0 Bewertungen0% fanden dieses Dokument nützlich (0 Abstimmungen)
47 Ansichten66 Seiten
The TSEAS Process, has been designed to address the issues of bridge scour and stream stability and comply with the intent of the FHWA Technical advisory 5142.23.
Originaltitel
Texas Secondary Evaluation and Analysis for Scour (TSEAS)
The TSEAS Process, has been designed to address the issues of bridge scour and stream stability and comply with the intent of the FHWA Technical advisory 5142.23.
The TSEAS Process, has been designed to address the issues of bridge scour and stream stability and comply with the intent of the FHWA Technical advisory 5142.23.