PLUMBING
Materials and Estimated Quantities Required Item to be Estimated DESCRIPTION pcs FIXTURES WATER CLOSET LAVATORY SOAP HOLDER TISSUE HOLDER FAUCETS SHOWER HEAD KITCHEN SINK CLEAN WATER LINE SUPPLY PIPE (Dia. = 19 mm X 4M) Commercial Length = Total Pipe length = Total No. of C/L = ELBOW TEE UNION PATENTE CHECK VALVE COUPLING GATE VALVE WATER METER METER SHUT-OFF SEWER/SANITARY LINE SOIL PVC PIPE (DIA. = 100MM) Commercial Length = Total Length = No. of Commercial Length = REDUCER TEE (50 x 75 mm) P TRAP (50 mm) FLOOR DRAIN VENT PVC PIPE (DIA.= 75mm) Commercial Length = Total Length = No. of Commercial Length = 1/8 BEND (50 mm) 1/4 BEND (50 mm) WYE (100 x 50mm) REDUCER SANITARY TEE (100 x 50 mm) PVC COUPLING 100MM 1/8 BEND W/ PLUG (DIA. = 100mm) SEPTIC VAULT CHB 6" CEMENT:CLASS A MORTAR = PLASTER(20MM) = SLAB & COVER = Total bags of Cement = SAND: MORTAR = PLASTER(20MM) = SLAB & COVER = 3.00 3.00 3.00 3.00 15.00 3.00 3.00 cu.m UNIT bags kg

FIXTURES

4.00 63.20 15.80

m m pcs

16.00 33.00 18.00 9.00 3.00 9.00 3.00 3.00 3.00

WATER LINE

4.00 30.30 7.58

m m pcs

8.00 6.00 12.00 9.00

SEWER/SANITARY LINE

4.00 20.00 5.00

m m pcs

5.00 3.00 3.00 12.00 3.00 3.00 6.00 188.00

21.97 5.18 7.56 34.72 1.22 0.29 1.93

bags bags bags bags cu.m cu.m cu.m

35.00

3.50

SEPTIC VAULT

Materials and Estimated Quantities Required Item to be Estimated DESCRIPTION pcs TOTAL SAND = SEPTIC VAULT GRAVEL STEEL BARS : 12MM X 6.00M Wall Area = 14.40 Slab Area = 3.00 Cover Area = 5.40 VERTICAL BAR PER C/L = 5.11 HORIZONTAL BAR PER C/L = 5.16 REINFORCEMENT BAR PER C/L = 16.63 TOTAL NO. OF BARS 6.00M = 26.90 G.I TIE WIRE :0.40 M NO.16 CHB REINFORCEMENT = 0.60 SLAB & COVER REINFORCEMENT = 1.47 TOTAL TIE WIRE = 2.07 CLEAN OUT PLUG SANITARY TEE 100M DRAINAGE (CATCH BASINS) NO. OF CATCH BASINS = 3 CHB 4" CEMENT:CLASS A AREA OF WALL= 4.20 AREA OF SLAB= 0.96 MORTAR = 6.41 PLASTER(20MM) = 1.51 SLAB & COVER = 0.86 Total bags of Cement = 8.79 SAND: MORTAR = 0.35 PLASTER(20MM) = 0.08 SLAB & COVER = 0.05 TOTAL SAND = 0.49 GRAVEL STEEL BARS : 10MM X 6.00M Wall Area = 4.20 Slab & cover Area = 0.86 VERTICAL BAR PER C/L = 1.49 HORIZONTAL BAR PER C/L = 1.51 REINFORCEMENT BAR PER C/L = 1.71 TOTAL NO. OF BARS 6.00M = 4.71 G.I TIE WIRE :0.40 M NO.16 CHB REINFORCEMENT = 0.18 SLAB & COVER REINFORCEMENT = 0.15 TOTAL TIE WIRE = 0.33 PVC PIPE 150 MM: Commercial Length = 4.00 Total Length = 8.50 No. of PVC PIPE per C/L = 2.13 PVC 1/4 BEND (100 MM) PVC DOWN SPOUT PIPE (100 MM): Commercial Length = 4.00 Total Length = 16.00 No. of PVC PIPE per C/L = 4.00 sq.m sq.m sq.m pcs pcs pcs pcs KG KG KG 3.00 3.00 3.43 cu.m 1.00 3.50 cu.m UNIT bags kg

27.00

2.50

sq.m sq.m bags bags bags bags cu.m cu.m cu.m cu.m

9.00

0.50

0.50 sq.m sq.m pcs pcs pcs pcs KG KG KG m m pcs 3.00 9.00 m m pcs 4.00

DRAINAGE (CATCH BASINS)

5.00

0.50

ITEM NO. 1

DESCRIPTION OF MATERIAL CONCRETE WORKS CEMENT SAND GRAVEL TIE WIRES 0.40 m by No. of Kg STEEL WORKS .016m by 9m Steel bars .01m by 12m Steel bars .016m by 7.5m Steel bars .01m by 7.5m Steel bars .012m by 7.5m Steel bars .012 by 9.0m Steel bars .012m by 6.0m Steel bars .012 by 10.50m Steel bars .012m by 12.0m Steel bars .016m by 10.50m Steel bars .016m by 6m Steel bars .01m by 9m Steel bars .016m by 6.0m Steel bars TILE WORKS 4" X 4" Size of Tile 6" X 6" Size of Tile 8" X 8" Size of Tile 10" X 10" Size of Tile 12" X 12" Size of Tile 16" X 16" Size of Tile CEMENT MORTAR (bags) WHITE CEMENT (kg) TILE ADHESIVE (bags) ROOFING MATERIALS 6m of 62.5 x 62.5 x 4.8mm 6m of 37.5 x 37.5x 4.8mm 6m of 50 x 150 x 4.8mm PAINTINGS ACRYLIC CONCRETE SEALER ACRYLIC GLOSS LATEX PAINT NEUTRALIZER ACRYLIC ROOF SHIELD WOOD PRIMER QUICK DRYING ENAMEL

QUANTITY UNITS 170 15 24 200 23 31 11 7 16 6 6 27 4 4 6 19 3 2940 95 199 553 131 302 21 75 24 12 60 18 14 14 6 16 8 8 BAG CU.M CU.M KG PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC PC BAGS KG BAGS PC PC PC GAL GAL GAL GAL GAL GAL

BILL OF MATERIAL MATERIAL COST UNIT TOTAL 150 200 280 60 284.04 147.84 236.7 145 133.2 159.84 106.56 186.48 190.15 331.38 390 110.88 189.36 18 22 25 34 42 55 25 25 25 315.16 220.14 250.14 328 650 580 650 600 625 25500 3000 6720 12000 6532.92 4583.04 2603.7 1015 2131.2 959.04 639.36 5034.96 760.6 1325.52 2340 2106.72 568.08 52920 2090 4975 18802 5502 16610 525 1875 600 3781.92 13208.4 4502.52 4592 9100 3480 10400 4800 5000 0 0

2 3

0 0

BILL OF MATERIAL LABOR COST UNIT TOTAL 45 60 84 18 85.212 44.352 71.01 43.5 39.96 47.952 31.968 55.944 57.045 99.414 117 33.264 56.808 5.4 6.6 7.5 10.2 12.6 16.5 7.5 7.5 7.5 94.548 66.042 75.042 98.4 195 174 195 180 187.5 0 0 7650 900 2016 3600 1959.876 1374.912 781.11 304.5 639.36 287.712 191.808 1510.488 228.18 397.656 702 632.016 170.424 15876 627 1492.5 5640.6 1650.6 4983 157.5 562.5 180 1134.576 3962.52 1350.756 1377.6 2730 1044 3120 1440 1500 0 0

DIRECT COST UNIT TOTAL 195 260 364 78 369.252 192.192 307.71 188.5 173.16 207.792 138.528 242.424 247.195 430.794 507 144.144 246.168 23.4 28.6 32.5 44.2 54.6 71.5 32.5 32.5 32.5 409.708 286.182 325.182 426.4 845 754 845 780 812.5 0 0 33150 3900 8736 15600 8492.796 5957.952 3384.81 1319.5 2770.56 1246.752 831.168 6545.448 988.78 1723.176 3042 2738.736 738.504 68796 2717 6467.5 24442.6 7152.6 21593 682.5 2437.5 780 4916.496 17170.92 5853.276 5969.6 11830 4524 13520 6240 6500 0 0

INDIRECT COST UNIT TOTAL 14.625 19.5 27.3 5.85 27.6939 14.4144 23.07825 14.1375 12.987 15.5844 10.3896 18.1818 18.539625 32.30955 38.025 10.8108 18.4626 1.755 2.145 2.4375 3.315 4.095 5.3625 2.4375 2.4375 2.4375 30.7281 21.46365 24.38865 31.98 63.375 56.55 63.375 58.5 60.9375 0 0 2486.25 292.5 655.2 1170

BID AMOUNT UNIT TOTAL 209.625 279.5 391.3 83.85 35636.25 4192.5 9391.2 16770

636.9597 396.9459 9129.7557 446.8464 206.6064 6404.7984 253.86075 330.78825 3638.67075 98.9625 202.6375 1418.4625 207.792 186.147 2978.352 93.5064 223.3764 1340.2584 62.3376 148.9176 893.5056 490.9086 260.6058 7036.3566 74.1585 265.734625 1062.9385 129.2382 463.10355 1852.4142 228.15 545.025 3270.15 205.4052 154.9548 2944.1412 55.3878 264.6306 793.8918 5159.7 203.775 485.0625 1833.195 536.445 1619.475 51.1875 182.8125 58.5 368.7372 1287.819 438.9957 447.72 887.25 339.3 1014 468 487.5 0 0 25.155 30.745 34.9375 47.515 58.695 76.8625 34.9375 34.9375 34.9375 440.4361 307.64565 349.57065 458.38 908.375 810.55 908.375 838.5 873.4375 0 0 73955.7 2920.775 6952.5625 26275.795 7689.045 23212.475 733.6875 2620.3125 838.5 5285.2332 18458.739 6292.2717 6417.32 12717.25 4863.3 14534 6708 6987.5 0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

0 0

Earthworks

FORM WORKS Materials and Estimated Quantities Required Item to be Estimated Calculations C1F1 NO. OF MEMBERS = 2 EXCAVATION: Area of Excavation = 2.25 Depth of Excavation = 1.5 Volume of Excavation = 6.75 say 7.00 BACKFILL: additional = 25 Volume of C1F1 = 1.89 Volume of Backfill = 12.16 say 12.50 GRAVEL FILL (COLUMN FOOTING) thickness = 0.05 Area of Footing = 2.25 Volume of Gravel Fill (footing) = 0.23 0.50 say C2F2 NO. OF MEMBERS = 5 EXCAVATION: Area of Excavation = 1.96 Depth of Excavation = 1.5 Volume of Excavation = 14.7 say 15.00 BACKFILL: additional = 25 Volume of C2F2 = 3.52 Volume of Backfill = 69.86 say 72.00 GRAVEL FILL (COLUMN FOOTING) thickness = 0.05 Area of Footing = 1.96 Volume of Gravel Fill (footing) = 0.49 0.50 say C3F3 NO. OF MEMBERS = 1 EXCAVATION: Area of Excavation = 0.81 Depth of Excavation = 1.2 Volume of Excavation = 0.97 say 1.00 BACKFILL: EXCAVATION CU.M BACKFILL CU.M GRAVEL FILL CU.M

sq.m m cu.m cu.m % cu.m cu.m cu.m m sq.m cu.m cu.m

7.00

C1F1

12.50

0.50

sq.m m cu.m cu.m % cu.m cu.m cu.m m sq.m cu.m cu.m

15.00

C2F2

72.00

0.50

sq.m m cu.m cu.m

1.00

C3F3

FORM WORKS Materials and Estimated Quantities Required Item to be Estimated Calculations additional = 25 Volume of C3F3 = 0.34 Volume of Backfill = 0.79 say 1.00 GRAVEL FILL (COLUMN FOOTING) thickness = 0.05 Area of Footing = 0.81 Volume of Gravel Fill (footing) = 0.04 0.50 say C4F4 NO. OF MEMBERS = 3 EXCAVATION: Area of Excavation = 0.64 Depth of Excavation = 1.2 Volume of Excavation = 2.30 say 2.50 BACKFILL: additional = 25 Volume of C4F4 = 0.63 Volume of Backfill = 6.28 say 6.50 GRAVEL FILL (COLUMN FOOTING) thickness = 0.05 Area of Footing = 0.64 Volume of Gravel Fill (footing) = 0.10 0.50 say C5F5 NO. OF MEMBERS = 3 EXCAVATION: Area of Excavation = 0.49 Depth of Excavation = 0.9 Volume of Excavation = 1.32 say 1.50 BACKFILL: additional = 25 Volume of C5F5 = 0.48 Volume of Backfill = 3.17 say 3.50 GRAVEL FILL (COLUMN FOOTING) thickness = 0.05 Area of Footing = 0.49 Volume of Gravel Fill (footing) = 0.07 0.50 say C6F6 NO. OF MEMBERS = 5 EXCAVATION: Area of Excavation = 0.36 Depth of Excavation = 0.9 Volume of Excavation = 1.62 say 2.00 BACKFILL: additional = 25 Volume of C6F6 = 0.49 Volume of Backfill = 7.07 % cu.m cu.m cu.m m sq.m cu.m cu.m EXCAVATION CU.M BACKFILL CU.M GRAVEL FILL CU.M

C3F3

1.00

0.50

sq.m m cu.m cu.m % cu.m cu.m cu.m m sq.m cu.m cu.m

2.50

C4F4

6.50

0.50

sq.m m cu.m cu.m % cu.m cu.m cu.m m sq.m cu.m cu.m

1.50

C5F5

3.50

0.50

sq.m m cu.m cu.m % cu.m cu.m

2.00

C6F6

FORM WORKS Materials and Estimated Quantities Required C6F6 Item to be Estimated Calculations say 7.50 GRAVEL FILL (COLUMN FOOTING) thickness = 0.05 Area of Footing = 0.36 Volume of Gravel Fill (footing) = 0.09 0.50 say WF1 NO. OF MEMBERS = 1 EXCAVATION: Area of Excavation = 8.52 Depth of Excavation = 0.6 Volume of Excavation = 4.72 say 5.00 BACKFILL: additional = 25 Volume of WF1 = 4.16 Volume of Backfill = 0.70 say 1.00 GRAVEL FILL (WALL FOOTING) thickness = 0.05 Area of Footing = 8.52 Volume of Gravel Fill (footing) = 0.43 0.50 say WF2 NO. OF MEMBERS = 1 EXCAVATION: Area of Excavation = 6.52 Depth of Excavation = 0.6 Volume of Excavation = 3.91 say 4.00 BACKFILL: additional = 25 Volume of WF2 = 3.19 Volume of Backfill = 0.91 say 1.00 GRAVEL FILL (WALL FOOTING) thickness = 0.05 Area of Footing = 6.52 Volume of Gravel Fill (footing) = 0.33 0.50 say cu.m m sq.m cu.m cu.m EXCAVATION CU.M BACKFILL CU.M 7.50 GRAVEL FILL CU.M

0.50

sq.m m cu.m cu.m % cu.m cu.m cu.m m sq.m cu.m cu.m

5.00

WF1

1.00

0.50

sq.m m cu.m cu.m % cu.m cu.m cu.m m sq.m cu.m cu.m Total =

4.00

WF2

1.00

38cu.m

105cu.m

0.50 4cu.m

FORM WORKS Materials and Estimated Quantities Required EARTH FILL GRAVEL FILL CU.M CU.M

Item to be Estimated

Calculations AREA SLAB EARTH FILL Area of Excavation = Depth of Excavation =

103 sq.m 0.4 m

AREA SLAB

FORM WORKS Materials and Estimated Quantities Required Item to be Estimated Calculations Volume of Excavation = say GRAVEL FILL (SLAB) thickness = Area of Footing = Volume of Gravel Fill (slab) = say 41.20 cu.m 41.50 cu.m 0.2 103 20.60 21.00 m sq.m cu.m cu.m Total = EXCAVATION CU.M 41.50 BACKFILL CU.M GRAVEL FILL CU.M

AREA SLAB

41.5cu.m

21.00 21cu.m

Espayos, Jefferson F. Sales, Reniel A

Estimate Work Sheet


Name of project: Proposed 3 Units Residence Owner: Mrs. Violeta P. Baens Location: Lot 6-A-1, Pitong Gatang St., Tondo, Manila

Ground Floor
Mark 1 Description Column footing F-1 F-2 F-3 F-4 F-5 F-6 Column C-1 C-2 C-3 C-4 C-5 C-6 3 Slab on fill 10.00 4 Wall footing WF-1 WF-1 WF-1 WF-1 WF-1 WF-1 WF-1 WF-1 WF-1 WF-2 WF-2 10.30 0.10 1 Total 1 1 4 1 2 7 2 4 1 1 2 10.30 10.30 0.32 0.28 0.96 0.20 0.37 1.12 0.29 0.38 0.08 0.28 0.48 0.40 0.40 0.35 0.30 0.30 0.30 0.20 0.20 0.20 0.20 0.20 0.20 5.10 5.15 4.85 4.90 4.60 4.65 2 5 1 3 3 5 Total 0.82 2.06 0.34 0.88 0.83 1.40 6.32 L Dimension (m) W T 1.50 1.40 0.90 0.80 0.70 0.60 0.40 0.35 0.35 0.30 0.30 0.25 # of pieces Volume (m3) 2 5 1 3 3 5 Total 1.80 3.43 0.28 0.58 0.44 0.45 6.98

1.50 1.40 0.90 0.80 0.70 0.60

4.00 3.50 3.00 2.50 2.30 2.00 1.80 1.20 1.00 3.50 3.00

0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40

0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20

WF-2 WF-2 WF-2 WF-2 WF-2

2.50 2.30 2.00 1.80 1.20

0.40 0.40 0.40 0.40 0.40

0.20 0.20 0.20 0.20 0.20

1 2 4 2 2 Total

0.20 0.37 0.64 0.29 0.19 6.45

Mark 5

Description Stair Footing Stair Column Stair Wall Beam Steps = 14 Landing Soffits Soffits

Stair Details Dimension (m) H W 0.30 1.00 0.60 0.20 0.20 0.20 0.22 0.25 0.22 0.85 0.15 4.1 0.15 0.68

(m2) Area 0.30 0.12 0.04 0.03 0.19 0.62 0.10

(m) L 0.85 0.85 0.85 0.85 0.85 0.85 0.85 Total

(m3) Volume 0.26 0.10 0.03 0.33 0.16 0.52 0.09 1.49

Second Floor
Mark 6 Description Column C-2 PC PC 7 Beam B-1 B-1 B-2 B-2 B-3 B-3 B-3 B-3 CB-1 CB-2 CB-3 8 Slab S-1 S-1 S-2 S-3 4.00 3.15 4.00 2.00 3.00 3.50 1.81 0.80 0.10 0.10 0.10 0.10 1 1 1 1 1.20 1.10 0.72 0.16 4.00 2.00 3.50 3.00 4.00 3.50 3.00 2.00 1.81 0.80 0.80 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 0.40 3 1 1 1 1 2 1 1 2 1 2 Total 0.96 0.16 0.28 0.24 0.32 0.56 0.24 0.16 0.29 0.06 0.13 3.40 0.40 0.30 0.40 0.20 0.20 0.20 2.70 2.70 2.70 2 2 2 Total 0.43 0.32 0.43 1.19 Dimension (m) W L T # of pieces Volume (m3)

S-3 S-3

2.00 0.85

0.80 0.15

0.10 0.10

1 1 Total

0.16 0.01 3.36

Mark 9 Beams

Description

Roof Details Dimension (m) W L T 4.30 4.00 3.00 4.00 3.00 2.00 1.20 0.20 0.20 0.20 0.20 0.20 0.20 0.20 0.30 0.30 0.30 0.30 0.30 0.30 0.30

# of pieces Volume (m3)

RB-1 RB-1 RB-1 RB-2 RB-2 RB-3 RB-3

2 2 2 1 8 4 4 Total

0.52 0.48 0.36 0.24 1.44 0.48 0.29 3.80

Mark 1 2 3 4 5 6 7

Description Column Footing Column Beams Slab on Fill Slab Wall footing Stairs Total

Volume of Concrete (m3) 6.98 7.51 7.21 10.30 3.36 6.45 1.49 43.29

Mark 1 2 3 4 5

Description Column Footing Column Slab on Fill Wall footing Stairs

Volume of Concrete 6.98 6.32 10.30 6.45 1.49

Ground Floor Wastages 0.70 0.32 1.03 0.64 0.07

Total Volume 7.68 6.64 11.33 7.09 1.56

Item to be Estimated

Calculations Volume of Concrete = 6.98 10% Wastages = 0.70 Total Volume = 7.68 Using Class A Cement = 9.00 x total volume = 69.11 Sand = 0.50 x total volume = 3.84

Materials and Estimated Quantities Requi Cement bag(40kg)

Column Footing

70.00

Column Footing

70.00

Column

Slab on Fill

Wall Footing

Stairs

Gravel = 1.00 x total volume = Volume of Concrete = 6.32 5% Wastages = 0.32 Total Volume = 6.64 Using Class A Cement = 9.00 x total volume = Sand = 0.50 x total volume = Gravel = 1.00 x total volume = Volume of Concrete = 10.30 10% Wastages = 1.03 Total Volume = 11.33 Using Class C Cement = 6.00 x total volume = Sand = 0.50 x total volume = Gravel = 1.00 x total volume = Volume of Concrete = 6.45 10% Wastages = 0.64 Total Volume = 7.09 Using Class A Cement = 9.00 x total volume = Sand = 0.50 x total volume = Gravel = 1.00 x total volume = Volume of Concrete = 1.49 5% Wastages = 0.07 Total Volume = 1.56 Using Class A Cement = 9.00 x total volume = Sand = 0.50 x total volume = Gravel = 1.00 x total volume =

7.68

60.00 59.73 3.32 6.64

68.00 67.98 5.67 11.33

64.00 63.84 3.55 7.09

15.00 14.05 0.78 1.56

Total Volume (Ground Floor) Total number of Bags (Class A) Total number of Bags (Class C)

209.00 68.00

Cement 69.11 59.73 67.98 63.84 14.05

Sand 3.84 3.32 5.67 3.55 0.78

Gravel 7.68 6.64 11.33 7.09 1.56

Mark 1 2 3

Description Column Beam Slab

Item to be Estimated

Materials and Estimated Quantities Required Sand Gravel cu.m cu.m Column 4.00 8.00

Beam

4.00

8.00

Beam 3.50 7.00

Slab 6.00 11.50

Total Volume (Second Floor) Total number of Bags (Class A) 4.00 7.50 Mark 1 Description Beam

1.00

2.00

Item to be Estimated

Beam 18.50 36.00 -

Total Volume (Roof Details) Total number of Bags (Class A)

Materials and Estimated Quantities Re Total Volume (m3) Total number of Bags (Class A )

Total number of Bags (Class C )

Volume of Concrete 1.19 3.40 3.36

Second Floor Wastages 0.06 0.17 0.17

Total Volume 1.25 3.57 3.53

Cement 11.23 32.15 31.74

Sand 0.62 1.79 1.76

Calculations Volume of Concrete = 1.19 10% Wastages = 0.06 Total Volume = 1.25 Using Class A Cement = 9.00 x total volume = 11.23 Sand = 0.50 x total volume = 0.62 Gravel = 1.00 x total volume = 1.25 Volume of Concrete = 3.40

Materials and Estimated Quantities Required Cement Sand Gravel bag(40kg) cu.m cu.m

12.00

1.00

1.50

33.00

2.00

4.00

5% Wastages = 0.17 Total Volume = 3.57 Using Class A Cement = 9.00 x total volume = Sand = 0.50 x total volume = Gravel = 1.00 x total volume = Volume of Concrete = 3.36 10% Wastages = 0.17 Total Volume = 3.53 Using Class A Cement = 9.00 x total volume = Sand = 0.50 x total volume = Gravel = 1.00 x total volume =

33.00 32.15 1.79 3.57

2.00

4.00

32.00 31.74 1.76 3.53

2.00

4.00

Total Volume (Second Floor) Total number of Bags (Class A)

77.00

5.00 -

9.50 -

Volume of Concrete 3.80

Roof Details Wastages 0.19

Total Volume 3.99

Cement 35.95

Sand 2.00

Calculations Volume of Concrete = 3.80 5% Wastages = 0.19 Total Volume = 3.99 Using Class A Cement = 9.00 x total volume = 35.95 Sand = 0.50 x total volume = 2.00 Gravel = 1.00 x total volume = 3.99

Materials and Estimated Quantities Required Cement Sand Gravel bag(40kg) cu.m cu.m

36.00

2.00

4.00

Total Volume (Roof Details) Total number of Bags (Class A)

36.00

2.00 -

4.00 -

Materials and Estimated Quantities Required Total Volume (m3) Total number of Bags (Class A )

Cement 322.00

Sand 25.50 -

Gravel 49.50 -

Total number of Bags (Class C )

68.00

Gravel 1.25 3.57 3.53

Gravel 3.99

Painting

PAINTING Materials and Estimated Quantities Required Item to be Estimated Calculations PRIMER EPOXY PRIMER WOOD PRIMER PCS PER 4L PCS PER 4L PAINT QUICK DRYING ACRYLIC LATEX ENAMEL PCS PER 4L PCS PER 4L THINNER PCS PER 4L

MASONRY EXTERIOR WALL PRIMER COAT: Total Area = 149.39 Factor = 30 Primer Required per 4L = 4.98 EXTERIOR WALL say 5 PAINT: Total Area = 149.39 Factor = 30 Primer Required per 4L = 4.98 say 5 INTERIOR WALL PRIMER COAT: Total Area = 497.59 Factor = 30 Primer Required per 4L = 16.59 INTERIOR WALL say 17 PAINT: Total Area = 497.59 Factor = 30 Primer Required per 4L = 16.59 say 17 WOOD SURFACE GROUND FLOOR WOOD PRIMER Total Area = 109.67 Factor = 30 Primer Required per 4L = 3.66 say 4 PAINT: Total Area = 109.67 CEILING Factor = 30 Primer Required per 4L = 3.66 say 4 THINNER: Total Primer & Paint 7.31 Factor = 0.5 Total thinner = 3.66 say 4

sq.m /4L pcs pcs sq.m /4L pcs pcs

5.00

5.00

sq.m /4L pcs pcs sq.m /4L pcs pcs

17.00

17.00

sq.m /4L pcs pcs sq.m /4L pcs pcs gal. pcs pcs Total =

4.00

4.00

22 Gal.

4 Gal.

22 Gal.

4 Gal.

4.00 4 Gal.

TileWorks

TILEWORK (MATERIALS FOR TILING) Item to be Estimated Materials and Estimated Quantities Required Calculations UNIT 1 FLOOR Total Area = Cement Mortar = White cement = T&B FLOOR: Total Area = 2.40 Cement Mortar = 0.21 White cement = 1.20 6.40 Inside Cor. Perimeter = Internal Bead = 32.00 by direct counting: 4.00 Internal Corner Bead = WALL: T&B Total wall Area = 17.27 Cement Mortar = 1.49 White cement = 8.64 Vertical Perimeter = 12.00 Internal Bead = 60.00 6.40 Wall perimeter = 5.00 Door jamb length Capping = 57.00 4.00 Internal Corner Capping = 2.46 External Bead = 2.00 External Corner Capping = LAUNDRY AREA Total Area = 4.00 LAUNDRY AREA Cement Mortar = 0.34 White cement = 2.00 KITCHEN SINK/LAVATORY: Total Area = 1.28 Cement Mortar = 0.11 White cement = 0.64 1.70 Inside Cor. Perimeter = 8.50 Internal Bead = 0.70 External Bead = by direct counting: 1.00 Internal Corner Bead = 2.00 External Corner Bead = WALL: KITCHEN Total Area = 0.85 Cement Mortar = 0.07 White cement = 0.43 0.50 Inside Cor. Perimeter = 2.50 Internal Bead = 0.20 External Bead = 8.50 Capping = by direct counting: 1.00 Internal Corner Bead = 2.00 External Corner Bead = 1.00 Internal Corner Capping = 1.00 External Corner Capping = UNIT 2 FLOOR FLOOR Total Area = 18.00 sq.m bags Kg m pcs pcs sq.m bags Kg m pcs m m pcs pcs pcs pcs sq.m bags Kg 1.00 2.00 32.00 4.00 CEMENT BAGS W. CEMENT KG CAPPING PCS I.C.C PCS E.C.C PCS I.C.B PCS E.C.B PCS I.B (20cm) PCS E.B (2.44m) PCS

FLOOR

18.00 sq.m 1.55 bags 9.00 Kg

2.00 9.00

2.00 9.00 60.00

57.00 4.00 3.00 2.00

1.00 2.00

sq.m bags Kg m pcs pcs pcs pcs sq.m bags Kg m pcs pcs

1.00 1.00 9.00 1.00 1.00 2.00

1.00 1.00 3.00 1.00 9.00

pcs pcs pcs pcs

1.00 2.00 1.00 1.00

sq.m

TILEWORK (MATERIALS FOR TILING) Item to be Estimated Materials and Estimated Quantities Required Calculations Cement Mortar = White cement = T&B FLOOR: Total Area = 2.40 Cement Mortar = 0.21 White cement = 1.20 6.40 Inside Cor. Perimeter = Internal Bead = 32.00 by direct counting: 4.00 Internal Corner Bead = WALL: T&B Total wall Area = 19.20 Cement Mortar = 1.65 White cement = 9.60 Vertical Perimeter = 12.00 Internal Bead = 60.00 6.40 Wall perimeter = 5.00 Door jamb length Capping = 57.00 4.00 Internal Corner Capping = 2.46 External Bead = 2.00 External Corner Capping = LAUNDRY AREA Total Area = 4.00 LAUNDRY AREA Cement Mortar = 0.34 White cement = 2.00 KITCHEN SINK/LAVATORY: Total Area = 1.28 Cement Mortar = 0.11 White cement = 0.64 1.70 Inside Cor. Perimeter = 8.50 Internal Bead = 0.70 External Bead = by direct counting: 1.00 Internal Corner Bead = 2.00 External Corner Bead = WALL: KITCHEN Total Area = 0.85 Cement Mortar = 0.07 White cement = 0.43 0.50 Inside Cor. Perimeter = 2.50 Internal Bead = 0.20 External Bead = 8.50 Capping = by direct counting: 1.00 Internal Corner Bead = 2.00 External Corner Bead = 1.00 Internal Corner Capping = 1.00 External Corner Capping = GROUND FLOOR FLOOR Total Area = 18.00 FLOOR Cement Mortar = 1.55 White cement = 9.00 T&B FLOOR: Total Area = 4.00 Cement Mortar = 0.34 White cement = 2.00 8.00 Inside Cor. Perimeter = Internal Bead = 40.00 by direct counting: 4.00 Internal Corner Bead = WALL: T&B Total wall Area = 24.00 Cement Mortar = 2.06 White cement = 12.00 Vertical Perimeter = 12.00 sq.m bags Kg m pcs pcs sq.m bags Kg m pcs m m pcs pcs pcs pcs sq.m bags Kg 1.00 2.00 32.00 4.00 1.55 bags 9.00 Kg CEMENT BAGS 2.00 W. CEMENT KG 9.00 CAPPING PCS I.C.C PCS E.C.C PCS I.C.B PCS E.C.B PCS I.B (20cm) PCS E.B (2.44m) PCS

2.00 10.00 60.00

57.00 4.00 3.00 2.00

1.00 2.00

sq.m bags Kg m pcs pcs pcs pcs sq.m bags Kg m pcs pcs

1.00 1.00 9.00 1.00 1.00 2.00

1.00 1.00 3.00 1.00 9.00

pcs pcs pcs pcs

1.00 2.00 1.00 1.00

sq.m bags Kg

2.00 9.00

sq.m bags Kg m pcs pcs sq.m bags Kg m

1.00 2.00 40.00 4.00

3.00 12.00

T&B Item to be Estimated Calculations

TILEWORK (MATERIALS FOR TILING) Materials and Estimated Quantities Required CEMENT BAGS W. CEMENT KG CAPPING PCS I.C.C PCS E.C.C PCS I.C.B PCS E.C.B PCS I.B (20cm) PCS 60.00 E.B (2.44m) PCS

Internal Bead = 60.00 pcs 8.00 m Wall perimeter = 5.00 m Door jamb length Capping = 65.00 pcs 4.00 pcs Internal Corner Capping = 2.46 pcs External Bead = 2.00 pcs External Corner Capping = LAUNDRY AREA Total Area = 4.00 sq.m LAUNDRY AREA Cement Mortar = 0.34 bags White cement = 2.00 Kg KITCHEN SINK/LAVATORY: Total Area = 1.28 sq.m Cement Mortar = 0.11 bags White cement = 0.64 Kg 1.70 m Inside Cor. Perimeter = 8.50 pcs Internal Bead = 0.70 pcs External Bead = by direct counting: 1.00 pcs Internal Corner Bead = 2.00 pcs External Corner Bead = WALL: KITCHEN Total Area = 0.85 sq.m Cement Mortar = 0.07 bags White cement = 0.43 Kg 0.50 m Inside Cor. Perimeter = 2.50 pcs Internal Bead = 0.20 pcs External Bead = 8.50 Capping = by direct counting: 1.00 pcs Internal Corner Bead = 2.00 pcs External Corner Bead = 1.00 pcs Internal Corner Capping = 1.00 pcs External Corner Capping = SECOND FLOOR LIVING ROOM Total Area = 10.20 sq.m LIVING ROOM Cement Mortar = 0.88 bags White cement = 5.10 Kg CANOPY Total Area = 3.20 sq.m CANOPY Cement Mortar = 0.28 bags White cement = 1.60 Kg BEDROOM Total Area = 14.00 sq.m BEDROOM Cement Mortar = 1.20 bags White cement = 7.00 Kg BALCONY Total Area = 6.00 sq.m BALCONY Cement Mortar = 0.52 bags White cement = 3.00 Kg TOTAL =

65.00 4.00 3.00 2.00

1.00 2.00

1.00 1.00 9.00 1.00 1.00 2.00

1.00 1.00 3.00 1.00 9.00 1.00 2.00 1.00 1.00

1.00 6.00

1.00 2.00

2.00 7.00

1.00 30 bags 3.00 94 kg 206 pcs 15 pcs 9 pcs 18 pcs 12 pcs 320 pcs 15 pcs

TileWorks

TILEWORKS (TILES) Materials and Estimated Quantities Required Item to be Estimated Calculations 16" x 16" PCS UNIT 1 FLOOR Floor Area = 18.00 Factor = 6.25 Total no. tiles = 112.50 113 say T&B FLOOR: Floor Area = 2.40 T&B Factor = 100 Total no. tiles = 240.00 240 say WALL: Wall Area = 19.2 Wall Openning Area = 1.93 total Area = 17.27 Factor = 50 Total no. tiles = 863.50 864 say LAUNDRY AREA FLOOR: Floor Area = 4.00 LAUNDRY AREA Factor = 11.11 Total no. tiles = 44.44 45 say KITCHEN SINK/LAVATORY: Total surface Area = 1.28 Factor = 2.78 Total no. tiles = 3.56 KITCHEN 4 say WALL: Total surface Area = 0.40 FLOOR sq.m pcs pcs 12" x 12" PCS TILES 4" x 4" 4" x 8" PCS PCS 6" x 8" PCS 24" x 24" PCS

113.00

sq.m pcs pcs sq.m sq.m sq.m pcs pcs

240.00

864.00

sq.m pcs pcs

45.00

sq.m pcs pcs sq.m

4.00

TILEWORKS (TILES) Materials and Estimated Quantities Required Item to be KITCHEN Estimated Calculations 16" x 16" PCS Factor = Total no. tiles = say UNIT 2 FLOOR FLOOR 50 20.00 pcs 20 pcs 12" x 12" PCS TILES 4" x 4" 4" x 8" PCS PCS 6" x 8" PCS 24" x 24" PCS

20.00

Floor Area = 18.00 Factor = 6.25 Total no. tiles = 112.50 113 say T&B FLOOR: Floor Area = 2.40 Factor = 100 Total no. tiles = 240.00 240 say T&B WALL: Wall Area = 19.2 Wall Openning Area = 1.93 total Area = 17.27 Factor = 50 Total no. tiles = 863.50 864 say LAUNDRY AREA FLOOR: Floor Area = 4.00 LAUNDRY AREA Factor = 11.11 Total no. tiles = 44.44 45 say KITCHEN SINK/LAVATORY: Total surface Area = 1.28 Factor = 2.78 Total no. tiles = 3.56 KITCHEN 4.00 say WALL: Total surface Area = 0.85 Factor = 50 Total no. tiles = 42.50 43 say GROUND FLOOR FLOOR FLOOR Floor Area = Factor = Total no. tiles = say

sq.m pcs pcs

113.00

sq.m pcs pcs sq.m sq.m sq.m pcs pcs

240.00

864.00

sq.m pcs pcs

45.00

sq.m pcs pcs sq.m pcs pcs

4.00

43.00

18.00 sq.m 6.25 112.50 pcs 113 pcs

113.00

TILEWORKS (TILES) Materials and Estimated Quantities Required Item to be Estimated Calculations 16" x 16" PCS T&B FLOOR: Floor Area = Factor = Total no. tiles = say T&B WALL: sq.m sq.m sq.m pcs pcs 4.00 sq.m 100 400.00 pcs 400 pcs 12" x 12" PCS TILES 4" x 4" 4" x 8" PCS PCS 6" x 8" PCS 24" x 24" PCS

400.00

Wall Area = 24 Wall Openning Area = 1.93 total Area = 22.07 Factor = 33.33 Total no. tiles = 735.59 736 say LAUNDRY AREA FLOOR: Floor Area = 4.00 LAUNDRY AREA Factor = 11.11 Total no. tiles = 44.44 45 say KITCHEN SINK/LAVATORY: Total surface Area = 1.28 Factor = 2.78 Total no. tiles = 3.56 KITCHEN 4.00 say WALL: Total surface Area = 0.40 Factor = 50 Total no. tiles = 20.00 20 say SECOND FLOOR LIVING ROOM

736.00

sq.m pcs pcs

45.00

sq.m pcs pcs sq.m pcs pcs

4.00

20.00

LIVING ROOM

Floor Area = 13.20 sq.m Floor openning Area = 3.00 sq.m Total Area = 10.20 sq.m Factor = 11.11 Total no. tiles = 113.32 pcs 114 pcs say CANOPY Floor Area = 3.20 sq.m Factor = 11.11 Total no. tiles = 35.55 pcs 36 pcs say BEDROOM

114.00

CANOPY

36.00

BEDROOM

TILEWORKS (TILES) Materials and Estimated Quantities Required Item to be Estimated Calculations 16" x 16" PCS Floor Area = 14.00 sq.m Factor = 11.11 Total no. tiles = 155.54 pcs 156 pcs say BALCONY Floor Area = Factor = Total no. tiles = say 6.00 sq.m 11.11 66.66 pcs 67 pcs TOTAL = 12" x 12" PCS TILES 4" x 4" 4" x 8" PCS PCS 6" x 8" PCS 24" x 24" PCS

BEDROOM

156.00

BALCONY

339 pcs

67.00 508 pcs

880 pcs 1811 pcs

736 pcs

12 pcs

Doors and Windows

DOORS AND WINDOWS Item to be Estimated Materials and Estimated Quantities Required Dimension (m) W H DOORS D/1 TYPE OF DOOR: Wooden Panel Swng Door Type on 2" x 6" Door Jamb LOCATION: Main Entry Dining Area D/2 TYPE OF DOOR: PVC Swing Door-Type w/ Louver 0.90 0.90 2.20 2.20 2 1 No. of Pieces

Description

LOCATION: All Toilet & Bathroom D/3 TYPE OF DOOR: Wooden Panel Swing Door Type on 2" x 6" Door Jamb LOCATION: All Laundry Area Bedroom D/5 TYPE OF DOOR: Wooden Panel Swing Door Type on 2" x 6" Door Jamb

0.60

2.10

0.60 0.60

2.10 2.10

3 1

DOORS AND WINDOWS Item to be Estimated Materials and Estimated Quantities Required Dimension (m) W H No. of Pieces

Description Wooden Panel Swing Door Type on 2" x 6" Door Jamb LOCATION: Living Room Terrace WINDOWS W/1 TYPE OF WINDOW: Sliding Window in Powder-Coated Aluminum Frame with 1/4" THK. Glass LOCATION: Dining Area Unit 1 Unit 2 W/2 TYPE OF WINDOW: Sliding Window in Powder-Coated Aluminum Frame with 1/4" THK. Glass LOCATION: Canopy W/3 TYPE OF WINDOW: Common Type of Window in Toilet & Bathroom LOCATION: Toilet & Bathroom Laundry Area TOTALDOOR = TOTALWINDOW =

2.00 2.00

2.10 2.10

1 1

2.15 2.15 2.15

1.20 1.20 1.20

1 1 1

2.00

1.20

0.60 0.60

0.90 0.90 13 pcs 10pcs

3 3

ROOFING Materials and Estimated Quantities Required Item to be Estimated Calculations 2" x 3" BD.FT ROOF FRAMING TRUSS TOP CHORD total length Commercial length total no. of C/L = say WEB MEMBERS total length Commercial length total no. of C/L = say BOTTOM CHORD total length Commercial length total no. of C/L = say TRUSS TOP CHORD total length Commercial length total no. of C/L = say 1.40 14.28 #REF! #REF! 1.20 27.90 #REF! #REF! 0.20 0.00 #REF! #REF! m sq.m pcs pcs m sq.m pcs pcs m sq.m pcs pcs \ LUMBER 2" x 6" BD.FT 2" x 2" BD.FT PLYWOOD 4' x 8' x (1/4") PCS 4" KG NAILS 2.5" KG 1" KG

#REF!

ROOF FRAMING

#REF!

#REF!

5.00 7.00 #REF! #REF!

m sq.m pcs pcs

#REF!

FORM WORKS Materials and Estimated Quantities Required Item to be Estimated Calculations LUMBER 2" x 2" 2" x 3" BD.FT BD.FT PLYWOOD 4' x 8' x (1/4") PCS 4" KG NAILS 2.5" KG 1" KG

COLUMN C-1 PLYWOOD FORM Perimeter = 1.40 m total area = 14.28 sq.m Factor = 2.88 Total no. of Plywood = 4.96 pcs 5.00 pcs say 0.28 kg NAILS = say 0.50 kg WOOD FRAME Total no. of Plywood= 5.00 pcs Factor = 29.67 Total no. of Bd.Ft = 148.35 Bd.Ft say 149.00 Bd.Ft 7.45 kg NAILS = say 8.00 kg SCAFFOLDING VERTICAL SUPPORT: Total Length of Columns= 10.20 m Factor = 7.00 Total no. of Bd.Ft = 71.40 Bd.Ft say 72.00 Bd.Ft HORIZONTAL SUPPORT: Total Length of Columns= 10.20 m Factor = 21.00 Total no. of Bd.Ft = 214.20 Bd.Ft say 215.00 Bd.Ft DIAGONAL BRACES SUPPORT: Total Length of Columns= Factor = Total no. of Bd.Ft = say

5.00 0.50

149.00 8.00

C-1

72.00

215.00

10.20 m 11.70 119.34 Bd.Ft 120.00 Bd.Ft

120.00

7.45 kg SCAFFOLDING NAILS = say 8.00 kg C-2 PLYWOOD FORM Perimeter = 1.40 m total area = 36.05 sq.m Factor = 2.88 Total no. of Plywood = 12.52 pcs say 13.00 pcs 0.72 kg NAILS = say 1.00 kg WOOD FRAME Total no. of Plywood= 13.00 pcs Factor = 29.67 Total no. of Bd.Ft = 385.71 Bd.Ft say 386.00 Bd.Ft

8.00

13.00 1.00

386.00

FORM WORKS Materials and Estimated Quantities Required Item to be Estimated Calculations LUMBER 2" x 2" 2" x 3" BD.FT BD.FT 19.30 kg 8.00 kg PLYWOOD 4' x 8' x (1/4") PCS 4" KG NAILS 2.5" KG 8.00 1" KG

NAILS = say

C-2

SCAFFOLDING VERTICAL SUPPORT: Total Length of Columns= 25.75 m Factor = 7.00 Total no. of Bd.Ft = 180.25 Bd.Ft say 181.00 Bd.Ft HORIZONTAL SUPPORT: Total Length of Columns= 25.75 m Factor = 21.00 Total no. of Bd.Ft = 540.75 Bd.Ft say 541.00 Bd.Ft DIAGONAL BRACES SUPPORT: Total Length of Columns= Factor = Total no. of Bd.Ft = say SCAFFOLDING NAILS = say C-3 PLYWOOD FORM Perimeter = total area = Factor = Total no. of Plywood = say NAILS = say WOOD FRAME Total no. of Plywood= Factor = Total no. of Bd.Ft = say NAILS = say

181.00

541.00

25.75 m 11.70 301.28 Bd.Ft 302.00 Bd.Ft 18.80 kg 19.00 kg

302.00

19.00

1.30 6.31 2.88 2.19 3.00 0.17 0.50 3.00 29.67 89.01 90.00 4.50 8.00

m sq.m pcs pcs kg kg pcs Bd.Ft Bd.Ft kg kg

3.00 0.50

90.00 8.00

C-3

SCAFFOLDING VERTICAL SUPPORT: Total Length of Columns= 4.85 m Factor = 7.00 Total no. of Bd.Ft = 33.95 Bd.Ft say 34.00 Bd.Ft HORIZONTAL SUPPORT: Total Length of Columns= 4.85 m Factor = 21.00 Total no. of Bd.Ft = 101.85 Bd.Ft say 102.00 Bd.Ft DIAGONAL BRACES SUPPORT: Total Length of Columns= 4.85 m Factor = 11.70 Total no. of Bd.Ft = 56.75 Bd.Ft say 57.00 Bd.Ft SCAFFOLDING NAILS = say C-4 PLYWOOD FORM 3.54 kg 4.00 kg

34.00

102.00

57.00

4.00

FORM WORKS Materials and Estimated Quantities Required Item to be Estimated Calculations LUMBER 2" x 2" 2" x 3" BD.FT BD.FT PLYWOOD 4' x 8' x (1/4") PCS 4" KG NAILS 2.5" KG 1" KG

Perimeter = 1.20 m total area = 17.64 sq.m Factor = 2.88 Total no. of Plywood = 6.13 pcs 7.00 pcs say 0.39 kg NAILS = say 0.50 kg WOOD FRAME Total no. of Plywood= 7.00 pcs Factor = 29.67 Total no. of Bd.Ft = 207.69 Bd.Ft say 208.00 Bd.Ft NAILS = 10.40 kg say 10.50 kg SCAFFOLDING VERTICAL SUPPORT: Total Length of Columns= 14.70 m Factor = 7.00 Total no. of Bd.Ft = 102.90 Bd.Ft say 103.00 Bd.Ft HORIZONTAL SUPPORT: Total Length of Columns= 14.70 m Factor = 21.00 Total no. of Bd.Ft = 308.70 Bd.Ft say 309.00 Bd.Ft DIAGONAL BRACES SUPPORT: Total Length of Columns= Factor = Total no. of Bd.Ft = say

7.00 0.50

208.00 10.50

C-4

103.00

309.00

14.70 m 11.70 171.99 Bd.Ft 172.00 Bd.Ft

172.00

SCAFFOLDING NAILS = 10.73 kg say 11.00 kg C-5 PLYWOOD FORM Perimeter = 1.20 m total area = 16.56 sq.m Factor = 2.88 Total no. of Plywood = 5.75 pcs 6.00 pcs say 0.33 kg NAILS = say 0.50 kg WOOD FRAME Total no. of Plywood= 6.00 pcs Factor = 29.67 Total no. of Bd.Ft = 178.02 Bd.Ft say 179.00 Bd.Ft 8.95 kg NAILS = say 9.00 kg SCAFFOLDING VERTICAL SUPPORT: Total Length of Columns= 13.80 m Factor = 7.00 Total no. of Bd.Ft = 96.60 Bd.Ft say 97.00 Bd.Ft HORIZONTAL SUPPORT: Total Length of Columns= 13.80 m Factor = 21.00 Total no. of Bd.Ft = 289.80 Bd.Ft

11.00

6.00 0.50

179.00 9.00

C-5

97.00

C-5

FORM WORKS Materials and Estimated Quantities Required Item to be Estimated Calculations LUMBER 2" x 2" 2" x 3" BD.FT BD.FT 290.00 PLYWOOD 4' x 8' x (1/4") PCS 4" KG NAILS 2.5" KG 1" KG

say 290.00 Bd.Ft DIAGONAL BRACES SUPPORT: Total Length of Columns= Factor = Total no. of Bd.Ft = say

13.80 m 11.70 161.46 Bd.Ft 162.00 Bd.Ft

162.00

SCAFFOLDING NAILS = 10.07 kg say 10.50 kg C-6 PLYWOOD FORM Perimeter = 1.20 m total area = 27.90 sq.m Factor = 2.88 Total no. of Plywood = 9.69 pcs say 10.00 pcs 0.55 kg NAILS = say 0.50 kg WOOD FRAME Total no. of Plywood= 10.00 pcs Factor = 29.67 Total no. of Bd.Ft = 296.70 Bd.Ft say 297.00 Bd.Ft NAILS = 14.85 kg say 15.00 kg SCAFFOLDING VERTICAL SUPPORT: Total Length of Columns= 23.25 m Factor = 7.00 Total no. of Bd.Ft = 162.75 Bd.Ft say 163.00 Bd.Ft HORIZONTAL SUPPORT: Total Length of Columns= 23.25 m Factor = 21.00 Total no. of Bd.Ft = 488.25 Bd.Ft say 489.00 Bd.Ft DIAGONAL BRACES SUPPORT: Total Length of Columns= Factor = Total no. of Bd.Ft = say SCAFFOLDING NAILS = say BEAMS B-1(4M LONG) PLYWOOD FORM Perimeter = Total Area = Factor = Total no. of Plywood = say NAILS = say WOOD FRAME Total no. of Plywood= Factor = Total no. of Bd.Ft = say NAILS = say

10.50

10.00 0.50

297.00 15.00

C-6

163.00

489.00

23.25 m 11.70 272.03 Bd.Ft 273.00 Bd.Ft 16.97 kg 17.00 kg

273.00

17.00

1.00 12 2.88 4.17 5.00 0.28 0.50 5.00 25.06 125.30 126.00 6.30 6.30

m sq.m pcs pcs kg kg pcs Bd.Ft Bd.Ft kg kg

5.00 0.50

126.00 6.30

B-1(4M LONG)

FORM WORKS Materials and Estimated Quantities Required Item to be Estimated Calculations LUMBER 2" x 2" 2" x 3" BD.FT BD.FT PLYWOOD 4' x 8' x (1/4") PCS 4" KG NAILS 2.5" KG 1" KG

B-1(4M LONG) SCAFFOLDING VERTICAL SUPPORT: Total Length of Beams= 12.00 m Factor = 6.00 Total no. of Bd.Ft = 72.00 Bd.Ft say 72.00 Bd.Ft HORIZONTAL SUPPORT: Total Length of Columns= Factor = Total no. of Bd.Ft = say

72.00

12.00 m 4.70 56.40 Bd.Ft 57.00 Bd.Ft

57.00

B-1(1M LONG)

8.76 kg SCAFFOLDING NAILS = say 9.00 kg B-1(1M LONG) PLYWOOD FORM Perimeter = 1.20 m Total Area = 2.4 sq.m Factor = 2.88 Total no. of Plywood = 0.83 pcs 1.00 pcs say 0.06 kg NAILS = say 0.50 kg WOOD FRAME Total no. of Plywood= 1.00 pcs Factor = 25.06 Total no. of Bd.Ft = 25.06 Bd.Ft say 26.00 Bd.Ft 1.30 kg NAILS = say 1.50 kg SCAFFOLDING VERTICAL SUPPORT: Total Length of Beams= 2.00 m Factor = 6.00 Total no. of Bd.Ft = 12.00 Bd.Ft say 12.00 Bd.Ft HORIZONTAL SUPPORT: Total Length of Columns= Factor = Total no. of Bd.Ft = say SCAFFOLDING NAILS = say B-2 (3.5M LONG) PLYWOOD FORM Perimeter = Total Area = Factor = Total no. of Plywood = say NAILS = say WOOD FRAME Total no. of Plywood= Factor = Total no. of Bd.Ft = say NAILS = say

9.00

1.00 0.50

26.00 1.50

12.00

2.00 m 4.70 9.40 Bd.Ft 10.00 Bd.Ft 1.46 kg 1.50 kg

10.00

1.50

1.20 4.2 2.88 1.46 2.00 0.11 0.50 2.00 25.06 50.12 51.00 2.55 3.00

m sq.m pcs pcs kg kg pcs Bd.Ft Bd.Ft kg kg

2.00 0.50

51.00 3.00

B-2 (3.5M LONG)

FORM WORKS Materials and Estimated Quantities Required Item to be Estimated B-2 (3.5M LONG) SCAFFOLDING VERTICAL SUPPORT: Total Length of Beams= 3.50 m Factor = 6.00 Total no. of Bd.Ft = 21.00 Bd.Ft say 21.00 Bd.Ft HORIZONTAL SUPPORT: Total Length of Columns= Factor = Total no. of Bd.Ft = say Calculations LUMBER 2" x 2" 2" x 3" BD.FT BD.FT PLYWOOD 4' x 8' x (1/4") PCS 4" KG NAILS 2.5" KG 1" KG

21.00

3.50 m 4.70 16.45 Bd.Ft 17.00 Bd.Ft

17.00

B-2 (3M LONG)

2.56 kg SCAFFOLDING NAILS = say 3.00 kg B-2 (3M LONG) PLYWOOD FORM Perimeter = 1.20 m Total Area = 3.6 sq.m Factor = 2.88 Total no. of Plywood = 1.25 pcs 2.00 pcs say 0.11 kg NAILS = say 0.50 kg WOOD FRAME Total no. of Plywood= 2.00 pcs Factor = 25.06 Total no. of Bd.Ft = 50.12 Bd.Ft say 51.00 Bd.Ft 2.55 kg NAILS = say 3.00 kg SCAFFOLDING VERTICAL SUPPORT: Total Length of Beams= 3.00 m Factor = 6.00 Total no. of Bd.Ft = 18.00 Bd.Ft say 18.00 Bd.Ft HORIZONTAL SUPPORT: Total Length of Columns= Factor = Total no. of Bd.Ft = say

3.00

2.00 0.50

51.00 3.00

18.00

3.00 m 4.70 14.10 Bd.Ft 15.00 Bd.Ft

15.00

B-3 (4M LONG)

2.19 kg SCAFFOLDING NAILS = say 2.50 kg B-3 (4M LONG) PLYWOOD FORM Perimeter = 1.20 m Total Area = 4.8 sq.m Factor = 2.88 Total no. of Plywood = 1.67 pcs 2.00 pcs say 0.11 kg NAILS = say 0.50 kg WOOD FRAME Total no. of Plywood= 2.00 pcs Factor = 25.06 Total no. of Bd.Ft = 50.12 Bd.Ft say 51.00 Bd.Ft 2.55 kg NAILS = say 3.00 kg SCAFFOLDING

2.50

2.00 0.50

51.00 3.00

FORM WORKS Materials and Estimated Quantities Required Item to be Estimated B-3 (4M LONG) Calculations LUMBER 2" x 2" 2" x 3" BD.FT BD.FT 4.00 m 6.00 24.00 Bd.Ft 24.00 Bd.Ft PLYWOOD 4' x 8' x (1/4") PCS 4" KG NAILS 2.5" KG 1" KG

VERTICAL SUPPORT: Total Length of Beams= Factor = Total no. of Bd.Ft = say HORIZONTAL SUPPORT: Total Length of Columns= Factor = Total no. of Bd.Ft = say SCAFFOLDING NAILS = say B-3 (3.5M LONG) PLYWOOD FORM Perimeter = Total Area = Factor = Total no. of Plywood = say NAILS = say WOOD FRAME Total no. of Plywood= Factor = Total no. of Bd.Ft = say NAILS = say

24.00

4.00 m 4.70 18.80 Bd.Ft 19.00 Bd.Ft 2.92 kg 3.00 kg

19.00

3.00

1.20 8.4 2.88 2.92 3.00 0.17 0.50 3.00 25.06 75.18 76.00 3.80 4.00

m sq.m pcs pcs kg kg pcs Bd.Ft Bd.Ft kg kg

3.00 0.50

76.00 4.00

B-3 (3.5M LONG)

SCAFFOLDING VERTICAL SUPPORT: Total Length of Beams= 7.00 m Factor = 6.00 Total no. of Bd.Ft = 42.00 Bd.Ft say 42.00 Bd.Ft HORIZONTAL SUPPORT: Total Length of Columns= Factor = Total no. of Bd.Ft = say

42.00

7.00 m 4.70 32.90 Bd.Ft 33.00 Bd.Ft

33.00

B-3 (3M LONG)

5.11 kg SCAFFOLDING NAILS = say 5.50 kg B-3 (3M LONG) PLYWOOD FORM Perimeter = 1.20 m Total Area = 3.6 sq.m Factor = 2.88 Total no. of Plywood = 1.25 pcs 2.00 pcs say 0.11 kg NAILS = say 0.50 kg WOOD FRAME Total no. of Plywood= 2.00 pcs Factor = 25.06 Total no. of Bd.Ft = 50.12 Bd.Ft say 51.00 Bd.Ft 2.55 kg NAILS = say 3.00 kg SCAFFOLDING VERTICAL SUPPORT:

5.50

2.00 0.50

51.00 3.00

FORM WORKS Materials and Estimated Quantities Required B-3 (3M LONG) Item to be Estimated Calculations LUMBER 2" x 2" 2" x 3" BD.FT BD.FT 3.00 m 6.00 18.00 Bd.Ft 18.00 Bd.Ft PLYWOOD 4' x 8' x (1/4") PCS 4" KG NAILS 2.5" KG 1" KG

Total Length of Beams= Factor = Total no. of Bd.Ft = say HORIZONTAL SUPPORT: Total Length of Columns= Factor = Total no. of Bd.Ft = say

18.00

3.00 m 4.70 14.10 Bd.Ft 15.00 Bd.Ft

15.00

B-3 (2M LONG)

2.19 kg SCAFFOLDING NAILS = say 2.50 kg B-3 (2M LONG) PLYWOOD FORM Perimeter = 1.20 m Total Area = 2.4 sq.m Factor = 2.88 Total no. of Plywood = 0.83 pcs 1.00 pcs say 0.06 kg NAILS = say 0.50 kg WOOD FRAME Total no. of Plywood= 1.00 pcs Factor = 25.06 Total no. of Bd.Ft = 25.06 Bd.Ft say 26.00 Bd.Ft 1.30 kg NAILS = say 1.50 kg SCAFFOLDING VERTICAL SUPPORT: Total Length of Beams= 2.00 m Factor = 6.00 Total no. of Bd.Ft = 12.00 Bd.Ft say 12.00 Bd.Ft HORIZONTAL SUPPORT: Total Length of Columns= Factor = Total no. of Bd.Ft = say

2.50

1.00 0.50

26.00 1.50

12.00

2.00 m 4.70 9.40 Bd.Ft 10.00 Bd.Ft kg kg

10.00

CB-1 (1.81M LONG)

1.46 SCAFFOLDING NAILS = say 1.50 CB-1 (1.81M LONG) PLYWOOD FORM Perimeter = 1.20 Total Area = 4.344 Factor = 2.88 Total no. of Plywood = 1.51 2.00 say 0.11 NAILS = say 0.50 WOOD FRAME Total no. of Plywood= 2.00 Factor = 25.06 Total no. of Bd.Ft = 50.12 say 51.00 2.55 NAILS = say 3.00 SCAFFOLDING VERTICAL SUPPORT: Total Length of Beams=

1.50

m sq.m pcs pcs kg kg pcs Bd.Ft Bd.Ft kg kg

2.00 0.50

51.00 3.00

3.62 m

FORM WORKS CB-1 (1.81M LONG) Item to be Estimated Calculations Materials and Estimated Quantities Required LUMBER 2" x 2" 2" x 3" BD.FT BD.FT 6.00 21.72 Bd.Ft 22.00 Bd.Ft PLYWOOD 4' x 8' x (1/4") PCS 4" KG NAILS 2.5" KG 1" KG

Factor = Total no. of Bd.Ft = say HORIZONTAL SUPPORT: Total Length of Columns= Factor = Total no. of Bd.Ft = say

22.00

3.62 m 4.70 17.01 Bd.Ft 18.00 Bd.Ft kg kg

18.00

CB-2 (0.80M LONG)

2.64 SCAFFOLDING NAILS = say 3.00 CB-2 (0.80M LONG) PLYWOOD FORM Perimeter = 1.20 Total Area = 2.88 Factor = 2.88 Total no. of Plywood = 1.00 1.00 say 0.06 NAILS = say 0.50 WOOD FRAME Total no. of Plywood= 1.00 Factor = 25.06 Total no. of Bd.Ft = 25.06 say 26.00 1.30 NAILS = say 1.50

3.00

m sq.m pcs pcs kg kg pcs Bd.Ft Bd.Ft kg kg

1.00 0.50

26.00 1.50

SCAFFOLDING VERTICAL SUPPORT: Total Length of Beams= 2.40 m Factor = 6.00 Total no. of Bd.Ft = 14.40 Bd.Ft say 15.00 Bd.Ft HORIZONTAL SUPPORT: Total Length of Columns= Factor = Total no. of Bd.Ft = say

15.00

2.40 m 4.70 11.28 Bd.Ft 12.00 Bd.Ft kg kg

12.00

RB-1 (4.30M LONG)

1.75 SCAFFOLDING NAILS = say 2.00 RB-1 (4.30M LONG) PLYWOOD FORM Perimeter = 1.00 Total Area = 8.6 Factor = 2.88 Total no. of Plywood = 2.99 3.00 say 0.17 NAILS = say 0.50 WOOD FRAME Total no. of Plywood= 3.00 Factor = 25.06 Total no. of Bd.Ft = 75.18 say 76.00 3.80 NAILS = say 4.00 SCAFFOLDING VERTICAL SUPPORT: Total Length of Beams= Factor =

2.00

m sq.m pcs pcs kg kg pcs Bd.Ft Bd.Ft kg kg

3.00 0.50

76.00 4.00

8.60 m 6.00

RB-1 (4.30M LONG) Item to be Estimated Calculations

FORM WORKS Materials and Estimated Quantities Required LUMBER 2" x 2" 2" x 3" BD.FT BD.FT 51.60 Bd.Ft 52.00 Bd.Ft 52.00 PLYWOOD 4' x 8' x (1/4") PCS 4" KG NAILS 2.5" KG 1" KG

Total no. of Bd.Ft = say HORIZONTAL SUPPORT: Total Length of Columns= Factor = Total no. of Bd.Ft = say SCAFFOLDING NAILS = say RB-1 (4M LONG) PLYWOOD FORM Perimeter = Total Area = Factor = Total no. of Plywood = say NAILS = say WOOD FRAME Total no. of Plywood= Factor = Total no. of Bd.Ft = say NAILS = say

8.60 m 4.70 40.42 Bd.Ft 41.00 Bd.Ft 6.28 kg 6.50 kg

41.00

6.50

1.00 8 2.88 2.78 3.00 0.17 0.50 3.00 25.06 75.18 76.00 3.80 4.00

m sq.m pcs pcs kg kg pcs Bd.Ft Bd.Ft kg kg

3.00 0.50

76.00 4.00

RB-1 (4M LONG)

SCAFFOLDING VERTICAL SUPPORT: Total Length of Beams= 8.00 m Factor = 6.00 Total no. of Bd.Ft = 48.00 Bd.Ft say 48.00 Bd.Ft HORIZONTAL SUPPORT: Total Length of Columns= Factor = Total no. of Bd.Ft = say SCAFFOLDING NAILS = say RB-1 (3M LONG) PLYWOOD FORM Perimeter = Total Area = Factor = Total no. of Plywood = say NAILS = say WOOD FRAME Total no. of Plywood= Factor = Total no. of Bd.Ft = say NAILS = say

48.00

8.00 m 4.70 37.60 Bd.Ft 38.00 Bd.Ft 5.84 kg 6.50 kg

38.00

6.50

1.00 6 2.88 2.08 3.00 0.17 0.50 3.00 25.06 75.18 76.00 3.80 4.00

m sq.m pcs pcs kg kg pcs Bd.Ft Bd.Ft kg kg

3.00 0.50

76.00 4.00

RB-1 (3M LONG)

SCAFFOLDING VERTICAL SUPPORT: Total Length of Beams= 6.00 m Factor = 6.00 Total no. of Bd.Ft = 36.00 Bd.Ft

RB-1 (3M LONG)

FORM WORKS Materials and Estimated Quantities Required

Item to be Estimated

Calculations

say HORIZONTAL SUPPORT: Total Length of Columns= Factor = Total no. of Bd.Ft = say SCAFFOLDING NAILS = say RB-2 (4M LONG) PLYWOOD FORM Perimeter = Total Area = Factor = Total no. of Plywood = say NAILS = say WOOD FRAME Total no. of Plywood= Factor = Total no. of Bd.Ft = say NAILS = say

36.00 Bd.Ft

LUMBER 2" x 2" 2" x 3" BD.FT BD.FT 36.00

PLYWOOD 4' x 8' x (1/4") PCS

4" KG

NAILS 2.5" KG

1" KG

6.00 m 4.70 28.20 Bd.Ft 29.00 Bd.Ft 4.38 kg 4.50 kg

29.00

4.50

1.00 4 2.88 1.39 2.00 0.11 0.50 2.00 25.06 50.12 51.00 2.55 3.00

m sq.m pcs pcs kg kg pcs Bd.Ft Bd.Ft kg kg

2.00 0.50

51.00 3.00

RB-2 (4M LONG)

SCAFFOLDING VERTICAL SUPPORT: Total Length of Beams= 4.00 m Factor = 6.00 Total no. of Bd.Ft = 24.00 Bd.Ft say 24.00 Bd.Ft HORIZONTAL SUPPORT: Total Length of Columns= Factor = Total no. of Bd.Ft = say

24.00

4.00 m 4.70 18.80 Bd.Ft 19.00 Bd.Ft kg kg

19.00

RB-2 (3M LONG)

2.92 SCAFFOLDING NAILS = say 3.00 RB-2 (3M LONG) PLYWOOD FORM Perimeter = 1.00 Total Area = 24 Factor = 2.88 Total no. of Plywood = 8.33 9.00 say 0.50 NAILS = say 0.50 WOOD FRAME Total no. of Plywood= 9.00 Factor = 25.06 Total no. of Bd.Ft = 225.54 say 226.00 NAILS = 11.30 say 11.50

3.00

m sq.m pcs pcs kg kg pcs Bd.Ft Bd.Ft kg kg

9.00 0.50

226.00 11.50

SCAFFOLDING VERTICAL SUPPORT: Total Length of Beams= 24.00 m Factor = 6.00 Total no. of Bd.Ft = 144.00 Bd.Ft say 144.00 Bd.Ft

144.00

RB-2 (3M LONG) FORM WORKS Materials and Estimated Quantities Required Item to be Estimated Calculations LUMBER 2" x 2" 2" x 3" BD.FT BD.FT PLYWOOD 4' x 8' x (1/4") PCS 4" KG NAILS 2.5" KG 1" KG

HORIZONTAL SUPPORT: Total Length of Columns= 24.00 m Factor = 4.70 Total no. of Bd.Ft = 112.80 Bd.Ft say 113.00 Bd.Ft SCAFFOLDING NAILS = say RB-3 (2M LONG) PLYWOOD FORM Perimeter = Total Area = Factor = Total no. of Plywood = say NAILS = say WOOD FRAME Total no. of Plywood= Factor = Total no. of Bd.Ft = say NAILS = say 17.52 kg 18.00 kg

113.00

18.00

1.00 8 2.88 2.78 3.00 0.17 0.50 3.00 25.06 75.18 76.00 3.80 4.00

m sq.m pcs pcs kg kg pcs Bd.Ft Bd.Ft kg kg

3.00 0.50

76.00 4.00

RB-3 (2M LONG)

SCAFFOLDING VERTICAL SUPPORT: Total Length of Beams= 8.00 m Factor = 6.00 Total no. of Bd.Ft = 48.00 Bd.Ft say 48.00 Bd.Ft HORIZONTAL SUPPORT: Total Length of Columns= Factor = Total no. of Bd.Ft = say

48.00

8.00 m 4.70 37.60 Bd.Ft 38.00 Bd.Ft kg kg

38.00

RB-3 (1.20M LONG)

5.84 SCAFFOLDING NAILS = say 6.00 RB-3 (1.20M LONG) PLYWOOD FORM Perimeter = 1.00 Total Area = 4.8 Factor = 2.88 Total no. of Plywood = 1.67 2.00 say 0.11 NAILS = say 0.50 WOOD FRAME Total no. of Plywood= 2.00 Factor = 25.06 Total no. of Bd.Ft = 50.12 say 51.00 2.55 NAILS = say 3.00

6.00

m sq.m pcs pcs kg kg pcs Bd.Ft Bd.Ft kg kg

2.00 0.50

51.00 3.00

SCAFFOLDING VERTICAL SUPPORT: Total Length of Beams= 4.80 m Factor = 6.00 Total no. of Bd.Ft = 28.80 Bd.Ft say 29.00 Bd.Ft

29.00

RB-3 (1.20M LONG) FORM WORKS Materials and Estimated Quantities Required Item to be Estimated Calculations LUMBER 2" x 2" 2" x 3" BD.FT BD.FT 4.80 m 4.70 22.56 Bd.Ft 23.00 Bd.Ft PLYWOOD 4' x 8' x (1/4") PCS 4" KG NAILS 2.5" KG 1" KG

HORIZONTAL SUPPORT: Total Length of Columns= Factor = Total no. of Bd.Ft = say

23.00

FLOORING

3.50 kg SCAFFOLDING NAILS = say 3.50 kg SLABS FLOORING PLYWOOD FORM Total Area 41.20 sq.m Factor = 2.88 Total no. of Plywood = 14.31 pcs say 15.00 pcs SCAFFOLDING SLAB Total Slab Area= 41.20 sq.m Factor = 9.10 Total no. of Bd.Ft = 374.92 Bd.Ft say 375.00 Bd.Ft TOTAL = 6015 Bd.Ft

3.50

15.00

375.00 1662 Bd.Ft 105 pcs. 151 kg 121.8 kg 12 kg

CARPENTRY (CEILING) Materials and Estimated Quantities Required Item to be Estimated Calculations LUMBER 2" x 2" BD.FT PLYWOOD 40cm x 60cm PCS NAILS 2.5" KG 1" KG

GROUND FLOOR DINING AREA CEILING JOIST Area of ceiling= 15.15 sq.m Factor = 5.373 Total no. of Bd.Ft = 81.41 bd.ft 82 bd.ft say CEILING BOARD Area of ceiling= Factor = Total no. of Bd.Ft = say NAILS - CEILING JOIST Area of ceiling= Factor = Total no. of KG = say

82.00

DINING AREA

15.15 sq.m 0.24 63.14 pcs 64.00 pcs

64.00

15.15 sq.m 0.055 0.83 kg 1 kg

1.00

NAILS - CEILING BOARD Area of ceiling= 15.15 sq.m Factor = 0.055 Total no. of KG = 0.83 kg 1 kg say UNIT 1 CEILING JOIST Area of ceiling= Factor = Total no. of Bd.Ft = say CEILING BOARD Area of ceiling= Factor = Total no. of Bd.Ft = say NAILS - CEILING JOIST Area of ceiling= Factor =

1.00

18.00 sq.m 5.373 96.71 bd.ft 97 bd.ft

97.00

UNIT 1

18.00 sq.m 0.24 75.00 pcs 75.00 pcs

75.00

18.00 sq.m 0.055

CARPENTRY (CEILING) UNIT 1 Item to be Estimated Calculations Materials and Estimated Quantities Required LUMBER 2" x 2" BD.FT 0.99 kg 1 kg PLYWOOD 40cm x 60cm PCS NAILS 2.5" KG 1.00 1" KG

Total no. of KG = say

NAILS - CEILING BOARD Area of ceiling= 18.00 sq.m Factor = 0.055 Total no. of KG = 0.99 kg 1 kg say UNIT 2 CEILING JOIST Area of ceiling= Factor = Total no. of Bd.Ft = say CEILING BOARD Area of ceiling= Factor = Total no. of Bd.Ft = say NAILS - CEILING JOIST Area of ceiling= Factor = Total no. of KG = say

1.00

18.00 sq.m 5.373 96.71 bd.ft 97 bd.ft

97.00

UNIT 2

18.00 sq.m 0.24 75.00 pcs 75.00 pcs

75.00

18.00 sq.m 0.055 0.99 kg 1 kg

1.00

NAILS - CEILING BOARD Area of ceiling= 18.00 sq.m Factor = 0.055 Total no. of KG = 0.99 kg 1 kg say TOILET AND BATHROOM (1) CEILING JOIST Area of ceiling= 4.00 sq.m Factor = 5.373 Total no. of Bd.Ft = 21.49 bd.ft 22 bd.ft say CEILING BOARD Area of ceiling= Factor = Total no. of Bd.Ft = TOILET AND BATHROOM say (1) NAILS - CEILING JOIST Area of ceiling= Factor = Total no. of KG = say

1.00

22.00

4.00 sq.m 0.24 16.67 pcs 17.00 pcs

17.00

4.00 sq.m 0.055 0.22 kg 1 kg

1.00

TOILET AND BATHROOM (1) CARPENTRY (CEILING) Materials and Estimated Quantities Required Item to be Estimated Calculations LUMBER 2" x 2" BD.FT PLYWOOD 40cm x 60cm PCS NAILS 2.5" KG 1" KG

NAILS - CEILING BOARD Area of ceiling= 4.00 sq.m Factor = 0.055 Total no. of KG = 0.22 kg 1 kg say TOILET AND BATHROOM (2) CEILING JOIST Area of ceiling= 4.80 sq.m Factor = 5.373 Total no. of Bd.Ft = 25.79 bd.ft 26 bd.ft say CEILING BOARD Area of ceiling= Factor = Total no. of Bd.Ft = TOILET AND BATHROOM say (2) NAILS - CEILING JOIST Area of ceiling= Factor = Total no. of KG = say

1.00

26.00

4.80 sq.m 0.24 20.00 pcs 20.00 pcs

20.00

4.80 sq.m 0.055 0.26 kg 1 kg

1.00

NAILS - CEILING BOARD Area of ceiling= 4.80 sq.m Factor = 0.055 Total no. of KG = 0.26 kg 1 kg say SECOND FLOOR LIVING AREA CEILING JOIST Area of ceiling= 14.00 sq.m Factor = 5.373 Total no. of Bd.Ft = 75.22 bd.ft 76 bd.ft say CEILING BOARD Area of ceiling= Factor = Total no. of Bd.Ft = say NAILS - CEILING JOIST Area of ceiling= Factor = Total no. of KG = say

1.00

76.00

LIVING AREA

14.00 sq.m 0.24 58.33 pcs 59.00 pcs

59.00

14.00 sq.m 0.055 0.77 kg 1 kg

1.00

NAILS - CEILING BOARD Area of ceiling= 14.00 sq.m

LIVING AREA

CARPENTRY (CEILING) Materials and Estimated Quantities Required Item to be Estimated Calculations LUMBER 2" x 2" BD.FT 0.055 0.77 kg 1 kg PLYWOOD 40cm x 60cm PCS NAILS 2.5" KG 1" KG

Factor = Total no. of KG = say

1.00

BEDROOM CEILING JOIST Area of ceiling= 12.00 sq.m Factor = 5.373 Total no. of Bd.Ft = 64.48 bd.ft 65 bd.ft say CEILING BOARD Area of ceiling= Factor = Total no. of Bd.Ft = say NAILS - CEILING JOIST Area of ceiling= Factor = Total no. of KG = say

65.00

BEDROOM

12.00 sq.m 0.24 50.00 pcs 50.00 pcs

50.00

12.00 sq.m 0.055 0.66 kg 1 kg

1.00

NAILS - CEILING BOARD Area of ceiling= 12.00 sq.m Factor = 0.055 Total no. of KG = 0.66 kg 1 kg say BALCONY CEILING JOIST Area of ceiling= 7.20 sq.m Factor = 5.373 Total no. of Bd.Ft = 38.69 bd.ft 39 bd.ft say CEILING BOARD Area of ceiling= Factor = Total no. of Bd.Ft = say NAILS - CEILING JOIST Area of ceiling= Factor = Total no. of KG = say

1.00

39.00

BALCONY

7.20 sq.m 0.24 30.00 pcs 30 pcs

30.00

7.20 sq.m 0.055 0.40 kg 1 kg

1.00

NAILS - CEILING BOARD Area of ceiling= 7.20 sq.m Factor = 0.055 Total no. of KG = 0.40 kg 1 kg say

1.00

CARPENTRY (CEILING) Materials and Estimated Quantities Required Item to be Estimated Calculations LUMBER 2" x 2" BD.FT PLYWOOD 40cm x 60cm PCS NAILS 2.5" KG 1" KG

CANOPY CEILING JOIST Area of ceiling= 3.20 sq.m Factor = 5.373 Total no. of Bd.Ft = 17.19 bd.ft 18 bd.ft say CEILING BOARD Area of ceiling= Factor = Total no. of Bd.Ft = say NAILS - CEILING JOIST Area of ceiling= Factor = Total no. of KG = say

18.00

CANOPY

3.20 sq.m 0.24 13.33 pcs 14 pcs

14.00

3.20 sq.m 0.055 0.18 kg 1 kg

1.00

NAILS - CEILING BOARD Area of ceiling= 3.20 sq.m Factor = 0.055 Total no. of KG = 0.18 kg 1 kg say TOTAL = 522 bd. ft. 404 pcs 9 kg

1.00 9 kg

TIE WIRE Materials and Estimated Quantities Required Item to be Estimated Calculations KILOGRAM COLUMN FOOTING F1 Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms = F2 Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms = F3 Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms = F4 Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms = F5 Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms = F6 Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms = 180 40 cm 72 m 1.3585 kg say 2 147 40 cm 58.8 m 1.1094 kg say 2 192 40 cm 76.8 m 1.4491 kg say 2 81 40 cm 32.4 m 0.6113 kg say 1 605 40 cm 242 m 4.566 kg say 5 288 40 cm 115.2 m 2.1736 kg say 3

COLUMN FOOTING

COLUMN FOOTING

COLUMN FOOTING

COLUMN FOOTING

COLUMN FOOTING

COLUMN FOOTING

WALL FOOTING

TIE WIRE Materials and Estimated Quantities Required Item to be Estimated Calculations KILOGRAM WF-1 (4M LONG) Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms = 45 40 cm 18 m 0.3396 kg say 1 WF-1 (3.5M LONG) 39 40 cm 15.6 m 0.2943 kg say 1 WF-1 (3M LONG)

WALL FOOTING

WALL FOOTING

Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms =

WALL FOOTING

Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms =

132 40 cm 52.8 m 0.9962 kg say 1 WF-1 (2.5M LONG) 30 40 cm 12 m 0.2264 kg say 1 WF-1 (2.3M LONG) 54 40 cm 21.6 m 0.4075 kg say 1 WF-1 (2M LONG)

WALL FOOTING

Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms =

WALL FOOTING

Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms =

WALL FOOTING

Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms =

168 40 cm 67.2 m 1.2679 kg say 2 WF-1 (1.8M LONG)

WALL FOOTING

Total No of Intersection = 30 Length of Tie Wire = 40 Total Length of Tie Wire = 12

cm m

TIE WIRE Materials and Estimated Quantities Required Item to be Estimated WALL FOOTING Calculations KILOGRAM No of Kilograms = 0.2264 kg say WF-1 (1.2M LONG) Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms = 1 1

WALL FOOTING

60 40 cm 24 m 0.4528 kg say 1 WF-1 (1M LONG)

WALL FOOTING

Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms =

6 40 cm 2.4 m 0.0453 kg say 1 WF-2 (3.5M LONG) 39 40 cm 15.6 m 0.2943 kg say 1 WF-2 (3M LONG)

WALL FOOTING

Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms =

WALL FOOTING

Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms =

66 40 cm 26.4 m 0.4981 kg say 1 WF-2 (2.5M LONG) 30 40 cm 12 m 0.2264 kg say 1 WF-2 (2.3M LONG) 60 40 cm 24 m 0.4528 kg say 1 WF-2 (2M LONG)

WALL FOOTING

Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms =

WALL FOOTING

Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms =

Total No of Intersection = 108 WALL FOOTING

TIE WIRE Materials and Estimated Quantities Required Item to be Estimated Calculations KILOGRAM WALL FOOTING Length of Tie Wire = 40 cm Total Length of Tie Wire = 43.2 m No of Kilograms = 0.8151 kg say 1 WF-2 (1.8M LONG) Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms = 42 40 cm 16.8 m 0.317 kg say 1 WF-2 (1.2M LONG) 30 40 cm 12 m 0.2264 kg say 1

WALL FOOTING

WALL FOOTING

Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms = COLUMN C1 Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms = C2 Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms = C3 Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms = C4 Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms =

COLUMN

896 40 cm 358.4 m 6.7623 kg say 7

COLUMN

930 40 cm 372 m 7.0189 kg say 8

COLUMN

162 40 cm 64.8 m 1.2226 kg say 2

COLUMN

486 40 cm 194.4 m 3.6679 kg say 4

TIE WIRE Materials and Estimated Quantities Required Item to be Estimated Calculations KILOGRAM C5 Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms = C6 Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms = 520 40 cm 208 m 3.9245 kg say 4 960 40 cm 384 m 7.2453 kg say 8

COLUMN

COLUMN

COLUMN (2ND FLOOR) C2 Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms = PC(C2) Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms = PC(C6) Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms = BEAMS B-1 (2m long) Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms = 88 40 cm 35.2 m 0.6642 kg say 1 B-1 (4m long) 152 40 cm 60.8 m 1.1472 kg say 2 252 40 cm 100.8 m 1.9019 kg say 2 630 40 cm 252 m 4.7547 kg say 5

COLUMN

COLUMN

COLUMN

COLUMN

COLUMN

TIE WIRE Materials and Estimated Quantities Required Item to be Estimated Calculations KILOGRAM Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms = 450 40 cm 180 m 3.3962 kg say 4 B-2 (3.5m long) 115 40 cm 46 m 0.8679 kg say 1 B-2 (4m long) 105 40 cm 42 m 0.7925 kg say 1 B-3 (4m long)

COLUMN

COLUMN

Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms =

COLUMN

Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms =

COLUMN

Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms =

106 40 cm 42.4 m 0.8 kg say 1 B-3 (3.5m long) 204 40 cm 81.6 m 1.5396 kg say 2 B-3 (3m long) 89 40 cm 35.6 m 0.6717 kg say 1 B-3 (2m long) 60 40 cm 24 m 0.4528 kg say 1

COLUMN

Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms =

COLUMN

Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms =

COLUMN

Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms =

TIE WIRE Materials and Estimated Quantities Required Item to be Estimated Calculations KILOGRAM CB-1 (1.81 m long) Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms = 144 40 cm 57.6 m 1.0868 kg say 2 CB-2(0.8m long) 40 40 cm 16 m 0.3019 kg say 1 CB-3 (0.80 m) 64 40 cm 25.6 m 0.483 kg say 1

COLUMN

COLUMN

Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms =

COLUMN

Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms =

ROOF BEAMS R-1 (4.3m long) Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms = 286 40 cm 114.4 m 2.1585 kg say 3 R-1 (4m long) 258 40 cm 103.2 m 1.9472 kg say 2 R-1 (3m long) 202 40 cm 80.8 m 1.5245 kg say 2 R-2 (4m long)

BEAMS

BEAMS

Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms =

BEAMS

Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms =

BEAMS

Total No of Intersection = 104 Length of Tie Wire = 40

cm

TIE WIRE Materials and Estimated Quantities Required Item to be Estimated BEAMS Calculations KILOGRAM Total Length of Tie Wire = 41.6 m No of Kilograms = 0.7849 kg say R-2 (3m long) Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms =

BEAMS

202 40 cm 80.8 m 1.5245 kg say 2 R-2 (4m long) 104 40 cm 41.6 m 0.7849 kg say 1 R-2 (3m long) 712 40 cm 284.8 m 5.3736 kg say 6 R-3 (2m long)

BEAMS

Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms =

BEAMS

Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms =

BEAMS

Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms =

272 40 cm 108.8 m 2.0528 kg say 3 R-3 (1.2m long) 132 40 cm 52.8 m 0.9962 kg say 1 TOTAL =

BEAMS

Total No of Intersection = Length of Tie Wire = Total Length of Tie Wire = No of Kilograms =

1 111 kg

TIE WIRE
Item no. 1 Description COLUMN FOOTING F1 F2 F3 F4 F5 F6 2 WALL FOOTING WF-1 (4M LONG) WF-1 (3.5M LONG) WF-1 (3M LONG) WF-1 (2.5M LONG) WF-1 (2.3M LONG) WF-1 (2M LONG) WF-1 (1.8M LONG) WF-1 (1.2M LONG) WF-1 (1M LONG) WF-2 (3.5M LONG) WF-2 (3M LONG) WF-2 (2.5M LONG) WF-2 (2.3M LONG) WF-2 (2M LONG) WF-2 (1.8M LONG) WF-2 (1.2M LONG) 3 COLUMN C1 C2 C3 C4 C5 C6 448 186 162 162 320 104 2 5 1 3 3 5 896 930 162 486 960 520 45 39 33 30 27 24 15 15 6 39 33 30 30 27 21 15 1 1 4 1 2 7 2 4 1 1 2 1 2 4 2 2 45 39 132 30 54 168 30 60 6 39 66 30 60 108 42 30 144 121 81 64 49 36 2 5 1 3 3 5 288 605 81 192 147 180 Number of Intersection per Member Number of Member Total Number of Intersections

TIE WIRE
Item no. 4 Description COLUMN (2ND FLOOR) C2 PC(C2) PC(C6) 5 BEAMS B-1 (2m long) B-1 (4m long) B-2 (3.5m long) B-2 (4m long) B-3 (4m long) B-3 (3.5m long) B-3 (3m long) B-3 (2m long) CB-1 (1.81 m long) CB-2(0.8m long) CB-3 (0.80 m) 6 ROOF BEAMS R-1 (4.3m long) R-1 (4m long) R-1 (3m long) R-2 (4m long) R-2 (3m long) R-3 (2m long) R-3 (1.2m long) 143 129 101 104 89 68 33 2 2 2 1 8 4 4 286 258 202 104 712 272 132 88 150 115 105 106 102 89 60 72 40 32 1 3 1 1 1 2 1 1 2 1 2 88 450 115 105 106 204 89 60 144 40 64 126 126 76 5 2 2 630 252 152 Number of Intersection per Member Number of Member Total Number of Intersections

SLAB
Item no. 1 2 3 Description S-3 S-2 S-1 Bar Dia. (mm) 10 10 10 Spacing (cm) 20 20 20 Area (Sq.m) 106.2 7.2 29.2

SLAB REINFORCEMENT Materials and Estimated Quantities Required Item to be Estimated Calculations S-1 TWO - WAY SLAB Area = 29.2 sq.m Bar Spacing = 20 cm Diameter = 10 mm From the table: Used(commercial length) = 7.5 m Factor = 1.775 Total No. Commercial Length: Total Area x Factor = 51.83 pcs say 52 S-2 TWO - WAY SLAB Area = 7.2 sq.m Bar Spacing = 20 cm Diameter = 10 mm From the table: Used(commercial length) = 7.5 m Factor = 2.360 Total No. Commercial Length: Total Area x Factor = 16.992 pcs say 17 S-3 TWO - WAY SLAB Area = 106.2 sq.m Bar Spacing = 20 cm Diameter = 10 mm From the table: Used(commercial length) = 7.5 m Factor = 2.360 Total No. Commercial Length: Total Area x Factor = 250.632 pcs say 251 TOTAL = 10 mm x 7.5 m 10 mm x6m

SLAB (S -1)

52

SLAB (S -2)

17

SLAB (S - 3)

251 303 pcs

17 pcs

SLAB Item to be Estimated Calculations S-1 TWO-WAY SLAB Total Area = Bar Spacing = Length of Tie Wire = Concrete Slab 106.20 sq. m 20 cm 40 cm tie Materials and Estimated Quantities Required No of Kilogram

From the table: Factor = 0.227 No of Kilograms Factor x Area = 24.11 say. . 25 S-2 TWO-WAY SLAB Total Area = Bar Spacing = Length of Tie Wire = 7.20 sq. m 20 cm 40 cm tie

25

Concrete Slab

From the table: Factor = 0.227 No of Kilograms Factor x Area = 1.63 say. . 2 S-3 ONE-WAY SLAB Total Area = Bar Spacing = Length of Tie Wire = 29.20 sq. m 20 cm 40 cm tie

Concrete Slab

From the table: Factor = 0.168 No of Kilograms Factor x Area = 4.91 say. . 5 Total =

5 32kg

WALL Item to be Estimated Calculations W-1 W-1 (4M LONG) Total Area = Vertical Spacing = Horizontal Spacing = Length of Tie Wire = 12.20 60 3 40 sq. m cm layers cm tie Materials and Estimated Quantities Required No of Kilogram

CHB Wall (W-1)

From the table: Factor = 0.042 No of Kilograms Factor x Area = 0.51 say. . 1 W-1 (3.5M LONG) Total Area = Vertical Spacing = Horizontal Spacing = Length of Tie Wire = 15.05 60 3 40 sq. m cm layers cm tie

CHB Wall (W-1)

From the table: Factor = 0.042 No of Kilograms Factor x Area = 0.63 say. . 1 W-1 (3M LONG) Total Area = Vertical Spacing = Horizontal Spacing = Length of Tie Wire = 41.60 60 3 40 sq. m cm layers cm tie

CHB Wall (W-1)

From the table: Factor = 0.042 No of Kilograms Factor x Area = 1.75 say. . 2

WALL Item to be Estimated Calculations W-1 (2.5M LONG) Total Area = Vertical Spacing = Horizontal Spacing = Length of Tie Wire = 10.75 60 3 40 sq. m cm layers cm tie Materials and Estimated Quantities Required No of Kilogram

CHB Wall (W-1)

From the table: Factor = 0.042 No of Kilograms Factor x Area = 0.45 say. . 1 W-1 (2.3M LONG) Total Area = Vertical Spacing = Horizontal Spacing = Length of Tie Wire = 19.78 60 3 40 sq. m cm layers cm tie

CHB Wall (W-1)

From the table: Factor = 0.042 No of Kilograms Factor x Area = 0.83 say. . 1 W-1 (2M LONG) Total Area = Vertical Spacing = Horizontal Spacing = Length of Tie Wire = 52.76 60 3 40 sq. m cm layers cm tie

CHB Wall (W-1)

From the table: Factor = 0.042 No of Kilograms Factor x Area = 2.22 say. . 3 W-1 (1.8M LONG) Total Area = Vertical Spacing = 10.88 sq. m 60 cm

CHB Wall

WALL Item to be Estimated Calculations Horizontal Spacing = Length of Tie Wire = 3 layers 40 cm tie Materials and Estimated Quantities Required No of Kilogram

CHB Wall (W-1)

From the table: Factor = 0.042 No of Kilograms Factor x Area = 0.46 say. . 1 W-1 (1.2M LONG) Total Area = Vertical Spacing = Horizontal Spacing = Length of Tie Wire = 17.12 60 3 40 sq. m cm layers cm tie

CHB Wall (W-1)

From the table: Factor = 0.042 No of Kilograms Factor x Area = 0.72 say. . 1 W-1 (1M LONG) Total Area = Vertical Spacing = Horizontal Spacing = Length of Tie Wire = 4.30 60 3 40 sq. m cm layers cm tie

CHB Wall (W-1)

From the table: Factor = 0.042 No of Kilograms Factor x Area = 0.18 say. . 1 W-1 (10.3M LONG - TRIANGLE) Total Area = Vertical Spacing = Horizontal Spacing = Length of Tie Wire = From the table: 10.30 60 3 40 sq. m cm layers cm tie

CHB Wall (W-1)

WALL CHB Item to be Wall Estimated (W-1) Calculations Factor = 0.042 No of Kilograms Factor x Area = 0.43 say. . 1 W-2 W-2 (3.5M LONG) Total Area = Vertical Spacing = Horizontal Spacing = Length of Tie Wire = 15.05 60 3 40 sq. m cm layers cm tie Materials and Estimated Quantities Required No of Kilogram

CHB Wall (W-2)

From the table: Factor = 0.042 No of Kilograms Factor x Area = 0.63 say. . 1 W-2 (3M LONG) Total Area = Vertical Spacing = Horizontal Spacing = Length of Tie Wire = 25.80 60 3 40 sq. m cm layers cm tie

CHB Wall (W-2)

From the table: Factor = 0.042 No of Kilograms Factor x Area = 1.08 say. . 2 W-2 (2.5M LONG) Total Area = Vertical Spacing = Horizontal Spacing = Length of Tie Wire = 10.75 60 3 40 sq. m cm layers cm tie

CHB Wall (W-2)

From the table: Factor = 0.042 No of Kilograms

CHB Wall (W-2) Item to be Estimated

WALL Calculations Factor x Area = 0.45 say. . 1 W-2 (2.3M LONG) Total Area = Vertical Spacing = Horizontal Spacing = Length of Tie Wire = 19.78 60 3 40 sq. m cm layers cm tie Materials and Estimated Quantities Required No of Kilogram 1

CHB Wall (W-2)

From the table: Factor = 0.042 No of Kilograms Factor x Area = 0.83 say. . 1 W-2 (2M LONG) Total Area = Vertical Spacing = Horizontal Spacing = Length of Tie Wire = 34.40 60 3 40 sq. m cm layers cm tie

CHB Wall (W-2)

From the table: Factor = 0.042 No of Kilograms Factor x Area = 1.44 say. . 2 W-2 (1.8M LONG) Total Area = Vertical Spacing = Horizontal Spacing = Length of Tie Wire = 15.48 60 3 40 sq. m cm layers cm tie

CHB Wall (W-2)

From the table: Factor = 0.042 No of Kilograms Factor x Area = 0.65 say. . 1 W-2 (1.2M LONG)

WALL Item to be Estimated Calculations Total Area = Vertical Spacing = Horizontal Spacing = Length of Tie Wire = 10.32 60 3 40 sq. m cm layers cm tie Materials and Estimated Quantities Required No of Kilogram

CHB Wall (W-2)

From the table: Factor = 0.042 No of Kilograms Factor x Area = 0.43 say. . 1 W-2 (10.3M LONG - TRIANGLE) Total Area = Vertical Spacing = Horizontal Spacing = Length of Tie Wire = 10.30 60 3 40 sq. m cm layers cm tie

CHB Wall (W-2)

From the table: Factor = 0.042 No of Kilograms Factor x Area = 0.43 say. . 1 Total = WALL (SECOND FLOOR)

1 23kg

Item to be Estimated

Calculations W-1 W-1 (4M LONG) Total Area = Vertical Spacing = Horizontal Spacing = Length of Tie Wire = 29.36 60 3 40 sq. m cm layers cm tie

Materials and Estimated Quantities Required No of Kilogram

CHB Wall (W-1)

From the table: Factor = 0.042 No of Kilograms

CHB Wall (W-1) Item to be Estimated

WALL Calculations Factor x Area = 1.23 say. . 2 W-2 W-2 (3.5M LONG) Total Area = Vertical Spacing = Horizontal Spacing = Length of Tie Wire = 9.45 60 3 40 sq. m cm layers cm tie Materials and Estimated Quantities Required No of Kilogram 2

CHB Wall (W-2)

From the table: Factor = 0.042 No of Kilograms Factor x Area = 0.40 say. . 1 W-2 (2.5M LONG) Total Area = Vertical Spacing = Horizontal Spacing = Length of Tie Wire = 6.75 60 3 40 sq. m cm layers cm tie

CHB Wall (W-2)

From the table: Factor = 0.042 No of Kilograms Factor x Area = 0.28 say. . 1 W-2 (2.3M LONG) Total Area = Vertical Spacing = Horizontal Spacing = Length of Tie Wire = 6.21 60 3 40 sq. m cm layers cm tie

CHB Wall (W-2)

From the table: Factor = 0.042 No of Kilograms Factor x Area = 0.26 say. . 1 W-2 (2M LONG)

WALL Item to be Estimated Calculations Materials and Estimated Quantities Required No of Kilogram Total Area = Vertical Spacing = Horizontal Spacing = Length of Tie Wire = 5.40 60 3 40 sq. m cm layers cm tie

CHB Wall (W-2)

From the table: Factor = 0.042 No of Kilograms Factor x Area = 0.23 say. . 1 W-2 (10.3M LONG - TRIANGLE) Total Area = Vertical Spacing = Horizontal Spacing = Length of Tie Wire = 10.30 60 3 40 sq. m cm layers cm tie

CHB Wall (W-2)

From the table: Factor = 0.042 No of Kilograms Factor x Area = 0.43 say. . 1 Total =

1 7kg

MASONRY WORKS Materials and Estimated Quantities Required CHB 6" CEMENT SAND pcs bags cu.m

Item to be Estimated

Calculations W-1 W-1 (4M LONG) CHB 6" Area of wall= Factor = Total no of CHB say MORTAR Area of wall= Cement Factor = Class = No. of bags of cement = say 12.20 sq.m 1.526 A 18.62 bags 19 bags 12.20 sq.m 13.00 158.6 pcs 159 pcs

159.00

WALL (W-1)

19.00

Sand Factor = 0.0844 Sand = 1.03 cu.m say 1.50 cu.m PLASTER (20 mm) Area of wall (2 sides) = Cement Factor = Class = No. of bags of cement = say Sand Factor = Sand = say

1.50

19.60 0.36 A 7.06 8 0.02 0.39 0.50

sq.m

bags bags cu.m cu.m

8.00

0.50

W-1 (3.5M LONG) CHB 6" Area of wall= 15.05 sq.m Factor = 13.00 Total no of CHB 195.65 pcs

MASONRY WORKS Materials and Estimated Quantities Required CHB 6" CEMENT SAND pcs bags cu.m 196.00

Item to be Estimated

Calculations say MORTAR Area of wall= Cement Factor = Class = No. of bags of cement = say 15.05 sq.m 1.526 A 22.97 bags 23 bags 196 pcs

WALL (W-1)

23.00

Sand Factor = 0.0844 Sand = 1.27 cu.m say 1.50 cu.m PLASTER (20 mm) Area of wall (2 sides) = Cement Factor = Class = No. of bags of cement = say Sand Factor = Sand = say

1.50

25.90 0.36 A 9.32 10 0.02 0.52 1.00

sq.m

bags bags cu.m cu.m

10.00

1.00

W-1 (3M LONG) CHB 6" Area of wall= Factor = Total no of CHB say MORTAR Area of wall= Cement Factor = Class = No. of bags of cement = say 41.60 sq.m 1.526 A 63.48 bags 64 bags 41.60 sq.m 13.00 540.8 pcs 541 pcs

541.00

WALL (W-1)

64.00

Sand Factor = 0.0844 Sand = 3.51 cu.m say 4.00 cu.m PLASTER (20 mm) Area of wall (2 sides) = Cement Factor = Class =

4.00

68.80 sq.m 0.36 A

(W-1)

MASONRY WORKS Materials and Estimated Quantities Required CHB 6" CEMENT SAND pcs bags cu.m 24.77 25 0.02 1.38 1.50 bags bags cu.m cu.m 25.00

Item to be Estimated

Calculations No. of bags of cement = say Sand Factor = Sand = say

1.50

W-1 (2.5M LONG) CHB 6" Area of wall= 10.75 sq.m Factor = 13.00 Total no of CHB 139.75 pcs say 140 pcs MORTAR Area of wall= Cement Factor = Class = No. of bags of cement = say 10.75 sq.m 1.526 A 16.40 bags 17 bags

140.00

WALL (W-1)

17.00

Sand Factor = 0.0844 Sand = 0.91 cu.m say 1.00 cu.m PLASTER (20 mm) Area of wall (2 sides) = Cement Factor = Class = No. of bags of cement = say Sand Factor = Sand = say

1.00

18.50 0.36 A 6.66 7 0.02 0.37 0.50

sq.m

bags bags cu.m cu.m

7.00

0.50

W-1 (2.3M LONG) CHB 6" Area of wall= 19.78 sq.m Factor = 13.00 Total no of CHB 257.14 pcs say 258 pcs MORTAR Area of wall= Cement Factor = Class = WALL (W-1) 19.78 sq.m 1.526 A

258.00

MASONRY WORKS Materials and Estimated Quantities Required CHB 6" CEMENT SAND pcs bags cu.m 30.18 bags 31 bags 31.00

Item to be Estimated

Calculations No. of bags of cement = say

WALL (W-1)

Sand Factor = 0.0844 Sand = 1.67 cu.m say 2.00 cu.m PLASTER (20 mm) Area of wall (2 sides) = Cement Factor = Class = No. of bags of cement = say Sand Factor = Sand = say

2.00

34.04 0.36 A 12.25 13 0.02 0.68 1.00

sq.m

bags bags cu.m cu.m

13.00

1.00

W-1 (2M LONG) CHB 6" Area of wall= 52.76 sq.m Factor = 13.00 Total no of CHB 685.88 pcs say 686 pcs MORTAR Area of wall= Cement Factor = Class = No. of bags of cement = say 52.76 sq.m 1.526 A 80.51 bags 81 bags

686.00

WALL (W-1)

81.00

Sand Factor = 0.0844 Sand = 4.45 cu.m say 4.50 cu.m PLASTER (20 mm) Area of wall (2 sides) = Cement Factor = Class = No. of bags of cement = say Sand Factor = Sand = say

4.50

88.72 0.36 A 31.94 32 0.02 1.77 2.00

sq.m

bags bags cu.m cu.m

32.00

2.00

MASONRY WORKS Materials and Estimated Quantities Required CHB 6" CEMENT SAND pcs bags cu.m

Item to be Estimated

Calculations W-1 (1.8M LONG) CHB 6" Area of wall= 10.88 sq.m Factor = 13.00 Total no of CHB 141.44 pcs say 142 pcs MORTAR Area of wall= Cement Factor = Class = No. of bags of cement = say 10.88 sq.m 1.526 A 16.60 bags 17 bags

142.00

WALL (W-1)

17.00

Sand Factor = 0.0844 Sand = 0.92 cu.m say 1.00 cu.m PLASTER (20 mm) Area of wall (2 sides) = Cement Factor = Class = No. of bags of cement = say Sand Factor = Sand = say

1.00

17.44 0.36 A 6.28 7 0.02 0.35 0.50

sq.m

bags bags cu.m cu.m

7.00

0.50

W-1 (1.2M LONG) CHB 6" Area of wall= 17.12 sq.m Factor = 13.00 Total no of CHB 222.56 pcs say 223 pcs MORTAR Area of wall= Cement Factor = Class = No. of bags of cement = say 17.12 sq.m 1.526 A 26.13 bags 27 bags

223.00

WALL (W-1)

27.00

Sand Factor = 0.0844 Sand = 1.44 cu.m say 1.50 cu.m

1.50

WALL (W-1) Item to be Estimated

MASONRY WORKS Materials and Estimated Quantities Required CHB 6" CEMENT SAND pcs bags cu.m

Calculations

PLASTER (20 mm) Area of wall (2 sides) = Cement Factor = Class = No. of bags of cement = say Sand Factor = Sand = say

28.48 0.36 A 10.25 11 0.02 0.57 1.00

sq.m

bags bags cu.m cu.m

11.00

1.00

W-1 (1M LONG) CHB 6" Area of wall= Factor = Total no of CHB say MORTAR Area of wall= Cement Factor = Class = No. of bags of cement = say 4.30 sq.m 1.526 A 6.56 bags 7 bags 4.30 sq.m 13.00 55.9 pcs 56 pcs

56.00

WALL (W-1)

7.00

Sand Factor = 0.0844 Sand = 0.36 cu.m say 0.50 cu.m PLASTER (20 mm) Area of wall (2 sides) = Cement Factor = Class = No. of bags of cement = say Sand Factor = Sand = say

0.50

7.40 0.36 A 2.66 3 0.02 0.15 0.50

sq.m

bags bags cu.m cu.m

3.00

0.50

W-1 (10.3M - LONG TRIANGLE) CHB 6" Area of wall= 10.30 sq.m Factor = 13.00 Total no of CHB 133.9 pcs say 134 pcs

134.00

MASONRY WORKS Materials and Estimated Quantities Required CHB 6" CEMENT SAND pcs bags cu.m

Item to be Estimated

Calculations

MORTAR Area of wall= Cement Factor = Class = No. of bags of cement = say 10.30 sq.m 1.526 A 15.72 bags 16 bags

WALL (W-1)

16.00

Sand Factor = 0.0844 Sand = 0.87 cu.m say 1.00 cu.m PLASTER (20 mm) Area of wall (2 sides) = Cement Factor = Class = No. of bags of cement = say Sand Factor = Sand = say

1.00

20.60 0.36 A 7.42 8 0.02 0.41 0.50

sq.m

bags bags cu.m cu.m

8.00

0.50

W-2 W-2 (3.5M LONG) CHB 6" Area of wall= 15.05 sq.m Factor = 13.00 Total no of CHB 195.65 pcs say 196 pcs MORTAR Area of wall= Cement Factor = Class = No. of bags of cement = say 15.05 sq.m 1.526 A 22.97 bags 23 bags

196.00

WALL (W-2)

23.00

Sand Factor = 0.0844 Sand = 1.27 cu.m say 1.50 cu.m PLASTER (20 mm) Area of wall (2 sides) = Cement Factor = Class =

1.50

30.10 sq.m 0.36 A

(W-2)

MASONRY WORKS Materials and Estimated Quantities Required CHB 6" CEMENT SAND pcs bags cu.m 10.84 11 0.02 0.60 1.00 bags bags cu.m cu.m 11.00

Item to be Estimated

Calculations No. of bags of cement = say Sand Factor = Sand = say

1.00

W-2 (3M LONG) CHB 6" Area of wall= Factor = Total no of CHB say MORTAR Area of wall= Cement Factor = Class = No. of bags of cement = say 25.80 sq.m 1.526 A 39.37 bags 40 bags 25.80 sq.m 13.00 335.4 pcs 336 pcs

336.00

WALL (W-2)

40.00

Sand Factor = 0.0844 Sand = 2.18 cu.m say 2.50 cu.m PLASTER (20 mm) Area of wall (2 sides) = Cement Factor = Class = No. of bags of cement = say Sand Factor = Sand = say

2.50

51.60 0.36 A 18.58 19 0.02 1.03 1.50

sq.m

bags bags cu.m cu.m

19.00

1.50

W-2 (2.5M LONG) CHB 6" Area of wall= 10.75 sq.m Factor = 13.00 Total no of CHB 139.75 pcs say 140 pcs MORTAR Area of wall= Cement Factor = Class = WALL (W-2) 10.75 sq.m 1.526 A

140.00

MASONRY WORKS Materials and Estimated Quantities Required CHB 6" CEMENT SAND pcs bags cu.m 16.40 bags 17 bags 17.00

Item to be Estimated

Calculations No. of bags of cement = say

WALL (W-2)

Sand Factor = 0.0844 Sand = 0.91 cu.m say 1.00 cu.m PLASTER (20 mm) Area of wall (2 sides) = Cement Factor = Class = No. of bags of cement = say Sand Factor = Sand = say

1.00

21.50 0.36 A 7.74 8 0.02 0.43 0.50

sq.m

bags bags cu.m cu.m

8.00

0.50

W-2 (2.3M LONG) CHB 6" Area of wall= 19.78 sq.m Factor = 13.00 Total no of CHB 257.14 pcs say 258 pcs MORTAR Area of wall= Cement Factor = Class = No. of bags of cement = say 19.78 sq.m 1.526 A 30.18 bags 31 bags

258.00

WALL (W-2)

31.00

Sand Factor = 0.0844 Sand = 1.67 cu.m say 2.00 cu.m PLASTER (20 mm) Area of wall (2 sides) = Cement Factor = Class = No. of bags of cement = say Sand Factor = Sand = say

2.00

39.56 0.36 A 14.24 15 0.02 0.79 1.00

sq.m

bags bags cu.m cu.m

15.00

1.00

MASONRY WORKS Materials and Estimated Quantities Required CHB 6" CEMENT SAND pcs bags cu.m

Item to be Estimated

Calculations W-2 (2M LONG) CHB 6" Area of wall= Factor = Total no of CHB say MORTAR Area of wall= Cement Factor = Class = No. of bags of cement = say 34.40 sq.m 1.526 A 52.49 bags 53 bags 34.40 sq.m 13.00 447.2 pcs 448 pcs

448.00

WALL (W-2)

53.00

Sand Factor = 0.0844 Sand = 2.90 cu.m say 2.00 cu.m PLASTER (20 mm) Area of wall (2 sides) = Cement Factor = Class = No. of bags of cement = say Sand Factor = Sand = say

2.00

68.80 0.36 A 24.77 25 0.02 1.38 1.50

sq.m

bags bags cu.m cu.m

25.00

1.50

W-2 (1.8M LONG) CHB 6" Area of wall= 15.48 sq.m Factor = 13.00 Total no of CHB 201.24 pcs say 202 pcs MORTAR Area of wall= Cement Factor = Class = No. of bags of cement = say 15.48 sq.m 1.526 A 23.62 bags 24 bags

202.00

WALL (W-2)

24.00

Sand Factor = 0.0844 Sand = 1.31 cu.m say 1.50 cu.m

1.50

WALL (W-2) Item to be Estimated

MASONRY WORKS Materials and Estimated Quantities Required CHB 6" CEMENT SAND pcs bags cu.m

Calculations

PLASTER (20 mm) Area of wall (2 sides) = Cement Factor = Class = No. of bags of cement = say Sand Factor = Sand = say

30.96 0.36 A 11.15 12 0.02 0.62 1.00

sq.m

bags bags cu.m cu.m

12.00

1.00

W-2 (1.2M LONG) CHB 6" Area of wall= 10.32 sq.m Factor = 13.00 Total no of CHB 134.16 pcs say 135 pcs MORTAR Area of wall= Cement Factor = Class = No. of bags of cement = say 10.32 sq.m 1.526 A 15.75 bags 16 bags

135.00

WALL (W-2)

16.00

Sand Factor = 0.0844 Sand = 0.87 cu.m say 1.00 cu.m PLASTER (20 mm) Area of wall (2 sides) = Cement Factor = Class = No. of bags of cement = say Sand Factor = Sand = say

1.00

20.64 0.36 A 7.43 8 0.02 0.41 0.50

sq.m

bags bags cu.m cu.m

8.00

0.50

W-2 (10.3M - LONG TRIANGLE) CHB 6" Area of wall= 10.30 sq.m Factor = 13.00 Total no of CHB 133.9 pcs say 134 pcs

134.00

MASONRY WORKS Materials and Estimated Quantities Required CHB 6" CEMENT SAND pcs bags cu.m

Item to be Estimated

Calculations

MORTAR Area of wall= Cement Factor = Class = No. of bags of cement = say 10.30 sq.m 1.526 A 15.72 bags 16 bags

WALL (W-2)

16.00

Sand Factor = 0.0844 Sand = 0.87 cu.m say 1.00 cu.m PLASTER (20 mm) Area of wall (2 sides) = Cement Factor = Class = No. of bags of cement = say Sand Factor = Sand = say

1.00

20.60 0.36 A 7.42 8 0.02 0.41 0.50

sq.m

bags bags cu.m cu.m Total = 4384 pcs

8.00

0.50 752 bags 47.5 cu.m

MASONRY WORKS (SECOND FLOOR) Materials and Estimated Quantities Required CHB 6" CEMENT SAND pcs bags cu.m

Item to be Estimated

Calculations W-1 W-1 (4M LONG) CHB 6" Area of wall= 29.36 sq.m Factor = 13.00 Total no of CHB 381.68 pcs say 382 pcs MORTAR Area of wall= Cement Factor = Class = No. of bags of cement = say 29.36 sq.m 1.526 A 44.80 bags 45 bags

382.00

WALL (W-1)

45.00

MASONRY WORKS Materials and Estimated Quantities Required CHB 6" CEMENT SAND pcs bags cu.m

Item to be Estimated WALL (W-1)

Calculations Sand Factor = 0.0844 Sand = 2.48 cu.m say 2.50 cu.m PLASTER (20 mm) Area of wall (2 sides) = Cement Factor = Class = No. of bags of cement = say Sand Factor = Sand = say

2.50

58.72 0.36 A 21.14 22 0.02 1.17 1.50

sq.m

bags bags cu.m cu.m

22.00

1.50

W-2 W-2 (3.5M LONG) CHB 6" Area of wall= 9.45 sq.m Factor = 13.00 Total no of CHB 122.85 pcs say 123 pcs MORTAR Area of wall= Cement Factor = Class = No. of bags of cement = say 9.45 sq.m 1.526 A 14.42 bags 15 bags

123.00

WALL (W-2)

15.00

Sand Factor = 0.0844 Sand = 0.80 cu.m say 1.00 cu.m PLASTER (20 mm) Area of wall (2 sides) = Cement Factor = Class = No. of bags of cement = say Sand Factor = Sand = say

1.00

18.90 0.36 A 6.80 7 0.02 0.38 0.50

sq.m

bags bags cu.m cu.m

7.00

0.50

W-2 (2.5M LONG) CHB 6"

MASONRY WORKS Materials and Estimated Quantities Required CHB 6" CEMENT SAND pcs bags cu.m 6.75 sq.m 13.00 87.75 pcs 123 pcs

Item to be Estimated

Calculations Area of wall= Factor = Total no of CHB say MORTAR Area of wall= Cement Factor = Class = No. of bags of cement = say 6.75 sq.m 1.526 A 10.30 bags 15 bags

123.00

WALL (W-2)

15.00

Sand Factor = 0.0844 Sand = 0.57 cu.m say 1.00 cu.m PLASTER (20 mm) Area of wall (2 sides) = Cement Factor = Class = No. of bags of cement = say Sand Factor = Sand = say

1.00

13.50 0.36 A 4.86 7 0.02 0.27 0.50

sq.m

bags bags cu.m cu.m

7.00

0.50

W-2 (2.3M LONG) CHB 6" Area of wall= Factor = Total no of CHB say MORTAR Area of wall= Cement Factor = Class = No. of bags of cement = say 6.21 sq.m 1.526 A 9.48 bags 10 bags 6.21 sq.m 13.00 80.73 pcs 81 pcs

81.00

WALL (W-2)

10.00

Sand Factor = 0.0844 Sand = 0.52 cu.m say 1.00 cu.m PLASTER (20 mm)

1.00

WALL (W-2) MASONRY WORKS Materials and Estimated Quantities Required CHB 6" CEMENT SAND pcs bags cu.m 12.42 0.36 A 4.47 5 0.02 0.25 0.50 sq.m

Item to be Estimated

Calculations Area of wall (2 sides) = Cement Factor = Class = No. of bags of cement = say Sand Factor = Sand = say

bags bags cu.m cu.m

5.00

0.50

W-2 (2M LONG) CHB 6" Area of wall= Factor = Total no of CHB say MORTAR Area of wall= Cement Factor = Class = No. of bags of cement = say 5.40 sq.m 1.526 A 8.24 bags 9 bags 5.40 sq.m 13.00 70.2 pcs 71 pcs

71.00

WALL (W-2)

9.00

Sand Factor = 0.0844 Sand = 0.46 cu.m say 0.50 cu.m PLASTER (20 mm) Area of wall (2 sides) = Cement Factor = Class = No. of bags of cement = say Sand Factor = Sand = say

0.50

10.80 0.36 A 3.89 4 0.02 0.22 0.50

sq.m

bags bags cu.m cu.m

4.00

0.50

W-2 (10.3M LONG - TRIANGLE) CHB 6" Area of wall= 10.30 sq.m Factor = 13.00 Total no of CHB 133.9 pcs say 134 pcs MORTAR

134.00

MASONRY WORKS Materials and Estimated Quantities Required CHB 6" CEMENT SAND pcs bags cu.m 10.30 sq.m 1.526 A 15.72 bags 16 bags

Item to be Estimated

Calculations Area of wall= Cement Factor = Class = No. of bags of cement = say

WALL (W-2)

16.00

Sand Factor = 0.0844 Sand = 0.87 cu.m say 1.00 cu.m PLASTER (20 mm) Area of wall (2 sides) = Cement Factor = Class = No. of bags of cement = say Sand Factor = Sand = say

1.00

20.60 0.36 A 7.42 8 0.02 0.41 0.50

sq.m

bags bags cu.m cu.m Total = 914 pcs

8.00

0.50 163 bags 11 cu.m

WALL (GROUND FLOOR) Item to be Estimated Calculations W-1 W-1 (4M LONG) VERTICAL BARS: Area = 12.20 sq.m % of Wastages = 10 % Total Area = 13.42 sq.m FOR VERTICAL REINFORCEMENTS: Spacing = 60 cm Factor = 2.13 Total Length of Bars : Total Area x Factor = 28.58 m No of C/L needed: WALL (W-1) total length of bars / C/L bars = 4.76 say 5 HORIZONTAL BARS: Area = 12.20 sq.m % of Wastages = 20 % Total Area = 14.64 sq.m FOR HORIZONTAL REINFORCEMENTS: Spacing = 3 layer Factor = 2.15 Total Length of Bars : Total Area x Factor = 31.48 m No of C/L needed: total length of bars / C/L bars = 5.25 say 6 W-1 (3.5M LONG) VERTICAL BARS: Area = 15.05 sq.m % of Wastages = 10 % Total Area = 16.56 sq.m FOR VERTICAL REINFORCEMENTS: Spacing = 60 cm Factor = 2.13 Total Length of Bars : Total Area x Factor = 35.26 m No of C/L needed: WALL (W-1) total length of bars / C/L bars = 5.88 say 6 5 Materials and Estimated Quantities Required 10 mm x 6 m

WALL (W-1)

HORIZONTAL BARS: Area = 15.05 sq.m % of Wastages = 20 % Total Area = 18.06 sq.m FOR HORIZONTAL REINFORCEMENTS: Spacing = 3 layer Factor = 2.15 Total Length of Bars : Total Area x Factor = 38.83 m No of C/L needed: total length of bars / C/L bars = 6.47 say 7 W-1 (3M LONG) VERTICAL BARS: Area = 41.60 sq.m % of Wastages = 10 % Total Area = 45.76 sq.m FOR VERTICAL REINFORCEMENTS: Spacing = 60 cm Factor = 2.13 Total Length of Bars : Total Area x Factor = 97.47 m No of C/L needed: 7

WALL (W-1)

total length of bars / C/L bars = 16.24 say 17 HORIZONTAL BARS: Area = 41.60 sq.m % of Wastages = 20 % Total Area = 49.92 sq.m FOR HORIZONTAL REINFORCEMENTS: Spacing = 3 layer Factor = 2.15 Total Length of Bars : Total Area x Factor = 107.3 m No of C/L needed: total length of bars / C/L bars = 17.89 say 18 W-1 (2.5M LONG) VERTICAL BARS: Area = 10.75 sq.m % of Wastages = 10 % Total Area = 11.83 sq.m FOR VERTICAL REINFORCEMENTS: Spacing = 60 cm Factor = 2.13 Total Length of Bars : Total Area x Factor = 25.19 m

17

18

WALL (W-1)

No of C/L needed: WALL (W-1) total length of bars / C/L bars = 4.20 say 5 HORIZONTAL BARS: Area = 10.75 sq.m % of Wastages = 20 % Total Area = 12.9 sq.m FOR HORIZONTAL REINFORCEMENTS: Spacing = 3 layer Factor = 2.15 Total Length of Bars : Total Area x Factor = 27.74 m No of C/L needed: total length of bars / C/L bars = 4.62 say 5 W-1 (2.3M LONG) VERTICAL BARS: Area = 19.78 sq.m % of Wastages = 10 % Total Area = 21.76 sq.m FOR VERTICAL REINFORCEMENTS: Spacing = 60 cm Factor = 2.13 Total Length of Bars : Total Area x Factor = 46.34 m No of C/L needed: WALL (W-1) total length of bars / C/L bars = 7.724 say 8 HORIZONTAL BARS: Area = 19.78 sq.m % of Wastages = 20 % Total Area = 23.74 sq.m FOR HORIZONTAL REINFORCEMENTS: Spacing = 3 layer Factor = 2.15 Total Length of Bars : Total Area x Factor = 51.03 m No of C/L needed: total length of bars / C/L bars = 8.51 say 9 W-1 (2M LONG) VERTICAL BARS: Area = 52.76 sq.m % of Wastages = 10 % Total Area = 58.04 sq.m FOR VERTICAL REINFORCEMENTS: Spacing = 60 cm 5

Factor = 2.13 Total Length of Bars : Total Area x Factor = 123.6 m No of C/L needed: WALL (W-1) total length of bars / C/L bars = 20.603 say 21 HORIZONTAL BARS: Area = 52.76 sq.m % of Wastages = 20 % Total Area = 63.31 sq.m FOR HORIZONTAL REINFORCEMENTS: Spacing = 3 layer Factor = 2.15 Total Length of Bars : Total Area x Factor = 136.1 m No of C/L needed: total length of bars / C/L bars = 22.69 say 23 W-1 (1.8M LONG) VERTICAL BARS: Area = 10.88 sq.m % of Wastages = 10 % Total Area = 11.97 sq.m FOR VERTICAL REINFORCEMENTS: Spacing = 60 cm Factor = 2.13 Total Length of Bars : Total Area x Factor = 25.49 m No of C/L needed: WALL (W-1) total length of bars / C/L bars = 4.249 say 5 HORIZONTAL BARS: Area = 10.88 sq.m % of Wastages = 20 % Total Area = 13.06 sq.m FOR HORIZONTAL REINFORCEMENTS: Spacing = 3 layer Factor = 2.15 Total Length of Bars : Total Area x Factor = 28.07 m No of C/L needed: total length of bars / C/L bars = 4.68 say 5 W-1 (1.2M LONG) VERTICAL BARS: Area = 17.12 sq.m % of Wastages = 10 % 21

23

Total Area = 18.83 sq.m FOR VERTICAL REINFORCEMENTS: Spacing = 60 cm Factor = 2.13 Total Length of Bars : Total Area x Factor = 40.11 m No of C/L needed: WALL (W-1) total length of bars / C/L bars = 6.685 say 7 HORIZONTAL BARS: Area = 17.12 sq.m % of Wastages = 20 % Total Area = 20.54 sq.m FOR HORIZONTAL REINFORCEMENTS: Spacing = 3 layer Factor = 2.15 Total Length of Bars : Total Area x Factor = 44.17 m No of C/L needed: total length of bars / C/L bars = 7.36 say 8 W-1 (1M LONG) VERTICAL BARS: Area = 4.30 sq.m % of Wastages = 10 % Total Area = 4.73 sq.m FOR VERTICAL REINFORCEMENTS: Spacing = 60 cm Factor = 2.13 Total Length of Bars : Total Area x Factor = 10.07 m No of C/L needed: WALL (W-1) total length of bars / C/L bars = 1.679 say 2 HORIZONTAL BARS: Area = 4.30 sq.m % of Wastages = 20 % Total Area = 5.16 sq.m FOR HORIZONTAL REINFORCEMENTS: Spacing = 3 layer Factor = 2.15 Total Length of Bars : Total Area x Factor = 11.09 m No of C/L needed: total length of bars / C/L bars = 1.85 say 2 W-1 (10.3M - LONG TRIANGLE) 7

VERTICAL BARS: Area = 10.30 sq.m % of Wastages = 10 % Total Area = 11.33 sq.m FOR VERTICAL REINFORCEMENTS: Spacing = 60 cm Factor = 2.13 Total Length of Bars : Total Area x Factor = 24.13 m No of C/L needed: WALL (W-1) total length of bars / C/L bars = 4.02 say 5 HORIZONTAL BARS: Area = 10.30 sq.m % of Wastages = 20 % Total Area = 12.36 sq.m FOR HORIZONTAL REINFORCEMENTS: Spacing = 3 layer Factor = 2.15 Total Length of Bars : Total Area x Factor = 26.57 m No of C/L needed: total length of bars / C/L bars = 4.43 say 5 W-2 W-2 (3.5M LONG) VERTICAL BARS: Area = 15.05 sq.m % of Wastages = 10 % Total Area = 16.56 sq.m FOR VERTICAL REINFORCEMENTS: Spacing = 60 cm Factor = 2.13 Total Length of Bars : Total Area x Factor = 35.26 m No of C/L needed: WALL (W-2) total length of bars / C/L bars = 5.88 say 6 HORIZONTAL BARS: Area = 15.05 sq.m % of Wastages = 20 % Total Area = 18.06 sq.m FOR HORIZONTAL REINFORCEMENTS: Spacing = 3 layer Factor = 2.15 Total Length of Bars : Total Area x Factor = 38.83 m 5

No of C/L needed: total length of bars / C/L bars = 6.47 say 7 W-2 (3M LONG) VERTICAL BARS: Area = 25.80 sq.m % of Wastages = 10 % Total Area = 28.38 sq.m FOR VERTICAL REINFORCEMENTS: Spacing = 60 cm Factor = 2.13 Total Length of Bars : Total Area x Factor = 60.45 m No of C/L needed: WALL (W-2) total length of bars / C/L bars = 10.07 say 11 HORIZONTAL BARS: Area = 25.80 sq.m % of Wastages = 20 % Total Area = 30.96 sq.m FOR HORIZONTAL REINFORCEMENTS: Spacing = 3 layer Factor = 2.15 Total Length of Bars : Total Area x Factor = 66.56 m No of C/L needed: total length of bars / C/L bars = 11.09 say 12 W-2 (2.5M LONG) VERTICAL BARS: Area = 10.75 sq.m % of Wastages = 10 % Total Area = 11.83 sq.m FOR VERTICAL REINFORCEMENTS: Spacing = 60 cm Factor = 2.13 Total Length of Bars : Total Area x Factor = 25.19 m No of C/L needed: WALL (W-2) total length of bars / C/L bars = 4.20 say 5 HORIZONTAL BARS: Area = 10.75 sq.m % of Wastages = 20 % Total Area = 12.9 sq.m FOR HORIZONTAL REINFORCEMENTS: Spacing = 3 layer 7

11

12

Factor = 2.15 Total Length of Bars : Total Area x Factor = 27.74 m No of C/L needed: total length of bars / C/L bars = 4.62 say 5 W-2 (2.3M LONG) VERTICAL BARS: Area = 19.78 sq.m % of Wastages = 10 % Total Area = 21.76 sq.m FOR VERTICAL REINFORCEMENTS: Spacing = 60 cm Factor = 2.13 Total Length of Bars : Total Area x Factor = 46.34 m No of C/L needed: WALL (W-2) total length of bars / C/L bars = 7.72 say 8 HORIZONTAL BARS: Area = 19.78 sq.m % of Wastages = 20 % Total Area = 23.74 sq.m FOR HORIZONTAL REINFORCEMENTS: Spacing = 3 layer Factor = 2.15 Total Length of Bars : Total Area x Factor = 51.03 m No of C/L needed: total length of bars / C/L bars = 8.51 say 9 W-2 (2M LONG) VERTICAL BARS: Area = 34.40 sq.m % of Wastages = 10 % Total Area = 37.84 sq.m FOR VERTICAL REINFORCEMENTS: Spacing = 60 cm Factor = 2.13 Total Length of Bars : Total Area x Factor = 80.6 m No of C/L needed: WALL (W-2) total length of bars / C/L bars = 13.43 say 14 HORIZONTAL BARS: Area = 34.40 sq.m % of Wastages = 20 % 5

14

(W-2)

Total Area = 41.28 sq.m FOR HORIZONTAL REINFORCEMENTS: Spacing = 3 layer Factor = 2.15 Total Length of Bars : Total Area x Factor = 88.75 m No of C/L needed: total length of bars / C/L bars = 14.79 say 15 W-2 (1.8M LONG) VERTICAL BARS: Area = 15.48 sq.m % of Wastages = 10 % Total Area = 17.03 sq.m FOR VERTICAL REINFORCEMENTS: Spacing = 60 cm Factor = 2.13 Total Length of Bars : Total Area x Factor = 36.27 m No of C/L needed: WALL (W-2) total length of bars / C/L bars = 6.04 say 7 HORIZONTAL BARS: Area = 15.48 sq.m % of Wastages = 20 % Total Area = 18.58 sq.m FOR HORIZONTAL REINFORCEMENTS: Spacing = 3 layer Factor = 2.15 Total Length of Bars : Total Area x Factor = 39.94 m No of C/L needed: total length of bars / C/L bars = 6.66 say 7 W-2 (1.2M LONG) VERTICAL BARS: Area = 10.32 sq.m % of Wastages = 10 % Total Area = 11.35 sq.m FOR VERTICAL REINFORCEMENTS: Spacing = 60 cm Factor = 2.13 Total Length of Bars : Total Area x Factor = 24.18 m No of C/L needed: WALL (W-2) total length of bars / C/L bars = 4.03 say 5 15

WALL (W-2)

HORIZONTAL BARS: Area = 10.32 sq.m % of Wastages = 20 % Total Area = 12.38 sq.m FOR HORIZONTAL REINFORCEMENTS: Spacing = 3 layer Factor = 2.15 Total Length of Bars : Total Area x Factor = 26.63 m No of C/L needed: total length of bars / C/L bars = 4.44 say 5 W-2 (10.3M - LONG TRIANGLE) VERTICAL BARS: Area = 10.30 sq.m % of Wastages = 10 % Total Area = 11.33 sq.m FOR VERTICAL REINFORCEMENTS: Spacing = 60 cm Factor = 2.13 Total Length of Bars : Total Area x Factor = 24.13 m No of C/L needed: 5

WALL (W-2)

total length of bars / C/L bars = 4.02 say 5 HORIZONTAL BARS: Area = 10.30 sq.m % of Wastages = 20 % Total Area = 12.36 sq.m FOR HORIZONTAL REINFORCEMENTS: Spacing = 3 layer Factor = 2.15 Total Length of Bars : Total Area x Factor = 26.57 m No of C/L needed: total length of bars / C/L bars = 4.43 say 5 Total =

5 295

WALL (SECOND FLOOR) Item to be Estimated Calculations W-1 W-1 (4M LONG) Materials and Estimated Quantities Required 10 mm x6m

VERTICAL BARS: Area = 29.36 sq.m % of Wastages = 10 % Total Area = 32.3 sq.m FOR VERTICAL REINFORCEMENTS: Spacing = 60 cm Factor = 2.13 Total Length of Bars : Total Area x Factor = 68.79 m No of C/L needed: WALL (W-1) total length of bars / C/L bars = 11.47 say 12 HORIZONTAL BARS: Area = 29.36 sq.m % of Wastages = 20 % Total Area = 35.23 sq.m FOR HORIZONTAL REINFORCEMENTS: Spacing = 3 layer Factor = 2.15 Total Length of Bars : Total Area x Factor = 75.75 m No of C/L needed: total length of bars / C/L bars = 12.62 say 13 W-2 W-2 (3.5M LONG) VERTICAL BARS: Area = 9.45 sq.m % of Wastages = 10 % Total Area = 10.4 sq.m FOR VERTICAL REINFORCEMENTS: Spacing = 60 cm Factor = 2.13 Total Length of Bars : Total Area x Factor = 22.14 m No of C/L needed: WALL (W-2) total length of bars / C/L bars = 3.69 say 4 HORIZONTAL BARS: Area = 9.45 sq.m % of Wastages = 20 % Total Area = 11.34 sq.m FOR HORIZONTAL REINFORCEMENTS: Spacing = 3 layer Factor = 2.15 Total Length of Bars : Total Area x Factor = 24.38 m 12

13

No of C/L needed: total length of bars / C/L bars = 4.06 say 5 W-2 (2.5M LONG) VERTICAL BARS: Area = 6.75 sq.m % of Wastages = 10 % Total Area = 7.425 sq.m FOR VERTICAL REINFORCEMENTS: Spacing = 60 cm Factor = 2.13 Total Length of Bars : Total Area x Factor = 15.82 m No of C/L needed: WALL (W-2) total length of bars / C/L bars = 2.64 say 3 HORIZONTAL BARS: Area = 6.75 sq.m % of Wastages = 20 % Total Area = 8.1 sq.m FOR HORIZONTAL REINFORCEMENTS: Spacing = 3 layer Factor = 2.15 Total Length of Bars : Total Area x Factor = 17.42 m No of C/L needed: total length of bars / C/L bars = 2.90 say 3 W-2 (2.3M LONG) VERTICAL BARS: Area = 6.21 sq.m % of Wastages = 10 % Total Area = 6.831 sq.m FOR VERTICAL REINFORCEMENTS: Spacing = 60 cm Factor = 2.13 Total Length of Bars : Total Area x Factor = 14.55 m No of C/L needed: WALL (W-2) total length of bars / C/L bars = 2.43 say 3 HORIZONTAL BARS: Area = 6.21 sq.m % of Wastages = 20 % Total Area = 7.452 sq.m FOR HORIZONTAL REINFORCEMENTS: Spacing = 3 layer 5

Factor = 2.15 Total Length of Bars : Total Area x Factor = 16.02 m No of C/L needed: total length of bars / C/L bars = 2.67 say 3 W-2 (2M LONG) VERTICAL BARS: Area = 5.40 sq.m % of Wastages = 10 % Total Area = 5.94 sq.m FOR VERTICAL REINFORCEMENTS: Spacing = 60 cm Factor = 2.13 Total Length of Bars : Total Area x Factor = 12.65 m No of C/L needed: WALL (W-2) total length of bars / C/L bars = 2.11 say 3 HORIZONTAL BARS: Area = 5.40 sq.m % of Wastages = 20 % Total Area = 6.48 sq.m FOR HORIZONTAL REINFORCEMENTS: Spacing = 3 layer Factor = 2.15 Total Length of Bars : Total Area x Factor = 13.93 m No of C/L needed: total length of bars / C/L bars = 2.32 say 3 W-2 (10.3M LONG - TRIANGLE) VERTICAL BARS: Area = 10.30 sq.m % of Wastages = 10 % Total Area = 11.33 sq.m FOR VERTICAL REINFORCEMENTS: Spacing = 60 cm Factor = 2.13 Total Length of Bars : Total Area x Factor = 24.13 m No of C/L needed: WALL (W-2) total length of bars / C/L bars = say HORIZONTAL BARS: Area = 10.30 % of Wastages = 20 4.02 5 sq.m % 3

(W-2)

Total Area = 12.36 sq.m FOR HORIZONTAL REINFORCEMENTS: Spacing = 3 layer Factor = 2.15 Total Length of Bars : Total Area x Factor = 26.57 m No of C/L needed: total length of bars / C/L bars = 4.43 say 5 Total = 5 62

G R O U N D F L O O R (WALL STEEL)
Bar Dia. Item no. 1 Description WALL - 1 W-1 (4m) VERTICAL BARS HORIZONTAL BARS W-1 (3.5m) VERTICAL BARS HORIZONTAL BARS W-1 (3m) VERTICAL BARS HORIZONTAL BARS W-1 (2.5m) VERTICAL BARS HORIZONTAL BARS W-1 (2.3m) VERTICAL BARS HORIZONTAL BARS W-1 (2m) VERTICAL BARS HORIZONTAL BARS W-1 (1.8m) VERTICAL BARS HORIZONTAL BARS W-1 (1.2m) VERTICAL BARS HORIZONTAL BARS W-1 (1m) VERTICAL BARS HORIZONTAL BARS W-1 (10.3m - triangle) VERTICAL BARS HORIZONTAL BARS 10 10 10 10 10 10 10 10 10 10 10 10 10 10 60 3 60 3 60 3 60 3 60 3 60 3 60 3 10.75 10.75 19.78 19.78 60.20 60.20 15.48 15.48 20.64 20.64 4.30 4.30 10.30 10.30 0.00 0.00 0.00 0.00 7.44 7.44 4.60 4.60 3.52 3.52 0.00 0.00 0.00 0.00 10.75 10.75 19.78 19.78 52.76 52.76 10.88 10.88 17.12 17.12 4.30 4.30 10.30 10.30 10 10 60 3 51.60 51.60 10.00 10.00 41.60 41.60 10 10 60 3 15.05 15.05 0.00 0.00 15.05 15.05 10 10 60 3 17.20 17.20 5.00 5.00 12.20 12.20 (mm) Spacing (cm) or layer Area of Area of wall(m2) Opening Total Area

Bar Dia. Item no. 2 Description WALL - 2 W-2 (3.5m) VERTICAL BARS HORIZONTAL BARS W-2 (3m) VERTICAL BARS HORIZONTAL BARS W-2 (2.5m) VERTICAL BARS HORIZONTAL BARS W-2 (2.3m) VERTICAL BARS HORIZONTAL BARS W-2 (2m) VERTICAL BARS HORIZONTAL BARS W-2 (1.8m) VERTICAL BARS HORIZONTAL BARS W-2 (1.2m) VERTICAL BARS HORIZONTAL BARS W-2 (10.3m - triangle) VERTICAL BARS HORIZONTAL BARS 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 10 (mm)

Spacing (cm) or layer

Area of Area of wall(m2) Opening

Total Area

60 3 60 3 60 3 60 3 60 3 60 3 60 3 60 3

15.05 15.05 25.80 25.80 10.75 10.75 19.78 19.78 34.40 34.40 15.48 15.48 10.32 10.32 10.30 10.30

0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

15.05 15.05 25.80 25.80 10.75 10.75 19.78 19.78 34.40 34.40 15.48 15.48 10.32 10.32 10.30 10.30

S E C O N D F L O O R (WALL)
Item no. 3 Description WALL - 1 W-1 (4m) VERTICAL BARS HORIZONTAL BARS 4 WALL - 2 W-2 (3.5m) 10 10 60 3 43.20 43.20 13.84 13.84 29.36 29.36 Bar Dia. (mm) Spacing (cm) Area of Area of wall(m2) Opening Total Area

Bar Dia. Item no. Description VERTICAL BARS HORIZONTAL BARS W-2 (2.5m) VERTICAL BARS HORIZONTAL BARS W-2 (2.3m) VERTICAL BARS HORIZONTAL BARS W-2 (2m) VERTICAL BARS HORIZONTAL BARS W-2 (10.3 - triangle) VERTICAL BARS HORIZONTAL BARS 10 10 10 10 10 10 10 10 (mm) 10 10

Spacing (cm) or layer 60 3 60 3 60 3 60 3 60 3

Area of Area of wall(m2) Opening 9.45 9.45 6.75 6.75 6.21 6.21 5.40 5.40 10.30 10.30 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00

Total Area 9.45 9.45 6.75 6.75 6.21 6.21 5.40 5.40 10.30 10.30

GROUND FLOOR
Item no. 1 description COLUMN FOOTING
a

Bar Diameter (mm)

Bar Shape a

Dimensions (m) b c

No. of bars in member (pcs)

No. of members (pcs)

Total number of bars (pcs)

Cut length (m)

F1 F2 F3 F4 F5 F6 2 WALL FOOTING WF-1 (4M LONG)

16 16

b a

1.350 1.250

0.075 0.075 0.075 0.075 0.075 0.075

24 22 18 16 14 12

2 5 1 3 3 5

48 110 18 48 42 60

1.50 1.40 0.90 0.80 0.70 0.60

b a

12. 12

b a

0.750 0.650

b a

12 12

b a

0.550 0.450

LONGITUDINAL BARS TRANSVERSE BARS WF-1 (3.5M LONG)

10
b a

3.850 0.250
b

0.075 0.075

3 15

1 1

3 15

4.00 0.40

10

LONGITUDINAL BARS TRANSVERSE BARS WF-1 (3M LONG)

10 10

b a

3.350 0.250

0.075 0.075

3 13

1 1

3 13

3.50 0.40

LONGITUDINAL BARS TRANSVERSE BARS WF-1 (2.5M LONG)

10 10

b a

2.850 0.250

0.075 0.075

3 11

4 4

12 44

3.00 0.40

LONGITUDINAL BARS TRANSVERSE BARS WF-1 (2.3M LONG)

10 10

b a b

2.350 0.250

0.075 0.075

3 10

1 1

3 10

2.50 0.40

LONGITUDINAL BARS TRANSVERSE BARS WF-1 (2M LONG)

10 10

b a

2.150 0.250

0.075 0.075

3 9

2 2

6 18

2.30 0.40

LONGITUDINAL BARS TRANSVERSE BARS WF-1 (1.8M LONG)

10 10

b a

1.850 0.250

0.075 0.075

3 8

7 7

21 56

2.00 0.40

LONGITUDINAL BARS TRANSVERSE BARS WF-1 (1.2M LONG)

10 10

b a b

1.650 0.250

0.075 0.075

3 5

2 2

6 10

1.80 0.40

LONGITUDINAL BARS

10

b a

1.050

0.075

12

1.20

b a

TRANSVERSE BARS WF-1 (1M LONG)

10

0.250

0.075

20

0.40

LONGITUDINAL BARS TRANSVERSE BARS WF-2 (3.5M LONG)

10 10

b a b

0.850 0.250

0.075 0.075

3 2

1 1

3 2

1.00 0.40

LONGITUDINAL BARS TRANSVERSE BARS WF-2 (3M LONG)

10 10

b a b

3.350 0.250

0.075 0.075

3 13

1 1

3 13

3.50 0.40

LONGITUDINAL BARS TRANSVERSE BARS WF-2 (2.5M LONG)

10
b a

2.850 0.250
b

0.075 0.075

3 11

2 2

6 22

3.00 0.40

10

LONGITUDINAL BARS TRANSVERSE BARS WF-2 (2.3M LONG)

10
b a

2.350 0.250

0.075 0.075

3 10

1 1

3 10

2.50 0.40

10

LONGITUDINAL BARS TRANSVERSE BARS WF-2 (2M LONG)

10 10

b a b

2.150 0.250

0.075 0.075

3 10

2 2

6 20

2.30 0.40

LONGITUDINAL BARS TRANSVERSE BARS WF-2 (1.8M LONG)

10 10

b a b

1.850 0.250

0.075 0.075

3 9

4 4

12 36

2.00 0.40

LONGITUDINAL BARS TRANSVERSE BARS WF-2 (1.2M LONG)

10 10

b a b

1.650 0.250

0.075 0.075

3 7

2 2

6 14

1.80 0.40

LONGITUDINAL BARS TRANSVERSE BARS 3 COLUMN C1 VERTICAL BARS LATERAL TIES [2 sets] C2 VERTICAL BARS LATERAL TIES C3 VERTICAL BARS LATERAL TIES C4 VERTICAL BARS LATERAL TIES C5 VERTICAL BARS LATERAL TIES [2 sets]

10 10

b a b

1.050 0.250

0.075 0.075

3 5

2 2

6 10

1.20 0.40

16 10

0.230

5.100 0.216

0.075

8 56

2 2

16 112

5.33 1.66

c
0.124

16 10

0.230

5.150 0.324

0.075

6 31

5 5

30 155

5.38 1.05

c
0.124

12 10

0.188

4.850 0.274

0.075

6 27

1 1

6 27

5.04 0.95

c
0.124

12 10

0.188

4.900 0.224

0.075

6 27

3 3

18 81

5.09 0.85

c
0.124

12 10

0.188

4.600 0.224

0.075

4 80

3 3

12 240

4.79 0.85

c
0.124

C6 VERTICAL BARS LATERAL TIES 12 10


a

b b c

0.188 0.124

4.650 0.224

0.075

4 26

5 5

20 130

4.84 0.85

SECOND FLOOR
Item no. 4 description COLUMN C2 VERTICAL BARS LATERAL TIES PC(C2) VERTICAL BARS LATERAL TIES PC(C6) VERTICAL BARS LATERAL TIES 5 BEAMS B-1 (2m long)
b

Bar Diameter (mm)

Bar Shape a

Dimensions (m) b c

No. of bars in member (pcs)

No. of members (pcs)

Total number of bars (pcs)

Cut length (m)

16 10

0.230

2.700 0.324

0.075

6 21

5 5

30 105

2.93 1.05

c
0.124

16 10

0.230

2.700 0.324

0.075

6 21

2 2

12 42

2.93 1.05

c
0.124

12 10

0.188

2.700 0.224

0.075

4 19

2 2

8 38

2.89 0.85

c
0.124

MAIN BARS STIRRUPS CUT BARS: SUPPORTS (LEFT&RIGHT) MID SPAN B-1 (4m long)

18 10

0.25 0.12

2.80 0.32 0.075

6 10 1

6 10

3.30 1.04

18 18

b a a
b

0.25 1.20

0.9

4 2

4 2

1.15 1.20

MAIN BARS STIRRUPS CUT BARS: SUPPORTS (LEFT&RIGHT) MID SPAN B-2 (3.5m long)

18 10

0.25 0.12

4.8 0.32 0.075

6 18 3

18 54

5.30 1.04

18 18

b a a
b

0.25 2.40

1.4

4 2

12 6

1.65 2.40

MAIN BARS STIRRUPS CUT BARS: SUPPORTS (LEFT&RIGHT) MID SPAN B-2 (4m long)

18 10

0.25 0.12

4.3 0.32 0.075

6 16 1

6 16

4.80 1.04

18 18

b a a
b

0.25 2.10

1.28

2 1

2 1

1.53 2.10

MAIN BARS STIRRUPS CUT BARS: SUPPORTS (LEFT&RIGHT)

18 10

0.25 0.12

4.8 0.32 0.075

6 14 1

6 14

5.30 1.04

18

b a

0.25

1.4

1.65

a
MID SPAN B-3 (4m long)
b

18

2.40

2.40

MAIN BARS STIRRUPS CUT BARS: SUPPORTS (LEFT&RIGHT) MID SPAN B-3 (3.5m long)

18 10

0.25 0.12

4.8 0.32 0.075

4 16 1

4 16

5.30 1.04

18 18

b a a
b

0.25 2.40

1.4

4 2

4 2

1.65 2.40

MAIN BARS STIRRUPS CUT BARS: SUPPORTS (LEFT&RIGHT) MID SPAN B-3 (3m long)

18 10

0.25 0.12

4.3 0.32 0.075

4 16 2

8 32

4.80 1.04

18 18

b a a
b

0.25 2.10

1.28

4 2

8 4

1.53 2.10

MAIN BARS STIRRUPS CUT BARS: SUPPORTS (LEFT&RIGHT) MID SPAN B-3 (2m long)

18 10

0.25 0.12

3.8 0.32 0.075

4 14 1

4 14

4.30 1.04

18 18

b a a
b

0.25 1.80

1.15

4 2

4 2

1.40 1.80

MAIN BARS STIRRUPS CUT BARS: SUPPORTS (LEFT&RIGHT) MID SPAN CB-1 (1.81 m long)

18 10

0.25 0.12

2.8 0.32 0.075

4 9 1

4 9

3.30 1.04

18 18

b a a
b

0.25 1.20

0.9

4 2

4 2

1.15 1.20

MAIN BARS STIRRUPS CB-2(0.8m long)

16 10

0.20 0.12

2.61 0.32 0.075

8 9

2 2

16 18

3.01 1.04

MAIN BARS STIRRUPS CB-3 (0.80 m)

16 10

0.20 0.12

1.6 0.32 0.075

5 8

1 1

5 8

2.00 1.04

MAIN BARS STIRRUPS 6 ROOF BEAMS R-1 (4.3m long)

16 10

0.20 0.12

1.6 0.32 0.075

4 8

2 2

8 16

2.00 1.04

MAIN BARS STIRRUPS CUT BARS: SUPPORTS (LEFT&RIGHT) MID SPAN R-1 (4m long)

12 10

0.15 0.12

5.1 0.22 0.075

6 20 2

12 40

5.40 0.84

12 12

b a a
b

0.15 2.58

1.48

2 1

4 2

1.63 2.58

MAIN BARS STIRRUPS CUT BARS: SUPPORTS (LEFT&RIGHT) MID SPAN R-1 (3m long)

12 10

0.15 0.12

4.8 0.22 0.075

6 18 2

12 36

5.10 0.84

12 12

b a a
b

0.15 2.40

1.4

2 1

4 2

1.55 2.40

MAIN BARS STIRRUPS CUT BARS: SUPPORTS (LEFT&RIGHT) MID SPAN R-2 (4m long)

12 10

0.15 0.12

3.8 0.22 0.075

6 14 2

12 28

4.10 0.84

12 12

b a a
b

0.15 1.80

1.15

2 1

4 2

1.30 1.80

MAIN BARS STIRRUPS CUT BARS: SUPPORTS (LEFT&RIGHT) MID SPAN R-2 (3m long)

12 10

0.15 0.12

4.8 0.22 0.075

4 18 1

4 18

5.10 0.84

12 12

b a a
b

0.15 2.40

1.4

4 2

4 2

1.55 2.40

MAIN BARS STIRRUPS CUT BARS: SUPPORTS (LEFT&RIGHT) MID SPAN R-3 (2m long)

12 10

0.15 0.12

3.8 0.22 0.075

4 14 8

32 112

4.10 0.84

12 12

b a a
b

0.15 1.80

1.15

4 2

32 16

1.30 1.80

MAIN BARS STIRRUPS CUT BARS: SUPPORTS (LEFT&RIGHT) MID SPAN R-3 (1.2m long)

12 10

0.15 0.12

2.8 0.22 0.075

4 14 4

16 56

3.10 0.84

12 12

b a a
b

0.15 1.20

0.9

2 1

8 4

1.05 1.20

MAIN BARS STIRRUPS CUT BARS: SUPPORTS (LEFT&RIGHT) MID SPAN

12 10

0.15 0.12

2 0.22 0.075

4 6 4

16 24

2.30 0.84

12 12

b a a

0.15 0.72

0.7

2 1

8 4

0.85 0.72

STAIR DETAILS
Item no. 7 Description STAIRS COLUMN FOOTING
a

Bar Diameter (mm)

Bar Shape a

Dimensions (m) b c

No. of bars in member (pcs)

No. of members (pcs)

Total number of bars (pcs)

Cut length (m)

LONGITUDINAL TRANSVERSE

16 16

b a b

1.350 0.850

0.075 0.075

8 12

1 1

8 12

1.50 1.00

COLUMN
b

VERTICAL BARS LATERAL TIES BENT BARS

16 10

0.230

0.600 0.700 0.075

6 5

1 1

6 5

0.83 1.95

c
0.200

16 TRANSVERSE 16 LANDING 10
b a

0.175

0.145

0.075

12

14

168

0.47

0.700

14

42

0.700

0.700

0.075

14

15

0.85

TOP SUPPORT 16 BOTTOM SUPPORT 16 BEAM (0.85m long) MAIN BARS STIRRUPS 10 18 10
a b a

0.478

0.200

0.68

0.478

0.200

0.68

0.250 0.124

1.650 0.124 0.075

4 2 6

8 11

1.90 0.65

FOOTINGS
Materials and Estimated Quantities Required Item to be Estimated Calculations FOOTINGS F-1 Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 16 mm x6m 12 mm x9m 12 mm x 12 m 12 mm x 10.5 m 12 mm x6m 10 mm x6m 10 mm x 12 m 10 mm x 10.5m 10 mm x 7.5m 10 mm x9m

48.00 1.50 4.00 5.00 6.00 7.00 8.00

FOOTING (F-1)

Therefore , use ___6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = F-2 Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 12.00 110.00 1.40 4.29 5.36 6.43 7.50 8.57 12

FOOTING (F-2)

Therefore , use ___6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . F-3 Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 27.50 28 18.00 0.90 6.67 8.33 10.00 11.67 13.33

28

FOOTING (F-3)

Therefore , use ___9__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . F-4 Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 1.80 2 48.00 0.80 7.50 9.38 11.25 13.13 15.00

FOOTING (F-4)

Therefore , use ___12__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = 3.20 say. . . 4

FOOTINGS
Materials and Estimated Quantities Required Item to be Estimated Calculations F-5 Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 16 mm x6m 42.00 0.70 8.57 10.71 12.86 15.00 17.14 12 mm x9m 12 mm x 12 m 12 mm x 10.5 m 12 mm x6m 10 mm x6m 10 mm x 12 m 10 mm x 10.5m 10 mm x 7.5m 10 mm x9m

FOOTING (F-5)

Therefore , use ___10.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . F-6 Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 2.80 3 60.00 0.60 10.00 12.50 15.00 17.50 20.00

FOOTING (F-6)

Therefore , use ___6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . WALL FOOTINGS WF-1 (4M LONG) LONGITUDINAL BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 6.00 6

3.00 4.00 1.50 1.88 2.25 2.63 3.00

Therefore , use __12__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . TRANSVERSE BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 1.00 1 15.00 0.40 15.00 18.75 22.50 26.25 30.00

WALL FOOTING (WF-1)

Therefore , use ___6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . WF-1 (3.5M LONG) LONGITUDINAL BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 1.00 1

3.00 3.50 1.71 2.14 2.57 3.00 3.43

Therefore , use __10.5__ (select the trial having the least value of remainder) WALL FOOTING (WF-1) No of C/L Required:

FOOTINGS
Materials and Estimated Quantities Required Item to be Estimated WALL FOOTING (WF-1) Calculations total no of bars / bars per C/L = 1.00 say. . . 1 TRANSVERSE BARS: Total No of Bars = 13.00 Cut Length = 0.40 No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = 15.00 Trial 2; 7.5 m = 7.50 / (cut length) = 18.75 Trial 3; 9.0 m = 9.00 / (cut length) = 22.50 Trial 4; 10.5 m = 10.5 / (cut length) = 26.25 Trial 5; 12.0 m = 12.0 / (cut length) = 30.00 Therefore , use ___6__ (select the trial having the No of C/L Required: total no of bars / bars per C/L = 0.87 say. . . 1 WF-1 (3M LONG) LONGITUDINAL BARS: Total No of Bars = 12.00 Cut Length = 3.00 No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = 2.00 Trial 2; 7.5 m = 7.50 / (cut length) = 2.50 Trial 3; 9.0 m = 9.00 / (cut length) = 3.00 Trial 4; 10.5 m = 10.5 / (cut length) = 3.50 Trial 5; 12.0 m = 12.0 / (cut length) = 4.00 Therefore , use __6__ (select the trial having the least value of remainder) WALL FOOTING (WF-1) No of C/L Required: total no of bars / bars per C/L = 6.00 say. . . 6 TRANSVERSE BARS: Total No of Bars = 44.00 Cut Length = 0.40 No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = 15.00 Trial 2; 7.5 m = 7.50 / (cut length) = 18.75 Trial 3; 9.0 m = 9.00 / (cut length) = 22.50 Trial 4; 10.5 m = 10.5 / (cut length) = 26.25 Trial 5; 12.0 m = 12.0 / (cut length) = 30.00 Therefore , use ___6__ (select the trial having the No of C/L Required: total no of bars / bars per C/L = 2.93 say. . . 3 WF-1 (2.5M LONG) LONGITUDINAL BARS: Total No of Bars = 3.00 Cut Length = 2.50 No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = 2.40 Trial 2; 7.5 m = 7.50 / (cut length) = 3.00 Trial 3; 9.0 m = 9.00 / (cut length) = 3.60 Trial 4; 10.5 m = 10.5 / (cut length) = 4.20 Trial 5; 12.0 m = 12.0 / (cut length) = 4.80 Therefore , use __7.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . TRANSVERSE BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 1.00 1 10.00 0.40 15.00 18.75 22.50 26.25 30.00 16 mm x6m 12 mm x9m 12 mm x 12 m 12 mm x 10.5 m 12 mm x6m 10 mm x6m 10 mm x 12 m 10 mm x 10.5m 1 10 mm x 7.5m 10 mm x9m

WALL FOOTING (WF-1)

Therefore , use ___6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = 0.67 say. . . 1

FOOTINGS
Materials and Estimated Quantities Required Item to be Estimated Calculations WF-1 (2.3M LONG) LONGITUDINAL BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 16 mm x6m 12 mm x9m 12 mm x 12 m 12 mm x 10.5 m 12 mm x6m 10 mm x6m 10 mm x 12 m 10 mm x 10.5m 10 mm x 7.5m 10 mm x9m

6.00 2.30 2.61 3.26 3.91 4.57 5.22

Therefore , use __12__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . TRANSVERSE BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 1.20 2 18.00 0.40 15.00 18.75 22.50 26.25 30.00

WALL FOOTING (WF-1)

Therefore , use ___6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . WF-1 (2M LONG) LONGITUDINAL BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 1.20 2

21.00 2.00 3.00 3.75 4.50 5.25 6.00

Therefore , use __6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . TRANSVERSE BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 7.00 7 56.00 0.40 15.00 18.75 22.50 26.25 30.00

WALL FOOTING (WF-1)

Therefore , use ___6__ (select the trial having the least value of remainder) B2a total no of bars / bars per C/L = say. . . WF-1 (1.8M LONG) LONGITUDINAL BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 3.73 4 4

6.00 1.80 3.33 4.17 5.00 5.83 6.67

Therefore , use __9__ (select the trial having the least value of remainder) No of C/L Required: WALL FOOTING (WF-1)

FOOTINGS
Materials and Estimated Quantities Required Item to be Estimated Calculations total no of bars / bars per C/L = say. . . TRANSVERSE BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 2.00 2 10.00 0.40 15.00 18.75 22.50 26.25 30.00 16 mm x6m 12 mm x9m 12 mm x 12 m 12 mm x 10.5 m 12 mm x6m 10 mm x6m 10 mm x 12 m 10 mm x 10.5m 10 mm x 7.5m 10 mm x9m 2

WALL FOOTING (WF-1)

Therefore , use ___6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . WF-1 (1.2M LONG) LONGITUDINAL BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 0.67 1

12.00 1.20 5.00 6.25 7.50 8.75 10.00

Therefore , use __6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . TRANSVERSE BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 2.40 3 20.00 0.40 15.00 18.75 22.50 26.25 30.00

WALL FOOTING (WF-1)

Therefore , use ___6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . WF-1 (1M LONG) LONGITUDINAL BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 1.33 2

3.00 1.00 6.00 7.50 9.00 10.50 12.00

Therefore , use __6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . TRANSVERSE BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 0.50 1 2.00 0.40 15.00 18.75 22.50 26.25 30.00

WALL FOOTING (WF-1)

Therefore , use ___6__ (select the trial having the least value of remainder)

FOOTINGS
Materials and Estimated Quantities Required Item to be Estimated Calculations No of C/L Required: total no of bars / bars per C/L = say. . . WF-2 (3.5M LONG) LONGITUDINAL BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 16 mm x6m 0.13 1 12 mm x9m 12 mm x 12 m 12 mm x 10.5 m 12 mm x6m 10 mm x6m 10 mm x 12 m 10 mm x 10.5m 10 mm x 7.5m 10 mm x9m

3.00 3.50 1.71 2.14 2.57 3.00 3.43

Therefore , use __10.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . TRANSVERSE BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 1.00 1 13.00 0.40 15.00 18.75 22.50 26.25 30.00

WALL FOOTING (WF-2)

Therefore , use ___6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . WF-2 (3M LONG) LONGITUDINAL BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 0.87 1

6.00 3.00 2.00 2.50 3.00 3.50 4.00

Therefore , use __6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . TRANSVERSE BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 3.00 3 22.00 0.40 15.00 18.75 22.50 26.25 30.00

WALL FOOTING (WF-2)

Therefore , use ___6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . WF-2 (2.5M LONG) LONGITUDINAL BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 1.47 2

3.00 2.50 2.40 3.00 3.60 4.20 4.80

WALL FOOTING

FOOTINGS
Materials and Estimated Quantities Required Item to be Estimated Calculations 16 mm x6m 12 mm x9m 12 mm x 12 m 12 mm x 10.5 m 12 mm x6m 10 mm x6m 10 mm x 12 m 10 mm x 10.5m 10 mm x 7.5m 10 mm x9m

Therefore , use __7.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . TRANSVERSE BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 1.00 1 10.00 0.40 15.00 18.75 22.50 26.25 30.00

WALL FOOTING (WF-2)

Therefore , use ___6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . WF-2 (2.3M LONG) LONGITUDINAL BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 0.67 1

6.00 2.30 2.61 3.26 3.91 4.57 5.22

Therefore , use __12__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . TRANSVERSE BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 1.20 2 20.00 0.40 15.00 18.75 22.50 26.25 30.00

WALL FOOTING (WF-2)

Therefore , use ___6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . WF-2 (2M LONG) LONGITUDINAL BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 1.33 2

12.00 2.00 3.00 3.75 4.50 5.25 6.00

Therefore , use __6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . TRANSVERSE BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = 4.00 4 36.00 0.40 15.00 18.75 22.50 26.25

WALL FOOTING (WF-2)

WALL FOOTING (WF-2)

FOOTINGS
Materials and Estimated Quantities Required Item to be Estimated Calculations Trial 5; 12.0 m = 12.0 / (cut length) = 30.00 Therefore , use ___6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . WF-2 (1.8M LONG) LONGITUDINAL BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 2.40 3 16 mm x6m 12 mm x9m 12 mm x 12 m 12 mm x 10.5 m 12 mm x6m 10 mm x6m 10 mm x 12 m 10 mm x 10.5m 10 mm x 7.5m 10 mm x9m

6.00 1.80 3.33 4.17 5.00 5.83 6.67

Therefore , use __9__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . TRANSVERSE BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 1.20 2 14.00 0.40 15.00 18.75 22.50 26.25 30.00

WALL FOOTING (WF-2)

Therefore , use ___6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . WF-2 (1.2M LONG) LONGITUDINAL BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 0.93 1

6.00 1.20 5.00 6.25 7.50 8.75 10.00

Therefore , use __6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . TRANSVERSE BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 1.20 2 10.00 0.40 15.00 18.75 22.50 26.25 30.00

WALL FOOTING (WF-2)

Therefore , use ___6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = 0.67 say. . . 1 TOTAL =

40

1 53

BEAMS Materials and Estimated Quantities Required Item to be Estimated Calculations 18 mm x 10.5m BEAMS B-1 (2M LONG) MAIN BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 6.00 3.30 1.82 2.27 2.73 3.18 3.64 18 mm x9m 18 mm x 12 m 18 mm x6m 12 mm x6m 12mm x 12 m 12 mm x 10.5 m 12 mm x9m 16 mm x 7.5 m 10 mm x 10.5m 10 mm x6m

Therefore , use __10.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . STIRRUPS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 2.00 2 10.00 1.04 5.78 7.23 8.67 10.12 11.56

Therefore , use ___10.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . CUT BARS SUPPORTS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 1.00 1

BEAMS B-1

4.00 1.15 5.22 6.52 7.83 9.13 10.43

Therefore , use __10.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . MIDSPAN SUPPORT: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 0.44 1 2.00 1.20 5.00 6.25 7.50 8.75 10.00

Therefore , use ___6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . B-1 (4M LONG) MAIN BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 0.40 1

18.00 5.30 1.13 1.42 1.70 1.98 2.26

BEAMS Materials and Estimated Quantities Required Item to be Estimated Calculations 18 mm x 10.5m Therefore , use __6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . STIRRUPS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 18.00 18 54.00 1.04 5.78 7.23 8.67 10.12 11.56 18 mm x9m 18 mm x 12 m 18 mm x6m 12 mm x6m 12mm x 12 m 12 mm x 10.5 m 12 mm x9m 16 mm x 7.5 m 10 mm x 10.5m 10 mm x6m

18

Therefore , use ___10.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . CUT BARS SUPPORTS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 5.40 6

BEAMS B-1

12.00 1.65 3.64 4.55 5.45 6.36 7.27

Therefore , use __12__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . MIDSPAN SUPPORT: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 1.71 2 6.00 2.40 2.50 3.13 3.75 4.38 5.00

Therefore , use ___12__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . B-2 (3.5M LONG) MAIN BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 1.20 2

6.00 4.80 1.25 1.56 1.88 2.19 2.50

Therefore , use __10.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . STIRRUPS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 3.00 3 16.00 1.04 5.78 7.23 8.67 10.12 11.56

BEAMS Materials and Estimated Quantities Required Item to be Estimated Calculations 18 mm x 10.5m Therefore , use ___10.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . CUT BARS SUPPORTS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 1.60 2 18 mm x9m 18 mm x 12 m 18 mm x6m 12 mm x6m 12mm x 12 m 12 mm x 10.5 m 12 mm x9m 16 mm x 7.5 m 10 mm x 10.5m 10 mm x6m

BEAMS B-2

2.00 1.53 3.92 4.90 5.88 6.86 7.84

Therefore , use __12__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . MIDSPAN SUPPORT: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 0.29 1 1.00 2.10 2.86 3.57 4.29 5.00 5.71

Therefore , use ___10.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . B-2 (4M LONG) MAIN BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 0.20 1

6.00 5.30 1.13 1.42 1.70 1.98 2.26

Therefore , use __6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . STIRRUPS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 6.00 6 14.00 1.04 5.78 7.23 8.67 10.12 11.56

Therefore , use ___10.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . CUT BARS SUPPORTS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = 1.40 2

BEAMS B-2

2.00 1.65 3.64 4.55 5.45 6.36

BEAMS B-2

BEAMS Materials and Estimated Quantities Required Item to be Estimated Calculations 18 mm x 10.5m Trial 5; 12.0 m = 12.0 / (cut length) = 7.27 Therefore , use __12__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . MIDSPAN SUPPORT: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 0.29 1 1.00 2.40 2.50 3.13 3.75 4.38 5.00 18 mm x9m 18 mm x 12 m 18 mm x6m 12 mm x6m 12mm x 12 m 12 mm x 10.5 m 12 mm x9m 16 mm x 7.5 m 10 mm x 10.5m 10 mm x6m

Therefore , use ___12__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . B-3 (4M LONG) MAIN BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 0.20 1

4.00 5.30 1.13 1.42 1.70 1.98 2.26

Therefore , use __6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . STIRRUPS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 4.00 4 16.00 1.04 5.78 7.23 8.67 10.12 11.56

Therefore , use ___10.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . CUT BARS SUPPORTS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 1.60 2

BEAMS B-3

4.00 1.65 3.64 4.55 5.45 6.36 7.27

Therefore , use __12__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . MIDSPAN SUPPORT: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = 0.57 1 2.00 2.40 2.50 3.13 3.75 4.38

BEAMS Materials and Estimated Quantities Required Item to be Estimated Calculations 18 mm x 10.5m Trial 5; 12.0 m = 12.0 / (cut length) = 5.00 Therefore , use ___12__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . B-3 (3.5M LONG) MAIN BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 0.40 1 18 mm x9m 18 mm x 12 m 18 mm x6m 12 mm x6m 12mm x 12 m 12 mm x 10.5 m 12 mm x9m 16 mm x 7.5 m 10 mm x 10.5m 10 mm x6m

8.00 4.80 1.25 1.56 1.88 2.19 2.50

Therefore , use __10.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . STIRRUPS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 4.00 4 32.00 1.04 5.78 7.23 8.67 10.12 11.56

Therefore , use ___10.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . CUT BARS SUPPORTS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 3.20 4

BEAMS B-3

8.00 1.53 3.92 4.90 5.88 6.86 7.84

Therefore , use __12__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . MIDSPAN SUPPORT: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 1.14 2 4.00 2.10 2.86 3.57 4.29 5.00 5.71

Therefore , use ___10.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . B-3 (3M LONG) MAIN BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = 0.80 1

4.00 4.30 1.40 1.74 2.09

BEAMS Materials and Estimated Quantities Required Item to be Estimated Calculations 18 mm x 10.5m Trial 4; 10.5 m = 10.5 / (cut length) = 2.44 Trial 5; 12.0 m = 12.0 / (cut length) = 2.79 Therefore , use __9__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . STIRRUPS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 2.00 2 14.00 1.04 5.78 7.23 8.67 10.12 11.56 18 mm x9m 18 mm x 12 m 18 mm x6m 12 mm x6m 12mm x 12 m 12 mm x 10.5 m 12 mm x9m 16 mm x 7.5 m 10 mm x 10.5m 10 mm x6m

Therefore , use ___10.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . CUT BARS SUPPORTS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 1.40 2

BEAMS B-3

4.00 1.40 4.29 5.36 6.43 7.50 8.57

Therefore , use __6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . MIDSPAN SUPPORT: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 1.00 1 4.00 1.40 4.29 5.36 6.43 7.50 8.57

Therefore , use ___6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . CB-1 (1.81M LONG) MAIN BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 1.00 1

16.00 3.01 1.99 2.49 2.99 3.49 3.99

Therefore , use __7.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . STIRRUPS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = 8.00 8 18.00 1.04 5.78 7.23 8.67

BEAMS CB-1

BEAMS CB-1 BEAMS Materials and Estimated Quantities Required Item to be Estimated Calculations 18 mm x 10.5m Trial 4; 10.5 m = 10.5 / (cut length) = 10.12 Trial 5; 12.0 m = 12.0 / (cut length) = 11.56 Therefore , use ___10.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . CB-2 (0.8M LONG) MAIN BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 1.80 2 18 mm x9m 18 mm x 12 m 18 mm x6m 12 mm x6m 12mm x 12 m 12 mm x 10.5 m 12 mm x9m 16 mm x 7.5 m 10 mm x 10.5m 10 mm x6m

5.00 2.00 3.00 3.75 4.50 5.25 6.00

Therefore , use __6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . STIRRUPS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 1.67 2 8.00 1.04 5.78 7.23 8.67 10.12 11.56

BEAMS CB-2

Therefore , use ___10.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . CB-3 (0.8M LONG) MAIN BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 0.80 1

8.00 2.00 3.00 3.75 4.50 5.25 6.00

Therefore , use __6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . STIRRUPS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 2.67 3 16.00 1.04 5.78 7.23 8.67 10.12 11.56

BEAMS CB-3

Therefore , use ___10.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . RB-1 (4.3M LONG) MAIN BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = 1.60 2

12.00 5.40 1.11 1.39

BEAMS Materials and Estimated Quantities Required Item to be Estimated Calculations 18 mm x 10.5m Trial 3; 9.0 m = 9.00 / (cut length) = 1.67 Trial 4; 10.5 m = 10.5 / (cut length) = 1.94 Trial 5; 12.0 m = 12.0 / (cut length) = 2.22 Therefore , use __6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . STIRRUPS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 12.00 12 40.00 0.84 7.16 8.95 10.74 12.53 14.32 18 mm x9m 18 mm x 12 m 18 mm x6m 12 mm x6m 12mm x 12 m 12 mm x 10.5 m 12 mm x9m 16 mm x 7.5 m 10 mm x 10.5m 10 mm x6m

12

Therefore , use ___6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . CUT BARS SUPPORTS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 5.71 6

RB -1

4.00 1.63 3.68 4.60 5.52 6.44 7.36

Therefore , use __12__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . MIDSPAN SUPPORT: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 0.57 1 2.00 2.58 2.33 2.91 3.49 4.07 4.65

Therefore , use ___10.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . RB-1 (4M LONG) MAIN BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 0.50 1

12.00 5.10 1.18 1.47 1.76 2.06 2.35

Therefore , use __10.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . STIRRUPS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = 6.00 6 36.00 0.84 7.16 8.95

BEAMS Materials and Estimated Quantities Required Item to be Estimated Calculations 18 mm x 10.5m Trial 3; 9.0 m = 9.00 / (cut length) = 10.74 Trial 4; 10.5 m = 10.5 / (cut length) = 12.53 Trial 5; 12.0 m = 12.0 / (cut length) = 14.32 Therefore , use ___6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . CUT BARS SUPPORTS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 5.14 6 18 mm x9m 18 mm x 12 m 18 mm x6m 12 mm x6m 12mm x 12 m 12 mm x 10.5 m 12 mm x9m 16 mm x 7.5 m 10 mm x 10.5m 10 mm x6m

RB -1

4.00 1.55 3.87 4.84 5.81 6.77 7.74

Therefore , use __12__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . MIDSPAN SUPPORT: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 0.57 1 2.00 2.40 2.50 3.13 3.75 4.38 5.00

Therefore , use ___12__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . RB-1 (3M LONG) MAIN BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 0.40 1

12.00 4.10 1.46 1.83 2.20 2.56 2.93

Therefore , use __9__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . STIRRUPS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 6.00 6 28.00 0.84 7.16 8.95 10.74 12.53 14.32

Therefore , use ___6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . CUT BARS SUPPORTS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = 4.00 4

RB -1

4.00 1.30 4.62

RB -1

BEAMS Materials and Estimated Quantities Required

Item to be Estimated

Calculations

18 mm x 10.5m

18 mm x9m

18 mm x 12 m

18 mm x6m

12 mm x6m

12mm x 12 m

12 mm x 10.5 m

12 mm x9m

16 mm x 7.5 m

10 mm x 10.5m

10 mm x6m

Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) =

5.77 6.92 8.08 9.23

Therefore , use __10.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . MIDSPAN SUPPORT: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 0.50 1 2.00 1.80 3.33 4.17 5.00 5.83 6.67

Therefore , use ___9__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . RB-2 (4M LONG) MAIN BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 0.40 1

4.00 5.10 1.18 1.47 1.76 2.06 2.35

Therefore , use __10.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . STIRRUPS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 2.00 2 18.00 0.84 7.16 8.95 10.74 12.53 14.32

Therefore , use ___6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . CUT BARS SUPPORTS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 2.57 3

RB -2

4.00 1.55 3.87 4.84 5.81 6.77 7.74

Therefore , use __12__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . MIDSPAN SUPPORT: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = 0.57 1 2.00 2.40 2.50

BEAMS Materials and Estimated Quantities Required Item to be Estimated Calculations 18 mm x 10.5m Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 3.13 3.75 4.38 5.00 18 mm x9m 18 mm x 12 m 18 mm x6m 12 mm x6m 12mm x 12 m 12 mm x 10.5 m 12 mm x9m 16 mm x 7.5 m 10 mm x 10.5m 10 mm x6m

Therefore , use ___12__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . RB-2 (3M LONG) MAIN BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 0.40 1

32.00 4.10 1.46 1.83 2.20 2.56 2.93

Therefore , use __9__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . STIRRUPS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 16.00 16 112.00 0.84 7.16 8.95 10.74 12.53 14.32

16

Therefore , use ___6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . CUT BARS SUPPORTS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 16.00 16

RB -2

16

32.00 1.30 4.62 5.77 6.92 8.08 9.23

Therefore , use __10.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . MIDSPAN SUPPORT: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 4.00 4 16.00 1.80 3.33 4.17 5.00 5.83 6.67

Therefore , use ___9__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . RB-3 (2M LONG) MAIN BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: 3.20 4

16.00 3.10

BEAMS Materials and Estimated Quantities Required Item to be Estimated Calculations 18 mm x 10.5m Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 1.94 2.42 2.90 3.39 3.87 18 mm x9m 18 mm x 12 m 18 mm x6m 12 mm x6m 12mm x 12 m 12 mm x 10.5 m 12 mm x9m 16 mm x 7.5 m 10 mm x 10.5m 10 mm x6m

Therefore , use __10.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . STIRRUPS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 5.33 6 56.00 0.84 7.16 8.95 10.74 12.53 14.32

Therefore , use ___6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . CUT BARS SUPPORTS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 8.00 8

RB -3

8.00 1.05 5.71 7.14 8.57 10.00 11.43

Therefore , use __10.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . MIDSPAN SUPPORT: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 0.80 1 4.00 1.20 5.00 6.25 7.50 8.75 10.00

Therefore , use ___6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . RB-3 (1.2M LONG) MAIN BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 0.80 1

16.00 2.30 2.61 3.26 3.91 4.57 5.22

Therefore , use __12__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . STIRRUPS: Total No of Bars = Cut Length = No of Bars per Commercial Length: 3.20 4 24.00 0.84

BEAMS Materials and Estimated Quantities Required Item to be Estimated Calculations 18 mm x 10.5m Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 7.16 8.95 10.74 12.53 14.32 18 mm x9m 18 mm x 12 m 18 mm x6m 12 mm x6m 12mm x 12 m 12 mm x 10.5 m 12 mm x9m 16 mm x 7.5 m 10 mm x 10.5m 10 mm x6m

Therefore , use ___6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . CUT BARS SUPPORTS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 3.43 4

RB - 3

8.00 0.85 7.06 8.82 10.59 12.35 14.12

Therefore , use __6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . MIDSPAN SUPPORT: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 1.14 2 4.00 0.72 8.33 10.42 12.50 14.58 16.67

Therefore , use ___6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = 0.50 say. . . 1 TOTAL =

30

11

18

1 16

21

27

24

47

PROJECT: LOCATION: OWNER: COLUMN Materials and Estimated Quantities Required Item to be Estimated Calculations COLUMN C-1 VERTICAL BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 16 mm x6m 12 mm x6m 12 mm x 10.5m 10 mm x 12 m 10 mm x6m 10 mm x 10.5m

16.00 5.33 1.13 1.41 1.69 1.97 2.25

Therefore , use __6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . LATERAL TIES: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 16.00 16 112.00 1.66 3.61 4.52 5.42 6.33 7.23

COLUMN C-1

16

Therefore , use ___12__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . C-2 VERTICAL BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 16.00 16

16

30.00 5.38 1.12 1.39 1.67 1.95 2.23

Therefore , use __6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . LATERAL TIES: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 30.00 30 155.00 1.05 5.74 7.17 8.60 10.04 11.47

COLUMN C-2

30

Therefore , use ___10.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . C-3 VERTICAL BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = 15.50 16

16

6.00 5.04 1.19 1.49

COLUMN Materials and Estimated Quantities Required Item to be Estimated Calculations Trial 3; 9.0 m = 9.00 / (cut length) = 1.79 Trial 4; 10.5 m = 10.5 / (cut length) = 2.08 Trial 5; 12.0 m = 12.0 / (cut length) = 2.38 Therefore , use __10.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . LATERAL TIES: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 3.00 3 27.00 0.95 6.34 7.93 9.51 11.10 12.68 16 mm x6m 12 mm x6m 12 mm x 10.5m 10 mm x 12 m 10 mm x6m 10 mm x 10.5m

COLUMN C-3

Therefore , use ___10.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . C-4 VERTICAL BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 2.45 3

18.00 5.09 1.18 1.47 1.77 2.06 2.36

Therefore , use __10.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . LATERAL TIES: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 9.00 9 81.00 0.85 7.09 8.87 10.64 12.41 14.18

COLUMN C-4

Therefore , use ___6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . C-5 VERTICAL BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 11.57 12

12

12.00 4.79 1.25 1.57 1.88 2.19 2.51

Therefore , use __10.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . LATERAL TIES: Total No of Bars = Cut Length = 6.00 6 240.00 0.85

COLUMN C-5

COLUMN C-5 Item to be Estimated

COLUMN Materials and Estimated Quantities Required Calculations 16 mm x6m 7.09 8.87 10.64 12.41 14.18 12 mm x6m 12 mm x 10.5m 10 mm x 12 m 10 mm x6m 10 mm x 10.5m

No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) =

Therefore , use ___6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . C-6 VERTICAL BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 34.29 35

35

20.00 4.84 1.24 1.55 1.86 2.17 2.48

Therefore , use __10.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . LATERAL TIES: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 10.00 10 130.00 0.85 7.09 8.87 10.64 12.41 14.18

COLUMN C-6

10

Therefore , use ___6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = 18.57 say. . . 19 TOTAL =

46

28

16

19 66

19

COLUMN (SECOND FLOOR) Materials and Estimated Quantities Required Item to be Estimated Calculations COLUMN C-2 VERTICAL BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 16 mm x6m 12 mm x6m 12 mm x 10.5m 10 mm x 12 m 10 mm x6m 10 mm x 10.5m

30.00 2.93 2.05 2.56 3.07 3.58 4.10

Therefore , use __6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . LATERAL TIES: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = 15.00 15 105.00 1.05 5.74

COLUMN C-2

15

COLUMN C-2

COLUMN Materials and Estimated Quantities Required Calculations 7.17 8.60 10.04 11.47

Item to be Estimated

16 mm x6m

12 mm x6m

12 mm x 10.5m

10 mm x 12 m

10 mm x6m

10 mm x 10.5m

Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) =

Therefore , use ___10.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . PC-2 VERTICAL BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 10.50 11

11

12.00 2.93 2.05 2.56 3.07 3.58 4.10

Therefore , use __6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . LATERAL TIES: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 6.00 6 42.00 1.05 5.74 7.17 8.60 10.04 11.47

COLUMN PC-2

Therefore , use ___10.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . PC(C2) VERTICAL BARS: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 4.20 5

12.00 2.93 2.05 2.56 3.07 3.58 4.10

Therefore , use __6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . LATERAL TIES: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 6.00 6 42.00 1.05 5.74 7.17 8.60 10.04 11.47

COLUMN PC-(C2)

Therefore , use ___10.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = 4.20 say. . . 5 PC(C6) VERTICAL BARS:

COLUMN Materials and Estimated Quantities Required Item to be Estimated Calculations Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 8.00 2.89 2.08 2.60 3.12 3.64 4.16 16 mm x6m 12 mm x6m 12 mm x 10.5m 10 mm x 12 m 10 mm x6m 10 mm x 10.5m

Therefore , use __6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . LATERAL TIES: Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 4.00 4 38.00 0.85 7.09 8.87 10.64 12.41 14.18

COLUMN PC-(C6)

Therefore , use ___6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = 5.43 say. . . 6 TOTAL =

27

6 6

21

STAIRS
Item to be Estimated Calculations COLUMN FOOTING LONGITUDINAL Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 18 mm x6m 16 mm x 10.5 m 16 mm x9m 16 mm x 7.5 m 16 mm x6m 10 mm x6m 10 mm x 10.5m

8.00 1.50 4.00 5.00 6.00 7.00 8.00

Therefore , use ___6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . TRANSVERSE Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 2.00 2 12.00 1.00 6.00 7.50 9.00 10.50 12.00

FOOTING

Therefore , use ___6__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = say. . . COLUMN VERTICAL BARS Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 2.00 2

6.00 0.83 7.23 9.04 10.84 12.65 14.46

Therefore , use ___7.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = 0.67 say. . . 1 LATERAL TIES Total No of Bars = 5.00 Cut Length = 1.95 No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = 3.08 Trial 2; 7.5 m = 7.50 / (cut length) = 3.85 Trial 3; 9.0 m = 9.00 / (cut length) = 4.62 Trial 4; 10.5 m = 10.5 / (cut length) = 5.38 Trial 5; 12.0 m = 12.0 / (cut length) = 6.15 Therefore , use ___6__ (select the trial having the No of C/L Required: total no of bars / bars per C/L = 1.67 say. . . 2

COLUMN

STAIRS
Item to be Estimated Calculations BENT BARS Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 168.00 0.47 12.77 15.96 19.15 22.34 25.53 18 mm x6m 16 mm x 10.5 m 16 mm x9m 16 mm x 7.5 m 16 mm x6m 10 mm x6m 10 mm x 10.5m

BENT BARS

Therefore , use ___9__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = 8.84 say. . . 9 TRANSVERSE Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 42.00 0.70 8.57 10.71 12.86 15.00 17.14

TRANSVERSE

Therefore , use ___10.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = 2.80 say. . . 3 LANDING Total No of Bars = 15.00 Cut Length = 0.85 No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = 7.06 Trial 2; 7.5 m = 7.50 / (cut length) = 8.82 Trial 3; 9.0 m = 9.00 / (cut length) = 10.59 Trial 4; 10.5 m = 10.5 / (cut length) = 12.35 Trial 5; 12.0 m = 12.0 / (cut length) = 14.12 Therefore , use ___6__ (select the trial having the No of C/L Required: total no of bars / bars per C/L = 2.14 say. . . 3 TOP SUPPORT Total No of Bars = Cut Length = No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = Trial 2; 7.5 m = 7.50 / (cut length) = Trial 3; 9.0 m = 9.00 / (cut length) = Trial 4; 10.5 m = 10.5 / (cut length) = Trial 5; 12.0 m = 12.0 / (cut length) = 7.00 0.68 8.85 11.06 13.27 15.49 17.70

LANDING

TOP SUPPORT

Therefore , use ___7.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = 0.64 say. . . 1 BOTTOM SUPPORT

STAIRS
Item to be Estimated Calculations 18 mm x6m 16 mm x 10.5 m 16 mm x9m 16 mm x 7.5 m 16 mm x6m 10 mm x6m 10 mm x 10.5m

BOTTOM SUPPORT

BEAMS

Total No of Bars = 7.00 Cut Length = 0.68 No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = 8.85 Trial 2; 7.5 m = 7.50 / (cut length) = 11.06 Trial 3; 9.0 m = 9.00 / (cut length) = 13.27 Trial 4; 10.5 m = 10.5 / (cut length) = 15.49 Trial 5; 12.0 m = 12.0 / (cut length) = 17.70 Therefore , use ___7.5__ (select the trial having the No of C/L Required: total no of bars / bars per C/L = 0.64 say. . . 1 BEAMS MAIN BARS Total No of Bars = 8.00 Cut Length = 1.90 No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = 3.16 Trial 2; 7.5 m = 7.50 / (cut length) = 3.95 Trial 3; 9.0 m = 9.00 / (cut length) = 4.74 Trial 4; 10.5 m = 10.5 / (cut length) = 5.53 Trial 5; 12.0 m = 12.0 / (cut length) = 6.32 Therefore , use ___6__ (select the trial having the No of C/L Required: total no of bars / bars per C/L = 2.67 say. . . 3 TRANSVERSE Total No of Bars = 11.33 Cut Length = 0.65 No of Bars per Commercial Length: Trial 1; 6.0 m = 6.00 / (cut length) = 9.29 Trial 2; 7.5 m = 7.50 / (cut length) = 11.61 Trial 3; 9.0 m = 9.00 / (cut length) = 13.93 Trial 4; 10.5 m = 10.5 / (cut length) = 16.25 Trial 5; 12.0 m = 12.0 / (cut length) = 18.58 Therefore , use ___10.5__ (select the trial having the least value of remainder) No of C/L Required: total no of bars / bars per C/L = 0.71 say. . . 1 Total =

1 1

GROUND B1 B2 B3 L(m) 4 2 3.5 3 4 3.5 3 2 1.81 0.8 0.8 No.of pieces 3 1 1 1 1 2 1 1 2 1 2 W1 L 4 3.5 3 2.5 2.3 2 1.8 1.2 1 10.3 3.5 3 2.5 2.3 2 1.8 1.2 10.3 H 4.3 4.3 4.3 4.3 4.3 4.3 4.3 4.3 4.3 2 4.3 4.3 4.3 4.3 4.3 4.3 4.3 2

CB1 CB2 CB3

W 1 (triangle) W2

RB1

RB2 RB3

4.3 4 3 4 3 2 1.2

2 2 2 1 8 4 4

W 2 (triangle) SECOND W1 W2

L 4 3.5 2.5 2.3 2 10.3

H 2.7 2.7 2.7 2.7 2.7 2

W 2 (triangle)

no. of Pieces 1 1 4 1 2 7 2 4 1 1 1 2 1 2 4 2 2 1

area 17.2 15.05 51.6 10.75 19.78 60.2 15.48 20.64 4.3 10.3 15.05 25.8 10.75 19.78 34.4 15.48 10.32 10.3

opening 5 0 10 0 0 7.44 4.6 3.52 0 0 0 0 0 0 0 0 0 0

Total Area 12.2 15.05 41.6 10.75 19.78 52.76 10.88 17.12 4.3 10.3 15.05 25.8 10.75 19.78 34.4 15.48 10.32 10.3

type D/1 , W/1 2x[D/1] , 2x[W/1]

D/2, D/2, W/3, D/3, W/3, W/3, W/3 W/3, D/3, D/3, W/3 D/2, D/2

no. of Pieces 4 1 1 1 1 1

area 43.2 9.45 6.75 6.21 5.4 10.3

opening 13.84 0 0 0 0 0

Total Area 29.36 9.45 6.75 6.21 5.4 10.3

D/5, D/3, D/5, W/2

location dining area unit 1 & 2

t&b, t&b, t&b, laundry, laundry, t&b, t&b 2 laundry areas (1.8x2.00) 2 t&b (1.2x2.00)

H 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7 3.7

area for plaster 14.8 12.95 44.4 9.25 17.02 51.8 13.32 17.76 3.7

total area plaster 19.6 25.9 68.8 18.5 34.04 88.72 17.44 28.48 7.4

terrace, bedroom, living room, canopy

FOR PAINTING GROUND W1 L 4 3.5 3 2.5 2.3 2 1.8 1.2 1 10.3 3.5 3 2.5 2.3 2 1.8 1.2 10.3 H 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 3.3 2 3.3 3.3 3.3 3.3 3.3 3.3 3.3 2 no. of Pieces 1 1 4 1 2 7 2 4 1 1 1 2 1 2 4 2 2 1 area 13.2 11.55 39.6 8.25 15.18 46.2 11.88 15.84 3.3 10.3 11.55 19.8 8.25 15.18 26.4 11.88 7.92 10.3 opening 5 0 10 0 0 7.44 4.6 3.52 0 0 0 0 0 0 0 0 0 0 Total Area 8.2 11.55 29.6 8.25 15.18 38.76 7.28 12.32 3.3 10.3 11.55 19.8 8.25 15.18 26.4 11.88 7.92 10.3

W 1 (triangle) W2

W 2 (triangle) SECOND W1 W2

L 4 3.5 2.5 2.3 2 10.3

H 2.7 2.7 2.7 2.7 2.7 2

no. of Pieces 4 1 1 1 1 1

area 43.2 9.45 6.75 6.21 5.4 10.3

opening 13.84 0 0 0 0 0

Total Area 29.36 9.45 6.75 6.21 5.4 10.3

W 2 (triangle)

G R O U N D F L O O R (SLAB)
Item no. 1 2 3 Description S-3 S-2 S-1 Bar Dia. (mm) 10 10 10 Spacing (cm) 20 20 20 Area sq.m 106.2 7.2 29.2

PROJECT Proposed 3 Units Residence PROFESSOR

GROUP MEMBERS Sales, Reniel A. Espayos, Jefferson F. LOCATION Lot 6-A-1, Pitong Gatang St., Tondo, Manila

TITLE

Form Works

Owner Mrs. Violeta P. Baens

ESTIMATE WORKSHEET