Sie sind auf Seite 1von 1

ONGCHAZIRAPLANTFIREWATERNETWORKPROJECT

PIPESUPPORTCALCULATION

WeightofPipewithWater:

WeightofPipe:
Wall
Operating
PipeOD
Pipesize
thickness Pressure
Sr.
(inch)
(m)
(mm)
(barg)

PipeID(m)

Longitudinalload
Lateralload
Verticalload
[30%ofVerticalload] [30%ofVerticalload]
(N/m)
(N/m)
(N/m)
1458.58
437.57
437.57

Span
length

(m)

Longitudinalload
Lateralload
Verticalload
[30%ofVerticalload] [30%ofVerticalload]
(N/m)
(N/m)
(N/m)
5744.22
1723.27
1723.27
6

30

7.76

0.762

0.746

28

7.7

0.711

0.695

1359.92

407.98

407.98

5079.62

1523.89

1523.89

26

7.7

0.660

0.644

1261.26

378.38

378.38

4455.08

1336.53

1336.53

24

8.28

0.610

0.594

1164.54

349.36

349.36

3881.68

1164.50

1164.50

20

6.35

7.86

0.508

0.495

770.27

231.08

231.08

2659.46

797.84

797.84

18

6.35

7.7

0.457

0.444

691.96

207.59

207.59

2212.13

663.64

663.64

16

6.35

7.9

0.406

0.393

613.65

184.10

184.10

1804.86

541.46

541.46

14

6.35

8.37

0.356

0.343

536.88

161.06

161.06

1444.46

433.34

433.34

12

6.35

8.02

0.324

0.311

487.74

146.32

146.32

1234.01

370.20

370.20

10

10

6.35

7.79

0.273

0.260

409.43

122.83

122.83

931.21

279.36

279.36

11

6.35

8.1

0.219

0.206

326.52

97.96

97.96

654.26

196.28

196.28

12

5.4

7.7

0.168

0.157

212.32

63.69

63.69

402.62

120.79

120.79

13

5.4

7.7

0.141

0.130

177.06

53.12

53.12

307.61

92.28

92.28

14

5.4

7.7

0.114

0.103

141.81

42.54

42.54

223.82

67.15

67.15

15

4.85

7.7

0.089

0.079

98.69

29.61

29.61

147.11

44.13

44.13

16

2.5

4.47

7.7

0.073

0.064

74.07

22.22

22.22

105.67

31.70

31.70

17

4.47

7.7

0.060

0.051

60.02

18.01

18.01

80.10

24.03

24.03

18

1.5

4.05

7.7

0.048

0.040

43.04

12.91

12.91

55.30

16.59

16.59

19

4.05

7.7

0.033

0.025

28.35

8.51

8.51

33.13

9.94

9.94

Das könnte Ihnen auch gefallen