Sie sind auf Seite 1von 1

Project:ProposedVehicularGatewithPedestrianGate

Location:HillSide,AyalaHeightsSubdivision,Q.C.
Subject: BillofQuantities
Item

Description
SitePreparation
LayoutandStaking
ChippingWorks

Unit

lot
lot

Qty.

MaterialCost
Unit
Total

1.00 500.00
1.00 760.00
SubTotal
PedestrianGateFrameFabrication,Erection,andInstallation
50mmx50mmx3mmTubularSteel
pcs. 3.00 1,628.10
25mmx50mm(1"x2")x2mmTubularSteel
pcs. 1.00 1,080.00
PillowBlockBearing
pcs. 4.00 1,200.00
4'x8'x2mmM.S.Plate
pcs. 2.00 2,160.00
OtherAccessories,StainlessAccessories
lot 1.00 10,000.00
SubTotal
VehicularGateFrameFabrication,Erection,andInstallation
50mmx50mmx3mmTubularSteel
pcs. 12.00 1,628.10
25mmx50mm(1"x2")x2mmTubularSteel
pcs. 4.00 1,080.00
PillowBlockBearing
pcs. 4.00 2,000.00
4'x8'x2mmM.S.Plate
pcs. 8.00 2,160.00
OtherAccessories,StainlessAccessories
lot 1.00 15,000.00
SubTotal

LaborCost
Unit
Total

UnitCost

TotalCost

500.00 1,360.00 1,360.00 1,860.00 1,860.00


760.00 1,140.00 1,140.00 1,900.00 1,900.00
1,260.00
2,500.00
3,760.00
4,884.30
1,080.00
4,800.00
4,320.00
10,000.00
25,084.30

900.00
225.00
450.00
740.00
5,400.00

2,700.00
225.00
1,800.00
1,480.00
5,400.00
11,605.00

2,528.10
1,305.00
1,650.00
2,900.00
15,400.00

7,584.30
1,305.00
6,600.00
5,800.00
15,400.00
36,689.30

19,537.20
4,320.00
8,000.00
17,280.00
15,000.00
64,137.20

900.00
225.00
450.00
740.00
5,400.00

10,800.00
900.00
1,800.00
5,920.00
5,400.00
24,820.00

2,528.10
1,305.00
2,450.00
2,900.00
20,400.00

30,337.20
5,220.00
9,800.00
23,200.00
20,400.00
88,957.20