CUBICACION DE PARTIDAS

PROYECTO VIVIENDA CON TALLER


N
PARTIDA
GASTOS ADICIONALES, OBRAS PROVISIONALES Y
1
TRABAJOS PREVIOS
1.3
TRABAJOS PREVIOS
1.3.3
TRAZADO
2
OBRAS DE CONTRUCCION
2.1
OBRA GRUESA
2.1.1
EXCAVACIONES Y MOVIMIENTOS DE TIERRA
2.1.1.1
EXCAVACIONES DE CIMIENTOS (JUNTO CON EMPLANTILLADO)
2.1.1.2
EXCAVACIONES PARA INSTALACIONES
2.1.1.2.1
CAMARAS DE INSPECCION
2.1.1.2.2
TUBERIAS PVC ALCANTARILLADO
2.1.1.2.2.1 PVC 50MM
2.1.1.2.2.2 PVC 75MM
2.1.1.2.2.3 PVC 110MM
2.1.1.2.3
CAERIAS DE Cu. AGUA POTABLE
2.1.1.2.3.1 19mm
2.1.1.2.3.2 13mm
2.1.1.2.4
CAERIAS DE GAS
2.1.1.3
EXTRACCION Y TRANSPORTE DE ESCOMBROS
2.1.2
EMPLANTILLADO H-5
2.1.3
CIMIENTO H-10
2.1.3.1
BOLON DESPLAZADOR 20%
2.1.3.2
HORMIGON CIMIENTO (MENOS BOLON DESPLAZADOR)
2.1.4
SOBRECIMIENTO
2.1.4.1
MOLDAJE SOBRECIMIENTO
2.1.4.2
ENFIERRADURA SOBRECIMIENTO
2.1.4.2.1
Fe 12mm
2.1.4.2.2
Fe 8mm
2.1.4.3
HORMIGON SOBRECIMIENTO H-15
2.1.5
VIGA DE FUNDACION
2.1.5.1
MOLDAJE VIGA DE FUNDACION
2.1.5.2
ENFIERRADURA VIGA DE FUNDACION
2.1.5.2.1
Fe 12mm
2.1.5.2.2
Fe 8mm
2.1.5.3
HORMIGON VIGA DE FUNDACION
2.1.6
BASE DE PAVIMENTOS
2.1.6.1
RELLENO ESTABILIZADO
2.1.6.2
RELLENO CAMA DE RIPIO
2.1.6.3
RADIER H-18 e=0.08
2.1.7
ENFIERRADURA ESTRUCTURAS
2.1.7.1
VERTICAL
2.1.7.1.1
ENFIERRADURA PILARES Fe 12mm
2.1.7.1.1.1 P101
2.1.7.1.1.2 P102
2.1.7.1.1.3 P103

UNIDAD CANTIDAD

16.13
5.06

m
m
m

0.016
0.01
0.15

m
m
m
m
m
m
m
m

0.019
0.004
0.27
21.659
0.77
11.63
2.326
9.304

22.19

Kg/ml
Kg/ml
m
m
Kg/ml
Kg/ml
m

179.21
119.69
2.33
3.69
27.95
20.51
0.37

m
m
m

5.64
4.7
3.76

ml
ml
ml

235.2
33.6
50.4

2.1.7.1.1.4
2.1.7.1.1.5
2.1.7.1.1.6
2.1.7.1.1.7

P104
P105
P106
P107
TOTAL

2.1.7.1.2
2.1.7.1.2.1
2.1.7.1.2.2
2.1.7.1.2.3
2.1.7.1.2.4
2.1.7.1.2.5
2.1.7.1.2.6
2.1.7.1.2.7

ESTRIBOS PILARES Fe 8mm @0.20


P101
P102
P103
P104
P105
P106
P107

2.1.7.1.3
2.1.7.1.3.1
2.1.7.2.2
2.1.7.2.3

TOTAL
ENFIERRADURA PILARES ANTE-TECHO Fe 12mm
P101
VIGAS
CADENETAS

2.1.8
2.1.8.1
2.1.8.2
2.1.8.3
2.1.8.4
2.1.8.5
2.1.9
2.1.9.1
2.1.9.2
2.1.9.3
2.1.9.4
2.1.10
2.1.11
2.1.12
2.1.13

MOLDAJES
PILARES
PILARETE
CADENAS
VIGAS
CADENETA
ELEMENTOS SEPARADORES
TABIQUES METALCOM h=2.10
TABIQUES METALCOM h=2.40
AISLACION TABIQUE POLIESTIRENO EXPANDIDO h=2.10
AISLACION TABIQUE POLIESTIRENO EXPANDIDO h=2.40
TECHUMBRE
CUBIERTA
PROTECCION HIDRICA
ANTE-TECHO

2.2
2.2.1
2.2.2
2.2.2.1
2.2.2.1.1
2.2.6.3
2.2.6.4
2.2.6.5
2.2.7
2.2.7.1
2.2.7.2
2.2.7.3
2.2.8

TERMINACIONES
REVESTIMIENTO EXTERIOR
REVESTIMIENTO INTERIOR
REVESTIMIENTO INTERIOR MUROS
ESTUCO HIDROFUGO e=0.03
PICAPORTE
RIELES DE CLOSET
TIRADORES DE MUEBLES
VIDRIOS
ESPEJOS BAOS
ESPEJOS DORMITORIO
ESPEJOS PELUQUERIA
CARPINTERIA ESPECIALES

ml
ml
ml
ml
Kg/ml

50.4
50.4
33.6
50.4
443.02

ml
ml
ml
ml
ml
ml
ml
Kg/ml

25.55
6.98
3.71
3.26
2.74
2.18
3.4
18.89

ml

26

ml
ml
m
m
m
m
ml

5
2.6
10.5
6.24
47.9
48.65
30.53

2.2.8.1
2.2.11
2.2.11.1
2.2.11.2
2.2.11.3
2.2.11.4
2.2.11.5
2.2.11.6
3
3.1
3.1.1
3.1.2
3.1.3
3.1.4
3.1.2
3.1.2.1
3.1.2.2
3.1.2.3
3.1.2.4
3.1.2.5
3.1.2.6
3.1.3
3.1.3.1
3.1.3.2
3.1.3.3
3.1.3.4
3.1.4
3.1.4.1
3.1.4.2
3.1.4.3
3.1.4.4
3.2
3.2.1.1
3.2.2
3.2.2.1

PUERTAS CLOSET
PINTURAS
MUROS EXTERIORES
MUROS INTERIORES
CIELO
PUERTAS
GUARDAPOLVO
CORNISAS

3.2.3
3.2.4

TABLERO DE DISTRIBUCION INTERIOR


INSTALACION DOMICILIARIA DE ENCHUFE

3.2.4.1
3.2.4.2
3.2.4.3
3.2.4.3.1
3.2.4.3.2
3.3
3.3.1
3.3.2
3.3.3

CAERIA PVC 25mm PARA ENCHUFES


CAJA DE DISTRIBUCION
INTERRUPTORES DE FUERZA
INTERRUPTOR DE 1 FUERZA
INTERRUPTOR DE 2 FUERZA
INSTALACION DOMICILIARIA DE COMBUSTIBLE
RED INTERIOR Cu. 3/4"
RED INTERIOR Cu. 1/2"
ARTEFACTO

INSTALACIONES
ARTEFACTO SANITARIOS
INODORO
LAVAMANOS
LAVAPLATOS
DUCHA
RED INTERIOR AGUA FRIA
CAERIA Cu. 25
CAERIA Cu. 20
CAERIA Cu. 13
LLAVE DE PASO CAERIA Cu. 25
LLAVE DE PASO CAERIA Cu. 20
LLAVE DE PASO CAERIA Cu. 13
RED INTERIOR AGUA CALIENTE
CAERIA Cu. 20
CAERIA Cu. 13
LLAVE DE PASO CAERIA Cu. 20
LLAVE DE PASO CAERIA Cu. 13
CAPTACION Y EVACUACION DE AGUAS SERVIDAS ALCANTARILLADO)
TUBERIA PVC 75mm
TUBERIA PVC 110mm
TUBERIA PVC 50mm
TUBERIA PVC 38mm
INSTALACIONES ELECTRICAS
CAERIA PVC 25mm
LAMPISTERIA

3.3.3.1
3.3.3.2

CALEFON 11 LITROS
COCINA 4 QUEMADORES

3
D

TABLAS DE JUSTIFICACION CUBICACION


2.1.1.1
EJE
1
2
2
3
3
4
A
B
D
D
E

EXCAVACIONES CON CHUZO PARA CIMIENTOS (JUNTO CON EMPLANTILLADO)


ENTRE
ANCHO (m)
ALTO (m)
LARGO (m)
TOTAL (m)
(B-D)
0.4
0.8
4.80
1.536
(B-C)
0.4
0.8
3.25
1.04
(D-E)
0.4
0.8
2.00
0.64
(A-C)
0.4
0.8
3.90
1.248
(D-D1)
0.4
0.8
0.88
0.2816
(B1-C)
0.4
0.8
2.35
0.752
(3-3A)
0.4
0.8
1.30
0.416
(1-3)
0.4
0.8
6.10
1.952
(1-2)
0.4
0.8
2.85
0.912
(3-3A)
0.4
0.8
1.70
0.544
(2-2A)
0.4
0.8
2.73
0.8736
SUB-TOTAL
10.1952

EJE
A
D
E

EXCAVACION FUNDACIONES CURVAS


ENTRE
ALTO (m)
(3A-B1)
0.8
(3A-C)
0.8
(2A-D1)
0.8

EJE
1
2
2
3
3
4
A
B
D
D
E

EMPLANTILLADO
ENTRE
(B-D)
(B-C)
(D-E)
(A-C)
(D-D1)
(B1-C)
(3-3A)
(1-3)
(1-2)
(3-3A)
(2-2A)

EJE
A
D
E

EMPLANTILLADO CURVOS
ENTRE
(3A-B1)
(3A-C)
(2A-D1)

2.1.2

AREA (m) FUND. CURVA


0.91
0.91
0.71
SUB-TOTAL
TOTAL
TOTAL + 0.30% ESPONJAMIENTO

ANCHO (m)
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4

ALTO (m)
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05
0.05

TOTAL (m)
0.728
0.728
0.568
2.024
12.2192
15.88496

LARGO (m)
TOTAL (m)
4.40
0.088
2.85
0.057
2.20
0.044
4.30
0.086
0.88
0.0176
2.35
0.047
1.30
0.026
6.10
0.122
2.85
0.057
1.70
0.034
2.73
0.0546
SUB-TOTAL
0.6332

ALTO (m) AREA (m) EMPLANTILLADO CURVO


0.05
0.91
0.05
0.91
0.05
0.71
SUB-TOTAL
TOTAL

TOTAL (m)
0.0455
0.0455
0.0355
0.1265
0.7597

2.1.3
EJE
1
2
2
3
3
4
A
B
D
D
E

CIMIENTO
ENTRE
(B-D)
(B-C)
(D-E)
(A-C)
(D-D1)
(B1-C)
(3-3A)
(1-3)
(1-2)
(3-3A)
(2-2A)

ANCHO (m)
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4
0.4

EJE
A
D
E

CIMIENTOS CURVOS
ENTRE
(3A-B1)
(3A-C)
(2A-D1)

ALTO (m)
0.75
0.75
0.75

2.1.4.2.1
EJE
1
2
2
3
3
A
B
D

ALTO (m)
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75
0.75

LARGO (m)
TOTAL (m)
4.80
1.44
3.25
0.975
2.20
0.66
4.30
1.29
0.88
0.264
2.35
0.705
1.30
0.39
6.10
1.83
2.85
0.855
1.70
0.51
2.73
0.819
SUB-TOTAL
9.738

AREA (m) CIMIENTO. CURVO


0.91
0.91
0.71
SUB-TOTAL
TOTAL

TOTAL (m)
0.6825
0.6825
0.5325
1.8975
11.6355

ENFIERRADURA SOBRECIMIENTO 4 Fe 12mm (LARGO COMERCIAL 6 mts.)


LARGO
TRASLAPOS
EMPALMES
TOTAL (ml)
ENTRE
ENTRE EJES cant.x 0,50
cant.x 0,50
(B-D)
4.4
1.2
0
5.6
(B-C)
2.85
1.2
0
4.05
(D-E)
1.8
1.2
0
3
(A-C)
5.45
1.2
0
6.65
(D-2A-E)
5.08
1.2
0.6
6.88
(3-B1-C-3)
10.09
1.2
0.6
11.89
(1-3)
7.3
0.6
0.6
8.5
(1-2)
3.65
1.2
0
4.85
SUB-TOTAL
51.42
TOTAL * 4 Fe
205.68
TOTAL * Kg/ml 12
180.79

2.1.4.2.2
EJE
1
2
2
3
3
4
A
B
D
D
E

2.1.4.3
EJE
1
2
2
3
3
4
A
B
D
D
E

EJE
A
D
E

2.1.5.2.1
EJE
2
3
D

ESTRIBOS SOBRECIMIENTO Fe 8mm @0.15


LARGO
CANTIDAD EST.
ENTRE
EJE
EJE
(B-D)
4.2
0.15
(B-C)
3.05
0.15
(C-D)
2.0
0.15
(A-C)
4
0.15
(D-2A)
2.15
0.15
(B1-C)
2.15
0.15
(3-B1)
3.47
0.15
(1-3)
6.9
0.15
(1-2)
3.25
0.15
(3-C)
3.47
0.15
(2-2A)
2.23
0.15

LARGO
TOTAL (ml)
ESTRIBO
1.18
34.22
1.18
25.17
1.18
16.91
1.18
32.65
1.18
18.09
1.18
18.09
1.18
28.48
1.18
55.46
1.18
26.75
1.18
28.48
1.18
18.72
SUB-TOTAL
303.02
TOTAL * Kg/ml 8
119.69

HORMIGON SOBRECIMIENTO
ENTRE
(B-D)
(B-C)
(D-E)
(A-C)
(D-D1)
(B1-C)
(3-3A)
(1-3)
(1-2)
(3-3A)
(2-2A)

ANCHO (m)
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2
0.2

ALTO (m)
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3
0.3

LARGO (m)
TOTAL (m)
4.40
0.264
2.85
0.171
1.80
0.108
3.90
0.234
0.88
0.0528
2.35
0.141
1.50
0.09
7.10
0.426
3.45
0.207
1.70
0.102
2.73
0.1638
SUB-TOTAL
1.9596

HORMIGON SOBRECIMIENTO CURVOS


ENTRE
ALTO (m)
AREA (m) SOBRECIMIENTO CURVO
(3A-B1)
0.3
0.45
(3A-C)
0.3
0.45
(2A-D1)
0.3
0.34
SUB-TOTAL
TOTAL

TOTAL (m)
0.135
0.135
0.102
0.372
2.3316

ENFIERRADURA VIGA DE FUNDACION 4 Fe 12mm (LARGO COMERCIAL 6 mts.)


LARGO
TRASLAPOS
EMPALMES
ENTRE
TOTAL (ml)
ENTRE EJES cant.x 0,50
cant.x 0,50
(C-D)
1.35
0.6
0
1.95
(C-D)
1.35
0.6
0
1.95
(2-3)
3.45
0.6
0
4.05
SUB-TOTAL
7.95
TOTAL * 4 Fe
31.8
TOTAL * Kg/ml 12
27.95

2.1.5.2.2
EJE
2
3
D

2.1.5.3
EJE
2
3
D

ESTRIBOS VIGA DE FUNDACION Fe 8mm @0.15


LARGO
CANTIDAD EST.
ENTRE
EJE
EJE
(C-D)
1.35
0.15
(C-D)
1.35
0.15
(2-3)
3.45
0.15

LARGO
TOTAL (ml)
ESTRIBO
1.18
11.8
1.18
11.8
1.18
28.32
SUB-TOTAL
51.92
TOTAL * Kg/ml 8
20.51

HORMIGON VIGA DE FUNDACION


ENTRE
ANCHO (m)
(C-D)
0.2
(C-D)
0.2
(2-3)
0.2

ALTO (m)

LARGO (m)
TOTAL (m)
0.3
1.35
0.081
0.3
1.35
0.081
0.3
3.45
0.207
TOTAL
0.369

2.1.7.1.1 ENFIERRADURA PILARES Fe 12mm


TRASLAPO MAS CANTIDAD
ALTURA CIMIENTO
TIPO
ALTURA
Fe
MAS SOBRECIMIENTO LLEGADA FUND.
P101
2.4
1.05
0.75
4
P102
2.4
1.05
0.75
2
P103
2.4
1.05
0.75
12
P104
2.4
1.05
0.75
12
P105
2.4
1.05
0.75
12
P106
2.4
1.05
0.75
8
P107
2.4
1.05
0.75
12

CANTIDAD
TOTAL (ml)
PILARES
14
235.2
4
33.6
1
50.4
1
50.4
1
50.4
1
33.6
1
50.4
SUB-TOTAL
504
TOTAL * Kg/ml 12
443.016

2.1.7.1.1 ESTRIBOS PILARES Fe 8mm @0.20


ALTURA CIMIENTO
TIPO
ALTURA
MAS SOBRECIMIENTO
P101
2.4
1.05
P102
2.4
1.05
P103
2.4
1.05
P104
2.4
1.05
P105
2.4
1.05
P106
2.4
1.05
P107
2.4
1.05

CANTIDAD
ESTRIBO
4
2
12
12
12
8
12

2.1.7.1.3 ENFIERRADURA PILARES ANTE-TECHO Fe 12mm


CANTIDAD
TIPO
ALTURA
TRASLAPO
Fe
P101
0.7
0.6
4
P101
1.1
0.6
4

LARGO
ESTRIBO
0.98
0.64
2.88
2.53
2.13
1.52
2.64

CANTIDAD
TOTAL (ml)
PILARES
14
25.55
4
6.98
1
3.71
1
3.26
1
2.74
1
2.18
1
3.40
SUB-TOTAL
47.81
TOTAL * Kg/ml 8
18.89

CANTIDAD
PILARES

TOTAL (ml)
5
6

SUB-TOTAL
TOTAL * Kg/ml 12
2.1.7.1.1 ESTRIBOS PILARES ANTE-TECHO Fe 8mm @0.20
CANTIDAD
LARGO
TIPO
ALTURA
ESTRIBO
ESTRIBO
P101
0.7
4
0.98
P101
1.1
2
0.64

CANTIDAD
PILARES

26
40.8
66.8
58.72

TOTAL (ml)
5
6

SUB-TOTAL
TOTAL * Kg/ml 8

5.76
5.95
11.71
4.63

2.1.7.2.1 ENFIERRADURA CADENA Fe 12mm


LARGO
EJE
ENTRE

ENTRE EJES

1
2
3
A
B
C
D

(B-D)
(B-E)
(A-D-E)
(3-C-3)
(1-3)
(1-3)
(1-3)

7.1
6.2
9.75
10.29
7.3
7.1
7.1

TRASLAPOS
cant.x 0,50
1.2
1.2
1.2
1.2
1.2
1.2
1.2

2.1.7.2.2 ENFIERRADURA CADENA ESTRIBOS Fe 8mm


LARGO
DISTANCIA
EJE
ENTRE
ENTRE EJES
ESTRIBOS
1
(B-D)
7.1
0.15
2
(B-E)
6.2
0.15
3
(A-D-E)
9.75
0.15
A
(3-C-3)
10.29
0.15
B
(1-3)
7.3
0.15
C
(1-3)
7.1
0.15
D
(1-3)
7.1
0.15

EMPALMES
TOTAL (ml)
cant.x 0,50
0.6
8.9
0.6
8
0.6
11.55
0.6
12.09
0.6
9.1
0.6
8.9
0.6
8.9
SUB-TOTAL
67.44
TOTAL * 4 Fe12mm
269.76
TOTAL * Kg/ml 12
237.11904

LARGO
TOTAL (ml)
ESTRIBO
1.18
57.03
2.18
92.29
3.18
209.88
4.18
290.93
5.18
257.27
6.18
298.70
7.18
347.03
SUB-TOTAL
1553.13
TOTAL * Kg/ml 8
613.49