TASK

status_codewbs_id
task_code task_name target_drtn_hr_cnt
start_date end_date total_float_hr_cnt
target_cost
Activity Status
WBS Code Activity ID Activity Name
Original Duration(d)
(*)Start
(*)Finish (*)Total Float(d)
(*)Budgeted Total Cost(QR)
Not StartedCGC Pro.CN.0003.2
A1010
Excavation 25
11/2/2013 8:00:00
11/30/2013
AM 04:00:00 PM100000
Not StartedCGC Pro.CN.0003.2
A1030
Dewatering48
11/2/2013 8:00:00
12/26/2013
AM 03:00:00 PM10000
Not StartedCGC Pro.CN.0003.2
A1040
Levelling & 5
Compaction11/30/2013 12/5/2013
4:00:00 PM
4:00:00
0
PM 10000
Not StartedCGC Pro.AA.1
A1350
Authorities Approval
35
10/4/2014 2:00:00
11/13/2014
PM 54
2:00:00 PM0
Not StartedCGC Pro.GN.C2
D1-CA-GN-1020
Site Mobilization
30
9/28/2013 8:00:00
10/31/2013
AM 05:00:00 PM100000
Not StartedCGC Pro.GN.C1
D1-ML-GN-1030
Commencement
0
Of Contract
9/28/2013
Period
8:00:00 AM 0
0
Not StartedCGC Pro.GN.C1
D1-ML-GN-1040
Contrcat Finish
0
1/15/2015 2:00:00
0
PM 0
Not StartedCGC Pro.DM.SD.1F.DD01
D2-SD-1F-1000
Consultant:Issue
1
Level 11/9/2013
Construction
8:00:00
11/9/2013
Drwg/Details
AM4:00:00
12
PM 0
Not StartedCGC Pro.DM.SD.1F.DD08
D2-SD-1F-1010
Contractor :9Prepare MEP
4/22/2014
reviewed
8:00:00
5/1/2014
Finishes
AM
4:00:00
Layout
14
PM 0
Not StartedCGC Pro.DM.SD.1F.DD09
D2-SD-1F-1020
Contractor :24
Prepare & 5/5/2014
Submit Co-ordinated
8:00:00
6/1/2014
AM4:00:00
RCP
17 Drawings
PM 0
Not StartedCGC Pro.DM.SD.1F.DD01
D2-SD-1F-1060
Contractor :10
Prepare & 11/10/2013
Submit Shop
11/20/2013
8:00:00
Drawings
AM12
4:00:00 PM0
Not StartedCGC Pro.DM.SD.1F.DD08
D2-SD-1F-1080
Consultant :10
Review Finishes
5/3/2014
Drawings
8:00:00
5/13/2014
AM 4:00:00
14
PM 0
Not StartedCGC Pro.DM.SD.1F.DD01
D2-SD-1F-1090
Consultant :10
Approve Shop
11/21/2013
drawings
12/2/2013
8:00:00 AM
4:00:00
12
PM 0
Not StartedCGC Pro.DM.SD.1F.DD02
D2-SD-1F-1120
Contractor :12
Prepare & 12/26/2013
Submit Rebar
1/8/2014
8:00:00
Details
AM
4:00:00
12
PM 0
Not StartedCGC Pro.DM.SD.1F.DD09
D2-SD-1F-1130
Consultant :10
Approve Co-ordinated
6/2/2014 8:00:00
6/12/2014
RCP AM
Drawings
4:00:00
17
PM 0
Not StartedCGC Pro.DM.SD.1F.DD02
D2-SD-1F-1150
Consultant :10
Approve Rebar
1/9/2014
Details
8:00:00
1/20/2014
AM 4:00:00
12
PM 0
Not StartedCGC Pro.DM.SD.1F.DD06
D2-SD-1F-1170
SC : Submit18
Contr:Reviewed
12/31/2013
MEP 1/20/2014
Details
8:00:00 AM
4:00:00
27
PM 0
Not StartedCGC Pro.DM.SD.1F.DD06
D2-SD-1F-1180
Consultant :10
Approve MEP
1/21/2014
Details8:00:00
2/1/2014
AM
4:00:00
27
PM 0
Not StartedCGC Pro.DM.SD.1F.DD07
D2-SD-1F-1190
Contractor :9Prepare & 1/28/2014
Submit Blockwork
8:00:00
2/6/2014
AM
Drawings
4:00:00
27
PM 0
Not StartedCGC Pro.DM.SD.1F.DD07
D2-SD-1F-1200
Consultant :10
Approve Blockwork
2/8/2014 8:00:00
Drawings
2/18/2014
AM 4:00:00
27
PM 0
Not StartedCGC Pro.DM.SD.5B.DD01
D2-SD-B1-1000
Consultant:Issue
10
Level 9/28/2013
Construction
8:00:00
10/8/2013
Drwg/Details
AM4:00:00
11
PM 0
Not StartedCGC Pro.DM.SD.5B.DD01
D2-SD-B1-1010
Contractor :8Prepare & 10/9/2013
Submit Shop
8:00:00
10/17/2013
Drawings
AM 11
4:00:00 PM0
Not StartedCGC Pro.DM.SD.5B.DD01
D2-SD-B1-1020
Consultant :14
Approve Shop
10/19/2013
drawings
11/3/2013
8:00:00 AM
4:00:00
11
PM 0
Not StartedCGC Pro.DM.SD.5B.DD02
D2-SD-B1-1040
Contractor :12
Prepare & 11/4/2013
Submit Rebar
8:00:00
11/17/2013
Details
AM 11
4:00:00 PM0
Not StartedCGC Pro.DM.SD.5B.DD02
D2-SD-B1-1060
Consultant :10
Approve Rebar
11/18/2013
Details11/28/2013
8:00:00 AM11
4:00:00 PM0
Not StartedCGC Pro.DM.SD.5B.DD06
D2-SD-B1-1080
Contractor :18
Submit Contr:Reviewed
11/4/2013 8:00:00
11/24/2013
MEP AM
Details
19
4:00:00 PM0
Not StartedCGC Pro.DM.SD.5B.DD06
D2-SD-B1-1090
Consultant :8Approve MEP
11/25/2013
Details 12/3/2013
8:00:00 AM
4:00:00
19
PM 0
Not StartedCGC Pro.DM.SD.5B.DD07
D2-SD-B1-1100
Contractor :9Prepare & 1/1/2014
Submit Blockwork
8:00:00
1/11/2014
AM
Drawings
4:00:00
20
PM 0
Not StartedCGC Pro.DM.SD.5B.DD07
D2-SD-B1-1110
Consultant :10
Approve Blockwork
1/12/2014Drawings
8:00:00
1/22/2014
AM4:00:00
20
PM 0
Not StartedCGC Pro.DM.SD.5B.DD09
D2-SD-B1-1130
Contractor :24
Prepare & 1/23/2014
Submit Co-ordinated
8:00:00
2/19/2014
AMRCP
4:00:00
39 Drawings
PM 0
Not StartedCGC Pro.DM.SD.5B.DD08
D2-SD-B1-1140
Contractor :9Prepare Finishes
1/23/2014
Layout
8:00:00
2/2/2014
AM
4:00:00
49
PM 0
Not StartedCGC Pro.DM.SD.5B.DD08
D2-SD-B1-1150
Consultant :10
Review Finishes
5/19/2014
Drawings
8:00:00
5/29/2014
AM4:00:00
49
PM 0
Not StartedCGC Pro.DM.SD.5B.DD09
D2-SD-B1-1160
Consultant :10
Approve Co-ordinated
5/1/2014 8:00:00
5/12/2014
RCP AM
Drawings
4:00:00
39
PM 0
Not StartedCGC Pro.DM.SD.GF.DD07
D2-SD-GF-1020
Contractor :9Prepare & 12/29/2013
Submit Blockwork
1/7/2014
8:00:00Drawings
AM
4:00:00
12
PM 0
Not StartedCGC Pro.DM.SD.GF.DD07
D2-SD-GF-1030
Consultant :10
Approve Blockwork
1/8/2014 8:00:00
Drawings
1/19/2014
AM 4:00:00
12
PM 0
Not StartedCGC Pro.DM.SD.GF.DD01
D2-SD-GF-1050
Consultant:Issue
1
Level 10/9/2013
Construction
8:00:00
10/9/2013
Drwg/Details
AM4:00:00
12
PM 0
Not StartedCGC Pro.DM.SD.GF.DD01
D2-SD-GF-1060
Contractor :10
Prepare & 10/10/2013
Submit Shop
10/21/2013
8:00:00
Drawings
AM12
4:00:00 PM0
Not StartedCGC Pro.DM.SD.GF.DD01
D2-SD-GF-1070
Consultant :10
Approve Shop
10/22/2013
drawings
11/2/2013
8:00:00 AM
4:00:00
12
PM 0
Not StartedCGC Pro.DM.SD.GF.DD06
D2-SD-GF-1110
SC : Submit18
Contr:Reviewed
12/1/2013
MEP8:00:00
12/21/2013
Details AM 53
4:00:00 PM0
Not StartedCGC Pro.DM.SD.GF.DD06
D2-SD-GF-1120
Consultant :10
Approve MEP
12/22/2013
Details 1/1/2014
8:00:00 AM
4:00:00
53
PM 0
Not StartedCGC Pro.DM.SD.GF.DD02
D2-SD-GF-1130
Contractor :12
Prepare & 11/3/2013
Submit Rebar
8:00:00
11/16/2013
Details
AM 25
4:00:00 PM0
Not StartedCGC Pro.DM.SD.GF.DD02
D2-SD-GF-1140
Consultant :10
Approve Rebar
11/17/2013
Details11/27/2013
8:00:00 AM25
4:00:00 PM0
Not StartedCGC Pro.DM.SD.GF.DD09
D2-SD-GF-1160
Contractor :24
Prepare & 5/5/2014
Submit Co-ordinated
8:00:00
6/1/2014
AM4:00:00
RCP
12 Drawings
PM 0
Not StartedCGC Pro.DM.SD.GF.DD09
D2-SD-GF-1170
Consultant :10
Approve Co-ordinated
6/2/2014 8:00:00
6/12/2014
RCP AM
Drawings
4:00:00
12
PM 0
Not StartedCGC Pro.DM.SD.GF.DD08
D2-SD-GF-1200
Contractor :9Prepare MEP
3/31/2014
reviewed
8:00:00
4/9/2014
Finishes
AM
4:00:00
Layout
19
PM 0
Not StartedCGC Pro.DM.SD.GF.DD08
D2-SD-GF-1210
Consultant :10
Review Finishes
4/10/2014
Drawings
8:00:00
4/21/2014
AM4:00:00
19
PM 0
Not StartedCGC Pro.DM.SD.2F.DD01
D2-SD-RF-1050
Consultant:Issue
1
Level 11/21/2013
Construction
11/21/2013
8:00:00
Drwg/Details
AM12
4:00:00 PM0
Not StartedCGC Pro.DM.SD.2F.DD01
D2-SD-RF-1060
Contractor :10
Prepare & 11/23/2013
Submit Shop
12/3/2013
8:00:00
Drawings
AM
4:00:00
12
PM 0
Not StartedCGC Pro.DM.SD.2F.DD01
D2-SD-RF-1090
Consultant :10
Approve Shop
12/4/2013
drawings
8:00:00
12/15/2013
AM 12
4:00:00 PM0
Not StartedCGC Pro.DM.SD.2F.DD02
D2-SD-RF-1120
Contractor :12
Prepare & 1/20/2014
Submit Rebar
8:00:00
2/2/2014
Details
AM
4:00:00
12
PM 0

Page 1

TASK

Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC

Pro.DM.SD.2F.DD02
D2-SD-RF-1150
Consultant :10
Approve Rebar
2/3/2014
Details
8:00:00
2/13/2014
AM 4:00:00
12
PM 0
Pro.PR.SP.30
D3-PR-SP-1450
Supplier/Subcntrctr
18
tender
10/9/2013
issue, review
8:00:00
10/29/2013
&AM
award
15
4:00:00 PM0
Pro.PR.SP.30
D3-PR-SP-2400
Submission24
& Approval10/30/2013
For Technical
11/26/2013
8:00:00
Details
AM&
15
4:00:00
Samples
PM0
Pro.PR.SP.01
D3-PR-SP-2870
Supplier/Subcntrctr
6
tender
10/14/2013
issue, review
10/20/2013
8:00:00
& award
AM54:00:00 PM0
Pro.PR.SP.02
D3-PR-SP-2880
Supplier/Subcntrctr
6
tender
11/13/2013
issue, review
11/19/2013
8:00:00
& award
AM84:00:00 PM0
Pro.PR.SP.10
D3-PR-SP-2890
Supplier/Subcntrctr
12
tender
10/2/2013
issue, review
8:00:00
10/15/2013
&AM
award
64:00:00 PM0
Pro.PR.SP.01
D3-PR-SP-2930
Submission30
& Approval10/21/2013
For Technical
11/24/2013
8:00:00
Details
AM&
54:00:00
Samples
PM0
Pro.PR.SP.02
D3-PR-SP-2940
Submission6& Approval11/20/2013
For Technical
11/26/2013
8:00:00
Details
AM&
84:00:00
Samples
PM0
Pro.PR.SP.04
D3-PR-SP-2960
Supplier/Subcntrctr
24
tender
11/25/2013
issue, review
12/22/2013
8:00:00
& award
AM14
4:00:00 PM0
Pro.PR.SP.10
D3-PR-SP-3050
Submission12
& Approval10/16/2013
For Technical
10/29/2013
8:00:00
Details
AM&
64:00:00
Samples
PM0
Pro.PR.SP.15
D3-PR-SP-3090
Supplier/Subcntrctr
24
tender
2/15/2014
issue, review
8:00:00
3/13/2014
&AM
award
4:00:00
21
PM 0
Pro.PR.SP.11
D3-PR-SP-3200
Supplier/Subcntrctr
24
tender
10/9/2013
issue, review
8:00:00
11/5/2013
&AM
award
4:00:00
48
PM 0
Pro.PR.SP.05
D3-PR-SP-3240
Supplier/Subcntrctr
36
tender
12/30/2013
issue, review
2/9/2014
8:00:00
& award
AM
4:00:00
14
PM 0
Pro.PR.SP.01
D3-PR-SP-3270
Material Procurement
4
11/25/2013 11/28/2013
8:00:00 AM54:00:00 PM0
Pro.PR.SP.02
D3-PR-SP-3280
Material Procurement
5
11/27/2013 12/2/2013
8:00:00 AM
4:00:00
8
PM 0
Pro.PR.SP.01
D3-PR-SP-3320
Material Required
0
on Site
11/30/2013 8:00:00 AM5
0
Pro.PR.SP.24
D3-PR-SP-3350
Supplier/Subcntrctr
24
tender
3/22/2014
issue, review
8:00:00
4/17/2014
&AM
award
4:00:00
11
PM 0
Pro.PR.SP.19
D3-PR-SP-3360
Supplier/Subcntrctr
24
tender
2/15/2014
issue, review
8:00:00
3/13/2014
&AM
award
4:00:00
20
PM 0
Pro.PR.SP.02
D3-PR-SP-3370
Material Required
0
on Site
12/3/2013 8:00:00 AM 8
0
Pro.PR.SP.30
D3-PR-SP-3380
Material Procurement
120
11/27/2013 4/15/2014
8:00:00 AM
4:00:00
15
PM 0
Pro.PR.SP.10
D3-PR-SP-3530
Material Procurement
28
10/30/2013 12/1/2013
8:00:00 AM
4:00:00
6
PM 0
Pro.PR.SP.04
D3-PR-SP-3590
Submission24
& Approval12/23/2013
For Technical
1/19/2014
8:00:00
Details
AM
4:00:00
&
14Samples
PM 0
Pro.PR.SP.15
D3-PR-SP-3760
Submission24
& ApprovalFor
3/15/2014
Technical
8:00:00
4/10/2014
Details
AM4:00:00
&21
Samples
PM 0
Pro.PR.SP.11
D3-PR-SP-3790
Submission12
& Approval11/6/2013
For Technical
8:00:00
11/19/2013
Details
AM &
48
4:00:00
Samples
PM0
Pro.PR.SP.31
D3-PR-SP-4260
Supplier/Subcntrctr
36
tender
12/30/2013
issue, review
2/9/2014
8:00:00
& award
AM
4:00:00
15
PM 0
Pro.PR.SP.24
D3-PR-SP-4270
Submission18
& Approval4/19/2014
For Technical
8:00:00
5/8/2014
Details
AM
4:00:00
&
11Samples
PM 0
Pro.PR.SP.19
D3-PR-SP-4290
Submission18
& Approval3/15/2014
For Technical
8:00:00
4/3/2014
Details
AM
4:00:00
&
20Samples
PM 0
Pro.PR.SP.05
D3-PR-SP-4380
Submission24
& Approval2/10/2014
For Technical
8:00:00
3/9/2014
Details
AM
4:00:00
&
14Samples
PM 0
Pro.PR.SP.10
D3-PR-SP-4400
Material Required
0
on Site
12/2/2013 8:00:00 AM 6
0
Pro.PR.SP.11
D3-PR-SP-4810
Material Procurement
27
11/20/2013 12/21/2013
8:00:00 AM48
4:00:00 PM0
Pro.PR.SP.15
D3-PR-SP-4980
Material Procurement
70
4/12/2014 8:00:00
7/1/2014
AM
4:00:00
21
PM 0
Pro.PR.SP.04
D3-PR-SP-5010
Material Procurement
84
1/20/2014 8:00:00
4/27/2014
AM4:00:00
14
PM 0
Pro.PR.SP.24
D3-PR-SP-5070
Material Procurement
56
5/10/2014 8:00:00
7/13/2014
AM4:00:00
11
PM 0
Pro.PR.SP.19
D3-PR-SP-5100
Material Procurement
42
4/5/2014 8:00:00
5/22/2014
AM 4:00:00
20
PM 0
Pro.PR.SP.11
D3-PR-SP-5190
Material Required
0
on Site
12/22/2013 8:00:00 AM48
0
Pro.PR.SP.31
D3-PR-SP-5200
Submission54
& ApprovalFor
2/10/2014
Technical
8:00:00
4/13/2014
Details
AM4:00:00
&15
Samples
PM 0
Pro.PR.SP.05
D3-PR-SP-5330
Material Procurement
105
3/10/2014 8:00:00
7/9/2014
AM
4:00:00
14
PM 0
Pro.PR.SP.19
D3-PR-SP-5490
Material Required
0
on Site
5/24/2014 8:00:00 AM 20
0
Pro.PR.SP.24
D3-PR-SP-5650
Material Required
0
on Site
7/14/2014 8:00:00 AM 11
0
Pro.PR.SP.15
D3-PR-SP-5760
Material Required
0
on Site
7/2/2014 8:00:00 AM 21
0
Pro.PR.SP.04
D3-PR-SP-5960
Material Required
0
on Site
4/28/2014 8:00:00 AM 14
0
Pro.PR.SP.31
D3-PR-SP-5990
Material Procurement
70
4/14/2014 8:00:00
7/3/2014
AM
4:00:00
15
PM 0
Pro.PR.SP.30
D3-PR-SP-6030
Commencement
0
on site4/16/2014 8:00:00 AM 15
0
Pro.PR.SP.05
D3-PR-SP-6690
Material Required
0
on Site
7/10/2014 8:00:00 AM 14
0
Pro.PR.SP.31
D3-PR-SP-6770
Material Required
0
on Site
7/5/2014 8:00:00 AM 15
0
Pro.PR.SP.8
D3-PR-SP-7330
Selection of18
Supplier/SC
11/25/2013 12/15/2013
8:00:00 AM15
4:00:00 PM0
Pro.PR.SP.8
D3-PR-SP-7360
Submittal &36
Approval of12/16/2013
Technical 1/26/2014
Data
8:00:00
/ Shop
AM
4:00:00
15
Drawings
PM 0
Pro.PR.SP.8
D3-PR-SP-7380
Material Procurement
90
1/27/2014 8:00:00
5/11/2014
AM4:00:00
15
PM 0
Pro.PR.SP.8
D3-PR-SP-7390
Commence1delivery of 5/11/2014
Materials to
8:00:00
5/11/2014
Site AM4:00:00
15
PM 0
Pro.CN.0A01.0089.ES09
D4-EX-FF-1000
Area 01 : Excavation
6
5/20/2014 3:00:00
5/27/2014
PM3:00:00
60
PM 0
Pro.CN.0A01.0089.ES09
D4-EX-FF-1010
Area 01 : Bedding
6
Works
5/27/2014 3:00:00
6/3/2014
PM
3:00:00
60
PM 0
Pro.CN.0A01.0089.ES09
D4-EX-FF-1020
Area 01 : Fire
6 Fighting Mainline
6/3/2014 laying
3:00:00
6/10/2014
PM 3:00:00
60
PM 0

Page 2

TASK

Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC

Pro.CN.0A01.0089.ES09
D4-EX-FF-1030
Area 01 : Backfilling
6
6/10/2014 3:00:00
6/17/2014
PM3:00:00
60
PM
Pro.CN.0A01.0089.ES09
D4-EX-FF-1040
Area 01 : Control
6
Units 6/14/2014
installation3:00:00
6/21/2014
PM3:00:00
60
PM
Pro.CN.0A01.0093
D4-EX-HL-1000
Area 01 : Clear
3 Site Office
5/27/2014
Area 3:00:00
5/31/2014
PM3:00:00
60
PM
Pro.CN.0A01.0093
D4-EX-HL-1010
Area 01 : Backfilling
3
/ Levelling
5/31/2014 3:00:00
6/3/2014
PM
3:00:00
60
PM
Pro.CN.0A01.0093
D4-EX-HL-1020
Area 01 : Paving
12
Works6/3/2014 3:00:00
6/17/2014
PM 3:00:00
60
PM
Pro.CN.0A01.0093
D4-EX-HL-1030
Area 01 : Inspection
3
& Handover
6/17/2014 3:00:00
6/21/2014
PM3:00:00
60
PM
Pro.CN.0A01.0093
D4-EX-HL-1040
Area 01 :Retaining
10
Wall7/5/2014
Structures
8:00:00
7/15/2014
& Foundations
AM 4:00:00
15
PM
Pro.CN.0A01.0093
D4-EX-HL-1050
Area 01 : Backfilling
9
7/16/2014 8:00:00
7/26/2014
AM4:00:00
15
PM
Pro.CN.0A01.0093
D4-EX-HL-1060
Area 01 : Sidewalk
9
Paving
7/27/2014
& Stone
8:00:00
8/5/2014
AM
4:00:00
15
PM
Pro.CN.0A01.0093
D4-EX-HL-1070
Area 01 : Fix
6 Benches 8/6/2014 8:00:00
8/12/2014
AM 4:00:00
15
PM
Pro.CN.0A01.0089.ES07
D4-EX-LV-1000
Area 01 : Excavation
6
5/20/2014 3:00:00
5/27/2014
PM3:00:00
45
PM
Pro.CN.0A01.0089.ES07
D4-EX-LV-1010
Area 01 : Sand
6 Bedding5/24/2014 3:00:00
5/31/2014
PM3:00:00
45
PM
Pro.CN.0A01.0089.ES07
D4-EX-LV-1020
Area 01 : Cable
6
laying 5/27/2014 3:00:00
6/3/2014
PM
3:00:00
45
PM
Pro.CN.0A01.0089.ES07
D4-EX-LV-1030
Area 01 : Sand
6 backfilling
5/31/2014 3:00:00
6/7/2014
PM
3:00:00
45
PM
Pro.CN.0A01.0089.ES07
D4-EX-LV-1040
Area 01 : Normal
6
back 6/3/2014
filling
3:00:00
6/10/2014
PM 3:00:00
45
PM
Pro.CN.0A01.0089.ES07
D4-EX-LV-1050
Area 01 : Compaction
6
6/7/2014 3:00:00
6/14/2014
PM 3:00:00
45
PM
Pro.CN.0A01.0089.ES07
D4-EX-LV-1060
Area 01 : Feeder
6
Pillar 6/14/2014
Works
3:00:00
6/21/2014
PM3:00:00
45
PM
Pro.CN.0A01.0089.ES01
D4-EX-SW-1000
Area 01 : Formation
6
upto
3/22/2014
Invert Level
3:00:00
3/29/2014
PM3:00:00
45
PM
Pro.CN.0A01.0089.ES01
D4-EX-SW-1010
Area 01 : Compaction
6
3/29/2014 3:00:00
4/5/2014
PM
3:00:00
45
PM
Pro.CN.0A01.0089.ES01
D4-EX-SW-1020
Area 01 : Bedding
6
Works
4/5/2014 3:00:00
4/12/2014
PM 3:00:00
45
PM
Pro.CN.0A01.0089.ES01
D4-EX-SW-1030
Area 01 : Manhole
6
Structural
4/5/2014
Works
3:00:00
4/12/2014
PM 3:00:00
60
PM
Pro.CN.0A01.0089.ES01
D4-EX-SW-1040
Area 01 : Pipe
6 laying & 4/12/2014
Connections
3:00:00
4/19/2014
PM3:00:00
45
PM
Pro.CN.0A01.0089.ES01
D4-EX-SW-1050
Area 01 : Pipe
6 Testing &
4/26/2014
Signoff 3:00:00
5/3/2014
PM
3:00:00
45
PM
Pro.CN.0A01.0089.ES01
D4-EX-SW-1060
Area 01 : Gravel
6
/ Sand5/3/2014
Filling 3:00:00
5/10/2014
PM 3:00:00
45
PM
Pro.CN.0A01.0089.ES01
D4-EX-SW-1070
Area 01 : Manhole
6
Coal5/3/2014
Tar Epoxy
3:00:00
5/10/2014
Coating
PM 3:00:00
48
PM
Pro.CN.0A01.0089.ES01
D4-EX-SW-1080
Area 01 : Backfilling
6
& Compaction
5/10/2014 3:00:00
5/17/2014
PM3:00:00
45
PM
Pro.CN.0A01.0089.ES01
D4-EX-SW-1090
Area 01 : GRP
6 Access 4/19/2014
Ladder
3:00:00
4/26/2014
PM3:00:00
60
PM
Pro.CN.0A01.0089.ES01
D4-EX-SW-1100
Area 01 : Cover
6
Slab &5/13/2014
Manhole Fixing
3:00:00
5/20/2014
PM3:00:00
45
PM
Pro.CN.0015.2.BL01
D4-GN-PL-1260
Shaft Access
0 to Machine room
4/16/2014 8:00:00
15
AM
Pro.CN.0015.2.BL01
D4-GN-PL-1270
Prlm.Wrks Lighting,Template,Plumbing
15
4/16/2014 8:00:00
5/3/2014
AM
4:00:00
15
PM
Pro.CN.0015.2.BL01
D4-GN-PL-1280
Fixing of Separator
15
Beams,Guide
5/4/2014 8:00:00
Rail
5/20/2014
Brackets
AM 4:00:00
15
PM
Pro.CN.0015.2.BL02
D4-GN-PL-1290
Rail Hoisting
9 & Alignment
5/21/2014 8:00:00
5/31/2014
AM4:00:00
15
PM
Pro.CN.0015.2.BL02
D4-GN-PL-1300
Entrance Sill,
9 Jamb Fixing
6/1/2014 8:00:00
6/10/2014
AM 4:00:00
15
PM
Pro.CN.0015.2.BL02
D4-GN-PL-1310
Grouting of 9Entrance Frames
6/11/2014 8:00:00
6/21/2014
AM4:00:00
15
PM
Pro.CN.0015.2.BL02
D4-GN-PL-1320
Machine Works(Mechanical
9
6/22/2014
& Electrical)
8:00:00
7/1/2014
AM
4:00:00
15
PM
Pro.CN.0015.2.BL02
D4-GN-PL-1330
Hoistway Trunking
9
& Wiring
7/2/2014 8:00:00
7/12/2014
AM 4:00:00
15
PM
Pro.CN.0015.2.BL02
D4-GN-PL-1340
Car Cabin Assembly,Roping
9
7/13/2014
& Wiring
8:00:00
7/22/2014
AM4:00:00
15
PM
Pro.CN.0015.2.BL02
D4-GN-PL-1350
Fixing of Entrance
9
Door7/23/2014 8:00:00
8/2/2014
AM
4:00:00
15
PM
Pro.CN.0015.2.BL02
D4-GN-PL-1360
Removal of 9Scaffolding8/3/2014 8:00:00
8/12/2014
AM 4:00:00
15
PM
Pro.CN.0005.1
D4-IF-B5-1000
Structural Access
0
to MEP
1/29/2014
& Finishes
3:00:00 PM 14
Pro.CN.0005.1
D4-IF-B5-1010
Blockwork 15
2/15/2014 3:00:00
3/4/2014
PM
3:00:00
0
PM
Pro.CN.0005.1
D4-IF-B5-1020
MEP 1st Fix15
2/17/2014 3:00:00
3/6/2014
PM
3:00:00
22
PM
Pro.CN.0005.1
D4-IF-B5-1030
Render
18
3/6/2014 3:00:00
3/27/2014
PM 3:00:00
22
PM
Pro.CN.0005.1
D4-IF-B5-1040
MEP 2nd Fix
30
5/12/2014 8:00:00
6/15/2014
AM4:00:00
15
PM
Pro.CN.0005.1
D4-IF-B5-1050
Ceiling Grid10
6/14/2014 8:00:00
6/24/2014
AM4:00:00
12
PM
Pro.CN.0005.1
D4-IF-B5-1060
Ceiling Closure
10
7/1/2014 8:00:00
7/12/2014
AM 4:00:00
12
PM
Pro.CN.0005.1
D4-IF-B5-1070
MEP Final Fix
30
7/13/2014 8:00:00
8/16/2014
AM4:00:00
12
PM
Pro.CN.0005.1
D4-IF-B5-1080
Final Finishes
30
7/14/2014 8:00:00
8/17/2014
AM4:00:00
11
PM
Pro.CN.0005.1
D4-IF-B5-1090
Wall Finishes
4
4/20/2014 3:00:00
4/24/2014
PM3:00:00
36
PM
Pro.CN.0005.1
D4-IF-B5-1100
Floor Finish-Epoxy
21
Coating
4/24/2014 3:00:00
5/19/2014
PM3:00:00
36
PM
Pro.CN.0005.1
D4-IF-B5-1110
Ceiling Paint
20
3/27/2014 3:00:00
4/20/2014
PM3:00:00
36
PM
Pro.CN.0005.6
D4-IF-GF-1000
Structural Access
0
to MEP
2/2/2014
& Finishes
3:00:00 PM 26

Page 3

0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
0
50000
20000
30000
20000
20000
25000
15000
30000
25000
20000
15000
0

TASK

Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC
Not StartedCGC

Pro.CN.0005.6
D4-IF-GF-1010
Blockwork 15
3/4/2014 3:00:00
3/22/2014
PM 3:00:00
0
PM 0
Pro.CN.0005.6
D4-IF-GF-1020
MEP 1st Fix15
3/6/2014 3:00:00
3/24/2014
PM 3:00:00
12
PM 0
Pro.CN.0005.6
D4-IF-GF-1030
Render
30
3/24/2014 3:00:00
4/28/2014
PM3:00:00
12
PM 0
Pro.CN.0005.6
D4-IF-GF-1040
MEP 2nd Fix
30
5/14/2014 3:00:00
6/18/2014
PM3:00:00
12
PM 0
Pro.CN.0005.6
D4-IF-GF-1050
Ceiling Grid20
6/1/2014 3:00:00
6/24/2014
PM 3:00:00
12
PM 0
Pro.CN.0005.6
D4-IF-GF-1060
Ceiling Closure
20
6/18/2014 3:00:00
7/12/2014
PM3:00:00
12
PM 0
Pro.CN.0005.6
D4-IF-GF-1070
MEP Final Fix
30
7/12/2014 3:00:00
8/16/2014
PM3:00:00
12
PM 0
Pro.CN.0005.6
D4-IF-GF-1080
Final Finishes
30
7/12/2014 3:00:00
8/16/2014
PM3:00:00
12
PM 0
Pro.CN.0005.6
D4-IF-GF-1090
Wall Finishes
18
3/27/2014 3:00:00
4/17/2014
PM3:00:00
22
PM 0
Pro.CN.0005.6
D4-IF-GF-1100
Floor Finish-Epoxy
10
Coating
5/14/2014 8:00:00
5/25/2014
AM5:00:00
31
PM 0
Pro.CN.0005.6
D4-IF-GF-1110
Floor Finish-Tiles
14
4/28/2014 8:00:00
5/13/2014
AM5:00:00
14
PM 0
Pro.CN.0005.6
D4-IF-GF-1120
Floor Finish-Calsium
18
Silicate
5/14/2014
+Carpet
8:00:00
6/3/2014
AM
5:00:00
23
PM 0
Pro.CN.0005.6
D4-IF-GF-1130
Ceiling Paint
14
4/28/2014 3:00:00
5/14/2014
PM3:00:00
12
PM 0
Pro.CN.0005.7
D4-IF-MF-1000
Structural Access
0
to MEP
3/22/2014
& Finishes
3:00:00 PM 0
0
Pro.CN.0005.7
D4-IF-MF-1010
Blockwork 21
3/22/2014 3:00:00
4/15/2014
PM3:00:00
0
PM 10000
Pro.CN.0005.7
D4-IF-MF-1020
MEP 1st Fix15
3/31/2014 3:00:00
4/17/2014
PM3:00:00
0
PM 0
Pro.CN.0005.7
D4-IF-MF-1030
Render
23
4/17/2014 3:00:00
5/14/2014
PM3:00:00
0
PM 0
Pro.CN.0005.7
D4-IF-MF-1040
MEP 2nd Fix
30
5/17/2014 3:00:00
6/21/2014
PM3:00:00
10
PM 0
Pro.CN.0005.7
D4-IF-MF-1050
Ceiling Grid20
6/15/2014 3:00:00
7/8/2014
PM
3:00:00
0
PM 0
Pro.CN.0005.7
D4-IF-MF-1060
Ceiling Closure
20
7/2/2014 3:00:00
7/26/2014
PM 3:00:00
0
PM 0
Pro.CN.0005.7
D4-IF-MF-1070
MEP Final Fix
30
7/26/2014 3:00:00
8/30/2014
PM3:00:00
0
PM 0
Pro.CN.0005.7
D4-IF-MF-1080
Final Finishes
30
7/26/2014 3:00:00
8/30/2014
PM3:00:00
0
PM 0
Pro.CN.0005.7
D4-IF-MF-1090
Ceiling Paint
2
5/14/2014 3:00:00
5/17/2014
PM3:00:00
10
PM 0
Pro.CN.0005.7
D4-IF-MF-2000
Wall Finishes
13
5/14/2014 3:00:00
5/29/2014
PM3:00:00
0
PM 0
Pro.CN.0005.7
D4-IF-MF-2010
Floor Finish-Tiles
7
5/29/2014 3:00:00
6/7/2014
PM
3:00:00
0
PM 0
Pro.CN.0005.7
D4-IF-MF-2020
Floor Finish-Epoxy
2
Coating
6/7/2014 3:00:00
6/9/2014
PM3:00:00
18
PM 0
Pro.CN.0005.7
D4-IF-MF-2030
Floor Finish-Calsium
20
Silicate
6/7/2014
+Carpet
3:00:00
6/30/2014
PM 3:00:00
0
PM 0
Pro.CN.0003.5.4
D4-SB-B4-2000
Level : B1 -10
GF Columns
12/26/2013 1/7/2014
3:00:00 PM
3:00:00
0
PM 60000
Pro.CN.0003.5.4
D4-SB-B4-2010
Level : B1 Retaining
15
Wall,
12/26/2013
Beams 1/13/2014
&
3:00:00
Slab PM
3:00:00
0
PM 40000
Pro.CN.0003.5.3
D4-SB-DE-1060
Level : B1-GF
14 Deshuttering
1/13/2014 3:00:00
1/29/2014
PM3:00:00
14
PM 10000
Pro.CN.0003.5.1
D4-SB-RW-1070
Anti Termite2 Protection12/7/2013 8:00:00
12/8/2013
AM4:00:00
0
PM 10000
Pro.CN.0003.5.1
D4-SB-RW-1080
Blinding
3
12/5/2013 8:00:00
12/8/2013
AM4:00:00
0
PM 25000
Pro.CN.0003.5.1
D4-SB-RW-1100
Blinding Water
4
proofing
12/9/2013 8:00:00
12/12/2013
AM 04:00:00 PM30000
Pro.CN.0003.5.1
D4-SB-RW-1110
Tie Reinforcement
12
12/12/2013 12/25/2013
8:00:00 AM04:00:00 PM12000
Pro.CN.0003.5.1
D4-SB-RW-1120
Formwork 10
12/15/2013 12/25/2013
9:00:00 AM04:00:00 PM30000
Pro.CN.0003.5.1
D4-SB-RW-1130
Pour Concrete
1
12/26/2013 12/26/2013
8:00:00 AM03:00:00 PM50000
Pro.CN.0004.3
D4-SS-1F-1000
Level : 1F Beams
10
& Slab
2/3/2014 3:00:00
2/15/2014
PM 3:00:00
0
PM 40000
Pro.CN.0004.3
D4-SS-1F-1010
Level : 1F -11
RF Columns
2/15/2014
& Shaft 3:00:00
Wall
2/27/2014
PM3:00:00
0
PM 60000
Pro.CN.0004.4
D4-SS-2F-1010
Level : RF 12
Beams & Slab
2/27/2014 3:00:00
3/13/2014
PM3:00:00
0
PM 40000
Pro.CN.0004.1
D4-SS-DE-1000
Level : GF-1F
7 Deshuttering
1/25/2014 3:00:00
2/2/2014
PM
3:00:00
26
PM 10000
Pro.CN.0004.1
D4-SS-DE-1010
Level : 1F-RF
7 Deshuttering
3/13/2014 3:00:00
3/22/2014
PM3:00:00
0
PM 10000
Pro.CN.0004.2
D4-SS-GF-1000
Level : GF 10
Beams & Slab
1/13/2014 3:00:00
1/25/2014
PM3:00:00
0
PM 60000
Pro.CN.0004.2
D4-SS-GF-1010
Level : GF 8- 1F Columns
1/25/2014
& Shaft 3:00:00
Wall
2/3/2014
PM
3:00:00
0
PM 60000
Pro.TC
D5-TC-1000Testing & Commissioning
30
8/30/2014 3:00:00
10/4/2014
PM2:00:00
0
PM 0
Pro.AA.AB.AB
D6-AA-AB-1000
Prepare SC18
list for As builts
10/12/2014 11/2/2014
2:00:00 PM
2:00:00
0
PM 0
Pro.AA.AB.AB
D6-AA-AB-1010
Consultant Approve
10
S/C
11/2/2014
list for Asbuilt
2:00:00
11/13/2014
PM 02:00:00 PM0
Pro.AA.AB.AB
D6-AA-AB-1020
SC prepare30
As Builts 11/13/2014 12/18/2014
2:00:00 PM02:00:00 PM0
Pro.AA.AB.AB
D6-AA-AB-1030
Consultant approve
24
Asbuilts
12/18/2014 1/15/2015
2:00:00 PM
2:00:00
0
PM 0
Pro.AA.AB.FM
D6-AA-FM-1010
FM Training20
10/4/2014 2:00:00
10/27/2014
PM 02:00:00 PM0
Pro.AA.AB.OM
D6-AA-OM-1000
Prepare SC18
list for O&M
10/12/2014 11/2/2014
2:00:00 PM
2:00:00
0
PM 0
Pro.AA.AB.OM
D6-AA-OM-1010
Consultant Approve
10
S/C
11/2/2014
list for O&M
2:00:00
11/13/2014
PM 02:00:00 PM0
Pro.AA.AB.OM
D6-AA-OM-1020
SC prepare30
O&M
11/13/2014 12/18/2014
2:00:00 PM02:00:00 PM0

Page 4

TASK

Not StartedCGC Pro.AA.AB.OM


D6-AA-OM-1030
Consultant approve
24
O&M
12/18/2014 1/15/2015
2:00:00 PM
2:00:00
0
PM 0

Page 5

TASK

delete_record_flag
Delete This Row

Page 6

USERDATA

user_data
UserSettings Do Not Edit
DurationQtyType=QT_DayShowAsPercentage=0SmallScaleQtyType=QT_HourDateFormat=dd'-'mmm'-'yyCurrencyFormat=QA

Page 7

USERDATA

t=dd'-'mmm'-'yyCurrencyFormat=QATAR RIYAL