Sie sind auf Seite 1von 3

FIRE EXTINGUISHER CHECK LIST

Company Forms and Check Lists

Date Rev.No Prep. App. Section Page

: 01.04.03 : 16 : MGV : CAP : 04 : 1 of 3

POSITION

TYPE

CAPACITY DATE OF LAST kgs MAINTENANCE 6 B. 4th DECK

INITIALS

REMARKS

A. NAVIGATION BRIDGE DECK 1 Wheel House Dry Chem

2 3

Acc. Cross Alleway Radio Office

Dry Chem CO2

6 6.8

C. 3rd DECK 4 Acc. Cross Alleway Dry Chem 6

D. 2nd DECK 5 6 Acc. Cross Alleway Galley Dry Chem Dry Chem 6 6

E. MAIN DECK 7 8 9 10 11 12 13 14 15 Mast House Mast House Acc. Port Entrance Paints Room Deck Workshop Acc. Cross Alleway I.G.Room I.G Room Emer. Generator Room Dry Chem Dry Chem Dry Chem Foam Dry Chem Dry Chem Dry Chem CO2 CO2 6 6 6 9 6 6 6 6.8 6.8

F. ENGINE ROOM 16 17 18 19 20 21 22 2nd Deck Fwd (Port) 2nd Deck Middle (Stbd) 2nd Deck Middle (Stbd) 2nd Deck Aft (Port) 2nd Deck Aft (Stbd) 2nd Deck Boiler Platform Aft Engine Control Room Foam Foam Foam Foam Foam Foam CO2 9 9 9 9 9 9 6.8

C:\FORMS\04_0003.PDF

M/T LADON

FIRE EXTINGUISHER CHECK LIST


Company Forms and Check Lists

Date Rev.No Prep. App. Section Page

: 01.04.03 : 16 : MGV : CAP : 04 : 2 of 3

23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40 41 42 43 44 45 46 47

Engine Control Room 3rd Deck Fwd (Middle) 3rd Deck Fwd (Middle) 3rd Deck Middle (Stbd) 3rd Deck Boiler Platform (Stbd) 3rd Deck Boiler Platform (Stbd) 3rd Deck Boiler Platform (Aft) 3rd Deck Boiler Platform (Aft) 3rd Deck Boiler Platform (Aft) 3rd Deck Boiler Platf. (Fwd Port) 3rd Deck Boiler Platf. (Fwd Port) Boiler Platform Engine Workshop Engine Workshop Engine Workshop Engine Platform (Aft Stbd) Engine Platform (Fwd Port) Engine Platform (Fwd Port) Engine Platform (Fwd Center) Engine Platform (Fwd Center) Engine Platform (Aft Port) Botom (Fwd Port) Bottom (Fwd Stbd) Bottom (Aft Port) Bottom (Aft Stbd)

Dry Chem Foam Foam Foam Foam Foam Foam Foam Foam Foam CO2 Dry Chem CO2 CO2 Dry Chem Foam Foam Foam Foam Foam Foam Foam Foam Foam Foam

9 9 9 9 9 9 9 9 9 9 6.8 9 6.8 6.8 6 9 9 9 9 9 9 9 9 9 9

G. PUMP ROOM 48 49 Top Plate Bottom Foam Foam 9 9

C:\FORMS\04_0003.PDF

M/T LADON

FIRE EXTINGUISHER CHECK LIST


Company Forms and Check Lists

Date Rev.No Prep. App. Section Page

: 01.04.03 : 16 : MGV : CAP : 04 : 3 of 3

50

Bottom TOTAL TOTAL TOTAL

Foam FOAM DRY CHEM. CO2

9 29X9 Ltr 12x6Kg 2X9kg 7X6,8Kg

SPARES ON BOARD ("E" FOR EXTINGUISHERS / "R" FOR RE-CHARGES / "GC" FOR GAS CARTRIDGES) a. b. c. d. 2nd Deck Accommodation Emergency Locker 2nd Deck Accommodation Emergency Locker 2nd Deck Accommodation Emergency Locker 2nd Deck Accommodation Emergency Locker e. 2nd Deck Accommodation Emergency Locker f. 2nd Deck Accommodation Emergency Locker g. 2nd Deck Accommodation Emergency Locker h. 2nd Deck Accommodation Emergency Locker Dry Chem (E) Dry Chem (E) Dry Chem (R) H. LIFE BOATS 51 52 Life Boat No.1 (Stbd) Life Boat No. 2 (Port) Dry Chem Dry Chem 2 2 120kg 8X9Kg 2X4,5Kg CO2 (E) 2X2,3Kg CO2 (E) 2X4,5Kg CO2 (E) 4X6,8Kg Foam (R) 19 sets Foam(E) 1X9Ltr

I. NON PORTABLE (Wheeled) EXT 53 54 Mast House Bottom (Fwd Center) Dry Chem Dry Chem 20Kg 20Kg

J. FOAM APPLICATORS 55 56 2nd Deck Acc. Em. Locker 2nd Deck Acc. Em. Locker Foam Foam 1X20 Ltr 1X40 Ltr

INSTRUCTIONS :
To complete on a monthly basis in conjuction with "Monthly Safety Checklist". When entries are made in the Safety Inspection Log without comments, checklist can be discarded. Last completed checklist to be kept in Deck Maintenance Log Book file.

C:\FORMS\04_0003.PDF

M/T LADON

Das könnte Ihnen auch gefallen