COST ESTIMATE
SR. NO.
UNIT
QTY
Pin Insulator
NO.
36
215.00
7,740.00
Insulator Pin
NO.
36
263.00
9,468.00
NO.
51
2,690.00
137,190.00
Conductor OSP
MTR.
625
217.00
135,625.00
Conductor Dog
MTR.
1250
91.00
113,750.00
KG
80
109.00
8,720.00
10
NO.
396.00
3,168.00
11
NO.
86.00
344.00
12
NO.
256.00
768.00
15
NO.
100
16.00
1,600.00
16
DA Bolts
NO.
21
136.00
2,856.00
17
NO.
18
NO.
19
Square Washer
NO.
16.00
20
Round Washer
NO.
100
6.00
600.00
NO.
500.00
4,000.00
HT Structure 45'
NO.
49,500.00
346,500.00
25
DESCRIPTION
Cost of Material
b
UNIT RATE
Rs.
772,329.00
26
Foundation
30
Services
154,465.80
Rs.
No.
Job
TOTAL AMOUNT
926,794.80
7
1
21,500.00
150,500.00
-
Total Cost of (a + b + c)
HE
HE
estimated