This document contains a schedule with due dates for engineering drawings and site visits for a WCS line check project. Key deliverables due on May 9th include P&ID drawings, engineering specifications for piping, and piping material specifications. Additional material specifications and piping support standard drawings are scheduled for May 10th. The document also provides a summary of to-do list items for Subash Sander with no open items remaining for this week, tomorrow, or today.
This document contains a schedule with due dates for engineering drawings and site visits for a WCS line check project. Key deliverables due on May 9th include P&ID drawings, engineering specifications for piping, and piping material specifications. Additional material specifications and piping support standard drawings are scheduled for May 10th. The document also provides a summary of to-do list items for Subash Sander with no open items remaining for this week, tomorrow, or today.
This document contains a schedule with due dates for engineering drawings and site visits for a WCS line check project. Key deliverables due on May 9th include P&ID drawings, engineering specifications for piping, and piping material specifications. Additional material specifications and piping support standard drawings are scheduled for May 10th. The document also provides a summary of to-do list items for Subash Sander with no open items remaining for this week, tomorrow, or today.
Drawings Engineering Spec.for Piping 5/9/2014 Drawings Piping Material Specification 5/9/2014 Go to Site WCS Line Check 5/9/2014 Go to Site WCS Line Check 5/9/2014 Go to Site WCS Line Check 5/9/2014 Drawings Material Specification 5/10/2014 Drawings Piping Support Standard Drawing 5/10/2014 To-Do List- SUBASH SANDAR N Summary Session Priority Status Items Due: Morning High Ongoing Afternoon High Completed Afternoon High Completed Afternoon High Completed This Week Tomorrow Today Afternoon High Completed 0 0 0 Afternoon High Completed To-Do List- SUBASH SANDAR N 0 5 10 15 20 25 This Week Tomorrow Today Blind Plates - Used to separate Equipment from Pipeline