Sie sind auf Seite 1von 1

DAILY TESTS AND CHECKS

Company Forms and Check Lists

Date : 03.04.01 Rev.No : 1 Prep. : MGV App. : CAP Section : 01 Page : 1 of 1

ACTION (at noon or other convenient fixed times) Has the following equipment been tested / checked? bridge and engineroom telegraphs, including revolution indicators (also before canal transit) bridge telephones bridge watch MF radio telephone receiver clocks and chronometers general emergency alarm signal radio room auto alarm ship's whistle (but not in poor visibility or when other vessels are nearby) steering gear changeover procedure
INSTRUCTIONS :
To be filled in daily . To be used to update the bridge log book and then be discarded.

YES/NO

C:\FORMS\01_0012.PDF

MT LADON

Das könnte Ihnen auch gefallen