Beruflich Dokumente
Kultur Dokumente
00 KM
SWA AGENCY ADP-652
SUB HEAD:- KM 1
KM-I
1 SUB GRADE
EARTH WORK
Earth Excavation
Qty: as per X-Section
Take
30 % Shingle Gravel
Or
(S.I No:3.09-a)
Take
@ Rs:-
249.66 P:M3
40 % Soft Rock
Or
(S.I No:3.11-a)
Take
(S.I No:3.12-a)
@ Rs:-
264.77 P:M3
2 ROAD WORK
SUB BASE
i) Granular Sub Base using Pitrun Gravel.
Road
1x
3280 x 13 x
Take
5%
for curves
0.5
Total:OR
(S.I No:16-03-a)
@ Rs:- 944.55 P:M3
BASE COURSE
ii) Water Bound Macadam Base Course.
Road
1
x
3280 x 12 x 0.5
Take
5%
for curves
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Treatment.
Road
1
x
Take
5%
1489262
Rs:-
2716613
Rs:-
2491528
8346
6705748
281044 Cft
7953.5452 M3
210783 Cft
5965.1589 M3
39360 Cft
1114 Cft
31.52303 M3
21320
1066
22386
633.5238
19680
984
20664
584.7912
Cft
Cft
Cft
M3
3280 x 12
for curves
@ Rs:-
39360
1968
41328
3839.3712
Rs:-
598395
Rs:-
1120887
Rs:-
1935427
3654709
Cft
Cft
Cft
M3
Total:OR
(S.I No:16-08-c)
Rs:-
341.56 P:M3
(S.I No:3.05-a)
702610 Cft
210783 Cft
5965.1589 M3
Sft
Sft
Sft
M2
504.1 P:M2
Total Road Work:-
3 ROAD STRUCTURE
i) Constn: of 4' Span Culvert
No @ Rs:-
444967 P:No
444967
5427 P:No
651240
8599 P:Rft
3009650
2587 P:Rft
517400
v) Constn: of KM Stone
2806.73 P:No
2807
No @ Rs:-
4626064
ABSTRACT
KM-1
EARTH WORK
ROAD WORK
STRUCTURE WORK
6705748
3654709
4626064
TOTAL:- 14986521
20 % Soft Rock
Or
(S.I No:3.11-a)
Take
(S.I No:3.12-a)
Berms
@ Rs:-
OR
@ Rs:-
264.77 P:M3
2 ROAD WORK
SUB BASE
i) Granular Sub Base using Pitrun Gravel.
Road
1
x
3280 x 13 x
Take
5%
for curves
0.5
Total:OR
(S.I No:16-03-a)
@ Rs:-
0.5
Total:OR
WEARING COURSE
i) Tripple Surface Treatment.
Road
1
x
Take
5%
Rs:-
1276550
Rs:-
3122084
8346
6273145
132064 Cft
3737.4112 M3
264128 Cft
7474.8224 M3
39360 Cft
1114 Cft
31.52303 M3
21320
1066
22386
633.5238
Cft
Cft
Cft
M3
19680
984
20664
584.7912
3280 x 12
for curves
@ Rs:-
39360
1968
41328.00
3839.3712
Rs:-
598395
Rs:-
1120887
Rs:-
1935427
3654709
Cft
Cft
Cft
M3
Total:OR
(S.I No:16-08-c)
1866164
944.55 P:M3
BASE COURSE
ii) Water Bound Macadam Base Course.
Road
1
x
3280 x 12 x
Take
5%
for curves
(S.I No:16-04-b)
Rs:-
341.56 P:M3
(S.I No:3.05-a)
660320 Cft
264128 Cft
7474.8224 M3
Sft
Sft
Sft
M2
504.1 P:M2
Total Road Work:-
3 ROAD STRUCTURE
i) Constn: of 4' Span Culvert
No @ Rs:-
444967 P:No
444967
No @ Rs:-
603429 P:No
603429
2587 P:No
388050
5427 P:No
651240
8599 P:Rft
2837670
2806.73 P:No
2807
No @ Rs:-
4928163
ABSTRACT
KM-2
EARTH WORK
ROAD WORK
STRUCTURE WORK
6273145
3654709
4928163
TOTAL:- 14856016
x 0.5
Total:OR
(S.I No:16-03-a)
@ Rs:- 944.55 P:M3
BASE COURSE
ii) Water Bound Macadam Base Course.
Road
1
x
600 x 6 x 0.5
1
x
800 x 20 x 0.5
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Traetment.
Road
1
x
1
x
600
800
x 6
x 20
Total:OR
(SI 16-08-c)
@ Rs:-
12000
12000
12000
339.6
Cft
Cft
Cft
M3
89916
89916
8400 Cft
8400 Cft
237.72 M3
1800
8000
9800
277.34
3600
16000
19600.00
1820.84
Rs:-
224538
Rs:-
531586
Rs:-
917885
1674010
Cft
Cft
Cft
M3
Sft
Sft
Sft
M2
504.1 P:M2
Total Road Work:-
3 ROAD STRUCTURE
i) Constn: of Drain
1103 P:Rft
441200
441200
ABSTRACT
KM-1
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
89916
1674010
441200
2205126
x 10 x
0.5
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Traetment.
1
x
Cft
Cft
Cft
M3
150
x 10
@ Rs:-
74930
74930
750 Cft
750 Cft
21.225 M3
Total:OR
(SI 16-08-c)
10000
10000
10000
283
Rs:-
40683
Rs:-
70246
110929
1500 Sft
1500.00 Sft
139.35 M2
504.1 P:M2
Total Road Work:-
3 ROAD STRUCTURE
ii) Constn: of 6'-0" High R/Wall
2871 P:Rft
287100
287100
ABSTRACT
KM-2
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
74930
110929
287100
472959
6x
0.5
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Traetment.
Road
1
x
100
6
Total:OR
@ Rs:-
(SI 16-08-c)
12000
12000
12000
339.6
Cft
Cft
Cft
M3
89916
89916
300 Cft
300 Cft
8.49 M3
Rs:-
16273
Rs:-
28099
44372
600 Sft
600.00 Sft
55.74 M2
504.1 P:M2
Total Road Work:-
3 ROAD STRUCTURE
i) Constn: of Drain
Rft @ Rs:-
0 P:Rft
2871 P:Rft
Total Structure Work:-
ABSTRACT
Km-3
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
89916
44372
287100
421387
SUB DIVISIONAL OFFICER
HIGHWAY SUB DIVISION WANA SWA
0
287100
287100
6x
0.5
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Traetment.
Road
1
x
Cft
Cft
Cft
M3
300
@ Rs:-
161849
161849
900 Cft
900 Cft
25.47 M3
Total:OR
(SI 16-08-c)
21600
21600
21600
611.28
Rs:-
48819
Rs:-
84296
133115
1800 Sft
1800.00 Sft
167.22 M2
504.1 P:M2
Total Road Work:-
3 ROAD STRUCTURE
No @ Rs:-
0 P:Rft
2871 P:Rft
287100
287100
ABSTRACT
KM-4
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
161849
133115
287100
582063
x 20 x
0.5
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Traetment.
Road
1
x
1100
x 20
@ Rs:-
89916
89916
11000 Cft
11000 Cft
311.3 M3
Total:OR
(SI 16-08-c)
12000 Cft
12000 Cft
339.6 M3
Rs:-
596678
Rs:-
1030280
1626958
22000 Sft
22000.00 Sft
2043.8 M2
504.1 P:M2
Total Road Work:-
3 ROAD STRUCTURE
No @ Rs:-
0 P:Rft
Rft @ Rs:-
1103 P:Rft
ABSTRACT
KM-5
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
89916
1626958
0
1716874
6x
0.5
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Traetment.
Road
1x
12000 Cft
12000 Cft
339.6 M3
Rs:Total Earth Work Rs:-
1800 Cft
1800 Cft
50.94 M3
600
6
Total:OR
(S.I No:16-09-a)
@ Rs:-
Rs:-
97638
Rs:-
168591
Rs:-
632937
899166
3600 Sft
3600.00 Sft
334.44 M2
(SI 16-08-c)
Total:OR
89916
89916
53600 Sft
53600.00 Sft
4979.44 M2
127.11 P:M2
Total Road Work:-
3 ROAD STRUCTURE
No @ Rs:-
0 P:Rft
1103 P:Rft
551500
2871 P:Rft
Total Structure Work:-
488070
1039570
ABSTRACT
KM-6
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
89916
899166
1039570
2028652
6x
0.5
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Traetment.
Road
1
x
12000 Cft
12000 Cft
339.6 M3
Rs:Total Earth Work Rs:-
1800 Cft
1800 Cft
50.94 M3
600
6
Total:OR
(S.I No:16-09-a
@ Rs:-
Rs:-
97638
Rs:-
168591
Rs:-
632937
899166
3600 Sft
3600.00 Sft
334.44 M2
(SI 16-08-c)
Total:OR
89916
89916
53600 Sft
53600.00 Sft
4979.44 M2
127.11 P:M2
Total Road Work:-
3 ROAD STRUCTURE
No @ Rs:-
0 P:Rft
1103 P:Rft
551500
2871 P:Rft
143550
695050
50
Rft @ Rs:-
ABSTRACT
KM-7
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
89916
899166
695050
1684132
SUB DIVISIONAL OFFICER
HIGHWAY SUB DIVISION WANA SWA
x 0.5
Total:OR
(S.I No:16-03-a)
@ Rs:- 944.55 P:M3
BASE COURSE
ii) Water Bound Macadam Base Course.
Road
1
x
800 x 20 x 0.5
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Traetment.
Road
1
x
25000 Cft
25000 Cft
707.5 M3
Rs:Total Earth Work Rs:-
6300 Cft
6300 Cft
178.29 M3
x 20
Total:OR
(S.I No:16-09-a)
@ Rs:-
168404
Rs:-
433948
Rs:-
749294
Rs:-
236170
1419412
16000 Sft
16000.00 Sft
1486.4 M2
(SI 16-08-c)
Total:OR
Rs:-
8000 Cft
8000 Cft
226.4 M3
800
187325
187325
20000 Sft
20000.00 Sft
1858 M2
127.11 P:M2
Total Road Work:-
3 ROAD STRUCTURE
No @ Rs:-
0 P:Rft
Rft @ Rs:-
2871 P:Rft
ABSTRACT
KM-8
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
187325
1419412
0
1606737
x 20 x
0.5
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Traetment.
Road
1
x
400
x 20
Total:OR
12000 Cft
12000 Cft
339.6 M3
Rs:Total Earth Work Rs:-
4000 Cft
4000 Cft
113.2 M3
(S.I No:16-09-a)
@ Rs:-
Rs:-
216974
Rs:-
374647
Rs:-
236170
827791
8000 Sft
8000.00 Sft
743.2 M2
(SI 16-08-c)
Total:OR
89916
89916
20000 Sft
20000.00 Sft
1858 M2
127.11 P:M2
Total Road Work:-
3 ROAD STRUCTURE
No @ Rs:-
0 P:Rft
Rft @ Rs:-
2871 P:Rft
ABSTRACT
KM-9
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
89916
827791
0
917707
6x
0.5
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Traetment.
Road
1
x
20000 Cft
20000 Cft
566 M3
Rs:Total Earth Work Rs:-
900 Cft
900 Cft
25.47 M3
300
6
Total:OR
(S.I No:16-09-a)
@ Rs:-
Rs:-
48819
Rs:-
84296
Rs:-
354256
487370
1800 Sft
1800.00 Sft
167.22 M2
(SI 16-08-c)
Total:OR
149860
149860
30000 Sft
30000.00 Sft
2787 M2
127.11 P:M2
Total Road Work:-
3 ROAD STRUCTURE
No @ Rs:-
0 P:Rft
Rft @ Rs:-
2871 P:Rft
ABSTRACT
KM-10
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
149860
487370
0
637230
x 0.5
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Traetment.
Road
1
x
39360
39360
39360
1113.888
Cft
Cft
Cft
M3
3600 Cft
3600 Cft
101.88 M3
600
x 12
Total:OR
Rs:-
195276
Rs:-
337182
379762
912221
73211 P:No
Total Structure Work:-
366055
366055
7200 Sft
7200.00 Sft
668.88 M2
(SI 16-08-c)
Total:OR
(S.I No:16-09-a)
@ Rs:-
294924
294924
32160 Sft
32160.00 Sft
2987.664 M2
127.11 P:M2
3 ROAD STRUCTURE
No @ Rs:-
ABSTRACT
KM-1
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
294924
912221
366055
1573200
39360
39360
39360
1113.888
Cft
Cft
Cft
M3
Rs:-
294924
Rs:-
32546
Rs:-
112394
Rs:-
436443
581383
600 Cft
600 Cft
16.98 M3
2400 Sft
2400.00 Sft
222.96 M2
36960 Sft
36960.00 Sft
3433.584 M2
Total Road Work:-
3 ROAD STRUCTURE
No @ Rs:-
0 P:Rft
No @ Rs:-
73211 P:No
366055
366055
ABSTRACT
KM-2
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
294924
581383
366055
1242362
x 0.5
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Traetment.
Road
1
39360
39360
39360
1113.888
Cft
Cft
Cft
M3
1800 Cft
1800 Cft
50.94 M3
600
x 12
Total:OR
(S.I No:16-09-a)
@ Rs:-
Rs:-
97638
Rs:-
337182
Rs:-
379762
814583
7200 Sft
7200.00 Sft
668.88 M2
(SI 16-08-c)
Total:OR
294924
294924
32160 Sft
32160.00 Sft
2987.664 M2
127.11 P:M2
Total Road Work:-
3 ROAD STRUCTURE
No @ Rs:-
0 P:Rft
2871 P:Rft
430650
73211 P:No
Total Structure Work:-
219633
650283
No @ Rs:-
ABSTRACT
KM-3
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
294924
814583
650283
1759790
SUB DIVISIONAL OFFICER
HIGHWAY SUB DIVISION WANA SWA
x 0.5
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Traetment.
Road
1
x
39360
39360
39360
1113.888
Cft
Cft
Cft
M3
1600 Cft
1600 Cft
45.28 M3
400
x 12
Total:OR
(S.I No:16-09-a)
@ Rs:-
Rs:-
86790
Rs:-
224788
Rs:-
408102
719680
4800 Sft
4800.00 Sft
445.92 M2
(SI 16-08-c)
Total:OR
294924
294924
34560 Sft
34560.00 Sft
3210.624 M2
127.11 P:M2
Total Road Work:-
3 ROAD STRUCTURE
8803 P:Rft
1496510
2871 P:Rft
287100
1783610
ABSTRACT
KM-4
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
294924
719680
1783610
2798214
SUB DIVISIONAL OFFICER
HIGHWAY SUB DIVISION WANA SWA
x 0.5
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Traetment.
Road
1
x
39360 Cft
39360 Cft
1113.888 M3
Rs:Total Earth Work Rs:-
2760 Cft
2760 Cft
78.108 M3
460
x 20
Total:OR
(S.I No:16-09-a)
@ Rs:-
Rs:-
149712
Rs:-
430844
Rs:-
399600
980156
9200 Sft
9200.00 Sft
854.68 M2
(SI 16-08-c)
Total:OR
294924
294924
33840 Sft
33840.00 Sft
3143.736 M2
127.11 P:M2
Total Road Work:-
3 ROAD STRUCTURE
Rft @ Rs:-
8803 P:Rft
616210
2871 P:Rft
287100
903310
70
ABSTRACT
KM-5
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
294924
980156
903310
2178391
x 0.5
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Traetment.
Road
1
x
39360 Cft
39360 Cft
1113.888 M3
Rs:Total Earth Work Rs:-
2700 Cft
2700 Cft
76.41 M3
450
x 12
Total:OR
(S.I No:16-09-a)
@ Rs:-
Rs:-
146457
Rs:-
252887
Rs:-
401017
800361
5400 Sft
5400.00 Sft
501.66 M2
(SI 16-08-c)
Total:OR
294924
294924
33960 Sft
33960.00 Sft
3154.884 M2
127.11 P:M2
Total Road Work:-
3 ROAD STRUCTURE
No @ Rs:-
0 P:Rft
2871 P:Rft
488070
488070
ABSTRACT
KM-6
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
294924
800361
488070
1583356
x 0.5
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Traetment.
Road
1
x
39360 Cft
39360 Cft
1113.888 M3
Rs:Total Earth Work Rs:-
2700 Cft
2700 Cft
76.41 M3
450
x 12
Total:OR
(S.I No:16-009-a
@ Rs:-
Rs:-
146457
Rs:-
252887
Rs:-
401017
800361
5400 Sft
5400.00 Sft
501.66 M2
(SI 16-08-c)
Total:OR
294924
294924
33960 Sft
33960.00 Sft
3154.884 M2
127.11 P:M2
Total Road Work:-
3 ROAD STRUCTURE
No @ Rs:-
8803 P:Rft
616210
2871 P:Rft
459360
1075570
70
ABSTRACT
KM-7
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
294924
800361
1075570
2170856
x 0.5
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Traetment.
Road
1
x
39360 Cft
39360 Cft
1113.888 M3
Rs:Total Earth Work Rs:-
4000 Cft
4000 Cft
113.2 M3
800
x 12
Total:OR
(S.I No:16-09-a)
@ Rs:-
Rs:-
216974
Rs:-
449577
Rs:-
351422
1017972
9600 Sft
9600.00 Sft
891.84 M2
(SI 16-08-c)
Total:OR
294924
294924
29760 Sft
29760.00 Sft
2764.704 M2
127.11 P:M2
Total Road Work:-
3 ROAD STRUCTURE
No @ Rs:-
0 P:Rft
2871 P:Rft
430650
430650
ABSTRACT
KM-8
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
294924
1017972
430650
1743546
SUB DIVISIONAL OFFICER
HIGHWAY SUB DIVISION WANA SWA
@ Rs:-
2 ROAD WORK
SUB BASE
i) Granular Sub Base using Pitrun Gravel.
Road
1
x
3280
264.77 P:M3
x 21 x
@ Rs:-
BASE COURSE
ii) Water Bound Macadam Base Course.
Road
1
x
3280
0.5
x 20 x
0.5
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Treatment.
Road
1
x
3280
x 20
Total:OR
@ Rs:-
294924
294924
34440 Cft
34440 Cft
974.652 M3
944.55 P:M3
Total:OR
(S.I No:16-08-c)
Cft
Cft
Cft
M3
Total:OR
(S.I No:16-03-a)
0
39360
39360
1113.888
Rs:-
920608
Rs:-
1779185
Rs:-
3072106
32800 Cft
32800 Cft
928.24 M3
65600 Sft
65600 Sft
6094.24 M2
504.1 P:M2
Total Road Work:-
5771899
3 ROAD STRUCTURE
i) Constn: of 4' Span Culvert
No @ Rs:-
481431 P:No
NO @ Rs:-
73211 P:No
439266
439266
ABSTRACT
KM-1
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
294924
5771899
439266
6506090
4x
0.5
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Traetment.
Road
1
x
600
4
Total:OR
32800
32800
32800
928.24
Cft
Cft
Cft
M3
1200 Cft
1200 Cft
33.96 M3
(S.I No:16-09-a)
@ Rs:-
Rs:-
65092
Rs:-
112394
Rs:-
379762
557248
2400 Sft
2400.00 Sft
222.96 M2
(SI 16-08-c)
Total:OR
245770
245770
32160 Sft
32160.00 Sft
2987.664 M2
127.11 P:M2
Total Road Work:-
3 ROAD STRUCTURE
No @ Rs:-
0 P:Rft
2871 P:Rft
459360
459360
ABSTRACT
KM-1
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
245770
557248
459360
1262378
x 6x
x 4x
x 5x
x 10 x
x 8x
x 12 x
0.5
0.5
0.5
0.5
0.5
0.5
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Traetment.
1
3
6
1
2
Road
3
32800
32800
32800
928.24
Cft
Cft
Cft
M3
600
180
750
750
520
2340
5140
145.462
Cft
Cft
Cft
Cft
Cft
Cft
Cft
M3
x
x
x
x
x
x
200
30
50
150
65
130
x 6
x 4
x 5
x 10
x 8
x 12
Total:OR
1200
360
1500
1500
1040
4680
10280.00
955.012
(S.I No:16-09-a)
@ Rs:-
Rs:-
278811
Rs:-
481422
Rs:-
354256
1114488
Sft
Sft
Sft
Sft
Sft
Sft
Sft
M2
(SI 16-08-c)
Total:OR
245770
245770
30000 Sft
30000.00 Sft
2787 M2
127.11 P:M2
Total Road Work:-
3 ROAD STRUCTURE
ii) Constn: of 6'-0" High R/Wall
2871 P:Rft
574200
574200
ABSTRACT
KM-2
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
245770
1114488
574200
1934459
6x
0.5
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Traetment.
Road
1
x
600
6
Total:OR
32800
32800
32800
928.24
Cft
Cft
Cft
M3
1800 Cft
1800 Cft
50.94 M3
(S.I No:16-09-a)
@ Rs:-
Rs:-
97638
Rs:-
168591
Rs:-
379762
645991
3600 Sft
3600.00 Sft
334.44 M2
(SI 16-08-c)
Total:OR
245777
245777
32160 Sft
32160.00 Sft
2987.664 M2
127.11 P:M2
Total Road Work:-
3 ROAD STRUCTURE
i) Constn: of Drain
Rft @ Rs:-
1070 P:Rft
2871 P:Rft
Total Structure Work:-
ABSTRACT
Km-3
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
245777
645991
287100
1178868
SUB DIVISIONAL OFFICER
HIGHWAY SUB DIVISION WANA SWA
0
287100
287100
8x
0.5
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Traetment.
Road
1
x
32800
32800
32800
928.24
Cft
Cft
Cft
M3
1600 Cft
1600 Cft
45.28 M3
800
8
Total:OR
(S.I No:16-09-a)
@ Rs:-
Rs:-
86790
Rs:-
299718
Rs:-
351422
737929
6400 Sft
6400.00 Sft
594.56 M2
(SI 16-08-c)
Total:OR
245770
245770
29760 Sft
29760.00 Sft
2764.704 M2
127.11 P:M2
Total Road Work:-
3 ROAD STRUCTURE
No @ Rs:-
0 P:Rft
70
Rft @ Rs:-
2871 P:Rft
200970
200970
ABSTRACT
KM-4
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
245770
737929
200970
1184669
SUB DIVISIONAL OFFICER
HIGHWAY SUB DIVISION WANA SWA
@ Rs:-
2 ROAD WORK
BASE COURSE
ii) Water Bound Macadam Base Course.
Road
1
x
150
264.77 P:M3
4x
0.5
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Treatment.
Road
1x
Take
5%
150 x 20
for curves
(S.I No:16-08-c)
@ Rs:- 504.1 P:M2
ii) Resurfacing of road with % sft 22 Lbs Bitumen,2.5 Cft Baji..
Road
1
x
3130 x 20
Total:OR
@ Rs:-
287731
287731
300 Cft
300 Cft
8.49 M3
Total:OR
(S.I No:16-09-a)
38400 Cft
38400 Cft
1086.72 M3
3000
150
3150
292.635
Rs:-
16273
Rs:-
147517
Rs:-
739213
903004
Sft
Sft
Sft
M2
62600 Sft
62600.00 Sft
5815.54 M2
127.11 P:M2
Total Road Work:-
3 ROAD STRUCTURE
i) epair of Cause Way
= 200 Rft @ Rs
1670 P:Rft
334000
2871 P:No
430650
2806.73 P:No
2806.73
No @ Rs:-
ABSTRACT
KM-1
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
287731
903004
767456.7
1958191
5x
0.5
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Treatment.
Road
1
x
Take
5%
Cft
Cft
Cft
Cft
M3
200 x
for curves
(S.I No:16-08-c)
@ Rs:- 504.1 P:M2
ii) Resurfacing of road with % sft 22 Lbs Bitumen,2.5 Cft Baji..
Road
1
x
3080 x 20
Total:OR
@ Rs:-
188823
188823
500 Cft
500 Cft
14.15 M3
Total:OR
(S.I No:16-09-a)
24000
24000
1200
25200
713.16
1000
50
1050.00
97.545
Rs:-
27122
Rs:-
49172
Rs:-
727405
803699
Sft
Sft
Sft
M2
61600 Sft
61600.00 Sft
5722.64 M2
127.11 P:M2
Total Road Work:-
3 ROAD STRUCTURE
i) Repair of Cause Way
Rft @ Rs:-
8803 P:Rft
NO @ Rs:-
73211 P:No
No @ Rs:-
2806.73 P:No
2806.73
2806.73
ABSTRACT
KM-2
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
188823
803699
2806.73
995329
@ Rs:-
2 ROAD WORK
BASE COURSE
ii) Water Bound Macadam Base Course.
Road
1
x
200 x
Take
5%
for curves
264.77 P:M3
5x
0.5
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Treatment.
Road
1
x
Take
5%
500
25
525
14.8575
200 x
for curves
(S.I No:16-08-c)
@ Rs:- 504.1 P:M2
ii) Resurfacing of road with % sft 22 Lbs Bitumen,2.5 Cft Baji..
Road
1
x
3080 x 20
Total:OR
@ Rs:-
1000
50
1050
97.545
233781
233781
Cft
Cft
Cft
M3
Total:OR
(S.I No:16-08-b)
31200 Cft
31200 Cft
882.96 M3
Rs:-
28478
Rs:-
49172
Rs:-
727405
805055
Sft
Sft
Sft
M2
61600 Sft
61600.00 Sft
5722.64 M2
127.11 P:M2
Total Road Work:-
3 ROAD STRUCTURE
i) Repair of Cause Way
= 300 No @ Rs:-
1670 P:No
501000
2871 P:No
516780
2806.73 P:No
2806.73
No @ Rs:-
1020587
ABSTRACT
KM-3
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
233781
805055
1020587
2059423
x 20 x
0.5
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Treatment.
Road
1
x
Take
5%
Cft
Cft
Cft
Cft
M3
250 x 20
for curves
(S.I No:16-08-c)
@ Rs:- 504.1 P:M2
ii) Resurfacing of road with % sft 22 Lbs Bitumen,2.5 Cft Baji..
Road
1
x
3030 x 20
Total:OR
@ Rs:-
309670
309670
2500 Cft
2500 Cft
70.75 M3
Total:OR
(S.I No:16-09-a)
39360
39360
1968
41328
1169.5824
5000
250
5250.00
487.725
Rs:-
135609
Rs:-
245862
Rs:-
715596
1097067
Sft
Sft
Sft
M2
60600 Sft
60600.00 Sft
5629.74 M2
127.11 P:M2
Total Road Work:-
3 ROAD STRUCTURE
i) Constn: of 4' Span Culvert
No @ Rs:-
0 P:No
8599 P:No
1719800
2806.73 P:No
2806.73
No @ Rs:-
1722607
ABSTRACT
KM-4
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
309670
1097067
1722607
3129344
@ Rs:-
19680
19680
19680
556.944
Cft
Cft
Cft
M3
147462
147462
39360 Sft
39360.00 Sft
3656.544 M2
127.11 P:M2
464783
464783
3 ROAD STRUCTURE
No @ Rs:-
Rft @ Rs:-
P:Rft
2871 P:Rft
Total Structure Work:-
ABSTRACT
KM-1
EARTH WORK
ROAD WORK
STRUCTURE WORK
147462
464783
0
TOTAL:612245
SUB DIVISIONAL OFFICER
HIGHWAY SUB DIVISION WANA SWA
0
0
0
x 0.5
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Traetment.
Road
1
x
900
x 12
Total:OR
19680
19680
19680
556.944
Cft
Cft
Cft
M3
5400 Cft
5400 Cft
152.82 M3
(S.I No:16-09-a)
@ Rs:-
Rs:-
292915
Rs:-
505774
Rs:-
338668
1137357
10800 Sft
10800.00 Sft
1003.32 M2
(SI 16-08-c)
Total:OR
147462
147462
28680 Sft
28680.00 Sft
2664.372 M2
127.11 P:M2
Total Road Work:-
3 ROAD STRUCTURE
No @ Rs:-
P:Rft
30
Rft @ Rs:-
2871 P:Rft
86130
86130
ABSTRACT
KM-2
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
147462
1137357
86130
1370949
x 0.5
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Traetment.
Road
1
x
19680
19680
19680
556.944
Cft
Cft
Cft
M3
10140 Cft
10140 Cft
286.962 M3
1690
x 12
Total:OR
(S.I No:16-09-a)
@ Rs:-
Rs:-
550029
Rs:-
949730
Rs:-
226724
1726483
20280 Sft
20280.00 Sft
1884.012 M2
(SI 16-08-c)
Total:OR
147462
147462
19200 Sft
19200.00 Sft
1783.68 M2
127.11 P:M2
Total Road Work:-
3 ROAD STRUCTURE
No @ Rs:-
P:Rft
2871 P:Rft
Total Structure Work:-
ABSTRACT
KM-3
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
147462
1726483
287100
2161045
0
287100
287100
x 0.5
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Traetment.
Road
1
x
14760
14760
14760
417.708
Cft
Cft
Cft
M3
9000 Cft
9000 Cft
254.7 M3
1500
x 12
Total:OR
(S.I No:16-09-a)
@ Rs:-
Rs:-
488191
Rs:-
842956
Rs:-
253647
1584794
18000 Sft
18000.00 Sft
1672.2 M2
(SI 16-08-c)
Total:OR
110597
110597
21480 Sft
21480.00 Sft
1995.492 M2
127.11 P:M2
Total Road Work:-
3 ROAD STRUCTURE
No @ Rs:-
80
Rft @ Rs:-
P:Rft
2871 P:Rft
Total Structure Work:-
ABSTRACT
KM-4
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
110597
1584794
229680
1925071
0
229680
229680
1430
x 20
Total:OR
19680
19680
19680
556.944
Cft
Cft
Cft
M3
(S.I No:16-09-a)
@ Rs:-
147462
Rs:-
465409
Rs:-
1339363
Rs:-
263566
2068338
8580 Cft
8580 Cft
242.814 M3
28600 Sft
28600.00 Sft
2656.94 M2
(SI 16-08-c)
Total:OR
Rs:-
22320 Sft
22320.00 Sft
2073.528 M2
127.11 P:M2
Total Road Work:-
3 ROAD STRUCTURE
No @ Rs:-
P:Rft
2871 P:Rft
287100
287100
ABSTRACT
KM-5
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
147462
2068338
287100
2502901
x 0.5
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Traetment.
Road
1
x
19680
19680
19680
556.944
Cft
Cft
Cft
M3
10800 Cft
10800 Cft
305.64 M3
1800
x 12
Total:OR
@ Rs:-
(S.I No:16-09-a)
Rs:-
585829
Rs:-
1011547
Rs:-
211136
1808513
21600 Sft
21600.00 Sft
2006.64 M2
(SI 16-08-c)
Total:OR
147462
147462
17880 Sft
17880.00 Sft
1661.052 M2
127.11 P:M2
Total Road Work:-
3 ROAD STRUCTURE
No @ Rs:-
0 P:Rft
80
Rft @ Rs:-
2871 P:Rft
229680
229680
ABSTRACT
KM-6
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
147462
1808513
229680
2185655
x 0.5
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Traetment.
Road
1
x
1280
x 12
Total:OR
19680
19680
19680
556.944
Cft
Cft
Cft
M3
7680 Cft
7680 Cft
217.344 M3
(S.I No:16-09-a)
@ Rs:-
Rs:-
416590
Rs:-
719322
Rs:-
284821
1420734
15360 Sft
15360.00 Sft
1426.944 M2
(SI 16-08-c)
Total:OR
147462
147462
24120 Sft
24120.00 Sft
2240.748 M2
127.11 P:M2
Total Road Work:-
3 ROAD STRUCTURE
No @ Rs:-
0 P:Rft
2871 P:Rft
430650
430650
ABSTRACT
KM-7
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
147462
1420734
430650
1998846
@ Rs:-
2 ROAD WORK
SUB BASE
i) Granular Sub Base using Pitrun Gravel.
Road
1
x
3280
264.77 P:M3
x 13 x
0.5
Total:OR
(S.I No:16-03-a)
@ Rs:-
BASE COURSE
ii) Water Bound Macadam Base Course.
Road
1
x
3280
x 12 x
0.5
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Treatment.
Road
1
x
3280
x 12
Total:OR
@ Rs:-
294924
294924
21320 Cft
21320 Cft
603.356 M3
944.55 P:M3
Total:OR
(S.I No:16-08-c)
39360 Cft
39360 Cft
1113.888 M3
Rs:-
569900
Rs:-
1067511
Rs:-
1843264
19680 Cft
19680 Cft
556.944 M3
39360 Sft
39360 Sft
3656.544 M2
504.1 P:M2
Total Road Work:-
3480675
3 ROAD STRUCTURE
i) Constn: of Drain
1103 P:Rft
661800
NO @ Rs:-
73211 P:No
292844
2871 P:Rft
2153250
No @ Rs:-
481431 P:No
1444293
No @ Rs:-
2806.73 P:No
Total Structure Work:-
2807
4554994
ABSTRACT
KM-1
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
294924
3480675
4554994
8330593
x 13 x
0.5
Total:OR
(S.I No:16-03-a)
@ Rs:- 944.55 P:M3
BASE COURSE
ii) Water Bound Macadam Base Course.
Road
1x
3280 x 12 x 0.5
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Treatment.
Road
1x
Cft
Cft
Cft
M3
3280
x 12
@ Rs:-
294924
294924
21320 Cft
21320 Cft
603.356 M3
Rs:-
569900
Rs:-
1067511
Rs:-
1843264
3480675
19680 Cft
19680 Cft
556.944 M3
Total:OR
(S.I No:16-08-c)
39360
39360
39360
1113.888
39360 Sft
39360.00 Sft
3656.544 M2
504.1 P:M2
Total Road Work:-
3 ROAD STRUCTURE
i) Constn: of 4' Span Culvert
No @ Rs:-
481431 P:No
1444293
NO @ Rs:-
73211 P:No
292844
1103 P:Rft
330900
2871 P:Rft
1435500
v) Constn: of KM Stone
2806.73 P:No
Total Structure Work:-
2807
3506344
No @ Rs:-
ABSTRACT
KM-2
EARTH WORK
ROAD WORK
STRUCTURE WORK
294924
3480675
3506344
TOTAL:-
7281943
SUB DIVISIONAL OFFICER
@ Rs:-
2 ROAD WORK
SUB BASE
i) Granular Sub Base using Pitrun Gravel.
Road
1x
3280
264.77 P:M3
x 13 x
0.5
Total:OR
(S.I No:16-03-a)
@ Rs:-
BASE COURSE
ii) Water Bound Macadam Base Course.
Road
1x
3280
x 12 x
0.5
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Treatment.
Road
1x
3280
x 12
Total:OR
@ Rs:-
294924
294924
21320 Cft
21320 Cft
603.356 M3
944.55 P:M3
Total:OR
(S.I No:16-08-c)
39360 Cft
39360 Cft
1113.888 M3
Rs:-
569900
Rs:-
1067511
Rs:-
1843264
19680 Cft
19680 Cft
556.944 M3
39360 Sft
39360 Sft
3656.544 M2
504.1 P:M2
Total Road Work:-
3480675
3 ROAD STRUCTURE
i) Constn: of 4' Span Culvert
No @ Rs:-
444967 P:No
NO @ Rs:-
73211 P:No
292844
No @ Rs:-
2806.73 P:No
2806.73
ABSTRACT
KM-3
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
294924
3480675
295650.7
4071250
x 13 x
0.5
Total:OR
(S.I No:16-03-a)
@ Rs:-
BASE COURSE
ii) Water Bound Macadam Base Course.
Road
1x
3280
x 12 x
0.5
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Treatment.
Road
1x
3280
x 12
Total:OR
@ Rs:-
Cft
Cft
Cft
Cft
M3
1034160
1034160
21320 Cft
21320 Cft
603.356 M3
944.55 P:M3
Total:OR
(S.I No:16-08-c)
98657
39360
138017
138017
3905.8811
Rs:-
569900
Rs:-
1067511
Rs:-
1843264
3480675
19680 Cft
19680 Cft
556.944 M3
39360 Sft
39360.00 Sft
3656.544 M2
504.1 P:M2
Total Road Work:-
3 ROAD STRUCTURE
i) Constn: of 4' Span Culvert
No @ Rs:-
0 P:No
NO @ Rs:-
73211 P:No
219633
No @ Rs:-
2806.73 P:No
2806.73
ABSTRACT
KM-4
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
1034160
3480675
222439.7
4737275
2 x
3280 x
x 1
OR
(S.I No:3.05-a)
@ Rs:-
2 ROAD WORK
SUB BASE
i) Granular Sub Base using Pitrun Gravel.
Road
1x
3280
264.77 P:M3
x 13 x
0.5
Total:OR
(S.I No:16-03-a)
@ Rs:-
BASE COURSE
ii) Water Bound Macadam Base Course.
Road
1x
3280
x 12 x
0.5
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Treatment.
Road
1
x
3280
x 12
Total:OR
@ Rs:-
294924
294924
21320 Cft
21320 Cft
603.356 M3
944.55 P:M3
Total:OR
(S.I No:16-08-c)
39360 Cft
39360 Cft
1113.888 M3
Rs:-
569900
Rs:-
1067511
Rs:-
1843264
19680 Cft
19680 Cft
556.944 M3
39360 Sft
39360 Sft
3656.544 M2
504.1 P:M2
Total Road Work:-
3480675
3 ROAD STRUCTURE
i) Constn: of 4' Span Culvert
No @ Rs:-
444967 P:No
NO @ Rs:-
73211 P:No
No @ Rs:-
2806.73 P:No
2806.73
2806.73
ABSTRACT
KM-1
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
294924
3480675
2806.73
3778406
x 13 x
0.5
Total:OR
(S.I No:16-03-a)
@ Rs:-
BASE COURSE
ii) Water Bound Macadam Base Course.
Road
1x
3280
x 12 x
0.5
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Treatment.
Road
1x
3280
x 12
Total:OR
@ Rs:-
Cft
Cft
Cft
Cft
M3
309670
309670
21320 Cft
21320 Cft
603.356 M3
944.55 P:M3
Total:OR
(S.I No:16-08-c)
39360
39360
1968
41328
1169.5824
Rs:-
569900
Rs:-
1067511
Rs:-
1843264
3480675
19680 Cft
19680 Cft
556.944 M3
39360 Sft
39360.00 Sft
3656.544 M2
504.1 P:M2
Total Road Work:-
3 ROAD STRUCTURE
i) Constn: of 4' Span Culvert
No @ Rs:-
444967 P:No
444967
NO @ Rs:-
0 P:No
No @ Rs:-
2806.73 P:No
2806.73
ABSTRACT
KM-2
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
309670
3480675
447773.7
4238119
@ Rs:-
2 ROAD WORK
SUB BASE
i) Granular Sub Base using Pitrun Gravel.
Road
1x
3280
264.77 P:M3
x 13 x
0.5
Total:OR
(S.I No:16-03-a)
@ Rs:-
BASE COURSE
ii) Water Bound Macadam Base Course.
Road
1x
3280
x 12 x
0.5
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Treatment.
Road
1x
3280
x 12
Total:OR
@ Rs:-
294924
294924
21320 Cft
21320 Cft
603.356 M3
944.55 P:M3
Total:OR
(S.I No:16-08-c)
39360 Cft
39360 Cft
1113.888 M3
Rs:-
569900
Rs:-
1067511
Rs:-
1843264
19680 Cft
19680 Cft
556.944 M3
39360 Sft
39360 Sft
3656.544 M2
504.1 P:M2
Total Road Work:-
3480675
3 ROAD STRUCTURE
i) Constn: of 4' Span Culvert
No @ Rs:-
0 P:No
NO @ Rs:-
0 P:No
No @ Rs:-
2806.73 P:No
2806.73
2806.73
ABSTRACT
KM-3
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
294924
3480675
2806.73
3778406
@ Rs:-
264.77 P:M3
2 ROAD WORK
SUB BASE
i) Granular Sub Base using Pitrun Gravel.
Road
1x
3280 x 13 x
Take
5%
for curves
@ Rs:-
0.5
0.5
Total:OR
WEARING COURSE
i) Tripple Surface Treatment.
Road
1x
Take
5%
19680
984
20664
584.7912
3280 x 12
for curves
@ Rs:-
39360
1968
41328
3839.3712
2221972
2221972
Cft
Cft
Cft
M3
Rs:-
598395
Rs:-
1120887
Rs:-
1935427
Cft
Cft
Cft
M3
Total:OR
(S.I No:16-08-c)
21320
1066
22386
633.5238
944.55 P:M3
BASE COURSE
ii) Water Bound Macadam Base Course.
Road
1x
3280 x 12 x
Take
5%
for curves
(S.I No:16-04-b)
Cft
Cft
Cft
M3
Total:OR
(S.I No:16-03-a)
257180
39360
296540
8392.082
Sft
Sft
Sft
M2
504.1 P:M2
Total Road Work:-
3654709
3 ROAD STRUCTURE
i) Constn: of 4' Span Culvert
No @ Rs:-
444967 P:No
889934
NO @ Rs:-
73211 P:No
146422
2871 P:Rft
1579050
2806.73 P:No
Total Structure Work:-
2806.73
2618213
No @ Rs:-
ABSTRACT
KM-1
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
2221972
3654709
2618213
8494893
0.5
Total:OR
(S.I No:16-03-a)
@ Rs:-
0.5
Total:OR
WEARING COURSE
i) Tripple Surface Treatment.
Road
1x
Take
5%
10660
533
11193
316.7619
9840
492
10332
292.3956
1640 x 12
for curves
@ Rs:-
19680
984
20664.00
1919.6856
1173223
1173223
Cft
Cft
Cft
M3
Rs:-
299197
Rs:-
560443
Rs:-
967714
1827354
Cft
Cft
Cft
M3
Total:OR
(S.I No:16-08-c)
Cft
Cft
Cft
Cft
Cft
M3
944.55 P:M3
BASE COURSE
ii) Water Bound Macadam Base Course.
Road
1x
1640 x 12 x
Take
5%
for curves
(S.I No:16-04-b)
129440
19680
149120
7456
156576
4431.1008
Sft
Sft
Sft
M2
504.1 P:M2
Total Road Work:-
3 ROAD STRUCTURE
i) Constn: of 4' Span Culvert
No @ Rs:-
444967 P:No
444967
NO @ Rs:-
73211 P:No
146422
2871 P:Rft
861300
2806.73 P:No
2806.73
No @ Rs:-
1455496
ABSTRACT
KM-2
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
1173223
1827354
1455496
4456073
@ Rs:-
249.66 P:M3
10 % Soft Rock
Or
(S.I No:3.11-a)
Take
(S.I No:3.12-a)
@ Rs:-
264.77 P:M3
2 ROAD WORK
SUB BASE
i) Granular Sub Base using Pitrun Gravel.
Road
1x
3280 x 13 x
Take
5%
for curves
0.5
(S.I No:16-03-a)
@ Rs:- 944.55 P:M3
BASE COURSE
ii) Water Bound Macadam Base Course.
Road
1
x
3280 x 12 x 0.5
Take
5%
for curves
Total:OR
3280 x 12
for curves
@ Rs:-
Rs:-
1458738
Rs:-
1783832
150912 Cft
4270.8096 M3
39360 Cft
1114 Cft
31.52303 M3
21320
1066
22386
633.5238
19680
984
20664
584.7912
Cft
Cft
Cft
M3
39360
1968
41328
3839.3712
Rs:-
598395
Rs:-
1120887
Rs:-
1935427
3654709
Cft
Cft
Cft
M3
Total:OR
(S.I No:16-08-c)
8530003
Rs:8346
Total Earth Work Rs:- 11780918
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Treatment.
Road
1
x
Take
5%
Rs:150912 Cft
4270.8096 M3
341.56 P:M3
(S.I No:3.05-a)
1509120 Cft
1207296 Cft
34166.477 M3
Sft
Sft
Sft
M2
504.1 P:M2
Total Road Work:-
3 ROAD STRUCTURE
i) Constn: of 4' Span Culvert
No @ Rs:-
444967 P:No
889934
5427 P:No
542700
2871 P:Rft
1148400
2587 P:Rft
776100
v) Constn: of Drain
1103 P:Rft
772100
4129234
ABSTRACT
KM-1
EARTH WORK
ROAD WORK
STRUCTURE WORK
11780918
3654709
4129234
TOTAL:- 19564861
@ Rs:-
249.66 P:M3
10 % Soft Rock
Or
(S.I No:3.11-a)
Take
(S.I No:3.12-a)
@ Rs:-
264.77 P:M3
2 ROAD WORK
SUB BASE
i) Granular Sub Base using Pitrun Gravel.
Road
1x
3280 x 13 x
Take
5%
for curves
0.5
Total:OR
(S.I No:16-03-a)
@ Rs:- 944.55 P:M3
BASE COURSE
ii) Water Bound Macadam Base Course.
Road
1
x
3280 x 12 x 0.5
Take
5%
for curves
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Treatment.
Road
1
x
Take
5%
4663432
Rs:-
797506
Rs:-
975237
8346
6444521
82505 Cft
2334.8915 M3
82505 Cft
2334.8915 M3
39360 Cft
1114 Cft
31.52303 M3
21320
1066
22386
633.5238
19680
984
20664
584.7912
Cft
Cft
Cft
M3
3280 x 12
for curves
@ Rs:-
39360
1968
41328
3839.3712
Rs:-
598395
Rs:-
1120887
Rs:-
1935427
3654709
Cft
Cft
Cft
M3
Total:OR
(S.I No:16-08-c)
Rs:-
341.56 P:M3
(S.I No:3.05-a)
825050 Cft
660040 Cft
18679.132 M3
Sft
Sft
Sft
M2
504.1 P:M2
Total Road Work:-
3 ROAD STRUCTURE
i) Constn: of 10' Span Culvert
No @ Rs:-
633293 P:No
633293
9255 P:Rft
1110600
2871 P:Rft
1148400
2587 P:Rft
724360
v) Constn: of Drain
1103 P:Rft
551500
4168153
ABSTRACT
KM-1
EARTH WORK
ROAD WORK
STRUCTURE WORK
6444521
3654709
4168153
TOTAL:- 14267383
@ Rs:-
249.66 P:M3
15 % Soft Rock
Or
(S.I No:3.11-a)
Take
(S.I No:3.12-a)
@ Rs:-
264.77 P:M3
2 ROAD WORK
SUB BASE
i) Granular Sub Base using Pitrun Gravel.
Road
1x
3280 x 13 x
Take
5%
for curves
0.5
Total:OR
(S.I No:16-03-a)
@ Rs:- 944.55 P:M3
BASE COURSE
ii) Water Bound Macadam Base Course.
Road
1
x
3280 x 12 x 0.5
Take
5%
for curves
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Treatment.
Road
1
x
Take
5%
4149595
Rs:-
1216514
Rs:-
1487626
8346
6862081
125853 Cft
3561.6399 M3
125853 Cft
3561.6399 M3
39360 Cft
1114 Cft
31.52303 M3
21320
1066
22386
633.5238
19680
984
20664
584.7912
Cft
Cft
Cft
M3
3280 x 12
for curves
@ Rs:-
39360
1968
41328
3839.3712
Rs:-
598395
Rs:-
1120887
Rs:-
1935427
3654709
Cft
Cft
Cft
M3
Total:OR
(S.I No:16-08-c)
Rs:-
341.56 P:M3
(S.I No:3.05-a)
839020 Cft
587314 Cft
16620.986 M3
Sft
Sft
Sft
M2
504.1 P:M2
Total Road Work:-
3 ROAD STRUCTURE
i) Constn: of 6' Span Culvert
No @ Rs:-
493967 P:No
987934
Rft @ Rs;-
9255 P:Rft
2871 P:Rft
2009700
2587 P:Rft
1190020
v) Constn: of Drain
1103 P:Rft
Total Structure Work:-
860340
5047994
ABSTRACT
KM-1
EARTH WORK
ROAD WORK
STRUCTURE WORK
6862081
3654709
5047994
TOTAL:- 15564784
CONSTRUCTION OF BLACK TOPPED ROAD MAIN RAZMAK ROAD TO SHERAONAY KIRACH KHEL KALAY
SHAKTOI TEHSIL LADHA
ADP NO:- 651 (2013-14)
KM-I
1 SUB GRADE
EARTH WORK
Earth Excavation
Qty: as per X-Section
Take
50 % Shingle Gravel
Or
(S.I No:3.09-a)
Take
@ Rs:-
249.66 P:M3
20 % Soft Rock
Or
(S.I No:3.11-a)
Take
(S.I No:3.12-a)
@ Rs:-
264.77 P:M3
2 ROAD WORK
SUB BASE
i) Granular Sub Base using Pitrun Gravel.
Road
1x
3280 x 13 x
Take
5%
for curves
0.5
Total:OR
(S.I No:16-03-a)
@ Rs:- 944.55 P:M3
BASE COURSE
ii) Water Bound Macadam Base Course.
Road
1
x
3280 x 12 x 0.5
Take
5%
for curves
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Treatment.
Road
1
x
Take
5%
1829650
Rs:-
1001258
Rs:-
1836598
8346
4675853
103584 Cft
2931.4272 M3
155376 Cft
4397.1408 M3
39360 Cft
1114 Cft
31.52303 M3
21320
1066
22386
633.5238
19680
984
20664
584.7912
Cft
Cft
Cft
M3
3280 x 12
for curves
@ Rs:-
39360
1968
41328
3839.3712
Rs:-
598395
Rs:-
1120887
Rs:-
1935427
3654709
Cft
Cft
Cft
M3
Total:OR
(S.I No:16-08-c)
Rs:-
341.56 P:M3
(S.I No:3.05-a)
517920 Cft
258960 Cft
7328.568 M3
Sft
Sft
Sft
M2
504.1 P:M2
Total Road Work:-
3 ROAD STRUCTURE
i) Constn: of 6' Span Culvert
No @ Rs:-
493967 P:No
493967
9255 P:Rft
1573350
2871 P:Rft
1263240
2587 P:Rft
827840
v) Constn: of Drain
1103 P:Rft
Total Structure Work:-
639740
4798137
ABSTRACT
KM-1
EARTH WORK
ROAD WORK
STRUCTURE WORK
4675853
3654709
4798137
TOTAL:- 13128698
610720 Cft
OR
(S.I No:3.05-a)
@ Rs:-
264.77 P:M3
2 ROAD WORK
SUB BASE
i) Granular Sub Base using Pitrun Gravel.
Road
1x
3280 x 13 x
Take
5%
for curves
0.5
Total:OR
(S.I No:16-03-a)
@ Rs:- 944.55 P:M3
BASE COURSE
ii) Water Bound Macadam Base Course.
Road
1
x
3280 x 12 x 0.5
Take
5%
for curves
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Treatment.
Road
1
x
Take
5%
21320
1066
22386
633.5238
19680
984
20664
584.7912
3280 x 12
for curves
@ Rs:-
39360
1968
41328
3839.3712
4871044
4871044
Cft
Cft
Cft
M3
Rs:-
598395
Rs:-
1120887
Rs:-
1935427
3654709
Cft
Cft
Cft
M3
Total:OR
(S.I No:16-08-c)
610720 Cft
39360 Cft
650080 Cft
18397.264 M3
650080
Rs:Total Earth Work Rs:-
Sft
Sft
Sft
M2
504.1 P:M2
Total Road Work:-
3 ROAD STRUCTURE
i) Constn: of 6' Span Culvert
No @ Rs:-
493967 P:No
493967
Rft @ Rs;-
9255 P:Rft
2871 P:Rft
574200
Rft @ Rs:-
2587 P:Rft
v) Constn: of Drain
1103 P:Rft
386050
1454217
ABSTRACT
KM-1
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
4871044
3654709
1454217
9979969
@ Rs:-
249.66 P:M3
30 % Soft Rock
Or
(S.I No:3.11-a)
Take
(S.I No:3.12-a)
@ Rs:-
264.77 P:M3
2 ROAD WORK
SUB BASE
i) Granular Sub Base using Pitrun Gravel.
Road
1x
3280 x 13 x
Take
5%
for curves
0.5
Total:OR
(S.I No:16-03-a)
@ Rs:- 944.55 P:M3
BASE COURSE
ii) Water Bound Macadam Base Course.
Road
1
x
3280 x 12 x 0.5
Take
5%
for curves
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Treatment.
Road
1
x
Take
5%
915786
Rs:-
939666
Rs:-
1149079
8346
3012877
97212 Cft
2751.0996 M3
97212 Cft
2751.0996 M3
39360 Cft
1114 Cft
31.52303 M3
21320
1066
22386
633.5238
19680
984
20664
584.7912
Cft
Cft
Cft
M3
3280 x 12
for curves
@ Rs:-
39360
1968
41328
3839.3712
Rs:-
598395
Rs:-
1120887
Rs:-
1935427
3654709
Cft
Cft
Cft
M3
Total:OR
(S.I No:16-08-c)
Rs:-
341.56 P:M3
(S.I No:3.05-a)
324040 Cft
129616 Cft
3668.1328 M3
Sft
Sft
Sft
M2
504.1 P:M2
Total Road Work:-
3 ROAD STRUCTURE
i) Constn: of 6' Span Culvert
No @ Rs:-
493967 P:No
493967
70
Rft @ Rs;-
9255 P:Rft
647850
2871 P:Rft
890010
2587 P:Rft
333723
v) Constn: of Drain
1103 P:Rft
275750
2641300
ABSTRACT
KM-1
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
3012877
3654709
2641300
9308886
@ Rs:-
249.66 P:M3
25 % Soft Rock
Or
(S.I No:3.11-a)
Take
(S.I No:3.12-a)
@ Rs:-
264.77 P:M3
2 ROAD WORK
SUB BASE
i) Granular Sub Base using Pitrun Gravel.
Road
1x
3280 x 13 x
Take
5%
for curves
0.5
Total:OR
(S.I No:16-03-a)
@ Rs:- 944.55 P:M3
BASE COURSE
ii) Water Bound Macadam Base Course.
Road
1
x
3280 x 12 x 0.5
Take
5%
for curves
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Treatment.
Road
1
x
Take
5%
1271387
Rs:-
966325
Rs:-
1418016
8346
3664073
99970 Cft
2829.151 M3
119964 Cft
3394.9812 M3
39360 Cft
1114 Cft
31.52303 M3
21320
1066
22386
633.5238
19680
984
20664
584.7912
Cft
Cft
Cft
M3
3280 x 12
for curves
@ Rs:-
39360
1968
41328
3839.3712
Rs:-
598395
Rs:-
1120887
Rs:-
1935427
3654709
Cft
Cft
Cft
M3
Total:OR
(S.I No:16-08-c)
Rs:-
341.56 P:M3
(S.I No:3.05-a)
399880 Cft
179946 Cft
5092.4718 M3
Sft
Sft
Sft
M2
504.1 P:M2
Total Road Work:-
3 ROAD STRUCTURE
i) Constn: of 6' Span Culvert
No @ Rs:-
493967 P:No
45
Rft @ Rs;-
9255 P:Rft
416475
2871 P:Rft
832590
2587 P:Rft
452725
v) Constn: of Drain
1103 P:Rft
479805
2181595
ABSTRACT
KM-2
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
3664073
3654709
2181595
9500377
@ Rs:-
249.66 P:M3
35 % Soft Rock
Or
(S.I No:3.11-a)
Take
(S.I No:3.12-a)
@ Rs:-
264.77 P:M3
2 ROAD WORK
SUB BASE
i) Granular Sub Base using Pitrun Gravel.
Road
1x
3280 x 13 x
Take
5%
for curves
0.5
Total:OR
(S.I No:16-03-a)
@ Rs:- 944.55 P:M3
BASE COURSE
ii) Water Bound Macadam Base Course.
Road
1
x
3280 x 12 x 0.5
Take
5%
for curves
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Treatment.
Road
1
x
Take
5%
1336317
Rs:-
1599689
Rs:-
1397283
8346
4341636
165494 Cft
4683.4802 M3
118210 Cft
3345.343 M3
39360 Cft
1114 Cft
31.52303 M3
21320
1066
22386
633.5238
19680
984
20664
584.7912
Cft
Cft
Cft
M3
3280 x 12
for curves
@ Rs:-
39360
1968
41328
3839.3712
Rs:-
598395
Rs:-
1120887
Rs:-
1935427
3654709
Cft
Cft
Cft
M3
Total:OR
(S.I No:16-08-c)
Rs:-
341.56 P:M3
(S.I No:3.05-a)
472840 Cft
189136 Cft
5352.5488 M3
Sft
Sft
Sft
M2
504.1 P:M2
Total Road Work:-
3 ROAD STRUCTURE
i) Constn: of 6' Span Culvert
No @ Rs:-
493967 P:No
493967
Rft @ Rs;-
9255 P:Rft
2871 P:Rft
1019205
2587 P:Rft
685555
v) Constn: of Drain
1103 P:Rft
358475
2557202
ABSTRACT
KM-3
EARTH WORK
ROAD WORK
STRUCTURE WORK
4341636
3654709
2557202
TOTAL:- 10553547
CONSTRUCTION OF BLACK TOPPED ROAD SHERAONAY TO SHADKAY OMER KHEL SHABI KHEL
TEHSIL LADHA ( 2.00 KM)
ADP NO:- 653 (2013-14)
KM-I
1 SUB GRADE
EARTH WORK
Earth Excavation
Qty: as per X-Section
Take
80 % Shingle Gravel
Or
(S.I No:3.09-a)
Take
@ Rs:-
249.66 P:M3
10 % Soft Rock
Or
(S.I No:3.11-a)
Take
(S.I No:3.12-a)
@ Rs:-
264.77 P:M3
2 ROAD WORK
SUB BASE
i) Granular Sub Base using Pitrun Gravel.
Road
1x
3280 x 13 x
Take
5%
for curves
0.5
Total:OR
(S.I No:16-03-a)
@ Rs:- 944.55 P:M3
BASE COURSE
ii) Water Bound Macadam Base Course.
Road
1
x
3280 x 12 x 0.5
Take
5%
for curves
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Treatment.
Road
1
x
Take
5%
6322439
Rs:-
1081217
Rs:-
1322176
8346
8734179
111856 Cft
3165.5248 M3
111856 Cft
3165.5248 M3
39360 Cft
1114 Cft
31.52303 M3
21320
1066
22386
633.5238
19680
984
20664
584.7912
Cft
Cft
Cft
M3
3280 x 12
for curves
@ Rs:-
39360
1968
41328
3839.3712
Rs:-
598395
Rs:-
1120887
Rs:-
1935427
3654709
Cft
Cft
Cft
M3
Total:OR
(S.I No:16-08-c)
Rs:-
341.56 P:M3
(S.I No:3.05-a)
1118560 Cft
894848 Cft
25324.198 M3
Sft
Sft
Sft
M2
504.1 P:M2
Total Road Work:-
3 ROAD STRUCTURE
i) Constn: of 6' Span Culvert
No @ Rs:-
493967 P:No
493967
75
Rft @ Rs;-
9255 P:Rft
694125
2871 P:Rft
330165
2587 P:Rft
310440
v) Constn: of Drain
1103 P:Rft
Total Structure Work:-
0
1828697
Rft @ Rs:-
ABSTRACT
KM-1
EARTH WORK
ROAD WORK
STRUCTURE WORK
8734179
3654709
1828697
TOTAL:- 14217585
CONSTRUCTION OF BLACK TOPPED ROAD SHERAONAY TO SHADKAY OMER KHEL SHABI KHEL
TEHSIL LADHA ( 2.00 KM)
ADP NO:- 653 (2013-14)
KM-2
1 SUB GRADE
EARTH WORK
Earth Excavation
Qty: as per X-Section
Take
80 % Shingle Gravel
Or
(S.I No:3.09-a)
Take
@ Rs:-
249.66 P:M3
10 % Soft Rock
Or
(S.I No:3.11-a)
Take
(S.I No:3.12-a)
@ Rs:-
264.77 P:M3
2 ROAD WORK
SUB BASE
i) Granular Sub Base using Pitrun Gravel.
Road
1x
3280 x 13 x
Take
5%
for curves
0.5
Total:OR
(S.I No:16-03-a)
@ Rs:- 944.55 P:M3
BASE COURSE
ii) Water Bound Macadam Base Course.
Road
1
x
3280 x 12 x 0.5
Take
5%
for curves
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Treatment.
Road
1
x
Take
5%
6672882
Rs:-
1141147
Rs:-
1395463
8346
9217838
118056 Cft
3340.9848 M3
118056 Cft
3340.9848 M3
39360 Cft
1114 Cft
31.52303 M3
21320
1066
22386
633.5238
19680
984
20664
584.7912
Cft
Cft
Cft
M3
3280 x 12
for curves
@ Rs:-
39360
1968
41328
3839.3712
Rs:-
598395
Rs:-
1120887
Rs:-
1935427
3654709
Cft
Cft
Cft
M3
Total:OR
(S.I No:16-08-c)
Rs:-
341.56 P:M3
(S.I No:3.05-a)
1180560 Cft
944448 Cft
26727.878 M3
Sft
Sft
Sft
M2
504.1 P:M2
Total Road Work:-
3 ROAD STRUCTURE
i) Constn: of 6' Span Culvert
No @ Rs:-
493967 P:No
493967
55
Rft @ Rs;-
9255 P:Rft
509025
2871 P:Rft
559845
2587 P:Rft
426855
v) Constn: of Drain
1103 P:Rft
220600
2210292
ABSTRACT
KM-2
EARTH WORK
ROAD WORK
STRUCTURE WORK
9217838
3654709
2210292
TOTAL:- 15082839
@ Rs:-
249.66 P:M3
0 % Soft Rock
Or
(S.I No:3.11-a)
Take
(S.I No:3.12-a)
@ Rs:-
264.77 P:M3
2 ROAD WORK
SUB BASE
i) Granular Sub Base using Pitrun Gravel.
Road
1x
3280 x 13 x
Take
5%
for curves
0.5
Total:OR
(S.I No:16-03-a)
@ Rs:- 944.55 P:M3
BASE COURSE
ii) Water Bound Macadam Base Course.
Road
1
x
3280 x 12 x 0.5
Take
5%
for curves
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Treatment.
Road
1
x
Take
5%
2615603
Rs:-
Rs:-
8346
2623949
0 Cft
0 M3
0 Cft
0 M3
39360 Cft
1114 Cft
31.52303 M3
21320
1066
22386
633.5238
19680
984
20664
584.7912
Cft
Cft
Cft
M3
3280 x 12
for curves
@ Rs:-
39360
1968
41328
3839.3712
Rs:-
598395
Rs:-
1120887
Rs:-
1935427
3654709
Cft
Cft
Cft
M3
Total:OR
(S.I No:16-08-c)
Rs:-
341.56 P:M3
(S.I No:3.05-a)
370200 Cft
370200 Cft
10476.66 M3
Sft
Sft
Sft
M2
504.1 P:M2
Total Road Work:-
3 ROAD STRUCTURE
i) Constn: of 6' Span Culvert
No @ Rs:-
493967 P:No
493967
55
Rft @ Rs;-
9255 P:Rft
509025
2871 P:Rft
1435500
2587 P:Rft
1034800
v) Constn: of Drain
1103 P:Rft
Total Structure Work:-
463260
3936552
ABSTRACT
KM-1
EARTH WORK
ROAD WORK
STRUCTURE WORK
2623949
3654709
3936552
TOTAL:- 10215210
@ Rs:-
249.66 P:M3
10 % Soft Rock
Or
(S.I No:3.11-a)
Take
(S.I No:3.12-a)
@ Rs:-
264.77 P:M3
2 ROAD WORK
SUB BASE
i) Granular Sub Base using Pitrun Gravel.
Road
1x
3280 x 13 x
Take
5%
for curves
0.5
Total:OR
(S.I No:16-03-a)
@ Rs:- 944.55 P:M3
BASE COURSE
ii) Water Bound Macadam Base Course.
Road
1
x
3280 x 12 x 0.5
Take
5%
for curves
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Treatment.
Road
1
x
Take
5%
4735047
Rs:-
719780
Rs:-
8346
5463173
74464 Cft
2107.3312 M3
0 Cft
0 M3
39360 Cft
1114 Cft
31.52303 M3
21320
1066
22386
633.5238
19680
984
20664
584.7912
Cft
Cft
Cft
M3
3280 x 12
for curves
@ Rs:-
39360
1968
41328
3839.3712
Rs:-
598395
Rs:-
1120887
Rs:-
1935427
3654709
Cft
Cft
Cft
M3
Total:OR
(S.I No:16-08-c)
Rs:-
341.56 P:M3
(S.I No:3.05-a)
744640 Cft
670176 Cft
18965.981 M3
Sft
Sft
Sft
M2
504.1 P:M2
Total Road Work:-
3 ROAD STRUCTURE
i) Constn: of 6' Span Culvert
No @ Rs:-
493967 P:No
50
Rft @ Rs;-
9255 P:Rft
462750
2871 P:Rft
861300
2587 P:Rft
672620
v) Constn: of Drain
1103 P:Rft
441200
2437870
ABSTRACT
KM-2
EARTH WORK
ROAD WORK
STRUCTURE WORK
5463173
3654709
2437870
TOTAL:- 11555752
@ Rs:-
249.66 P:M3
5 % Soft Rock
Or
(S.I No:3.11-a)
Take
(S.I No:3.12-a)
@ Rs:-
264.77 P:M3
2 ROAD WORK
SUB BASE
i) Granular Sub Base using Pitrun Gravel.
Road
1x
3280 x 13 x
Take
5%
for curves
0.5
Total:OR
(S.I No:16-03-a)
@ Rs:- 944.55 P:M3
BASE COURSE
ii) Water Bound Macadam Base Course.
Road
1
x
3280 x 12 x 0.5
Take
5%
for curves
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Treatment.
Road
1
x
Take
5%
1144871
Rs:-
82437
Rs:-
8346
1235654
8528.4 Cft
241.35372 M3
0 Cft
0 M3
39360 Cft
1114 Cft
31.52303 M3
21320
1066
22386
633.5238
19680
984
20664
584.7912
Cft
Cft
Cft
M3
3280 x 12
for curves
@ Rs:-
39360
1968
41328
3839.3712
Rs:-
598395
Rs:-
1120887
Rs:-
1935427
3654709
Cft
Cft
Cft
M3
Total:OR
(S.I No:16-08-c)
Rs:-
341.56 P:M3
(S.I No:3.05-a)
170568 Cft
162039.6 Cft
4585.7207 M3
Sft
Sft
Sft
M2
504.1 P:M2
Total Road Work:-
3 ROAD STRUCTURE
i) Constn: of 6' Span Culvert
No @ Rs:-
493967 P:No
80
Rft @ Rs;-
9255 P:Rft
740400
2871 P:Rft
1297692
2587 P:Rft
905450
v) Constn: of Drain
1103 P:Rft
441200
3384742
ABSTRACT
KM-3
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
1235654
3654709
3384742
8275105
@ Rs:-
249.66 P:M3
15 % Soft Rock
Or
(S.I No:3.11-a)
Take
(S.I No:3.12-a)
@ Rs:-
264.77 P:M3
2 ROAD WORK
SUB BASE
i) Granular Sub Base using Pitrun Gravel.
Road
1x
3280 x 13 x
Take
5%
for curves
0.5
Total:OR
(S.I No:16-03-a)
@ Rs:- 944.55 P:M3
BASE COURSE
ii) Water Bound Macadam Base Course.
Road
1
x
3280 x 12 x 0.5
Take
5%
for curves
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Treatment.
Road
1
x
Take
5%
1860766
Rs:-
449244
Rs:-
8346
2318356
46476 Cft
1315.2708 M3
0 Cft
0 M3
39360 Cft
1114 Cft
31.52303 M3
21320
1066
22386
633.5238
19680
984
20664
584.7912
Cft
Cft
Cft
M3
3280 x 12
for curves
@ Rs:-
39360
1968
41328
3839.3712
Rs:-
598395
Rs:-
1120887
Rs:-
1935427
3654709
Cft
Cft
Cft
M3
Total:OR
(S.I No:16-08-c)
Rs:-
341.56 P:M3
(S.I No:3.05-a)
309840 Cft
263364 Cft
7453.2012 M3
Sft
Sft
Sft
M2
504.1 P:M2
Total Road Work:-
3 ROAD STRUCTURE
i) Constn: of 6' Span Culvert
No @ Rs:-
493967 P:No
493967
Rft @ Rs;-
9255 P:Rft
2871 P:Rft
1119690
2587 P:Rft
685555
v) Constn: of Drain
1103 P:Rft
347445
2646657
ABSTRACT
KM-1
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
2318356
3654709
2646657
8619722
@ Rs:-
249.66 P:M3
15 % Soft Rock
Or
(S.I No:3.11-a)
Take
(S.I No:3.12-a)
@ Rs:-
264.77 P:M3
2 ROAD WORK
SUB BASE
i) Granular Sub Base using Pitrun Gravel.
Road
1x
3280 x 13 x
Take
5%
for curves
0.5
Total:OR
(S.I No:16-03-a)
@ Rs:- 944.55 P:M3
BASE COURSE
ii) Water Bound Macadam Base Course.
Road
1
x
3280 x 12 x 0.5
Take
5%
for curves
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Treatment.
Road
1
x
Take
5%
2218190
Rs:-
569007
Rs:-
231939
8346
3027482
58866 Cft
1665.9078 M3
19622 Cft
555.3026 M3
39360 Cft
1114 Cft
31.52303 M3
21320
1066
22386
633.5238
19680
984
20664
584.7912
Cft
Cft
Cft
M3
3280 x 12
for curves
@ Rs:-
39360
1968
41328
3839.3712
Rs:-
598395
Rs:-
1120887
Rs:-
1935427
3654709
Cft
Cft
Cft
M3
Total:OR
(S.I No:16-08-c)
Rs:-
341.56 P:M3
(S.I No:3.05-a)
392440 Cft
313952 Cft
8884.8416 M3
Sft
Sft
Sft
M2
504.1 P:M2
Total Road Work:-
3 ROAD STRUCTURE
i) Constn: of 6' Span Culvert
No @ Rs:-
493967 P:No
493967
65
Rft @ Rs;-
9255 P:Rft
601575
2871 P:Rft
1062270
2587 P:Rft
491530
v) Constn: of Drain
1103 P:Rft
330900
2980242
ABSTRACT
KM-2
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
3027482
3654709
2980242
9662433
@ Rs:-
249.66 P:M3
25 % Soft Rock
Or
(S.I No:3.11-a)
Take
(S.I No:3.12-a)
@ Rs:-
264.77 P:M3
2 ROAD WORK
SUB BASE
i) Granular Sub Base using Pitrun Gravel.
Road
1x
3280 x 13 x
Take
5%
for curves
0.5
Total:OR
(S.I No:16-03-a)
@ Rs:- 944.55 P:M3
BASE COURSE
ii) Water Bound Macadam Base Course.
Road
1
x
3280 x 12 x 0.5
Take
5%
for curves
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Treatment.
Road
1
x
Take
5%
2434588
Rs:-
1110254
Rs:-
8346
3553188
114860 Cft
3250.538 M3
0 Cft
0 M3
39360 Cft
1114 Cft
31.52303 M3
21320
1066
22386
633.5238
19680
984
20664
584.7912
Cft
Cft
Cft
M3
3280 x 12
for curves
@ Rs:-
39360
1968
41328
3839.3712
Rs:-
598395
Rs:-
1120887
Rs:-
1935427
3654709
Cft
Cft
Cft
M3
Total:OR
(S.I No:16-08-c)
Rs:-
341.56 P:M3
(S.I No:3.05-a)
459440 Cft
344580 Cft
9751.614 M3
Sft
Sft
Sft
M2
504.1 P:M2
Total Road Work:-
3 ROAD STRUCTURE
i) Constn: of 6' Span Culvert
No @ Rs:-
493967 P:No
493967
Rft @ Rs;-
9255 P:Rft
2871 P:Rft
1076625
2587 P:Rft
737295
v) Constn: of Drain
1103 P:Rft
441200
2749087
ABSTRACT
KM-3
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
3553188
3654709
2749087
9956984
8x
0.5
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Traetment.
Road
1x
13000 Cft
13000 Cft
367.9 M3
Rs:Total Earth Work Rs:-
2200 Cft
2200 Cft
62.26 M3
550
8
Total:OR
(S.I No:16-09-a)
@ Rs:-
Rs:-
119336
Rs:-
206056
Rs:-
386847
712239
4400 Sft
4400.00 Sft
408.76 M2
(SI 16-08-c)
Total:OR
97409
97409
32760 Sft
32760.00 Sft
3043.404 M2
127.11 P:M2
Total Road Work:-
3 ROAD STRUCTURE
No @ Rs:-
9255 P:Rft
462750
1103 P:Rft
408110
2871 P:Rft
Total Structure Work:-
401940
1272800
50
ABSTRACT
KM-1
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
97409
712239
1272800
2082447
9x
0.5
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Traetment.
Road
1
x
11000 Cft
11000 Cft
311.3 M3
Rs:Total Earth Work Rs:-
1800 Cft
1800 Cft
50.94 M3
400
9
Total:OR
(S.I No:16-09-a
@ Rs:-
Rs:-
97638
Rs:-
168591
Rs:-
408102
674332
3600 Sft
3600.00 Sft
334.44 M2
(SI 16-08-c)
Total:OR
82423
82423
34560 Sft
34560.00 Sft
3210.624 M2
127.11 P:M2
Total Road Work:-
3 ROAD STRUCTURE
No @ Rs:-
0 P:Rft
1103 P:Rft
739010
2871 P:Rft
430650
1169660
ABSTRACT
KM-2
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
82423
674332
1169660
1926415
SUB DIVISIONAL OFFICER
HIGHWAY SUB DIVISION LADHA
x 12 x
0.5
Total:OR
(S.I No:16-04-b)
WEARING COURSE
i) Tripple Surface Traetment.
Road
1
x
100
x 12
@ Rs:-
14986
14986
600 Cft
600 Cft
16.98 M3
Total:OR
(SI 16-08-c)
2000 Cft
2000 Cft
56.6 M3
Rs:-
32546
Rs:-
56197
88743
1200 Sft
1200.00 Sft
111.48 M2
504.1 P:M2
Total Road Work:-
3 ROAD STRUCTURE
No @ Rs:-
30
Rft @ Rs:-
0 P:Rft
2871 P:Rft
Total Structure Work:-
ABSTRACT
KM-3
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL:-
14986
88743
86130
189859
0
86130
86130
SL:NO
1
2
3
4
5
6
7
8
9
10
11
12
NAME OF WORK
Re-Habilitation of Wana Kari Kot Road Tehsil Wana
(10-00 KM)
Construction of Satey Khullah-Khamrang Road
(1.00 KM)
Re-Habilitation of Azam Warsak Bypass Road Tehsil
Birmal Through Malik Raz Mohammad Dinor (1.00 KM)
Re-habilitation of Shaki Bazar to Landai Noor Road
Tehsil Shakai (4.00 KM)
Rehabilitation of Tanai-Spin Road (4.00 KM)
Rehabilitation of Karab Kot-Samar Bagh Road
(Phase-I = 3.00 KM)
Construction of remaining 1-Km road of under construction road
Wana Jandola road to village Peer Mohammad Khel tehsil
Sarwakai
Construction of Link Road from Main Jandola Wana
Road to Shinwam Tehsil Sarwakai (1.0 KM)
Construction of link road from Main Jandola road to
Qari zainudin kot shahoor tehsil Sarwaki (1.0 KM)
Construction of 1.50 KM road from reshwara to
zhawara gurgura Tehsil Tiarza(Closed)(Tentative)
Construction of 1-Km road from Ghat Khowa to Faqeer Kalai
Tehsil Tiarza(Closed)(Tentative)
Construction of Zam Chan - Dre Nashtar road 4-Kms
E:COST
126.591
0.5 %
G:Total:-
EXECUTIVE ENGINEER
HIGHWAY DIVISION SWA
13.074
15.965
7.192
6.147
9.001
12.802
14.009
15.547
14.515
27.000
18.000
18.338
5.745
0.433
132.770
NAME OF WORK
SL:NO
1
2
3
4
5
6
7
8
9
10
E:COST
36.000
33.216
54.000
31.218
13.023
11.101
6.500
12.144
11.999
12.216
124.917
5.596
0.625
0.5 %
G:Total:-
EXECUTIVE ENGINEER
HIGHWAY DIVISION SWA
131.138
NAME OF WORK
SL:NO
1
2
3
4
5
6
7
E:COST
11.719
18.000
18.000
18.282
18.202
37.097
14.659
99.959
3.957
0.500
0.5 %
G:Total:-
104.416
ABSTRACT OF COST
NAME OF WORK:- CONSTN: OF B.T ROAD FROM SATEY KHULLA-KHAMRANG ROAD
2.00 KM
ADP NO:- 652/130025 (2013-14)
KM NO
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL
6705748
3654709
4626064
14986521
Total:-
6705748
3654709
4626064
14986521
Add
899191
Total:-
Add
0.5 % Contingency
15885712
79429
Total
15965141
Total:-
15965141
15.965
ABSTRACT OF COST
NAME OF WORK:- REHABILITATION OF WANA KARI KOT ROAD
TEHSIL WANA
10.00 KM
ADP NO:- 652/130025 (2013-14)
KM NO
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL
89916
1674010
441200
2205126
74930
110929
287100
472959
89916
44372
287100
421387
161849
133115
287100
582063
89916
1626958
1716874
89916
899166
1039570
2028652
89916
899166
695050
1684132
187325
1419412
1606737
89916
827791
917707
10
149860
487370
637230
Total:-
1113458
8122289
3037120
12272867
Add
736372
Total:-
Add
0.5 % Contingency
Total
13009239
65046
13074285
13.074
ABSTRACT OF COST
NAME OF WORK:- REHABILITATION OF AZAM WARSAK LARKHO ROAD
TEHSIL BIRMAL
8.00 KM
ADP NO:- 652/130025 (2013-14)
KM NO
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL
294924
912221
366055
1573200
294924
581383
366055
1242362
294924
814583
650283
1759790
294924
719680
1783610
2798214
294924
980156
903310
2178391
294924
800361
488070
1583356
294924
800361
1075570
2170856
294924
1017972
430650
1743546
Total:-
2359393
6626718
6063603
15049714
Add
1504971
Total:-
Add
0.5 % Contingency
Total:-
16554685
82773
16637459
16.637
ABSTRACT OF COST
NAME OF WORK:- CONSTN: OF AZAM WARSAK BYPASS ROAD TEHSIL BIRMAL
THROUGH MALIK RAZ MOHAMMAD DINOR
(1.00 KM)
ADP NO:- 652/130025 (2013-14)
KM NO
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL
294924
5771899
439266
6506090
Total:-
294924
5771899
439266
6506090
Add
650609
Total:-
Add
0.5 % Contingeny
7156698
35783
Total:-
7192482
Total:-
7192482
7.192
ABSTRACT OF COST
NAME OF WORK:- REHABILITATION OF SHAKI BAZAR TO LANDAI NOOR
TEHSIL SHAKAI
( 4.00 KM)
ADP NO:- 652/130025 (2013-14)
KM NO
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL
245770
557248
459360
1262378
245770
1114488
574200
1934459
245777
645991
287100
1178868
245770
737929
200970
1184669
Total:-
983087
3055657
1521630
5560374
Add
556037
Total:-
Add
0.5 % Contingency
Total:-
6116411
30582
6146993
6.147
ABSTRACT OF COST
NAME OF WORK:- CONSTRUCTION OF TANAI SPIN ROAD
( 4.00 KM )
ADP NO:- 652/130025 (2013-14)
KM NO
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL
287731
903004
767456.73
1958191
188823
803699
2807
995329
233781
805055
1020586.73
2059423
309670
1097067
1722607
3129344
Total:-
1020006
3608825
3513457
8142287
Add
814229
Total:-
Add
0.5 % Contingeny
8956516
44783
Total:-
9001299
G:Total:-
9001299
9.001
ABSTRACT OF COST
NAME OF WORK:- ZALAI KHAN KOT ROAD
(PHASE-I = 7.00 KM )
ADP NO:- 652/130025 (2013-14)
KM NO
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL
147462
464783
612245
147462
1137357
86130
1370949
147462
1726483
287100
2161045
110597
1584794
229680
1925071
147462
2068338
287100
2502901
147462
1808513
229680
2185655
147462
1420734
430650
1998846
Total:-
995369
10211002
1550340
12756711
Add
765403
Total:-
Add
0.5 % Contingency
Total:-
13522113
67611
13589724
13.590
ABSTRACT OF COST
NAME OF WORK:- CONSTRUCTION OF ZAM CHAN-DRE NASHTAR ROAD
( 2.00 KM )
ADP NO:- 652/130025 (2013-14)
KM NO
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL
294924
3480675
4554994
8330593
294924
3480675
3506344
7281943
Total:-
589848
6961350
8061337
15612536
Add
Add
Add
0.5
6.25
1561254
Total:-
17173789
% Contingeny
85869
G:Total:-
17259658
% Q:Commission
1078729
G:Total:-
18338387
18.338
ABSTRACT OF COST
NAME OF WORK:- CONSTRUCTION OF ROAD FROM GHWA KHWA TO SALMAN DAGI
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL
2221972
3654709
2618213
8494893
1173223
1827354
1455496
4456073
Total:-
3395194
5482063
4073708
12950966
Add
Add
Add
0.5
6.25
777058
Total:-
13728024
% Contingeny
68640
Total:-
13796664
% Q:Commission
862291
G:Total:-
14658955
14.659
ABSTRACT OF COST
NAME OF WORK:- REHABILITATION OF KARAB KOT-SAMAR BAGH ROAD
3.00 KM( 7.50 KM )
ADP NO:- 652/130025 (2013-14)
KM NO
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL
294924
3480675
2807
3778406
309670
3480675
447774
4238119
294924
3480675
2807
3778406
Total:-
899519
10442025
453387
11794931
Add
943594
Total:-
Add
0.5 % Contingency
G:Total:-
12738525
63693
12802218
12.802
ABSTRACT OF COST
NAME OF WORK:- CONSTN: OF BLACK TOPPED ROAD FROM JANDOLA MAKEEN ROAD
TO IZAN SHABI KHEL
(1.00 KM)
ADP NO:- 651/130024 (2013-14)
KM NO
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL
11780918
3654709
4129234
19564861
Total:-
11780918
3654709
4129234
19564861
Add
1956486
Total:-
Add
0.5 % Contingeny
Total:-
Add
21521347
107607
21628954
6.25 % Q:Commission
Total:-
1351810
22980764
22.981
ABSTRACT OF COST
NAME OF WORK:- CONSTN: OF BLACK TOPPED ROAD FROM GHAT KHOWA TO FAQEER KALAI
TEHSIL TIRAZA
(1.00 KM)
ADP NO:- 651/130025 (2013-14)
KM NO
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL
6444521
3654709
4168153
14267383
Total:-
6444521
3654709
4168153
14267383
Add
1426738
Total:-
Add
0.5 % Contingeny
Total:-
Add
15694122
78471
15772592
6.25 % Q:Commission
Total:-
985787
16758379
16.758
ABSTRACT OF COST
NAME OF WORK:- CONSTN: OF BLACK TOPPED ROAD SULIMAN SHAHI TO KHALID KOROONA
TEHSIL SARAROGHA
(1.00 KM)
ADP NO:- 651/130024 (2013-14)
KM NO
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL
6862081
3654709
5047994
15564784
Total:-
6862081
3654709
5047994
15564784
Add
1556478
Total:-
Add
0.5 % Contingeny
Total:-
Add
17121262
85606
17206869
6.25 % Q:Commission
Total:-
1075429
18282298
18.282
ABSTRACT OF COST
CONSTRUCTION OF BLACK TOPPED ROAD MAIN RAZMAK ROAD TO SHERAONAY KIRACH KHEL KALAY
SHAKTOI TEHSIL LADHA
(1.00 KM)
ADP NO:- 651/130024 (2013-14)
KM NO
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL
4675853
3654709
4798137
13128698
Total:-
4675853
3654709
4798137
13128698
Add
1312870
Total:-
Add
0.5 % Contingeny
Total:-
Add
14441568
72208
14513776
6.25 % Q:Commission
Total:-
907111
15420887
15.421
ABSTRACT OF COST
CONSTRUCTION OF BLACK TOPPED ROAD MAIN SHAKTOI JANATA TO MARAY RAGHZAI
SHER MUHAMMAD KOT
(1.00 KM)
ADP NO:- 651/130024 (2013-14)
KM NO
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL
4871044
3654709
1454217
9979969
Total:-
4871044
3654709
1454217
9979969
Add
997997
Total:-
Add
0.5 % Contingeny
Total:-
Add
10977966
54890
11032856
6.25 % Q:Commission
Total:-
686123
11718979
11.719
ABSTRACT OF COST
CONSTRUCTION OF BLACK TOPPED ROAD PASTAY NAWAI TO MANDAWOOM SHAKTOI
TEHSIL MAKEEN ( 3.00 KM)
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL
3012877
3654709
2641300
9308886
3664073
3654709
2181595
9500377
4341636
3654709
2557202
10553547
Total:-
11018587
10964126
7380097
29362810
Add
2349025
Total:-
Add
0.5 % Contingency
31711835
158559
Total:-
31870394
G:Total:-
31870394
31.870
ABSTRACT OF COST
CONSTRUCTION OF BLACK TOPPED ROAD SHERAONAY TO SHADKAY OMER KHEL SHABI KHEL
TEHSIL LADHA ( 2.00 KM)
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL
8734179
3654709
1828697
14217585
9217838
3654709
2210292
15082839
Total:-
17952017
7309418
4038989
29300423
Add
2930042
Total:-
Add
0.5 % Contingency
32230465
161152
Total:-
32391618
G:Total:-
32391618
32.392
ABSTRACT OF COST
CONSTRUCTION OF BLACK TOPPED ROAD SARAROGHA MAKEEN ROAD TO KANAY SHKARAY
TEHSIL SARAROGHA ( 3.00 KM)
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL
2623949
3654709
3936552
10215210
5463173
3654709
2437870
11555752
1235654
3654709
3384742
8275105
Total:-
9322777
10964126
9759164
30046067
Add
3004607
Total:-
Add
0.5 % Contingency
33050674
165253
Total:-
33215927
G:Total:-
33215927
33.216
ABSTRACT OF COST
CONSTRUCTION OF BLACK TOPPED ROAD FROM AHMAD WAM TO JANATA
PHASE-II ( 3.00 KM)
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL
2318356
3654709
2646657
8619722
3027482
3654709
2980242
9662433
3553188
3654709
2749087
9956984
Total:-
8899027
10964126
8375986
28239139
Add
2823914
Total:-
Add
0.5 % Contingency
31063053
155315
Total:-
31218368
G:Total:-
31218368
31.218
ABSTRACT OF COST
REHABILITATION OF MOMI KARAMA TO BADAR CHALWESHTI ROAD
TEHSIL LADHA (2.2O KM)
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL
97409
712239
1272800
2082447
82423
674332
1169660
1926415
14986
88743
86130
189859
Total:-
194818
1475314
2528590
4198721
Add
419872
Total:-
Add
4618594
0.5 % Contingency
23093
Total:-
4641686
G:Total:-
4641686
4.642
ABSTRACT OF COST
NAME OF WORK:- CONSTN: OF LINK ROAD FROM MAIN JANDOLA WANA ROAD TO SHISWAM
TEHSIL SARWAKAI
ADP NO:- 652/130025 (2013-14)
KM NO
1
Total:Add
EARTH WORK
ROAD WORK
STRUCTURE WORK
4646193
3654709
6293212
4646193
3654709
6293212
6 % Cost Factor on CSR 2012
Total:Add
0.5 % Contingency
Total
Total:Say Rs: in Million
TOTAL
14594114
14594114
875647
15469761
77349
15547110
15547110
15.547
ABSTRACT OF COST
NAME OF WORK:- CONSTN: OF LINK ROAD FROM MAIN JANDOLA ROAD TO QARI ZAINUDIN
EARTH WORK
ROAD WORK
STRUCTURE WORK
TOTAL
4118623
3654709
5851640
13624972
Total:-
4118623
3654709
5851640
13624972
Add
817498
Total:-
Add
0.5 % Contingency
14442470
72212
Total
14514683
Total:-
14514683
14.515
651
S:No
Name of Road
E/Work
Road Work
Str: Work
Q:Commision
Contgy
Total
5358148
4020180
1599639
686122
54890
11718979
5143438
4020180
5277951
907111
72208
15420888
12959009
4020180
4542157
1351810
107607
22980763
4 Khalid Korroona
7548289
4020180
5552793
1075429
85606
18282297
5 Sre Khawaray
4169885
3873991
9002633
1070734
85233
18202476
6 Kot Habib
7016990
5811440
21912903
2182188
173707
37097228
3598905
5810987
4318130
862291
68640
14658953
8 Zam Chan
2034069
14758062
1492413
1148498
91423
19524465
9 Ghat Khwa
7088973
4020180
4584968
985787
78471
16758379
3241808
3873991
6823665
69697
14009161
58159514
54229371
65107252
10269970
887482
188653589
652
S:No
Name of Road
E/Work
Road Work
Str: Work
Q:Commision
Contgy
Total
1 Stay Khulla
7108093
3873992
4903627
79429
15965141
1180265
8609626
3219347
65046
13074284
324416
6349089
483192
35783
7192480
5 Landi Noor
1081396
3361223
1673793
30582
6146994
6 Tanai Spin
1122006
3969708
3864803
44783
9001300
648832
7657485
8867470
1078729
85869
18338385
971481
11277387
489658
63693
12802219
3241808
3873991
6823665
69697
14009161
12 Shin Wam
4924964
3873991
6670895
77349
15547199
4365740
3873992
6202738
72212
14514682
24969001
56720484
43199188
1078729
624443
126591845
Dare Nashtar
9 Karab Kot
Pir Muhammad Khel
Total
653
S:No
Name of Road
E/Work
1 Sheranai to Shadkai
Road Work
Str: Work
Q:Commision
Contgy
Total
10255054
12060538
10735080
165253
33215925
9788930
12060539
9213584
155315
31218368
5 Rehmat UllahKot
4133362
3873991
4950868
64791
13023012
3318553
3873991
3854188
55234
11101966
8 Inzar to Mushigari
4068661
3873991
4141134
60418
12144204
9 Sararogha Ganra
4065690
3873991
3999863
59698
11999242
4061373
3873991
4220301
60778
12216443
39691623
43491032
41115018
621487
124919160
2 Sararogha Makeen
3 Pastay Nawai
7 Momi Karama
86097673
5596348.745
130515508.7