MITSUBISHI HEAVY INDUSTRIES, LTD. MITSUBISHI HEAVY INDUSTRIES, LTD. TRAINER: Yuki Yoshikawa PAITON PAITON EXPANSION PROJECT EXPANSION PROJECT B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 2 2 MHI BUSI NESS CONFI DENTI AL Upon completion of the lesson, the trainee will be able to describe the features and design considerations for Paiton boiler. Instructor Guide Material Objectives General Objective: B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 3 3 MHI BUSI NESS CONFI DENTI AL Outline n n Summary Summary n n Design of Design of Paiton Paiton Boiler Boiler Combustion Systems Combustion Systems Vertical Water Wall Vertical Water Wall Pressure Parts Pressure Parts Boiler Expansion Systems Boiler Expansion Systems Air and Gas Systems Air and Gas Systems n n Basics of Boiler Basics of Boiler n n Feature of Feature of Paiton Paiton Boiler Boiler Major Specification Major Specification Coal Property Coal Property Design for Sub Design for Sub- -bituminous Coal bituminous Coal n n Operation Operation B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 4 4 MHI BUSI NESS CONFI DENTI AL Outline n n Summary Summary n n Design of Design of Paiton Paiton Boiler Boiler Combustion Systems Combustion Systems Vertical Water Wall Vertical Water Wall Pressure Parts Pressure Parts Boiler Expansion Systems Boiler Expansion Systems Air and Gas Systems Air and Gas Systems n n Basics of Boiler Basics of Boiler n n Feature of Feature of Paiton Paiton Boiler Boiler Major Specification Major Specification Coal Property Coal Property Design for Sub Design for Sub- -bituminous Coal bituminous Coal n n Operation Operation B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 5 5 MHI BUSI NESS CONFI DENTI AL Purpose Purpose : : Condenser Feed Water High Pressure High Temperature Steam Exhaust Steam To generate high pressure and high temperature steam To generate high pressure and high temperature steam to operate steam turbine to operate steam turbine TURBINE Boiler = Steam Generator Make-up Water Typical Relation Basics of Boiler B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 6 6 MHI BUSI NESS CONFI DENTI AL Combustion Reaction Water Fuel Air Steam Flue Gas Input Materials Output Materials Fuel energy Process of Steam Generation Basics of Boiler Heat transfer B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 7 7 MHI BUSI NESS CONFI DENTI AL W a t e r Fuel Air C o m b u s t i o n Flue Gas F u r n a c e S u p e r h e a t e r E c o n o m i z e r A i r
h e a t e r R e h e a t e r S t e a m Typical Scheme of Boiler System Basics of Boiler B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 8 8 MHI BUSI NESS CONFI DENTI AL Superheated Steam Saturated Steam Heated by fuel combustion Water wall SH Superheated Steam Basics of Boiler Water Steam Steam turbine turbine B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 9 9 MHI BUSI NESS CONFI DENTI AL Compressed Water Compressed Water P r e s s u r e
( M P a ( g ) ) Superheated Steam Superheated Steam Temperature (!) Water boils at 100 Water boils at 100! ! in the in the atmosphere. atmosphere. Saturation Pressure and Temperature 0 100 200 300 400 0 10 20 Basics of Boiler Boundary Boundary = Saturation = Saturation B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 10 10 MHI BUSI NESS CONFI DENTI AL Pressure and Enthalpy Chart Pressure (MPa) E n t h a l p y
( k c a l / k g ) 0 200 400 600 800 1000 0 10 20 30 40 Water 600! 500! 400! 300! 200! Saturation Saturation (Steam/Water) (Steam/Water) Basics of Boiler Critical pressure 22.1 MPa Supercritical B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 11 11 MHI BUSI NESS CONFI DENTI AL Pressure (MPa) E n t h a l p y
( k c a l / k g ) 0 200 400 600 800 1000 0 10 20 30 40 Water 600! 500! 400! 300! 200! Basics of Boiler Supercritical Sliding Pressure Operation Saturation Saturation (Water/Steam) (Water/Steam) 35% 50% 75% BMCR Eco. Inlet Economizer Water Wall Superheater 100% SH Outlet W .W Inlet W.W Outlet B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 12 12 MHI BUSI NESS CONFI DENTI AL Comparison of Drum Type Boiler and Once-through Boiler to SteamTurbine SH Furnace Eco Steam Drum BFP BCP SH Furnace Eco Water Separator BFP to SteamTurbine Basics of Boiler Higher Grade (Higher steam condition) Base Tube Material Less (Better plant heat rate) Base Environmental Impact Approx. 3% Better (Higher Steam Condition) Base Plant Heat Rate (Required heat input per 1kW ) Better (Less Heat Capacity) Base Load Change Rate System Schematic Supercritical Sub-critical Operating Press. Once-Through boiler Drum type boiler Boiler Type B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 13 13 MHI BUSI NESS CONFI DENTI AL Comparison of Drum Type Boiler and Once-through Boiler Tube Materials of Pressure Parts " " Furnace " " SA-213T91 #9Cr$ " ASME Code Case 2199 #2.25Cr$ " " " SA-213T22 #2Cr$ " " " " ASME Code Case 2328-1 #18Cr$ " " " " SA-213T12 #1Cr$ " SA-210C #Carbon Steel$ 2ry RH 1ry RH 3ry SH 2ry SH 1ry SH Eco Material Material Pressure Parts "Paiton (One-through Boiler) B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 14 14 MHI BUSI NESS CONFI DENTI AL 3ry SH 2ry SH " " " " Panel " " Inlet Stub " " Outlet Stub " " Inlet Stub Stainless Steel Alloy Steel " " ASME Code Case 2199 #2.25Cr$ " SA-213TP347H #18Cr$ " " SA-213T91 #9Cr$ " " SA-213T22 #2Cr$ " ASME Code Case 2328-1 (18Cr$ " " SA-213T12 #1Cr$ Outlet Stub Panel Material Material "T Plant (Drum Type Boiler) "Paiton (One-through Boiler) Tube Materials of Pressure Parts Comparison of Drum Type Boiler and Once-through Boiler Basics of Boiler B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 15 15 MHI BUSI NESS CONFI DENTI AL Supercritical Sliding Pressure Operation Boilers in Japan Soma Joint EPCO. Shinchi P/S (1995) 1,000MW 24.1MPa%538/566! Tohoku EPCO. Haramachi P/S (1997) 1,000MW 24.5MPa%566/593! Tokyo EPCO. Hirono P/S (2004) 600MW 24.5MPa%600/600! Chubu EPCO. Hekinan P/S (1991) 700MW 24.1MPa%538/566! &Vertical Water Wall ' Kobe steel IPP Kobe P/S (2002) 700MW 24.1MPa%538/566! Chugoku EPCO. Misumi P/S (1998) 1,000MW 24.5MPa%600/600! Kyushu EPCO. Matsuura P/S (1989) 700MW 24.1MPa%538/566! Kansai EPCO. Maizuru P/S (2004) 900MW 24.5MPa%595/595! Basics of Boiler B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 16 16 MHI BUSI NESS CONFI DENTI AL Global Supply Record for Vertical Water Wall Boiler No.1 Share / 5 countries / 32,896MW / 45units Since 1989, As of September 2010 ( ): COD SC : Supercritical USC : Ultra-Supercritical Chugoku EPCO Misumi #1 10 1000MW 24.5MPa600/600!(1998), and other 9 units for other customers Japan( 10 units China( 32 units (by Licensee) Jaypee Nigrie #1, #2 700MW 24.5MPa566/593!(2011), and other 9 units for other customers Paiton 856MW 24.1MPa538/566! (2012) Indonesia( 1 unit CFE Pacifico #1 700MW 24.2MPa538/566! (2010) Mexico( 1 unit India( 11 units (by L&T-MHI Boiler) Pvt. Ltd. as Joint Venture) Henung Yuhuan #1 to #4 100 1000MW 26.4MPa600/600! (2006), and other 28 units for other customers Basics of Boiler B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 17 17 MHI BUSI NESS CONFI DENTI AL Availability of Supercritical Sliding Pressure Operation Boiler (Vertical Water Wall) Reliability (%) = (Calendar date hours(h)- forced outage hours (h)) / (Calendar date hours(h)) 0% 20% 40% 60% 80% 100% A v a i l a b i l i t y A v a i l a b i l i t y Misu Misumi mi 1,000MW 1,000MW Haramachi Haramachi 1,000MW 1,000MW Shinchi Shinchi 1,000MW 1,000MW Matsuura Matsuura 700MW 700MW Basics of Boiler B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 18 18 MHI BUSI NESS CONFI DENTI AL Outline n n Summary Summary n n Design of Design of Paiton Paiton Boiler Boiler Combustion Systems Combustion Systems Vertical Water Wall Vertical Water Wall Pressure Parts Pressure Parts Boiler Expansion Systems Boiler Expansion Systems Air and Gas Systems Air and Gas Systems n n Basics of Boiler Basics of Boiler n n Feature of Feature of Paiton Paiton Boiler Boiler Major Specification Major Specification Coal Property Coal Property Design for Sub Design for Sub- -bituminous Coal bituminous Coal n n Operation Operation B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 19 19 MHI BUSI NESS CONFI DENTI AL 4.66 Gcal/m 2 h Fuel Heat Input (*1) / Plan Area 421.65 m 2 Plan Area 29,414 mm Width 55,149 mm Height 21,369 m 3 Volume 0.089 Gcal/m 3 h Fuel Heat Input (*2) / Volume 14,335 mm Depth Furnace 25.78 MPa(g) SH Outlet Pressure 4.85 MPa(g) RH Outlet 542 ! SH Outlet Temperature 568 ! RH Outlet 2,695 t/h Steam Flow 815 MW Net Power Output Paiton Unit Major Specification (*1)*Include combustion air sensible heat and H 2 ,H 2 O latent heat (HHV) (*2)*Exclude combustion air sensible heat and H 2 ,H 2 O latent heat (HHV) Feature of Paiton Boiler B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 20 20 MHI BUSI NESS CONFI DENTI AL Material and Design Code MHI Standard JIS or Equivalent Non Pressure Parts ASME Pressure Vessel Code Section + ASME Pressure Vessel Code Section ,, ASME Code Case Pressure Parts Design Material Feature of Paiton Boiler ASME Pressure Vessel Code Section + NFPA Code 85B, D E Design for Implosion, Explosion B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 21 21 MHI BUSI NESS CONFI DENTI AL Outline n n Summary Summary n n Design of Design of Paiton Paiton Boiler Boiler Combustion Systems Combustion Systems Vertical Water Wall Vertical Water Wall Pressure Parts Pressure Parts Boiler Expansion Systems Boiler Expansion Systems Air and Gas Systems Air and Gas Systems n n Basics of Boiler Basics of Boiler n n Feature of Feature of Paiton Paiton Boiler Boiler Major Specification Major Specification Coal Property Coal Property Design for Sub Design for Sub- -bituminous Coal bituminous Coal n n Operation Operation B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 22 22 MHI BUSI NESS CONFI DENTI AL ASTM* Coal Rank (*American Society for Testing and Materials) 40 60 80 100 16000 Gross Calorific Value Moist Mineral Matter Free(BTU/Lb) D r y
M i n e r a l - M a t t e r
F r e e
F i x e d
C a r b o n
( % ) Bituminous Bituminous Lignite Lignite Sub Sub- - Bituminous Bituminous Mahakam Melawan 50 70 90 30 6000 8000 10000 12000 14000 Anthracite Anthracite Pasir Roto South Loa janan Enviro Pasir Roto North Feature of Paiton Boiler Coals for Paiton Project are classified into Sub- Bituminous coal. Performance coal B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 23 23 MHI BUSI NESS CONFI DENTI AL 40 60 80 100 37200 Gross Calorific Value Moist Mineral Matter Free (kJ/kg) D r y
M i n e r a l - M a t t e r
F r e e
F i x e d
C a r b o n
( % ) Bituminous Bituminous Lignite Lignite Sub Sub- - Bituminous Bituminous Mahakam Melawan 50 70 90 30 14000 18600 23300 27900 32600 Anthracite Anthracite Pasir Roto South Loa janan Enviro Pasir Roto North Feature of Paiton Boiler ASTM* Coal Rank (*American Society for Testing and Materials) Coals for Paiton Project are classified into Sub- Bituminous coal. Performance coal B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 24 24 MHI BUSI NESS CONFI DENTI AL Sub-bituminous coal (Paiton) Bituminous coal 5.2 2.5 1.7 25 47 0.96 1.0 5.2 0.8 0.2 5.21 0.1 20 0.84 1200 41 16.7 0.96 Performance Coal -35 -20 -10 -18 .40 -2.5 -1.8 -35 -4.0 -3.0 -35 -2.0 -15 -0.5 .1200 .20 -18 -2.5 Range Design Coal Range Unit Item AS: As Received AD: Air Dry Base DB: Dry Base DSF: Dry Ash Free 1.9/5.3 kg/10 6 kcal Ash Loading 1.1/3.8 kg/10 6 kcal Al 2 O 3 0SiO 2 (DB) 0.7/2.5 kg/10 6 kcal Quartz(SiO 2 ) (DB) Erosion Characteristic 21/32 % Total Moisture (AR) 43/53 1 HGI Coal Fineness 0.86/1.07 1 Fuel Ratio (AD) 0.9/1.8 % Nitrogen 2N3 (DAF) NOx Emission Characteristic 1.9/5.3 kg/10 6 kcal Ash Loading 0.8/2.7 % Na 2 O0K 2 O (DB) 0.2/1.8 % Na 2 O (DB) Fouling Characteristic 1.9/5.28 kg/10 6 kcal Ash Loading 0.1/0.3 % Total Sulfur (AD) 12.5/20 % Fe 2 O 3 (DB) 0.31/1.5 1 Base/Acid Ratio(*1) (DB) 1200/1320 ! Ash Softening Temperature Slagging Characteristic 40.5/43.5 % Volatile Matter (AD) 13.4/17.6 1 C/H Ratio (DAF) 0.86/1.07 1 Fuel Ratio (AD) Combustion Characteristic ( 4 5)* The ratio of basic substances (Fe 2 O 3 , CaO,MgO,Na 2 O,K 2 O) to acid substances (SiO 2 , Al 2 O 3 , TiO 2 ) Coal Property Feature of Paiton Boiler B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 25 25 MHI BUSI NESS CONFI DENTI AL Sub-bituminous coal (Paiton) Bituminous coal 5.2 2.5 1.7 25 47 0.96 1.0 5.2 0.8 0.2 5.21 0.1 20 0.84 1200 41 16.7 0.96 Performance Coal -35 -20 -10 -18 .40 -2.5 -1.8 -35 -4.0 -3.0 -35 -2.0 -15 -0.5 .1200 .20 -18 -2.5 Range Design Coal Range Unit Item 1.9/5.3 kg/10 6 kcal Ash Loading 1.1/3.8 kg/10 6 kcal Al 2 O 3 0SiO 2 0.7/2.5 kg/10 6 kcal Quartz(SiO 2 ) Erosion Characteristic 21/32 % Total Moisture (As Received) 43/53 1 HGI Coal Fineness 0.86/1.07 1 Fuel Ratio 0.9/1.8 % Nitrogen 2N3 (Dry Ash Free) NOx Emission Characteristic 1.9/5.3 kg/10 6 kcal Ash Loading 0.8/2.7 % Na 2 O0K 2 O (in Ash) 0.2/1.8 % Na 2 O (in Ash) Fouling Characteristic 1.9/5.28 kg/10 6 kcal Ash Loading 0.1/0.3 % Total Sulfur 12.5/20 % Fe 2 O 3 (in Ash) 0.31/1.5 1 Base/Acid Ratio(*1) 1200/1320 ! Ash Softening Temperature Slagging Characteristic 40.5/43.5 % Volatile Matter (Air Dry Base) 13.4/17.6 1 C/H Ratio 0.86/1.07 1 Fuel Ratio Combustion Characteristic ( 4 5)* The ratio of basic substances (Fe 2 O 3 , CaO,MgO,Na 2 O,K 2 O) to acid substances (SiO 2 , Al 2 O 3 , TiO 2 ) Coal Property Feature of Paiton Boiler B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 26 26 MHI BUSI NESS CONFI DENTI AL Outline n n Summary Summary n n Design of Design of Paiton Paiton Boiler Boiler Combustion Systems Combustion Systems Vertical Water Wall Vertical Water Wall Pressure Parts Pressure Parts Boiler Expansion Systems Boiler Expansion Systems Air and Gas Systems Air and Gas Systems n n Basics of Boiler Basics of Boiler n n Feature of Feature of Paiton Paiton Boiler Boiler Major Specification Major Specification Coal Property Coal Property Design for Sub Design for Sub- -bituminous Coal bituminous Coal n n Operation Operation B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 27 27 MHI BUSI NESS CONFI DENTI AL Slagging Slagging characteristic characteristic Design Considerations for Sub-bituminous Coal Feature of Paiton Boiler Low calorific value Low calorific value High spontaneous High spontaneous combustibility combustibility High moisture content High moisture content Coal Fineness Coal Fineness Coal Property of Coal Property of sub sub- -bituminous bituminous coal coal B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 28 28 MHI BUSI NESS CONFI DENTI AL Slagging Slagging characteristic characteristic Feature of Paiton Boiler Low calorific value Low calorific value High spontaneous High spontaneous combustibility combustibility High moisture content High moisture content Coal Fineness Coal Fineness Coal Property of Coal Property of sub sub- -bituminous bituminous coal coal Design Considerations for Sub-bituminous Coal B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 29 29 MHI BUSI NESS CONFI DENTI AL Feature of Paiton Boiler l High spontaneous combustibility Decrease Pulverizer Outlet Air Temperature 60! Sub-Bituminous Coal (Paiton) 77! Bituminous Coal P u l v e r i z e r O u t l e t
A i r
T e m p . ( ! ) 50 100 0 Design Considerations for Sub-bituminous Coal B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 30 30 MHI BUSI NESS CONFI DENTI AL Feature of Paiton Boiler l High moisture content Increase Pulverizer Inlet Air Temperature Sub-Bituminous Coal (Paiton) 255! Bituminous Coal P u l v e r i z e r I n l e t
A i r
T e m p .
( ! ) 100 200 300 241! 0 Design Considerations for Sub-bituminous Coal B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 31 31 MHI BUSI NESS CONFI DENTI AL Feature of Paiton Boiler l Low calorific value (More coal flow) Larger capacity pulverizer is selected. Sub-Bituminous Coal (Paiton) 108 t/h Bituminous Coal P u l v e r i z e r C a p a c i t y
( t / h ) 50 100 150 95 t/h 0 Design Considerations for Sub-bituminous Coal B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 32 32 MHI BUSI NESS CONFI DENTI AL Proper arrangement of Wall Deslagger Wall Deslagger : 68 Half Retractable Sootblower : 10 Long Retractable Sootblower : 26 Features of Paiton Boiler l Slagging characteristic Design Considerations for Sub-bituminous Coal B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 33 33 MHI BUSI NESS CONFI DENTI AL Outline n n Summary Summary n n Design of Design of Paiton Paiton Boiler Boiler Combustion Systems Combustion Systems Vertical Water Wall Vertical Water Wall Pressure Parts Pressure Parts Boiler Expansion Systems Boiler Expansion Systems Air and Gas Systems Air and Gas Systems n n Basics of Boiler Basics of Boiler n n Feature of Feature of Paiton Paiton Boiler Boiler Major Specification Major Specification Coal Property Coal Property Design for Sub Design for Sub- -bituminous Coal bituminous Coal n n Operation Operation B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 34 34 MHI BUSI NESS CONFI DENTI AL Boiler Front Fixed Separator Pulverizer In-Furnace DeNOx System MACT* (*Mitubishi Advanced Combustion Technology) Circular Corner Firing CCF Low NOx A-PM* Burner (*Advanced Pollution minimum) Combustion Systems Combustion Systems B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 35 35 MHI BUSI NESS CONFI DENTI AL Plan View 2. High Combustion Stability 6Mutual supporting combustion by adjacent burner 1. High Efficient Combustion 6Better mixing of fuel and air 6Long flame path by effective use of furnace Circular Corner Firing (CCF) Combustion Systems Side View 3. Low NOx Emission 4. Less Furnace slagging 6Uniform combustion without peak heat flux. l Twin furnace l Eight(8) burners l No division wall l Two concentric circles are formed by circular firing. - Main Structure - B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 36 36 MHI BUSI NESS CONFI DENTI AL Coal Fired Supercritical Pressure Operation Boiler -CCF Units (Twin Furnace)- Coal Mar.2003 600MW China FPC USA CP #4 13 Coal Sep.2000 600MW China FPC USA CP #2 8 Coal .2000 600MW Taiwan Mailiao FPCC #6 9 Coal Mar.2000 600MW China FPC USA CP #1 7 Coal Aug.2004 900MW Kansai EPC Maizuru #1 14 Coal .2002 600MW Taiwan Mailiao FPCC #7 12 Coal .2002 600MW Taiwan Mailiao FP #4 11 Coal Jan.2000 600MW China FPC USA CP #3 10 Coal Sep.1999 600MW Taiwan Mailiao FP #2 6 Coal Jun.1999 600MW Taiwan Mailiao FP #1 5 Coal Jul.1998 1000MW Chugoku EPC Misumi #1 4 Coal Jul.1997 1000MW Tohoku EPC Haranomachi #1 3 Coal Jul.1995 1000MW Soma Kyodo PC Shinchi #2 2 Coal Oct.1991 700MW Chubu EPC Hekinan #1 1 Fuel Commercial Operation Capacity Plant Name No. Combustion Systems B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 37 37 MHI BUSI NESS CONFI DENTI AL A-PM Burner (1/2) Conc. flame surface is extended Stable Ignition Conc. Weak Conc. Coal Coal A-PM Burner : Advanced - Pollution Minimum Burner Aux.2 AA Aux.1 Oil / Air Coal Coal Aux.1 Aux.1 Oil / Air Coal Coal Aux.1 Aux.1 Oil / Air Coal Coal AA AA AA Oil / Air Coal Coal AA : Additional Air Aux.1(U) Combustion Systems B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 38 38 MHI BUSI NESS CONFI DENTI AL Conc Flame A-PM Burner (2/2) N O x
( p p m ) Primary Air / Coal Ratio 0 A-PM Burner 7/8 3/4 Single Flame Burner A C 1 C 2 Weak Flame C 0 Combustion Systems B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 39 39 MHI BUSI NESS CONFI DENTI AL Main Burner Additional Air Furnace outlet Combustion Completion Zone Reductive DeNOx Zone Main Burner Combustion Zone Stable and Low NOx Combustion with A-PM Burner Combustion Air 40% 60% - In-Furnace DeNOx System - MACT (Mitsubishi Advance Combustion Technology) Combustion Systems B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 40 40 MHI BUSI NESS CONFI DENTI AL Fixed Separator and Pulverizer (1/2) Combustion Systems Hot Air Hot Air Raw Raw Coal Coal Pulverized Pulverized Coal Coal Coarse Coal Coarse Coal Fine Coal Fine Coal Roller Roller Grinding Grinding Table Table Hydraulic Hydraulic Loading Loading Device Device Fixed Fixed Separator Separator B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 41 41 MHI BUSI NESS CONFI DENTI AL Pulverizer and Coal Pipe Arrangement Fixed Separator and Pulverizer (2/2) P u l v e r i z e r :
6
u n i t s Coal Pipe Boiler Front Combustion Systems B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 42 42 MHI BUSI NESS CONFI DENTI AL Boiler Front Fixed Separator Pulverizer In-Furnace DeNOx System MACT* (*Mitubishi Advanced Combustion Technology) Circular Corner Firing CCF Low NOx A-PM* Burner (*Advanced Pollution minimum) Combustion Systems Combustion Systems B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 43 43 MHI BUSI NESS CONFI DENTI AL Outline n n Summary Summary n n Design of Design of Paiton Paiton Boiler Boiler Combustion Systems Combustion Systems Vertical Water Wall Vertical Water Wall Pressure Parts Pressure Parts Boiler Expansion Systems Boiler Expansion Systems Air and Gas Systems Air and Gas Systems n n Basics of Boiler Basics of Boiler n n Feature of Feature of Paiton Paiton Boiler Boiler Major Specification Major Specification Coal Property Coal Property Design for Sub Design for Sub- -bituminous Coal bituminous Coal n n Operation Operation B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 44 44 MHI BUSI NESS CONFI DENTI AL Smooth Tube Film Boiling Nucleate Boiling Nucleate Boiling (Spiral Wall) Rifled Tube (Vertical Wall) Vertical Water Wall Boiling Phenomenon B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 45 45 MHI BUSI NESS CONFI DENTI AL Spiral Water Wall Vertical Water Wall (Paiton) Vertical Water Wall Smooth Tube Rifled Tube Boiler Type (1) (1) Simple Structure Simple Structure (2) (2) Low Low P at Water Wall P at Water Wall (3) (3) Easy Removal of Slag Easy Removal of Slag Merits of Vertical Water Wall Merits of Vertical Water Wall B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 46 46 MHI BUSI NESS CONFI DENTI AL Smooth Tube Mass Velocity 1,500 kg/m 2 s Mass Velocity 3,100 kg/m 2 s Film Boiling Nucleate Boiling Nucleate Boiling Pww Pww ! ! - -5 kg/cm 5 kg/cm 2 2 (Spiral Wall) Rifled Tube (Vertical Wall) Vertical Water Wall Boiling Phenomenon B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 47 47 MHI BUSI NESS CONFI DENTI AL 700 600 500 400 0.0 0.2 0.4 0.6 0.8 1.0 Steam Quality 2,000kg/m 2 !s 3,000 3,500 T u b e
M e t a l
T e m p e r a t u r e
( ! ) Maximum Allowable Temp. Steam Quality = ( Steam Flow ) / ( Steam Flow + Liquid Flow ) Smooth Tube Design 3,100 kg/m 2 !s 2,000 2,500 Rifled Tube Design 1,500 kg/m 2 !s Water Water Furnace Hopper Burner Zone Upper Furnace Steam Steam Vertical Water Wall Steam Quality and Tube Metal Temperature B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 48 48 MHI BUSI NESS CONFI DENTI AL 8P Vertical Water Wall Spiral Water Wall n 30 deg. Incline n Half pcs. of tubes 4P 30 Vertical Water Wall Spiral Water Wall For smooth tube, For smooth tube, Sufficient mass Sufficient mass velocity is required. velocity is required. B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 49 49 MHI BUSI NESS CONFI DENTI AL Horizontal Buckstay Support Structure of Spiral Water Wall Holder Vertical Tie Holder Lug Vertical Water Wall B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 50 50 MHI BUSI NESS CONFI DENTI AL Keeper Lug Horizontal Buckstay Support Structure of Vertical Water Wall Holder Holder Vertical Water Wall Horizontal tie B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 51 51 MHI BUSI NESS CONFI DENTI AL Fall easily Adhere on the shelf of tube fin Vertical Water Wall Spiral Water Wall Easy Removal of Slag Vertical Water Wall B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 52 52 MHI BUSI NESS CONFI DENTI AL Spiral Water Wall Vertical Water Wall (Paiton) Vertical Water Wall Smooth Tube Rifled Tube (1) (1) Simple Structure Simple Structure (2) (2) Low Low P at Water Wall P at Water Wall (3) (3) Easy Removal of Slag Easy Removal of Slag Merits of Vertical Water Wall Merits of Vertical Water Wall Spiral Spiral water wall has been a water wall has been adopted dopted previously. previously. Now, MHI has de Now, MHI has deve velop loped ed and adopted vertical and adopted vertical water wall with rifled tube over 20 years, water wall with rifled tube over 20 years, considering above merits. considering above merits. B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 53 53 MHI BUSI NESS CONFI DENTI AL Outline n n Summary Summary n n Design of Design of Paiton Paiton Boiler Boiler Combustion Systems Combustion Systems Vertical Water Wall Vertical Water Wall Pressure Parts Pressure Parts Boiler Expansion Systems Boiler Expansion Systems Air and Gas Systems Air and Gas Systems n n Basics of Boiler Basics of Boiler n n Feature of Feature of Paiton Paiton Boiler Boiler Major Specification Major Specification Coal Property Coal Property Design for Sub Design for Sub- -bituminous Coal bituminous Coal n n Operation Operation B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 54 54 MHI BUSI NESS CONFI DENTI AL Economizer Water Wall 2ry Superheater 2ry Reheater 3ry Superheater 1ry Reheater Pressure Parts Pressure Parts Arrangement 1ry Superheater B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 55 55 MHI BUSI NESS CONFI DENTI AL Arrangement and Flow Diagram (1/12) Eco Eco Inlet Pipe Inlet Pipe Eco Inlet Eco Inlet Header Header Furnace Furnace Inlet Pipe Inlet Pipe Furnace Furnace Inlet Pipe Inlet Pipe Eco Eco Inlet Pipe Inlet Pipe Eco Inlet Header Eco Inlet Header Eco Outlet Eco Outlet Header Header Eco Outlet Eco Outlet Header Header Pressure Parts Intermediate Intermediate Header Header Intermediate Intermediate Header Header Economizer B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 56 56 MHI BUSI NESS CONFI DENTI AL Economizer Pressure Parts Intermediate Header Outlet Header Roof Tube Inlet Header Intermediate Header Design considerations u Counter flow for more efficient heat transfer u Intermediate HDR for temp. equalization u Heating surface area is designed considering Eco. outlet temp. u Sufficient Eco. outlet subcool is ensured. Horizontal Horizontal Part Part Hanger Hanger Part Part B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 57 57 MHI BUSI NESS CONFI DENTI AL A A Eco Tube Eco Tube Spiral Fin Eco Intermediate HDR Eco Hanger Tube Eco Hanger Tube Eco Intermediate HDR A-A Support Assembly Clevis Economizer horizontal part Pressure Parts B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 58 58 MHI BUSI NESS CONFI DENTI AL Water Wall (Furnace) Furnace Inlet Furnace Inlet Manifold Manifold Furnace Outlet Furnace Outlet Header Header Furnace Inlet Furnace Inlet Manifold Manifold Furnace Furnace Outlet Outlet Header Header Pressure Parts Arrangement and Flow Diagram (2/12) Furnace Furnace Intermediate Intermediate Manifold Manifold Furnace Furnace Intermediate Intermediate manifold manifold B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 59 59 MHI BUSI NESS CONFI DENTI AL Water Wall (Roof) Roof Inlet Roof Inlet Manifold Manifold Roof Inlet Roof Inlet Header Header Roof Inlet Roof Inlet Manifold Manifold Roof Outlet Roof Outlet Header Header Roof Outlet Roof Outlet Header Header Roof Inlet Roof Inlet Header Header Pressure Parts Arrangement and Flow Diagram (2/12) B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 60 60 MHI BUSI NESS CONFI DENTI AL Water Wall (Passage Side Wall) (Rear Wall Hanger) Outlet Header Outlet Header Outlet Header Outlet Header Inlet Header Inlet Header Passage Side Wall Passage Side Wall Inlet Manifold Inlet Manifold Rear Rear Wall Hanger Wall Hanger Inlet Manifold Inlet Manifold Rear Wall Hanger Rear Wall Hanger Inlet Manifold Inlet Manifold Passage Side Wall Inlet Manifold Passage Side Wall Inlet Manifold Inlet Header Inlet Header Arrangement and Flow Diagram (4/12) Pressure Parts B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 61 61 MHI BUSI NESS CONFI DENTI AL Water Wall (Back Pass) Outlet Header Outlet Header Back Pass Back Pass Inlet Pipe Inlet Pipe Inlet Header Inlet Header Inlet Manifold Inlet Manifold Water Separator Water Separator Inlet Pipe Inlet Pipe Water Separator Water Separator Inlet Pipe Inlet Pipe Inlet Header Inlet Header Back Pass Back Pass Inlet Pipe Inlet Pipe Inlet Inlet Manifold Manifold Outlet Header Outlet Header Arrangement and Flow Diagram (5/12) Pressure Parts B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 62 62 MHI BUSI NESS CONFI DENTI AL Water Wall 2RY PASS FRONT WALL OUTLET HDR. RIGHT SIDE ONLY S M O O T H
T U B E LEFT SIDE ONLY R I F L E
T U B E S M O O T H
T U B E M E M B R A N E M E M B R A N E FURNACE INLET PIPE +16500 +45120 ROOF INLET HDR. +64200 SIDE WALL OUTLET HDR. PASSAGE SIDE WALL OUTLET HDR. SECONDARY PASS SIDE WALL OUTLET HDR. F I N F I N F I N ROOF OUTLET HDR. SIDE WALL SIDE WALL INLET HDR. 1st TUBE OF PASSAGE SIDE WALL FROMBOILER FRONT TOBE INCLUDEDWITHFURNACE SIDE WALL TUBE PANEL. CL
O F
F U R N A C E SECONDARY PASS SIDE WALL PRIMARY SHINLET HDR. SECONDARY PASS SIDE WALL INLET HDR. M E M B R A N E PRIMARY RHINLET HDR. 1st TUBE OF PASSAGE SIDE WALL FROMBOILER REAR TOBE INCLUDED WITHFURNACE SIDE WALL TUBE PANEL. FURNACE INTER MEDIATE HDR. (SIDE) PASSAGE SIDE WALL INLET HDR. REAR WALL HANGER TUBE REAR WALL HANGER INLET HDR OUTSIDE WELDING GROOVE FRONT WALL OUTLET HDR. REAR WALL HANGER OUTLET HDR. 2RY PASS REAR WALL OUTLET HDR. 2RY PASS DIVISIONWALL OUTLET HDR 2RY PASS DIVISIONWALL INLET HDR Rifled Tube Rifled Tube Pressure Parts Design considerations u Plan area is designed considering the coal slagging characteristic u Furnace size is designed so that 2ry SH outlet gas temp is below the ash softening temp. u Rifled tube is used at furnace lower wall B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 63 63 MHI BUSI NESS CONFI DENTI AL Water Wall Adjustment of heat absorption Adjustment of heat absorption p p In In- -tube orifice tube orifice Variation of orifice diameter Variation of orifice diameter p p Intermediate HDR and manifold Intermediate HDR and manifold Elimination of temp. difference Elimination of temp. difference in upper wall tubes in upper wall tubes Pressure Parts Heat absorption in each tube is not equal. p Heat distribution in furnace p Burner shaded part B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 64 64 MHI BUSI NESS CONFI DENTI AL Water Separator & Drain Tank 1ry SH 1ry SH Inlet Pipe Inlet Pipe WS WS Drain Drain Tank Tank Water Water Separator Separator Drain Tank Drain Tank 1ry SH 1ry SH Inlet Pipe Inlet Pipe Arrangement and Flow Diagram (6/12) Pressure Parts B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 65 65 MHI BUSI NESS CONFI DENTI AL Water Separator 3310mm (Shell) Height 1000mm Outside diameter SA-387-11-2 (Shell) Material 120mm (Shell) Thickness Pressure Parts B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 66 66 MHI BUSI NESS CONFI DENTI AL Water Separator Drain Tank 16.4m (Shell) Height 1000mm Outside diameter SA-387-11-2 (Shell) Material 120mm (Shell) Thickness Pressure Parts B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 67 67 MHI BUSI NESS CONFI DENTI AL 1ry SH 1ry SH- -DeSH DeSH 1ry Superheater 2ry SH 2ry SH Inlet Pipe Inlet Pipe 1ry SH 1ry SH Inlet Header Inlet Header 2ry SH 2ry SH Inlet Pipe Inlet Pipe 1ry 1ry SH SH- -DeSH DeSH 1ry SH 1ry SH Outlet Header Outlet Header 1ry SH 1ry SH Inlet Inlet Header Header 1ry SH 1ry SH Outlet Outlet Header Header Arrangement and Flow Diagram (7/12) Pressure Parts B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 68 68 MHI BUSI NESS CONFI DENTI AL Outlet Header Roof Tube Inlet Header Pressure Parts 1ry Superheater Design considerations u Counter flow for more efficient heat transfer. u Heating surface area is decided so that necessary total heat absorption of SH is obtained. u The height is within the effective area of soot blowing. Horizontal Horizontal Part Part Terminal Terminal Part Part B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 69 69 MHI BUSI NESS CONFI DENTI AL 2ry Superheater 3ry SH 3ry SH Inlet Pipe Inlet Pipe 2ry SH 2ry SH- -DeSH DeSH 2ry SH 2ry SH Inlet Header Inlet Header 2ry SH 2ry SH- -DeSH DeSH 3ry SH 3ry SH Inlet Pipe Inlet Pipe 2ry SH 2ry SH Inlet Header Inlet Header 2ry SH 2ry SH Outlet Header Outlet Header Arrangement and Flow Diagram (8/12) Pressure Parts 2ry SH 2ry SH Outlet Header Outlet Header B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 70 70 MHI BUSI NESS CONFI DENTI AL Outlet Header Inlet Header 2ry Superheater Roof Tube Girdling Tube Pressure Parts u Panel type, which absorbs the radiant heat from furnace effectively. u Heating surface area is designed based on the furnace size. u 2ry SH outlet gas temp. is designed below the ash softening temp. u Girdling tube and wrapper tube are provided for anti-vibration. Design considerations B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 71 71 MHI BUSI NESS CONFI DENTI AL Girdling tube / 2ry SH Wrapper tube Pressure Parts B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 72 72 MHI BUSI NESS CONFI DENTI AL 3ry Superheater 3ry SH 3ry SH Inlet Header Inlet Header 3ry SH 3ry SH Outlet Header Outlet Header Main Steam Main Steam 3ry SH 3ry SH Outlet Header Outlet Header Arrangement and Flow Diagram (9/12) Pressure Parts 3ry SH 3ry SH Inlet Header Inlet Header B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 73 73 MHI BUSI NESS CONFI DENTI AL Girdling Tube Outlet Header Inlet Header 3ry Superheater Roof Tube Pressure Parts u Platen type, which absorbs the radiant heat from furnace and convection heat from flue gas. u Heating surface area is designed based on the furnace size. u Girdling tube and spacer tube are provided for anti- vibration. Design considerations B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 74 74 MHI BUSI NESS CONFI DENTI AL 1ry SH Inlet HDR Spacer tube Pressure Parts B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 75 75 MHI BUSI NESS CONFI DENTI AL 1ry Reheater 2ry RH 2ry RH Inlet Pipe Inlet Pipe 1ry RH 1ry RH Outlet Header Outlet Header RH RH- -DeSH DeSH LTR LTR 1ry RH 1ry RH Inlet Header Inlet Header 1ry RH Outlet Header 1ry RH Outlet Header 2ry RH 2ry RH Inlet Pipe Inlet Pipe RH RH- -DeSH DeSH LTR LTR 1ry RH 1ry RH Inlet Inlet Header Header Arrangement and Flow Diagram (10/12) Pressure Parts B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 76 76 MHI BUSI NESS CONFI DENTI AL Outlet Header Inlet Header 1ry Reheater Pressure Parts u Counter flow for more efficient heat transfer u Heating surface area is decided so that necessary total heat absorption of RH is obtained. u The height is within the effective area of soot blowing. Design considerations Horizontal Horizontal Part Part Terminal Terminal Part Part B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 77 77 MHI BUSI NESS CONFI DENTI AL 2ry Reheater 2ry RH 2ry RH Outlet Header Outlet Header 2ry RH 2ry RH Inlet Header Inlet Header 2ry RH 2ry RH Inlet Header Inlet Header 2ry RH 2ry RH Outlet Header Outlet Header Arrangement and Flow Diagram (11/12) Pressure Parts B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 78 78 MHI BUSI NESS CONFI DENTI AL Inlet Header Outlet Header 2ry Reheater Roof Tube Pressure Parts u Pendant type, which absorbs the convection heat from flue gas. u Heating surface area is designed based on the furnace size. u Spacer tube are provided for anti-vibration. Design considerations B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 79 79 MHI BUSI NESS CONFI DENTI AL 2ry SH 2ry SH 2ry 2ry RH RH 3ry 3ry SH SH Eco Eco WS WS ECO ECO 1ry RH 1ry RH 2ry RH 2ry RH WS WS Back Pass Back Pass Furnace Furnace Roof Roof Passage Side Wall Passage Side Wall Rear Wall Hanger Rear Wall Hanger Arrangement and Flow Diagram (12/12) Pressure Parts 1ry 1ry RH RH 1ry 1ry SH SH 3ry SH 3ry SH 2ry SH 1ry SH 1ry SH B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 80 80 MHI BUSI NESS CONFI DENTI AL Eco - Furnace 31.49 28.00 Roof, PSW 30.11 Back Pass 28.77 WS 1ry SH 28.61 2ry SH 29.80 27.56 3ry SH SH out 27.05 5.84 RH 6 5 4 Design Pressure Diagram 26 24 25 27 28 29 30 31 32 33 P r e s s u r e
( M P a ) 6 5 4 Operating Pressure Predicted Performance + MSV Inlet Operating Press.%5% Predicted Performance Included Not Included Pressure Parts B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 81 81 MHI BUSI NESS CONFI DENTI AL 250 600 550 500 450 400 350 300 250 600 550 500 450 400 350 300 Design Temperature Diagram T e m p e r a t u r e
# ! $ Operating Temperature 350 582 513 550 3ry SH 454 450 WS 1ry SH 467 2ry SH 391 450 Back Pass 450 Eco - Furnace 350 Furnace Interm. HDR 450 ECO Interm. HDR 362 Roof, PSW 1ry SH Inlet HDR 533 496 RH Included Not Included Pressure Parts B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 82 82 MHI BUSI NESS CONFI DENTI AL SH Outlet Design Press. 27.05 Spring Loaded 3 . 9 7 % 29.52 30.74 PCV 2 . 9 9 % 26.24 27.05 Safety Valve Design P r e s s u r e
( M P a ) 33 32 31 30 29 28 27 26 26 24 34 SH outlet WS outlet SH Outlet Press. 25.80 Operating Pressure WS Outlet Press. 27.36 3 . 9 8 % 3 . 9 7 % 3 . 9 9 % 3 . 9 8 % 3 . 9 9 % 3 . 9 8 % Spring Loaded 30.38 31.64 30.24 31.49 30.09 31.34 29.95 31.19 29.80 31.04 29.66 30.89 P r e s s u r e
( M P a ) 6.0 5.5 5.0 4.5 6.5 RH Outlet Press. 4.86 RH Outlet Operating Pressure RH Inlet Press. 5.03 RH inlet RH Design Press. 5.90 Spring Loaded 3 . 8 7 % 5.46 5.68 6.07 Spring Loaded 3 . 9 0 % 5.67 5.90 3 . 9 5 % 5.83 3 . 9 9 % 5.77 6.01 3 . 8 6 % 5.73 5.96 Reheat Steam Line Reheat Steam Line Main Steam Line Main Steam Line As per ASME Boiler & Pressure Vessel Code, Section+, PG-67 Pressure Parts WS Design Press. 28.77 MFT 28.67 ANN 26.83 B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 83 83 MHI BUSI NESS CONFI DENTI AL 1ry Reheater 2ry RH 2ry RH Inlet Pipe Inlet Pipe 1ry RH 1ry RH Outlet Header Outlet Header RH RH- -DeSH DeSH LTR LTR 1ry RH 1ry RH Inlet Header Inlet Header 1ry RH Outlet Header 1ry RH Outlet Header 2ry RH 2ry RH Inlet Pipe Inlet Pipe RH RH- -DeSH DeSH LTR LTR 1ry RH 1ry RH Inlet Inlet Header Header Arrangement and Flow Diagram (10/12) Pressure Parts B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 84 84 MHI BUSI NESS CONFI DENTI AL 2ry SH 2ry SH 2ry 2ry RH RH 3ry 3ry SH SH Eco Eco WS WS ECO ECO 1ry RH 1ry RH 2ry RH 2ry RH WS WS Back Pass Back Pass Furnace Furnace Roof Roof Passage Side Wall Passage Side Wall Rear Wall Hanger Rear Wall Hanger Arrangement and Flow Diagram (12/12) Pressure Parts 1ry 1ry RH RH 1ry 1ry SH SH 3ry SH 3ry SH 2ry SH 1ry SH 1ry SH B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 85 85 MHI BUSI NESS CONFI DENTI AL Outline n n Summary Summary n n Design of Design of Paiton Paiton Boiler Boiler Combustion Systems Combustion Systems Vertical Water Wall Vertical Water Wall Pressure Parts Pressure Parts Boiler Expansion Systems Boiler Expansion Systems Air and Gas Systems Air and Gas Systems n n Basics of Boiler Basics of Boiler n n Feature of Feature of Paiton Paiton Boiler Boiler Major Specification Major Specification Coal Property Coal Property Design for Sub Design for Sub- -bituminous Coal bituminous Coal n n Operation Operation B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 86 86 MHI BUSI NESS CONFI DENTI AL C E N T E R
O F
F U R N A C E CL BOILER FRONT Furnace Bottom Boiler Expansion Systems Furnace Furnace Hopper Hopper Drag Drag Chain Chain Conveyor Conveyor Seal Seal Plate Plate Free Free Free Free B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 87 87 MHI BUSI NESS CONFI DENTI AL CORNER PLATE 11 STOPPER BEAM 12 BOILER STRUCTURE COLUMN 13 STIFFENER 14 CORNER LINK 10 HOLDER 9 TIE PLATE 8 BUCKSTAY 7 LOOSE MINERAL FIBER 6 OUTER CASING 5 PIN CLIPS 4 INSULATION PINS 3 BLOCK INSULATION (MINERAL FIBER BOARD) 2 WATER WALL TUBES 1 DESCRIPTION ITEM Buckstay Arrangement Free Free Free Free Fix Fix Boiler Expansion Systems B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 88 88 MHI BUSI NESS CONFI DENTI AL Outline n n Summary Summary n n Design of Design of Paiton Paiton Boiler Boiler Combustion Systems Combustion Systems Vertical Water Wall Vertical Water Wall Pressure Parts Pressure Parts Boiler Expansion Systems Boiler Expansion Systems Air and Gas Systems Air and Gas Systems n n Basics of Boiler Basics of Boiler n n Feature of Feature of Paiton Paiton Boiler Boiler Major Specification Major Specification Coal Property Coal Property Design for Sub Design for Sub- -bituminous Coal bituminous Coal n n Operation Operation B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 89 89 MHI BUSI NESS CONFI DENTI AL Air & Gas Systems PAF 2ry Air 2ry Air 1ry Cold Air PAF 1ry Cold Air FDF FDF 1ry Hot Air 1ry Hot Air Pulverizer Outlet Temp. control Pulverizer Outlet Temp. Control Furnace (Boiler) A i r
h e a t e r A i r
H e a t e r Furnace Eco. Pulverizer Gas Gas Air & Gas Systems IDF IDF EP EP FGD Stack B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 90 90 MHI BUSI NESS CONFI DENTI AL Gas side, Cold end Soot blower Arrangement Gas side, Hot end 369 !/ 145 ! 1,683 t/h (BMCR, Design coal) 2 sets Regenerative, Rotary Vertical Trisector Gas Temp. (Inlet / Outlet (Uncorrected)) Inlet Gas Flow Stationary Water Washing device Number Type Air Heater (1/3) Air & Gas Systems B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 91 91 MHI BUSI NESS CONFI DENTI AL Air Heater (2/3) Gas Inlet 2ry Air Outlet 1ry Air Outlet Air & Gas Systems Soot Soot blower blower B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 92 92 MHI BUSI NESS CONFI DENTI AL Over View B-side A side
2ry Duct 1ry Duct Gas Duct 1ry Duct l Rotating Direction Air Heater (3/3) Air & Gas Systems 7Flue Gas Path 82ry Air Path 91ry Air Path l Rotation Speed Approx. 1 rpm B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 93 93 MHI BUSI NESS CONFI DENTI AL Fans 2 1 1 Impeller Stage Impeller Stage 8,580kW 3,400kW 2,500kW Motor Capacity Motor Capacity Variable Blade Pitch Control Inlet Vane Control Variable Blade Pitch Control Control System Control System 140! 25.5! 25.5! Inlet Air Inlet Air/ /Gas Gas Temperature Temperature -540mmAq -50mmAq -50mmAq Inlet Pressure Inlet Pressure 430mmAq 1,570mmAq 480mmAq Discharge Pressure Discharge Pressure 45,400m 3 /min 9,900m 3 /min 21,000m 3 /min Capacity Capacity 2 2 2 Number Number Axial Flow Horizontal Centrifugal Horizontal Axial Flow Horizontal Type Type IDF IDF PAF PAF FDF FDF Fan Fan Air & Gas Systems B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 94 94 MHI BUSI NESS CONFI DENTI AL Drive Unit Drive Unit Seal Plate Seal Plate Link Chain Link Chain Lower Trough Lower Trough Dewatering Dewatering Furnace Flight Flight Dewatering section Dewatering section Falling of the Clinker Chain Roller Chain Roller Transport Transport Air & Gas Systems Upper Trough Upper Trough Cooling To Bottom ash storage pit To Bottom ash storage pit Cooling Cooling Bottom Ash Handling System Drag Chain Conveyor Crush Crush Grinder Grinder B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 95 95 MHI BUSI NESS CONFI DENTI AL Outline n n Summary Summary n n Design of Design of Paiton Paiton Boiler Boiler Combustion Systems Combustion Systems Vertical Water Wall Vertical Water Wall Pressure Parts Pressure Parts Boiler Expansion Systems Boiler Expansion Systems Air and Gas Systems Air and Gas Systems n n Basics of Boiler Basics of Boiler n n Feature of Feature of Paiton Paiton Boiler Boiler Major Specification Major Specification Coal Property Coal Property Design for Sub Design for Sub- -bituminous Coal bituminous Coal n n Operation Operation B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 96 96 MHI BUSI NESS CONFI DENTI AL Operation n n Operation Mode Operation Mode n n Main Steam Temp. Control Main Steam Temp. Control n n Reheat Outlet Steam Temp. Control Reheat Outlet Steam Temp. Control n n Pulverizer Pulverizer Operation Operation n n NOx NOx Tuning Tuning B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 97 97 MHI BUSI NESS CONFI DENTI AL Feed Water Flow Water Fuel Ratio (WFR) 30% 100% Dry Mode (Once-Through Mode) 0% - 20% Load Fuel flow Press. Control Spray Temp. Control System Schematics Wet Mode (Circulation Mode) Same system as drum type boiler. BCP is operated to re-circulate the water for the heat recovery. BCP is stopped. Boiler Operation Mode SH Eco BFP to SteamTurbine Furnace Water Separator SH Eco BFP to SteamTurbine Furnace Water Separator SH Eco BFP to SteamTurbine Furnace Water Separator SH Eco BFP to SteamTurbine Furnace Water Separator BCP BCP Operation B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 98 98 MHI BUSI NESS CONFI DENTI AL Pressure (MPa) E n t h a l p y
( k c a l / k g ) 0 200 400 600 800 1000 0 10 20 30 40 Water 600! 500! 400! 300! 200! Saturation Saturation (Water/Steam) (Water/Steam) Supercritical Sliding Pressure Operation 35% 50% 80% BMCR Eco. Inlet Economizer Water Wall Superheater SH Outlet W .W Inlet W.W Outlet Operation W.W outlet Enthalpy in W.W outlet Enthalpy in Wet Mode (0 Wet Mode (0/ /20%Load) 20%Load) W.W outlet Enthalpy in W.W outlet Enthalpy in Transition (20 Transition (20/ /30%Load) 30%Load) B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 99 99 MHI BUSI NESS CONFI DENTI AL SH Eco BFP to SteamTurbine Furnace Water Separator Wet Mode 1ry SH Inlet Pipe 1ry SH Inlet Pipe Water Separator Water Separator Furnace Inlet Pipe Furnace Inlet Pipe SH Eco BFP to SteamTurbine Eco Inlet Pipe Eco Inlet Pipe Furnace Water Separator BCP BCP BCP Outlet Pipe BCP Outlet Pipe Drain Tank Drain Tank BCP Inlet Pipe BCP Inlet Pipe BCP BCP Eco Eco Operation B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 100 100 MHI BUSI NESS CONFI DENTI AL SH Eco BFP to SteamTurbine Furnace Water Separator Dry Mode 1ry SH Inlet Pipe 1ry SH Inlet Pipe Water Separator Water Separator Eco Eco Furnace Inlet Pipe Furnace Inlet Pipe SH Eco BFP to SteamTurbine Eco Inlet Pipe Eco Inlet Pipe Furnace Water Separator Operation B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 101 101 MHI BUSI NESS CONFI DENTI AL Dry Mode Dry Mode Wet Mode Wet Mode BCP is in BCP is in- -service. service. Boiler Operation Mode Load (%) W a t e r
F l o w
t h r o u g h
F u r n a c e
w a l l
( % ) 25 25% Boiler minimum flow for furnace wall tubes protection 0 100 25 50 75 0 50 75 100 50% : No.4 70% : No.5 Mill 35% : No.3 20% : No.1,2 Operation BCP is stopped. BCP is stopped. Transition Transition 30 20 B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 102 102 MHI BUSI NESS CONFI DENTI AL Main Steam Temperature Control Systems Operation mode Operation mode ! !Separate control Separate control ! !Over injection Over injection protection function protection function - - Supplementary Supplementary - - ! !Load change Load change ! !Quick response Quick response ! !Separate control Separate control SH spray SH spray (2 Stages) (2 Stages) N/A N/A - - Main Main - - ! !Control avg. value of Control avg. value of final SH outlet steam final SH outlet steam temp. temp. Water / Fuel Ratio Water / Fuel Ratio Wet Mode Wet Mode Dry Mode Dry Mode Control Control Matter Matter Operation B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 103 103 MHI BUSI NESS CONFI DENTI AL S t e a m
T e m p . 1SH 1ry DeSH 2SH 2ry DeSH 3SH Spray Spray SH Desuperheater Operation B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 104 104 MHI BUSI NESS CONFI DENTI AL RH Outlet Steam Temperature Control Systems Gas Distribution Damper (Main) Adjustable Burner Nozzle angle (Auxiliary) RH spray (For load change and emergency) RH RH Pass Pass SH SH Pass Pass Division Wall Division Wall Operation B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 105 105 MHI BUSI NESS CONFI DENTI AL Pulverizer Operation Upper Limit 90% Lower Limit 30% P a s ir P a s ir R o t o R o t o N o r t h N o r t h P e r f o r m a n c e
P e r f o r m a n c e
c o a l c o a l Boiler Load (%) P u l v e r i z e r
L o a d
( % ) 100 75 50 25 0 20 40 60 80 100 2 5 % 3 0 % 5 0 % 1 0 0 % 7 5 % B M C R 3
P u l v e r i z e r s 4
P u l v e r i z e r s 5
P u l v e r i z e r s 6
P u l v e r i z e r s 2
P u l v e r i z e r s Operation B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 106 106 MHI BUSI NESS CONFI DENTI AL Operating Parameter for NOx Tuning Low NOx High NOx Additional Air Damper Close Open Excess Air Increase Decrease Coal Damper Open Close Auxiliary Air Damper Open Close Operation Burner Nozzle Angle Upward Downward B B- -1 1 Basics OF BOILER PAGE Basics OF BOILER PAGE- - 107 107 MHI BUSI NESS CONFI DENTI AL Summary n Boiler design for Paiton project is based on a lot of MHIs experiences. n n Boiler design for Boiler design for Pa Paiton iton project is project is based on design coal properties. based on design coal properties. n n We are looking forward to We are looking forward to demonstrating high performance demonstrating high performance and high reliability of and high reliability of Pa Paiton iton Boiler. Boiler.