Minutes of Meeting

Date:- 08.02.14

Vendor :- NA Steel

At VMHPL

Mr. Kamthe Mr. Aayaj

Mr. Rizwan Khan Mr. Kumar Mr. Sumit

Remarks:5 No Pilot batch chassis to be made by the 31 march 4 Nos TLX & CTX chassis parts to be cut on CNC Plasma m/c. 1 No TLX And CTX chassis is at NA steel on full weld condition as per old drawings -- Hence no rectification -- to be use with Tiller brg Housing as per old dwg 1 Nos TLX And CTX chassis to be made as per fabrication stages according to dwgs. -- with out fixture. Stage Inspection to be carried out FRP cover to be made and send to NA steel for rear bend cover. GO AHEAD GIVEN FOR THE MTRL CUTTING. Component fixtures to be made by NA steel -1. cyl. Mounting bracket welding fixture 2. platform welding fixture Time Line 1) Inspection is scheduled at NA steel for the TLX & CTX Chassis 10th Feb. 2) For C channel fitting Dummy roller arrangement to be made -- layout 10th Feb. 3) Roller Bearing for the dummy roller arrangement to be sent at NA steel by the 11th Feb. 4) Dummy roller arrangement to be ready at NA Steel by the 16th Feb. 5) L plates fixing template to be made by NA steel by the 16th Feb. 6) Fabrication Platform to be ready at NA Steel by the 16th Feb. 7) 1 No TLX & CTX chassis with corrected dwgs will be ready at NA steel by the 3rd March.

Action/Follow-Up by VMHPL Mr. Sumit & Kumar Mr CKN & Nikhil Mr. Deepak Mr. Deepak Mr. Deepak Mr. Deepak Mr. Deepak

Das könnte Ihnen auch gefallen