Schedule Description Due Date

P & ID (Utility) Study P&ID 5/9/2014


Drawings Engineering Spec.for Piping 5/9/2014
Drawings Piping Material Specification 5/9/2014
Go to Site WCS Line Check 5/9/2014
Go to Site WCS Line Check 5/9/2014
Go to Site WCS Line Check 5/9/2014
Drawings Material Specification 5/10/2014
Drawings Piping Support Standard Drawing 5/10/2014