42

0.21

0.21

39.70

10

3.97

1.99

1.99

11.51

12

0.96

0.47

0.47

0.03

0.056

.056 T.
Crane

0.31

0.03

2.88

1.44

0.70

0.70

0.04

0.056

.056 T.
Crane

0.08

0.04

8.74

12

0.73

0.35

0.35

0.02

0.056

.056 T.
Crane

0.24

0.02

6.55

12

0.55

0.27

0.27

0.01

0.056

.056 T.
Crane

0.18

0.01

0.42

4.63

2.14

4.27

7.44

1.39
3.85
3.51

1 Mason
1
Helper
.056
Operator
1 Mason
1
Helper
.056
Operator
1 Alum.
Tech 1
Helper
.056
Operator
1 Painter
1 Painter
1 Painter
1 Mason
1
Helper
.056
Operator

Z2V33-4830

O. Screed + Polished Marble & Skirtings @ 5L

M2

453

12.00

37.75

2.056

Z2V33-4840

O. Sreed + Graniti Tiles & Skirtings @ 5L

M2

50

12.00

4.17

2.056

Z2V33-4850

O. G.Steel, Powder coated Railin to Staircase@5L

LM

26

20.00

1.30

2.056

Z2V33-4860
Z2V33-4870
Z2V33-4880

O. Primer Application Works @ 5L


O. Stucco Application Works @ 5L
O. Emulsion Paint Works @ 5L

M2
M2
M2

119
119
55

54.60
16.40
32.20

2.18
7.26
1.71

1.000
1.000
1.000

Z2V33-4890

Hollow Block Works + Lintels @ Roof Floor

M2

307

10.00

30.70

2.056

Z2V33-4900

Plaster Accessories & Rush @ Roof Floor

M2

72

48.46

1.49

2.000

1 Mason
1 Helper

Z2V33-4910

Plastering Works @ Roof Deck Floor

M2

339

20.00

16.95

2.000

1 Mason
1
Helper

Z2V33-4920
Z2V33-4930
Z2V33-4940
Z2V33-4950
Z2V33-4960
Z2V33-4970
Z2V33-4980
Z2V33-4990
Z2V33-5000
Z2V33-5010
Z2V33-5020
Z2V33-5030
Z2V33-5040
Z2V33-5050
Z2V33-5060
Z2V33-5070
Z2V33-5080
Z2V33-5090
Z2V33-5100
Z2V33-5110
Z2V33-5120
Z2V33-5130
Z2V33-5140
Z2V33-5150

Roof Drain & Access.+ Lightweight Concrete


One Coat Cold Bituminous Primer
2 Layers of SBS W.P. Membrane + Water Test
Alum. Foil Covering Fixed to Upstand w/ Sealant
50mm Thk. Extruded Polystyrene Insulation
Protection Layer
18mm-25mm Round Aggregates (50mm Thk.)
1mm Thk. Alum. Flashing Fixed into Conc. Upstand
Sealant Application Around top of Alum. Flashing
Channel & Rails Installation for Lifts
Cabin Assembly / Installation for lifts
Machine Installation for lifts
Doors Installation for lifts
Connections To Ele + Finishing Touches for lifts
Installation of Chute Tubes and Intake Throats
Install Intake Doors, Chute Vent & Accessories
Install Ground Floor Offset + Fire Shutter Door
Install Compactor with MCP
Installation of Garbage Container
Final Test & Comm.
Installation of Window Cleaning Eqmt.
Primer Application Works @ Roof Deck
Stucco Application Works @ Roof Deck
Emulsion / Epoxy Paint Works @ Roof Deck

M2
M2
M2
LM
M2
M2
M2
M2
M2
Items
Items
Items
Items
Items
Item
Item
Item
Item
Item
Item
Item
M2
M2
M2

Z2V33-5160

Excavation Works External

M3

Z2V33-5170

RCC Manholes / Gully Traps

Nos.

Z2V33-5180

Water Proofing

M2

Z2V33-5190

Sand Bedding

M2

Z2V33-5200

Backfilling Works

M3

Z2V33-5210
Z2V33-5220
Z2V33-5230
Z2V33-5240
Z2V33-5250
Z2V33-5260
Z2V33-5270
Z2V33-5280

Instl Drainage Pipes &Con. To Existing Chambers


Instl Water Supply Pipes&Con. To Existg Chambers
Instl Chilled Water Pipes&Con. To Existg Chamber
Instl Central Gas Pipes &Con. To Existg Chambers
Instl Telephone Ducts &Con. To Existing Chambers
Laying of Power cables (By Others)
Hardscaping Works
Landscaping Works

Item
Item
Item
Item
Item
Item
Item
Item

Z2V33-5290

Ext. Plaster Accessories & Rush on Front Elev.

M2

Z2V33-5300

Ext. Plaster Works on Front Elevation

M2

Z2V33-5310

Install Balcony Handrail on Front Elev.

Nos.

Z2V33-5320

Decorative GRC Panels W/ Epoxy Paint @ F. Elev.

Nos.

365.00
106.00
259.00
83
259.00
259.00
259.00
83
83
2
2
2
2
2
1
1
1
1
1
1
1
69
69
203

1.26
4.21
6.30

1.000
1.000
1.000

315.00

21.87

2.000

5.63

12.27

5.000

124.30

76.00

1.64

6.000

52.67

60.00

0.88

1.250

69

6,834.67

12

6.47

3.15

3.15

0.18

0.056

.056 T.
Crane

2.11

0.18

8.57

12

0.71

0.35

0.35

0.02

0.056

.056 T.
Crane

0.23

0.02

2.67

0.33

0.16

0.01

0.056

.056 T.
Crane

0.07

0.01

2.18
7.26
1.71

7
8
10

0.31
0.91
0.17

63.12

10

6.31

3.07

3.07

0.056

.056 T.
Crane

1.72

0.17

2.97

0.59

0.30

0.30

33.90

4.24

2.12

2.12

601.00

11.37

7.500

1 Painter
1 Painter
1 Painter
1
Operator
1 Helper
2
Carpente
r 1
Mason
1 Helper
1
Operator
4Waterpr
oofer
2
Helper
1 Helper
0.25
Operator

48.46

38.49

2.000

2.25

2.000

19

15.00

1.27

2.250

10

2.00

5.00

2.500

1.5
Operator
3 Driver
3 Helper

8
10
12

0.16
0.42
0.53

43.73

8.75

61.33

14

4.38

9.81

12

0.82

0.27

1.10

10

0.11

0.09

85.29

14

1 Mason
1 Helper

1 Mason
1
Helper
1 Mason
1
Helper
.25
Operator
1
Carpente
r1
Helper .5
Operator

76.97

38.49

4.50

2.85

4.500

0.5
Shovel 3
Dump
Truck .5
S. Roller
.5 Bob
Cat

2.44

0.02

1.22

2.44

0.22

51.17

0.02

0.41

2.44

0.41

0.41

0.32

0.03

12.50

10

1.25

0.50

0.50

0.25

0.500

..5 M.
Crane

2.50

0.25

1.56

12

0.13

0.05

0.05

0.03

0.500

.5 M.
Crane

0.31

0.03

175.43

14

12.53

28.39

14.20

7.10

7.10

4.50

1.13

0.56

0.56

2.25

10

0.23

0.10

0.10

0.03

0.250

.25 M.
Crane

0.25

0.03

0.16

0.06

0.03

0.500

..5 M.
Crane

0.25

0.03

18

8.00

2.25

2.000

Nos.

15

15.00

1.00

2.250

Decorative GRC Panels W/ Epoxy Paint @ LS. Elev.

Nos.

2.00

0.50

2.500

1
Carpente
r1
Helper .5
Operator

1.25

Z2V33-5390

External Painting Works on Left Side Elevation

M2

706

32.20

21.93

3.000

3 Painter

65.78

12

Z2V33-5400

Ext. Plaster Accessories & Rush on Rear Elev.

M2

1,417.00

48.46

29.24

2.000

1 Mason
1 Helper

58.48

29.24

Z2V33-5410

Ext. Plaster Works on Rear Elevation

M2

18.00

8.00

2.25

2.000

1 Mason
1
Helper

4.50

1.13

Z2V33-5380

.25 Bob
Cat

0.55

.25 M.
Crane

1 Mason
1 Helper

Install Balcony Handrail on Leftside Elev.

0.250

0.88

0.250

2.000

Z2V33-5370

12.27

0.03

3.000

M2

1 M.
Crane

0.11

14.20

Ext. Plaster Works on Left Side Elevation

1.000

0.11

58.48

Z2V33-5360

0.88

0.24

48.46

M2

0.88

4.37

12

32.20

M2

Ext. Plaster Access. & Rush on Leftside Elev.

21.87

0.56

688

External Painting Works on Front Elevation

Z2V33-5350

1
Excavato
r

0.56

1,883.00

Z2V33-5340

1.000

1.13

2.500

0.88

4.37

19.24

0.63

LM

1.75

4.37

19.24

8.00

Wooden Pergola on Front Elev. @ (1st & 2nd) Flr.

0.16
0.42
0.53

6.09

1
Carpente
r1
Helper
.5
Operator
3 Painter

Z2V33-5330

0.17

14
12
14
12
10
7
14
12

8.00

18.00

0.31
0.91
0.17

1.26
4.21
6.30

1
1
1
1
1
1
1
1
1,865.00

0.16

7
2
6
3
2
2
4
3
2
14
10
7
10
12
8
4
2
1
1
3
14

54.60
16.40
32.20

6,887.67

77.61

1 Mason
1
Helper
1 Mason
1
Helper
.25
Operator

12.53

0.06

5.48

5.48
14.62

14.62

0.56

0.56

Z2V33-5420

Install Balcony Handrail on Rear Elev.

Nos.

95

15.00

6.33

2.250

1 Mason
1
Helper
.25
Operator

14.25

12

1.19

Z2V33-5430

Decorative GRC Panels W/ Epoxy Paint @ R. Elev.

Nos.

22

2.00

11.00

2.500

1
Carpente
r1
Helper .5
Operator

27.50

10

2.75

1.56

12

0.13

133.70

14

28.39

14.20

7.10

7.10

4.50

1.13

0.56

0.56

2.25

10

0.23

0.10

0.10

0.06

8.00

0.63

2.500

1,435.00

32.20

44.57

3.000

1
Carpente
r1
Helper
.5
Operator
3 Painter

688

48.46

14.20

2.000

1 Mason
1 Helper

18

8.00

2.25

2.000

Nos.

15

15.00

1.00

2.250

Decorative GRC Panels W/ Epoxy Paint @ RS. Elev.

Nos.

2.00

0.50

2.500

1
Carpente
r1
Helper .5
Operator

1.25

0.16

External Painting Works on Right Side Elevation


Snagging & Desnagging For Finishes @ GF
Handing-Over For Finishes @ GF
Snagging & Desnagging For Finishes @ 1F
Handing-Over For Finishes @ 1F
Snagging & Desnagging For Finishes @ 2F
Handing-Over For Finishes @ 2F
Snagging & Desnagging For Finishes @ 3F
Handing-Over For Finishes @ 3F
Snagging & Desnagging For Finishes @ 4F
Handing-Over For Finishes @ 4F
Snagging & Desnagging For Finishes @ 5F
Handing-Over For Finishes @ 5F
Snagging & Desnagging For Finishes @ Roof Floor
Handing-Over For Finishes @ Roof Floor
Power On (By DEWA)
Precommissioning & Startup
Availability of Chilled Water (By Others)
Testing & Final Commissioning
Snagging & Desnagging For External Finishes
Handing-Over For External Finishes
Completion of Fdn./Superstructure -Building # 33
Completion of External Works for Building # 33
Completion of MEP Works for Building # 33
Completion of Finishes for Building # 33
Completion of Fdn./SuperStruc. for Phase-2 BLDG.
Completion of External Works for Phase-2 BLDG.
Completion of MEP Works for Phase-2 BLDG.
Completion of Finishes for Phase-2 BLDG.
Completion Milestone for Phase-2 Buildings

M2
Item
Item
Item
Item
Item
Item
Item
Item
Item
Item
Item
Item
Item
Item

32.20

21.93

3.000

3 Painter

65.78

12

5.48

Item
Item
Item
Item

706
1
1
1
1
1
1
1
1
1
1
1
1
1
1
0
0
0
0
1
1
1
1

Item
Item
Item

1
1
1

Item
Item

1
1

Z2V33-5440

Wooden Pergola on Rear Elev. @ (1st & 2nd) Flr.

LM

Z2V33-5450

External Painting Works on Rear Elevation

M2

Z2V33-5460

Ext. Plaster Access. & Rush on Rightside Elev.

M2

Z2V33-5470

Ext. Plaster Works on Right Side Elevation

M2

Z2V33-5480

Install Balcony Handrail on Rigthside Elev.

Z2V33-5490

Z2V33-5500
Z2V33-5510
Z2V33-5520
Z2V33-5530
Z2V33-5540
Z2V33-5550
Z2V33-5560
Z2V33-5570
Z2V33-5580
Z2V33-5590
Z2V33-5600
Z2V33-5610
Z2V33-5620
Z2V33-5630
Z2V33-5640
Z2V33-5650
Z2V33-5660
Z2V33-5670
Z2V33-5680
Z2V33-5690
Z2V33-5700
Z2V33-5710
Z2V33-5720
Z2V33-5730
Z2V33-5740
Z2V33-5750
Z2V33-5760
Z2V33-5770
Z2V33-5780
Z2V33-5790

1 Mason
1
Helper
1 Mason
1
Helper
.25
Operator

30
10
30
10
30
10
30
10
30
10
30
10
1
21
1
35
12
2
1
1
1
1
0
0
0
0
0

54.60
16.40
32.20
48.46

0.53

0.13

0.250

.25 M.
Crane

1.58

0.13

1.10

1.10

0.55

0.500

..5 M.
Crane

5.50

0.55

0.05

0.05

0.03

0.500

.5 M.
Crane