Report No. 16
Date: 17/04/2012
Fixed Data
Block
Field
Well No.
Spud date
12
Bibiyana
BY-15
14/01/2012
Co-ordinate
Latitude
(deg. min. sec)
24402.442
Longitude
(deg. min. sec)
RKB-GL
913550.524
10.3 m
Well Data
Date
Report
Well
No.
Configuration
/ type
Drilling
Company
/ Drilling
Rig
37
Deviated
Weatherford/
WDI 801
Depth MD
Depth
TVD
TVDSS
Progress
3426.0
2187.53
16/04/2012
POOH
Offset / Horizontal
Displacement
-
Survey Report
MD, TVD, Incl , Azmth
3426.0m,2187.53m,55.62,336.62
Lithology
Depth
Percentage
Sandstone-05%
32303426
Claystone-95%
Remarks
Unconsolidated, fine-medium grained, sub angular-sub
rounded, moderate-well sorted, clear, translucent,
white, light orange quartz, some aggregates in
part( gray, dark gray, very-fine grain, poorly cemented
with silica), occ dark colored mafics, clear, black mica.
Light-dark gray, greenish gray, sub blocky-sub fissile,
flaky in part, soft-moderately hard, very slightly
calcareous, micro micaceous.
Remarks
-
Time Log
Time
From
To
Hours
00:00
02.00
2.00
02.00
06.30
13:30
06.30
13.30
17:00
4:30
7:00
3:30
Operations
Continue to TOH from1246m to 490m. Well taking correct
displacement.
Flow check, Service TDS
Preparing tools to test BOP, Pull wear bushing
B/O and L/D BOP test assembly, Install wear bushing
Fluid Parameters
Time
Weight
ppg
Viscosity
sec/qt
Plastic
Viscosity
cp
24hrs
Solids
(%)
9.48
9.50
Sand
(%)
-
52
Cake
19
Chlorides
mg/L
50,000
Yield
Gel
Point
lb/100
lb/100
ft
ft
14
10/14/17
Water (%)
20.5
Filtrate
cc/30min
pH
4.6
temperature
in C
-
Temperature
out C
-
Pumps Data
Pump
No.
1
Made
Model
Liner
FB1600
FB1600
EMSCO
2
EMSCO
Bbl/Stk
(bbls)
0.0855
Stk/Min
(SPM)
219
Gal/Min
(GPM)
786.0
0.0855
219
786.0
Pressure
(psi)
AV-DC
(ft/min)
AV-DP
(Ft/min)
Bit Data
Bit No.
Size
(in)
Manufacturer
Model
5RR1
12
Smith
MA619VPXO
In at
(m)
Out at
(m)
Drilled (m)
total
Hours
Nozzles
Serial
No.
IADC code
JE7903
WOB
RPM
Bit Grade
(t/b/g)
16x 7
1/32
Drilling Parameters
WOB
(klbs)
RPM
Torque
Hole Size
(in)
12 1/4
Shoe
Casing
depth (Grade/Size)
13 3/8
Flow rate
(gpm)
Pressure
(Psi)
ROP
Pump 1
.......
spm, ...... psi
Pump 2
.....
spm, .....psi
Pump
3 ......
spm, ....
psi
Safety Checks
Meetings
Inspect
-Done
-
Remarks
Mohammad Saifuddin
Assistant Manager, Contract Division, Petrobangla.