DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO.

NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS EXECUTIVE ENGINEER, PUBLIC WORKS DEPARTMENT, BANKURA DIVISION-II AND EXECUTIVE ENGINEER, PUBLIC WORKS DEPARTMENT, MIDNAPORE ELECTRICAL DIVISION PUA DEPT.'S SANCTION ORDER NO. 62/PM(F)/P/ 1B-68/2012 DATE 03-05-2012 SANCTIONED AMOUNT 75.86656 RELEASED AMOUNT 75.86656 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 31-05-2013 ` IN LAC REMARKS

1 CONSTRUCTION OF BLOOD BANK IN KHATRA S.D. HOSPITAL COMPLEX

CIVIL WORK COMPLETE; PROBLEM IN CONSTRUCTIO N OF PARTITION WALL

2 DEVELOPMENT AND BLOCK DEVELOPMENT REPAIRING OF DAMAGED OFFICER, RAIPUR BLOCK CONDITION OF SCHOOL BUILDINGS WITH ELECTRIFICATION OF LOUPARA HIGH SCHOOL UNDER RAIPUR BLOCK

85/PM(F)/P/ 09-05-2012 & 1B-71/2012 26-09-2012 & 321

4.50000

4.50000

100%

15-12-2012

4.50000 COMPLETE

3.1 RENOVATION OF CANAL EXECUTIVE ENGINEER, FOR RESTORATION OF BANKURA IRRIGATION IRRIGATION POTENTIAL IN DIVISION, 03242-254934 BETWEEN CH. 55.00 & CH. 92.00 INCLUDING CANAL STRUCTURES AT CH. 1.50 & CH. 63.00 UNDER ONDA BLOCK

98/PM(F)/P/ 1B-67/2012 & 173/PM(F)/P /1B-67/2012 DATED 1307-2012

31-05-2012

26.75799

26.75799

100%

76.26716 COMPLETE

76.26716

DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 98/PM(F)/P/ 1B-67/2012 & 173/PM(F)/P /1B-67/2012 DATED 1307-2013 DATE 31-05-2012 SANCTIONED AMOUNT 25.76252 RELEASED AMOUNT 25.76252 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS

3.2 RENOVATION OF CANAL EXECUTIVE ENGINEER, FOR RESTORATION OF BANKURA IRRIGATION IRRIGATION POTENTIAL IN DIVISION, 03242-254934 BETWEEN CH. 92.00 & CH. 120.00 INCLUDING CANAL STRUCTURES AT CH. 101.00 UNDER ONDA BLOCK 3.3 RENOVATION OF CANAL EXECUTIVE ENGINEER, FOR RESTORATION OF BANKURA IRRIGATION IRRIGATION POTENTIAL IN DIVISION, 03242-254934 BETWEEN CH. 204.10 & CH. 232.00 INCLUDING CANAL STRUCTURES AT CH. 198.00 UNDER ONDA BLOCK 4 228 UNITS OF PISICULTURE SCHEME WITHIN 14 BLOCKS OF BANKURA AND KHATRA SUB-DIVISION ASSISTANT DIRECTOR OF FISHERIES, BANKURA

COMPLETE

98/PM(F)/P/ 1B-67/2012 & 173/PM(F)/P /1B-67/2012 DATED 1307-2014

31-05-2012

27.14059

27.14059

100%

COMPLETE

105/PM(F)/P /1B-79/2012

05-06-2012

11.85600

11.85600

100%

11.85600 COMPLETE

DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 05-06-2012 SANCTIONED AMOUNT 55.12595 RELEASED AMOUNT 36.15924 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 85% 30-09-2013 ` IN LAC REMARKS

NO. 5 EXCAVATION OF WATER CHIEF EXECUTIVE OFFICER, 106/PM(F)/P HARVESTING TANK, PASCHIMANCHAL UNNAYAN /1B-88/2012 BOULDER PITCHING WORK PARSHAD WITH TOE WALL, CONSTRUCTION OF GHAT, PLANTATION AND ECODEVELOPMENT AT PUP ADMINISTRATIVE BUILDING PREMISES 6.1 SINKING OF MEDIUM ADDITIONAL EXECUTIVE DUTY TUBE-WELL FOR OFFICER, BANKURA ZILLA IRRIGATION IN MURAKATI PARISHAD (KALARA) VILLAGE, SALTORA GP, TALDANGRA PS 6.2 SINKING OF MEDIUM DUTY TUBE-WELL FOR IRRIGATION IN SATBAR VILLAGE, SALTORA GP, TALDANGRA PS ADDITIONAL EXECUTIVE OFFICER, BANKURA ZILLA PARISHAD 110/PM(F)/P /1B-77/2012

36.15924 PLANTATION, BORING COMPLETE, TANK AND ALLIED WORK TO BE COMPLETED VERY SHORTLY

07-06-2012

3.03000

3.03000

100%

28-02-2013

COMPLETE

110/PM(F)/P /1B-77/2012

07-06-2012

3.03000

3.03000

SITE NOT AVAILABLE

6.3 SINKING OF MEDIUM ADDITIONAL EXECUTIVE DUTY TUBE-WELL FOR OFFICER, BANKURA ZILLA IRRIGATION IN KARANDIHI PARISHAD VILLAGE, SALTORA GP, TALDANGRA PS

110/PM(F)/P /1B-77/2012

07-06-2012

3.03000

3.03000

SITE NOT AVAILABLE

DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 06-07-2012 SANCTIONED AMOUNT 92.27288 RELEASED AMOUNT 68.30214 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 80% 30-05-2013 ` IN LAC REMARKS

NO. 7 CONSTRUCTION OF SC/ST CHIEF EXECUTIVE OFFICER, 157/PM(F)/P GIRLS HOSTEL BUILDING PASCHIMANCHAL UNNAYAN /1B-93/2012 OF BIRSHA MUNDA PARSHAD THROUGH BDO, MEMORIAL COLLEGE, RAIPUR PIRRA, RAIPUR BLOCK

68.30214 WORK IN PROGRESS

8 CONSTRUCTION OF BOUNDARY WALL AT P.R.M.S. MAHAVIDYALAYA, BARAGARI, JAMBONI 9 BORING OF A 200 x 150 MM. DIA TUBE-WELL OF DEPTH 200 MT. AT BHARAT SEVASHRAM SANGHA, KENDUADIHI

CHIEF EXECUTIVE OFFICER, 160/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD THROUGH BDO, 130/2012 SARENGA

11-07-2012

48.84000

15-06-2013

WORK STARTED

CHIEF EXECUTIVE OFFICER, 161/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD 133/2012

11-07-2012

3.76948

1.77078

100%

15-04-2013

1.77078 COMPLETE

10 SINKING OF A DEEP TUBE- CHIEF EXECUTIVE OFFICER, WELL OF 200 MT. DEPTH PASCHIMANCHAL UNNAYAN AND INSTALLATION OF PARSHAD SUBMERSIBLE PUMP SET AND NECESSARY WATER DISTRIBUTION LINE OF AMADER HASPATAL

171/PM(F)/P /1B52/2011(PT.I)

13-07-2012

5.00819

3.51613

100%

15-04-2013

3.51613 COMPLETE

11 CONSTRUCTION OF BRIDGE AT EKCHALA (MARAKANALI), GANGAJALGHATI P.S.

CHIEF EXECUTIVE OFFICER, 178/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD 116/2012

17-07-2012

25.00000

21.67155

85%

30-09-2013

21.67155 WORK IN PROGRESS

DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 179/PM(F)/P /1B150/2012 DATE 18-07-2012 SANCTIONED AMOUNT 20.77653 RELEASED AMOUNT PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION ` IN LAC REMARKS

12.1 INFRASTRUCTURE BLOCK DEVELOPMENT DEVELOPMENT WORKS AT OFFICER, INDPUR BLOCK BANSIDI HIGH SCHOOL, INDPUR

REVISED ESTIMATE AS SUBMITTED BY BDO VETTED FROM PUP ON 29/07/2013 13.75664 100% 10-05-2013 13.75664 COMPLETE

12.2 REPAIRING AND RENOVATION WORK OF SCHOOL BUILDING AT CHHATNA CHANDIDAS VIDYAPITH, CHHATNA 13.1 CONSTRUCTION OF CONCRETE ROAD FROM BIKNA UPOR PARA TO NAMO PARA

BLOCK DEVELOPMENT OFFICER, CHHATNA BLOCK

179/PM(F)/P /1B150/2012

18-07-2012

14.48700

CHIEF EXECUTIVE OFFICER, 181/PM(F)/P PASCHIMANCHAL UNNAYAN /1B-20/2012 PARSHAD

23-07-2012

16.45132

23.30520

100%

30-04-2013

23.30520 COMPLETE

13.2 CONSTRUCTION OF BRICK CHIEF EXECUTIVE OFFICER, 181/PM(F)/P WORK DRAIN FROM PASCHIMANCHAL UNNAYAN /1B-20/2012 BIKNA UPOR PARA TO PARSHAD NAMO PARA 13.3 CONSTRUCTION OF CONCRETE ROAD FROM RAMSAGAR BUS STAND TO RAMSAGAR RLY. STATION CHIEF EXECUTIVE OFFICER, 181/PM(F)/P PASCHIMANCHAL UNNAYAN /1B-20/2012 PARSHAD

23-07-2012

10.18784

100%

30-06-2013

COMPLETE

23-07-2012

23.58344

COMPLETE

13.4 CONSTRUCTION OF BRICK CHIEF EXECUTIVE OFFICER, 181/PM(F)/P WORK DRAIN FROM PASCHIMANCHAL UNNAYAN /1B-20/2012 RAMSAGAR BUS STAND PARSHAD TO RAMSAGAR RLY. STATION

23-07-2012

20.26142

36.16744

80%

30-09-2013

36.16744

WORK IN PROGRESS

DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 187/PM(F)/P /1B143/2012 DATE 25-07-2012 SANCTIONED AMOUNT 170.00000 RELEASED AMOUNT 170.00000 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 31-07-2013 ` IN LAC REMARKS

14 CONSTRUCTION OF 15KM ADDITIONAL EXECUTIVE BITUMINOUS ROAD FROM OFFICER, BANKURA ZILLA DHANJHAR MORE TO PARISHAD KARAPARA (BANSIDIHA) AT RANIBANDH

170.00000 COMPLETE

15 CONSTRUCTION OF ROAD ADDITIONAL EXECUTIVE FROM RATANPUR TO OFFICER, BANKURA ZILLA KRISHNAGAR AT ONDA PARISHAD BLOCK 16 CULTIVATION OF KHARIFF DIRECTOR OF RESEARCH, ONION IN BANKURA BIDHAN CHANDRA KRISHI DISTRICT VISWAVIDYALAYA, P.O. KALYANI, DIST. - NADIA 17.1 ROY BUNDH SURFACE ADDITIONAL EXECUTIVE FLOW MINOR IRRIGATION OFFICER, BANKURA ZILLA SCHEME, BHABRIGORA PARISHAD MOUZA, INDPUR BLOCK 17.2 PONDA BUNDH SURFACE ADDITIONAL EXECUTIVE FLOW MINOR IRRIGATION OFFICER, BANKURA ZILLA SCHEME, RADHANAGAR PARISHAD MOUZA, INDPUR BLOCK 17.3 UPAR BUNDH SURFACE ADDITIONAL EXECUTIVE FLOW MINOR IRRIGATION OFFICER, BANKURA ZILLA SCHEME, SAYERDI PARISHAD MOUZA, INDPUR BLOCK

189/PM(F)/P /1B144/2012 190/PM(F)/P /1B148/2012

25-07-2012

117.61524

117.61524

45%

30-11-2013

117.36727 WORK IN PROGRESS

25-07-2012

9.00000

9.00000

100%

2.16169 COMPLETE

191/PM(F)/P /1B137/2012

25-07-2012

80.80050

80.80050

100%

26-04-2013

13.49815 COMPLETE

191/PM(F)/P /1B137/2012

25-07-2012

56.01009

56.01009

100%

26-04-2013

COMPLETE

191/PM(F)/P /1B137/2012

25-07-2012

27.27898

27.27898

100%

26-04-2013

COMPLETE

DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS ADDITIONAL EXECUTIVE OFFICER, BANKURA ZILLA PARISHAD PUA DEPT.'S SANCTION ORDER NO. 191/PM(F)/P /1B137/2012 DATE 25-07-2012 SANCTIONED AMOUNT 21.81970 RELEASED AMOUNT 21.81970 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 26-04-2013 ` IN LAC REMARKS

17.4 KAMALYA BELGORIA SURFACE FLOW MINOR IRRIGATION SCHEME, KAJALKURA MOUZA, INDPUR BLOCK

COMPLETE

17.5 NATUN BUNDH SURFACE ADDITIONAL EXECUTIVE FLOW MINOR IRRIGATION OFFICER, BANKURA ZILLA SCHEME, LEDAPALASH PARISHAD MOUZA, INDPUR BLOCK

191/PM(F)/P /1B137/2012

25-07-2012

35.54999

35.54999

100%

01-01-2013

COMPLETE

17.6 LAYEK BUNDH SURFACE CHIEF EXECUTIVE OFFICER, 191/PM(F)/P FLOW MINOR IRRIGATION PASCHIMANCHAL UNNAYAN /1BSCHEME, KAJALKURA PARSHAD 137/2012 MOUZA, INDPUR BLOCK 17.7 ARALDIHI SCHOOL BUNDH CHIEF EXECUTIVE OFFICER, 191/PM(F)/P SURFACE FLOW MINOR PASCHIMANCHAL UNNAYAN /1BIRRIGATION SCHEME, PARSHAD 137/2012 ARALDIHI MOUZA, INDPUR BLOCK 17.8 HURHURA BUNDH SURFACE FLOW MINOR IRRIGATION SCHEME, MADHABPUR MOUZA, GANGAJALGHATI BLOCK CHIEF EXECUTIVE OFFICER, 191/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD 137/2012

25-07-2012

43.58450

31.82655

100%

30-06-2013

31.82655 COMPLETE

25-07-2012

20.11056

11.76998

100%

30-06-2013

11.76998 COMPLETE

25-07-2012

35.27534

25.03379

100%

30-06-2013

25.03379 COMPLETE

DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 25-07-2012 SANCTIONED AMOUNT 38.72656 RELEASED AMOUNT PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 65% 30-11-2013 ` IN LAC REMARKS

NO. 17.9 CONSTRUCTION OF CHECK CHIEF EXECUTIVE OFFICER, 191/PM(F)/P DAM AND PASCHIMANCHAL UNNAYAN /1BAUGMENTATION OF PARSHAD 137/2012 RESERVOIR, MAHESNA MOUZA, CHHATNA BLOCK 18.1 BANER BUNDH MINOR IRRIGATION SCHEME IN CHHATNA BLOCK CHIEF EXECUTIVE OFFICER, 192/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD 149/2012

WORK IN PROGRESS

26-07-2012

47.69337

25.98405

100%

30-05-2013

25.98405 COMPLETE

18.2 RESHER PUKUR MINOR IRRIGATION SCHEME IN CHHATNA BLOCK

CHIEF EXECUTIVE OFFICER, 192/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD 149/2012

26-07-2012

37.88384

21.49535

100%

30-05-2013

21.49535 COMPLETE

18.3 DHOBAGORA SOLER CHIEF EXECUTIVE OFFICER, 192/PM(F)/P BUNDH IN INDPUR BLOCK PASCHIMANCHAL UNNAYAN /1BPARSHAD 149/2012

26-07-2012

61.77828

35.49425

90%

30-11-2013

35.49425 WORK IN PROGRESS

18.4 BARABUNDH MINOR IRRIGATION SCHEME IN INDPUR BLOCK

CHIEF EXECUTIVE OFFICER, 192/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD 149/2012

26-07-2012

29.12293

13.55864

100%

30-05-2013

13.55864 COMPLETE

19 CONSTRUCTION OF A VOCATIONAL TRAINING CENTRE AND HOSTEL BUILDING AT AMADER HASPATAL, CHHATNA

FOUNDATION FOR HEALTH ACTION

226/PM(F)/P /1B-52/2011

16-08-2012

60.00607

60.00607

100%

30-06-2013

39.49217 COMPLETE

DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 07-09-2012 SANCTIONED AMOUNT 72.61834 RELEASED AMOUNT 27.30297 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 85% 30-09-2013 ` IN LAC REMARKS

NO. 20 CONSTRUCTION OF CHIEF EXECUTIVE OFFICER, 284/PM(F)/P BITUMINOUS ROAD FROM PASCHIMANCHAL UNNAYAN /1BKHATRA KANGSABATI PARSHAD 178/2012 SISHU VIDYALAYA TO BANTILLA VILLAGE, KHATRA BLOCK 21 CONSTRUCTION OF INCOMPLETE TOURIST COTTAGE AND INCOMPLETE TOURIST HUT AT ENDOGENOUS TOURISM PROJECT, BARAGHUTU, MUKUTMANIPUR, KHATRA PS CHIEF EXECUTIVE OFFICER, 292/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD THROUGH EO, 187/2012 KHATRA

27.30297 WORK IN PROGRESS

12-09-2012

19.63154

10.41345

60%

10.41345 WORK IN PROGRESS

22.1 CEMENT CONCRETE ROAD CHIEF EXECUTIVE OFFICER, AT PALAJURIA VILLAGE PASCHIMANCHAL UNNAYAN FROM ASTHIR BUNDH TO PARSHAD EXISTING CONCRETE ROAD, GANGAJALGHATI PS

304/PM(F)/P /1B116/2012 (PT.-I)

17-09-2012

15.68943

15.55921

100%

15-05-2013

15.55921 COMPLETE

22.2 CEMENT CONCRETE ROAD CHIEF EXECUTIVE OFFICER, 304/PM(F)/P AT RAJARAMPUR VILLAGE, PASCHIMANCHAL UNNAYAN /1BGANGAJALGHATI PS PARSHAD 116/2012 (PT.-I)

17-09-2012

22.33824

13.55160

100%

15-05-2013

13.55160 COMPLETE

DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 17-09-2012 SANCTIONED AMOUNT 23.89221 RELEASED AMOUNT PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 50% 31-10-2013 ` IN LAC REMARKS

NO. 22.3 IMPROVEMENT OF CHIEF EXECUTIVE OFFICER, 304/PM(F)/P MORRUM ROAD FROM PASCHIMANCHAL UNNAYAN /1BJAMBEDIA JORE TO PARSHAD 116/2012 VIRINGI MORE VIA VIRINGI (PT.-I) VILLAGE, GANGAJALGHATI PS 22.4 IMPROVEMENT OF MORRUM ROAD FROM EKCHALA MORE TO MORAKANALI MORE VIA EKCHALA VILLAGE, GANGAJALGHATI PS 23 CONSTRUCTION OF BOUNDARY WALL AT VIVEKANANDA SIKSHA MANDIR (JR. HIGH SCHOOL) AT MOLEBONA, BANKURA-I BLOCK 24 DISEMINATION OF AGRO TECHNIQUES FOR GROWING AND PROCESSING OF TURMERIC IN NONTRADITIONAL AREAS OF PASCHIMANCHAL FOR LIVELIHOOD CHIEF EXECUTIVE OFFICER, 304/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD 116/2012 (PT.-I)

WORK IN PROGRESS

17-09-2012

24.37135

9.56597

80%

30-09-2013

9.56597 WORK IN PROGRESS

SCHOOL AUTHORITY, 313/PM(F)/P VIVEKANANDA SIKSHA /1BMANDIR (JR. HIGH SCHOOL) 186/2012

24-09-2012

25.97403

25.97403

100%

20-04-2013

25.97403 COMPLETE

DIRECTOR OF RESEARCH, BIDHAN CHANDRA KRISHI VISWAVIDYALAYA, P.O. KALYANI, DIST. - NADIA

322/PM(F)/P /1B188/2012

26-09-2012

19.50000

19.50000

6.96604 ONGOING, PROJECT HAS 3 YRS. DURATION

DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS BLOCK DEVELOPMENT OFFICER, RANIBUNDH BLOCK PUA DEPT.'S SANCTION ORDER NO. 323/PM(F)/P /1B193/2012 DATE 27-09-2012 SANCTIONED AMOUNT 21.23786 RELEASED AMOUNT 20.21763 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 30-04-2013 ` IN LAC REMARKS

25.1 CONSTRUCTION OF BOUNDARY WALL AT BARIKUL UDAY BHARATI HIGH SCHOOL (HS), BARIKUL

20.21763 COMPLETE

25.2 UPGRADATION TO BLOCK DEVELOPMENT BITUMINOUS ROAD FROM OFFICER, INDPUR BLOCK AHANDA PIYARSEE GIRLS HIGH SCHOOL TO NH-60A, INDPUR PS

323/PM(F)/P /1B193/2012

27-09-2012

50.95586

17.77060

25%

31-05-2013

16.78116 WORK IN PROGRESS

26.1 RENOVATION OF CANAL EXECUTIVE ENGINEER, IN THE FORM OF BANKURA IRRIGATION RESTORING & LINING IN DIVISION, 03242-254934 BETWEEN CH. 126.70 AND CH. 160.00 OF DY-4 OF B.B.C. FOR RESTORATION OF DISTRESSED IRRIGATION POTENTIAL WITHIN ONDA BLOCK, DIST. BANKURA UNDER BANKURA IRRIGATION DIVISION

342/PM(F)/P /1B167/2012

09-10-2012

31.75000

31.75000

100%

30-04-2013

120.94868 COMPLETE

DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 342/PM(F)/P /1B167/2012 DATE 09-10-2012 SANCTIONED AMOUNT 38.95000 RELEASED AMOUNT 38.95000 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 30-04-2013 ` IN LAC REMARKS

26.2 RENOVATION OF CANAL EXECUTIVE ENGINEER, IN THE FORM OF BANKURA IRRIGATION RESECTIONING & LINING DIVISION, 03242-254934 IN BETWEEN CH. 160.00 AND CH. 198.80 OF DY-4 OF B.B.C. FOR RESTORATION OF DISTRESSED IRRIGATION POTENTIAL WITHIN ONDA BLOCK, DIST. BANKURA UNDER BANKURA IRRIGATION DIVISION

COMPLETE

26.3 RENOVATION OF CANAL EXECUTIVE ENGINEER, IN THE FORM OF BANKURA IRRIGATION RESECTIONING & LINING DIVISION, 03242-254934 IN BETWEEN CH.198.80 AND CH. 257.50 OF DY-4 OF B.B.C. FOR RESTORATION OF DISTRESSED IRRIGATION POTENTIAL WITHIN ONDA BLOCK, DIST. BANKURA UNDER BANKURA IRRIGATION DIVISION.

342/PM(F)/P /1B167/2012

09-10-2012

49.98000

49.98000

85%

31-12-2013

WORK IN PROGRESS

DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 342/PM(F)/P /1B167/2012 DATE 09-10-2012 SANCTIONED AMOUNT 49.91000 RELEASED AMOUNT 49.91000 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 30% 31-12-2013 ` IN LAC REMARKS

26.4 RESTORATION OF EXECUTIVE ENGINEER, DISTRESSED IRRIGATION BANKURA IRRIGATION POTENTIAL IN THE FORM DIVISION, 03242-254934 OF RE-SECTIONING OF CANAL INCLUDING CEMENT CONCRETE LINING IN BETWEEN CH. 836.00 & CH 980.22 OF SIMLAPAL BRANCH CANAL WITHIN SIMLAPAL BLOCK, DIST. BANKURA UNDER BANKURA IRRIGATION DIVISION

WORK IN PROGRESS

26.5 RESTORATION OF EXECUTIVE ENGINEER, DISTRESSED IRRIGATION BANKURA IRRIGATION POTENTIAL IN THE FORM DIVISION, 03242-254934 OF RE-SECTIONING OF CANAL INCLUDING CEMENT CONCRETE LINING & REPAIR OF STRUCTURES IN DISTRIBUTORY CANAL NO. 15, 16, 17, 18 OF SIMLAPAL BRANCH CANAL WITHIN SIMLAPAL BLOCK, DIST. BANKURA UNDER BANKURA IRRIGATION DIVISION

342/PM(F)/P /1B167/2012

09-10-2012

49.89000

49.89000

70%

31-12-2013

WORK IN PROGRESS

DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 342/PM(F)/P /1B167/2012 DATE 09-10-2012 SANCTIONED AMOUNT 31.85000 RELEASED AMOUNT 31.85000 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 70% 31-12-2013 ` IN LAC REMARKS

26.6 RESTORATION OF EXECUTIVE ENGINEER, DISTRESSED IRRIGATION BANKURA IRRIGATION POTENTIAL IN THE FORM DIVISION, 03242-254934 OF CANAL INCLUDING CEMENT CONCRETE LINING & REPAIR OF STRUCTURES IN DISTRIBUTARY CANAL NO. 13 OF SIMLAPAL BRANCH CANAL WITHIN SIMLAPAL BLOCK, DIST. BANKURA UNDER BANKURA IRRIGATION DIVISION

WORK IN PROGRESS

27.1 WORK OF SANITATION AT SECRETARY, YUGACHARYA 362/PM(F)/P AMDANGA HOSTEL, VIVEKANANDA SEVA SAMITY /1BSIMLAPAL BLOCK 217/2012

30-10-2012

2.99893

2.99893

100%

30-06-2013

2.99893 COMPLETE

27.2 SINKING OF SUBMERSIBLE SECRETARY, YUGACHARYA 362/PM(F)/P PUMP AND PIPELINE AT VIVEKANANDA SEVA SAMITY /1BAMDANGA HOSTEL, 217/2012 SIMLAPAL BLOCK

30-10-2012

2.81251

2.81251

100%

30-06-2013

2.81251 COMPLETE

DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 366/PM(F)/P /1B219/2012 DATE 06-11-2012 SANCTIONED AMOUNT 57.50786 RELEASED AMOUNT 27.07305 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 60% 30-06-2013 ` IN LAC REMARKS

28 COMPLETION OF BLOCK DEVELOPMENT DEVELOPMENT OF TRIBAL OFFICER, CHHATNA BLOCK TANK ADJUNCTION TO SUSUNIA HILL INCLUDING BOATING CLUB AND PISICULTURE, CHHATNA BLOCK

27.07305 TANK EXCAVATION IS IN PROGRESS

29.1 CONSTRUCTION OF BOUNDARY WALL AT BHARAT SEVASHRAM SANGHA, KHATRA PS

SECRETARY, BHARAT SEVASHRAM SANGHA, KHATRA

375/PM(F)/P /1B231/2012

20-11-2012

21.07423

21.07423

100%

21.07423 COMPLETE

29.2 CONSTRUCTION OF FENCING AT BHARAT SEVASHRAM SANGHA, KHATRA PS

SECRETARY, BHARAT SEVASHRAM SANGHA, KHATRA

375/PM(F)/P /1B231/2012

20-11-2012

5.25124

5.25124

100%

5.25124 COMPLETE

30 CONSTRUCTION OF SCHOOL AUTHORITY, HOSTEL BUILDING, SALDAHA JUNIOR HIGH KITCHEN STORE, DINING SCHOOL AND WATER CLOSET BATH OF SALDAHA JUNIOR HIGH SCHOOL, SALDAHA VILLAGE, TALDANGRA BLOCK

377/PM(F)/P /1B186/2012

21-11-2012

14.39078

14.39078

100%

14.39078 COMPLETE

DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 21-11-2012 SANCTIONED AMOUNT 18.78989 RELEASED AMOUNT 18.21910 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 31-05-2013 ` IN LAC REMARKS

31 CONSTRUCTION OF BOUNDARY WALL OF JYOTI PRATIBANDHI PUNARBASAN KENDRA, BANKURA (SADAR) SUBDIVISION 32 RE-EXCAVATION AND CONSTRUCTION OF BATHING GHAT, GUARD WALL ETC. OF BHARAT SEVASHRAM SANGHA POND, KHATRA BLOCK 33 CONSTRUCTION OF BOUNDARY WALL AT PAIRASOLE DUBURIA JUNIOR HIGH SCHOOL, MEJIA BLOCK

NO. CHIEF EXECUTIVE OFFICER, 378/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD 227/2012

18.21910 COMPLETE

SECRETARY, BHARAT SEVASHRAM SANGHA, KHATRA

379/PM(F)/P /1B216/2012

21-11-2012

23.57070

23.57070

100%

31-05-2013

23.57070 COMPLETE

SCHOOL AUTHORITY, PAIRASOLE DUBURIA JUNIOR HIGH SCHOOL

387/PM(F)/P /1B223/2012

23-11-2012

10.26511

10.26511

50%

5.05142 WORK IN PROGRESS

34.1 CONSTRUCTION OF SIDE EXECUTIVE OFFICER, DRAIN FROM TALDANGRA PANCHAYAT PANCHMURA SABRAKONE SAMITY ROAD TO PANCHMURA KUMARPARA, TALDANGRA BLOCK

402/PM(F)/P /1B189/2012

05-12-2012

22.64636

22.64636

50%

31-05-2013

10.00000 WORK IN PROGRESS

DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 402/PM(F)/P /1B189/2012 DATE 05-12-2012 SANCTIONED AMOUNT 24.86973 RELEASED AMOUNT 24.86973 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS

34.2 CONSTRUCTION OF PCC EXECUTIVE OFFICER, ROAD FROM PANCHMURA TALDANGRA PANCHAYAT SABRAKONE ROAD TO SAMITY PANCHMURA KUMARPARA, TALDANGRA BLOCK

23.20588 COMPLETE

34.3 CONSTRUCTION OF PCC EXECUTIVE OFFICER, ROAD OVER EXISTING TALDANGRA PANCHAYAT VILLAGE ROAD AT SAMITY PANCHMURA KUMARPARA, TALDANGRA BLOCK 35 RE-EXCAVATION OF NAGRI EXECUTIVE OFFICER, SAHEB BUNDH, KHATRA KHATRA PANCHAYAT P.S. SAMITY

402/PM(F)/P /1B189/2012

05-12-2012

12.49113

12.49113

100%

31-05-2013

11.86479 COMPLETE

410/PM(F)/P /1B235/2012

11-12-2012

37.55526

37.55526

100%

30-04-2013

37.37119 COMPLETE

36 CONSTRUCTION OF CHIEF EXECUTIVE OFFICER, 415/PM(F)/P CONCRETE ROAD FROM PASCHIMANCHAL UNNAYAN /1BKARAPARA CHOWMATHA PARSHAD 238/2012 TO NAMOPARA IN PURUSHOTTAMPUR VILLAGE, PURUSHOTTAMPUR MAUZA, INDPUR BLOCK

13-12-2012

37.12752

18.76838

50%

30-09-2013

18.76838 WORK IN PROGRESS

DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 434/PM(F)/P /1B192/2012 DATE 20-12-2012 SANCTIONED AMOUNT 58.10722 RELEASED AMOUNT 17.58357 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 30% 30-06-2013 ` IN LAC REMARKS

37 CONSTRUCTION OF 3 NOS. BLOCK DEVELOPMENT OF COTTAGE AND ALLIED OFFICER, CHHATNA BLOCK WORKS FOR COMPLETION OF MURUTHBAHA ECO PARK AT SUSUNIA, BANKURA

17.58357 CONST. OF COTTAGE RUNNING UPTO PLINTH LEVEL

38 CONSTRUCTION OF EXTRA EXECUTIVE OFFICER, ONDA FOUNDATION FOR PANCHAYAT SAMITY ADDITIONAL CLASSROOMS ON 1ST FLOOR OF PUNISOLE NASRUL ULLOM SIDDQUIA M.S.K. (SR. MADRASAH TYPE), ONDA PS 39 DEVELOPMENT OF BIDHAN CHANDRA KRISHI TECHNOLOGY FOR VISWAVIDYALAYA, PRODUCTION OF WINE MOHANPUR, NADIA GRAPES IN DROUGHT PRONE AREA OF BANKURA DISTRICT (TOTAL 41.24000 LAC)

437/PM(F)/P /1B254/2012

21-12-2012

7.35000

7.35000

NO INFORMATION RECEIVED

439/PM(F)/P /1B236/2012

24-12-2012

16.30400

16.30400

40%

PROJECT IS ONGOING

DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 01/PM(F)/P/ 1B-67/2012 DATE 04-01-2013 SANCTIONED AMOUNT 32.78000 RELEASED AMOUNT 32.78000 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 15% 31-12-2013 ` IN LAC REMARKS

40.1 RENOVATION OF CANAL EXECUTIVE ENGINEER, IN THE FORM OF BANKURA IRRIGATION RESECTIONING & LINING DIVISION, 03242-254934 IN BETWEEN CH. 258.09 AND CH. 286.112 OF DY-4 OF B.B.C. FOR RESTORATION OF DISTRESSED IRRIGATION POTENTIAL WITHIN ONDA BLOCK, DIST. BANKURA UNDER BANKURA IRRIGATION DIVISION

WORK IN PROGRESS

40.2 RENOVATION OF CANAL EXECUTIVE ENGINEER, IN THE FORM OF BANKURA IRRIGATION RESECTIONING & LINING DIVISION, 03242-254934 IN BETWEEN CH. 287.506 AND CH. 323.936 OF DY-4 OF B.B.C. FOR RESTORATION OF DISTRESSED IRRIGATION POTENTIAL WITHIN ONDA BLOCK, DIST. BANKURA UNDER BANKURA IRIGATION DIVISION

01/PM(F)/P/ 1B-67/2012

04-01-2013

44.89000

44.89000

15%

31-12-2013

WORK IN PROGRESS

DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 01/PM(F)/P/ 1B-67/2012 DATE 04-01-2013 SANCTIONED AMOUNT 49.98000 RELEASED AMOUNT 49.98000 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 15% 31-12-2013 ` IN LAC REMARKS

40.3 RENOVATION OF CANAL EXECUTIVE ENGINEER, IN THE FORM OF BANKURA IRRIGATION RESECTIONING & LINING DIVISION, 03242-254934 IN BETWEEN CH. 324.609 AND CH. 368.00 OF DY-4 OF B.B.C. FOR RESTORATION OF DISTRESSED IRRIGATION POTENTIAL WITHIN ONDA BLOCK, DIST. BANKURA UNDER BANKURA IRRIGATION DIVISION

WORK IN PROGRESS

40.4 RENOVATION OF CANAL EXECUTIVE ENGINEER, IN THE FORM OF BANKURA IRRIGATION RESECTIONING & LINING DIVISION, 03242-254934 IN BETWEEN CH. 368.886 AND CH. 411.00 OF DY-4 OF B.B.C. FOR RESTORATION OF DISTRESSED IRRIGATION POTENTIAL WITHIN ONDA BLOCK, DIST. BANKURA UNDER BANKURA IRRIGATION DIVISION

01/PM(F)/P/ 1B-67/2012

04-01-2013

49.20000

49.20000

15%

15-07-2013

WORK IN PROGRESS

DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS EXECUTIVE ENGINEER, KANGSABATI CANALS DIVISION - II, KHATRA, BANKURA PUA DEPT.'S SANCTION ORDER NO. 02/PM(F)/P/ 1B-188/2012 DATE 04-01-2013 SANCTIONED AMOUNT 23.82127 RELEASED AMOUNT 23.82127 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 30-06-2013 ` IN LAC REMARKS

41.1 RESTORATION OF LOST IRRIGATION POTENTIAL BY M/R TO CAST IN SITU CEMENT CONCRETE LINING IN BETWEEN CH. 14.00 TO CH. 18.00, CH. 38.00 TO CH. 42.00 ETC. OF DY-03 OF R.M.B.C., MUKUTMONIPUR, KHATRA BLOCK

COMPLETE

41.2 IMPROVEMENT OF IRRIGATION POTENTIAL AND CANAL SYSTEM BY RESECTIONING & CONSTRUCTION OF CONCRETE LINING FROM CH. 344.00 TO CH. 359.00 OF MR-3 OF DY-08 OF R.M.B.C. WITHIN RAIPUR BLOCK

EXECUTIVE ENGINEER, KANGSABATI CANALS DIVISION - II, KHATRA, BANKURA

02/PM(F)/P/ 1B-188/2012

04-01-2013

24.23655

24.23655

100%

COMPLETE

DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS EXECUTIVE ENGINEER, KANGSABATI CANALS DIVISION - II, KHATRA, BANKURA PUA DEPT.'S SANCTION ORDER NO. 02/PM(F)/P/ 1B-188/2012 DATE 04-01-2013 SANCTIONED AMOUNT 24.37774 RELEASED AMOUNT 24.37774 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS

41.3 IMPROVEMENT OF IRRIGATION POTENTIAL AND CANAL SYSTEM BY RESECTIONING & CONSTRUCTION OF CONCRETE LINING FROM CH. 328.00 TO CH.343.00 OF MR-3 OF DY-8 OF R.M.B.C. WITHIN RAIPUR BLOCK 41.4 RESTORATION OF LOST IRRIGATION POTENTIAL OF DY-06 OF K.M.C.(U) FROM CH. 128.00 TO CH.132.0O AND 135.00 TO CH. 138.00 WITHIN SIMLAPAL BLOCK

COMPLETE

EXECUTIVE ENGINEER, KANGSABATI CANALS DIVISION - II, KHATRA, BANKURA

02/PM(F)/P/ 1B-188/2012

04-01-2013

7.72585

7.72585

100%

COMPLETE

41.5 RESTORATION OF LOST IRRIGATION POTENTIAL OF DY-08 OF S.M.C.(U) FROM CH. 288.00 TO CH. 231.50, CH. 233.50 TO CH. 238.50 ETC. WITHIN KHATRA BLOCK

EXECUTIVE ENGINEER, KANGSABATI CANALS DIVISION - II, KHATRA, BANKURA

02/PM(F)/P/ 1B-188/2012

04-01-2013

10.01345

10.01345

85%

31-12-2013

WORK IN PROGRESS

DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS EXECUTIVE ENGINEER, KANGSABATI CANALS DIVISION - II, KHATRA, BANKURA PUA DEPT.'S SANCTION ORDER NO. 02/PM(F)/P/ 1B-188/2012 DATE 04-01-2013 SANCTIONED AMOUNT 10.16305 RELEASED AMOUNT 10.16305 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 85% 31-12-2013 ` IN LAC REMARKS

41.6 RESTORATION OF LOST IRRIGATION POTENTIAL OF DY-08 OF S.M.C.(U) FROM CH. 88.00 TO CH. 207.00 WITHIN KHATRA BLOCK

WORK IN PROGRESS

42.1 IMPROVEMENT OF RIDING EXECUTIVE ENGINEER, PWD, 13/PM(F)/P/ QUALITY OF BANKURABANKURA DIVISION 1B-247/2012 SALTORA ROAD FROM 18.60 KMP TO 19.20 KMP (KHARBONA BAZAR) IN THE DISTRICT OF BANKURA 42.2 IMPROVEMENT OF RIDING EXECUTIVE ENGINEER, PWD, 13/PM(F)/P/ QUALITY OF BANKURABANKURA DIVISION 1B-247/2012 SALTORA ROAD FROM 12.31 KMP TO 14.20 KMP (CHHATNA BAZAR) IN THE DISTRICT OF BANKURA

24-01-2013

18.13512

36.27023

24-01-2013

40.67724

81.35448

*FULL AMOUNT RELEASED BY MISTAKE, BUT AS OTHER SOURCE OF FUND RECEIVED BY EE, PWD ENTIRE AMOUNT WILL BE REFUNDED TO PUP

43.1 CONSTRUCTION OF LIBRARY BUILDING AT RAMCHANDRA TARUN PALLY, MEJIA

CHIEF EXECUTIVE OFFICER, 19/PM(F)/P/ PASCHIMANCHAL UNNAYAN 1B-253/2012 PARSHAD

24-01-2013

13.38992

9.51356

60%

30-11-2013

9.51356 WORK IN PROGRESS

DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 24-01-2013 SANCTIONED AMOUNT 24.43413 RELEASED AMOUNT 16.95020 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS

NO. 43.2 CONSTRUCTION OF CHIEF EXECUTIVE OFFICER, 19/PM(F)/P/ CEMENT CONCRETE ROAD PASCHIMANCHAL UNNAYAN 1B-253/2012 FROM LALBAZAR PRIMARY PARSHAD SCHOOL TO LALBAZAR MASJID (IN 3 PART), ARDHAGRAM GP, MEJIA 44 REPAIRING OF CENTRAL LABORATORY OF PMGSY CELL OF BANKURA DIVISION ADDITIONAL EXECUTIVE OFFICER, BANKURA ZILLA PARISHAD 23/PM(F)/P/ 1B-259/2012

16.95020 COMPLETE

30-01-2013

6.21360

6.21360

NOT STARTED

45.1 RENOVATION OF BLOCK DEVELOPMENT 71/PM(F)/P/ DILAPIDATED ROAD FROM OFFICER, BANKURA-II BLOCK 1B-25/2013 MAIN ROAD OF NABAJIBANPUR VILLAGE (SAMABAY BANK) TO BORO POOL (TANTKANALI)

11-03-2013

4.00000

15-07-2013

COMPLETE OUT OF NREGS FUND

45.2 RENOVATION OF BLOCK DEVELOPMENT 71/PM(F)/P/ DILAPIDATED ROAD FROM OFFICER, BANKURA-II BLOCK 1B-25/2013 BADRA MORE TO NADIGHAT

11-03-2013

5.00000

15-07-2013

STARTED SOON

DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 99/PM(F)/P/ 1B-24/2013 DATE 18-03-2013 SANCTIONED AMOUNT 20.78564 RELEASED AMOUNT 20.78564 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 50% ` IN LAC REMARKS

46.1 CONSTRUCTION OF SC/ ST SCHOOL AUTHORITY, HOSTEL BUILDING AT DUMURTORE BAGBADINI DUMURTORE BAGBADINI HIGH SCHOOL HIGH SCHOOL, RAIPUR BLOCK

12.19032 WORK IN PROGRESS

46.2 SINKING OF DEEP TUBESCHOOL AUTHORITY, WELL AT DUMURTORE DUMURTORE BAGBADINI BAGBADINI HIGH SCHOOL, HIGH SCHOOL RAIPUR BLOCK

99/PM(F)/P/ 1B-24/2013

18-03-2013

3.59500

3.59500

100%

3.59500 COMPLETE

TOTAL:

2744.06355

2276.14612

1353.71976

DISTRICT: BIRBHUM DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS EXECUTIVE OFFICER, RAJNAGAR PANCHAYAT SAMITY PUA DEPT.'S SANCTION ORDER NO. DATE 256/PM(F)/P 24-08-2012 /1B-31/2012 SANCTIONED AMOUNT 123.37000 RELEASED AMOUNT 123.37000 PHYSICAL EXPECTED DATE PROGRESS OF COMPLETION 99% UC RECEIVED ` IN LAC REMARKS

1 IMPLEMENTATION OF 69 (SIXTY NINE) NOS. OF SCHEMES IN RESPECT OF RAJNAGAR BLOCK

123.36673 WORK IN PROGRESS

2 IMPLEMENTATION OF 23 EXECUTIVE OFFICER, MD. 257/PM(F)/P 24-08-2012 (TWENTY THREE) NOS. OF BAZAR PANCHAYAT SAMITY /1B-32/2012 SCHEMES IN RESPECT OF MD. BAZAR BLOCK

120.32000

120.32000

100%

120.32000 COMPLETE

3 IMPLEMENTATION OF 5 (FIVE) NOS. OF SCHEMES IN RESPECT OF NALHATI-I BLOCK

EXECUTIVE OFFICER, NALHATI-I PANCHAYAT SAMITY; 03465-255236; 9474766664; bdonal1@rediffmail.com

259/PM(F)/P 24-08-2012 /1B-34/2012

37.01500

37.01500

100%

37.01500 COMPLETE

4 IMPLEMENTATION OF 8 EXECUTIVE OFFICER, (EIGHT) NOS. OF SCHEMES ILLAMBAZAR PANCHAYAT IN RESPECT OF SAMITY ILLAMBAZAR BLOCK 5 IMPLEMENTATION OF 29 (TWENTY NINE) NOS. OF SCHEMES IN RESPECT OF BOLPUR-SRINIKETAN BLOCK

260/PM(F)/P 24-08-2012 /1B-35/2012

28.06500

28.06500

100%

28.06500 COMPLETE

EXECUTIVE OFFICER, 261/PM(F)/P 24-08-2012 BOLPUR-SRINIKETAN /1B-36/2012 PANCHAYAT SAMITY; 03463264280/ 264172/ 9434040654, bdo_bol@yahoo.co.in

100.72500

100.72500

100%

100.72500 COMPLETE

DISTRICT: BIRBHUM DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER SANCTIONED AMOUNT 124.53500 RELEASED AMOUNT 124.53500 PHYSICAL EXPECTED DATE PROGRESS OF COMPLETION 100% UC RECEIVED ` IN LAC REMARKS

6 IMPLEMENTATION OF 61 (SIXTY ONE) NOS. OF SCHEMES IN RESPECT OF SURI-I BLOCK 7 IMPLEMENTATION OF 35 (THIRTY FIVE) NOS. OF SCHEMES IN RESPECT OF DUBRAJPUR BLOCK

NO. DATE EXECUTIVE OFFICER, SURI-I 262/PM(F)/P 24-08-2012 PANCHAYAT SAMITY, 03462- /1B-41/2012 225409/ 9434004880

113.35277 COMPLETE

EXECUTIVE OFFICER, DUBRAJPUR PANCHAYAT SAMITY

266/PM(F)/P 27-08-2012 /1B-29/2012

103.29000

103.29000

95%

100.89902 WORK IN PROGRESS

8 IMPLEMENTATION OF 60 EXECUTIVE OFFICER, (SIXTY) NOS. OF SCHEMES MURARAI-I PANCHAYAT IN RESPECT OF MURARAI-I SAMITY BLOCK 9 IMPLEMENTATION OF 8 EXECUTIVE OFFICER, (EIGHT) NOS. OF SCHEMES KHOYRASOLE PANCHAYAT IN RESPECT OF SAMITY KHOYRASOLE BLOCK 10 IMPLEMENTATION OF 48 (FORTY EIGHT) NOS. OF SCHEMES IN RESPECT OF RAMPURHAT-I BLOCK

267/PM(F)/P 27-08-2012 /1B-28/2012

76.24000

76.24000

100%

76.24000 COMPLETE

268/PM(F)/P 27-08-2012 /1B-30/2012

29.53500

29.53500

90%

26.53500 WORK IN PROGRESS

EXECUTIVE OFFICER, 269/PM(F)/P 27-08-2012 RAMPURHAT-I PANCHAYAT /1B-33/2012 SAMITY

58.50000

58.50000

100%

58.50000 COMPLETE

11 CONSTRUCTION OF MINI BARRAGE OVER KANA AJOY AT UPARKHARA MOUZA, BOLPURSRINIKETAN PS (5TH INSTALMENT)

DISTRICT MAGISTRATE, BIRBHUM

329/PM(F)/P 28-09-2012 /1B-89/2008 (PT.-I)

144.68000

144.68000

CIVIL PART COMPLETE

DISTRICT: BIRBHUM DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER SANCTIONED AMOUNT 101.96240 RELEASED AMOUNT 101.96240 PHYSICAL EXPECTED DATE PROGRESS OF COMPLETION 100% 31-03-2013 UC RECEIVED ` IN LAC REMARKS

NO. DATE 12.1 IMPROVEMENT OF RIDING EXECUTIVE ENGINEER, 351/PM(F)/P 12-10-2012 QUALITY AND P.W.D., BIRBHUM DIVISION, /1BSTRENGTHENING OF S/R 03462-255261, 9830149949, 133/2011 TO RAMPURHAT pwdbirbhum@gmail.com DUMKA ROAD FROM 0.0 KM TO 3.00 KM AND 9.00 KM TO 12.30 KM UNDER RAMPURHAT SUBDIVISION

76.51008 COMPLETE

12.2 IMPROVEMENT OF RIDING QUALITY AND STRENGTHENING OF S/R TO SURI MD. BAZAR ROAD FROM 0.0 KM TO 1.00 KM AND 3.81 KM TO 5.60 UNDER SURI SUBDIVISION 12.3 IMPROVEMENT & STRENGTHENING OF KHAGRA JOYDEV ROAD FROM 0.0 KM TO 8.00 KM UNDER BOLPUR SUBDIVISION

EXECUTIVE ENGINEER, 351/PM(F)/P 12-10-2012 P.W.D., BIRBHUM DIVISION, /1B03462-255261, 9830149949, 133/2011 pwdbirbhum@gmail.com

47.70926

47.70926

100%

31-03-2013

24.35613 COMPLETE

EXECUTIVE ENGINEER, 351/PM(F)/P 12-10-2012 P.W.D., BIRBHUM DIVISION, /1B03462-255261, 9830149949, 133/2011 pwdbirbhum@gmail.com

171.52255

171.52255

100%

31-03-2013

137.10440 COMPLETE

DISTRICT: BIRBHUM DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER SANCTIONED AMOUNT 131.89738 RELEASED AMOUNT 131.89738 PHYSICAL EXPECTED DATE PROGRESS OF COMPLETION 95% 31-08-2013 UC RECEIVED ` IN LAC REMARKS

12.4 IMPROVEMENT & STRENGTHENING OF BOLPUR ILLAMBAZAR ROAD FROM 1.0 KM TO 9.40 KM EXCLUDING 3.0 KM TO 5.20 KM UNDER BOLPUR SUB-DIVISION

NO. DATE EXECUTIVE ENGINEER, 351/PM(F)/P 12-10-2012 P.W.D., BIRBHUM DIVISION, /1B03462-255261, 9830149949, 133/2011 pwdbirbhum@gmail.com

131.89738 WORK IN PROGRESS, 2012-13 FUND UTILISED

12.5 IMPROVEMENT OF RIDING QUALITY AND STRENGTHENING OF SURI RAJNAGAR ROAD (SH-13) FROM 0.0 KM TO 4.00 KM UNDER BIRBHUM HIGHWAY DIVISION

EXECUTIVE ENGINEER, 351/PM(F)/P 12-10-2012 P.W.D. (ROADS) /1BDIRECTORATE, BIRBHUM 133/2011 HIGHWAY DIVISION, 9434173015, 03462-255381

102.00000

102.00000

95%

31-10-2013

89.96072 WORK IN PROGRESS

13 IMPROVEMENT OF ROAD DISTRICT MAGISTRATE, FROM ROYPUR TO BIRBHUM DHOLKATA AT PANCHAMI AREA OF MD. BAZAR BLOCK 14 CONSTRUCTION OF SECRETARY, LIVER BUILDING FOR A PUBLIC FOUNDATION, 53 GOPAL HEALTH TRAINING CENTRE BANERJEE LANE, HOWRAH AND HEALTH CARE COMPLEX, BIRBHUM

367/PM(F)/P 12-11-2012 /1B117/2012

272.02011

272.02011

20%

50.28169 WORK IN PROGRESS

414/PM(F)/P 13-12-2012 /1B-99/2008

20.00000

20.00000

100%

20.00000 COMPLETE

DISTRICT: BIRBHUM DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER SANCTIONED AMOUNT 137.30196 RELEASED AMOUNT 137.30196 PHYSICAL EXPECTED DATE PROGRESS OF COMPLETION 95% 31-08-2013 UC RECEIVED ` IN LAC REMARKS

15 IMPROVEMENT & STRENGTHENING OF BOLPUR ILLAMBAZAR ROAD FROM 1.0 KMP TO 9.40 KMP EXCLUDING 3.0 KMP TO 5.20 KMP UNDER BOLPUR SUB-DIVISION (ADDITIONAL SANCTION)

NO. DATE EXECUTIVE ENGINEER, 438/PM(F)/P 24-12-2012 P.W.D., BIRBHUM DIVISION, /1B03462-255261, 9830149949, 133/2011 pwdbirbhum@gmail.com

137.30196 WORK IN PROGRESS, 2012-13 FUND UTILISED

TOTAL:

1,930.68866

1,930.68866

1,452.43088

DISTRICT: BURDWAN DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. DATE 180/PM(F)/P 20-07-2012 /1B151/2012 SANCTIONED AMOUNT 184.92185 RELEASED AMOUNT 184.92185 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 289.08098 ` IN LAC REMARKS

1.1 RESECTIONING OF DISTRICT MAGISTRATE, DURGAPUR BRANCH BURDWAN CANAL FROM CH. 0.00 TO CH. 268.00 IN KANKSA BLOCK UNDER DAMODAR HEAD WORKS DIVISION 1.2 RESECTIONING OF DISTRICT MAGISTRATE, DURGAPUR BRANCH BURDWAN CANAL FROM CH. 268.65 TO CH. 757.00 IN KANKSA AND AUSGRAM-II BLOCK UNDER DAMODAR HEAD WORKS DIVISION

180/PM(F)/P 20-07-2012 /1B151/2012

221.96128

221.96128

1.3 UPGRADATION AND DISTRICT MAGISTRATE, IMPROVEMENT OF BURDWAN PANDAVESWAR NATUNDANGA ROAD FROM 0.00 KMP TO 1.00 KMP UNDER ASANSOL SUBDIVISION 1.4 GROUND WATER BASED DISTRICT MAGISTRATE, WATER SUPPLY SCHEME BURDWAN AT ALEFNAGAR IN AUSGRAM - I BLOCK

180/PM(F)/P 20-07-2012 /1B151/2012

127.99466

127.99466

180/PM(F)/P 20-07-2012 /1B151/2012

68.97442

68.97442

DISTRICT: BURDWAN DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. DATE 180/PM(F)/P 20-07-2012 /1B151/2012 SANCTIONED AMOUNT 68.79944 RELEASED AMOUNT 68.79944 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION ` IN LAC REMARKS

1.5 GROUND WATER BASED DISTRICT MAGISTRATE, WATER SUPPLY SCHEME BURDWAN AT SHYAMSUNDARPUR IN AUSGRAM - II BLOCK

2 CONSTRUCTION OF RIG BORE TUBE WELL IN 10 BLOCKS AND RIVERBED TUBE WELL IN RANIGUNG BLOCK (150 NOS. TUBEWELLS)

EXECUTIVE ENGINEER, CENTRAL MECHANICAL DIVISION, P.H.E. DIRECTORATE, BURDWAN; 0342-2644048, ee_cme@wbphed.gov.in

273/PM(F)/P 29-08-2012 /1B-46/2012

141.36138

141.36138

100%

141.36138 COMPLETE

3 CONSTRUCTION OF ICDS CENTRES, ADDITIONAL CLASSROOMS & SUPPLY OF DRINKING WATER IN 10 BLOCKS

DISTRICT MAGISTRATE, BURDWAN

274/PM(F)/P 29-08-2012 /1B170/2011

342.53710

342.53710

4 CONTINGENT FUND FOR SMOOTH RUNNING OF PUP SCHEMES IMPLEMENTED DURING 2012-13

DISTRICT MAGISTRATE, BURDWAN

406/PM(F)/P 10-12-2012 /1B-85/2010

5.68000

5.68000

DISTRICT: BURDWAN DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. DATE 22/PM(F)/P/ 30-01-2013 1B-258/2012 SANCTIONED AMOUNT 22.44526 RELEASED AMOUNT 22.44526 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS

5.1 RESTORATION OF CANAL DISTRICT MAGISTRATE, BED AND SLOPES BURDWAN INCLUDING LINING WORKS WITH PCC FROM CH. 472.00 TO CH. 488.00 IN KANKSA BLOCK, BURDWAN IRRIGATION SUB-DIVN. NO. III 5.2 RESTORATION OF CANAL DISTRICT MAGISTRATE, BED AND SLOPES BURDWAN INCLUDING LINING WORKS WITH PCC FROM CH. 488.00 TO CH. 506.00 IN KANKSA & AUSGRAM-II BLOCK, BURDWAN IRRIGATION SUB-DIVN. NO. III 5.3 RESTORATION OF CANAL DISTRICT MAGISTRATE, BED AND SLOPES BURDWAN INCLUDING LINING WORKS WITH PCC FROM CH. 528.00 TO CH. 544.00 IN AUSGRAM-II BLOCK, BURDWAN IRRIGATION SUB-DIVN. NO. III TOTAL:

22.44526 COMPLETE (50% WORK SANCTIONED IN THIS F.Y.)

22/PM(F)/P/ 30-01-2013 1B-258/2012

22.28023

22.28023

100%

22.28023 COMPLETE (50% WORK SANCTIONED IN THIS F.Y.)

22/PM(F)/P/ 30-01-2013 1B-258/2012

22.34318

22.34318

100%

22.34318 COMPLETE (50% WORK SANCTIONED IN THIS F.Y.)

1,229.29880

1,229.29880

497.51103

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS BLOCK DEVELOPMENT OFFICER, KHARAGPUR-II BLOCK PUA DEPT.'S SANCTION ORDER NO. 89/PM(F)/P/ 1B-19/2012 DATE 11-05-2012 SANCTIONED AMOUNT 10.19855 RELEASED AMOUNT 9.18504 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS

1 CONSTRUCTION OF CLASSROOMS, HOSTEL BUILDING AND LADIES TOILET OF TENTULMURI RAMKRISHNA SIKSHANIKETAN UNDER KHARAGPUR-II BLOCK

9.18504 COMPLETE

2 CONSTRUCTION OF COMMUNITY CENTRE AT KANKRAJHORE WITHIN BINPUR-II PANCHAYAT SAMITY (POST FACTO APPROVAL)

CHIEF EXECUTIVE OFFICER, 93/PM(F)/P/ PASCHIMANCHAL UNNAYAN 1B-66/2011 PARSHAD

15-05-2012

4.35997

4.35997

100%

4.35997 COMPLETE

3 CONSTRUCTION OF RCC BLOCK DEVELOPMENT 94/PM(F)/P/ BOX CULVERT OVER OFFICER, NAYAGRAM BLOCK 1B-82/2012 MAHULIA KHAL IN BETWEEN BANSIABHOL AND SINGDHUI VILLAGE UNDER NAYAGRAM BLOCK 4 CONSTRUCTION OF ROAD CHIEF ENGINEER, FROM ASUI TO NURSOLE P.W.D.(ROADS) UNDER GOPIBALLAVPUR-I BLOCK 96/PM(F)/P/ 1B-69/2012

30-05-2012

22.50588

21.25718

100%

21.25718 COMPLETE

31-05-2012

217.81620

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS BLOCK DEVELOPMENT OFFICER, JAMBONI BLOCK PUA DEPT.'S SANCTION ORDER NO. 100/PM(F)/P /1B-78/2012 DATE 01-06-2012 SANCTIONED AMOUNT 24.63672 RELEASED AMOUNT 23.70242 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS

5.1 EXCAVATION OF NUNIA PUCCA PUKUR UNDER JAMBONI BLOCK

23.70242 COMPLETE

5.2 RE-EXCAVATION OF BARA BLOCK DEVELOPMENT BANKATA MUCHIR BUNDH OFFICER, JAMBONI BLOCK UNDER JAMBONI BLOCK

100/PM(F)/P /1B-78/2012

01-06-2012

18.79900

NIT ISSUED ON 30/05/2012

5.3 RE-EXCAVATION OF BLOCK DEVELOPMENT ALAMPUR KATHUA OFFICER, JAMBONI BLOCK BUNDH UNDER JAMBONI BLOCK 5.4 EXCAVATION OF DUMURIA PANRUA BUNDH UNDER JAMBONI BLOCK 6 CONSTRUCTION OF NURSING TRAINING SCHOOL AT LALGARH WITHIN PHC CAMPUS UNDER BINPUR-I BLOCK BLOCK DEVELOPMENT OFFICER, JAMBONI BLOCK

100/PM(F)/P /1B-78/2012

01-06-2012

18.79900

18.69857

100%

18.69857 COMPLETE

100/PM(F)/P /1B-78/2012

01-06-2012

24.63672

23.78753

100%

23.78753 COMPLETE

WEST BENGAL MEDICAL SERVICE CORPORATION LIMITED

102/PM(F)/P /1B-84/2012

04-06-2012

600.00000

300.00000

75%

WORK IN PROGRESS UPTO PILE CAP LEVEL, PILING WORK COMPLETE 11.43418 WORK IN PROGRESS

7 CONSTRUCTION OF HEADMASTER, ASANDA HOSTEL BUILDING AT SIKSHA NIKETAN ASANDA SIKSHA NIKETAN, P.O. LALNAGAR

108/PM(F)/P /1B124/2011

07-06-2012

22.86835

22.86835

60%

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS EXECUTIVE ENGINEER, KANGSABATI CANALS DIVISION NO. V, JHARGRAM, PASCHIM MEDINIPUR PUA DEPT.'S SANCTION ORDER NO. 109/PM(F)/P /1B-85/2012 DATE 07-06-2012 SANCTIONED AMOUNT 49.92400 RELEASED AMOUNT 49.92400 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 50% ` IN LAC REMARKS

8.1 CONSTRUCTION OF CLASS 'A' SINGLE LANE ROAD BRIDGE AT CH. 1233.26 OF TSMC(N) IN MOUZAJARALATA, PS-JHARGRAM ALONG KESIA-NATUNDIHI ROAD UNDER KANGSABATI CANALS DIVISION NO. V, JHARGRAM 8.2 CONSTRUCTION OF CLASS 'A' SINGLE LANE ROAD BRIDGE AT CH. 12.00 OF DY-12L OF TSMC(N) IN MOUZA-JARALATA, PSJHARGRAM ALONG KESIANATUNDIHI ROAD INCLUDING CONSTRUCTION OF LINING FROM CH. 0.00 TO CH. 20.00 OF DY-12L/ TSMC(N) UNDER KANGSABATI CANALS DIVISION NO. V, JHARGRAM

26.19818 WORK IN PROGRESS, W.O. ISSUED ON 01-11-2012, NIT ISSUED ON 03-08-2012

EXECUTIVE ENGINEER, 109/PM(F)/P KANGSABATI CANALS /1B-85/2012 DIVISION NO. V, JHARGRAM, PASCHIM MEDINIPUR

07-06-2012

32.95807

32.95807

50%

WORK IN PROGRESS, W.O. ISSUED ON 01-11-2012, NIT ISSUED ON 03-08-2012

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 11-06-2012 SANCTIONED AMOUNT 18.53949 RELEASED AMOUNT 17.91910 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 15-01-2013 ` IN LAC REMARKS

NO. 9 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 111/PM(F)/P FROM BARAPENIA TO OFFICER, JHARGRAM BLOCK /1B-94/2012 NARAYANPUR VILLAGE IN BANDHGORA G.P., JHARGRAM BLOCK

17.91910 COMPLETE

10 CONSTRUCTION OF GR. BLOCK DEVELOPMENT FLOOR SCHOOL BUILDING OFFICER, KHARAGPUR-II OF TENTULMURI PRIMARY BLOCK SCHOOL, KHARAGPUR-II

117/PM(F)/P /1B-81/2012

12-06-2012

21.72171

19.83684

100%

19.50345 COMPLETE

11 ANTI-EROSION WORK EXECUTIVE ENGINEER ALONG THE LEFT BANK OF (I&W), WEST MEDINIPUR RIVER KANGSABATI AT DIVISION DHERUA MOUZA, MEDINIPUR(SADAR) 12 CONSTRUCTION OF BLOCK DEVELOPMENT BOUNDARY WALL OF A OFFICER, BINPUR-I BLOCK MUSLIM GRAVEYARD AT DAHIJURI UNDER BINPUR-I P.S. 13 CONSTRUCTION OF SCHOOL BUILDING OF BINPUR HIGH SCHOOL, BINPUR

118/PM(F)/P /1B-86/2012

12-06-2012

51.55656

51.55656

119/PM(F)/P /1B-02/2012

12-06-2012

11.21914

9.81355

100%

9.81355 COMPLETE

HEADMASTER, BINPUR HIGH 131/PM(F)/P SCHOOL /1B-87/2012

15-06-2012

24.81233

24.81233

75%

12.16511 ROOF LEVEL WORK CONTINUING 8.27154 COMPLETE

14.1 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM GHUTIA TO BANKRA OFFICER, JAMBONI BLOCK

132/PM(F)/P /1B100/2012

15-06-2012

8.35429

8.27154

100%

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 132/PM(F)/P /1B100/2012 132/PM(F)/P /1B100/2012 132/PM(F)/P /1B100/2012 132/PM(F)/P /1B100/2012 DATE 15-06-2012 SANCTIONED AMOUNT 11.30479 RELEASED AMOUNT 11.17554 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS

14.2 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM BHTURO TO ASTI OFFICER, JAMBONI BLOCK

11.17554 COMPLETE

14.3 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM SARENGA TO OFFICER, JAMBONI BLOCK KURARIA 14.4 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM KENDUA TO OFFICER, JAMBONI BLOCK BAGHUA 14.5 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM AMLATORA TO OFFICER, JAMBONI BLOCK SARAKATA VIA BURISOLE

15-06-2012

3.30447

3.27012

100%

3.27012 COMPLETE

15-06-2012

4.95668

4.82411

100%

4.82411 COMPLETE

15-06-2012

4.50958

4.45041

100%

4.45041 COMPLETE

14.6 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM SALTALA TO ENATA OFFICER, JAMBONI BLOCK

132/PM(F)/P /1B100/2012 132/PM(F)/P /1B100/2012 132/PM(F)/P /1B100/2012

15-06-2012

9.68982

9.31803

100%

9.31803 COMPLETE

14.7 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM KHATKURA TO OFFICER, JAMBONI BLOCK BANNAGAJAR 14.8 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM BALIBANDH TO OFFICER, JAMBONI BLOCK JAMUNASOLE

15-06-2012

3.75797

3.72468

100%

3.72468 COMPLETE

15-06-2012

3.11874

2.47165

100%

2.47165 COMPLETE

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 132/PM(F)/P /1B100/2012 132/PM(F)/P /1B100/2012 132/PM(F)/P /1B100/2012 132/PM(F)/P /1B100/2012 132/PM(F)/P /1B100/2012 132/PM(F)/P /1B100/2012 132/PM(F)/P /1B100/2012 DATE 15-06-2012 SANCTIONED AMOUNT 5.01257 RELEASED AMOUNT 4.95333 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS

14.9 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM KANIMOHULI RAIL OFFICER, JAMBONI BLOCK STATION TO GAIDA 14.10 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM PARIHATI TO OFFICER, JAMBONI BLOCK GUIARA 14.11 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM ORO TO OFFICER, JAMBONI BLOCK BARABANKATA 14.12 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM GAGNASULI TO OFFICER, JAMBONI BLOCK BENASULI 14.13 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM PASCHIM OFFICER, JAMBONI BLOCK PURNAPANI TO KENDUASULI 14.14 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM HIZLI TO OFFICER, JAMBONI BLOCK SONAMUKHI 14.15 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM BAGGHORI TO OFFICER, JAMBONI BLOCK BADAKATA

4.95333 COMPLETE

15-06-2012

8.26114

8.17730

100%

8.17730 COMPLETE

15-06-2012

7.43503

7.32278

100%

7.32278 COMPLETE

15-06-2012

7.70226

7.60226

100%

7.60226 COMPLETE

15-06-2012

4.50958

4.46414

100%

4.46414 COMPLETE

15-06-2012

4.22372

4.17257

100%

4.17257 COMPLETE

15-06-2012

7.99756

7.90758

100%

7.90758 COMPLETE

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 132/PM(F)/P /1B100/2012 DATE 15-06-2012 SANCTIONED AMOUNT 4.48954 RELEASED AMOUNT 4.44426 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS

14.16 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM GIDHNI ADIBASI OFFICER, JAMBONI BLOCK PARA TO SALPATHRA 14.17 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT WITH MORRUM & OFFICER, JAMBONI BLOCK BOULDER FROM KASAFALIA TO RANGAMETIA VIA BHALUKKHULIA 14.18 CONSTRUCTION OF RCC SLAB CULVERT AT BHALUKKHULIA ON BHALUKKHULIA TO KASAFALIA ROAD 14.19 CONSTRUCTION OF RCC SLAB CULVERT AT BHALUKKHULIA ON KASAFALIA TO BHALUKKHULIA ROAD 14.20 CONSTRUCTION OF RCC BRIDGE OVER KASAFALIA KHAL ON THE ROAD OF BHALUKKHULIA TO KASAFALIA ROAD BLOCK DEVELOPMENT OFFICER, JAMBONI BLOCK

4.44426 COMPLETE

132/PM(F)/P 15-06-2012 & /1B29-11-2012 100/2012 & 396

10.77334

10.62233

100%

10.62233 COMPLETE

132/PM(F)/P 15-06-2012 & /1B29-11-2012 100/2012 & 396 132/PM(F)/P 15-06-2012 & /1B29-11-2012 100/2012 & 396

6.15000

6.15000

100%

6.15000 COMPLETE

BLOCK DEVELOPMENT OFFICER, JAMBONI BLOCK

6.15000

6.14823

100%

6.14823 COMPLETE

BLOCK DEVELOPMENT OFFICER, JAMBONI BLOCK

132/PM(F)/P 15-06-2012 & /1B29-11-2012 100/2012 & 396

8.00000

8.00000

100%

8.00000 COMPLETE

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 133/PM(F)/P /1B-98/2012 DATE 15-06-2012 SANCTIONED AMOUNT 18.12171 RELEASED AMOUNT 17.46736 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 15-12-2012 ` IN LAC REMARKS

15.1 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM ANDHARIA PITCH OFFICER, BINPUR-I BLOCK ROAD TO JAMDA IN ANDHARIA AND BELATIKRI GP 15.2 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM BELATIKRI TO OFFICER, BINPUR-I BLOCK LAGHATA NADIGHAT IN BELATIKRI AND NEPURA GP 15.3 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM KANSINA MORE TO OFFICER, BINPUR-I BLOCK RATHBERA CHAWK IN ANDHARIA GP 15.4 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM CHHOTO JAMDA TO OFFICER, BINPUR-I BLOCK AMAINAGAR PITCH ROAD IN BELATIKRI AND ANDHARIA GP 15.5 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM GOHOMIDANGA TO OFFICER, BINPUR-I BLOCK BHULKA IN BAITA GP 15.6 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM GUJISOLE MORE TO OFFICER, BINPUR-I BLOCK PANPURIA IN SIJUA GP

17.46736 COMPLETE

133/PM(F)/P /1B-98/2012

15-06-2012

21.91741

15.79283

55%

15-12-2012

15.79283 WORK IN PROGRESS

133/PM(F)/P /1B-98/2012

15-06-2012

13.55118

12.81494

100%

15-12-2012

12.81494 COMPLETE

133/PM(F)/P /1B-98/2012

15-06-2012

18.12171

17.54448

100%

15-12-2012

17.54448 COMPLETE

133/PM(F)/P /1B-98/2012

15-06-2012

13.55118

5.34015

50%

15-12-2012

1ST RA BILL DRAWN

133/PM(F)/P /1B-98/2012

15-06-2012

8.65624

8.32007

100%

15-12-2012

8.32007 COMPLETE

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 133/PM(F)/P /1B-98/2012 DATE 15-06-2012 SANCTIONED AMOUNT 8.65624 RELEASED AMOUNT 8.29046 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 15-12-2012 ` IN LAC REMARKS

15.7 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM TANTISOLE OFFICER, BINPUR-I BLOCK RAJBUNDH BRIDGE TO DUMURIA PRIMARY SCHOOL IN SIJUA GP 15.8 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM LALGARH BAZAR TO OFFICER, BINPUR-I BLOCK KANGSABATI NADIGHAT IN LALGARH GP 15.9 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM DUBRAJPUR TO OFFICER, BINPUR-I BLOCK POLICE PHARI IN RAMGARH GP 15.10 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM KUMIRKATA PITCH OFFICER, BINPUR-I BLOCK ROAD TO PANCHIARA IN DAHIJURI GP

8.29046 COMPLETE

133/PM(F)/P /1B-98/2012

15-06-2012

2.13970

1.50460

100%

15-12-2012

1.50460 COMPLETE

133/PM(F)/P /1B-98/2012

15-06-2012

8.65624

8.31675

100%

15-12-2012

8.31675 COMPLETE

133/PM(F)/P /1B-98/2012

15-06-2012

8.98066

7.95503

100%

15-12-2012

7.95503 COMPLETE

15.11 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM MAGURA TO OFFICER, BINPUR-I BLOCK ANKRO IN BINPUR 15.12 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM FULBERI MORE TO OFFICER, BINPUR-I BLOCK BANDARBONI IN DAHIJURI GP

133/PM(F)/P /1B-98/2012

15-06-2012

7.95368

2.61440

100%

15-12-2012

2.61440 COMPLETE

133/PM(F)/P /1B-98/2012

15-06-2012

13.55118

9.98461

100%

15-12-2012

9.98461 COMPLETE

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 133/PM(F)/P /1B-98/2012 DATE 15-06-2012 SANCTIONED AMOUNT 17.70938 RELEASED AMOUNT 13.26923 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 15-12-2012 ` IN LAC REMARKS

15.13 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM BAHADURPUR OFFICER, BINPUR-I BLOCK PITCH ROAD TO NACHHIPUR NADIGHAT IN NEPURA GP 15.14 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM LALGARH BURA OFFICER, BINPUR-I BLOCK BABA THAN (PITCH ROAD) TO PODIHA VILLAGE IN LALGARH GP 15.15 SINKING OF TUBE WELL BLOCK DEVELOPMENT WITH SUBMERSIBLE PUMP OFFICER, BINPUR-I BLOCK AT LAGHATA PHC IN NEPURA GP 15.16 SINKING OF TUBE WELL BLOCK DEVELOPMENT WITH SUBMERSIBLE PUMP OFFICER, BINPUR-I BLOCK AT NACHHIPUR HIGH SCHOOL IN NEPURA GP 15.17 SINKING OF TUBE WELL BLOCK DEVELOPMENT WITH SUBMERSIBLE PUMP OFFICER, BINPUR-I BLOCK AT LALGARH PHC IN LALGARH GP 15.18 SINKING OF TUBE WELL BLOCK DEVELOPMENT WITH SUBMERSIBLE PUMP OFFICER, BINPUR-I BLOCK AT LALGARH SARADAMONI PRIMARY SCHOOL IN LALGARH GP

13.26923 COMPLETE

133/PM(F)/P /1B-98/2012

15-06-2012

7.79544

7.49121

100%

15-12-2012

7.49121 COMPLETE

133/PM(F)/P /1B-98/2012

15-06-2012

2.50000

20%

15-12-2012

WORK IN PROGRESS

133/PM(F)/P /1B-98/2012

15-06-2012

2.50000

20%

15-12-2012

WORK IN PROGRESS

133/PM(F)/P /1B-98/2012

15-06-2012

2.50000

1.68492

50%

15-12-2012

1.68492 WORK IN PROGRESS

133/PM(F)/P /1B-98/2012

15-06-2012

2.50000

1.59973

50%

15-12-2012

1.59973 WORK IN PROGRESS

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 133/PM(F)/P /1B-98/2012 DATE 15-06-2012 SANCTIONED AMOUNT 2.50000 RELEASED AMOUNT PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 15-12-2012 ` IN LAC REMARKS

15.19 SINKING OF TUBE WELL BLOCK DEVELOPMENT WITH SUBMERSIBLE PUMP OFFICER, BINPUR-I BLOCK AT BAITA SRIGOPAL H.S. SCHOOL, JASHPUR IN BAITA GP 15.20 SINKING OF TUBE WELL BLOCK DEVELOPMENT WITH SUBMERSIBLE PUMP OFFICER, BINPUR-I BLOCK AT DHARAMPUR PHC IN DHARAMPUR GP 15.21 SINKING OF TUBE WELL BLOCK DEVELOPMENT WITH SUBMERSIBLE PUMP OFFICER, BINPUR-I BLOCK AT ANDHARIA CHAWK IN ANDHARIA GP 15.22 SINKING OF TUBE WELL BLOCK DEVELOPMENT WITH SUBMERSIBLE PUMP OFFICER, BINPUR-I BLOCK AT BINPUR CHAWK IN BINPUR GP 15.23 SINKING OF TUBE WELL BLOCK DEVELOPMENT WITH SUBMERSIBLE PUMP OFFICER, BINPUR-I BLOCK AT AMAINAGAR IN ANDHARIA GP 15.24 SINKING OF TUBE WELL BLOCK DEVELOPMENT WITH SUBMERSIBLE PUMP OFFICER, BINPUR-I BLOCK AT MURAR GARAI PARA IN RAMGARH GP

PENDING FOR CHANGING OF SITE

133/PM(F)/P /1B-98/2012

15-06-2012

2.50000

1.87039

100%

1.87039 COMPLETE

133/PM(F)/P /1B-98/2012

15-06-2012

2.49943

2.05069

100%

COMPLETE

133/PM(F)/P /1B-98/2012

15-06-2012

2.49943

1.83324

100%

15-12-2012

1.83324 COMPLETE

133/PM(F)/P /1B-98/2012

15-06-2012

2.49943

2.09192

60%

15-12-2012

2.09192 WORK IN PROGRESS

133/PM(F)/P /1B-98/2012

15-06-2012

2.49943

1.60526

100%

15-12-2012

1.60526 COMPLETE

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 134/PM(F)/P /1B-99/2012 DATE 15-06-2012 SANCTIONED AMOUNT 6.78290 RELEASED AMOUNT 6.23312 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS

16.1 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM AMLASOLE OFFICER, BINPUR-II BLOCK BIRSARMUNDA MORE TO JHARKHAND 16.2 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM DHOBAJAN COLONY OFFICER, BINPUR-II BLOCK TO SUKNAPAHARI VIA KHAMAR

6.23312 COMPLETE

134/PM(F)/P /1B-99/2012

15-06-2012

20.29578

19.80897

100%

19.80897 COMPLETE

16.3 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM SILDA SATIGHAT TO OFFICER, BINPUR-II BLOCK RAGHUNATHPUR

134/PM(F)/P /1B-99/2012

15-06-2012

23.77921

22.17645

100%

15-01-2013

22.17645 COMPLETE

16.4 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM JARDA TO OFFICER, BINPUR-II BLOCK RANGAMETIA, SANDAPARA

134/PM(F)/P /1B-99/2012

15-06-2012

20.99840

15.40325

100%

01-01-2013

15.40325 COMPLETE

16.5 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM DHULIPARA TO OFFICER, BINPUR-II BLOCK RAJDAHA IN BHELAIDIHA

134/PM(F)/P /1B-99/2012

15-06-2012

5.80462

5.24106

100%

5.24106 COMPLETE

16.6 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM LEDASAL TO OFFICER, BINPUR-II BLOCK PANCHTAKARPAL, KANKO

134/PM(F)/P /1B-99/2012

15-06-2012

19.55550

16.16900

100%

25-01-2013

16.16900 COMPLETE

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 134/PM(F)/P /1B-99/2012 DATE 15-06-2012 SANCTIONED AMOUNT 9.52460 RELEASED AMOUNT 8.71126 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 01-01-2013 ` IN LAC REMARKS

16.7 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM GORAMTHAN TO OFFICER, BINPUR-II BLOCK GADRASINI ASHRAM, BELPAHARI

8.71126 COMPLETE

16.8 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM DOMSOLE HIGH OFFICER, BINPUR-II BLOCK SCHOOL TO BANKATI, HARDA 16.9 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM BELPAHARI TO OFFICER, BINPUR-II BLOCK SANDAPARA IN BELPAHARI 16.10 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM RAGHUNATHPUR OFFICER, BINPUR-II BLOCK TO ERGODA, ERGODA

134/PM(F)/P /1B-99/2012

15-06-2012

9.67280

9.00553

100%

01-01-2013

9.00553 COMPLETE

134/PM(F)/P /1B-99/2012

15-06-2012

8.38352

7.46288

40%

01-01-2013

7.46288 WORK IN PROGRESS

134/PM(F)/P /1B-99/2012

15-06-2012

13.29110

11.62628

100%

11.62628 COMPLETE

16.11 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM MAHULBONI TO OFFICER, BINPUR-II BLOCK ODOLCHUA IN SIMULPAL

134/PM(F)/P /1B-99/2012

15-06-2012

10.05575

8.73974

100%

01-01-2013

8.73974 COMPLETE

17.1 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM BAHARAKOTA TO OFFICER, JHARGRAM BLOCK /1B-97/2012 DURGAPUR

15-06-2012

5.23219

3.67959

100%

25-01-2013

3.67959 COMPLETE

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 15-06-2012 SANCTIONED AMOUNT 5.23219 RELEASED AMOUNT 5.23219 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 30-01-2013 ` IN LAC REMARKS

NO. 17.2 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM NH-6 TO OFFICER, JHARGRAM BLOCK /1B-97/2012 CHANDIPUR VIA GP OFFICE 17.3 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM CHANDRI TO OFFICER, JHARGRAM BLOCK /1B-97/2012 MADHABPUR VIA ASTI IN CHANDRI GP 17.4 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM KANYADUBA TO OFFICER, JHARGRAM BLOCK /1B-97/2012 MURGIDIHI

5.23219 COMPLETE

15-06-2012

3.02559

2.84712

100%

30-05-2013

2.84712 COMPLETE

15-06-2012

3.02559

2.09073

100%

31-01-2013

2.09073 COMPLETE

17.5 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM PHASITALA TO OFFICER, JHARGRAM BLOCK /1B-97/2012 PATHRI VIA DHANGRI

15-06-2012

5.23219

5.23219

100%

5.23219 COMPLETE

17.6 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM AMDIHA TO OFFICER, JHARGRAM BLOCK /1B-97/2012 CHHANAPARA 17.7 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM KALABONI TO OFFICER, JHARGRAM BLOCK /1B-97/2012 JARULIA

15-06-2012

5.23219

3.94241

100%

30-04-2013

3.94241 COMPLETE

15-06-2012

14.55227

14.54627

100%

15-01-2013

14.54627 COMPLETE

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 15-06-2012 SANCTIONED AMOUNT 6.57273 RELEASED AMOUNT 5.46283 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 31-01-2013 ` IN LAC REMARKS

NO. 17.8 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM BIRIDANGA (NAHAR OFFICER, JHARGRAM BLOCK /1B-97/2012 KHAL CULVERT) TO BETKUNDRI MPS GATE

5.46283 COMPLETE

17.9 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM BARDANGA TO OFFICER, JHARGRAM BLOCK /1B-97/2012 SANKARBONI VIA SAGARBHANGA 17.10 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM KHALSHEULI TO OFFICER, JHARGRAM BLOCK /1B-97/2012 PAKURIAPAL VIA RADHANAGAR 17.11 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM AUSHPAL TO OFFICER, JHARGRAM BLOCK /1B-97/2012 TALDANGA 17.12 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM BRINDABANPUR TO OFFICER, JHARGRAM BLOCK /1B-97/2012 ANDHARIASOLE IN NEDABAHARA G.P. 17.13 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM MADHUPUR TO OFFICER, JHARGRAM BLOCK /1B-97/2012 PHASITALA

15-06-2012

5.85139

3.91160

100%

30-05-2013

3.91160 COMPLETE

15-06-2012

5.85139

5.47965

100%

15-01-2013

5.47965 COMPLETE

15-06-2012

6.57273

6.31699

100%

31-01-2013

6.31699 COMPLETE

15-06-2012

10.51140

10.50614

100%

31-01-2013

10.50614 COMPLETE

15-06-2012

14.55227

14.40258

100%

31-01-2013

14.40258 COMPLETE

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 15-06-2012 SANCTIONED AMOUNT 10.51140 RELEASED AMOUNT 10.51140 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 31-01-2013 ` IN LAC REMARKS

NO. 17.14 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM DEBI CHAK TO OFFICER, JHARGRAM BLOCK /1B-97/2012 PATASIMUL 17.15 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM JAMSOLA TO OFFICER, JHARGRAM BLOCK /1B-97/2012 KULDIHA 17.16 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM BARDANGA CHAK OFFICER, JHARGRAM BLOCK /1B-97/2012 TO METAL

10.51140 COMPLETE

15-06-2012

6.66189

6.51742

100%

31-01-2013

6.51742 COMPLETE

15-06-2012

5.69089

5.67048

100%

31-01-2013

5.67048 COMPLETE

17.17 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM GOLAGHUTIA TO OFFICER, JHARGRAM BLOCK /1B-97/2012 CHANDRI MORE 17.18 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM KUNDALDIHA TO OFFICER, JHARGRAM BLOCK /1B-97/2012 TENGIA

15-06-2012

5.69089

5.08448

100%

30-05-2013

5.08448 COMPLETE

15-06-2012

5.69089

4.65118

85%

30-05-2013

4.65118 WORK IN PROGRESS

17.19 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM NETURA BUS OFFICER, JHARGRAM BLOCK /1B-97/2012 STAND (NH-6) TO MATALSOLE 17.20 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM KHALSEULI TO OFFICER, JHARGRAM BLOCK /1B-97/2012 DAMRASOLE VIA KALABONI

15-06-2012

3.02559

2.80420

100%

30-05-2013

2.80420 COMPLETE

15-06-2012

5.69089

5.22085

100%

15-01-2013

5.22085 COMPLETE

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 15-06-2012 SANCTIONED AMOUNT 3.02559 RELEASED AMOUNT 2.03420 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 90% 30-05-2013 ` IN LAC REMARKS

NO. 17.21 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM PANCHAMI TO OFFICER, JHARGRAM BLOCK /1B-97/2012 PIPRI 17.22 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM JABNIKATA TO DEER OFFICER, JHARGRAM BLOCK /1B-97/2012 PARK VIA KHARIKASULI

2.03420 WORK IN PROGRESS

15-06-2012

10.51140

9.28310

100%

30-04-2013

9.28310 COMPLETE

18 WATER SUPLY SCHEME FOR R.G.T.S. SCHOOL AT BELPAHARI, BINPUR-II 19 SINKING OF 350 NOS. INDIAN MARK-II TUBEWELL IN 7 PUP BLOCKS

EXECUTIVE ENGINEER, MIDNAPORE DIVISION, P.H.E. DIRECTORATE EXECUTIVE ENGINEER, MIDNAPORE DIVISION, P.H.E. DIRECTORATE

138/PM(F)/P /1B111/2012 139/PM(F)/P /1B112/2012

22-06-2012

13.70584

13.70584

22-06-2012

313.91000

313.91000

85%

156.95500 311 TUBE-WELL COMPLETE

20 CONSTRUCTION OF BOUNDARY WALL AT LALGARH PHC, BINPUR-I BLOCK

CHIEF EXECUTIVE OFFICER, 152/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD THROUGH BDO, 115/2011 BINPUR-I

04-07-2012

38.01873

NIT ISSUED ON 10-10-2013

21 CONSTRUCTION OF SCHOOL BUILDING OF CHHAY HAZARI SCHOOL, GOPIBALLAVPUR-I

CHIEF EXECUTIVE OFFICER, 154/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD THROUGH BDO, 160/2011 GOPIBALLAVPUR-I

04-07-2012

22.64728

WORK ORDER ISSUED ON 2901-2013

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 13-07-2012 SANCTIONED AMOUNT 24.69324 RELEASED AMOUNT 11.52803 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 55% ` IN LAC REMARKS

22 CONSTRUCTION OF NEW SCHOOL BUILDING AT MURABONI NETAJI HIGH SCHOOL, MURABONI, BINPUR-I

NO. CHIEF EXECUTIVE OFFICER, 167/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD THROUGH BDO, 140/2011 BINPUR-I

11.08708 WORK IN PROGRESS

23 REPAIRING OF BITUMEN CHIEF EXECUTIVE OFFICER, ROAD FROM BINPUR TO PASCHIMANCHAL UNNAYAN PAPATPUR NODIGHAT PARSHAD AND BOXI VIA HARDA AND MURGIMORE, BINPUR-I BLOCK

175/PM(F)/P 16-07-2012 & /1B14-01-2013 141/2012 & 06/PM(F)/P/ 1B-141/2012

517.42392

372.89069

60%

30-11-2013

372.89069 WORK ORDER ISSUED IN 3 PARTS; WORK IN PROGRESS

24.1 CONSTRUCTION OF ADDITIONAL CLASS ROOM OF KENDIJAMBANI ICDS CENTRE, GARHBETA-III BLOCK 24.2 CONSTRUCTION OF BOUNDARY WALL AND OTHER WORK OF KADAMDIHA PRIMARY SCHOOL

CHIEF EXECUTIVE OFFICER, 194/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD THROUGH BDO, 153/2012 GARHBETA-III

27-07-2012

4.09890

4.09890

100%

4.09890 COMPLETE

CHIEF EXECUTIVE OFFICER, 194/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD THROUGH BDO, 153/2012 GARHBETA-III

27-07-2012

20.64973

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 27-07-2012 SANCTIONED AMOUNT 7.74436 RELEASED AMOUNT 7.51782 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 25-05-2013 ` IN LAC REMARKS

25 REPAIRING OF KADAMKANALI TO RADHANAGAR ROAD, JHARGRAM BLOCK

NO. BLOCK DEVELOPMENT 196/PM(F)/P OFFICER, JHARGRAM BLOCK /1B161/2012

7.51782 COMPLETE

26 CONSTRUCTION OF 6 NOS. HEADMASTER, RANTUA OF CLASSROOMS AT HIGH SCHOOL RANTUA HIGH SCHOOL, JHARGRAM 27 CONSTRUCTION OF HEAD TEACHER, SALJORA CLASSROOMS AT SALJORA PRIMARY SCHOOL PRIMARY SCHOOL, NARAYANGARH PS

198/PM(F)/P 30-07-2012 & /1B-17/2012 19-09-2012 & 305

36.82552

36.82552

60%

18.41276 WORK IN PROGRESS

200/PM(F)/P /1B129/2012

31-07-2012

12.01479

12.01479

100%

12.01479 COMPLETE

28 EXCAVATION OF POND ON CHIEF EXECUTIVE OFFICER, 203/PM(F)/P BRWS LAND, BELPAHARI PASCHIMANCHAL UNNAYAN /1BPARSHAD 155/2012

01-08-2012

3.52199

1.22058

100%

1.22058 COMPLETE

29 PLANT AND MACHINERY OF MILK PROCESSING UNIT AT KESHIARY AND CHANDRAKONA ROAD MILK CHILLING PLANT, GARHBETA-III BLOCK

MANAGING DIRECTOR, MIMUL, PASCHIM MEDINIPUR

205/PM(F)/P /1B152/2012

01-08-2012

69.51000

34.75500

50%

10.34000 M.P.U. AT KESHIARY IS PROPOSED FOR SHIFTING AT MIDNAPUR SADAR, CHILLING PLANT COMPLETE

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 03-08-2012 SANCTIONED AMOUNT 2.13945 RELEASED AMOUNT PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION ` IN LAC REMARKS

NO. 30.1 INSTALLATION OF MINI CHIEF EXECUTIVE OFFICER, 210/PM(F)/P DEEP TUBE-WELL AT PASCHIMANCHAL UNNAYAN /1BHARTORA MOUZA, J.L. NO. PARSHAD 160/2012 130, SALBONI BLOCK

SENT TO DEPTT. FOR ADDL. SANCTION

30.2 INSTALLATION OF MINI CHIEF EXECUTIVE OFFICER, 210/PM(F)/P DEEP TUBE-WELL AT PASCHIMANCHAL UNNAYAN /1BJOYPUR MOUZA, J.L. NO. PARSHAD 160/2012 46, SALBONI BLOCK

03-08-2012

2.13945

SENT TO DEPTT. FOR ADDL. SANCTION

30.3 INSTALLATION OF MINI CHIEF EXECUTIVE OFFICER, 210/PM(F)/P DEEP TUBE-WELL AT PASCHIMANCHAL UNNAYAN /1BBARAMESHA MOUZA, J.L. PARSHAD 160/2012 NO. 271, PLOT NO. - 49, SALBONI BLOCK

03-08-2012

2.13945

2.13945

100%

2.13945 COMPLETE

30.4 INSTALLATION OF MINI CHIEF EXECUTIVE OFFICER, 210/PM(F)/P DEEP TUBE-WELL AT PASCHIMANCHAL UNNAYAN /1BBHEDUA MOUZA, J.L. NO. PARSHAD 160/2012 435, PLOT NO. 59, 7 NO. GP, GARHBETA-III PS

03-08-2012

3.79870

3.79328

100%

3.79328 COMPLETE

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 03-08-2012 SANCTIONED AMOUNT 15.84989 RELEASED AMOUNT 10.24387 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 85% ` IN LAC REMARKS

30.5 CONST. OF PUCCA DRAIN WITH COVER SLAB AT GUIADAHA MOUZA, J.L. NO. 713, PLOT NO. 370, KARSA GP, GARHBETA-III PS 30.6 CONSTRUCTION OF SCHOOL BUILDING AT DABCHA NABKOLA SISHU NIKETAN, J.L. NO. 672, PLOT NO. 26, SATBANKURA GP 30.7 CONSTRUCTION OF INDOOR BADMINTON COURT AT GARHBETA-I BLOCK

NO. CHIEF EXECUTIVE OFFICER, 210/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD 160/2012

10.24387 WORK IN PROGRESS

CHIEF EXECUTIVE OFFICER, 210/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD THROUGH BDO, 160/2012 GARHBETA-III

03-08-2012

7.48394

CHIEF EXECUTIVE OFFICER, 210/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD THROUGH BDO, 160/2012 GARHBETA-I

03-08-2012

5.53052

30.8 CONSTRUCTION OF BOUNDARY WALL WITH M.S. SHEET GATE OF KIABONI HIGH SCHOOL, GARHBETA-III BLOCK

CHIEF EXECUTIVE OFFICER, 210/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD THROUGH BDO, 160/2012 GARHBETA-III

03-08-2012

9.94051

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 03-08-2012 SANCTIONED AMOUNT 4.02888 RELEASED AMOUNT PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION ` IN LAC REMARKS

NO. 30.9 CONSTRUCTION OF STAGE CHIEF EXECUTIVE OFFICER, 210/PM(F)/P WITH GREEN ROOM OF PASCHIMANCHAL UNNAYAN /1BKIABONI HIGH SCHOOL, PARSHAD THROUGH BDO, 160/2012 GARHBETA-III BLOCK GARHBETA-III

31 CONSTRUCTION OF SCHOOL HOSTEL BUILDING AT ARJUNI DESHBANDHU VIDYAPITH, NARAYANGARH BLOCK 32 CONSTRUCTION OF HOSTEL BUILDING AT KHALSEULI HIGH SCHOOL (H.S.), JHARGRAM SUBDIVISION

HEADMASTER, ARJUNI DESBANDHU VIDYAPITH, P.O.-THAKURCHAK, PASCHIM MEDINIPUR, PIN721424

130/PM(F)/P /1B120/2011

23-05-2013

24.50248

12.25124

TENDER INVITED ON 1402-2013

CHIEF EXECUTIVE OFFICER, 221/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD THROUGH BDO, 175/2012 JHARGRAM

14-08-2012

24.79534

11.27231

50%

01-06-2013

11.27231 WORK IN PROGRESS

33 ELECTRICAL INSTALLATION EXECUTIVE ENGINEER, WORK AT BAITA SRI P.W.D., MIDNAPORE GOPAL HIGH SCHOOL, ELECTRICAL DIVISION BINPUR-I BLOCK

222/PM(F)/P /1B172/2012

14-08-2012

3.85001

3.85001

100%

3.85001 COMPLETE

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS EXECUTIVE ENGINEER, MIDNAPORE HIGHWAY DIVISION-II, P.W.D.(ROADS) DIRECTORATE PUA DEPT.'S SANCTION ORDER NO. 223/PM(F)/P /1B-69/2011 DATE 14-08-2012 SANCTIONED AMOUNT 8.22649 RELEASED AMOUNT 8.22649 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS

34 REPAIRING OF ASUINURISOLE ROAD BY PATCHING POTHOLES BY JHAMA METAL CONSOLIDATION, GOPIBALLAVPUR-I BLOCK 35 CONSTRUCTION OF BOUNDARY WALL AT MADHUPUR BINAPANI HIGH SCHOOL (H.S.), MADHUPUR 36 EXCAVATION/ REEXCAVATION OF 5 NOS. OF WHS AND DHALL BANDHS AT LOGDICHALK, GARBERIA, MARCHI AND LOCHANGARH MOUZAS, GARHBETA-III BLOCK

8.20037 COMPLETE

CHIEF EXECUTIVE OFFICER, 225/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD THROUGH BDO, 171/2012 SALBONI

14-08-2012

16.76151

ASSISTANT DIRECTOR OF AGRICULTURE (ADMN.), SOIL CONSERVATION, MEDINIPUR

228/PM(F)/P /1B165/2012

17-08-2012

27.64158

27.37148

100%

27.37148 COMPLETE, BALANCE REFUNDED

37.1 CONSTRUCTION OF GROUND FLOOR OF GAJASHIMUL K.C.M. HIGH SCHOOL BUILDING

CHIEF EXECUTIVE OFFICER, 229/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD THROUGH BDO, 170/2012 JHARGRAM

17-08-2012

24.69324

17.88513

01-07-2013

17.88513 WORK IN PROGRESS

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 17-08-2012 SANCTIONED AMOUNT 9.96994 RELEASED AMOUNT 4.77381 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 60% 30-04-2013 ` IN LAC REMARKS

NO. 37.2 CONSTRUCTION OF CHIEF EXECUTIVE OFFICER, 229/PM(F)/P BOUNDARY WALL OF PASCHIMANCHAL UNNAYAN /1BGAJASHIMUL K.C.M. HIGH PARSHAD THROUGH BDO, 170/2012 SCHOOL JHARGRAM

4.77381 WORK IN PROGRESS, DELAYED DUE TO LAND DISPUTE

37.3 CONSTRUCTION OF FIRST FLOOR OF GAJASHIMUL K.C.M. HIGH SCHOOL BUILDING

CHIEF EXECUTIVE OFFICER, 229/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD THROUGH BDO, 170/2012 JHARGRAM

17-08-2012

7.96313

01-06-2013

NOT STARTED

38 SINKING OF 9 INDIA MARK- BLOCK DEVELOPMENT 230/PM(F)/P 17-08-2012 II TUBE WELL AND 124 OFFICER, JHARGRAM BLOCK /1BMDTW WITH 112/2012 SUBMERSIBLE PUMPS IN JHARGRAM BLOCK 39.1 REPAIRING OF BITUMEN CHIEF EXECUTIVE OFFICER, 265/PM(F)/P ROAD FROM BINPUR TO PASCHIMANCHAL UNNAYAN /1BPAPATPUR NODIGHAT PARSHAD 141/2012 AND BOXI VIA HARDA AND MURGIMORE, BINPUR-I BLOCK 39.2 REPAIR OF BITUMEN ROAD FROM MURGI MORE TO BOXI, BINPUR-I BLOCK CHIEF EXECUTIVE OFFICER, 265/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD 141/2012 27-08-2012

174.93129

129.92006

85%

25-05-2013

129.92006 9 INDIA MARKII TUBEWELLS & 114 MDTW COMPLETE

9.87435

9.21765

100%

9.21765 COMPLETE

27-08-2012

9.52170

7.46780

100%

7.46780 COMPLETE

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 271/PM(F)/P /1B181/2012 DATE 28-08-2012 SANCTIONED AMOUNT 24.41466 RELEASED AMOUNT 22.04488 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 80% ` IN LAC REMARKS

40 CONSTRUCTION OF BLOCK DEVELOPMENT HOSTEL BUILDING AT OFFICER, SALBONI BLOCK JOYPUR ST, SC & BC HIGH SCHOOL (HS), SALBONI BLOCK 41 CONSTRAUCTION OF BOUNDARY WALL AT ANDHARIA RAJBALLAV HIGH SCHOOL AT ANDHARIA

22.04488 WORK IN PROGRESS

SCHOOL AUTHORITY, 300/PM(F)/P ANDHARIA RAJBALLAV HIGH /1BSCHOOL 139/2011

14-09-2012

24.98108

12.49054

42 SINKING OF 2 (TWO) DEEP BLOCK DEVELOPMENT 307/PM(F)/P TUBE-WELL IN NUYASAI OFFICER, NAYAGRAM BLOCK /1B-82/2012 AND BORADANGA VILLAGE, NAYAGRAM DEVELOPMENT BLOCK

19-09-2012

10.00000

43.1 CONSTRUCTION OF DISTRICT MAGISTRATE, CONCRETE ROAD WITH PASCHIM MEDINIPUR GUARD WALL FROM JHARBONI TO RAJABUNDH (447.50 MTR.)

308/PM(F)/P /1B191/2012

19-09-2012

25.00411

25.00411

DM HAS ASKED BDO, NAYAGRAM TO INITIATE TENDER PROCESS DM HAS ASKED BDO, NAYAGRAM TO INITIATE TENDER PROCESS

43.2 CONSTRUCTION OF CONCRETE ROAD WITH PUCCA DRAIN IN THE VILLAGE NEMAINAGAR

DISTRICT MAGISTRATE, PASCHIM MEDINIPUR

308/PM(F)/P /1B191/2012

19-09-2012

24.95039

24.95039

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 19-09-2012 SANCTIONED AMOUNT 9.50534 RELEASED AMOUNT 9.50534 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS

44 CONSTRUCTION OF BOUNDARY WALL AT BARUA MSK, SIROMONI GRAM PANCHAYAT, MIDNAPUR SADAR PANCHAYAT SAMITY 45.1 INSTALLATION OF MINI DEEP TUBE-WELL FOR IRRIGATION WATER SUPPLY WITHIN GARHBETA-III BLOCK 45.2 CONSTRUCTION OF MODEL PUMP HOUSE IN GARHBETA-III PS

NO. BLOCK DEVELOPMENT 309/PM(F)/P OFFICER, MIDNAPUR SADAR /1BBLOCK 190/2012

9.50534 COMPLETE

CHIEF EXECUTIVE OFFICER, 311/PM(F)/P PASCHIMANCHAL UNNAYAN /1B-85/2012 PARSHAD

21-09-2012

4.25000

WORK ORDER NOT YET ISSUED

CHIEF EXECUTIVE OFFICER, 311/PM(F)/P PASCHIMANCHAL UNNAYAN /1B-85/2012 PARSHAD

21-09-2012

0.43965

NIT ISSUED ON 10/10/2012

45.3 CONSTRUCTION OF CHIEF EXECUTIVE OFFICER, 311/PM(F)/P PROPOSED GROUND PASCHIMANCHAL UNNAYAN /1B-85/2012 FLOOR OF NEW BUILDING PARSHAD OF KIABONI HIGH SCHOOL, GARHBETA-III PS 45.4 CONSTRUCTION OF PROPOSED FIRST FLOOR OF NEW BUILDING OF KIABONI HIGH SCHOOL, GARHBETA-III PS CHIEF EXECUTIVE OFFICER, 311/PM(F)/P PASCHIMANCHAL UNNAYAN /1B-85/2012 PARSHAD

21-09-2012

24.83621

10%

30-11-2013

WORK STARTED

21-09-2012

16.90667

10%

30-11-2013

WORK STARTED

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 314/PM(F)/P /1B174/2012 DATE 24-09-2012 SANCTIONED AMOUNT 11.50839 RELEASED AMOUNT PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION ` IN LAC REMARKS

46.1 CONSTRUCTION OF BLOCK DEVELOPMENT BUILDING OF CIRCLE LEVEL OFFICER, GARHBETA-III TRAINING HALL AT BLOCK CHANDRAKONA ROAD WITHIN GARHBETA-III PS

46.2 SUBMERSIBLE PUMP FOR BLOCK DEVELOPMENT DRINKING WATER SUPPLY OFFICER, GARHBETA-III PURPOSE AT BLOCK CHANDRAKONA ROAD S.I. OF SCHOOL, GARHBETA SOUTH CIRCLE, GARHBETAIII PS

314/PM(F)/P /1B174/2012

24-09-2012

2.31251

47 CONSTRUCTION OF FIRST BLOCK DEVELOPMENT FLOOR SCHOOL BUILDING OFFICER, SALBONI BLOCK AT BAGHPICHLA MSK, SALBONI BLOCK

316/PM(F)/P /1B173/2012

25-09-2012

11.09307

10.75146

100%

10.75146 COMPLETE

48 CONSTRUCTION OF SINGLE STORIED CLASSROOM WITH STAIRCASE AND BOUNDARY WALL OF ORGANJA SHRI RAMKRISHNA SARADA VIDYANIKETAN

SCHOOL AUTHORITY, ORGANJA SHRI RAMKRISHNA SARADA VIDYANIKETAN

317/PM(F)/P /1B-16/2010

25-09-2012

8.32500

4.16250

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 01-10-2012 SANCTIONED AMOUNT 4.68177 RELEASED AMOUNT 4.68177 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 15-01-2013 ` IN LAC REMARKS

49 RENOVATION OF AGRO INDUSTRIAL TRAINING CENTRE, JHARGRAM BLOCK

NO. BLOCK DEVELOPMENT 331/PM(F)/P OFFICER, JHARGRAM BLOCK /1B195/2012

4.68177 COMPLETE

50 CONSTRUCTION OF BLOCK DEVELOPMENT BUILDING AT OFFICER, GARHBETA-III KANCHADAHARIBLOCK GUIADAHA HIGH MADRASAH (10,57,801/-) & SINKING OF 6 NOS. OF DEEP TUBE-WELLS (12,00,000/-) IN DIFFERENT PLACES WITHIN GARHBETA-III PS

332/PM(F)/P /1B194/2012

01-10-2012

22.57801

9.68232

50%

9.68232 MADRASAH'S WORK COMPLETE

51 REPAIRING THE PUCCA CHIEF EXECUTIVE OFFICER, 335/PM(F)/P ROAD (8.4 KM) FROM PASCHIMANCHAL UNNAYAN /1BKHALSEULI TO MALANCHA PARSHAD 196/2012 (KHARAGPUR), BINPUR-I BLOCK 52.1 CONSTRUCTION OF BOUNDARY WALL OF NETAI JUNIOR HIGH SCHOOL SCHOOL AUTHORITY, NETAI 341/PM(F)/P JUNIOR HIGH SCHOOL /1B-49/2012

04-10-2012

199.99948

20%

WORK IN PROGRESS

09-10-2012

8.71574

8.71574

50%

4.35787 WORK IN PROGRESS

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 09-10-2012 SANCTIONED AMOUNT 13.02039 RELEASED AMOUNT 13.02039 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 50% ` IN LAC REMARKS

52.2 CONSTRUCTION OF GOUND FLOOR OF SCHOOL BUILDING OF NETAI JUNIOR HIGH SCHOOL

NO. SCHOOL AUTHORITY, NETAI 341/PM(F)/P JUNIOR HIGH SCHOOL /1B-49/2012

6.51020 WORK IN PROGRESS

53 SPECIAL REPAIRING IN DISTRICT MAGISTRATE, DAMAGED STEEL FRAMED PASCHIM MEDINIPUR BRIDGE ON NAHARKHAL, JHARGRAM BLOCK

354/PM(F)/P /1B212/2012

17-10-2012

7.88511

7.88511

54 CONSTRUCTION OF TEACHER-IN-CHARGE, HOSTEL BUILDING AT SATRANGI VIVEKANANDA SATRANGI VIVEKANANDA HIGH SCHOOL HIGH SCHOOL, KHARAGPUR-II BLOCK 55 CONSTRUCTION OF FOUR TEACHER-IN-CHARGE, CLASSROOMS AT MALANCHA HIGH SCHOOL MALANCHA HIGH SCHOOL, GOPIBALLAVPURII BLOCK

356/PM(F)/P /1B213/2012

18-10-2012

17.73412

17.73412

100%

17.73412 COMPLETE

361/PM(F)/P /1B169/2012

30-10-2012

28.32338

28.32338

55%

14.16169 WORK IN PROGRESS

56 CONSTRUCTION OF CHIEF EXECUTIVE OFFICER, 380/PM(F)/P CLASSROOM IN PASCHIMANCHAL UNNAYAN /1BMIDNAPORE TOWN PARSHAD 232/2012 WELFARE SOCIETY WITHIN SOCIETY TRAINING CENTRE (VIKASH) COMPOUND, MEDINIPUR SADAR

21-11-2012

16.33982

10.14014

80%

10.14014 WORK IN PROGRESS

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 23-11-2012 SANCTIONED AMOUNT 24.54446 RELEASED AMOUNT 24.54446 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 50% ` IN LAC REMARKS

NO. 57 CONSTRUCTION OF SCHOOL AUTHORITY, 388/PM(F)/P INSTITUTIONAL BUILDING SATSOLE KIRANMOYEE HIGH /1B(GROUND FLOOR) FOR SCHOOL (H.S.) 226/2012 SATSOLE KIRANMOYEE HIGH SCHOOL (H.S.), PHASE-I, ANANDAPUR P.S., KESHPUR 58 ARRANGEMENT OF SECRETARY, DURBAR FOOTBALL TOURNAMENT MAHILA SAMANWAYA AND ARCHERY COMMITTEE TOURNAMENT IN AMLASOLE AND ITS SURROUNDING AREA, PASCHIM MEDINIPUR 59 CONSTRUCTION OF BLOCK DEVELOPMENT GROUND FLOOR SCHOOL OFFICER, KESHPUR BLOCK BUILDING AT TALNANNA MADRASAH SIKSHA KENDRA, MUGBASAN GP, KESHPUR BLOCK 399/PM(F)/P /1B-53/2012

12.27223 WORK IN PROGRESS

04-12-2012

1.69125

1.69125

100%

1.69125 COMPLETE

400/PM(F)/P /1B131/2012

04-12-2012

18.11025

15.38467

75%

15.38467 WORK IN PROGRESS

60 CONSTRUCTION OF BOUNDARY WALL AT SEVAYATAN SIKSHAN MAHAVIDYALAYA AT JHARGRAM (IN 3 PART, TOTAL 580 METRE)

EXECUTIVE ENGINEER, VIDYASAGAR UNIVERSITY DIVISION, P.W.(C.B.) DTE., P.W.DEPTT.

404/PM(F)/P /1B184/2012

06-12-2012

34.95322

34.95322

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS HEADMASTER, CHAKMAKRAMPUR HIGH SCHOOL, P.O. CHAKMAKRAMPUR, DIST. PASCHIM MEDINIPUR, 721149 PUA DEPT.'S SANCTION ORDER NO. 408/PM(F)/P /1B218/2012 DATE 11-12-2012 SANCTIONED AMOUNT 29.21601 RELEASED AMOUNT 29.21601 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 55% ` IN LAC REMARKS

61 CONSTRUCTION OF BOUNDARY WALL AND EXTENSION AND RENOVATION WORK OF SCHOOL BUILDING AT CHAKMAKRAMPPUR HIGH SCHOOL

14.60801 WORK IN PROGRESS

62 INSTALLATION/ SINKING BLOCK DEVELOPMENT OF 7 NOS. OF MINI DEEP OFFICER, GARHBETA-III TUBE-WELLS IN DIFFERENT BLOCK MOUZAS (DUKI, DWARIGERIA(NORTH), BHOGISOLE, GHOSHKHIRA, GUIADAHA, NABKOLA AND AT GURAHARA, GUJRAT & KENDERISOLE MOUZA) WITHIN GARHBETA-III BLOCK

419/PM(F)/P /1B239/2012

13-12-2012

32.87133

21.35992

65%

21.35992 4 SCHEME AT DUKI, DWARIGERIA(N ORTH), GHOSHKHIRA & GUIADAHA COMPLETE

63 SINKING OF ONE MINI DEEP TUBE-WELL AT MOHASOLE MOUZA WITHIN SALBONI BLOCK

BLOCK DEVELOPMENT OFFICER, SALBONI BLOCK

420/PM(F)/P /1B239/2012

13-12-2012

4.14910

4.03005

100%

4.03005 COMPLETE

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 421/PM(F)/P /1B239/2012 DATE 13-12-2012 SANCTIONED AMOUNT 69.17176 RELEASED AMOUNT 45.90722 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS

64 SINKING OF 8 NOS. (@ BLOCK DEVELOPMENT `8.64647 LAC) MINI DEEP OFFICER, GARHBETA-II TUBE-WELLS IN DIFFERENT BLOCK MOUZAS (UMRAPATA, JAMSOLE, BHURUBONI, DUMURIA, CHHOTONAKDONA, BATHANTORE, HAMARGORA, GANGDUARI), GARHBETAII BLOCK 65 DISTRIBUTION OF SPORTS KITS TO 75 NOS. OF CLUBS/ YOUTH ORGANIZATIONS WITHIN FIVE ASSEMBLY CONSTITUENCIES OF JHARGRAM SUB-DIVISION 66 CONSTRUCTION OF BRIDGE OVER BAGDIHA KHAL, GOPIBALLAVPUR-I BLOCK 67 CONSTRUCTION OF RCC BOX BRIDGE AT KAMALPUR SAKAMUHI KHAL, NAYAGRAM PANCHAYAT SAMITY

45.90722 COMPLETE

422/PM(F)/P /1B257/2012

14-12-2012

16.50000

15.28800

100%

15.28800 COMPLETE

BLOCK DEVELOPMENT 425/PM(F)/P OFFICER, GOPIBALLAVPUR-I /1B-90/2012 BLOCK

18-12-2012

22.61065

EXECUTIVE OFFICER, NAYAGRAM PANCHAYAT SAMITY

428/PM(F)/P /1B251/2012

18-12-2012

23.03097

23.03097

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS SECRETARY, RED CROSS SOCIETY, JHARGRAM SUBDIVISIONAL BRANCH PUA DEPT.'S SANCTION ORDER NO. 433/PM(F)/P /1B113/2012 DATE 18-12-2012 SANCTIONED AMOUNT 4.84250 RELEASED AMOUNT 4.84250 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION ` IN LAC REMARKS

68 CONSTRUCTION OF OLDAGE HOME OF RED CROSS SOCIETY AT JHARGRAM

69 FITTING & INSTALLATION CHIEF EXECUTIVE OFFICER, 440/PM(F)/P FOR SUPPLYING SAFE PASCHIMANCHAL UNNAYAN /1BPURIFIED RURAL PARSHAD 264/2012 COMMUNITY DRINKING WATER FOR 9 NOS. PHC/BPHC/RH AT AN ESTIMATED COST OF 27.56771 LAC EACH NAMELY LALGARH PHC (BINPUR-I), CHINCHIRA PHC (JAMBONI), CHILKIGARH BPHC (JAMBONI), BINPUR RH (BINPUR-I), BELPAHARI RH (BINPUR-II), GOPIBALLAVPUR RH (GOPIBALLAVPUR-I), TOPSIA RH (GOPIBALLAVPUR-II), KHARIKAMATHANI RH (NAYAGRAM), BHANGAGARH RH (SANKRAIL) WITHIN JHARGRAM SUB-DIVISION

28-12-2012

248.10939

247.99388

100%

30-06-2013

247.99388 COMPLETE

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 10-01-2013 SANCTIONED AMOUNT 14.84400 RELEASED AMOUNT 14.84400 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 55% ` IN LAC REMARKS

70 CONSTRUCTION OF BOUNDARY WALL AT DEBAGRAM MAHADEV HIGH SCHOOL UNDER SALBONI BLOCK 71 INFRASTRUCTURAL DEVELOPMENT OF SILDA CHANDRA SEKHAR COLLEGE

NO. SCHOOL AUTHORITY, 04/PM(F)/P/ DEBAGRAM MAHADEV HIGH 1B-263/2012 SCHOOL

7.42200 WORK IN PROGRESS

EXECUTIVE ENGINEER-I, P.W.D., KHARAGPUR DIVISION

08/PM(F)/P/ 1B67/2008(Par t-IV)

15-01-2013

100.00000

100.00000

72.1 CONSTRUCTION OF BLOCK DEVELOPMENT HOSTEL BUILDING AT OFFICER, GARHBETA-I GARHBETA HIGH SCHOOL, BLOCK GARHBETA-I BLOCK

14/PM(F)/P/ 1B-262/2012

24-01-2013

28.17772

16.59022

60%

16.59022 WORK IN PROGRESS

72.2 CONSTRUCTION OF BLOCK DEVELOPMENT SCHOOL BUILDING AT OFFICER, GARHBETA-I GARHBETA HIGH SCHOOL, BLOCK GARHBETA-I BLOCK

14/PM(F)/P/ 1B-262/2012

24-01-2013

24.95645

18.55971

60%

18.55971 WORK IN PROGRESS

73 CONSTRUCTION OF BOUNDARY WALL AT JANARDANPUR HIGH SCHOOL, KHARAGPUR-II PS

SCHOOL AUTHORITY, JANARDANPUR HIGH SCHOOL

15/PM(F)/P/ 1B-261/2012

24-01-2013

3.63184

3.63184

100%

3.63184 COMPLETE

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS DM THROUGH EE(AI), JHARGRAM (AI) DIVISION PUA DEPT.'S SANCTION ORDER NO. 21/PM(F)/P/ 1B-05/2013 DATE 30-01-2013 SANCTIONED AMOUNT 75.10019 RELEASED AMOUNT 75.10019 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION ` IN LAC REMARKS

74 CONSTRUCTION OF 10 NOS. OF RAIN WATER HARVESTING TANK (RWHT) IN DIFF. BLOCKS

75 SINKING OF 10 NOS. OF MINI DEEP TUBE-WELLS (6.34440 EACH), NAYAGRAM BLOCK

BLOCK DEVELOPMENT 24/PM(F)/P/ OFFICER, NAYAGRAM BLOCK 1B-03/2013

30-01-2013

63.44400

76 ADDITIONAL FUND FOR DISTRICT MAGISTRATE, AWARDING 1888 NOS. OF PASCHIM MEDINIPUR BICYCLES TO TRIBAL GIRL STUDENTS OF CLASS X, XI & XII OF PASCHIM MEDINIPUR

31/PM(F)/P/ 1B-02/2011

05-02-2013

20.80120

20.80120

77.1 CONSTRUCTION OF RCC BLOCK DEVELOPMENT 33/PM(F)/P/ BOX CULVERT AT OFFICER, NAYAGRAM BLOCK 1B-243/2012 JAMSOLA OVER MAHULIA KHAL, NAYAGRAM BLOCK

07-02-2013

22.51000

BDO REQUESTED VIDE NO. 379/PUP/BNK/ 1A-04/12 DT. 20-02-2013 22.91880 100% 22.91880 COMPLETE

77.2 CONSTRUCTION OF BOX BLOCK DEVELOPMENT 33/PM(F)/P/ CULVERT AT JARKA OVER OFFICER, NAYAGRAM BLOCK 1B-243/2012 NAYAGRAM-ATMAJHIA ROAD , NAYAGRAM BLOCK

07-02-2013

23.03000

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 07-02-2013 SANCTIONED AMOUNT 7.00000 RELEASED AMOUNT PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION ` IN LAC REMARKS

NO. 77.3 CONSTRUCTION OF BLOCK DEVELOPMENT 33/PM(F)/P/ BANSPAT BOX CULVERT AT OFFICER, NAYAGRAM BLOCK 1B-243/2012 BANSPAT, NAYAGRAM BLOCK

BDO REQUESTED VIDE NO. 379/PUP/BNK/ 1A-04/12 DT. 20-02-2013 BDO REQUESTED VIDE NO. 379/PUP/BNK/ 1A-04/12 DT. 20-02-2013 BDO REQUESTED VIDE NO. 379/PUP/BNK/ 1A-04/12 DT. 20-02-2013 BDO REQUESTED VIDE NO. 379/PUP/BNK/ 1A-04/12 DT. 20-02-2013 TENDER INVITED ON 2002-2013

77.4 CONSTRUCTION OF RCC BOX CULVERT AT BARSOLE, NAYAGRAM BLOCK

BLOCK DEVELOPMENT 33/PM(F)/P/ OFFICER, NAYAGRAM BLOCK 1B-243/2012

07-02-2013

7.83000

77.5 CONSTRUCTION OF BOX BLOCK DEVELOPMENT 33/PM(F)/P/ CULVERT AT TOPOBAN OFFICER, NAYAGRAM BLOCK 1B-243/2012 OVER TOPOBAN BARSULI ROAD, NAYAGRAM BLOCK

07-02-2013

7.00000

77.6 CONSTRUCTION OF RCC BLOCK DEVELOPMENT 33/PM(F)/P/ BOX CULVERT OVER OFFICER, NAYAGRAM BLOCK 1B-243/2012 SITALANA KHAL AT KEYAJHARIA, NAYAGRAM BLOCK

07-02-2013

14.59000

78.1 PIPE LINE WATER SUPPLY BLOCK DEVELOPMENT AT MURAKATI JR. HIGH OFFICER, SANKRAIL BLOCK SCHOOL, SANKRAIL BLOCK

34/PM(F)/P/ 1B-243/2012

07-02-2013

2.50000

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS BLOCK DEVELOPMENT OFFICER, SANKRAIL BLOCK PUA DEPT.'S SANCTION ORDER NO. 34/PM(F)/P/ 1B-243/2012 DATE 07-02-2013 SANCTIONED AMOUNT 2.50000 RELEASED AMOUNT PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION ` IN LAC REMARKS

78.2 PIPE LINE WATER SUPPLY AT KHAMARMOHULI JR. HIGH SCHOOL, SANKRAIL BLOCK

TENDER INVITED ON 2002-2013

78.3 PIPE LINE WATER SUPPLY BLOCK DEVELOPMENT AT KUKURAKHUPI JR. HIGH OFFICER, SANKRAIL BLOCK SCHOOL, SANKRAIL BLOCK

34/PM(F)/P/ 1B-243/2012

07-02-2013

2.50000

TENDER INVITED ON 2002-2013

78.4 PIPE LINE WATER SUPPLY BLOCK DEVELOPMENT AT SIMULIA JR. HIGH OFFICER, SANKRAIL BLOCK SCHOOL, SANKRAIL BLOCK

34/PM(F)/P/ 1B-243/2012

07-02-2013

2.50000

TENDER INVITED ON 2002-2013

78.5 PIPE LINE WATER SUPPLY BLOCK DEVELOPMENT AT DURGAPUR JR. HIGH OFFICER, SANKRAIL BLOCK SCHOOL, SANKRAIL BLOCK

34/PM(F)/P/ 1B-243/2012

07-02-2013

2.50000

TENDER INVITED ON 2002-2013

78.6 PIPE LINE WATER SUPPLY AT BAHARADANRI JR. HIGH SCHOOL, SANKRAIL BLOCK

BLOCK DEVELOPMENT OFFICER, SANKRAIL BLOCK

34/PM(F)/P/ 1B-243/2012

07-02-2013

2.50000

TENDER INVITED ON 2002-2013

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 34/PM(F)/P/ 1B-243/2012 DATE 07-02-2013 SANCTIONED AMOUNT 2.50000 RELEASED AMOUNT PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION ` IN LAC REMARKS

78.7 PIPE LINE WATER SUPPLY BLOCK DEVELOPMENT AT HARIPURA JR. HIGH OFFICER, SANKRAIL BLOCK SCHOOL, SANKRAIL BLOCK

TENDER INVITED ON 2002-2013

78.8 PIPE LINE WATER SUPPLY BLOCK DEVELOPMENT AT ANDHARI JR. HIGH OFFICER, SANKRAIL BLOCK SCHOOL, SANKRAIL BLOCK

34/PM(F)/P/ 1B-243/2012

07-02-2013

2.50000

TENDER INVITED ON 2002-2013

78.9 PIPE LINE WATER SUPPLY BLOCK DEVELOPMENT AT KASHIDANGA JR. HIGH OFFICER, SANKRAIL BLOCK SCHOOL, SANKRAIL BLOCK

34/PM(F)/P/ 1B-243/2012

07-02-2013

2.50000

TENDER INVITED ON 2002-2013

78.10 PIPE LINE WATER SUPPLY BLOCK DEVELOPMENT AT CHHATRI JR. HIGH OFFICER, SANKRAIL BLOCK SCHOOL, SANKRAIL BLOCK

34/PM(F)/P/ 1B-243/2012

07-02-2013

2.50000

2.34185

100%

2.34185 COMPLETE

78.11 PIPE LINE WATER SUPPLY BLOCK DEVELOPMENT AT BAKRA JR. HIGH OFFICER, SANKRAIL BLOCK SCHOOL, SANKRAIL BLOCK

34/PM(F)/P/ 1B-243/2012

07-02-2013

2.50000

1.81459

100%

1.81459 COMPLETE

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 34/PM(F)/P/ 1B-243/2012 DATE 07-02-2013 SANCTIONED AMOUNT 2.50000 RELEASED AMOUNT 1.79130 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS

78.12 PIPE LINE WATER SUPPLY BLOCK DEVELOPMENT AT CHUNPARA JR. HIGH OFFICER, SANKRAIL BLOCK SCHOOL, SANKRAIL BLOCK

1.79130 COMPLETE

78.13 PIPE LINE WATER SUPPLY BLOCK DEVELOPMENT AT NEKRASULI JR. HIGH OFFICER, SANKRAIL BLOCK SCHOOL, SANKRAIL BLOCK

34/PM(F)/P/ 1B-243/2012

07-02-2013

2.50000

1.99820

100%

1.99820 COMPLETE

78.14 PIPE LINE WATER SUPPLY BLOCK DEVELOPMENT AT BANKATI JR. HIGH OFFICER, SANKRAIL BLOCK SCHOOL, SANKRAIL BLOCK

34/PM(F)/P/ 1B-243/2012

07-02-2013

2.50000

2.02123

100%

2.02123 COMPLETE

78.15 PIPE LINE WATER SUPPLY BLOCK DEVELOPMENT AT BHAMAL JR. HIGH OFFICER, SANKRAIL BLOCK SCHOOL, SANKRAIL BLOCK

34/PM(F)/P/ 1B-243/2012

07-02-2013

2.50000

1.52722

100%

1.52722 COMPLETE

78.16 PIPE LINE WATER SUPPLY AT PECHABINDHYA JR. HIGH SCHOOL, SANKRAIL BLOCK

BLOCK DEVELOPMENT OFFICER, SANKRAIL BLOCK

34/PM(F)/P/ 1B-243/2012

07-02-2013

2.50000

1.74802

100%

1.74802 COMPLETE

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 07-02-2013 SANCTIONED AMOUNT 19.36000 RELEASED AMOUNT 19.36000 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS

79.1 CONSTRUCTION OF CONCRETE ROAD FROM GOPIBALLAVPUR THANA CHOWK TO GOBINDA MANDIR, GOPIBALLAVPURI BLOCK

NO. BLOCK DEVELOPMENT 35/PM(F)/P/ OFFICER, GOPIBALLAVPUR-I 1B-243/2012 BLOCK

19.36000 COMPLETE

79.2 CONSTRUCTION OF BLOCK DEVELOPMENT 35/PM(F)/P/ CAUSEWAY AT OFFICER, GOPIBALLAVPUR-I 1B-243/2012 CHUTARPATA, BLOCK GOPIBALLAVPUR-I BLOCK 79.3 CHECK DAM AT BLOCK DEVELOPMENT 35/PM(F)/P/ ANDHARKULI, OFFICER, GOPIBALLAVPUR-I 1B-243/2012 GOPIBALLAVPUR-I BLOCK BLOCK

07-02-2013

7.12000

7.01092

100%

7.01092 COMPLETE

07-02-2013

7.74000

TENDER INVITED ON 2502-2013

80.1 CONSTRUCTION OF BLOCK DEVELOPMENT 36/PM(F)/P/ GUARD WALL AT OFFICER, GOPIBALLAVPUR-II 1B-243/2012 BAKULTALA TO PAIKUIBAR BLOCK AT MAHULI, GOPIBALLAVPUR-II BLOCK

07-02-2013

3.00000

3.00000

100%

3.00000 COMPLETE

80.2 CONSTRUCTION OF BLOCK DEVELOPMENT 36/PM(F)/P/ CULVERT AT EKDAL OFFICER, GOPIBALLAVPUR-II 1B-243/2012 VILLAGE, GOPIBALLAVPUR- BLOCK II BLOCK

07-02-2013

2.11000

BDO REQUESTED VIDE NO. 378/PUP/BNK/ 1A-04/12 DT. 20-02-2013

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 07-02-2013 SANCTIONED AMOUNT 3.46000 RELEASED AMOUNT 3.43955 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS

NO. 80.3 CONSTRUCTION OF BLOCK DEVELOPMENT 36/PM(F)/P/ CULVERT NEAR EKUR PRY. OFFICER, GOPIBALLAVPUR-II 1B-243/2012 SCHOOL, GOPIBALLAVPUR- BLOCK II BLOCK

3.43955 COMPLETE

81 EXCAVATION OF DINHI BUNDH, GARHBETA-III PANCHAYAT SAMITY

CHIEF EXECUTIVE OFFICER, 64/PM(F)/1BPASCHIMANCHAL UNNAYAN 204/2012 PARSHAD

05-03-2013

49.67589

100%

COMPLETE

82 CONSTRUCTION OF CHIEF EXECUTIVE OFFICER, 65/PM(F)/P/ ADDITIONAL CLASSROOMS PASCHIMANCHAL UNNAYAN 1B-153/2012 OF KENDIJAMBANI ICDS PARSHAD THROUGH BDO CENTRE, GARHBETA-III BLOCK (ADDL. AMOUNT)

05-03-2013

0.54882

0.41300

100%

0.41300 COMPLETE

83 INFRASTRUCTURAL SECRETARY, SIJUA MSK DEVELOPMENT (BOUNDARY WALL 12,91,449/- & SCHOOL BUILDING 24,74,328/-) OF SIJUA MSK, BINPUR-I PS

66/PM(F)/P/ 1B-18/2013

05-03-2013

37.65777

37.65777

84 INSTALLATION OF MINI DEEP TUBE-WELL AT BARAMESHA MOUZA, SALBONI BLOCK (ADDL. SANCTION)

CHIEF EXECUTIVE OFFICER, 70/PM(F)/P/ PASCHIMANCHAL UNNAYAN 1B-160/2012 PARSHAD

08-03-2013

2.68887

2.17864

100%

2.17864 COMPLETE

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS SCHOOL AUTHORITY, JHARGRAM BANITIRTHA HIGH SCHOOL (HS) PUA DEPT.'S SANCTION ORDER NO. 76/PM(F)/P/ 1B-19/2013 DATE 14-03-2013 SANCTIONED AMOUNT 8.21248 RELEASED AMOUNT 8.21248 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION ` IN LAC REMARKS

85 RENOVATION WORK OF CLASSROOMS AT JHARGRAM BANITIRTHA HIGH SCHOOL (HS)

86.1 CONSTRUCTION OF BORE TEACHER-IN-CHARGE, WELL AND BOUNDARY KAPGARI SEVA BHARATI WALL AROUND TRIBAL MAHAVIDYALAYA HOSTEL ATTACHED AT KAPGARI SEVA BHARATI MAHAVIDYALAYA, KAPGARI MOUZA

78/PM(F)/P/ 1B-31/2013

18-03-2013

6.93129

6.93129

86.2 ADDITION AND TEACHER-IN-CHARGE, ALTERATION OF GROUND KAPGARI SEVA BHARATI FLOOR AND FIRST FLOOR MAHAVIDYALAYA OF TRIBAL HOSTEL BUILDING AT KAPGARI SEVA BHARATI MAHAVIDYALAYA, KAPGARI MOUZA 87 DEVELOPMENT OF PLAY GROUND AT AMLASOLE UNDER BINPUR-II BLOCK (TOTAL SANCTION 1,02,452/-)

78/PM(F)/P/ 1B-31/2013

18-03-2013

44.67335

44.67335

55%

WORK IN PROGRESS

DURBAR MAHILA 79/PM(F)/P/ SAMANWAYA COMMITTEE, 1B-32/2013 KOLKATA

19-03-2013

0.14860

0.14860

DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 18-03-2013 SANCTIONED AMOUNT 27.20384 RELEASED AMOUNT 26.60348 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS

88 CONSTRUCTION OF RCC SLAB CULVERT OVER BAJUDIHA KHAL UNDER BERAJAL GRAM PANCHAYAT, NAYAGRAM PANCHAYAT SAMITY 89.1 NERAKOPA MINI PIPED WATER SUPPLY SCHEME, GARHBETA-III PANCHAYAT SAMITY

NO. BLOCK DEVELOPMENT 96/PM(F)/P/ OFFICER, NAYAGRAM BLOCK 1B-91/2012

26.60348 COMPLETE

EXECUTIVE ENGINEER, MIDNAPORE MECHANICAL DIVISION, PHE DTE., PASCHIM MEDINIPUR

97/PM(F)/P/ 1B-125/2012

18-03-2013

18.67077

18.67077

89.2 DWARIGERIA MINI PIPED WATER SUPPLY SCHEME, GARHBETA-III PANCHAYAT SAMITY

EXECUTIVE ENGINEER, MIDNAPORE MECHANICAL DIVISION, PHE DTE., PASCHIM MEDINIPUR

97/PM(F)/P/ 1B-125/2012

18-03-2013

17.95473

17.95473

90 CONSTRUCTION OF HOSTEL BUILDING ATTACHED TO SALANGA GOPINATHPUR VIVEKANANDA VIDYAPITH (HIGH SCHOOL), KESHPUR BLOCK TOTAL:

SCHOOL AUTHORITY, SALANGA GOPINATHPUR VIVEKANANDA VIDYAPITH (HIGH SCHOOL)

101/PM(F)/P /1B-20/2013

26-03-2013

24.99440

24.99440

60%

12.49720 WORK IN PROGRESS

5058.71832

3414.74922

2209.19734

DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS BLOCK DEVELOPMENT OFFICER, BAGHMUNDI BLOCK PUA DEPT.'S SANCTION ORDER NO. 82/PM(F)/P/ 1B-69/2012 DATE 03-05-2012 SANCTIONED AMOUNT 2.86800 RELEASED AMOUNT 2.70086 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 12-11-2012 ` IN LAC REMARKS

1.1 CONST. OF GARDIH VILLAGE ROAD P.C.C. AT AJODHYA GRAM PANCHAYAT

2.70086 COMPLETED

1.2 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM HELIPAD TO TURGA OFFICER, BAGHMUNDI FALLS IN BAGHMUNDI BLOCK GRAM PANCHAYAT (PARTI) 1.3 CONST. OF SOPARAMBERA BLOCK DEVELOPMENT NICHPARA TO UPAR PARA OFFICER, BAGHMUNDI P.C.C. ROAD IN AJODHYA BLOCK GRAM PANCHAYAT

82/PM(F)/P/ 1B-69/2012

03-05-2012

24.02200

17.16683

100%

28-11-2012

17.16683 COMPLETED

82/PM(F)/P/ 1B-69/2012

03-05-2012

9.03500

7.52028

100%

15-10-2012

7.52028 COMPLETED

1.4 CONST. OF KULTAR VILLAGE ROAD P.C.C. AT AJODHYA GRAM PANCHAYAT 1.5 CONST. OF SIMULBERA VILLAGE ROAD P.C.C. AT AJODHYA GRAM PANCHAYAT

BLOCK DEVELOPMENT OFFICER, BAGHMUNDI BLOCK

82/PM(F)/P/ 1B-69/2012

03-05-2012

5.72000

5.72000

100%

5.72000 COMPLETED

BLOCK DEVELOPMENT OFFICER, BAGHMUNDI BLOCK

82/PM(F)/P/ 1B-69/2012

03-05-2012

2.61000

2.61000

100%

25-11-2012

2.61000 COMPLETED

DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS BLOCK DEVELOPMENT OFFICER, BAGHMUNDI BLOCK PUA DEPT.'S SANCTION ORDER NO. 82/PM(F)/P/ 1B-69/2012 DATE 03-05-2012 SANCTIONED AMOUNT 6.00000 RELEASED AMOUNT 6.00000 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 15-11-2012 ` IN LAC REMARKS

1.6 CONST. OF PUNIASASAN UP ROAD P.C.C. AT AJODHYA GRAM PANCHAYAT

6.00000 COMPLETED

1.7 CONST. OF JAMGHUTU GRAMIN ROAD P.C.C. AT AJODHYA GRAM PANCHAYAT

BLOCK DEVELOPMENT OFFICER, BAGHMUNDI BLOCK

82/PM(F)/P/ 1B-69/2012

03-05-2012

2.61000

2.61000

100%

24-08-2012

2.61000 COMPLETE

1.8 CONST. OF KENDGUTU TO BLOCK DEVELOPMENT BHURSABERA P.C.C. ROAD OFFICER, BAGHMUNDI AT AJODHYA GRAM BLOCK PANCHAYAT 1.9 CONST. OF DUNGRI VILLAGE P.C.C. ROAD IN BURDA-KALIMATI GRAM PANCHAYAT 1.10 CONST. OF ICHHAKOTO VILLAGE P.C.C. ROAD IN BURDA-KALIMATI GRAM PANCHAYAT 1.11 CONST. OF BASARE TO DUNGRIDIH ROAD IN AJODHYA GRAM PANCHAYAT BLOCK DEVELOPMENT OFFICER, BAGHMUNDI BLOCK

82/PM(F)/P/ 1B-69/2012

03-05-2012

3.04000

3.01176

100%

3.01176 COMPLETE

82/PM(F)/P/ 1B-69/2012

03-05-2012

15.04900

13.27616

100%

13.27616 COMPLETE

BLOCK DEVELOPMENT OFFICER, BAGHMUNDI BLOCK

82/PM(F)/P/ 1B-69/2012

03-05-2012

15.04900

13.47469

100%

13.47469 COMPLETE

BLOCK DEVELOPMENT OFFICER, BAGHMUNDI BLOCK

82/PM(F)/P/ 1B-69/2012

03-05-2012

6.17200

6.17200

100%

30-08-2012

6.17200 COMPLETE

DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS BLOCK DEVELOPMENT OFFICER, BAGHMUNDI BLOCK PUA DEPT.'S SANCTION ORDER NO. 82/PM(F)/P/ 1B-69/2012 DATE 03-05-2012 SANCTIONED AMOUNT 2.91900 RELEASED AMOUNT 2.91900 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 31-08-2012 ` IN LAC REMARKS

1.12 CONST. OF SONAHARA VILLAGE P.C.C. ROAD IN AJODHYA GRAM PANCHAYAT

2.91900 COMPLETE

1.13 CONST. OF BHUINGHORA BLOCK DEVELOPMENT VILLAGE P.C.C. ROAD IN OFFICER, BAGHMUNDI AJODHYA GRAM BLOCK PANCHAYAT 1.14 CONST. OF HATINADA VILLAGE P.C.C. ROAD IN AJODHYA GRAM PANCHAYAT 1.15 CONST. OF DARUDIH VILLAGE P.C.C. ROAD IN AJODHYA GRAM PANCHAYAT 1.16 CONST. OF BONGADA (SANTAL PARA) VILLAGE P.C.C. ROAD IN AJODHYA GRAM PANCHAYAT 1.17 CONST. OF KAMLABAHAL VILLAGE P.C.C. ROAD IN AJODHYA GRAM PANCHAYAT BLOCK DEVELOPMENT OFFICER, BAGHMUNDI BLOCK

82/PM(F)/P/ 1B-69/2012

03-05-2012

5.82300

5.57933

100%

19-10-2012

5.57933 COMPLETED

82/PM(F)/P/ 1B-69/2012

03-05-2012

5.85700

5.70125

100%

18-08-2012

5.70125 COMPLETED

BLOCK DEVELOPMENT OFFICER, BAGHMUNDI BLOCK

82/PM(F)/P/ 1B-69/2012

03-05-2012

5.89000

5.89000

100%

11-10-2012

5.89000 COMPLETED

BLOCK DEVELOPMENT OFFICER, BAGHMUNDI BLOCK

82/PM(F)/P/ 1B-69/2012

03-05-2012

5.79000

5.79000

100%

14-02-2013

5.79000 COMPLETED

BLOCK DEVELOPMENT OFFICER, BAGHMUNDI BLOCK

82/PM(F)/P/ 1B-69/2012

03-05-2012

5.84000

5.84000

100%

5.84000 COMPLETED

DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 82/PM(F)/P/ 1B-69/2012 DATE 03-05-2012 SANCTIONED AMOUNT 5.75500 RELEASED AMOUNT 5.75500 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 08-11-2012 ` IN LAC REMARKS

1.18 CONST. OF KUCHRIRAKHA BLOCK DEVELOPMENT VILLAGE P.C.C. ROAD IN OFFICER, BAGHMUNDI AJODHYA GRAM BLOCK PANCHAYAT 2 CONSTRUCTION OF SMALL BLOCK DEVELOPMENT CULVERTS AND GUARD OFFICER, BAGHMUNDI WALL ON PUCCA ROAD BLOCK ALONG WITH PCC TO PROPOSED BAGHMUNDI POLYTECHNIC SITE IN BAGHMUNDI BLOCK

5.75500 COMPLETED

97/PM(F)/P/ 1B-83/2012

31-05-2012

20.21388

10.97533

10.68147 WORK COMPLETE FOR CULVERT & GUARD WALL; ROAD NOT STARTED AS ESTIMATE REVISED BDO HAS BEEN REQUESTED TO SUBMIT ALTERNATIVE SCHEME AS THE SANCTIONED SCHEME ALREADY COMPLETED

3.1 CONSTRUCTION OF INCOMPLETE ROAD AT KALIMELA UNDER SALTORE G.P.

BLOCK DEVELOPMENT OFFICER, NETURIA BLOCK

112/PM/P/1 B-101/2012

11-06-2012

2.00000

DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 112/PM/P/1 B-101/2012 DATE 11-06-2012 SANCTIONED AMOUNT 2.50000 RELEASED AMOUNT PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION ` IN LAC REMARKS

3.2 CONSTRUCTION OF ROAD BLOCK DEVELOPMENT AT NABAGRAM, OFFICER, NETURIA BLOCK KHAWASPARA

BDO HAS BEEN REQUESTED TO TAKE UP THE SCHEME VIDE NO. 807/PUP/BNK/ 1S-116/12 DATED 18-072012 59.54367 50% 59.54367 WORK IN PROGRESS

4 CONSTRUCTION OF GROUND FLOOR OF KOTSHILA MAHAVIDYALAYA AT KOTSHILA, P.O.-JIUDARU 5 CONSTRUCTION OF COMMUNITY HALL AT TUNTURI

BLOCK DEVELOPMENT OFFICER, JHALDA-II BLOCK

113/PM(F)/P /1B-96/2012

11-06-2012

114.88371

BLOCK DEVELOPMENT OFFICER, BAGHMUNDI BLOCK

114/PM(F)/P /1B110/2012

12-06-2012

13.35423

6.54633

40%

6.54633 WORK IN PROGRESS

6 CONSTRUCTION OF JHALDA SATYABHAMA VIDYAPITH HOSTEL BUILDING

BLOCK DEVELOPMENT OFFICER, JHALDA-I BLOCK

115/PM(F)/P /1B110/2012 120/PM(F)/P /1B107/2012

12-06-2012

16.90770

10.92300

80%

10.92300 NIT ISSUED ON 25/07/2012

7 CONSTRUCTION OF 3 NOS. HEADMASTER, KASHIDIH CLASSROOM AND C.R.C.G. VIDYAPITH BOUNDARY WALL AT KASHIDIH C.R.C.G. VIDYAPITH

12-06-2012

39.31213

39.31213

50%

30.55910 WORK IN PROGRESS

DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS HEADMASTER, JITUJURI DEBASISH HIGH SCHOOL (H.S.) PUA DEPT.'S SANCTION ORDER NO. 121/PM(F)/P /1B108/2012 122/PM(F)/P /1B109/2012 DATE 12-06-2012 SANCTIONED AMOUNT 21.66977 RELEASED AMOUNT 10.83488 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION ` IN LAC REMARKS

8 CONSTRUCTION OF SCHOOL BUILDING OF JITUJURI DEBASISH HIGH SCHOOL (H.S.)

9 CONSTRUCTION OF HEADMASTER, TATARIHOSTEL BUILDING AND KENDADIH HIGH SCHOOL SCHOOL BOUNDARY WALL AT TATARI-KENDADIH HIGH SCHOOL

12-06-2012

25.13340

25.13340

100%

25.13340 COMPLETE

10 CONSTRUCTION OF TWO BLOCK DEVELOPMENT 123/PM(F)/P CLASS ROOM AT OFFICER, BARABAZAR BLOCK /1BBADALDIH HIGH SCHOOL, 103/2012 BARABAZAR BLOCK 11 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM ANARA SHIV OFFICER, PARA BLOCK MANDIR TO ANARA BUS STAND (1.60 KM), PARA 124/PM(F)/P /1B114/2012

12-06-2012

14.13534

11.41001

100%

11.41001 COMPLETE

12-06-2012

14.28769

14.28769

100%

14.28769 COMPLETE

12 CONSTRUCTION OF TWO CLASS ROOM AT KHARIDURA HIGH SCHOOL, MANBAZAR-II

BLOCK DEVELOPMENT OFFICER, MANBAZAR-II BLOCK

127/PM(F)/P /1B104/2012

12-06-2012

14.13534

11.99356

100%

15-02-2012

11.78770 COMPLETE

DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 128/PM(F)/P /1B102/2012 DATE 13-06-2012 SANCTIONED AMOUNT 26.42877 RELEASED AMOUNT 25.86574 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS

13 CONSTRUCTION OF BLOCK DEVELOPMENT BOUNDARY WALL, REPAIR OFFICER, ARSHA BLOCK AND RENOVATION OF BUILDING OF MUDALI R.N.M. HIGH SCHOOL, ARSHA

25.86574 COMPLETE

14 EXCAVATION OF A SILTED SECRETARY, RAMAKRISHNA 141/PM(F)/P POND AT KHUKRAMURA MISSION VIDYAPITH, /1BVILLAGE, ARSHA PURULIA 122/2012

25-06-2012

24.99686

24.99686

100%

23.47824 COMPLETE

15 PIPED LINE DRINKING WATER SUPPLY FOR 97 NOS. ANGANWADI CENTRES AT KASHIPUR & NETURIA BLOCKS

DISTRICT MAGISTRATE, PURULIA

144/PM(F)/P /1B121/2012

25-06-2012

9.26611

9.26611

100%

COMPLETE

16 CONSTRUCTION OF A ADHYAKSHA, RAMAKRISHNA 145/PM(F)/P LIBRARY AND READING MATH, BAGDA, PURULIA /1BROOM CUM COMMUNITY 123/2012 HALL AT RAMAKRISHNA MATH, BAGDA 17 CONSTRUCTION OF BIDHAKATA JORE-CUMCULVERT BLOCK DEVELOPMENT OFFICER, SANTURI BLOCK 159/PM(F)/P /1B136/2012

25-06-2012

25.00000

25.00000

65%

23.25967 WORK IN PROGRESS

11-07-2012

24.86748

WORK ORDER ISSUED ON 1910-2012

DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS BLOCK DEVELOPMENT OFFICER, BALARAMPUR BLOCK PUA DEPT.'S SANCTION ORDER NO. 165/PM(F)/P /1B128/2012 DATE 12-07-2012 SANCTIONED AMOUNT 16.94634 RELEASED AMOUNT 16.10281 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS

18.1 CONSTRUCTION OF CLASSROOMS AT GHATBERA KEROWA H.S. SCHOOL 18.2 DEVELOPMENT OF PLAY FIELD OF LAGDA HIGH SCHOOL (H.S.)

16.10281 COMPLETE

BLOCK DEVELOPMENT OFFICER, PURULIA-I BLOCK

165/PM(F)/P /1B128/2012

12-07-2012

14.17509

11.26578

100% MAY'2013

11.26578 COMPLETE

18.3 UPGRADATION OF LALMATI GIRLS HIGH SCHOOL BUILDING

BLOCK DEVELOPMENT OFFICER, BALARAMPUR BLOCK

165/PM(F)/P /1B128/2012

12-07-2012

15.15221

18.4 CONSTRUCTION OF ROAD BLOCK DEVELOPMENT 165/PM(F)/P BRIDGE AT ARABAID JORE OFFICER, BARABAZAR BLOCK /1B128/2012

12-07-2012

24.56084

18.5 CONSTRUCTION OF SAPUJORA CULVERT UNDER BELA GP

BLOCK DEVELOPMENT OFFICER, BALARAMPUR BLOCK

165/PM(F)/P /1B128/2012

12-07-2012

15.81713

WORK ORDER ISSUED, SCHEME RUNNING WORK ORDER ISSUED, SCHEME RUNNING

18.6 CONSTRUCTION OF BLOCK DEVELOPMENT CULVERT WITH OFFICER, BALARAMPUR GUARDWALL AT CHITAHA BLOCK VILLAGE

165/PM(F)/P /1B128/2012

12-07-2012

6.15369

DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 16-07-2012 SANCTIONED AMOUNT 17.06713 RELEASED AMOUNT 17.06713 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION ` IN LAC REMARKS

NO. 19 CONSTRUCTION OF 1ST HEADMASTER, GARHJOYPUR 174/PM(F)/P FLOOR BUILDING WITHIN SHRI SHRI RAMKRISHNA /1BGARHJOYPUR SHRI SHRI VIVEKANANDA ASHRAM 135/2012 RAMKRISHNA VIVEKANANDA ASHRAM 20 CONSTRUCTION OF SECRETARY, BHARAT GROUND FLOOR (PHASE-I: SEVASHRAM SANGHA, 24.84568 LAC & PHASE-II: PURULIA 12.32675 LAC) OF A HOSTEL BUILDING FOR SC, ST AND OBC STUDENTS AT THE AJODHYA HILL TOP, BAGHMUNDI P.S. 21.1 EXTENSION OF HOSPITAL SECRETARY, NANRITAM BUILDING AND CONST. OF STAFF QUARTERS OF LOKESWARANANDA EYE FOUNDATION, PARA (50% OF REMAINING AMOUNT) 176/PM(F)/P /1B147/2012

16-07-2012

37.17243

37.17243

13.51339 WORK IN PROGRESS

182/PM(F)/P /1B-09/2012

24-07-2012

56.56642

56.56642

95%

26.11229

21.2 PURCHASING OF SECRETARY, NANRITAM EQUIPMENTS, INCLUDING SURGICAL EQUIPMENT, 2ND PHASE OF LOKESWARANANDA EYE FOUNDATION, PARA (FULL REMAINING AMOUNT)

182/PM(F)/P /1B-09/2012

24-07-2012

91.28300

91.28300

95%

85.01005

DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 182/PM(F)/P /1B-09/2012 DATE 24-07-2012 SANCTIONED AMOUNT 1.67708 RELEASED AMOUNT 1.67708 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 1.67708 ` IN LAC REMARKS

21.3 MOBILE VAN OF SECRETARY, NANRITAM LOKESWARANANDA EYE FOUNDATION, PARA (FULL REMAINING AMOUNT) 22.1 CONSTRUCTION OF PCC ROAD FROM BAGHRA TO KOLABANDH, PURULIA-II BLOCK

BLOCK DEVELOPMENT 207/PM(F)/P OFFICER, PURULIA-II BLOCK /1B163/2012

01-08-2012

19.99650

BDO HAS BEEN REQUESTED TO TAKE UP THE SCHEME VIDE NO. 988/PUP/BNK/ 1S-152/12 DATED 17-082012 13.84730 100% 13.84730 COMPLETE

22.2 CONSTRUCTION OF PCC ROAD FROM ARITA TO DESHRA, PURULIA-II BLOCK

BLOCK DEVELOPMENT 207/PM(F)/P OFFICER, PURULIA-II BLOCK /1B163/2012

01-08-2012

19.99304

22.3 CONSTRUCTION OF PIPE- BLOCK DEVELOPMENT 207/PM(F)/P CAUSEWAY AT HUTMURA, OFFICER, PURULIA-II BLOCK /1BPURULIA-II BLOCK 163/2012

01-08-2012

14.77170

14.29116

100%

14.29116 COMPLETE

DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 01-08-2012 SANCTIONED AMOUNT 15.31920 RELEASED AMOUNT 14.86673 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS

NO. 22.4 CONSTRUCTION OF LOW BLOCK DEVELOPMENT 207/PM(F)/P LEVEL BRIDGE OR OFFICER, PURULIA-II BLOCK /1BCAUSEWAY AT LALBAZAR163/2012 PURDA, PURULIA-II BLOCK

14.86673 COMPLETE

23 CONSTRUCTION OF 1ST FLOOR OF COMMUNITY HALL AT LALPUR, HURA BLOCK 24 CONSTRUCTION OF SCHOOL BUILDING OF SIMAKANALI SIDDIKA MADRASAH SHIKSHA KENDRA, PUNCHA PS

BLOCK DEVELOPMENT OFFICER, HURA BLOCK

270/PM(F)/P /1B182/2012

28-08-2012

48.86409

26.24129

50%

26.04705 WORK IN PROGRESS

EXECUTIVE OFFICER, PUNCHA PS

136/PM(F)/P /1B176/2012

28-05-2013

23.51743

12.10120

50%

12.10120 ONGOING

25 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM ANARA SHIV OFFICER, PARA BLOCK MANDIR TO ANARA BUS STAND (PART-B, C, & D), PARA

277/PM(F)/P /1B114/2012

30-08-2012

75.10098

65.79291

70%

65.79291 WORK IN PROGRESS

DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 30-08-2012 SANCTIONED AMOUNT 15.27580 RELEASED AMOUNT 15.27580 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION ` IN LAC REMARKS

26 CONSTRUCTION OF 2ND FLOOR FOR GYNAE, PEDIATRIC WARD, ELECTRICAL INSTALLATION AND ALLIED WORKS AT DEBEN MAHATO (SADAR) HOSPITAL

NO. EXECUTIVE ENGINEER, 279/PM(F)/P P.W.D., WESTERN ELECTICAL /1B-85/2011 DIVISION NO. - II

27 CONSTRUCTION OF BLOCK DEVELOPMENT 280/PM(F)/P CLASSROOMS AT BERADA OFFICER, BARABAZAR BLOCK /1BHIGHER SECONDARY 179/2012 SCHOOL, BARABAZAR BLOCK 28 CONSTRUCTION OF BRIDGE ON RIVER THAKURCHATANI NEAR GURRABERA, JHALDA-II BLOCK (ADDITIONAL FUND) BLOCK DEVELOPMENT OFFICER, JHALDA-II BLOCK 324/PM(F)/P /1B166/2011

31-08-2012

24.44847

24.09003

100%

23.73399 COMPLETE

27-09-2012

7.77867

WORK IN PROGRESS

29 RE-CONSTRUCTION WITH BLOCK DEVELOPMENT REPAIRING OF APPROACH OFFICER, JOYPUR BLOCK ROAD OF RANGANITARD CULVERT UNDER UPARKAHAN GP

325/PM(F)/P /1B199/2012

27-09-2012

5.13605

4.89772

100%

4.89772 COMPLETE

DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 326/PM(F)/P /1B198/2012 DATE 27-09-2012 SANCTIONED AMOUNT 52.92606 RELEASED AMOUNT 52.92606 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 80% 31-05-2013 ` IN LAC REMARKS

30 CONSTRUCTION OF ROAD DISTRICT MAGISTRATE, FROM GOPALPUR BUSPURULIA STAND TO BAGDA BUSSTAND VIA RASUDI (4 KM), PUNCHA BLOCK (PHASE-I & PHASE-II) 31 CONSTRUCTION OF BOUNDARY WALL OF MAIN BUILDING AT PATHARDIH BPHC, BAGHMUNDI BLOCK BLOCK DEVELOPMENT OFFICER, BAGHMUNDI BLOCK

TENDER INVITED ON 2612-2012

327/PM(F)/P /1B201/2012

27-09-2012

33.32000

15.52902

70%

15.52902 WORK IN PROGRESS

32 CONSTRUCTION OF CHECK BLOCK DEVELOPMENT 338/PM(F)/P DAM AT DHANSURA, OFFICER, PURULIA-II BLOCK /1BBELMA, CHAKIRBAN AND 162/2012 SENERA AMRA VILLAGE, PURULIA-II PS

05-10-2012

34.71569

14.34387

14.34387 BDO HAS BEEN REQUESTED TO TAKE UP THE SCHEME VIDE NO. 1424/PUP/BNK /1S-198/12 DATED 12/10/2012

33 ADDITIONAL EXPENDITURE FOR CONSTRUCTION OF 18 (EIGHTEEN) NOS. OF PCC ROAD IN BAGHMUNDI BLOCK

BLOCK DEVELOPMENT OFFICER, BAGHMUNDI BLOCK

339/PM(F)/P /1B-69/2012

08-10-2012

10.36500

8.23995

8.23995

DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS BLOCK DEVELOPMENT OFFICER, JHALDA-I BLOCK PUA DEPT.'S SANCTION ORDER NO. 346/PM(F)/P /1B205/2012 DATE 10-10-2012 SANCTIONED AMOUNT 24.59000 RELEASED AMOUNT 12.15688 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION ` IN LAC REMARKS

34.1 CONSTRUCTION OF CULVERT ON SALDAHA RIVER AT GOKULNAGAR MOUZA UNDER JHALDA-I BLOCK

12.15688 WORK IN PROGRESS

34.2 CONSTRUCTION OF BLACK BLOCK DEVELOPMENT TOP ROAD ON BOTH SIDE OFFICER, JHALDA-I BLOCK OF SALDAHA CULVERT IN GOKULNAGAR

346/PM(F)/P /1B205/2012

10-10-2012

12.46029

TENDER INVITED ON 2611-2012

35 CONSTRUCTION OF MAIN PRINCIPAL, PURULIA GATE AND TWO NOS. OF POLYTECHNIC SECURITY ROOMS AT PURULIA POLYTECHNIC

350/PM(F)/P /1B207/2012

12-10-2012

5.50742

5.50742

100%

5.50742 COMPLETE

36 CONSTRUCTION OF CLASSROOMS AT CHANDRA HIGH SCHOOL (HS) (ADDITIONAL AMOUNT)

BLOCK DEVELOPMENT OFFICER, MANBAZAR-I BLOCK

352/PM(F)/P /1B134/2011

16-10-2012

3.05053

37 CONSTRUCTION OF A SECRETARY, BHARAT PATIENT WAITING HALL IN SEVASHRAM SANGHA, PHASE-I & PHASE-II AT PURULIA BHARAT SEVASHRAM SANGHA CHARITABLE DISPENSARIES , PURULIA

353/PM(F)/P /1B210/2012

17-10-2012

40.43369

40.43369

15.30247

DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 18-10-2012 SANCTIONED AMOUNT 31.07141 RELEASED AMOUNT 31.07141 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 65% ` IN LAC REMARKS

38 CONSTRUCTION OF BOUNDARY WALL & SCHOOL BUILDING OF RAMAKRISHNA VIVEKANANDA MISSION AT BELKURI

NO. SECRETARY, RAMAKRISHNA 355/PM(F)/P VIVEKANANDA MISSION, /1BPURULIA 211/2012

20.47293 WORK IN PROGRESS

39 CONSTRUCTION OF DISTRICT MAGISTRATE, BRIDGE ON TULIN MAGHA PURULIA ROAD ON SALDAH RIVER, JHALDA-I BLOCK

359/PM(F)/P 19-10-2012 & /1B02-11-2012 110/2012 & 364/PM/201 2 09-11-2012

154.81423

154.81423

2%

31-03-2015

TENDER INVITED ON 2612-2012

40.1 CONSTRUCTION OF CLASSROOMS AT GENGARA HIGH SCHOOL, PURULIA-II BLOCK

BLOCK DEVELOPMENT 369/PM(F)/P OFFICER, PURULIA-II BLOCK /1B202/2012

5.00000

BDO HAS BEEN REQUESTED TO TAKE UP THE SCHEME VIDE NO. 1688/PUP/BNK /1S-210/12 DATED 05/12/2012

40.2 CONSTRUCTION OF CLASSROOMS AT KHUDIBANDH HIGH SCHOOL, PURULIA-II BLOCK

BLOCK DEVELOPMENT 369/PM(F)/P OFFICER, PURULIA-II BLOCK /1B202/2012

09-11-2012

9.95945

9.94479

100%

9.94479 COMPLETE

DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 371/PM(F)/P /1B220/2012 DATE 20-11-2012 SANCTIONED AMOUNT 39.31756 RELEASED AMOUNT 39.31756 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 55% 31-07-2013 ` IN LAC REMARKS

41 CONSTRUCTION OF DISTRICT MAGISTRATE, GALLERY OF THE STADIUM PURULIA FOR TWO BLOCKS AT MANBHUM VICTORIA INSTITUTION IN TWO PHASE 42 CONSTRUCTION WORK OF HEADMASTER, EXISTING SCHOOL KUKRUDABAR PRIMARY BUILDING AT SCHOOL, BANDWAN KUKRUDABAR PRIMARY SCHOOL, BANDWAN BLOCK

19.65878 WORK IN PROGRESS

389/PM(F)/P /1B214/2012

27-11-2012

2.80000

2.80000

2.80000 CONSTRUCTIO N WORK COMPLETE

43.1 CONSTRUCTION OF PCC BLOCK DEVELOPMENT 391/PM(F)/P ROAD FROM BILTORA OFFICER, PURULIA-II BLOCK /1BDEOGHORIA PARA TO 215/2012 BAURI BANDH, PURULIA-II BLOCK 43.2 CONSTRUCTION OF PCC ROAD FROM NADIHA ROAD TO PURANDIH VIA MALTHORE, BELMA, PURULIA-II BLOCK BLOCK DEVELOPMENT 391/PM(F)/P OFFICER, PURULIA-II BLOCK /1B215/2012

27-11-2012

3.50000

0.08436

27-11-2012

10.50000

9.85288

100%

9.85288 COMPLETE

44.1 CONSTRUCTION OF ROAD BLOCK DEVELOPMENT FROM GARAFUSRO OFFICER, PURULIA-I BLOCK SHIVAMANDIR TO GARAFUSRO JORE, PURULIA-I BLOCK

392/PM(F)/P /1B127/2012

27-11-2012

24.64165

24.31300

100% MAY'2013

23.85706 COMPLETE

DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 392/PM(F)/P /1B127/2012 DATE 27-11-2012 SANCTIONED AMOUNT 10.01256 RELEASED AMOUNT 8.19331 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% MAY'2013 ` IN LAC REMARKS

44.2 CONSTRUCTION OF BLOCK DEVELOPMENT CONCRETE ROAD FROM OFFICER, PURULIA-I BLOCK BALIAGARA SHIVAMANDIR TO BOSTOMTUPA JORE, PURULIA-I BLOCK

8.01139 COMPLETE

44.3 CONSTRUCTION OF ROAD BLOCK DEVELOPMENT FROM GHARJURI TO OFFICER, PURULIA-I BLOCK GARAFUSRO VILLAGE, PURULIA-I BLOCK

392/PM(F)/P /1B127/2012

27-11-2012

19.80377

0.36760

MAY'2013

WORK ORDER ISSUED

44.4 CONSTRUCTION OF ROAD BLOCK DEVELOPMENT FROM DULMI 40 QUARTER OFFICER, PURULIA-I BLOCK TO RAIBUNDH MORE, PURULIA-I BLOCK

392/PM(F)/P /1B127/2012

27-11-2012

19.80377

18.47510

100% MAY'2013

18.47510 COMPLETE

44.5 CONSTRUCTION OF BLOCK DEVELOPMENT CONCRETE ROAD FROM OFFICER, PURULIA-I BLOCK MANGURIA SHIVAMANDIR TO OLD BEGUNKODAR ROAD, PURULIA-I BLOCK

392/PM(F)/P /1B127/2012

27-11-2012

10.72774

8.89049

100% MAY'2013

8.89049 COMPLETE

45 CONSTRUCTION OF HEADMASTER, PARA SHIB BOUNDARY WALL AT PARA NARAYAN HIGH SCHOOL SHIB NARAYAN HIGH (H.S.) SCHOOL (H.S.), PARA BLOCK

409/PM(F)/P /1B234/2012

11-12-2012

23.51551

23.51551

100%

23.51551 COMPLETE

DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 413/PM(F)/P /1B-01/2012 DATE 13-12-2012 SANCTIONED AMOUNT 17.22960 RELEASED AMOUNT 8.61480 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION ` IN LAC REMARKS

46 CONSTRUCTION OF SCHOOL AUTHORITY, CLASSROOM AT CHELYAMA B.P. HIGH CHELYAMA B.P. HIGH SCHOOL SCHOOL, RAGHUNATHPURII BLOCK 47.1 CONSTRUCTION OF BLOCK DEVELOPMENT CULVERT AT KALIMATI OFFICER, BAGHMUNDI MORE TO BIDDRI ROAD IN BLOCK SERENGHDIH G.P., BAGHMUNDI BLOCK 47.2 CONSTRUCTION OF BLOCK DEVELOPMENT CULVERT ON BUKHADIH OFFICER, BAGHMUNDI TO SARAMCHAKI ROAD IN BLOCK BURDA-KALIMATI G.P., BAGHMUNDI BLOCK 47.3 CONSTRUCTION OF CULVERT ON THE ROAD SURJANDIH TO KAMALBAHAL ROAD IN AJODHYA G.P., BAGHMUNDI BLOCK BLOCK DEVELOPMENT OFFICER, BAGHMUNDI BLOCK

WORK ORDER ISSUED, DELAYED DUE TO RAIN

417/PM(F)/P /1B233/2012

13-12-2012

24.91970

24.05276

100%

24.05276 COMPLETE

417/PM(F)/P /1B233/2012

13-12-2012

24.91970

0.54360

0.54360 WORK IN PROGRESS

417/PM(F)/P /1B233/2012

13-12-2012

24.91970

0.54360

0.54360 WORK IN PROGRESS

48 SUPPLYING OF DRINKING EE, CIVIL, PHE DTE., PURULIA 418/PM(F)/P WATER BY LAYING PIPE /1BLINE TO 9 (NINE) NOS. OF 237/2012 ANGANWARI CENTRES IN PARA ICDS PROJECT

13-12-2012

0.97038

0.97038

DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 14-12-2012 SANCTIONED AMOUNT 3.35674 RELEASED AMOUNT 3.35674 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS

49 RENOVATION AND FURNISHING OF LABORATORIES AT CHITTARANJAN GIRLS' HIGH SCHOOL

NO. HEADMISTRESS, 423/PM(F)/P CHITTARANJAN GIRLS' HIGH /1BSCHOOL 248/2012

3.35674 COMPLETE

50 CONSTRUCTION OF PCC DISTRICT MAGISTRATE, ROAD FROM SATNALA PURULIA STREAM TO MAMUDIH VILLAGE (3.0 KM) WITHIN JHALDA-II BLOCK 51 CONSTRUCTION OF OFFICE HEADMASTER, R.B.B. HIGH BUILDINGS OF R.B.B. HIGH SCHOOL (H.S.) SCHOOL (H.S.) AT GARHJOYPUR

424/PM(F)/P /1B-70/2012

18-12-2012

119.22956

119.22956

25%

30-09-2013

426/PM(F)/P /1B249/2012

18-12-2012

19.30177

19.30177

50%

9.65088 WORK IN PROGRESS

52 CONSTRUCTION OF 2 NOS. HEADMASTER, MANIPUR 435/PM(F)/P OF CLASSROOMS SWAMI VIVEKANANDA HIGH /1BINCLUDING STAIRCASE AT SCHOOL (H.S.) 256/2012 MANIPUR SWAMI VIVEKANANDA HIGH SCHOOL (H.S.) 53 CONSTRUCTION OF BRIDGE ON SATNALA, JHALDA-II BLOCK DISTRICT MAGISTRATE, PURULIA 17/PM(F)/P/ 1B-70/2012

20-12-2012

16.36239

16.36239

8.18100

24-01-2013

4.45262

DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 29/PM(F)/P/ 1B-143/2012 DATE 04-02-2013 SANCTIONED AMOUNT 149.72598 RELEASED AMOUNT 149.72598 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 20% 30-09-2013 ` IN LAC REMARKS

54 CONSTRUCTION OF PUCCA DISTRICT MAGISTRATE, ROAD FROM TELEKOCHA PURULIA TO JAMUNA BANDH (5.70 KM), MANBAZAR-II BLOCK

55 CONSTRUCTION OF A ADHYAKSHA, RAMAKRISHNA 74/PM(F)/P/ LIBRARY AND READING MATH, BAGDA, PURULIA 1B-123/2012 ROOM CUM COMMUNITY HALL AT RAMAKRISHNA MATH, BAGDA (ADDL. FUND) 56 CONSTRUCTION OF BLOCK DEVELOPMENT ADDITIONAL CLASSROOMS OFFICER, BALARAMPUR AT BALARAMPUR PHOOL BLOCK CHAND HIGH SCHOOL, BALARAMPUR BLOCK 95/PM(F)/P/ 1B-22/2013

13-03-2013

19.52958

19.52958

18-03-2013

14.88602

BDO REQUESTED VIDE NO. 640/PUP/BNK/ 1S-278/12 DT. 22-03-2013 1669.37295 963.35976

TOTAL:

2128.55477