Sie sind auf Seite 1von 4

Client : PT VICO Indonesia Location Page 1 of 5

Process Unit : Item No. Document No.


Job No. : Fabricator
Service of unit : No. of units :
Size : TEMA Type Connected in Parallel Series
Effective surface per unit ft
2
shells/unit Surface/shell (eff.)
PERFORMANCE OF ONE UNIT
Inlet Inlet Outlet
Fluid Name
Fluid quantity, total lb/h
Vapour (relative molecular mass) lb/h
Liquid lb/h
Steam lb/h
Water lb/h
Noncondensable/ relative molecular mass lb/h
Temperature F
Density (vapour/liquid) lb/ft
3
Viscosity cP
Specific heat (vapour/liquid) Btu/(lb-F)
Thermal conductivity (vapour/liquid) Btu/(h-ft-F)
Specific latent heat Btu/lb @ F
Inlet pressure psig
Velocity ft/s
Pressure drop (alowable/calculated) psig
Fouling resistance h-ft
2
-F/Btu
Average ifilm coefficient Btu/(h-ft-F)
Heat Exchanged Btu/h
Heat transfer rate (required/fouled/clean) Btu/(h-ft-F)
V
2
[lb/ft.s
2
]: Inlet Nozzle Bundle entrance Bundle exit
CONSTRUCTION PER SHELL
Tube No. OD in
Thickness
Pitch Inlet
Length Outlet
Tube-tubesheet joint Intermediate
Shell diameter (ID/OD) / in Vent
Cross-baffle type Drain
Spacing : c/c in No. of crosspasses Pressure relief
% Cut Design pressure psig
Tube support type Vacuum pressure psia
Long baffle seal type Design temp. (Max/MDMT) F
Bypass seal type No.of passes per shell
Impingement protection (Y/N) Corrosion allowance in
MATERIAL OF CONSTRUCTION
Shell Tubes Gaskets :
Shell cover Shell side
Channel or bonnet Tube side
Channel cover Floating head
Floating head cover/bolts Spare sets req'd
Tubesheet Stat. Floating Test ring req'd (Y/N)
Baffles : Cross. Long Insullation : shell
Tube support material Channel inlet/exit
Expansion joint type Expansion joint material
Pressure design code Stamp Calc. MAWP (Y/N) TEMA Class
REMARKS :
Originator/ Check : / Approved Issue Date : Issue No.

NOZZLES - No., Size and Rating

SHELL SIDE TUBE SIDE

Mean temp. diff., MTD (corrected) (weighted)


TUBE SIDE

//

/

/


Outlet

@



SHELL SIDE

Job No. Page 2 of 5


Client
Location
Item No.
Document No. Issue No.
Shell Tubesheet Tube
Design
Normal
Starting
Shutdown
Upset #1
Upset #2
Steam out
Expansion joint esign life cycles
Shell : in
Head : in
Pipe/stub ends : in
Nozzle necks : in
Nozzle flanges : in
Body flanges : in
Expansion joint : in
Support in
Bolting (internal) : in
Bolting (eksternal) : in
Nozzle reinforcement : in
Tubes : in
Tubesheets : in
Bonnet/channel : in
Bonnet head (s) in
Channel cover (s) in
Body flanges : in
Pipe/stub ends : in
Bolting (internal) : in
Bolting (eksternal) : in
Nozzle reinforcement : in
Nozzle necks : in
Nozzle flanges : in
Baffles, spacers, tie rods : in
Shell side : Thickness : in MAWP (hot and corroded) : psi
= psi m = MAP (new and cold) : psi
Tube side : Thickness : in Hydrotest pressure :
= psi m = Field : psig Shop : psig
Floating head Thickness : in Masses : Empty : lb Bundle : lb
= psi m = Full of water lb
GASKETS (Optional) MECHANICAL DATA (Optional)

THERMAL EXPANSION DESIGN INFORMATION (Optional)


MATERIALS OF CONSTRUCTION (Optional) Corr. allow.
Tube
press. Psig
CONNECTION SCHEDULE (Optional)
mean metal
temp. F
Shell
press.
Psig
mean metal
temp. F
mean metal
temp. F
No.
req'd
Mark Size Rating Facing Description
Job No. Page 3 of 5
Client
Location
Item No.
Document No. Issue No.
ADDITIONAL REMARKS, SKETCHES, ETC. (Optional)
Job No. Page 4 of 5
Client
Location
Item No.
Document No. Issue No.
Fluid Name .. Ref. Pressure 1 : psi (abs)
Temp.
F
Thermal Sp. Heat
Cond. Vap Vapour
Btu/(h-ft-F) Btu/(lb-F)
Pressure
psi (abs)
Enthalpy
Btu/lb
Density
Vapour
lb/ft3
Viscosity
Vapour
cP

Das könnte Ihnen auch gefallen