GOBIERNO REGIONAL APURIMAC

GERENCIA REGIONAL DE INFRAESTRUCTURA

GOBIERNO REGIONAL APUR

HOJA DE METRADOS

PROYECTO : "CONSTRUCCION DE AULAS COLEGIO SECUNDARIO DE CONCACHA


BLOQUE-01 (AULAS)
ITEM

0.100.00

DESCRIPCION

UND
N PIEZAS
(Plg)

KG/ML
ANCHO

LARGO

METRADOS
ALTO
PARCIAL

###
OBSERVACIONES
###
###

TOTAL

OBRAS PROVISIONALES
CARTEL DE IDENTIFICACION DE LA OBRA 3.60X2.40M

GLB

1.00

1.00

1.00

CONSTRUCCION DE ALMACEN Y GUARDIANIA

UND

1.00

1.00

1.00

OFICINA DE ADMINISTRACION

UND

1.00

1.00

1.00

ALMACEN

UND

1.00

1.00

1.00

GUARDIANIA

UND

1.00

1.00

1.00

BATERIA DE SS.HH (05UND ) Y LAVATORIO (05 UND)

UND

1.00

1.00

1.00

01.01.00 DESMONTAJE DE PUERTAS

UND

22.00

22.00

22.00

01.02.00 DESMONTAJE DE VENTANS

UND

20.00

DESMONTAJE Y DEMOLICION

01.03.00 DESMONTAJE DE CALAMINAS


DESMONTAJE DE CORREAS DE MADERA

01.04.00 DESMONTAJE DE TIJERALES DE MADERA

02.00.00

02.00.00

1.00

M2

25.00

ML

1560.00

UND

64.00

1.00

50.00

20.00

20.00

1250.00

1,250.00

1560.00

1,560.00

64.00

64.00

DEMOLICION
DEMOLICIONES

M3

23.34

45.00

1050.30

1,050.30

ELIMINACION MATERIAL EXCEDENTE DE DEMOLICION C/MAQUINARIA

M3

23.32

41.00

956.12

956.12

MOVIMIENTOS DE TIERRAS

M3

CORTE PARA CONFORMACION DE TERRAPLENES

M3

37.50

66.60

0.50

1248.75

1,248.00

RELLENO Y COMP. MANUAL- MAT. DE PRESTAMO

m3

67.75

8.50

0.20

115.18

115.20

ELIMINACION MATERIAL EXCEDENTE C/MAQUINARIA

m3

29.00

38.85

0.50

563.33

563.00

AREA ADMINISTRATIVA ALTER-1

02.00.00

MOVIMIENTOS DE TIERRAS

02.02.00 EXCAVACION PARA ZAPATAS HASTA 1.10 DE PROFUNDIDAD

112.85

TIPO 1

M3

4.00

1.50

1.50

1.60

14.40

TIPO 2

M3

18.00

1.50

1.50

1.60

64.80

EJES A-A

1.00

0.50

21.65

1.00

10.83

EJES C-C

1.00

0.50

21.65

1.00

10.83

EJES 1-1

1.00

0.50

4.00

1.00

2.00

EJES 3-3

1.00

0.50

4.00

1.00

2.00

EJES 5-5

1.00

0.50

4.00

1.00

2.00

EJES 7-7

1.00

0.50

4.00

1.00

2.00

EJES 9-9

1.00

0.50

4.00

1.00

2.00

EJES 11-11

1.00

0.50

4.00

1.00

2.00

02.02.00 EXCAVACION PARA CIMIENTOS CORRIDOS ( INCLUYE VIGAS DE CIMENTACION

02.04.00 RELLENO COMPACTADO CON MATERIAL PROPIO

M3

M3
M3

4.00

0.20

2.00

1.60

2.56

TIPO 2

M3

18.00

0.20

2.00

1.60

11.52

A-A

0.20

4.00

1.00

0.80

C-C

0.20

4.00

1.00

0.80

EJE 1-1

0.20

4.00

1.00

0.80

EJE 3-3

0.20

4.00

1.00

0.80

EJE 5-5

0.20

4.00

1.00

0.80

EJE 7-7

0.20

4.00

1.00

0.80

EJE 9-9

0.20

4.00

1.00

0.80

EJE 11-11

0.20

4.00

1.00

0.80

1.50

1.60

3.60

02.09.00 ACARREO INTERNO DE MATERIAL, PROCEDIENTES DE EXCAVACIONES

M3
M3

4.00

1.50

TIPO 2

M3

18.00

1.50

1.50

1.60

3.60

A-A

0.50

21.65

1.00

10.83

C-C

0.50

21.65

1.00

10.83

EJE 1-1

0.50

4.00

1.00

2.00

EJE 3-3

0.50

4.00

1.00

2.00

EJE 5-5

0.50

4.00

1.00

2.00

EJE 7-7

0.50

4.00

1.00

2.00

EJE 9-9

0.50

4.00

1.00

2.00

EJE 11-11

0.50

4.00

1.00

2.00

M2

240.00

AULAS - 1

1.00

6.00

8.00

48.00

AULAS - 2

1.00

6.00

8.00

48.00

AULAS - 3

1.00

6.00

8.00

48.00

AULAS - 4

1.00

6.00

8.00

48.00

AULAS - 5

1.00

6.00

8.00

48.00

02.08.00 ELIMINACIN DE MATERIAL EXCEDENTE A MANO

M3

146.71
112.85

(EXCAVACION - RELLENO )* Esponjamiento 1.30%

1.30

146.71

OBRAS DE CONCRETO SIMPLE


SOLADO PARA ZAPATAS

M2

TIPO 1

M3

4.00

1.50

1.50

1.00

9.00

TIPO 2

M3

18.00

1.50

1.50

1.00

40.50

A-A

0.50

21.65

0.50

5.41

C-C

0.50

21.65

0.50

5.41

EJE 1-1

0.50

4.00

0.50

1.00

EJE 3-3

0.50

4.00

0.50

1.00

EJE 5-5

0.50

4.00

0.50

1.00

EJE 6-6

0.50

4.00

0.50

1.00

EJE 7-7

0.50

4.00

0.50

1.00

DIVISION AREA ADMINISTRATIVA

0.50

4.00

0.50

1.00

03.01.00 CONCRETO EN CIMIENTOS CORRIDO F'c = 100 KG/CM2 + 30% PM

04.00.00

40.85

TIPO 1

02.09.00 NIVELACIN Y COMPACTADO EN FALSO PISO

03.00.00

20.48

TIPO 1

49.50

M3

16.83

CONSTRUCCION VEREDA Y PATIO CON CONCRETO DE 4"

04.01.00 EXCAVACION PARA VEREDAS

M3

29.70

PAZADIZO

1.00

2.00

36.35

0.20

14.54

VEREDA COSTADOS

1.00

1.00

75.81

0.20

15.16

PAZADIZO

1.00

2.00

36.35

1.00

72.70

VEREDA COSTADOS

1.00

1.00

75.81

1.00

75.81

04.02.00 PERFILADO Y COMPACTACION PARA VEREDAS

M2

148.51

MK'K

GOBIERNO REGIONAL APURIMAC


GERENCIA REGIONAL DE INFRAESTRUCTURA

GOBIERNO REGIONAL APUR

HOJA DE METRADOS

PROYECTO : "CONSTRUCCION DE AULAS COLEGIO SECUNDARIO DE CONCACHA


BLOQUE-01 (AULAS)
ITEM

DESCRIPCION

04.03.00 EMPEDRADO PARA VEREDAS e=0.15 M

UND
N PIEZAS
(Plg)

ANCHO

LARGO

METRADOS
ALTO
PARCIAL

M2
1.00

2.00

36.35

1.00

72.70

VEREDA COSTADOS

1.00

1.00

75.81

1.00

75.81

PAZADIZO

1.00

1.00

36.35

0.20

7.27

VEREDA COSTADOS

1.00

1.00

75.81

0.20

15.16

1.00

2.00

36.35

1.00

72.70

1.00

1.00

75.81

1.00

75.81

PAZADIZO

1.00

2.00

36.35

1.00

72.70

VEREDA COSTADOS

1.00

1.00

75.81

1.00

75.81

PAZADIZO

36.35

2.00

1.00

1.00

72.70

VEREDA COSTADOS

75.81

1.00

1.00

1.00

75.81

PAZADIZO

12.00

2.00

1.00

1.00

24.00

VEREDA COSTADOS

26.00

1.00

1.00

1.00

26.00

04.05.00 CONCRETO EN VEREDAS F'c = 175 Kg/Cm2

M2

VEREDA COSTADOS

04.06.00 FROTACHADO EN VEREDAS

04.07.00 BRUAS EN VEREDAS

04.08.00 SELLO ASFALTICO EN VEREDAS

22.43

M2

PAZADIZO

###
OBSERVACIONES
###
###

TOTAL
148.51

PAZADIZO

04.04.00 ENCOFRADO Y DESENCOFRADO DE VEREDAS

05.00.00

KG/ML

148.51

M2

148.51

ML

148.51

ML

50.00

OBRAS DE CONCRETO ARMADO


CONCRETO EN ZAPATAS

M3

A-A TIPO 1

M3

4.00

1.50

1.50

0.60

5.40

29.70

B-B TIPO 2

M3

18.00

1.50

1.50

0.60

24.30

ACERO GRADO EN ZAPATAS

KG

A-A TIPO 1

5/8"

64.00

1.60

1.40

143.36

B-B TIPO 2

5/8"

288.00

1.60

1.40

645.12

03.01.00 CONCRETO EN VIGAS DE CIMENTACION

788.48

M3

13.19

A-A

0.30

32.20

0.50

4.83

C-C

0.30

32.20

0.50

4.83

EJE 1-1

0.30

4.70

0.50

0.71

EJE 3-3

0.30

4.70

0.50

0.71

EJE 5-5

0.30

4.70

0.50

0.71

EJE 7-7

0.30

4.70

0.50

0.71

EJE 11-11

0.30

4.70

0.50

0.71

05.01.00 ENCOFRADO Y DESENCOFRADO EN VIGAS DE CIMENTACION

M2

26.37

A-A

2.00

0.30

32.20

0.50

9.66

C-C

2.00

0.30

32.20

0.50

9.66

EJE 1-1

2.00

0.30

4.70

0.50

1.41

EJE 3-3

2.00

0.30

4.70

0.50

1.41

EJE 5-5

2.00

0.30

4.70

0.50

1.41

EJE 6-6

2.00

0.30

4.70

0.50

1.41

EJE 7-7

2.00

0.30

4.70

0.50

1.41

ACERO GRADO EN VIGAS DE CIMENTACION

KG

A-A

5/8"

4.00

1.60

ESTRIBOS

3/8"

250.00

C-C

5/8"

4.00

ESTRIBOS

3/8"

EJE 1-1

1,487.54
41.90

268.16

0.58

1.74

252.30

1.60

41.90

268.16

250.00

0.58

1.74

252.30

5/8"

4.00

1.60

6.90

44.16

ESTRIBOS

3/8"

30.00

0.58

1.74

30.28

EJE 3-3

5/8"

4.00

1.60

6.90

44.16

ESTRIBOS

3/8"

30.00

0.58

1.74

30.28

EJE 5-5

5/8"

4.00

1.60

6.90

44.16

ESTRIBOS

3/8"

30.00

0.58

1.74

30.28

EJE 7-7

5/8"

4.00

1.60

6.90

44.16

ESTRIBOS

3/8"

30.00

0.58

1.74

30.28

EJE 9-9

5/8"

4.00

1.60

6.90

44.16

ESTRIBOS

3/8"

30.00

0.58

1.74

30.28

EJE 11-11

5/8"

4.00

1.60

6.90

44.16

ESTRIBOS

3/8"

30.00

0.58

1.74

30.28

05.01.00 CONCRETO PARA SOBRECIMIENTO F'C=175KG/CM2

M3

18.61

A-A

0.30

24.10

0.80

5.78

C-C

0.30

24.10

0.80

5.78

EJE 1-1

0.30

4.40

0.80

1.06

EJE 3-3

0.30

4.40

0.80

1.06

EJE 5-5

0.30

4.40

0.80

1.06

EJE 7-7

0.30

4.40

0.80

1.06

EJE 9-9

0.30

4.40

0.80

1.06

EJE 11-11

0.50

4.40

0.80

1.76

05.01.00 ENCOFRADO Y DESENCOFRADO PARA SOBRECIMIENTOS

M2

140.77

A-A

2.00

32.24

0.80

51.58

C-C

2.00

32.24

0.80

51.58

EJE 1-1

2.00

4.70

0.80

7.52

EJE 3-3

2.00

4.70

0.80

7.52

EJE 5-5

2.00

4.70

0.80

7.52

EJE 6-6

2.00

4.70

0.80

7.52

EJE 7-7

2.00

4.70

0.80

7.52

05.01.00 CONCRETO 210 KG/CM2 PARA COLUMNETAS

M3

16.27

A-A

20.00

0.25

0.15

7.48

5.61

C-C

20.00

0.25

0.15

7.48

5.61

EJE 1-1

3.00

0.25

0.15

7.48

0.84

EJE 3-3

3.00

0.25

0.15

7.48

0.84

MK'K

GOBIERNO REGIONAL APURIMAC


GERENCIA REGIONAL DE INFRAESTRUCTURA

GOBIERNO REGIONAL APUR

HOJA DE METRADOS

PROYECTO : "CONSTRUCCION DE AULAS COLEGIO SECUNDARIO DE CONCACHA


BLOQUE-01 (AULAS)
ITEM

DESCRIPCION

UND
N PIEZAS
(Plg)

KG/ML
ANCHO

LARGO

METRADOS
ALTO
PARCIAL

EJE 5-5

3.00

0.25

0.15

7.48

0.84

EJE 7-7

3.00

0.25

0.15

7.48

0.84

EJE 9-9

3.00

0.25

0.15

7.48

0.84

EJE 11-11

3.00

0.25

0.15

7.48

0.84

A-A

20.00

1.00

0.55

7.48

82.28

C-C

20.00

1.00

0.55

7.48

82.28

EJE 1-1

3.00

1.00

0.30

7.48

6.73

EJE 3-3

3.00

1.00

0.30

7.48

EJE 5-5

3.00

1.00

0.30

7.48

6.73

EJE 6-6

3.00

1.00

0.55

7.48

12.34

EJE 7-7

3.00

1.00

0.30

7.48

6.73

05.07.00 ENCOFRADO Y DESENCOFRADO PARA COLUMNETAS

05.07.00 ACERO GRADO EN COLUMNETAS

M2

203.83

6.73

KG

675.21

A-A

3/8"

12.00

0.58

7.48

1.00

52.06

ESTRIBOS

1/4"

147.00

0.25

0.74

1.00

27.20

C-C

3/8"

12.00

0.58

7.48

1.00

52.06

ESTRIBOS

1/4"

147.00

0.25

0.90

1.00

33.08

EJE 1-1

3/8"

12.00

0.58

7.48

1.00

52.06

ESTRIBOS

1/4"

147.00

0.25

0.90

1.00

33.08

EJE 3-3

3/8"

12.00

0.58

7.48

1.00

52.06

ESTRIBOS

1/4"

147.00

0.25

0.90

1.00

33.08

EJE 5-5

3/8"

12.00

0.58

7.48

1.00

52.06

ESTRIBOS

1/4"

147.00

0.25

0.90

1.00

33.08

EJE 7-7

3/8"

12.00

0.58

7.48

1.00

52.06

ESTRIBOS

1/4"

147.00

0.25

0.90

1.00

33.08

EJE 9-9

3/8"

12.00

0.58

7.48

1.00

52.06

ESTRIBOS

1/4"

147.00

0.25

0.90

1.00

33.08

EJE 11-11

3/8"

12.00

0.58

7.48

1.00

52.06

ESTRIBOS

1/4"

147.00

0.25

0.90

1.00

33.08

05.01.00 CONCRETO 210 KG/CM2 PARA COLUMNAS

M3

46.07

COLUMNA-1

M3

4.00

0.25

1.25

7.43

9.29

COLUMNA-2

M3

18.00

0.25

1.10

7.43

36.78

05.07.00 ENCOFRADO Y DESENCOFRADO PARA COLUMNAS

M2

451.60

COLUMNA-1

m2

4.00

3.00

7.43

89.16

COLUMNA-2

m2

18.00

2.71

7.43

362.44

05.07.00 ACERO GRADO EN COLUMNAS

KG

COLUMNAS 1-1

3/4"

COLUMNAS 1-1

5/8"

COLUMNAS 1-1

1/2"

ESTRIBOS

3/8"

ESTRIBOS

3/8"

COLUMNAS 2-2

3/4"

COLUMNAS 2-2
COLUMNAS 2-2
ESTRIBOS
ESTRIBOS

05.12.00 VIGAS
05.12.00 CONCRETO - VIGAS F'C=210 KG/CM2

###
OBSERVACIONES
###
###

TOTAL

9,762.69
16.00

2.26

8.75

316.40

16.00

1.60

8.75

44.00

1.02

8.75

392.70

864.00

0.58

2.22

1112.49

864.00

0.58

1.62

811.81

72.00

2.26

8.75

1423.80

5/8"

72.00

1.60

8.75

1008.00

1/2"

216.00

1.02

8.75

1927.80

3/8"

864.00

0.58

2.54

1272.84

3/8"

864.00

0.58

2.54

1272.84

224.00

M3

41.99

VIGAS PRINCIPALES
EJE 1-1

1.00

0.30

6.60

0.60

1.19

EJE 2-2

1.00

0.30

6.60

0.60

1.19

EJE 3-3

1.00

0.30

6.60

0.60

1.19

EJE 4-4

1.00

0.30

6.60

0.60

1.19

EJE 5-5

1.00

0.30

6.60

0.60

1.19

EJE 6-6

2.00

0.30

8.60

0.60

3.10

EJE 7-7

2.00

0.30

8.60

0.60

3.10

EJE 8-8

2.00

0.30

8.60

0.60

3.10

EJE 9-9

2.00

0.30

8.60

0.60

3.10

EJE 10-10

2.00

0.30

8.60

0.60

3.10

EJE 11-11

2.00

0.30

8.60

0.60

3.10

EJE A-A

1.00

0.30

41.60

0.60

7.49

EJE C-C

1.00

0.30

41.60

0.60

7.49

VIGA CHATA

1.00

0.30

41.60

0.20

2.50

VIGAS SECUNDARIAS

05.13.00 ENCOFRADO Y DESENCOFRADO DE VIGAS

M2

433.94

VIGAS PRINCIPALES
EJE 1-1
EJE 2-2
EJE 3-3
EJE 4-4
EJE 5-5
EJE 6-6
EJE 7-7
EJE 8-8
EJE 9-9
EJE 10-10

2
2
2
2
2

6.50
6.50
6.50

1.50
1.50
1.50

9.75
9.75
9.75

6.50
6.50
8.55
8.55
8.55
8.55
8.55

1.50
1.50
1.50
1.50
1.50
1.50
1.50

9.75
9.75
25.65
25.65
25.65
25.65
25.65

EJE 11-11
VIGAS SECUNDARIAS

8.55

1.50

25.65

EJE A-A
EJE C-C
VIGA CHATA

2
2
2

41.50
41.50
22.92

1.20
1.20
0.70

99.60
99.60
32.09

05.03.00 ACERO GRADO EN VIGAS

KG

4,211.17

VIGAS PRINCIPALES
EJE 1-1

3/4"

6.00

2.26

6.90

93.56

EJE 1-1

1/2"

2.00

1.02

6.90

14.08

ESTRIBOS

3/8"

70.00

0.58

1.62

65.77

EJE 2-2

3/4"

6.00

2.26

6.90

93.56

EJE 2-2

1/2"

2.00

1.02

6.90

14.08

ESTRIBOS

3/8"

70.00

0.58

1.62

65.77

EJE 3-3

3/4"

6.00

2.26

6.90

93.56

EJE 3-3

1/2"

2.00

1.02

6.90

14.08

ESTRIBOS

3/8"

70.00

0.58

1.62

65.77

EJE 4-4

3/4"

6.00

2.26

6.90

93.56

EJE 4-4

1/2"

2.00

1.02

6.90

14.08

ESTRIBOS

3/8"

70.00

0.58

1.62

65.77

EJE 5-5

3/4"

6.00

2.26

6.90

93.56

EJE 5-5

1/2"

2.00

1.02

6.90

14.08

ESTRIBOS

3/8"

70.00

0.58

1.62

65.77

MK'K

GOBIERNO REGIONAL APURIMAC


GERENCIA REGIONAL DE INFRAESTRUCTURA

GOBIERNO REGIONAL APUR

HOJA DE METRADOS

PROYECTO : "CONSTRUCCION DE AULAS COLEGIO SECUNDARIO DE CONCACHA


BLOQUE-01 (AULAS)
ITEM

DESCRIPCION

UND
N PIEZAS
(Plg)

KG/ML
ANCHO

LARGO

METRADOS
ALTO
PARCIAL

EJE 6-6

3/4"

12.00

2.26

8.95

EJE 6-6

1/2"

4.00

1.02

8.95

36.52

ESTRIBOS

3/8"

140.00

0.58

1.62

131.54

EJE 7-7

3/4"

12.00

2.26

8.95

242.72

EJE 7-7

1/2"

4.00

1.02

8.95

36.52

ESTRIBOS

3/8"

140.00

0.58

1.62

131.54

ESTRIBOS

3/8"

140.00

0.58

1.62

131.54

EJE 8-8

3/4"

12.00

2.26

8.95

242.72

EJE 8-8

1/2"

4.00

1.02

8.95

36.52

ESTRIBOS

3/8"

140.00

0.58

1.62

131.54

ESTRIBOS

3/8"

140.00

0.58

1.62

131.54

EJE 9-9

3/4"

12.00

2.26

8.95

242.72

EJE 9-9

1/2"

4.00

1.02

8.95

36.52

ESTRIBOS

3/8"

140.00

0.58

1.62

131.54

ESTRIBOS

3/8"

140.00

0.58

1.62

131.54

EJE 10-10

3/4"

12.00

2.26

8.95

242.72

EJE 10-10

1/2"

4.00

1.02

8.95

36.52

ESTRIBOS

3/8"

140.00

0.58

1.62

131.54

EJE 11-11

3/4"

12.00

2.26

8.95

242.72

EJE 11-11

1/2"

4.00

1.02

8.95

36.52

ESTRIBOS

3/8"

140.00

0.58

1.62

131.54

###
OBSERVACIONES
###
###

TOTAL

242.72

VIGA CHATA
EJE A-A

5/8"

8.00

1.60

22.92

293.38

ESTRIBOS

3/8"

300.00

0.58

1.10

191.40

05.03.00 CONFINAMIENTO DE MUROS Y TABIQUES


ENCOFRADO Y DESENCOFRADO

M2

ACERO FY=4200 KG/CM2

KG

239.20
46.00

1/2"
CONCRETO F'C=210 KG/CM2

296.00

1.02

239.20

5.20

1569.98

1,569.98

5.20

20.67

20.67

187.20

187.20

M3
0.25

JUNTAS DE CONSTRUCCION CON TEKNOPORT

5.20

15.90

ML
36.00

5.20

LOSA LEGERADA
LOSA ALEGERADA

M3

39.19
8.55

CONCRETO EN LOSA ALIGERADA

05.07.00 ENCOFRADO Y DESENCOFRADO LOSA ALIGERADA

0.20

39.19
208.71

8.95

AULAS PRIMER PLOQUE

05.03.00 ACERO GRADO EN LOSA

22.92

M2
23.32

208.71

KG

1,494.37

VEGUETAS AULAS

1/2"

44.00

1.02

22.33

1002.17

ACERO DE TENPERATURA

1/4"

43.00

0.25

22.92

246.39

1/4"

115.00

0.25

8.55

245.81

ACERO DE TENPERATURA

05.03.00 COLOCACION DE BLOQUETAS

UND

05.03.00 LOSA MACISA DE CONCRETO (TECHOS)

1,647.00
1.00

LOSA ALEGERADA

1.00

1647.00

1.00

UND

398.59

ENCOFRADO Y DESENCOFRADO ( TECHO EN PASADIZO)

M2

10.50

22.92

240.66

TECHO NORMAL

M2

8.50

18.58

157.93

9.90

823.68

05.03.00 ACERO GRADO EN LOSA MACISA EN TECHO

KG

VIGAS DE TEJERALES

5/8"

VIGAS DE TEJERALES
ESTRIBOS
ACEROS LONGITUDINAL EN TECHO

5305.21
52.00

1.60

1/2"

18.00

1.02

9.90

181.76

3/8"

390.00

0.58

1.45

327.99

3/8"

56.00

0.58

22.33

725.28

ACEROS TRANSVERSAL EN TECHO

3/8"

116.00

0.58

9.43

634.45

VIGAS DE TEJERALES NORMAL

5/8"

52.00

1.60

9.60

798.72

VIGAS DE TEJERALES NORMAL

1/2"

18.00

1.02

9.60

176.26

ESTRIBOS

3/8"

355.00

0.58

1.45

298.56

ACEROS LONGITUDINAL EN TECHO

3/8"

58.00

0.58

22.13

744.45

ACEROS TRANSVERSAL EN TECHO

3/8"

118.00

0.58

8.68

594.06

05.12.00 CONCRETO - LOSA MACISA F'C=210 KG/CM2

1647.00 UND

1647.00

M3

48.83

TECHO CON PASADIZO

8.65

22.92

0.15

29.74

TECHO SIN PASADIZO

6.85

18.58

0.15

19.09

0.80

18.58

14.86

22.92

22.92

PARAPETOS
ENCOFRADO Y DESENCOFRADO 1ER NIVEL

M2

ENCOFRADO Y DESENCOFRADO 2DO NIVEL

M2

ACERO FY=4200KG/CM2

KG

PARANTES

1/2"

177.84

1.02

0.75

136.05

TRANSVERSALES

3/8"

8.00

0.58

22.92

106.35

TRANSVERSALES

3/8"

8.00

0.58

18.58

86.21

CONCRETO FC=210 KG/CM2 1ER NIVEL

M3

2.00

0.15

22.92

6.88

CONCRETO FC=210 KG/CM2 2DO NIVEL

M3

2.00

0.15

18.58

5.57

A-A

1.00

1.00

36.00

1.00

36.00

C-C

1.00

1.00

41.50

1.00

41.50

EJE 1-1

1.00

1.00

4.70

2.66

12.50

EJE 3-3

1.00

1.00

5.80

2.66

15.43

EJE 5-5

1.00

1.00

5.80

2.66

15.43

EJE 7-7

2.00

1.00

5.80

2.66

30.86

EJE 9-9

2.00

1.00

5.80

2.66

30.86

EJE 11-11

2.00

1.00

4.70

2.66

25.00

MUJENETES

2.00

1.00

5.15

1.00

10.30

37.78

328.61

12.45

01.00.00

MUROS Y TABIQUES

01.01.00 Muro de LADRILLO KK E=.25 cm

01.00.00

M2

217.87

REVOQUES Y ENLUCIDOS

01.01.00 TARRAJEO EN MUROS EXTERIORES

M2

246.87

A-A

1.00

36.00

1.00

36.00

C-C

1.00

41.50

1.00

41.50

EJE 1-1

1.00

4.70

2.66

12.50

EJE 3-3

1.00

5.60

2.66

14.90

EJE 5-5

1.00

5.60

2.66

14.90

EJE 7-7

2.00

5.60

2.66

29.79

EJE 9-9

2.00

5.60

2.66

29.79

EJE 11-11

2.00

5.60

2.66

29.79

MUJENETES

2.00

5.15

3.66

37.70

A-A

1.00

36.00

1.00

36.00

C-C

1.00

41.50

1.00

41.50

EJE 1-1

1.00

4.70

2.66

12.50

01.01.00 TARRAJEO EN MUROS INTERIORES

M2

209.17

MK'K

GOBIERNO REGIONAL APURIMAC


GERENCIA REGIONAL DE INFRAESTRUCTURA

GOBIERNO REGIONAL APUR

HOJA DE METRADOS

PROYECTO : "CONSTRUCCION DE AULAS COLEGIO SECUNDARIO DE CONCACHA


BLOQUE-01 (AULAS)
ITEM

DESCRIPCION

UND
N PIEZAS
(Plg)

KG/ML
ANCHO

LARGO

METRADOS
ALTO
PARCIAL

EJE 3-3

1.00

5.60

2.66

14.90

EJE 5-5

1.00

5.60

2.66

14.90

EJE 7-7

2.00

5.60

2.66

29.79

EJE 9-9

2.00

5.60

2.66

29.79

EJE 11-11

2.00

5.60

2.66

29.79

05.07.00 TARRAJEO EN COLUMNAS

M2

163.46

COLUMNA-1

m2

4.00

7.43

29.72

COLUMNA-2

m2

18.00

7.43

133.74

05.07.00 TARRAJEO EN COLUMNETAS

M2

203.83

A-A

20.00

0.55

7.48

82.28

C-C

20.00

0.55

7.48

82.28

EJE 1-1

3.00

0.30

7.48

6.73

EJE 3-3

3.00

0.30

7.48

EJE 5-5

3.00

0.30

7.48

6.73

EJE 6-6

3.00

0.55

7.48

12.34

3.00

0.30

7.48

6.73

EJE 7-7

05.13.00 TARRAJEO EN VIGAS

###
OBSERVACIONES
###
###

TOTAL

6.73

M2

VIGAS PRINCIPALES

87.35

EJE 1-1

6.85

6.85

EJE 2-2

6.85

6.85

EJE 3-3

6.85

6.85

EJE 4-4

6.85

6.85

EJE 5-5

6.85

6.85

EJE 6-6

8.85

8.85

EJE 7-7

8.85

8.85

EJE 8-8

8.85

8.85

EJE 9-9

8.85

8.85

EJE 10-10

8.85

8.85

EJE 11-11

8.85

8.85

VIGAS SECUNDARIAS
EJE A-A

1.00

44.46

1.20

53.35

EJE C-C

1.00

44.46

1.20

53.35

VIGA CHATA

1.00

22.23

0.70

15.56
80.07

PARAPETOS
TARRAJEO EN PARAPETOS 1ER NIVEL
TARRAJEO EN PARAPETOS 2DO NIVEL

04.06.00 VESTIDURA DE DERRAMES VANOS H = 0,20

M2
M2

0.80

44.26
44.66

35.41
44.66

ML

1097.40

PUERTAS
ML

8.00

83.15

665.20

ML

1.00

432.20

432.20

1.00

360.20

360.20

8.55

22.67

193.83

AULAS 2DO NIVEL

8.55

22.67

193.83

AULAS 1ER NIVEL

7.70

18.33

141.14

AULAS-1

6.00

8.00

48.00

AULAS-2

6.00

8.00

48.00

AULAS-3

6.00

8.00

48.00

AULAS-4

6.00

8.00

48.00

AULAS-5

6.00

8.00

48.00

P-1
VENTANAS
V-1

04.06.00 BRUAS DE 1 CM

ML

VIGAS

01.00.00

360.20

CIELO RASOS

01.01.00 CIELOS RASO CON CEMENTO ARENA PRIMER NIVEL

M2

193.83

TARRAJEO EN CIELO RASO

01.01.00 CIELOS RASO CON DRYWALL 2DO NIVEL

01.00.00

334.97

PISOS Y PAVIMENTOS

01.01.00 CONCRETO EN FALSO PISO CEMENTO - HORMIGON E=4"

CONTRA PISO DE 48MM

M2

240.00

177.32

M2

AULAS-6

6.00

8.00

48.00

AULAS DE COMPUTACION

6.00

14.17

85.02

1.95

22.72

44.30

AULAS-1

6.00

8.00

48.00

AULAS-2

6.00

8.00

48.00

AULAS-3

6.00

8.00

48.00

AULAS-4

6.00

8.00

48.00

AULAS-5

6.00

8.00

48.00

AULA DE COMPUTACION

6.00

14.17

85.02

AULAS

6.00

8.00

PASADIZO

1.95

22.92

44.69

PASADIZO

01.01.00 PISO DE CERAMICO ANTIDESLIZANTE 0.30X0.30M PRIMER NIVEL

M2

240.00

01.01.00 PISO 2DO NIVEL CERAMICO ANTIDESLIZANTE

01.00.00

129.71

ZOCALOS Y CONTRAZOCALOS

01.01.00 CONTRAZOCALO DE CEMENTO PULIDO H=0.10M

ML

131.16

A-A

1.00

39.23

39.23

C-C

1.00

50.53

50.53

EJE 1-1

1.00

4.60

4.60

EJE 3-3

1.00

4.60

4.60

EJE 5-5

1.00

4.60

4.60

EJE 7-7

2.00

4.60

9.20

EJE 9-9

2.00

4.60

9.20

EJE 11-11

2.00

4.60

9.20

102.62

30.79

01.01.00 ZOCALO DE DE CEMENTO PULIDO CEMENTO ARENA H=0.30M

M2

30.79

ZOCALO DE DE CEMENTO PULIDO CEMENTO ARENA H=0.30M

02.00.00

369.71

0.30

CUBIERTURA
163.74
CORREAS Y TIRANTES DE MADERA 2X3" 2DO PISO

ML

10

9.43

94.30

CORREAS Y TIRANTES DE MADERA 2X3" 1ER PISO

ML

8.68

69.44

CORREAS Y TRANSVERSALES DE MADERA 2X4"

ML

254.00

254.00

CORREAS Y TRANSVERSALES DE MADERA 2X4"

ML

254.00

254.00

CUBIERTURA CON TEJA ANDINA 1ER PISO

M2

10.50

24.50

257.25

CUBIERTURA CON TEJA ANDINA 2DO PISO

M2

9.50

24.50

232.75

CUMBRERA C/TEJA ANDINA 1ER PISO

ML

24.50

24.50

508.00

490.00

47.90

MK'K

GOBIERNO REGIONAL APURIMAC


GERENCIA REGIONAL DE INFRAESTRUCTURA

GOBIERNO REGIONAL APUR

HOJA DE METRADOS

PROYECTO : "CONSTRUCCION DE AULAS COLEGIO SECUNDARIO DE CONCACHA


BLOQUE-01 (AULAS)
ITEM

DESCRIPCION
CUMBRERA C/TEJA ANDINA 2DO PISO

UND
N PIEZAS
(Plg)

KG/ML
ANCHO

ML

LARGO

METRADOS
ALTO
PARCIAL

23.40

###
OBSERVACIONES
###
###

TOTAL

23.40

05.12.00 PRUEBAS DE LABORATORIO

02.00.00

DISEO DE MEZCLAS

UND

3.00

PRUEBAS DE CALIDAD DE CONCRETO (PRUEBA A LA COMPRESION)

UND

6.00

CARPINTERIA DE MADERA Y METALICA

02.14.00 PUERTA DE MADERA TABLERO REBAJADO AGUANO AULAS

02.00.00

12.00
8.00
20.79

M2

1.10

1.00

2.70

20.79

CERRAJERIA

02.14.00 CERRADURA DE DOS GOLPES

UND

7.00

7.00

02.14.00 BISAGRA CAPUCHINA DE 4"

UND

21

21.00

21.00

02.14.00 MANIJA DE BRONCE 4" PARA PUERTAS

UND

7.00

7.00

02.14.00 PICAFORTES DE 4"

UND

7.00

7.00

02.00.00

VIDRIOS

02.14.00 VENTANA SISTEMA NOVA INCLUYE VIDRIOS


PINTURA EN CIELO RASO

M2

02.00.00

1.66

83.51

81.85

81.85

8.55

22.92

195.97

195.97

M2

PINTURA EN CIELO RASO


PINTURAS

01.01.00 TARRAJEO EN MUROS EXTERIORES

M2

237.58

A-A

1.00

39.23

1.00

39.23

C-C

1.00

50.53

1.00

50.53

EJE 1-1

1.00

4.60

2.66

12.24

EJE 3-3

1.00

4.60

2.66

12.24

EJE 5-5

1.00

4.60

2.66

12.24

EJE 7-7

2.00

4.60

2.66

24.47

EJE 9-9

2.00

4.60

2.66

24.47

EJE 11-11

2.00

4.60

2.66

24.47

MUJENETES

2.00

5.15

3.66

37.70

A-A

1.00

39.23

1.00

39.23

C-C

1.00

50.53

1.00

50.53

EJE 1-1

1.00

4.60

2.66

12.24

EJE 3-3

1.00

4.60

2.66

12.24

EJE 5-5

1.00

4.60

2.66

12.24

EJE 7-7

2.00

4.60

2.66

24.47

EJE 9-9

2.00

4.60

2.66

24.47

EJE 11-11

2.00

4.60

2.66

24.47

01.01.00 TARRAJEO EN MUROS INTERIORES

M2

199.88

80.07

PARAPETOS
TARRAJEO EN PARAPETOS 1ER NIVEL

M2

TARRAJEO EN PARAPETOS 2DO NIVEL

M2

02.14.00 PINTURA EN VIGAS

0.80

44.26

35.41

44.66

44.66

M2

253.29

VIGAS PRINCIPALES
EJE 1-1

1.00

6.85

1.50

10.28

EJE 2-2

1.00

6.85

1.50

10.28

EJE 3-3

1.00

6.85

1.50

10.28

EJE 4-4

1.00

6.85

1.50

10.28

EJE 5-5

1.00

6.85

1.50

10.28

EJE 6-6

1.00

8.85

1.50

13.28

EJE 7-7

1.00

8.85

1.50

13.28

EJE 8-8

1.00

8.85

1.50

13.28

EJE 9-9

1.00

8.85

1.50

13.28

EJE 10-10

1.00

8.85

1.50

13.28

EJE 11-11

1.00

8.85

1.50

13.28

EJE A-A

1.00

44.46

1.20

53.35

EJE C-C

1.00

44.46

1.20

53.35

VIGA CHATA

1.00

22.23

0.70

15.56

VIGAS SECUNDARIAS

05.07.00 PINTURA EN COLUMNAS

M2

COLUMNA-1

m2

4.00

3.00

7.43

89.16

COLUMNA-2

m2

18.00

2.71

7.43

362.44

A-A

20.00

0.55

7.48

82.28

C-C

20.00

0.55

7.48

82.28

EJE 1-1

3.00

0.30

7.48

6.73

EJE 3-3

3.00

0.30

7.48

6.73

EJE 5-5

3.00

0.30

7.48

6.73

EJE 6-6

3.00

0.55

7.48

12.34

EJE 7-7

3.00

0.30

7.48

6.73

05.07.00 PINTURA EN COLUMNETAS

451.60

M2

203.83

MK'K

GOBIERNO REGIONAL APURIMAC


GERENCIA REGIONAL DE INFRAESTRUCTURA

GOBIERNO REGIONAL APUR

HOJA DE METRADOS

PROYECTO : "CONSTRUCCION DE AULAS COLEGIO SECUNDARIO DE CONCACHA


BLOQUE-01 (AULAS)
ITEM

DESCRIPCION

04.06.00 PINTURA EN DERRAMES Y VANOS H = 0,20

UND
N PIEZAS
(Plg)

KG/ML
ANCHO

LARGO

METRADOS
ALTO
PARCIAL

ML

###
OBSERVACIONES
###
###

TOTAL
1097.40

PUERTAS
P-1

ML

8.00

83.15

665.20

ML

1.00

432.20

432.20

0.30

102.62

30.79

1.10

1.00

VENTANAS
V-1

01.01.00 PINTURA EN ZOCALOS DE CEMENTO C/ESMALTE

M2

ZOCALO DE DE CEMENTO PULIDO CEMENTO ARENA H=0.30M

01.01.00 PINTURA EN PUERTAS


PUERTA DE MADERA TABLERO REBAJADO AGUANO AULAS

01.00.00

30.79
1.00

M2
M2

20.79
7

2.70

20.79

INSTACIONES ELECTRICAS
SALIDA DE CENTRO DE LUZ

PTO

30.00

30.00

30.00

SALIDA PARA TOMACORRIENTE DOBLE CON LINEA A TIERRA

PTO

36.00

36.00

36.00

INTERRUPTOR DE BAKELITA

UND

3.00

3.00

3.00

350.00

350.00

CIRCUITO EMPOTRADO EN PARED - TECHO

ML

350.00

MK'K

FORMATO N 26

PLANILLA DE SUSTENTACION DE METRADOS ACEROS


Nombre del Proyecto: CERCO PERIMETRICO DE PACHACONAS
Organismo Proponente: COMIT DE GESTIN CERCO PERIMETRICO PACHACONAS
Localidad: Pachaconas Distrito: Pachaconas Provincia: Antabamba Regin: Apurmac

01.05.00 OBRAS DE CONCRETO ARMADO

PARTIDA

01.05.02

DESCRIPCION

DISEO

(Plg)

N
ELEMENTO
IGUALES

N PIEZAS
POR
ELEMENTO
(M)

5/8"

12

20

5/8"

20

5/8"

20

5/8"

2
2

10
13

5/8"

1
1

7
8

ACERO EN ZAPATAS f'y=4200 kg/cm2


ZAPATAS

01.05.02

ACERO EN ZAPATAS f'y=4200 kg/cm

Z-1

Z-2

Z-3

Z-4

Z-5

(Plg)

N
ELEMENTO
IGUALES

N PIEZAS
POR
ELEMENTO
(M)

Eje A-B-C-F y 3-5-7-9

5/8"

ESTRIBOS

3/8"

60

Eje 1 y 2 A-B-C-D-F

5/8"

ESTRIBOS

3/8"

102

Eje D y F DE 3-4-5-6-7-8-9

5/8"

ESTRIBOS

3/8"

120

ZONA DE ESCALERAS EJE 2' - 3'


ESTRIBOS
ZONA DE ESCALERAS EJE E-F
ESTRIBOS

5/8"
3/8"
5/8"
3/8"

2
2
2
2

4
25
4
20

(Plg)

N
ELEMENTO
IGUALES

N PIEZAS
POR
ELEMENTO
(M)

PARTIDA

01.05.02

DESCRIPCION

DISEO

ACERO EN VIGAS DE CIMENTACION f'y=4200 kg/cm2


VIGAS DE CONEXIN

01.05.02

ACERO EN VIGAS DE CONEXION f'y=4200 kg/cm

PARTIDA

01.05.02

DESCRIPCION

ACERO EN COLUMNAS f'y=4200 kg/cm2


COLUMNAS

01.05.02

ACERO EN COLUMNAS f'y=4200 kg/cm


PRIMER NIVEL
COLUMNAS C1

DISEO

ESTRIBOS MAYOR
ESTRIBOS MENOR

3/4"

12

5/8"

12

1/2"

12

10

3/8"

12

50

3/8"

12

50

3/4"

5/8"

1/2"

10

3/8"

50

3/8"

50

COLUMNAS C1

ESTRIBOS MAYOR
ESTRIBOS MENOR

ORMATO N 26

DOS ACEROS

LONGITUD
LONGITUD
POR PIEZAS
(M)
PARCIAL (M)

1/4"
0.248

CLASIFICACION (M)
3/8"
1/2"
0.58
1.02

5/8"
1.6

PESO
PARCIAL

PESO
TOTAL

KG

KG

1634.57
1.86

446.4

446.4

749.95

1.86

223.20

223.20

374.98

1.86

186.00

186.00

312.48

2.36
1.86

47.20
48.36

47.20
48.36
95.56

160.54

1.56
1.36

10.92
10.88

10.92
10.88

36.62

21.80

LONGITUD
LONGITUD
POR PIEZAS
(M)
PARCIAL (M)

1/4"
0.25

CLASIFICACION (M)
3/8"
1/2"
0.58
1.02

5/8"
1.6

PESO
PARCIAL
KG

PESO
TOTAL
KG

1637.19
9.10

254.8

1.60

672.0

20.80

166.40

1.60

326.40

24.85

198.80

1.60

384.00

5.70
1.60
5.28
1.60

45.60
80.00
42.24
64.00

LONGITUD
LONGITUD
POR PIEZAS
(M)
PARCIAL (M)

254.8
672.0

428.06
409.25

166.40
326.40

279.55
198.78

198.80
384.00

233.86
45.60

80.00

48.72
42.24

64.00

1/4"
0.25

3/8"
0.58

CLASIFICACION (M)
1/2"
5/8"
1.02
1.6

38.98

3/4"
2.26

PESO
PARCIAL
KG

PESO TOTAL
KG

8.75

420.0

420.0

8.75

420.0

8.75

1050.0

2.28

1368.00

1368.00

833.11

1.68

1008.00

1008.00

613.87

8.75

210.0

8.75

210.0

8.75

525.0

2.28

684.00

684.00

0.00

1.68

504.00

504.00

0.00

420.0

705.60

1050.0

1124.55

210.0
210.0
525.0

996.66

0.00
0.00
0.00

80
72
136
175

PLANILLA DE RESUMEN DE METRADOS ACEROS

PROYECTO : "CONSTRUCCION COLEGIO SECUNDARIO DE MENORES GUILLERMO VILADEGUT FERRUFINO" DEL D

PARTIDA

DESCRIPCION

Total en Kg. 1/4"


Total en Kg. 3/8"
Total en Kg. 1/2"

DISEO

(Plg)

N
N PIEZAS LONGITUD LONGITUD
POR
ELEMENTO
POR
PARCIAL
ELEMENTO
IGUALES
PIEZAS (M)
(M)
(M)

ACEROS

DEGUT FERRUFINO" DEL DISTRITO DE LAMBRAMA


CLASIFICACION (M)
1/4"
0.248

3/8"
0.56

1/2"
0.994

#REF!

5/8"
1.552

PESO
PARCIAL
KG
#REF!

#REF!

#REF!
#REF!

#REF!

PESO
TOTAL
KG

#REF!
#REF!
#REF!

CALCULO DE FLETE TERRESTRE

CLAVOS
CEMENTO
MAYOLICA
MADERA
FIERRO
LADRILLO
LADRILLO PARA MURO

TOTA EN KILOS
EN P2
EN M2
EN BOLSAS
EN UNIDADES
LADRILLO DE MURO

ARQUITECTURA
ESTRUCTURA
INSTALACION SANITARIAS
CERCO PERIMETRICO
LOSA DEPORTIVA
INSTALACION DE GAS

KG
BOLSAS
M2
P2
KG
UND
UND

2200
486
140
2200
43123.69
9000
21313

300
3809.37
102
367
4041.13
27172.25

50461.820
2567.000
213.92 TABLAS
242.000
161.3 CAJAS
6585.370 279878.225 KG
38062.250
380622.5 KG
21313.00
170504

332551.15
653199.31
7536.60
146726.84
58353.00
11107.49
1209474.39

193
1390

TOTAL
3159.000
6585.370
242.000
2567.000
138 47302.820
1890 38062.250
21313.00
466
900

TOTAL x KG
50461.820
11122.76
3549.3333333333
279878.225
380622.5
170504.00
896138.638
COSTO X VIAJE

128.0198055 VIAJES
250

32004.951

PRESUPUESTO TOTAL DEL PROYECTO


PROYECTO : "CONSTRUCCION CENTRO DE SALUD SANTA ROSA
LUGAR: SANTA ROSA
DESCRIPCION

ESTRUCTURA

ARQUITECTURA

INST. SANIT.

INST. ELECTRICAS

VARIOS

TOTAL

COSTO DIRECTO
GASTOS GENERALES 10%
GASTOS DE SUPERVISION 3%

304,125.72
30,412.57
9,123.77

541,499.86
54,149.99
16,245.00

10,209.89
1,020.99
306.30

855,835.47
85,583.55
25,675.06

PRESUPUESTO TOTAL

343,662.06

611,894.84

11,537.18

967,094.08