NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS EXECUTIVE ENGINEER, PUBLIC WORKS DEPARTMENT, BANKURA DIVISION-II AND EXECUTIVE ENGINEER, PUBLIC WORKS DEPARTMENT, MIDNAPORE ELECTRICAL DIVISION PUA DEPT.'S SANCTION ORDER NO. 62/PM(F)/P/ 1B-68/2012 DATE 03-05-2012 SANCTIONED AMOUNT 75.86656 RELEASED AMOUNT 75.86656 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 31-05-2013 ` IN LAC REMARKS
2 DEVELOPMENT AND BLOCK DEVELOPMENT REPAIRING OF DAMAGED OFFICER, RAIPUR BLOCK CONDITION OF SCHOOL BUILDINGS WITH ELECTRIFICATION OF LOUPARA HIGH SCHOOL UNDER RAIPUR BLOCK
4.50000
4.50000
100%
15-12-2012
4.50000 COMPLETE
3.1 RENOVATION OF CANAL EXECUTIVE ENGINEER, FOR RESTORATION OF BANKURA IRRIGATION IRRIGATION POTENTIAL IN DIVISION, 03242-254934 BETWEEN CH. 55.00 & CH. 92.00 INCLUDING CANAL STRUCTURES AT CH. 1.50 & CH. 63.00 UNDER ONDA BLOCK
31-05-2012
26.75799
26.75799
100%
76.26716 COMPLETE
76.26716
DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 98/PM(F)/P/ 1B-67/2012 & 173/PM(F)/P /1B-67/2012 DATED 1307-2013 DATE 31-05-2012 SANCTIONED AMOUNT 25.76252 RELEASED AMOUNT 25.76252 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS
3.2 RENOVATION OF CANAL EXECUTIVE ENGINEER, FOR RESTORATION OF BANKURA IRRIGATION IRRIGATION POTENTIAL IN DIVISION, 03242-254934 BETWEEN CH. 92.00 & CH. 120.00 INCLUDING CANAL STRUCTURES AT CH. 101.00 UNDER ONDA BLOCK 3.3 RENOVATION OF CANAL EXECUTIVE ENGINEER, FOR RESTORATION OF BANKURA IRRIGATION IRRIGATION POTENTIAL IN DIVISION, 03242-254934 BETWEEN CH. 204.10 & CH. 232.00 INCLUDING CANAL STRUCTURES AT CH. 198.00 UNDER ONDA BLOCK 4 228 UNITS OF PISICULTURE SCHEME WITHIN 14 BLOCKS OF BANKURA AND KHATRA SUB-DIVISION ASSISTANT DIRECTOR OF FISHERIES, BANKURA
COMPLETE
31-05-2012
27.14059
27.14059
100%
COMPLETE
105/PM(F)/P /1B-79/2012
05-06-2012
11.85600
11.85600
100%
11.85600 COMPLETE
DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 05-06-2012 SANCTIONED AMOUNT 55.12595 RELEASED AMOUNT 36.15924 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 85% 30-09-2013 ` IN LAC REMARKS
NO. 5 EXCAVATION OF WATER CHIEF EXECUTIVE OFFICER, 106/PM(F)/P HARVESTING TANK, PASCHIMANCHAL UNNAYAN /1B-88/2012 BOULDER PITCHING WORK PARSHAD WITH TOE WALL, CONSTRUCTION OF GHAT, PLANTATION AND ECODEVELOPMENT AT PUP ADMINISTRATIVE BUILDING PREMISES 6.1 SINKING OF MEDIUM ADDITIONAL EXECUTIVE DUTY TUBE-WELL FOR OFFICER, BANKURA ZILLA IRRIGATION IN MURAKATI PARISHAD (KALARA) VILLAGE, SALTORA GP, TALDANGRA PS 6.2 SINKING OF MEDIUM DUTY TUBE-WELL FOR IRRIGATION IN SATBAR VILLAGE, SALTORA GP, TALDANGRA PS ADDITIONAL EXECUTIVE OFFICER, BANKURA ZILLA PARISHAD 110/PM(F)/P /1B-77/2012
36.15924 PLANTATION, BORING COMPLETE, TANK AND ALLIED WORK TO BE COMPLETED VERY SHORTLY
07-06-2012
3.03000
3.03000
100%
28-02-2013
COMPLETE
110/PM(F)/P /1B-77/2012
07-06-2012
3.03000
3.03000
6.3 SINKING OF MEDIUM ADDITIONAL EXECUTIVE DUTY TUBE-WELL FOR OFFICER, BANKURA ZILLA IRRIGATION IN KARANDIHI PARISHAD VILLAGE, SALTORA GP, TALDANGRA PS
110/PM(F)/P /1B-77/2012
07-06-2012
3.03000
3.03000
DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 06-07-2012 SANCTIONED AMOUNT 92.27288 RELEASED AMOUNT 68.30214 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 80% 30-05-2013 ` IN LAC REMARKS
NO. 7 CONSTRUCTION OF SC/ST CHIEF EXECUTIVE OFFICER, 157/PM(F)/P GIRLS HOSTEL BUILDING PASCHIMANCHAL UNNAYAN /1B-93/2012 OF BIRSHA MUNDA PARSHAD THROUGH BDO, MEMORIAL COLLEGE, RAIPUR PIRRA, RAIPUR BLOCK
8 CONSTRUCTION OF BOUNDARY WALL AT P.R.M.S. MAHAVIDYALAYA, BARAGARI, JAMBONI 9 BORING OF A 200 x 150 MM. DIA TUBE-WELL OF DEPTH 200 MT. AT BHARAT SEVASHRAM SANGHA, KENDUADIHI
CHIEF EXECUTIVE OFFICER, 160/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD THROUGH BDO, 130/2012 SARENGA
11-07-2012
48.84000
15-06-2013
WORK STARTED
11-07-2012
3.76948
1.77078
100%
15-04-2013
1.77078 COMPLETE
10 SINKING OF A DEEP TUBE- CHIEF EXECUTIVE OFFICER, WELL OF 200 MT. DEPTH PASCHIMANCHAL UNNAYAN AND INSTALLATION OF PARSHAD SUBMERSIBLE PUMP SET AND NECESSARY WATER DISTRIBUTION LINE OF AMADER HASPATAL
171/PM(F)/P /1B52/2011(PT.I)
13-07-2012
5.00819
3.51613
100%
15-04-2013
3.51613 COMPLETE
17-07-2012
25.00000
21.67155
85%
30-09-2013
DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 179/PM(F)/P /1B150/2012 DATE 18-07-2012 SANCTIONED AMOUNT 20.77653 RELEASED AMOUNT PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION ` IN LAC REMARKS
12.1 INFRASTRUCTURE BLOCK DEVELOPMENT DEVELOPMENT WORKS AT OFFICER, INDPUR BLOCK BANSIDI HIGH SCHOOL, INDPUR
REVISED ESTIMATE AS SUBMITTED BY BDO VETTED FROM PUP ON 29/07/2013 13.75664 100% 10-05-2013 13.75664 COMPLETE
12.2 REPAIRING AND RENOVATION WORK OF SCHOOL BUILDING AT CHHATNA CHANDIDAS VIDYAPITH, CHHATNA 13.1 CONSTRUCTION OF CONCRETE ROAD FROM BIKNA UPOR PARA TO NAMO PARA
179/PM(F)/P /1B150/2012
18-07-2012
14.48700
23-07-2012
16.45132
23.30520
100%
30-04-2013
23.30520 COMPLETE
13.2 CONSTRUCTION OF BRICK CHIEF EXECUTIVE OFFICER, 181/PM(F)/P WORK DRAIN FROM PASCHIMANCHAL UNNAYAN /1B-20/2012 BIKNA UPOR PARA TO PARSHAD NAMO PARA 13.3 CONSTRUCTION OF CONCRETE ROAD FROM RAMSAGAR BUS STAND TO RAMSAGAR RLY. STATION CHIEF EXECUTIVE OFFICER, 181/PM(F)/P PASCHIMANCHAL UNNAYAN /1B-20/2012 PARSHAD
23-07-2012
10.18784
100%
30-06-2013
COMPLETE
23-07-2012
23.58344
COMPLETE
13.4 CONSTRUCTION OF BRICK CHIEF EXECUTIVE OFFICER, 181/PM(F)/P WORK DRAIN FROM PASCHIMANCHAL UNNAYAN /1B-20/2012 RAMSAGAR BUS STAND PARSHAD TO RAMSAGAR RLY. STATION
23-07-2012
20.26142
36.16744
80%
30-09-2013
36.16744
WORK IN PROGRESS
DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 187/PM(F)/P /1B143/2012 DATE 25-07-2012 SANCTIONED AMOUNT 170.00000 RELEASED AMOUNT 170.00000 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 31-07-2013 ` IN LAC REMARKS
14 CONSTRUCTION OF 15KM ADDITIONAL EXECUTIVE BITUMINOUS ROAD FROM OFFICER, BANKURA ZILLA DHANJHAR MORE TO PARISHAD KARAPARA (BANSIDIHA) AT RANIBANDH
170.00000 COMPLETE
15 CONSTRUCTION OF ROAD ADDITIONAL EXECUTIVE FROM RATANPUR TO OFFICER, BANKURA ZILLA KRISHNAGAR AT ONDA PARISHAD BLOCK 16 CULTIVATION OF KHARIFF DIRECTOR OF RESEARCH, ONION IN BANKURA BIDHAN CHANDRA KRISHI DISTRICT VISWAVIDYALAYA, P.O. KALYANI, DIST. - NADIA 17.1 ROY BUNDH SURFACE ADDITIONAL EXECUTIVE FLOW MINOR IRRIGATION OFFICER, BANKURA ZILLA SCHEME, BHABRIGORA PARISHAD MOUZA, INDPUR BLOCK 17.2 PONDA BUNDH SURFACE ADDITIONAL EXECUTIVE FLOW MINOR IRRIGATION OFFICER, BANKURA ZILLA SCHEME, RADHANAGAR PARISHAD MOUZA, INDPUR BLOCK 17.3 UPAR BUNDH SURFACE ADDITIONAL EXECUTIVE FLOW MINOR IRRIGATION OFFICER, BANKURA ZILLA SCHEME, SAYERDI PARISHAD MOUZA, INDPUR BLOCK
25-07-2012
117.61524
117.61524
45%
30-11-2013
25-07-2012
9.00000
9.00000
100%
2.16169 COMPLETE
191/PM(F)/P /1B137/2012
25-07-2012
80.80050
80.80050
100%
26-04-2013
13.49815 COMPLETE
191/PM(F)/P /1B137/2012
25-07-2012
56.01009
56.01009
100%
26-04-2013
COMPLETE
191/PM(F)/P /1B137/2012
25-07-2012
27.27898
27.27898
100%
26-04-2013
COMPLETE
DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS ADDITIONAL EXECUTIVE OFFICER, BANKURA ZILLA PARISHAD PUA DEPT.'S SANCTION ORDER NO. 191/PM(F)/P /1B137/2012 DATE 25-07-2012 SANCTIONED AMOUNT 21.81970 RELEASED AMOUNT 21.81970 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 26-04-2013 ` IN LAC REMARKS
17.4 KAMALYA BELGORIA SURFACE FLOW MINOR IRRIGATION SCHEME, KAJALKURA MOUZA, INDPUR BLOCK
COMPLETE
17.5 NATUN BUNDH SURFACE ADDITIONAL EXECUTIVE FLOW MINOR IRRIGATION OFFICER, BANKURA ZILLA SCHEME, LEDAPALASH PARISHAD MOUZA, INDPUR BLOCK
191/PM(F)/P /1B137/2012
25-07-2012
35.54999
35.54999
100%
01-01-2013
COMPLETE
17.6 LAYEK BUNDH SURFACE CHIEF EXECUTIVE OFFICER, 191/PM(F)/P FLOW MINOR IRRIGATION PASCHIMANCHAL UNNAYAN /1BSCHEME, KAJALKURA PARSHAD 137/2012 MOUZA, INDPUR BLOCK 17.7 ARALDIHI SCHOOL BUNDH CHIEF EXECUTIVE OFFICER, 191/PM(F)/P SURFACE FLOW MINOR PASCHIMANCHAL UNNAYAN /1BIRRIGATION SCHEME, PARSHAD 137/2012 ARALDIHI MOUZA, INDPUR BLOCK 17.8 HURHURA BUNDH SURFACE FLOW MINOR IRRIGATION SCHEME, MADHABPUR MOUZA, GANGAJALGHATI BLOCK CHIEF EXECUTIVE OFFICER, 191/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD 137/2012
25-07-2012
43.58450
31.82655
100%
30-06-2013
31.82655 COMPLETE
25-07-2012
20.11056
11.76998
100%
30-06-2013
11.76998 COMPLETE
25-07-2012
35.27534
25.03379
100%
30-06-2013
25.03379 COMPLETE
DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 25-07-2012 SANCTIONED AMOUNT 38.72656 RELEASED AMOUNT PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 65% 30-11-2013 ` IN LAC REMARKS
NO. 17.9 CONSTRUCTION OF CHECK CHIEF EXECUTIVE OFFICER, 191/PM(F)/P DAM AND PASCHIMANCHAL UNNAYAN /1BAUGMENTATION OF PARSHAD 137/2012 RESERVOIR, MAHESNA MOUZA, CHHATNA BLOCK 18.1 BANER BUNDH MINOR IRRIGATION SCHEME IN CHHATNA BLOCK CHIEF EXECUTIVE OFFICER, 192/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD 149/2012
WORK IN PROGRESS
26-07-2012
47.69337
25.98405
100%
30-05-2013
25.98405 COMPLETE
26-07-2012
37.88384
21.49535
100%
30-05-2013
21.49535 COMPLETE
18.3 DHOBAGORA SOLER CHIEF EXECUTIVE OFFICER, 192/PM(F)/P BUNDH IN INDPUR BLOCK PASCHIMANCHAL UNNAYAN /1BPARSHAD 149/2012
26-07-2012
61.77828
35.49425
90%
30-11-2013
26-07-2012
29.12293
13.55864
100%
30-05-2013
13.55864 COMPLETE
19 CONSTRUCTION OF A VOCATIONAL TRAINING CENTRE AND HOSTEL BUILDING AT AMADER HASPATAL, CHHATNA
226/PM(F)/P /1B-52/2011
16-08-2012
60.00607
60.00607
100%
30-06-2013
39.49217 COMPLETE
DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 07-09-2012 SANCTIONED AMOUNT 72.61834 RELEASED AMOUNT 27.30297 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 85% 30-09-2013 ` IN LAC REMARKS
NO. 20 CONSTRUCTION OF CHIEF EXECUTIVE OFFICER, 284/PM(F)/P BITUMINOUS ROAD FROM PASCHIMANCHAL UNNAYAN /1BKHATRA KANGSABATI PARSHAD 178/2012 SISHU VIDYALAYA TO BANTILLA VILLAGE, KHATRA BLOCK 21 CONSTRUCTION OF INCOMPLETE TOURIST COTTAGE AND INCOMPLETE TOURIST HUT AT ENDOGENOUS TOURISM PROJECT, BARAGHUTU, MUKUTMANIPUR, KHATRA PS CHIEF EXECUTIVE OFFICER, 292/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD THROUGH EO, 187/2012 KHATRA
12-09-2012
19.63154
10.41345
60%
22.1 CEMENT CONCRETE ROAD CHIEF EXECUTIVE OFFICER, AT PALAJURIA VILLAGE PASCHIMANCHAL UNNAYAN FROM ASTHIR BUNDH TO PARSHAD EXISTING CONCRETE ROAD, GANGAJALGHATI PS
17-09-2012
15.68943
15.55921
100%
15-05-2013
15.55921 COMPLETE
22.2 CEMENT CONCRETE ROAD CHIEF EXECUTIVE OFFICER, 304/PM(F)/P AT RAJARAMPUR VILLAGE, PASCHIMANCHAL UNNAYAN /1BGANGAJALGHATI PS PARSHAD 116/2012 (PT.-I)
17-09-2012
22.33824
13.55160
100%
15-05-2013
13.55160 COMPLETE
DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 17-09-2012 SANCTIONED AMOUNT 23.89221 RELEASED AMOUNT PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 50% 31-10-2013 ` IN LAC REMARKS
NO. 22.3 IMPROVEMENT OF CHIEF EXECUTIVE OFFICER, 304/PM(F)/P MORRUM ROAD FROM PASCHIMANCHAL UNNAYAN /1BJAMBEDIA JORE TO PARSHAD 116/2012 VIRINGI MORE VIA VIRINGI (PT.-I) VILLAGE, GANGAJALGHATI PS 22.4 IMPROVEMENT OF MORRUM ROAD FROM EKCHALA MORE TO MORAKANALI MORE VIA EKCHALA VILLAGE, GANGAJALGHATI PS 23 CONSTRUCTION OF BOUNDARY WALL AT VIVEKANANDA SIKSHA MANDIR (JR. HIGH SCHOOL) AT MOLEBONA, BANKURA-I BLOCK 24 DISEMINATION OF AGRO TECHNIQUES FOR GROWING AND PROCESSING OF TURMERIC IN NONTRADITIONAL AREAS OF PASCHIMANCHAL FOR LIVELIHOOD CHIEF EXECUTIVE OFFICER, 304/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD 116/2012 (PT.-I)
WORK IN PROGRESS
17-09-2012
24.37135
9.56597
80%
30-09-2013
SCHOOL AUTHORITY, 313/PM(F)/P VIVEKANANDA SIKSHA /1BMANDIR (JR. HIGH SCHOOL) 186/2012
24-09-2012
25.97403
25.97403
100%
20-04-2013
25.97403 COMPLETE
DIRECTOR OF RESEARCH, BIDHAN CHANDRA KRISHI VISWAVIDYALAYA, P.O. KALYANI, DIST. - NADIA
322/PM(F)/P /1B188/2012
26-09-2012
19.50000
19.50000
DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS BLOCK DEVELOPMENT OFFICER, RANIBUNDH BLOCK PUA DEPT.'S SANCTION ORDER NO. 323/PM(F)/P /1B193/2012 DATE 27-09-2012 SANCTIONED AMOUNT 21.23786 RELEASED AMOUNT 20.21763 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 30-04-2013 ` IN LAC REMARKS
25.1 CONSTRUCTION OF BOUNDARY WALL AT BARIKUL UDAY BHARATI HIGH SCHOOL (HS), BARIKUL
20.21763 COMPLETE
25.2 UPGRADATION TO BLOCK DEVELOPMENT BITUMINOUS ROAD FROM OFFICER, INDPUR BLOCK AHANDA PIYARSEE GIRLS HIGH SCHOOL TO NH-60A, INDPUR PS
323/PM(F)/P /1B193/2012
27-09-2012
50.95586
17.77060
25%
31-05-2013
26.1 RENOVATION OF CANAL EXECUTIVE ENGINEER, IN THE FORM OF BANKURA IRRIGATION RESTORING & LINING IN DIVISION, 03242-254934 BETWEEN CH. 126.70 AND CH. 160.00 OF DY-4 OF B.B.C. FOR RESTORATION OF DISTRESSED IRRIGATION POTENTIAL WITHIN ONDA BLOCK, DIST. BANKURA UNDER BANKURA IRRIGATION DIVISION
342/PM(F)/P /1B167/2012
09-10-2012
31.75000
31.75000
100%
30-04-2013
120.94868 COMPLETE
DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 342/PM(F)/P /1B167/2012 DATE 09-10-2012 SANCTIONED AMOUNT 38.95000 RELEASED AMOUNT 38.95000 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 30-04-2013 ` IN LAC REMARKS
26.2 RENOVATION OF CANAL EXECUTIVE ENGINEER, IN THE FORM OF BANKURA IRRIGATION RESECTIONING & LINING DIVISION, 03242-254934 IN BETWEEN CH. 160.00 AND CH. 198.80 OF DY-4 OF B.B.C. FOR RESTORATION OF DISTRESSED IRRIGATION POTENTIAL WITHIN ONDA BLOCK, DIST. BANKURA UNDER BANKURA IRRIGATION DIVISION
COMPLETE
26.3 RENOVATION OF CANAL EXECUTIVE ENGINEER, IN THE FORM OF BANKURA IRRIGATION RESECTIONING & LINING DIVISION, 03242-254934 IN BETWEEN CH.198.80 AND CH. 257.50 OF DY-4 OF B.B.C. FOR RESTORATION OF DISTRESSED IRRIGATION POTENTIAL WITHIN ONDA BLOCK, DIST. BANKURA UNDER BANKURA IRRIGATION DIVISION.
342/PM(F)/P /1B167/2012
09-10-2012
49.98000
49.98000
85%
31-12-2013
WORK IN PROGRESS
DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 342/PM(F)/P /1B167/2012 DATE 09-10-2012 SANCTIONED AMOUNT 49.91000 RELEASED AMOUNT 49.91000 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 30% 31-12-2013 ` IN LAC REMARKS
26.4 RESTORATION OF EXECUTIVE ENGINEER, DISTRESSED IRRIGATION BANKURA IRRIGATION POTENTIAL IN THE FORM DIVISION, 03242-254934 OF RE-SECTIONING OF CANAL INCLUDING CEMENT CONCRETE LINING IN BETWEEN CH. 836.00 & CH 980.22 OF SIMLAPAL BRANCH CANAL WITHIN SIMLAPAL BLOCK, DIST. BANKURA UNDER BANKURA IRRIGATION DIVISION
WORK IN PROGRESS
26.5 RESTORATION OF EXECUTIVE ENGINEER, DISTRESSED IRRIGATION BANKURA IRRIGATION POTENTIAL IN THE FORM DIVISION, 03242-254934 OF RE-SECTIONING OF CANAL INCLUDING CEMENT CONCRETE LINING & REPAIR OF STRUCTURES IN DISTRIBUTORY CANAL NO. 15, 16, 17, 18 OF SIMLAPAL BRANCH CANAL WITHIN SIMLAPAL BLOCK, DIST. BANKURA UNDER BANKURA IRRIGATION DIVISION
342/PM(F)/P /1B167/2012
09-10-2012
49.89000
49.89000
70%
31-12-2013
WORK IN PROGRESS
DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 342/PM(F)/P /1B167/2012 DATE 09-10-2012 SANCTIONED AMOUNT 31.85000 RELEASED AMOUNT 31.85000 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 70% 31-12-2013 ` IN LAC REMARKS
26.6 RESTORATION OF EXECUTIVE ENGINEER, DISTRESSED IRRIGATION BANKURA IRRIGATION POTENTIAL IN THE FORM DIVISION, 03242-254934 OF CANAL INCLUDING CEMENT CONCRETE LINING & REPAIR OF STRUCTURES IN DISTRIBUTARY CANAL NO. 13 OF SIMLAPAL BRANCH CANAL WITHIN SIMLAPAL BLOCK, DIST. BANKURA UNDER BANKURA IRRIGATION DIVISION
WORK IN PROGRESS
27.1 WORK OF SANITATION AT SECRETARY, YUGACHARYA 362/PM(F)/P AMDANGA HOSTEL, VIVEKANANDA SEVA SAMITY /1BSIMLAPAL BLOCK 217/2012
30-10-2012
2.99893
2.99893
100%
30-06-2013
2.99893 COMPLETE
27.2 SINKING OF SUBMERSIBLE SECRETARY, YUGACHARYA 362/PM(F)/P PUMP AND PIPELINE AT VIVEKANANDA SEVA SAMITY /1BAMDANGA HOSTEL, 217/2012 SIMLAPAL BLOCK
30-10-2012
2.81251
2.81251
100%
30-06-2013
2.81251 COMPLETE
DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 366/PM(F)/P /1B219/2012 DATE 06-11-2012 SANCTIONED AMOUNT 57.50786 RELEASED AMOUNT 27.07305 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 60% 30-06-2013 ` IN LAC REMARKS
28 COMPLETION OF BLOCK DEVELOPMENT DEVELOPMENT OF TRIBAL OFFICER, CHHATNA BLOCK TANK ADJUNCTION TO SUSUNIA HILL INCLUDING BOATING CLUB AND PISICULTURE, CHHATNA BLOCK
375/PM(F)/P /1B231/2012
20-11-2012
21.07423
21.07423
100%
21.07423 COMPLETE
375/PM(F)/P /1B231/2012
20-11-2012
5.25124
5.25124
100%
5.25124 COMPLETE
30 CONSTRUCTION OF SCHOOL AUTHORITY, HOSTEL BUILDING, SALDAHA JUNIOR HIGH KITCHEN STORE, DINING SCHOOL AND WATER CLOSET BATH OF SALDAHA JUNIOR HIGH SCHOOL, SALDAHA VILLAGE, TALDANGRA BLOCK
377/PM(F)/P /1B186/2012
21-11-2012
14.39078
14.39078
100%
14.39078 COMPLETE
DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 21-11-2012 SANCTIONED AMOUNT 18.78989 RELEASED AMOUNT 18.21910 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 31-05-2013 ` IN LAC REMARKS
31 CONSTRUCTION OF BOUNDARY WALL OF JYOTI PRATIBANDHI PUNARBASAN KENDRA, BANKURA (SADAR) SUBDIVISION 32 RE-EXCAVATION AND CONSTRUCTION OF BATHING GHAT, GUARD WALL ETC. OF BHARAT SEVASHRAM SANGHA POND, KHATRA BLOCK 33 CONSTRUCTION OF BOUNDARY WALL AT PAIRASOLE DUBURIA JUNIOR HIGH SCHOOL, MEJIA BLOCK
18.21910 COMPLETE
379/PM(F)/P /1B216/2012
21-11-2012
23.57070
23.57070
100%
31-05-2013
23.57070 COMPLETE
387/PM(F)/P /1B223/2012
23-11-2012
10.26511
10.26511
50%
34.1 CONSTRUCTION OF SIDE EXECUTIVE OFFICER, DRAIN FROM TALDANGRA PANCHAYAT PANCHMURA SABRAKONE SAMITY ROAD TO PANCHMURA KUMARPARA, TALDANGRA BLOCK
402/PM(F)/P /1B189/2012
05-12-2012
22.64636
22.64636
50%
31-05-2013
DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 402/PM(F)/P /1B189/2012 DATE 05-12-2012 SANCTIONED AMOUNT 24.86973 RELEASED AMOUNT 24.86973 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS
34.2 CONSTRUCTION OF PCC EXECUTIVE OFFICER, ROAD FROM PANCHMURA TALDANGRA PANCHAYAT SABRAKONE ROAD TO SAMITY PANCHMURA KUMARPARA, TALDANGRA BLOCK
23.20588 COMPLETE
34.3 CONSTRUCTION OF PCC EXECUTIVE OFFICER, ROAD OVER EXISTING TALDANGRA PANCHAYAT VILLAGE ROAD AT SAMITY PANCHMURA KUMARPARA, TALDANGRA BLOCK 35 RE-EXCAVATION OF NAGRI EXECUTIVE OFFICER, SAHEB BUNDH, KHATRA KHATRA PANCHAYAT P.S. SAMITY
402/PM(F)/P /1B189/2012
05-12-2012
12.49113
12.49113
100%
31-05-2013
11.86479 COMPLETE
410/PM(F)/P /1B235/2012
11-12-2012
37.55526
37.55526
100%
30-04-2013
37.37119 COMPLETE
36 CONSTRUCTION OF CHIEF EXECUTIVE OFFICER, 415/PM(F)/P CONCRETE ROAD FROM PASCHIMANCHAL UNNAYAN /1BKARAPARA CHOWMATHA PARSHAD 238/2012 TO NAMOPARA IN PURUSHOTTAMPUR VILLAGE, PURUSHOTTAMPUR MAUZA, INDPUR BLOCK
13-12-2012
37.12752
18.76838
50%
30-09-2013
DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 434/PM(F)/P /1B192/2012 DATE 20-12-2012 SANCTIONED AMOUNT 58.10722 RELEASED AMOUNT 17.58357 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 30% 30-06-2013 ` IN LAC REMARKS
37 CONSTRUCTION OF 3 NOS. BLOCK DEVELOPMENT OF COTTAGE AND ALLIED OFFICER, CHHATNA BLOCK WORKS FOR COMPLETION OF MURUTHBAHA ECO PARK AT SUSUNIA, BANKURA
38 CONSTRUCTION OF EXTRA EXECUTIVE OFFICER, ONDA FOUNDATION FOR PANCHAYAT SAMITY ADDITIONAL CLASSROOMS ON 1ST FLOOR OF PUNISOLE NASRUL ULLOM SIDDQUIA M.S.K. (SR. MADRASAH TYPE), ONDA PS 39 DEVELOPMENT OF BIDHAN CHANDRA KRISHI TECHNOLOGY FOR VISWAVIDYALAYA, PRODUCTION OF WINE MOHANPUR, NADIA GRAPES IN DROUGHT PRONE AREA OF BANKURA DISTRICT (TOTAL 41.24000 LAC)
437/PM(F)/P /1B254/2012
21-12-2012
7.35000
7.35000
NO INFORMATION RECEIVED
439/PM(F)/P /1B236/2012
24-12-2012
16.30400
16.30400
40%
PROJECT IS ONGOING
DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 01/PM(F)/P/ 1B-67/2012 DATE 04-01-2013 SANCTIONED AMOUNT 32.78000 RELEASED AMOUNT 32.78000 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 15% 31-12-2013 ` IN LAC REMARKS
40.1 RENOVATION OF CANAL EXECUTIVE ENGINEER, IN THE FORM OF BANKURA IRRIGATION RESECTIONING & LINING DIVISION, 03242-254934 IN BETWEEN CH. 258.09 AND CH. 286.112 OF DY-4 OF B.B.C. FOR RESTORATION OF DISTRESSED IRRIGATION POTENTIAL WITHIN ONDA BLOCK, DIST. BANKURA UNDER BANKURA IRRIGATION DIVISION
WORK IN PROGRESS
40.2 RENOVATION OF CANAL EXECUTIVE ENGINEER, IN THE FORM OF BANKURA IRRIGATION RESECTIONING & LINING DIVISION, 03242-254934 IN BETWEEN CH. 287.506 AND CH. 323.936 OF DY-4 OF B.B.C. FOR RESTORATION OF DISTRESSED IRRIGATION POTENTIAL WITHIN ONDA BLOCK, DIST. BANKURA UNDER BANKURA IRIGATION DIVISION
01/PM(F)/P/ 1B-67/2012
04-01-2013
44.89000
44.89000
15%
31-12-2013
WORK IN PROGRESS
DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 01/PM(F)/P/ 1B-67/2012 DATE 04-01-2013 SANCTIONED AMOUNT 49.98000 RELEASED AMOUNT 49.98000 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 15% 31-12-2013 ` IN LAC REMARKS
40.3 RENOVATION OF CANAL EXECUTIVE ENGINEER, IN THE FORM OF BANKURA IRRIGATION RESECTIONING & LINING DIVISION, 03242-254934 IN BETWEEN CH. 324.609 AND CH. 368.00 OF DY-4 OF B.B.C. FOR RESTORATION OF DISTRESSED IRRIGATION POTENTIAL WITHIN ONDA BLOCK, DIST. BANKURA UNDER BANKURA IRRIGATION DIVISION
WORK IN PROGRESS
40.4 RENOVATION OF CANAL EXECUTIVE ENGINEER, IN THE FORM OF BANKURA IRRIGATION RESECTIONING & LINING DIVISION, 03242-254934 IN BETWEEN CH. 368.886 AND CH. 411.00 OF DY-4 OF B.B.C. FOR RESTORATION OF DISTRESSED IRRIGATION POTENTIAL WITHIN ONDA BLOCK, DIST. BANKURA UNDER BANKURA IRRIGATION DIVISION
01/PM(F)/P/ 1B-67/2012
04-01-2013
49.20000
49.20000
15%
15-07-2013
WORK IN PROGRESS
DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS EXECUTIVE ENGINEER, KANGSABATI CANALS DIVISION - II, KHATRA, BANKURA PUA DEPT.'S SANCTION ORDER NO. 02/PM(F)/P/ 1B-188/2012 DATE 04-01-2013 SANCTIONED AMOUNT 23.82127 RELEASED AMOUNT 23.82127 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 30-06-2013 ` IN LAC REMARKS
41.1 RESTORATION OF LOST IRRIGATION POTENTIAL BY M/R TO CAST IN SITU CEMENT CONCRETE LINING IN BETWEEN CH. 14.00 TO CH. 18.00, CH. 38.00 TO CH. 42.00 ETC. OF DY-03 OF R.M.B.C., MUKUTMONIPUR, KHATRA BLOCK
COMPLETE
41.2 IMPROVEMENT OF IRRIGATION POTENTIAL AND CANAL SYSTEM BY RESECTIONING & CONSTRUCTION OF CONCRETE LINING FROM CH. 344.00 TO CH. 359.00 OF MR-3 OF DY-08 OF R.M.B.C. WITHIN RAIPUR BLOCK
02/PM(F)/P/ 1B-188/2012
04-01-2013
24.23655
24.23655
100%
COMPLETE
DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS EXECUTIVE ENGINEER, KANGSABATI CANALS DIVISION - II, KHATRA, BANKURA PUA DEPT.'S SANCTION ORDER NO. 02/PM(F)/P/ 1B-188/2012 DATE 04-01-2013 SANCTIONED AMOUNT 24.37774 RELEASED AMOUNT 24.37774 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS
41.3 IMPROVEMENT OF IRRIGATION POTENTIAL AND CANAL SYSTEM BY RESECTIONING & CONSTRUCTION OF CONCRETE LINING FROM CH. 328.00 TO CH.343.00 OF MR-3 OF DY-8 OF R.M.B.C. WITHIN RAIPUR BLOCK 41.4 RESTORATION OF LOST IRRIGATION POTENTIAL OF DY-06 OF K.M.C.(U) FROM CH. 128.00 TO CH.132.0O AND 135.00 TO CH. 138.00 WITHIN SIMLAPAL BLOCK
COMPLETE
02/PM(F)/P/ 1B-188/2012
04-01-2013
7.72585
7.72585
100%
COMPLETE
41.5 RESTORATION OF LOST IRRIGATION POTENTIAL OF DY-08 OF S.M.C.(U) FROM CH. 288.00 TO CH. 231.50, CH. 233.50 TO CH. 238.50 ETC. WITHIN KHATRA BLOCK
02/PM(F)/P/ 1B-188/2012
04-01-2013
10.01345
10.01345
85%
31-12-2013
WORK IN PROGRESS
DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS EXECUTIVE ENGINEER, KANGSABATI CANALS DIVISION - II, KHATRA, BANKURA PUA DEPT.'S SANCTION ORDER NO. 02/PM(F)/P/ 1B-188/2012 DATE 04-01-2013 SANCTIONED AMOUNT 10.16305 RELEASED AMOUNT 10.16305 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 85% 31-12-2013 ` IN LAC REMARKS
41.6 RESTORATION OF LOST IRRIGATION POTENTIAL OF DY-08 OF S.M.C.(U) FROM CH. 88.00 TO CH. 207.00 WITHIN KHATRA BLOCK
WORK IN PROGRESS
42.1 IMPROVEMENT OF RIDING EXECUTIVE ENGINEER, PWD, 13/PM(F)/P/ QUALITY OF BANKURABANKURA DIVISION 1B-247/2012 SALTORA ROAD FROM 18.60 KMP TO 19.20 KMP (KHARBONA BAZAR) IN THE DISTRICT OF BANKURA 42.2 IMPROVEMENT OF RIDING EXECUTIVE ENGINEER, PWD, 13/PM(F)/P/ QUALITY OF BANKURABANKURA DIVISION 1B-247/2012 SALTORA ROAD FROM 12.31 KMP TO 14.20 KMP (CHHATNA BAZAR) IN THE DISTRICT OF BANKURA
24-01-2013
18.13512
36.27023
24-01-2013
40.67724
81.35448
*FULL AMOUNT RELEASED BY MISTAKE, BUT AS OTHER SOURCE OF FUND RECEIVED BY EE, PWD ENTIRE AMOUNT WILL BE REFUNDED TO PUP
24-01-2013
13.38992
9.51356
60%
30-11-2013
DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 24-01-2013 SANCTIONED AMOUNT 24.43413 RELEASED AMOUNT 16.95020 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS
NO. 43.2 CONSTRUCTION OF CHIEF EXECUTIVE OFFICER, 19/PM(F)/P/ CEMENT CONCRETE ROAD PASCHIMANCHAL UNNAYAN 1B-253/2012 FROM LALBAZAR PRIMARY PARSHAD SCHOOL TO LALBAZAR MASJID (IN 3 PART), ARDHAGRAM GP, MEJIA 44 REPAIRING OF CENTRAL LABORATORY OF PMGSY CELL OF BANKURA DIVISION ADDITIONAL EXECUTIVE OFFICER, BANKURA ZILLA PARISHAD 23/PM(F)/P/ 1B-259/2012
16.95020 COMPLETE
30-01-2013
6.21360
6.21360
NOT STARTED
45.1 RENOVATION OF BLOCK DEVELOPMENT 71/PM(F)/P/ DILAPIDATED ROAD FROM OFFICER, BANKURA-II BLOCK 1B-25/2013 MAIN ROAD OF NABAJIBANPUR VILLAGE (SAMABAY BANK) TO BORO POOL (TANTKANALI)
11-03-2013
4.00000
15-07-2013
45.2 RENOVATION OF BLOCK DEVELOPMENT 71/PM(F)/P/ DILAPIDATED ROAD FROM OFFICER, BANKURA-II BLOCK 1B-25/2013 BADRA MORE TO NADIGHAT
11-03-2013
5.00000
15-07-2013
STARTED SOON
DISTRICT: BANKURA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 REPORT AS ON 10/02/2014 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 99/PM(F)/P/ 1B-24/2013 DATE 18-03-2013 SANCTIONED AMOUNT 20.78564 RELEASED AMOUNT 20.78564 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 50% ` IN LAC REMARKS
46.1 CONSTRUCTION OF SC/ ST SCHOOL AUTHORITY, HOSTEL BUILDING AT DUMURTORE BAGBADINI DUMURTORE BAGBADINI HIGH SCHOOL HIGH SCHOOL, RAIPUR BLOCK
46.2 SINKING OF DEEP TUBESCHOOL AUTHORITY, WELL AT DUMURTORE DUMURTORE BAGBADINI BAGBADINI HIGH SCHOOL, HIGH SCHOOL RAIPUR BLOCK
99/PM(F)/P/ 1B-24/2013
18-03-2013
3.59500
3.59500
100%
3.59500 COMPLETE
TOTAL:
2744.06355
2276.14612
1353.71976
DISTRICT: BIRBHUM DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS EXECUTIVE OFFICER, RAJNAGAR PANCHAYAT SAMITY PUA DEPT.'S SANCTION ORDER NO. DATE 256/PM(F)/P 24-08-2012 /1B-31/2012 SANCTIONED AMOUNT 123.37000 RELEASED AMOUNT 123.37000 PHYSICAL EXPECTED DATE PROGRESS OF COMPLETION 99% UC RECEIVED ` IN LAC REMARKS
2 IMPLEMENTATION OF 23 EXECUTIVE OFFICER, MD. 257/PM(F)/P 24-08-2012 (TWENTY THREE) NOS. OF BAZAR PANCHAYAT SAMITY /1B-32/2012 SCHEMES IN RESPECT OF MD. BAZAR BLOCK
120.32000
120.32000
100%
120.32000 COMPLETE
37.01500
37.01500
100%
37.01500 COMPLETE
4 IMPLEMENTATION OF 8 EXECUTIVE OFFICER, (EIGHT) NOS. OF SCHEMES ILLAMBAZAR PANCHAYAT IN RESPECT OF SAMITY ILLAMBAZAR BLOCK 5 IMPLEMENTATION OF 29 (TWENTY NINE) NOS. OF SCHEMES IN RESPECT OF BOLPUR-SRINIKETAN BLOCK
28.06500
28.06500
100%
28.06500 COMPLETE
EXECUTIVE OFFICER, 261/PM(F)/P 24-08-2012 BOLPUR-SRINIKETAN /1B-36/2012 PANCHAYAT SAMITY; 03463264280/ 264172/ 9434040654, bdo_bol@yahoo.co.in
100.72500
100.72500
100%
100.72500 COMPLETE
DISTRICT: BIRBHUM DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER SANCTIONED AMOUNT 124.53500 RELEASED AMOUNT 124.53500 PHYSICAL EXPECTED DATE PROGRESS OF COMPLETION 100% UC RECEIVED ` IN LAC REMARKS
6 IMPLEMENTATION OF 61 (SIXTY ONE) NOS. OF SCHEMES IN RESPECT OF SURI-I BLOCK 7 IMPLEMENTATION OF 35 (THIRTY FIVE) NOS. OF SCHEMES IN RESPECT OF DUBRAJPUR BLOCK
NO. DATE EXECUTIVE OFFICER, SURI-I 262/PM(F)/P 24-08-2012 PANCHAYAT SAMITY, 03462- /1B-41/2012 225409/ 9434004880
113.35277 COMPLETE
103.29000
103.29000
95%
8 IMPLEMENTATION OF 60 EXECUTIVE OFFICER, (SIXTY) NOS. OF SCHEMES MURARAI-I PANCHAYAT IN RESPECT OF MURARAI-I SAMITY BLOCK 9 IMPLEMENTATION OF 8 EXECUTIVE OFFICER, (EIGHT) NOS. OF SCHEMES KHOYRASOLE PANCHAYAT IN RESPECT OF SAMITY KHOYRASOLE BLOCK 10 IMPLEMENTATION OF 48 (FORTY EIGHT) NOS. OF SCHEMES IN RESPECT OF RAMPURHAT-I BLOCK
76.24000
76.24000
100%
76.24000 COMPLETE
29.53500
29.53500
90%
58.50000
58.50000
100%
58.50000 COMPLETE
11 CONSTRUCTION OF MINI BARRAGE OVER KANA AJOY AT UPARKHARA MOUZA, BOLPURSRINIKETAN PS (5TH INSTALMENT)
144.68000
144.68000
DISTRICT: BIRBHUM DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER SANCTIONED AMOUNT 101.96240 RELEASED AMOUNT 101.96240 PHYSICAL EXPECTED DATE PROGRESS OF COMPLETION 100% 31-03-2013 UC RECEIVED ` IN LAC REMARKS
NO. DATE 12.1 IMPROVEMENT OF RIDING EXECUTIVE ENGINEER, 351/PM(F)/P 12-10-2012 QUALITY AND P.W.D., BIRBHUM DIVISION, /1BSTRENGTHENING OF S/R 03462-255261, 9830149949, 133/2011 TO RAMPURHAT pwdbirbhum@gmail.com DUMKA ROAD FROM 0.0 KM TO 3.00 KM AND 9.00 KM TO 12.30 KM UNDER RAMPURHAT SUBDIVISION
76.51008 COMPLETE
12.2 IMPROVEMENT OF RIDING QUALITY AND STRENGTHENING OF S/R TO SURI MD. BAZAR ROAD FROM 0.0 KM TO 1.00 KM AND 3.81 KM TO 5.60 UNDER SURI SUBDIVISION 12.3 IMPROVEMENT & STRENGTHENING OF KHAGRA JOYDEV ROAD FROM 0.0 KM TO 8.00 KM UNDER BOLPUR SUBDIVISION
EXECUTIVE ENGINEER, 351/PM(F)/P 12-10-2012 P.W.D., BIRBHUM DIVISION, /1B03462-255261, 9830149949, 133/2011 pwdbirbhum@gmail.com
47.70926
47.70926
100%
31-03-2013
24.35613 COMPLETE
EXECUTIVE ENGINEER, 351/PM(F)/P 12-10-2012 P.W.D., BIRBHUM DIVISION, /1B03462-255261, 9830149949, 133/2011 pwdbirbhum@gmail.com
171.52255
171.52255
100%
31-03-2013
137.10440 COMPLETE
DISTRICT: BIRBHUM DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER SANCTIONED AMOUNT 131.89738 RELEASED AMOUNT 131.89738 PHYSICAL EXPECTED DATE PROGRESS OF COMPLETION 95% 31-08-2013 UC RECEIVED ` IN LAC REMARKS
12.4 IMPROVEMENT & STRENGTHENING OF BOLPUR ILLAMBAZAR ROAD FROM 1.0 KM TO 9.40 KM EXCLUDING 3.0 KM TO 5.20 KM UNDER BOLPUR SUB-DIVISION
NO. DATE EXECUTIVE ENGINEER, 351/PM(F)/P 12-10-2012 P.W.D., BIRBHUM DIVISION, /1B03462-255261, 9830149949, 133/2011 pwdbirbhum@gmail.com
12.5 IMPROVEMENT OF RIDING QUALITY AND STRENGTHENING OF SURI RAJNAGAR ROAD (SH-13) FROM 0.0 KM TO 4.00 KM UNDER BIRBHUM HIGHWAY DIVISION
EXECUTIVE ENGINEER, 351/PM(F)/P 12-10-2012 P.W.D. (ROADS) /1BDIRECTORATE, BIRBHUM 133/2011 HIGHWAY DIVISION, 9434173015, 03462-255381
102.00000
102.00000
95%
31-10-2013
13 IMPROVEMENT OF ROAD DISTRICT MAGISTRATE, FROM ROYPUR TO BIRBHUM DHOLKATA AT PANCHAMI AREA OF MD. BAZAR BLOCK 14 CONSTRUCTION OF SECRETARY, LIVER BUILDING FOR A PUBLIC FOUNDATION, 53 GOPAL HEALTH TRAINING CENTRE BANERJEE LANE, HOWRAH AND HEALTH CARE COMPLEX, BIRBHUM
272.02011
272.02011
20%
20.00000
20.00000
100%
20.00000 COMPLETE
DISTRICT: BIRBHUM DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER SANCTIONED AMOUNT 137.30196 RELEASED AMOUNT 137.30196 PHYSICAL EXPECTED DATE PROGRESS OF COMPLETION 95% 31-08-2013 UC RECEIVED ` IN LAC REMARKS
15 IMPROVEMENT & STRENGTHENING OF BOLPUR ILLAMBAZAR ROAD FROM 1.0 KMP TO 9.40 KMP EXCLUDING 3.0 KMP TO 5.20 KMP UNDER BOLPUR SUB-DIVISION (ADDITIONAL SANCTION)
NO. DATE EXECUTIVE ENGINEER, 438/PM(F)/P 24-12-2012 P.W.D., BIRBHUM DIVISION, /1B03462-255261, 9830149949, 133/2011 pwdbirbhum@gmail.com
TOTAL:
1,930.68866
1,930.68866
1,452.43088
DISTRICT: BURDWAN DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. DATE 180/PM(F)/P 20-07-2012 /1B151/2012 SANCTIONED AMOUNT 184.92185 RELEASED AMOUNT 184.92185 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 289.08098 ` IN LAC REMARKS
1.1 RESECTIONING OF DISTRICT MAGISTRATE, DURGAPUR BRANCH BURDWAN CANAL FROM CH. 0.00 TO CH. 268.00 IN KANKSA BLOCK UNDER DAMODAR HEAD WORKS DIVISION 1.2 RESECTIONING OF DISTRICT MAGISTRATE, DURGAPUR BRANCH BURDWAN CANAL FROM CH. 268.65 TO CH. 757.00 IN KANKSA AND AUSGRAM-II BLOCK UNDER DAMODAR HEAD WORKS DIVISION
221.96128
221.96128
1.3 UPGRADATION AND DISTRICT MAGISTRATE, IMPROVEMENT OF BURDWAN PANDAVESWAR NATUNDANGA ROAD FROM 0.00 KMP TO 1.00 KMP UNDER ASANSOL SUBDIVISION 1.4 GROUND WATER BASED DISTRICT MAGISTRATE, WATER SUPPLY SCHEME BURDWAN AT ALEFNAGAR IN AUSGRAM - I BLOCK
127.99466
127.99466
68.97442
68.97442
DISTRICT: BURDWAN DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. DATE 180/PM(F)/P 20-07-2012 /1B151/2012 SANCTIONED AMOUNT 68.79944 RELEASED AMOUNT 68.79944 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION ` IN LAC REMARKS
1.5 GROUND WATER BASED DISTRICT MAGISTRATE, WATER SUPPLY SCHEME BURDWAN AT SHYAMSUNDARPUR IN AUSGRAM - II BLOCK
2 CONSTRUCTION OF RIG BORE TUBE WELL IN 10 BLOCKS AND RIVERBED TUBE WELL IN RANIGUNG BLOCK (150 NOS. TUBEWELLS)
EXECUTIVE ENGINEER, CENTRAL MECHANICAL DIVISION, P.H.E. DIRECTORATE, BURDWAN; 0342-2644048, ee_cme@wbphed.gov.in
141.36138
141.36138
100%
141.36138 COMPLETE
3 CONSTRUCTION OF ICDS CENTRES, ADDITIONAL CLASSROOMS & SUPPLY OF DRINKING WATER IN 10 BLOCKS
342.53710
342.53710
4 CONTINGENT FUND FOR SMOOTH RUNNING OF PUP SCHEMES IMPLEMENTED DURING 2012-13
5.68000
5.68000
DISTRICT: BURDWAN DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. DATE 22/PM(F)/P/ 30-01-2013 1B-258/2012 SANCTIONED AMOUNT 22.44526 RELEASED AMOUNT 22.44526 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS
5.1 RESTORATION OF CANAL DISTRICT MAGISTRATE, BED AND SLOPES BURDWAN INCLUDING LINING WORKS WITH PCC FROM CH. 472.00 TO CH. 488.00 IN KANKSA BLOCK, BURDWAN IRRIGATION SUB-DIVN. NO. III 5.2 RESTORATION OF CANAL DISTRICT MAGISTRATE, BED AND SLOPES BURDWAN INCLUDING LINING WORKS WITH PCC FROM CH. 488.00 TO CH. 506.00 IN KANKSA & AUSGRAM-II BLOCK, BURDWAN IRRIGATION SUB-DIVN. NO. III 5.3 RESTORATION OF CANAL DISTRICT MAGISTRATE, BED AND SLOPES BURDWAN INCLUDING LINING WORKS WITH PCC FROM CH. 528.00 TO CH. 544.00 IN AUSGRAM-II BLOCK, BURDWAN IRRIGATION SUB-DIVN. NO. III TOTAL:
22.28023
22.28023
100%
22.34318
22.34318
100%
1,229.29880
1,229.29880
497.51103
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS BLOCK DEVELOPMENT OFFICER, KHARAGPUR-II BLOCK PUA DEPT.'S SANCTION ORDER NO. 89/PM(F)/P/ 1B-19/2012 DATE 11-05-2012 SANCTIONED AMOUNT 10.19855 RELEASED AMOUNT 9.18504 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS
1 CONSTRUCTION OF CLASSROOMS, HOSTEL BUILDING AND LADIES TOILET OF TENTULMURI RAMKRISHNA SIKSHANIKETAN UNDER KHARAGPUR-II BLOCK
9.18504 COMPLETE
2 CONSTRUCTION OF COMMUNITY CENTRE AT KANKRAJHORE WITHIN BINPUR-II PANCHAYAT SAMITY (POST FACTO APPROVAL)
15-05-2012
4.35997
4.35997
100%
4.35997 COMPLETE
3 CONSTRUCTION OF RCC BLOCK DEVELOPMENT 94/PM(F)/P/ BOX CULVERT OVER OFFICER, NAYAGRAM BLOCK 1B-82/2012 MAHULIA KHAL IN BETWEEN BANSIABHOL AND SINGDHUI VILLAGE UNDER NAYAGRAM BLOCK 4 CONSTRUCTION OF ROAD CHIEF ENGINEER, FROM ASUI TO NURSOLE P.W.D.(ROADS) UNDER GOPIBALLAVPUR-I BLOCK 96/PM(F)/P/ 1B-69/2012
30-05-2012
22.50588
21.25718
100%
21.25718 COMPLETE
31-05-2012
217.81620
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS BLOCK DEVELOPMENT OFFICER, JAMBONI BLOCK PUA DEPT.'S SANCTION ORDER NO. 100/PM(F)/P /1B-78/2012 DATE 01-06-2012 SANCTIONED AMOUNT 24.63672 RELEASED AMOUNT 23.70242 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS
23.70242 COMPLETE
5.2 RE-EXCAVATION OF BARA BLOCK DEVELOPMENT BANKATA MUCHIR BUNDH OFFICER, JAMBONI BLOCK UNDER JAMBONI BLOCK
100/PM(F)/P /1B-78/2012
01-06-2012
18.79900
5.3 RE-EXCAVATION OF BLOCK DEVELOPMENT ALAMPUR KATHUA OFFICER, JAMBONI BLOCK BUNDH UNDER JAMBONI BLOCK 5.4 EXCAVATION OF DUMURIA PANRUA BUNDH UNDER JAMBONI BLOCK 6 CONSTRUCTION OF NURSING TRAINING SCHOOL AT LALGARH WITHIN PHC CAMPUS UNDER BINPUR-I BLOCK BLOCK DEVELOPMENT OFFICER, JAMBONI BLOCK
100/PM(F)/P /1B-78/2012
01-06-2012
18.79900
18.69857
100%
18.69857 COMPLETE
100/PM(F)/P /1B-78/2012
01-06-2012
24.63672
23.78753
100%
23.78753 COMPLETE
102/PM(F)/P /1B-84/2012
04-06-2012
600.00000
300.00000
75%
WORK IN PROGRESS UPTO PILE CAP LEVEL, PILING WORK COMPLETE 11.43418 WORK IN PROGRESS
7 CONSTRUCTION OF HEADMASTER, ASANDA HOSTEL BUILDING AT SIKSHA NIKETAN ASANDA SIKSHA NIKETAN, P.O. LALNAGAR
108/PM(F)/P /1B124/2011
07-06-2012
22.86835
22.86835
60%
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS EXECUTIVE ENGINEER, KANGSABATI CANALS DIVISION NO. V, JHARGRAM, PASCHIM MEDINIPUR PUA DEPT.'S SANCTION ORDER NO. 109/PM(F)/P /1B-85/2012 DATE 07-06-2012 SANCTIONED AMOUNT 49.92400 RELEASED AMOUNT 49.92400 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 50% ` IN LAC REMARKS
8.1 CONSTRUCTION OF CLASS 'A' SINGLE LANE ROAD BRIDGE AT CH. 1233.26 OF TSMC(N) IN MOUZAJARALATA, PS-JHARGRAM ALONG KESIA-NATUNDIHI ROAD UNDER KANGSABATI CANALS DIVISION NO. V, JHARGRAM 8.2 CONSTRUCTION OF CLASS 'A' SINGLE LANE ROAD BRIDGE AT CH. 12.00 OF DY-12L OF TSMC(N) IN MOUZA-JARALATA, PSJHARGRAM ALONG KESIANATUNDIHI ROAD INCLUDING CONSTRUCTION OF LINING FROM CH. 0.00 TO CH. 20.00 OF DY-12L/ TSMC(N) UNDER KANGSABATI CANALS DIVISION NO. V, JHARGRAM
EXECUTIVE ENGINEER, 109/PM(F)/P KANGSABATI CANALS /1B-85/2012 DIVISION NO. V, JHARGRAM, PASCHIM MEDINIPUR
07-06-2012
32.95807
32.95807
50%
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 11-06-2012 SANCTIONED AMOUNT 18.53949 RELEASED AMOUNT 17.91910 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 15-01-2013 ` IN LAC REMARKS
NO. 9 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 111/PM(F)/P FROM BARAPENIA TO OFFICER, JHARGRAM BLOCK /1B-94/2012 NARAYANPUR VILLAGE IN BANDHGORA G.P., JHARGRAM BLOCK
17.91910 COMPLETE
10 CONSTRUCTION OF GR. BLOCK DEVELOPMENT FLOOR SCHOOL BUILDING OFFICER, KHARAGPUR-II OF TENTULMURI PRIMARY BLOCK SCHOOL, KHARAGPUR-II
117/PM(F)/P /1B-81/2012
12-06-2012
21.72171
19.83684
100%
19.50345 COMPLETE
11 ANTI-EROSION WORK EXECUTIVE ENGINEER ALONG THE LEFT BANK OF (I&W), WEST MEDINIPUR RIVER KANGSABATI AT DIVISION DHERUA MOUZA, MEDINIPUR(SADAR) 12 CONSTRUCTION OF BLOCK DEVELOPMENT BOUNDARY WALL OF A OFFICER, BINPUR-I BLOCK MUSLIM GRAVEYARD AT DAHIJURI UNDER BINPUR-I P.S. 13 CONSTRUCTION OF SCHOOL BUILDING OF BINPUR HIGH SCHOOL, BINPUR
118/PM(F)/P /1B-86/2012
12-06-2012
51.55656
51.55656
119/PM(F)/P /1B-02/2012
12-06-2012
11.21914
9.81355
100%
9.81355 COMPLETE
15-06-2012
24.81233
24.81233
75%
14.1 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM GHUTIA TO BANKRA OFFICER, JAMBONI BLOCK
132/PM(F)/P /1B100/2012
15-06-2012
8.35429
8.27154
100%
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 132/PM(F)/P /1B100/2012 132/PM(F)/P /1B100/2012 132/PM(F)/P /1B100/2012 132/PM(F)/P /1B100/2012 DATE 15-06-2012 SANCTIONED AMOUNT 11.30479 RELEASED AMOUNT 11.17554 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS
14.2 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM BHTURO TO ASTI OFFICER, JAMBONI BLOCK
11.17554 COMPLETE
14.3 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM SARENGA TO OFFICER, JAMBONI BLOCK KURARIA 14.4 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM KENDUA TO OFFICER, JAMBONI BLOCK BAGHUA 14.5 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM AMLATORA TO OFFICER, JAMBONI BLOCK SARAKATA VIA BURISOLE
15-06-2012
3.30447
3.27012
100%
3.27012 COMPLETE
15-06-2012
4.95668
4.82411
100%
4.82411 COMPLETE
15-06-2012
4.50958
4.45041
100%
4.45041 COMPLETE
14.6 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM SALTALA TO ENATA OFFICER, JAMBONI BLOCK
15-06-2012
9.68982
9.31803
100%
9.31803 COMPLETE
14.7 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM KHATKURA TO OFFICER, JAMBONI BLOCK BANNAGAJAR 14.8 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM BALIBANDH TO OFFICER, JAMBONI BLOCK JAMUNASOLE
15-06-2012
3.75797
3.72468
100%
3.72468 COMPLETE
15-06-2012
3.11874
2.47165
100%
2.47165 COMPLETE
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 132/PM(F)/P /1B100/2012 132/PM(F)/P /1B100/2012 132/PM(F)/P /1B100/2012 132/PM(F)/P /1B100/2012 132/PM(F)/P /1B100/2012 132/PM(F)/P /1B100/2012 132/PM(F)/P /1B100/2012 DATE 15-06-2012 SANCTIONED AMOUNT 5.01257 RELEASED AMOUNT 4.95333 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS
14.9 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM KANIMOHULI RAIL OFFICER, JAMBONI BLOCK STATION TO GAIDA 14.10 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM PARIHATI TO OFFICER, JAMBONI BLOCK GUIARA 14.11 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM ORO TO OFFICER, JAMBONI BLOCK BARABANKATA 14.12 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM GAGNASULI TO OFFICER, JAMBONI BLOCK BENASULI 14.13 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM PASCHIM OFFICER, JAMBONI BLOCK PURNAPANI TO KENDUASULI 14.14 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM HIZLI TO OFFICER, JAMBONI BLOCK SONAMUKHI 14.15 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM BAGGHORI TO OFFICER, JAMBONI BLOCK BADAKATA
4.95333 COMPLETE
15-06-2012
8.26114
8.17730
100%
8.17730 COMPLETE
15-06-2012
7.43503
7.32278
100%
7.32278 COMPLETE
15-06-2012
7.70226
7.60226
100%
7.60226 COMPLETE
15-06-2012
4.50958
4.46414
100%
4.46414 COMPLETE
15-06-2012
4.22372
4.17257
100%
4.17257 COMPLETE
15-06-2012
7.99756
7.90758
100%
7.90758 COMPLETE
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 132/PM(F)/P /1B100/2012 DATE 15-06-2012 SANCTIONED AMOUNT 4.48954 RELEASED AMOUNT 4.44426 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS
14.16 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM GIDHNI ADIBASI OFFICER, JAMBONI BLOCK PARA TO SALPATHRA 14.17 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT WITH MORRUM & OFFICER, JAMBONI BLOCK BOULDER FROM KASAFALIA TO RANGAMETIA VIA BHALUKKHULIA 14.18 CONSTRUCTION OF RCC SLAB CULVERT AT BHALUKKHULIA ON BHALUKKHULIA TO KASAFALIA ROAD 14.19 CONSTRUCTION OF RCC SLAB CULVERT AT BHALUKKHULIA ON KASAFALIA TO BHALUKKHULIA ROAD 14.20 CONSTRUCTION OF RCC BRIDGE OVER KASAFALIA KHAL ON THE ROAD OF BHALUKKHULIA TO KASAFALIA ROAD BLOCK DEVELOPMENT OFFICER, JAMBONI BLOCK
4.44426 COMPLETE
10.77334
10.62233
100%
10.62233 COMPLETE
132/PM(F)/P 15-06-2012 & /1B29-11-2012 100/2012 & 396 132/PM(F)/P 15-06-2012 & /1B29-11-2012 100/2012 & 396
6.15000
6.15000
100%
6.15000 COMPLETE
6.15000
6.14823
100%
6.14823 COMPLETE
8.00000
8.00000
100%
8.00000 COMPLETE
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 133/PM(F)/P /1B-98/2012 DATE 15-06-2012 SANCTIONED AMOUNT 18.12171 RELEASED AMOUNT 17.46736 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 15-12-2012 ` IN LAC REMARKS
15.1 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM ANDHARIA PITCH OFFICER, BINPUR-I BLOCK ROAD TO JAMDA IN ANDHARIA AND BELATIKRI GP 15.2 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM BELATIKRI TO OFFICER, BINPUR-I BLOCK LAGHATA NADIGHAT IN BELATIKRI AND NEPURA GP 15.3 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM KANSINA MORE TO OFFICER, BINPUR-I BLOCK RATHBERA CHAWK IN ANDHARIA GP 15.4 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM CHHOTO JAMDA TO OFFICER, BINPUR-I BLOCK AMAINAGAR PITCH ROAD IN BELATIKRI AND ANDHARIA GP 15.5 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM GOHOMIDANGA TO OFFICER, BINPUR-I BLOCK BHULKA IN BAITA GP 15.6 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM GUJISOLE MORE TO OFFICER, BINPUR-I BLOCK PANPURIA IN SIJUA GP
17.46736 COMPLETE
133/PM(F)/P /1B-98/2012
15-06-2012
21.91741
15.79283
55%
15-12-2012
133/PM(F)/P /1B-98/2012
15-06-2012
13.55118
12.81494
100%
15-12-2012
12.81494 COMPLETE
133/PM(F)/P /1B-98/2012
15-06-2012
18.12171
17.54448
100%
15-12-2012
17.54448 COMPLETE
133/PM(F)/P /1B-98/2012
15-06-2012
13.55118
5.34015
50%
15-12-2012
133/PM(F)/P /1B-98/2012
15-06-2012
8.65624
8.32007
100%
15-12-2012
8.32007 COMPLETE
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 133/PM(F)/P /1B-98/2012 DATE 15-06-2012 SANCTIONED AMOUNT 8.65624 RELEASED AMOUNT 8.29046 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 15-12-2012 ` IN LAC REMARKS
15.7 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM TANTISOLE OFFICER, BINPUR-I BLOCK RAJBUNDH BRIDGE TO DUMURIA PRIMARY SCHOOL IN SIJUA GP 15.8 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM LALGARH BAZAR TO OFFICER, BINPUR-I BLOCK KANGSABATI NADIGHAT IN LALGARH GP 15.9 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM DUBRAJPUR TO OFFICER, BINPUR-I BLOCK POLICE PHARI IN RAMGARH GP 15.10 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM KUMIRKATA PITCH OFFICER, BINPUR-I BLOCK ROAD TO PANCHIARA IN DAHIJURI GP
8.29046 COMPLETE
133/PM(F)/P /1B-98/2012
15-06-2012
2.13970
1.50460
100%
15-12-2012
1.50460 COMPLETE
133/PM(F)/P /1B-98/2012
15-06-2012
8.65624
8.31675
100%
15-12-2012
8.31675 COMPLETE
133/PM(F)/P /1B-98/2012
15-06-2012
8.98066
7.95503
100%
15-12-2012
7.95503 COMPLETE
15.11 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM MAGURA TO OFFICER, BINPUR-I BLOCK ANKRO IN BINPUR 15.12 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM FULBERI MORE TO OFFICER, BINPUR-I BLOCK BANDARBONI IN DAHIJURI GP
133/PM(F)/P /1B-98/2012
15-06-2012
7.95368
2.61440
100%
15-12-2012
2.61440 COMPLETE
133/PM(F)/P /1B-98/2012
15-06-2012
13.55118
9.98461
100%
15-12-2012
9.98461 COMPLETE
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 133/PM(F)/P /1B-98/2012 DATE 15-06-2012 SANCTIONED AMOUNT 17.70938 RELEASED AMOUNT 13.26923 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 15-12-2012 ` IN LAC REMARKS
15.13 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM BAHADURPUR OFFICER, BINPUR-I BLOCK PITCH ROAD TO NACHHIPUR NADIGHAT IN NEPURA GP 15.14 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM LALGARH BURA OFFICER, BINPUR-I BLOCK BABA THAN (PITCH ROAD) TO PODIHA VILLAGE IN LALGARH GP 15.15 SINKING OF TUBE WELL BLOCK DEVELOPMENT WITH SUBMERSIBLE PUMP OFFICER, BINPUR-I BLOCK AT LAGHATA PHC IN NEPURA GP 15.16 SINKING OF TUBE WELL BLOCK DEVELOPMENT WITH SUBMERSIBLE PUMP OFFICER, BINPUR-I BLOCK AT NACHHIPUR HIGH SCHOOL IN NEPURA GP 15.17 SINKING OF TUBE WELL BLOCK DEVELOPMENT WITH SUBMERSIBLE PUMP OFFICER, BINPUR-I BLOCK AT LALGARH PHC IN LALGARH GP 15.18 SINKING OF TUBE WELL BLOCK DEVELOPMENT WITH SUBMERSIBLE PUMP OFFICER, BINPUR-I BLOCK AT LALGARH SARADAMONI PRIMARY SCHOOL IN LALGARH GP
13.26923 COMPLETE
133/PM(F)/P /1B-98/2012
15-06-2012
7.79544
7.49121
100%
15-12-2012
7.49121 COMPLETE
133/PM(F)/P /1B-98/2012
15-06-2012
2.50000
20%
15-12-2012
WORK IN PROGRESS
133/PM(F)/P /1B-98/2012
15-06-2012
2.50000
20%
15-12-2012
WORK IN PROGRESS
133/PM(F)/P /1B-98/2012
15-06-2012
2.50000
1.68492
50%
15-12-2012
133/PM(F)/P /1B-98/2012
15-06-2012
2.50000
1.59973
50%
15-12-2012
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 133/PM(F)/P /1B-98/2012 DATE 15-06-2012 SANCTIONED AMOUNT 2.50000 RELEASED AMOUNT PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 15-12-2012 ` IN LAC REMARKS
15.19 SINKING OF TUBE WELL BLOCK DEVELOPMENT WITH SUBMERSIBLE PUMP OFFICER, BINPUR-I BLOCK AT BAITA SRIGOPAL H.S. SCHOOL, JASHPUR IN BAITA GP 15.20 SINKING OF TUBE WELL BLOCK DEVELOPMENT WITH SUBMERSIBLE PUMP OFFICER, BINPUR-I BLOCK AT DHARAMPUR PHC IN DHARAMPUR GP 15.21 SINKING OF TUBE WELL BLOCK DEVELOPMENT WITH SUBMERSIBLE PUMP OFFICER, BINPUR-I BLOCK AT ANDHARIA CHAWK IN ANDHARIA GP 15.22 SINKING OF TUBE WELL BLOCK DEVELOPMENT WITH SUBMERSIBLE PUMP OFFICER, BINPUR-I BLOCK AT BINPUR CHAWK IN BINPUR GP 15.23 SINKING OF TUBE WELL BLOCK DEVELOPMENT WITH SUBMERSIBLE PUMP OFFICER, BINPUR-I BLOCK AT AMAINAGAR IN ANDHARIA GP 15.24 SINKING OF TUBE WELL BLOCK DEVELOPMENT WITH SUBMERSIBLE PUMP OFFICER, BINPUR-I BLOCK AT MURAR GARAI PARA IN RAMGARH GP
133/PM(F)/P /1B-98/2012
15-06-2012
2.50000
1.87039
100%
1.87039 COMPLETE
133/PM(F)/P /1B-98/2012
15-06-2012
2.49943
2.05069
100%
COMPLETE
133/PM(F)/P /1B-98/2012
15-06-2012
2.49943
1.83324
100%
15-12-2012
1.83324 COMPLETE
133/PM(F)/P /1B-98/2012
15-06-2012
2.49943
2.09192
60%
15-12-2012
133/PM(F)/P /1B-98/2012
15-06-2012
2.49943
1.60526
100%
15-12-2012
1.60526 COMPLETE
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 134/PM(F)/P /1B-99/2012 DATE 15-06-2012 SANCTIONED AMOUNT 6.78290 RELEASED AMOUNT 6.23312 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS
16.1 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM AMLASOLE OFFICER, BINPUR-II BLOCK BIRSARMUNDA MORE TO JHARKHAND 16.2 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM DHOBAJAN COLONY OFFICER, BINPUR-II BLOCK TO SUKNAPAHARI VIA KHAMAR
6.23312 COMPLETE
134/PM(F)/P /1B-99/2012
15-06-2012
20.29578
19.80897
100%
19.80897 COMPLETE
16.3 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM SILDA SATIGHAT TO OFFICER, BINPUR-II BLOCK RAGHUNATHPUR
134/PM(F)/P /1B-99/2012
15-06-2012
23.77921
22.17645
100%
15-01-2013
22.17645 COMPLETE
16.4 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM JARDA TO OFFICER, BINPUR-II BLOCK RANGAMETIA, SANDAPARA
134/PM(F)/P /1B-99/2012
15-06-2012
20.99840
15.40325
100%
01-01-2013
15.40325 COMPLETE
16.5 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM DHULIPARA TO OFFICER, BINPUR-II BLOCK RAJDAHA IN BHELAIDIHA
134/PM(F)/P /1B-99/2012
15-06-2012
5.80462
5.24106
100%
5.24106 COMPLETE
16.6 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM LEDASAL TO OFFICER, BINPUR-II BLOCK PANCHTAKARPAL, KANKO
134/PM(F)/P /1B-99/2012
15-06-2012
19.55550
16.16900
100%
25-01-2013
16.16900 COMPLETE
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 134/PM(F)/P /1B-99/2012 DATE 15-06-2012 SANCTIONED AMOUNT 9.52460 RELEASED AMOUNT 8.71126 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 01-01-2013 ` IN LAC REMARKS
16.7 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM GORAMTHAN TO OFFICER, BINPUR-II BLOCK GADRASINI ASHRAM, BELPAHARI
8.71126 COMPLETE
16.8 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM DOMSOLE HIGH OFFICER, BINPUR-II BLOCK SCHOOL TO BANKATI, HARDA 16.9 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM BELPAHARI TO OFFICER, BINPUR-II BLOCK SANDAPARA IN BELPAHARI 16.10 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM RAGHUNATHPUR OFFICER, BINPUR-II BLOCK TO ERGODA, ERGODA
134/PM(F)/P /1B-99/2012
15-06-2012
9.67280
9.00553
100%
01-01-2013
9.00553 COMPLETE
134/PM(F)/P /1B-99/2012
15-06-2012
8.38352
7.46288
40%
01-01-2013
134/PM(F)/P /1B-99/2012
15-06-2012
13.29110
11.62628
100%
11.62628 COMPLETE
16.11 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM MAHULBONI TO OFFICER, BINPUR-II BLOCK ODOLCHUA IN SIMULPAL
134/PM(F)/P /1B-99/2012
15-06-2012
10.05575
8.73974
100%
01-01-2013
8.73974 COMPLETE
17.1 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM BAHARAKOTA TO OFFICER, JHARGRAM BLOCK /1B-97/2012 DURGAPUR
15-06-2012
5.23219
3.67959
100%
25-01-2013
3.67959 COMPLETE
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 15-06-2012 SANCTIONED AMOUNT 5.23219 RELEASED AMOUNT 5.23219 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 30-01-2013 ` IN LAC REMARKS
NO. 17.2 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM NH-6 TO OFFICER, JHARGRAM BLOCK /1B-97/2012 CHANDIPUR VIA GP OFFICE 17.3 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM CHANDRI TO OFFICER, JHARGRAM BLOCK /1B-97/2012 MADHABPUR VIA ASTI IN CHANDRI GP 17.4 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM KANYADUBA TO OFFICER, JHARGRAM BLOCK /1B-97/2012 MURGIDIHI
5.23219 COMPLETE
15-06-2012
3.02559
2.84712
100%
30-05-2013
2.84712 COMPLETE
15-06-2012
3.02559
2.09073
100%
31-01-2013
2.09073 COMPLETE
17.5 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM PHASITALA TO OFFICER, JHARGRAM BLOCK /1B-97/2012 PATHRI VIA DHANGRI
15-06-2012
5.23219
5.23219
100%
5.23219 COMPLETE
17.6 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM AMDIHA TO OFFICER, JHARGRAM BLOCK /1B-97/2012 CHHANAPARA 17.7 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM KALABONI TO OFFICER, JHARGRAM BLOCK /1B-97/2012 JARULIA
15-06-2012
5.23219
3.94241
100%
30-04-2013
3.94241 COMPLETE
15-06-2012
14.55227
14.54627
100%
15-01-2013
14.54627 COMPLETE
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 15-06-2012 SANCTIONED AMOUNT 6.57273 RELEASED AMOUNT 5.46283 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 31-01-2013 ` IN LAC REMARKS
NO. 17.8 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM BIRIDANGA (NAHAR OFFICER, JHARGRAM BLOCK /1B-97/2012 KHAL CULVERT) TO BETKUNDRI MPS GATE
5.46283 COMPLETE
17.9 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM BARDANGA TO OFFICER, JHARGRAM BLOCK /1B-97/2012 SANKARBONI VIA SAGARBHANGA 17.10 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM KHALSHEULI TO OFFICER, JHARGRAM BLOCK /1B-97/2012 PAKURIAPAL VIA RADHANAGAR 17.11 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM AUSHPAL TO OFFICER, JHARGRAM BLOCK /1B-97/2012 TALDANGA 17.12 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM BRINDABANPUR TO OFFICER, JHARGRAM BLOCK /1B-97/2012 ANDHARIASOLE IN NEDABAHARA G.P. 17.13 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM MADHUPUR TO OFFICER, JHARGRAM BLOCK /1B-97/2012 PHASITALA
15-06-2012
5.85139
3.91160
100%
30-05-2013
3.91160 COMPLETE
15-06-2012
5.85139
5.47965
100%
15-01-2013
5.47965 COMPLETE
15-06-2012
6.57273
6.31699
100%
31-01-2013
6.31699 COMPLETE
15-06-2012
10.51140
10.50614
100%
31-01-2013
10.50614 COMPLETE
15-06-2012
14.55227
14.40258
100%
31-01-2013
14.40258 COMPLETE
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 15-06-2012 SANCTIONED AMOUNT 10.51140 RELEASED AMOUNT 10.51140 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 31-01-2013 ` IN LAC REMARKS
NO. 17.14 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM DEBI CHAK TO OFFICER, JHARGRAM BLOCK /1B-97/2012 PATASIMUL 17.15 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM JAMSOLA TO OFFICER, JHARGRAM BLOCK /1B-97/2012 KULDIHA 17.16 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM BARDANGA CHAK OFFICER, JHARGRAM BLOCK /1B-97/2012 TO METAL
10.51140 COMPLETE
15-06-2012
6.66189
6.51742
100%
31-01-2013
6.51742 COMPLETE
15-06-2012
5.69089
5.67048
100%
31-01-2013
5.67048 COMPLETE
17.17 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM GOLAGHUTIA TO OFFICER, JHARGRAM BLOCK /1B-97/2012 CHANDRI MORE 17.18 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM KUNDALDIHA TO OFFICER, JHARGRAM BLOCK /1B-97/2012 TENGIA
15-06-2012
5.69089
5.08448
100%
30-05-2013
5.08448 COMPLETE
15-06-2012
5.69089
4.65118
85%
30-05-2013
17.19 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM NETURA BUS OFFICER, JHARGRAM BLOCK /1B-97/2012 STAND (NH-6) TO MATALSOLE 17.20 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM KHALSEULI TO OFFICER, JHARGRAM BLOCK /1B-97/2012 DAMRASOLE VIA KALABONI
15-06-2012
3.02559
2.80420
100%
30-05-2013
2.80420 COMPLETE
15-06-2012
5.69089
5.22085
100%
15-01-2013
5.22085 COMPLETE
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 15-06-2012 SANCTIONED AMOUNT 3.02559 RELEASED AMOUNT 2.03420 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 90% 30-05-2013 ` IN LAC REMARKS
NO. 17.21 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM PANCHAMI TO OFFICER, JHARGRAM BLOCK /1B-97/2012 PIPRI 17.22 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT 135/PM(F)/P FROM JABNIKATA TO DEER OFFICER, JHARGRAM BLOCK /1B-97/2012 PARK VIA KHARIKASULI
15-06-2012
10.51140
9.28310
100%
30-04-2013
9.28310 COMPLETE
18 WATER SUPLY SCHEME FOR R.G.T.S. SCHOOL AT BELPAHARI, BINPUR-II 19 SINKING OF 350 NOS. INDIAN MARK-II TUBEWELL IN 7 PUP BLOCKS
EXECUTIVE ENGINEER, MIDNAPORE DIVISION, P.H.E. DIRECTORATE EXECUTIVE ENGINEER, MIDNAPORE DIVISION, P.H.E. DIRECTORATE
22-06-2012
13.70584
13.70584
22-06-2012
313.91000
313.91000
85%
CHIEF EXECUTIVE OFFICER, 152/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD THROUGH BDO, 115/2011 BINPUR-I
04-07-2012
38.01873
CHIEF EXECUTIVE OFFICER, 154/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD THROUGH BDO, 160/2011 GOPIBALLAVPUR-I
04-07-2012
22.64728
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 13-07-2012 SANCTIONED AMOUNT 24.69324 RELEASED AMOUNT 11.52803 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 55% ` IN LAC REMARKS
22 CONSTRUCTION OF NEW SCHOOL BUILDING AT MURABONI NETAJI HIGH SCHOOL, MURABONI, BINPUR-I
NO. CHIEF EXECUTIVE OFFICER, 167/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD THROUGH BDO, 140/2011 BINPUR-I
23 REPAIRING OF BITUMEN CHIEF EXECUTIVE OFFICER, ROAD FROM BINPUR TO PASCHIMANCHAL UNNAYAN PAPATPUR NODIGHAT PARSHAD AND BOXI VIA HARDA AND MURGIMORE, BINPUR-I BLOCK
517.42392
372.89069
60%
30-11-2013
24.1 CONSTRUCTION OF ADDITIONAL CLASS ROOM OF KENDIJAMBANI ICDS CENTRE, GARHBETA-III BLOCK 24.2 CONSTRUCTION OF BOUNDARY WALL AND OTHER WORK OF KADAMDIHA PRIMARY SCHOOL
CHIEF EXECUTIVE OFFICER, 194/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD THROUGH BDO, 153/2012 GARHBETA-III
27-07-2012
4.09890
4.09890
100%
4.09890 COMPLETE
CHIEF EXECUTIVE OFFICER, 194/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD THROUGH BDO, 153/2012 GARHBETA-III
27-07-2012
20.64973
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 27-07-2012 SANCTIONED AMOUNT 7.74436 RELEASED AMOUNT 7.51782 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 25-05-2013 ` IN LAC REMARKS
7.51782 COMPLETE
26 CONSTRUCTION OF 6 NOS. HEADMASTER, RANTUA OF CLASSROOMS AT HIGH SCHOOL RANTUA HIGH SCHOOL, JHARGRAM 27 CONSTRUCTION OF HEAD TEACHER, SALJORA CLASSROOMS AT SALJORA PRIMARY SCHOOL PRIMARY SCHOOL, NARAYANGARH PS
36.82552
36.82552
60%
200/PM(F)/P /1B129/2012
31-07-2012
12.01479
12.01479
100%
12.01479 COMPLETE
28 EXCAVATION OF POND ON CHIEF EXECUTIVE OFFICER, 203/PM(F)/P BRWS LAND, BELPAHARI PASCHIMANCHAL UNNAYAN /1BPARSHAD 155/2012
01-08-2012
3.52199
1.22058
100%
1.22058 COMPLETE
29 PLANT AND MACHINERY OF MILK PROCESSING UNIT AT KESHIARY AND CHANDRAKONA ROAD MILK CHILLING PLANT, GARHBETA-III BLOCK
205/PM(F)/P /1B152/2012
01-08-2012
69.51000
34.75500
50%
10.34000 M.P.U. AT KESHIARY IS PROPOSED FOR SHIFTING AT MIDNAPUR SADAR, CHILLING PLANT COMPLETE
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 03-08-2012 SANCTIONED AMOUNT 2.13945 RELEASED AMOUNT PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION ` IN LAC REMARKS
NO. 30.1 INSTALLATION OF MINI CHIEF EXECUTIVE OFFICER, 210/PM(F)/P DEEP TUBE-WELL AT PASCHIMANCHAL UNNAYAN /1BHARTORA MOUZA, J.L. NO. PARSHAD 160/2012 130, SALBONI BLOCK
30.2 INSTALLATION OF MINI CHIEF EXECUTIVE OFFICER, 210/PM(F)/P DEEP TUBE-WELL AT PASCHIMANCHAL UNNAYAN /1BJOYPUR MOUZA, J.L. NO. PARSHAD 160/2012 46, SALBONI BLOCK
03-08-2012
2.13945
30.3 INSTALLATION OF MINI CHIEF EXECUTIVE OFFICER, 210/PM(F)/P DEEP TUBE-WELL AT PASCHIMANCHAL UNNAYAN /1BBARAMESHA MOUZA, J.L. PARSHAD 160/2012 NO. 271, PLOT NO. - 49, SALBONI BLOCK
03-08-2012
2.13945
2.13945
100%
2.13945 COMPLETE
30.4 INSTALLATION OF MINI CHIEF EXECUTIVE OFFICER, 210/PM(F)/P DEEP TUBE-WELL AT PASCHIMANCHAL UNNAYAN /1BBHEDUA MOUZA, J.L. NO. PARSHAD 160/2012 435, PLOT NO. 59, 7 NO. GP, GARHBETA-III PS
03-08-2012
3.79870
3.79328
100%
3.79328 COMPLETE
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 03-08-2012 SANCTIONED AMOUNT 15.84989 RELEASED AMOUNT 10.24387 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 85% ` IN LAC REMARKS
30.5 CONST. OF PUCCA DRAIN WITH COVER SLAB AT GUIADAHA MOUZA, J.L. NO. 713, PLOT NO. 370, KARSA GP, GARHBETA-III PS 30.6 CONSTRUCTION OF SCHOOL BUILDING AT DABCHA NABKOLA SISHU NIKETAN, J.L. NO. 672, PLOT NO. 26, SATBANKURA GP 30.7 CONSTRUCTION OF INDOOR BADMINTON COURT AT GARHBETA-I BLOCK
CHIEF EXECUTIVE OFFICER, 210/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD THROUGH BDO, 160/2012 GARHBETA-III
03-08-2012
7.48394
CHIEF EXECUTIVE OFFICER, 210/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD THROUGH BDO, 160/2012 GARHBETA-I
03-08-2012
5.53052
30.8 CONSTRUCTION OF BOUNDARY WALL WITH M.S. SHEET GATE OF KIABONI HIGH SCHOOL, GARHBETA-III BLOCK
CHIEF EXECUTIVE OFFICER, 210/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD THROUGH BDO, 160/2012 GARHBETA-III
03-08-2012
9.94051
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 03-08-2012 SANCTIONED AMOUNT 4.02888 RELEASED AMOUNT PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION ` IN LAC REMARKS
NO. 30.9 CONSTRUCTION OF STAGE CHIEF EXECUTIVE OFFICER, 210/PM(F)/P WITH GREEN ROOM OF PASCHIMANCHAL UNNAYAN /1BKIABONI HIGH SCHOOL, PARSHAD THROUGH BDO, 160/2012 GARHBETA-III BLOCK GARHBETA-III
31 CONSTRUCTION OF SCHOOL HOSTEL BUILDING AT ARJUNI DESHBANDHU VIDYAPITH, NARAYANGARH BLOCK 32 CONSTRUCTION OF HOSTEL BUILDING AT KHALSEULI HIGH SCHOOL (H.S.), JHARGRAM SUBDIVISION
130/PM(F)/P /1B120/2011
23-05-2013
24.50248
12.25124
CHIEF EXECUTIVE OFFICER, 221/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD THROUGH BDO, 175/2012 JHARGRAM
14-08-2012
24.79534
11.27231
50%
01-06-2013
33 ELECTRICAL INSTALLATION EXECUTIVE ENGINEER, WORK AT BAITA SRI P.W.D., MIDNAPORE GOPAL HIGH SCHOOL, ELECTRICAL DIVISION BINPUR-I BLOCK
222/PM(F)/P /1B172/2012
14-08-2012
3.85001
3.85001
100%
3.85001 COMPLETE
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS EXECUTIVE ENGINEER, MIDNAPORE HIGHWAY DIVISION-II, P.W.D.(ROADS) DIRECTORATE PUA DEPT.'S SANCTION ORDER NO. 223/PM(F)/P /1B-69/2011 DATE 14-08-2012 SANCTIONED AMOUNT 8.22649 RELEASED AMOUNT 8.22649 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS
34 REPAIRING OF ASUINURISOLE ROAD BY PATCHING POTHOLES BY JHAMA METAL CONSOLIDATION, GOPIBALLAVPUR-I BLOCK 35 CONSTRUCTION OF BOUNDARY WALL AT MADHUPUR BINAPANI HIGH SCHOOL (H.S.), MADHUPUR 36 EXCAVATION/ REEXCAVATION OF 5 NOS. OF WHS AND DHALL BANDHS AT LOGDICHALK, GARBERIA, MARCHI AND LOCHANGARH MOUZAS, GARHBETA-III BLOCK
8.20037 COMPLETE
CHIEF EXECUTIVE OFFICER, 225/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD THROUGH BDO, 171/2012 SALBONI
14-08-2012
16.76151
228/PM(F)/P /1B165/2012
17-08-2012
27.64158
27.37148
100%
CHIEF EXECUTIVE OFFICER, 229/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD THROUGH BDO, 170/2012 JHARGRAM
17-08-2012
24.69324
17.88513
01-07-2013
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 17-08-2012 SANCTIONED AMOUNT 9.96994 RELEASED AMOUNT 4.77381 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 60% 30-04-2013 ` IN LAC REMARKS
NO. 37.2 CONSTRUCTION OF CHIEF EXECUTIVE OFFICER, 229/PM(F)/P BOUNDARY WALL OF PASCHIMANCHAL UNNAYAN /1BGAJASHIMUL K.C.M. HIGH PARSHAD THROUGH BDO, 170/2012 SCHOOL JHARGRAM
CHIEF EXECUTIVE OFFICER, 229/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD THROUGH BDO, 170/2012 JHARGRAM
17-08-2012
7.96313
01-06-2013
NOT STARTED
38 SINKING OF 9 INDIA MARK- BLOCK DEVELOPMENT 230/PM(F)/P 17-08-2012 II TUBE WELL AND 124 OFFICER, JHARGRAM BLOCK /1BMDTW WITH 112/2012 SUBMERSIBLE PUMPS IN JHARGRAM BLOCK 39.1 REPAIRING OF BITUMEN CHIEF EXECUTIVE OFFICER, 265/PM(F)/P ROAD FROM BINPUR TO PASCHIMANCHAL UNNAYAN /1BPAPATPUR NODIGHAT PARSHAD 141/2012 AND BOXI VIA HARDA AND MURGIMORE, BINPUR-I BLOCK 39.2 REPAIR OF BITUMEN ROAD FROM MURGI MORE TO BOXI, BINPUR-I BLOCK CHIEF EXECUTIVE OFFICER, 265/PM(F)/P PASCHIMANCHAL UNNAYAN /1BPARSHAD 141/2012 27-08-2012
174.93129
129.92006
85%
25-05-2013
9.87435
9.21765
100%
9.21765 COMPLETE
27-08-2012
9.52170
7.46780
100%
7.46780 COMPLETE
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 271/PM(F)/P /1B181/2012 DATE 28-08-2012 SANCTIONED AMOUNT 24.41466 RELEASED AMOUNT 22.04488 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 80% ` IN LAC REMARKS
40 CONSTRUCTION OF BLOCK DEVELOPMENT HOSTEL BUILDING AT OFFICER, SALBONI BLOCK JOYPUR ST, SC & BC HIGH SCHOOL (HS), SALBONI BLOCK 41 CONSTRAUCTION OF BOUNDARY WALL AT ANDHARIA RAJBALLAV HIGH SCHOOL AT ANDHARIA
14-09-2012
24.98108
12.49054
42 SINKING OF 2 (TWO) DEEP BLOCK DEVELOPMENT 307/PM(F)/P TUBE-WELL IN NUYASAI OFFICER, NAYAGRAM BLOCK /1B-82/2012 AND BORADANGA VILLAGE, NAYAGRAM DEVELOPMENT BLOCK
19-09-2012
10.00000
43.1 CONSTRUCTION OF DISTRICT MAGISTRATE, CONCRETE ROAD WITH PASCHIM MEDINIPUR GUARD WALL FROM JHARBONI TO RAJABUNDH (447.50 MTR.)
308/PM(F)/P /1B191/2012
19-09-2012
25.00411
25.00411
DM HAS ASKED BDO, NAYAGRAM TO INITIATE TENDER PROCESS DM HAS ASKED BDO, NAYAGRAM TO INITIATE TENDER PROCESS
43.2 CONSTRUCTION OF CONCRETE ROAD WITH PUCCA DRAIN IN THE VILLAGE NEMAINAGAR
308/PM(F)/P /1B191/2012
19-09-2012
24.95039
24.95039
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 19-09-2012 SANCTIONED AMOUNT 9.50534 RELEASED AMOUNT 9.50534 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS
44 CONSTRUCTION OF BOUNDARY WALL AT BARUA MSK, SIROMONI GRAM PANCHAYAT, MIDNAPUR SADAR PANCHAYAT SAMITY 45.1 INSTALLATION OF MINI DEEP TUBE-WELL FOR IRRIGATION WATER SUPPLY WITHIN GARHBETA-III BLOCK 45.2 CONSTRUCTION OF MODEL PUMP HOUSE IN GARHBETA-III PS
9.50534 COMPLETE
21-09-2012
4.25000
21-09-2012
0.43965
45.3 CONSTRUCTION OF CHIEF EXECUTIVE OFFICER, 311/PM(F)/P PROPOSED GROUND PASCHIMANCHAL UNNAYAN /1B-85/2012 FLOOR OF NEW BUILDING PARSHAD OF KIABONI HIGH SCHOOL, GARHBETA-III PS 45.4 CONSTRUCTION OF PROPOSED FIRST FLOOR OF NEW BUILDING OF KIABONI HIGH SCHOOL, GARHBETA-III PS CHIEF EXECUTIVE OFFICER, 311/PM(F)/P PASCHIMANCHAL UNNAYAN /1B-85/2012 PARSHAD
21-09-2012
24.83621
10%
30-11-2013
WORK STARTED
21-09-2012
16.90667
10%
30-11-2013
WORK STARTED
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 314/PM(F)/P /1B174/2012 DATE 24-09-2012 SANCTIONED AMOUNT 11.50839 RELEASED AMOUNT PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION ` IN LAC REMARKS
46.1 CONSTRUCTION OF BLOCK DEVELOPMENT BUILDING OF CIRCLE LEVEL OFFICER, GARHBETA-III TRAINING HALL AT BLOCK CHANDRAKONA ROAD WITHIN GARHBETA-III PS
46.2 SUBMERSIBLE PUMP FOR BLOCK DEVELOPMENT DRINKING WATER SUPPLY OFFICER, GARHBETA-III PURPOSE AT BLOCK CHANDRAKONA ROAD S.I. OF SCHOOL, GARHBETA SOUTH CIRCLE, GARHBETAIII PS
314/PM(F)/P /1B174/2012
24-09-2012
2.31251
47 CONSTRUCTION OF FIRST BLOCK DEVELOPMENT FLOOR SCHOOL BUILDING OFFICER, SALBONI BLOCK AT BAGHPICHLA MSK, SALBONI BLOCK
316/PM(F)/P /1B173/2012
25-09-2012
11.09307
10.75146
100%
10.75146 COMPLETE
48 CONSTRUCTION OF SINGLE STORIED CLASSROOM WITH STAIRCASE AND BOUNDARY WALL OF ORGANJA SHRI RAMKRISHNA SARADA VIDYANIKETAN
317/PM(F)/P /1B-16/2010
25-09-2012
8.32500
4.16250
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 01-10-2012 SANCTIONED AMOUNT 4.68177 RELEASED AMOUNT 4.68177 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 15-01-2013 ` IN LAC REMARKS
4.68177 COMPLETE
50 CONSTRUCTION OF BLOCK DEVELOPMENT BUILDING AT OFFICER, GARHBETA-III KANCHADAHARIBLOCK GUIADAHA HIGH MADRASAH (10,57,801/-) & SINKING OF 6 NOS. OF DEEP TUBE-WELLS (12,00,000/-) IN DIFFERENT PLACES WITHIN GARHBETA-III PS
332/PM(F)/P /1B194/2012
01-10-2012
22.57801
9.68232
50%
51 REPAIRING THE PUCCA CHIEF EXECUTIVE OFFICER, 335/PM(F)/P ROAD (8.4 KM) FROM PASCHIMANCHAL UNNAYAN /1BKHALSEULI TO MALANCHA PARSHAD 196/2012 (KHARAGPUR), BINPUR-I BLOCK 52.1 CONSTRUCTION OF BOUNDARY WALL OF NETAI JUNIOR HIGH SCHOOL SCHOOL AUTHORITY, NETAI 341/PM(F)/P JUNIOR HIGH SCHOOL /1B-49/2012
04-10-2012
199.99948
20%
WORK IN PROGRESS
09-10-2012
8.71574
8.71574
50%
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 09-10-2012 SANCTIONED AMOUNT 13.02039 RELEASED AMOUNT 13.02039 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 50% ` IN LAC REMARKS
52.2 CONSTRUCTION OF GOUND FLOOR OF SCHOOL BUILDING OF NETAI JUNIOR HIGH SCHOOL
53 SPECIAL REPAIRING IN DISTRICT MAGISTRATE, DAMAGED STEEL FRAMED PASCHIM MEDINIPUR BRIDGE ON NAHARKHAL, JHARGRAM BLOCK
354/PM(F)/P /1B212/2012
17-10-2012
7.88511
7.88511
54 CONSTRUCTION OF TEACHER-IN-CHARGE, HOSTEL BUILDING AT SATRANGI VIVEKANANDA SATRANGI VIVEKANANDA HIGH SCHOOL HIGH SCHOOL, KHARAGPUR-II BLOCK 55 CONSTRUCTION OF FOUR TEACHER-IN-CHARGE, CLASSROOMS AT MALANCHA HIGH SCHOOL MALANCHA HIGH SCHOOL, GOPIBALLAVPURII BLOCK
356/PM(F)/P /1B213/2012
18-10-2012
17.73412
17.73412
100%
17.73412 COMPLETE
361/PM(F)/P /1B169/2012
30-10-2012
28.32338
28.32338
55%
56 CONSTRUCTION OF CHIEF EXECUTIVE OFFICER, 380/PM(F)/P CLASSROOM IN PASCHIMANCHAL UNNAYAN /1BMIDNAPORE TOWN PARSHAD 232/2012 WELFARE SOCIETY WITHIN SOCIETY TRAINING CENTRE (VIKASH) COMPOUND, MEDINIPUR SADAR
21-11-2012
16.33982
10.14014
80%
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 23-11-2012 SANCTIONED AMOUNT 24.54446 RELEASED AMOUNT 24.54446 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 50% ` IN LAC REMARKS
NO. 57 CONSTRUCTION OF SCHOOL AUTHORITY, 388/PM(F)/P INSTITUTIONAL BUILDING SATSOLE KIRANMOYEE HIGH /1B(GROUND FLOOR) FOR SCHOOL (H.S.) 226/2012 SATSOLE KIRANMOYEE HIGH SCHOOL (H.S.), PHASE-I, ANANDAPUR P.S., KESHPUR 58 ARRANGEMENT OF SECRETARY, DURBAR FOOTBALL TOURNAMENT MAHILA SAMANWAYA AND ARCHERY COMMITTEE TOURNAMENT IN AMLASOLE AND ITS SURROUNDING AREA, PASCHIM MEDINIPUR 59 CONSTRUCTION OF BLOCK DEVELOPMENT GROUND FLOOR SCHOOL OFFICER, KESHPUR BLOCK BUILDING AT TALNANNA MADRASAH SIKSHA KENDRA, MUGBASAN GP, KESHPUR BLOCK 399/PM(F)/P /1B-53/2012
04-12-2012
1.69125
1.69125
100%
1.69125 COMPLETE
400/PM(F)/P /1B131/2012
04-12-2012
18.11025
15.38467
75%
60 CONSTRUCTION OF BOUNDARY WALL AT SEVAYATAN SIKSHAN MAHAVIDYALAYA AT JHARGRAM (IN 3 PART, TOTAL 580 METRE)
404/PM(F)/P /1B184/2012
06-12-2012
34.95322
34.95322
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS HEADMASTER, CHAKMAKRAMPUR HIGH SCHOOL, P.O. CHAKMAKRAMPUR, DIST. PASCHIM MEDINIPUR, 721149 PUA DEPT.'S SANCTION ORDER NO. 408/PM(F)/P /1B218/2012 DATE 11-12-2012 SANCTIONED AMOUNT 29.21601 RELEASED AMOUNT 29.21601 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 55% ` IN LAC REMARKS
61 CONSTRUCTION OF BOUNDARY WALL AND EXTENSION AND RENOVATION WORK OF SCHOOL BUILDING AT CHAKMAKRAMPPUR HIGH SCHOOL
62 INSTALLATION/ SINKING BLOCK DEVELOPMENT OF 7 NOS. OF MINI DEEP OFFICER, GARHBETA-III TUBE-WELLS IN DIFFERENT BLOCK MOUZAS (DUKI, DWARIGERIA(NORTH), BHOGISOLE, GHOSHKHIRA, GUIADAHA, NABKOLA AND AT GURAHARA, GUJRAT & KENDERISOLE MOUZA) WITHIN GARHBETA-III BLOCK
419/PM(F)/P /1B239/2012
13-12-2012
32.87133
21.35992
65%
63 SINKING OF ONE MINI DEEP TUBE-WELL AT MOHASOLE MOUZA WITHIN SALBONI BLOCK
420/PM(F)/P /1B239/2012
13-12-2012
4.14910
4.03005
100%
4.03005 COMPLETE
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 421/PM(F)/P /1B239/2012 DATE 13-12-2012 SANCTIONED AMOUNT 69.17176 RELEASED AMOUNT 45.90722 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS
64 SINKING OF 8 NOS. (@ BLOCK DEVELOPMENT `8.64647 LAC) MINI DEEP OFFICER, GARHBETA-II TUBE-WELLS IN DIFFERENT BLOCK MOUZAS (UMRAPATA, JAMSOLE, BHURUBONI, DUMURIA, CHHOTONAKDONA, BATHANTORE, HAMARGORA, GANGDUARI), GARHBETAII BLOCK 65 DISTRIBUTION OF SPORTS KITS TO 75 NOS. OF CLUBS/ YOUTH ORGANIZATIONS WITHIN FIVE ASSEMBLY CONSTITUENCIES OF JHARGRAM SUB-DIVISION 66 CONSTRUCTION OF BRIDGE OVER BAGDIHA KHAL, GOPIBALLAVPUR-I BLOCK 67 CONSTRUCTION OF RCC BOX BRIDGE AT KAMALPUR SAKAMUHI KHAL, NAYAGRAM PANCHAYAT SAMITY
45.90722 COMPLETE
422/PM(F)/P /1B257/2012
14-12-2012
16.50000
15.28800
100%
15.28800 COMPLETE
18-12-2012
22.61065
428/PM(F)/P /1B251/2012
18-12-2012
23.03097
23.03097
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS SECRETARY, RED CROSS SOCIETY, JHARGRAM SUBDIVISIONAL BRANCH PUA DEPT.'S SANCTION ORDER NO. 433/PM(F)/P /1B113/2012 DATE 18-12-2012 SANCTIONED AMOUNT 4.84250 RELEASED AMOUNT 4.84250 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION ` IN LAC REMARKS
69 FITTING & INSTALLATION CHIEF EXECUTIVE OFFICER, 440/PM(F)/P FOR SUPPLYING SAFE PASCHIMANCHAL UNNAYAN /1BPURIFIED RURAL PARSHAD 264/2012 COMMUNITY DRINKING WATER FOR 9 NOS. PHC/BPHC/RH AT AN ESTIMATED COST OF 27.56771 LAC EACH NAMELY LALGARH PHC (BINPUR-I), CHINCHIRA PHC (JAMBONI), CHILKIGARH BPHC (JAMBONI), BINPUR RH (BINPUR-I), BELPAHARI RH (BINPUR-II), GOPIBALLAVPUR RH (GOPIBALLAVPUR-I), TOPSIA RH (GOPIBALLAVPUR-II), KHARIKAMATHANI RH (NAYAGRAM), BHANGAGARH RH (SANKRAIL) WITHIN JHARGRAM SUB-DIVISION
28-12-2012
248.10939
247.99388
100%
30-06-2013
247.99388 COMPLETE
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 10-01-2013 SANCTIONED AMOUNT 14.84400 RELEASED AMOUNT 14.84400 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 55% ` IN LAC REMARKS
70 CONSTRUCTION OF BOUNDARY WALL AT DEBAGRAM MAHADEV HIGH SCHOOL UNDER SALBONI BLOCK 71 INFRASTRUCTURAL DEVELOPMENT OF SILDA CHANDRA SEKHAR COLLEGE
15-01-2013
100.00000
100.00000
72.1 CONSTRUCTION OF BLOCK DEVELOPMENT HOSTEL BUILDING AT OFFICER, GARHBETA-I GARHBETA HIGH SCHOOL, BLOCK GARHBETA-I BLOCK
14/PM(F)/P/ 1B-262/2012
24-01-2013
28.17772
16.59022
60%
72.2 CONSTRUCTION OF BLOCK DEVELOPMENT SCHOOL BUILDING AT OFFICER, GARHBETA-I GARHBETA HIGH SCHOOL, BLOCK GARHBETA-I BLOCK
14/PM(F)/P/ 1B-262/2012
24-01-2013
24.95645
18.55971
60%
15/PM(F)/P/ 1B-261/2012
24-01-2013
3.63184
3.63184
100%
3.63184 COMPLETE
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS DM THROUGH EE(AI), JHARGRAM (AI) DIVISION PUA DEPT.'S SANCTION ORDER NO. 21/PM(F)/P/ 1B-05/2013 DATE 30-01-2013 SANCTIONED AMOUNT 75.10019 RELEASED AMOUNT 75.10019 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION ` IN LAC REMARKS
30-01-2013
63.44400
76 ADDITIONAL FUND FOR DISTRICT MAGISTRATE, AWARDING 1888 NOS. OF PASCHIM MEDINIPUR BICYCLES TO TRIBAL GIRL STUDENTS OF CLASS X, XI & XII OF PASCHIM MEDINIPUR
31/PM(F)/P/ 1B-02/2011
05-02-2013
20.80120
20.80120
77.1 CONSTRUCTION OF RCC BLOCK DEVELOPMENT 33/PM(F)/P/ BOX CULVERT AT OFFICER, NAYAGRAM BLOCK 1B-243/2012 JAMSOLA OVER MAHULIA KHAL, NAYAGRAM BLOCK
07-02-2013
22.51000
BDO REQUESTED VIDE NO. 379/PUP/BNK/ 1A-04/12 DT. 20-02-2013 22.91880 100% 22.91880 COMPLETE
77.2 CONSTRUCTION OF BOX BLOCK DEVELOPMENT 33/PM(F)/P/ CULVERT AT JARKA OVER OFFICER, NAYAGRAM BLOCK 1B-243/2012 NAYAGRAM-ATMAJHIA ROAD , NAYAGRAM BLOCK
07-02-2013
23.03000
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 07-02-2013 SANCTIONED AMOUNT 7.00000 RELEASED AMOUNT PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION ` IN LAC REMARKS
NO. 77.3 CONSTRUCTION OF BLOCK DEVELOPMENT 33/PM(F)/P/ BANSPAT BOX CULVERT AT OFFICER, NAYAGRAM BLOCK 1B-243/2012 BANSPAT, NAYAGRAM BLOCK
BDO REQUESTED VIDE NO. 379/PUP/BNK/ 1A-04/12 DT. 20-02-2013 BDO REQUESTED VIDE NO. 379/PUP/BNK/ 1A-04/12 DT. 20-02-2013 BDO REQUESTED VIDE NO. 379/PUP/BNK/ 1A-04/12 DT. 20-02-2013 BDO REQUESTED VIDE NO. 379/PUP/BNK/ 1A-04/12 DT. 20-02-2013 TENDER INVITED ON 2002-2013
07-02-2013
7.83000
77.5 CONSTRUCTION OF BOX BLOCK DEVELOPMENT 33/PM(F)/P/ CULVERT AT TOPOBAN OFFICER, NAYAGRAM BLOCK 1B-243/2012 OVER TOPOBAN BARSULI ROAD, NAYAGRAM BLOCK
07-02-2013
7.00000
77.6 CONSTRUCTION OF RCC BLOCK DEVELOPMENT 33/PM(F)/P/ BOX CULVERT OVER OFFICER, NAYAGRAM BLOCK 1B-243/2012 SITALANA KHAL AT KEYAJHARIA, NAYAGRAM BLOCK
07-02-2013
14.59000
78.1 PIPE LINE WATER SUPPLY BLOCK DEVELOPMENT AT MURAKATI JR. HIGH OFFICER, SANKRAIL BLOCK SCHOOL, SANKRAIL BLOCK
34/PM(F)/P/ 1B-243/2012
07-02-2013
2.50000
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS BLOCK DEVELOPMENT OFFICER, SANKRAIL BLOCK PUA DEPT.'S SANCTION ORDER NO. 34/PM(F)/P/ 1B-243/2012 DATE 07-02-2013 SANCTIONED AMOUNT 2.50000 RELEASED AMOUNT PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION ` IN LAC REMARKS
78.2 PIPE LINE WATER SUPPLY AT KHAMARMOHULI JR. HIGH SCHOOL, SANKRAIL BLOCK
78.3 PIPE LINE WATER SUPPLY BLOCK DEVELOPMENT AT KUKURAKHUPI JR. HIGH OFFICER, SANKRAIL BLOCK SCHOOL, SANKRAIL BLOCK
34/PM(F)/P/ 1B-243/2012
07-02-2013
2.50000
78.4 PIPE LINE WATER SUPPLY BLOCK DEVELOPMENT AT SIMULIA JR. HIGH OFFICER, SANKRAIL BLOCK SCHOOL, SANKRAIL BLOCK
34/PM(F)/P/ 1B-243/2012
07-02-2013
2.50000
78.5 PIPE LINE WATER SUPPLY BLOCK DEVELOPMENT AT DURGAPUR JR. HIGH OFFICER, SANKRAIL BLOCK SCHOOL, SANKRAIL BLOCK
34/PM(F)/P/ 1B-243/2012
07-02-2013
2.50000
78.6 PIPE LINE WATER SUPPLY AT BAHARADANRI JR. HIGH SCHOOL, SANKRAIL BLOCK
34/PM(F)/P/ 1B-243/2012
07-02-2013
2.50000
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 34/PM(F)/P/ 1B-243/2012 DATE 07-02-2013 SANCTIONED AMOUNT 2.50000 RELEASED AMOUNT PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION ` IN LAC REMARKS
78.7 PIPE LINE WATER SUPPLY BLOCK DEVELOPMENT AT HARIPURA JR. HIGH OFFICER, SANKRAIL BLOCK SCHOOL, SANKRAIL BLOCK
78.8 PIPE LINE WATER SUPPLY BLOCK DEVELOPMENT AT ANDHARI JR. HIGH OFFICER, SANKRAIL BLOCK SCHOOL, SANKRAIL BLOCK
34/PM(F)/P/ 1B-243/2012
07-02-2013
2.50000
78.9 PIPE LINE WATER SUPPLY BLOCK DEVELOPMENT AT KASHIDANGA JR. HIGH OFFICER, SANKRAIL BLOCK SCHOOL, SANKRAIL BLOCK
34/PM(F)/P/ 1B-243/2012
07-02-2013
2.50000
78.10 PIPE LINE WATER SUPPLY BLOCK DEVELOPMENT AT CHHATRI JR. HIGH OFFICER, SANKRAIL BLOCK SCHOOL, SANKRAIL BLOCK
34/PM(F)/P/ 1B-243/2012
07-02-2013
2.50000
2.34185
100%
2.34185 COMPLETE
78.11 PIPE LINE WATER SUPPLY BLOCK DEVELOPMENT AT BAKRA JR. HIGH OFFICER, SANKRAIL BLOCK SCHOOL, SANKRAIL BLOCK
34/PM(F)/P/ 1B-243/2012
07-02-2013
2.50000
1.81459
100%
1.81459 COMPLETE
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 34/PM(F)/P/ 1B-243/2012 DATE 07-02-2013 SANCTIONED AMOUNT 2.50000 RELEASED AMOUNT 1.79130 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS
78.12 PIPE LINE WATER SUPPLY BLOCK DEVELOPMENT AT CHUNPARA JR. HIGH OFFICER, SANKRAIL BLOCK SCHOOL, SANKRAIL BLOCK
1.79130 COMPLETE
78.13 PIPE LINE WATER SUPPLY BLOCK DEVELOPMENT AT NEKRASULI JR. HIGH OFFICER, SANKRAIL BLOCK SCHOOL, SANKRAIL BLOCK
34/PM(F)/P/ 1B-243/2012
07-02-2013
2.50000
1.99820
100%
1.99820 COMPLETE
78.14 PIPE LINE WATER SUPPLY BLOCK DEVELOPMENT AT BANKATI JR. HIGH OFFICER, SANKRAIL BLOCK SCHOOL, SANKRAIL BLOCK
34/PM(F)/P/ 1B-243/2012
07-02-2013
2.50000
2.02123
100%
2.02123 COMPLETE
78.15 PIPE LINE WATER SUPPLY BLOCK DEVELOPMENT AT BHAMAL JR. HIGH OFFICER, SANKRAIL BLOCK SCHOOL, SANKRAIL BLOCK
34/PM(F)/P/ 1B-243/2012
07-02-2013
2.50000
1.52722
100%
1.52722 COMPLETE
78.16 PIPE LINE WATER SUPPLY AT PECHABINDHYA JR. HIGH SCHOOL, SANKRAIL BLOCK
34/PM(F)/P/ 1B-243/2012
07-02-2013
2.50000
1.74802
100%
1.74802 COMPLETE
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 07-02-2013 SANCTIONED AMOUNT 19.36000 RELEASED AMOUNT 19.36000 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS
79.1 CONSTRUCTION OF CONCRETE ROAD FROM GOPIBALLAVPUR THANA CHOWK TO GOBINDA MANDIR, GOPIBALLAVPURI BLOCK
19.36000 COMPLETE
79.2 CONSTRUCTION OF BLOCK DEVELOPMENT 35/PM(F)/P/ CAUSEWAY AT OFFICER, GOPIBALLAVPUR-I 1B-243/2012 CHUTARPATA, BLOCK GOPIBALLAVPUR-I BLOCK 79.3 CHECK DAM AT BLOCK DEVELOPMENT 35/PM(F)/P/ ANDHARKULI, OFFICER, GOPIBALLAVPUR-I 1B-243/2012 GOPIBALLAVPUR-I BLOCK BLOCK
07-02-2013
7.12000
7.01092
100%
7.01092 COMPLETE
07-02-2013
7.74000
80.1 CONSTRUCTION OF BLOCK DEVELOPMENT 36/PM(F)/P/ GUARD WALL AT OFFICER, GOPIBALLAVPUR-II 1B-243/2012 BAKULTALA TO PAIKUIBAR BLOCK AT MAHULI, GOPIBALLAVPUR-II BLOCK
07-02-2013
3.00000
3.00000
100%
3.00000 COMPLETE
80.2 CONSTRUCTION OF BLOCK DEVELOPMENT 36/PM(F)/P/ CULVERT AT EKDAL OFFICER, GOPIBALLAVPUR-II 1B-243/2012 VILLAGE, GOPIBALLAVPUR- BLOCK II BLOCK
07-02-2013
2.11000
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 07-02-2013 SANCTIONED AMOUNT 3.46000 RELEASED AMOUNT 3.43955 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS
NO. 80.3 CONSTRUCTION OF BLOCK DEVELOPMENT 36/PM(F)/P/ CULVERT NEAR EKUR PRY. OFFICER, GOPIBALLAVPUR-II 1B-243/2012 SCHOOL, GOPIBALLAVPUR- BLOCK II BLOCK
3.43955 COMPLETE
05-03-2013
49.67589
100%
COMPLETE
82 CONSTRUCTION OF CHIEF EXECUTIVE OFFICER, 65/PM(F)/P/ ADDITIONAL CLASSROOMS PASCHIMANCHAL UNNAYAN 1B-153/2012 OF KENDIJAMBANI ICDS PARSHAD THROUGH BDO CENTRE, GARHBETA-III BLOCK (ADDL. AMOUNT)
05-03-2013
0.54882
0.41300
100%
0.41300 COMPLETE
83 INFRASTRUCTURAL SECRETARY, SIJUA MSK DEVELOPMENT (BOUNDARY WALL 12,91,449/- & SCHOOL BUILDING 24,74,328/-) OF SIJUA MSK, BINPUR-I PS
66/PM(F)/P/ 1B-18/2013
05-03-2013
37.65777
37.65777
84 INSTALLATION OF MINI DEEP TUBE-WELL AT BARAMESHA MOUZA, SALBONI BLOCK (ADDL. SANCTION)
08-03-2013
2.68887
2.17864
100%
2.17864 COMPLETE
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS SCHOOL AUTHORITY, JHARGRAM BANITIRTHA HIGH SCHOOL (HS) PUA DEPT.'S SANCTION ORDER NO. 76/PM(F)/P/ 1B-19/2013 DATE 14-03-2013 SANCTIONED AMOUNT 8.21248 RELEASED AMOUNT 8.21248 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION ` IN LAC REMARKS
86.1 CONSTRUCTION OF BORE TEACHER-IN-CHARGE, WELL AND BOUNDARY KAPGARI SEVA BHARATI WALL AROUND TRIBAL MAHAVIDYALAYA HOSTEL ATTACHED AT KAPGARI SEVA BHARATI MAHAVIDYALAYA, KAPGARI MOUZA
78/PM(F)/P/ 1B-31/2013
18-03-2013
6.93129
6.93129
86.2 ADDITION AND TEACHER-IN-CHARGE, ALTERATION OF GROUND KAPGARI SEVA BHARATI FLOOR AND FIRST FLOOR MAHAVIDYALAYA OF TRIBAL HOSTEL BUILDING AT KAPGARI SEVA BHARATI MAHAVIDYALAYA, KAPGARI MOUZA 87 DEVELOPMENT OF PLAY GROUND AT AMLASOLE UNDER BINPUR-II BLOCK (TOTAL SANCTION 1,02,452/-)
78/PM(F)/P/ 1B-31/2013
18-03-2013
44.67335
44.67335
55%
WORK IN PROGRESS
19-03-2013
0.14860
0.14860
DISTRICT: PASCHIM MEDINIPUR DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 18-03-2013 SANCTIONED AMOUNT 27.20384 RELEASED AMOUNT 26.60348 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS
88 CONSTRUCTION OF RCC SLAB CULVERT OVER BAJUDIHA KHAL UNDER BERAJAL GRAM PANCHAYAT, NAYAGRAM PANCHAYAT SAMITY 89.1 NERAKOPA MINI PIPED WATER SUPPLY SCHEME, GARHBETA-III PANCHAYAT SAMITY
26.60348 COMPLETE
97/PM(F)/P/ 1B-125/2012
18-03-2013
18.67077
18.67077
89.2 DWARIGERIA MINI PIPED WATER SUPPLY SCHEME, GARHBETA-III PANCHAYAT SAMITY
97/PM(F)/P/ 1B-125/2012
18-03-2013
17.95473
17.95473
90 CONSTRUCTION OF HOSTEL BUILDING ATTACHED TO SALANGA GOPINATHPUR VIVEKANANDA VIDYAPITH (HIGH SCHOOL), KESHPUR BLOCK TOTAL:
101/PM(F)/P /1B-20/2013
26-03-2013
24.99440
24.99440
60%
5058.71832
3414.74922
2209.19734
DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS BLOCK DEVELOPMENT OFFICER, BAGHMUNDI BLOCK PUA DEPT.'S SANCTION ORDER NO. 82/PM(F)/P/ 1B-69/2012 DATE 03-05-2012 SANCTIONED AMOUNT 2.86800 RELEASED AMOUNT 2.70086 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 12-11-2012 ` IN LAC REMARKS
2.70086 COMPLETED
1.2 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM HELIPAD TO TURGA OFFICER, BAGHMUNDI FALLS IN BAGHMUNDI BLOCK GRAM PANCHAYAT (PARTI) 1.3 CONST. OF SOPARAMBERA BLOCK DEVELOPMENT NICHPARA TO UPAR PARA OFFICER, BAGHMUNDI P.C.C. ROAD IN AJODHYA BLOCK GRAM PANCHAYAT
82/PM(F)/P/ 1B-69/2012
03-05-2012
24.02200
17.16683
100%
28-11-2012
17.16683 COMPLETED
82/PM(F)/P/ 1B-69/2012
03-05-2012
9.03500
7.52028
100%
15-10-2012
7.52028 COMPLETED
1.4 CONST. OF KULTAR VILLAGE ROAD P.C.C. AT AJODHYA GRAM PANCHAYAT 1.5 CONST. OF SIMULBERA VILLAGE ROAD P.C.C. AT AJODHYA GRAM PANCHAYAT
82/PM(F)/P/ 1B-69/2012
03-05-2012
5.72000
5.72000
100%
5.72000 COMPLETED
82/PM(F)/P/ 1B-69/2012
03-05-2012
2.61000
2.61000
100%
25-11-2012
2.61000 COMPLETED
DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS BLOCK DEVELOPMENT OFFICER, BAGHMUNDI BLOCK PUA DEPT.'S SANCTION ORDER NO. 82/PM(F)/P/ 1B-69/2012 DATE 03-05-2012 SANCTIONED AMOUNT 6.00000 RELEASED AMOUNT 6.00000 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 15-11-2012 ` IN LAC REMARKS
6.00000 COMPLETED
82/PM(F)/P/ 1B-69/2012
03-05-2012
2.61000
2.61000
100%
24-08-2012
2.61000 COMPLETE
1.8 CONST. OF KENDGUTU TO BLOCK DEVELOPMENT BHURSABERA P.C.C. ROAD OFFICER, BAGHMUNDI AT AJODHYA GRAM BLOCK PANCHAYAT 1.9 CONST. OF DUNGRI VILLAGE P.C.C. ROAD IN BURDA-KALIMATI GRAM PANCHAYAT 1.10 CONST. OF ICHHAKOTO VILLAGE P.C.C. ROAD IN BURDA-KALIMATI GRAM PANCHAYAT 1.11 CONST. OF BASARE TO DUNGRIDIH ROAD IN AJODHYA GRAM PANCHAYAT BLOCK DEVELOPMENT OFFICER, BAGHMUNDI BLOCK
82/PM(F)/P/ 1B-69/2012
03-05-2012
3.04000
3.01176
100%
3.01176 COMPLETE
82/PM(F)/P/ 1B-69/2012
03-05-2012
15.04900
13.27616
100%
13.27616 COMPLETE
82/PM(F)/P/ 1B-69/2012
03-05-2012
15.04900
13.47469
100%
13.47469 COMPLETE
82/PM(F)/P/ 1B-69/2012
03-05-2012
6.17200
6.17200
100%
30-08-2012
6.17200 COMPLETE
DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS BLOCK DEVELOPMENT OFFICER, BAGHMUNDI BLOCK PUA DEPT.'S SANCTION ORDER NO. 82/PM(F)/P/ 1B-69/2012 DATE 03-05-2012 SANCTIONED AMOUNT 2.91900 RELEASED AMOUNT 2.91900 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 31-08-2012 ` IN LAC REMARKS
2.91900 COMPLETE
1.13 CONST. OF BHUINGHORA BLOCK DEVELOPMENT VILLAGE P.C.C. ROAD IN OFFICER, BAGHMUNDI AJODHYA GRAM BLOCK PANCHAYAT 1.14 CONST. OF HATINADA VILLAGE P.C.C. ROAD IN AJODHYA GRAM PANCHAYAT 1.15 CONST. OF DARUDIH VILLAGE P.C.C. ROAD IN AJODHYA GRAM PANCHAYAT 1.16 CONST. OF BONGADA (SANTAL PARA) VILLAGE P.C.C. ROAD IN AJODHYA GRAM PANCHAYAT 1.17 CONST. OF KAMLABAHAL VILLAGE P.C.C. ROAD IN AJODHYA GRAM PANCHAYAT BLOCK DEVELOPMENT OFFICER, BAGHMUNDI BLOCK
82/PM(F)/P/ 1B-69/2012
03-05-2012
5.82300
5.57933
100%
19-10-2012
5.57933 COMPLETED
82/PM(F)/P/ 1B-69/2012
03-05-2012
5.85700
5.70125
100%
18-08-2012
5.70125 COMPLETED
82/PM(F)/P/ 1B-69/2012
03-05-2012
5.89000
5.89000
100%
11-10-2012
5.89000 COMPLETED
82/PM(F)/P/ 1B-69/2012
03-05-2012
5.79000
5.79000
100%
14-02-2013
5.79000 COMPLETED
82/PM(F)/P/ 1B-69/2012
03-05-2012
5.84000
5.84000
100%
5.84000 COMPLETED
DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 82/PM(F)/P/ 1B-69/2012 DATE 03-05-2012 SANCTIONED AMOUNT 5.75500 RELEASED AMOUNT 5.75500 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 08-11-2012 ` IN LAC REMARKS
1.18 CONST. OF KUCHRIRAKHA BLOCK DEVELOPMENT VILLAGE P.C.C. ROAD IN OFFICER, BAGHMUNDI AJODHYA GRAM BLOCK PANCHAYAT 2 CONSTRUCTION OF SMALL BLOCK DEVELOPMENT CULVERTS AND GUARD OFFICER, BAGHMUNDI WALL ON PUCCA ROAD BLOCK ALONG WITH PCC TO PROPOSED BAGHMUNDI POLYTECHNIC SITE IN BAGHMUNDI BLOCK
5.75500 COMPLETED
97/PM(F)/P/ 1B-83/2012
31-05-2012
20.21388
10.97533
10.68147 WORK COMPLETE FOR CULVERT & GUARD WALL; ROAD NOT STARTED AS ESTIMATE REVISED BDO HAS BEEN REQUESTED TO SUBMIT ALTERNATIVE SCHEME AS THE SANCTIONED SCHEME ALREADY COMPLETED
112/PM/P/1 B-101/2012
11-06-2012
2.00000
DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 112/PM/P/1 B-101/2012 DATE 11-06-2012 SANCTIONED AMOUNT 2.50000 RELEASED AMOUNT PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION ` IN LAC REMARKS
3.2 CONSTRUCTION OF ROAD BLOCK DEVELOPMENT AT NABAGRAM, OFFICER, NETURIA BLOCK KHAWASPARA
BDO HAS BEEN REQUESTED TO TAKE UP THE SCHEME VIDE NO. 807/PUP/BNK/ 1S-116/12 DATED 18-072012 59.54367 50% 59.54367 WORK IN PROGRESS
4 CONSTRUCTION OF GROUND FLOOR OF KOTSHILA MAHAVIDYALAYA AT KOTSHILA, P.O.-JIUDARU 5 CONSTRUCTION OF COMMUNITY HALL AT TUNTURI
113/PM(F)/P /1B-96/2012
11-06-2012
114.88371
114/PM(F)/P /1B110/2012
12-06-2012
13.35423
6.54633
40%
12-06-2012
16.90770
10.92300
80%
7 CONSTRUCTION OF 3 NOS. HEADMASTER, KASHIDIH CLASSROOM AND C.R.C.G. VIDYAPITH BOUNDARY WALL AT KASHIDIH C.R.C.G. VIDYAPITH
12-06-2012
39.31213
39.31213
50%
DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS HEADMASTER, JITUJURI DEBASISH HIGH SCHOOL (H.S.) PUA DEPT.'S SANCTION ORDER NO. 121/PM(F)/P /1B108/2012 122/PM(F)/P /1B109/2012 DATE 12-06-2012 SANCTIONED AMOUNT 21.66977 RELEASED AMOUNT 10.83488 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION ` IN LAC REMARKS
9 CONSTRUCTION OF HEADMASTER, TATARIHOSTEL BUILDING AND KENDADIH HIGH SCHOOL SCHOOL BOUNDARY WALL AT TATARI-KENDADIH HIGH SCHOOL
12-06-2012
25.13340
25.13340
100%
25.13340 COMPLETE
10 CONSTRUCTION OF TWO BLOCK DEVELOPMENT 123/PM(F)/P CLASS ROOM AT OFFICER, BARABAZAR BLOCK /1BBADALDIH HIGH SCHOOL, 103/2012 BARABAZAR BLOCK 11 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM ANARA SHIV OFFICER, PARA BLOCK MANDIR TO ANARA BUS STAND (1.60 KM), PARA 124/PM(F)/P /1B114/2012
12-06-2012
14.13534
11.41001
100%
11.41001 COMPLETE
12-06-2012
14.28769
14.28769
100%
14.28769 COMPLETE
127/PM(F)/P /1B104/2012
12-06-2012
14.13534
11.99356
100%
15-02-2012
11.78770 COMPLETE
DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 128/PM(F)/P /1B102/2012 DATE 13-06-2012 SANCTIONED AMOUNT 26.42877 RELEASED AMOUNT 25.86574 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS
13 CONSTRUCTION OF BLOCK DEVELOPMENT BOUNDARY WALL, REPAIR OFFICER, ARSHA BLOCK AND RENOVATION OF BUILDING OF MUDALI R.N.M. HIGH SCHOOL, ARSHA
25.86574 COMPLETE
14 EXCAVATION OF A SILTED SECRETARY, RAMAKRISHNA 141/PM(F)/P POND AT KHUKRAMURA MISSION VIDYAPITH, /1BVILLAGE, ARSHA PURULIA 122/2012
25-06-2012
24.99686
24.99686
100%
23.47824 COMPLETE
15 PIPED LINE DRINKING WATER SUPPLY FOR 97 NOS. ANGANWADI CENTRES AT KASHIPUR & NETURIA BLOCKS
144/PM(F)/P /1B121/2012
25-06-2012
9.26611
9.26611
100%
COMPLETE
16 CONSTRUCTION OF A ADHYAKSHA, RAMAKRISHNA 145/PM(F)/P LIBRARY AND READING MATH, BAGDA, PURULIA /1BROOM CUM COMMUNITY 123/2012 HALL AT RAMAKRISHNA MATH, BAGDA 17 CONSTRUCTION OF BIDHAKATA JORE-CUMCULVERT BLOCK DEVELOPMENT OFFICER, SANTURI BLOCK 159/PM(F)/P /1B136/2012
25-06-2012
25.00000
25.00000
65%
11-07-2012
24.86748
DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS BLOCK DEVELOPMENT OFFICER, BALARAMPUR BLOCK PUA DEPT.'S SANCTION ORDER NO. 165/PM(F)/P /1B128/2012 DATE 12-07-2012 SANCTIONED AMOUNT 16.94634 RELEASED AMOUNT 16.10281 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS
18.1 CONSTRUCTION OF CLASSROOMS AT GHATBERA KEROWA H.S. SCHOOL 18.2 DEVELOPMENT OF PLAY FIELD OF LAGDA HIGH SCHOOL (H.S.)
16.10281 COMPLETE
165/PM(F)/P /1B128/2012
12-07-2012
14.17509
11.26578
100% MAY'2013
11.26578 COMPLETE
165/PM(F)/P /1B128/2012
12-07-2012
15.15221
18.4 CONSTRUCTION OF ROAD BLOCK DEVELOPMENT 165/PM(F)/P BRIDGE AT ARABAID JORE OFFICER, BARABAZAR BLOCK /1B128/2012
12-07-2012
24.56084
165/PM(F)/P /1B128/2012
12-07-2012
15.81713
WORK ORDER ISSUED, SCHEME RUNNING WORK ORDER ISSUED, SCHEME RUNNING
18.6 CONSTRUCTION OF BLOCK DEVELOPMENT CULVERT WITH OFFICER, BALARAMPUR GUARDWALL AT CHITAHA BLOCK VILLAGE
165/PM(F)/P /1B128/2012
12-07-2012
6.15369
DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 16-07-2012 SANCTIONED AMOUNT 17.06713 RELEASED AMOUNT 17.06713 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION ` IN LAC REMARKS
NO. 19 CONSTRUCTION OF 1ST HEADMASTER, GARHJOYPUR 174/PM(F)/P FLOOR BUILDING WITHIN SHRI SHRI RAMKRISHNA /1BGARHJOYPUR SHRI SHRI VIVEKANANDA ASHRAM 135/2012 RAMKRISHNA VIVEKANANDA ASHRAM 20 CONSTRUCTION OF SECRETARY, BHARAT GROUND FLOOR (PHASE-I: SEVASHRAM SANGHA, 24.84568 LAC & PHASE-II: PURULIA 12.32675 LAC) OF A HOSTEL BUILDING FOR SC, ST AND OBC STUDENTS AT THE AJODHYA HILL TOP, BAGHMUNDI P.S. 21.1 EXTENSION OF HOSPITAL SECRETARY, NANRITAM BUILDING AND CONST. OF STAFF QUARTERS OF LOKESWARANANDA EYE FOUNDATION, PARA (50% OF REMAINING AMOUNT) 176/PM(F)/P /1B147/2012
16-07-2012
37.17243
37.17243
182/PM(F)/P /1B-09/2012
24-07-2012
56.56642
56.56642
95%
26.11229
21.2 PURCHASING OF SECRETARY, NANRITAM EQUIPMENTS, INCLUDING SURGICAL EQUIPMENT, 2ND PHASE OF LOKESWARANANDA EYE FOUNDATION, PARA (FULL REMAINING AMOUNT)
182/PM(F)/P /1B-09/2012
24-07-2012
91.28300
91.28300
95%
85.01005
DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 182/PM(F)/P /1B-09/2012 DATE 24-07-2012 SANCTIONED AMOUNT 1.67708 RELEASED AMOUNT 1.67708 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% 1.67708 ` IN LAC REMARKS
21.3 MOBILE VAN OF SECRETARY, NANRITAM LOKESWARANANDA EYE FOUNDATION, PARA (FULL REMAINING AMOUNT) 22.1 CONSTRUCTION OF PCC ROAD FROM BAGHRA TO KOLABANDH, PURULIA-II BLOCK
01-08-2012
19.99650
BDO HAS BEEN REQUESTED TO TAKE UP THE SCHEME VIDE NO. 988/PUP/BNK/ 1S-152/12 DATED 17-082012 13.84730 100% 13.84730 COMPLETE
01-08-2012
19.99304
22.3 CONSTRUCTION OF PIPE- BLOCK DEVELOPMENT 207/PM(F)/P CAUSEWAY AT HUTMURA, OFFICER, PURULIA-II BLOCK /1BPURULIA-II BLOCK 163/2012
01-08-2012
14.77170
14.29116
100%
14.29116 COMPLETE
DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 01-08-2012 SANCTIONED AMOUNT 15.31920 RELEASED AMOUNT 14.86673 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS
NO. 22.4 CONSTRUCTION OF LOW BLOCK DEVELOPMENT 207/PM(F)/P LEVEL BRIDGE OR OFFICER, PURULIA-II BLOCK /1BCAUSEWAY AT LALBAZAR163/2012 PURDA, PURULIA-II BLOCK
14.86673 COMPLETE
23 CONSTRUCTION OF 1ST FLOOR OF COMMUNITY HALL AT LALPUR, HURA BLOCK 24 CONSTRUCTION OF SCHOOL BUILDING OF SIMAKANALI SIDDIKA MADRASAH SHIKSHA KENDRA, PUNCHA PS
270/PM(F)/P /1B182/2012
28-08-2012
48.86409
26.24129
50%
136/PM(F)/P /1B176/2012
28-05-2013
23.51743
12.10120
50%
12.10120 ONGOING
25 IMPROVEMENT OF ROAD BLOCK DEVELOPMENT FROM ANARA SHIV OFFICER, PARA BLOCK MANDIR TO ANARA BUS STAND (PART-B, C, & D), PARA
277/PM(F)/P /1B114/2012
30-08-2012
75.10098
65.79291
70%
DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 30-08-2012 SANCTIONED AMOUNT 15.27580 RELEASED AMOUNT 15.27580 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION ` IN LAC REMARKS
26 CONSTRUCTION OF 2ND FLOOR FOR GYNAE, PEDIATRIC WARD, ELECTRICAL INSTALLATION AND ALLIED WORKS AT DEBEN MAHATO (SADAR) HOSPITAL
NO. EXECUTIVE ENGINEER, 279/PM(F)/P P.W.D., WESTERN ELECTICAL /1B-85/2011 DIVISION NO. - II
27 CONSTRUCTION OF BLOCK DEVELOPMENT 280/PM(F)/P CLASSROOMS AT BERADA OFFICER, BARABAZAR BLOCK /1BHIGHER SECONDARY 179/2012 SCHOOL, BARABAZAR BLOCK 28 CONSTRUCTION OF BRIDGE ON RIVER THAKURCHATANI NEAR GURRABERA, JHALDA-II BLOCK (ADDITIONAL FUND) BLOCK DEVELOPMENT OFFICER, JHALDA-II BLOCK 324/PM(F)/P /1B166/2011
31-08-2012
24.44847
24.09003
100%
23.73399 COMPLETE
27-09-2012
7.77867
WORK IN PROGRESS
29 RE-CONSTRUCTION WITH BLOCK DEVELOPMENT REPAIRING OF APPROACH OFFICER, JOYPUR BLOCK ROAD OF RANGANITARD CULVERT UNDER UPARKAHAN GP
325/PM(F)/P /1B199/2012
27-09-2012
5.13605
4.89772
100%
4.89772 COMPLETE
DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 326/PM(F)/P /1B198/2012 DATE 27-09-2012 SANCTIONED AMOUNT 52.92606 RELEASED AMOUNT 52.92606 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 80% 31-05-2013 ` IN LAC REMARKS
30 CONSTRUCTION OF ROAD DISTRICT MAGISTRATE, FROM GOPALPUR BUSPURULIA STAND TO BAGDA BUSSTAND VIA RASUDI (4 KM), PUNCHA BLOCK (PHASE-I & PHASE-II) 31 CONSTRUCTION OF BOUNDARY WALL OF MAIN BUILDING AT PATHARDIH BPHC, BAGHMUNDI BLOCK BLOCK DEVELOPMENT OFFICER, BAGHMUNDI BLOCK
327/PM(F)/P /1B201/2012
27-09-2012
33.32000
15.52902
70%
32 CONSTRUCTION OF CHECK BLOCK DEVELOPMENT 338/PM(F)/P DAM AT DHANSURA, OFFICER, PURULIA-II BLOCK /1BBELMA, CHAKIRBAN AND 162/2012 SENERA AMRA VILLAGE, PURULIA-II PS
05-10-2012
34.71569
14.34387
14.34387 BDO HAS BEEN REQUESTED TO TAKE UP THE SCHEME VIDE NO. 1424/PUP/BNK /1S-198/12 DATED 12/10/2012
33 ADDITIONAL EXPENDITURE FOR CONSTRUCTION OF 18 (EIGHTEEN) NOS. OF PCC ROAD IN BAGHMUNDI BLOCK
339/PM(F)/P /1B-69/2012
08-10-2012
10.36500
8.23995
8.23995
DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS BLOCK DEVELOPMENT OFFICER, JHALDA-I BLOCK PUA DEPT.'S SANCTION ORDER NO. 346/PM(F)/P /1B205/2012 DATE 10-10-2012 SANCTIONED AMOUNT 24.59000 RELEASED AMOUNT 12.15688 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION ` IN LAC REMARKS
34.1 CONSTRUCTION OF CULVERT ON SALDAHA RIVER AT GOKULNAGAR MOUZA UNDER JHALDA-I BLOCK
34.2 CONSTRUCTION OF BLACK BLOCK DEVELOPMENT TOP ROAD ON BOTH SIDE OFFICER, JHALDA-I BLOCK OF SALDAHA CULVERT IN GOKULNAGAR
346/PM(F)/P /1B205/2012
10-10-2012
12.46029
35 CONSTRUCTION OF MAIN PRINCIPAL, PURULIA GATE AND TWO NOS. OF POLYTECHNIC SECURITY ROOMS AT PURULIA POLYTECHNIC
350/PM(F)/P /1B207/2012
12-10-2012
5.50742
5.50742
100%
5.50742 COMPLETE
352/PM(F)/P /1B134/2011
16-10-2012
3.05053
37 CONSTRUCTION OF A SECRETARY, BHARAT PATIENT WAITING HALL IN SEVASHRAM SANGHA, PHASE-I & PHASE-II AT PURULIA BHARAT SEVASHRAM SANGHA CHARITABLE DISPENSARIES , PURULIA
353/PM(F)/P /1B210/2012
17-10-2012
40.43369
40.43369
15.30247
DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 18-10-2012 SANCTIONED AMOUNT 31.07141 RELEASED AMOUNT 31.07141 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 65% ` IN LAC REMARKS
38 CONSTRUCTION OF BOUNDARY WALL & SCHOOL BUILDING OF RAMAKRISHNA VIVEKANANDA MISSION AT BELKURI
39 CONSTRUCTION OF DISTRICT MAGISTRATE, BRIDGE ON TULIN MAGHA PURULIA ROAD ON SALDAH RIVER, JHALDA-I BLOCK
154.81423
154.81423
2%
31-03-2015
5.00000
BDO HAS BEEN REQUESTED TO TAKE UP THE SCHEME VIDE NO. 1688/PUP/BNK /1S-210/12 DATED 05/12/2012
09-11-2012
9.95945
9.94479
100%
9.94479 COMPLETE
DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 371/PM(F)/P /1B220/2012 DATE 20-11-2012 SANCTIONED AMOUNT 39.31756 RELEASED AMOUNT 39.31756 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 55% 31-07-2013 ` IN LAC REMARKS
41 CONSTRUCTION OF DISTRICT MAGISTRATE, GALLERY OF THE STADIUM PURULIA FOR TWO BLOCKS AT MANBHUM VICTORIA INSTITUTION IN TWO PHASE 42 CONSTRUCTION WORK OF HEADMASTER, EXISTING SCHOOL KUKRUDABAR PRIMARY BUILDING AT SCHOOL, BANDWAN KUKRUDABAR PRIMARY SCHOOL, BANDWAN BLOCK
389/PM(F)/P /1B214/2012
27-11-2012
2.80000
2.80000
43.1 CONSTRUCTION OF PCC BLOCK DEVELOPMENT 391/PM(F)/P ROAD FROM BILTORA OFFICER, PURULIA-II BLOCK /1BDEOGHORIA PARA TO 215/2012 BAURI BANDH, PURULIA-II BLOCK 43.2 CONSTRUCTION OF PCC ROAD FROM NADIHA ROAD TO PURANDIH VIA MALTHORE, BELMA, PURULIA-II BLOCK BLOCK DEVELOPMENT 391/PM(F)/P OFFICER, PURULIA-II BLOCK /1B215/2012
27-11-2012
3.50000
0.08436
27-11-2012
10.50000
9.85288
100%
9.85288 COMPLETE
44.1 CONSTRUCTION OF ROAD BLOCK DEVELOPMENT FROM GARAFUSRO OFFICER, PURULIA-I BLOCK SHIVAMANDIR TO GARAFUSRO JORE, PURULIA-I BLOCK
392/PM(F)/P /1B127/2012
27-11-2012
24.64165
24.31300
100% MAY'2013
23.85706 COMPLETE
DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 392/PM(F)/P /1B127/2012 DATE 27-11-2012 SANCTIONED AMOUNT 10.01256 RELEASED AMOUNT 8.19331 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% MAY'2013 ` IN LAC REMARKS
44.2 CONSTRUCTION OF BLOCK DEVELOPMENT CONCRETE ROAD FROM OFFICER, PURULIA-I BLOCK BALIAGARA SHIVAMANDIR TO BOSTOMTUPA JORE, PURULIA-I BLOCK
8.01139 COMPLETE
44.3 CONSTRUCTION OF ROAD BLOCK DEVELOPMENT FROM GHARJURI TO OFFICER, PURULIA-I BLOCK GARAFUSRO VILLAGE, PURULIA-I BLOCK
392/PM(F)/P /1B127/2012
27-11-2012
19.80377
0.36760
MAY'2013
44.4 CONSTRUCTION OF ROAD BLOCK DEVELOPMENT FROM DULMI 40 QUARTER OFFICER, PURULIA-I BLOCK TO RAIBUNDH MORE, PURULIA-I BLOCK
392/PM(F)/P /1B127/2012
27-11-2012
19.80377
18.47510
100% MAY'2013
18.47510 COMPLETE
44.5 CONSTRUCTION OF BLOCK DEVELOPMENT CONCRETE ROAD FROM OFFICER, PURULIA-I BLOCK MANGURIA SHIVAMANDIR TO OLD BEGUNKODAR ROAD, PURULIA-I BLOCK
392/PM(F)/P /1B127/2012
27-11-2012
10.72774
8.89049
100% MAY'2013
8.89049 COMPLETE
45 CONSTRUCTION OF HEADMASTER, PARA SHIB BOUNDARY WALL AT PARA NARAYAN HIGH SCHOOL SHIB NARAYAN HIGH (H.S.) SCHOOL (H.S.), PARA BLOCK
409/PM(F)/P /1B234/2012
11-12-2012
23.51551
23.51551
100%
23.51551 COMPLETE
DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 413/PM(F)/P /1B-01/2012 DATE 13-12-2012 SANCTIONED AMOUNT 17.22960 RELEASED AMOUNT 8.61480 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION ` IN LAC REMARKS
46 CONSTRUCTION OF SCHOOL AUTHORITY, CLASSROOM AT CHELYAMA B.P. HIGH CHELYAMA B.P. HIGH SCHOOL SCHOOL, RAGHUNATHPURII BLOCK 47.1 CONSTRUCTION OF BLOCK DEVELOPMENT CULVERT AT KALIMATI OFFICER, BAGHMUNDI MORE TO BIDDRI ROAD IN BLOCK SERENGHDIH G.P., BAGHMUNDI BLOCK 47.2 CONSTRUCTION OF BLOCK DEVELOPMENT CULVERT ON BUKHADIH OFFICER, BAGHMUNDI TO SARAMCHAKI ROAD IN BLOCK BURDA-KALIMATI G.P., BAGHMUNDI BLOCK 47.3 CONSTRUCTION OF CULVERT ON THE ROAD SURJANDIH TO KAMALBAHAL ROAD IN AJODHYA G.P., BAGHMUNDI BLOCK BLOCK DEVELOPMENT OFFICER, BAGHMUNDI BLOCK
417/PM(F)/P /1B233/2012
13-12-2012
24.91970
24.05276
100%
24.05276 COMPLETE
417/PM(F)/P /1B233/2012
13-12-2012
24.91970
0.54360
417/PM(F)/P /1B233/2012
13-12-2012
24.91970
0.54360
48 SUPPLYING OF DRINKING EE, CIVIL, PHE DTE., PURULIA 418/PM(F)/P WATER BY LAYING PIPE /1BLINE TO 9 (NINE) NOS. OF 237/2012 ANGANWARI CENTRES IN PARA ICDS PROJECT
13-12-2012
0.97038
0.97038
DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER DATE 14-12-2012 SANCTIONED AMOUNT 3.35674 RELEASED AMOUNT 3.35674 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 100% ` IN LAC REMARKS
3.35674 COMPLETE
50 CONSTRUCTION OF PCC DISTRICT MAGISTRATE, ROAD FROM SATNALA PURULIA STREAM TO MAMUDIH VILLAGE (3.0 KM) WITHIN JHALDA-II BLOCK 51 CONSTRUCTION OF OFFICE HEADMASTER, R.B.B. HIGH BUILDINGS OF R.B.B. HIGH SCHOOL (H.S.) SCHOOL (H.S.) AT GARHJOYPUR
424/PM(F)/P /1B-70/2012
18-12-2012
119.22956
119.22956
25%
30-09-2013
426/PM(F)/P /1B249/2012
18-12-2012
19.30177
19.30177
50%
52 CONSTRUCTION OF 2 NOS. HEADMASTER, MANIPUR 435/PM(F)/P OF CLASSROOMS SWAMI VIVEKANANDA HIGH /1BINCLUDING STAIRCASE AT SCHOOL (H.S.) 256/2012 MANIPUR SWAMI VIVEKANANDA HIGH SCHOOL (H.S.) 53 CONSTRUCTION OF BRIDGE ON SATNALA, JHALDA-II BLOCK DISTRICT MAGISTRATE, PURULIA 17/PM(F)/P/ 1B-70/2012
20-12-2012
16.36239
16.36239
8.18100
24-01-2013
4.45262
DISTRICT: PURULIA DETAILS OF SCHEMES SANCTIONED BY DEPTT. OF PUA IN THE FINANCIAL YEAR 2012-13 SL. NO. NAME OF THE SCHEME IMPLEMENTING AGENCY WITH CONTACT DETAILS PUA DEPT.'S SANCTION ORDER NO. 29/PM(F)/P/ 1B-143/2012 DATE 04-02-2013 SANCTIONED AMOUNT 149.72598 RELEASED AMOUNT 149.72598 PHYSICAL EXPECTED DATE UC RECEIVED PROGRESS OF COMPLETION 20% 30-09-2013 ` IN LAC REMARKS
54 CONSTRUCTION OF PUCCA DISTRICT MAGISTRATE, ROAD FROM TELEKOCHA PURULIA TO JAMUNA BANDH (5.70 KM), MANBAZAR-II BLOCK
55 CONSTRUCTION OF A ADHYAKSHA, RAMAKRISHNA 74/PM(F)/P/ LIBRARY AND READING MATH, BAGDA, PURULIA 1B-123/2012 ROOM CUM COMMUNITY HALL AT RAMAKRISHNA MATH, BAGDA (ADDL. FUND) 56 CONSTRUCTION OF BLOCK DEVELOPMENT ADDITIONAL CLASSROOMS OFFICER, BALARAMPUR AT BALARAMPUR PHOOL BLOCK CHAND HIGH SCHOOL, BALARAMPUR BLOCK 95/PM(F)/P/ 1B-22/2013
13-03-2013
19.52958
19.52958
18-03-2013
14.88602
BDO REQUESTED VIDE NO. 640/PUP/BNK/ 1S-278/12 DT. 22-03-2013 1669.37295 963.35976
TOTAL:
2128.55477