This document contains a list of 21 pending work items for a model flat on the first floor, including internal and ceiling painting, carpentry, electrical wiring and switch fixing, window and door installation, balcony grill fixing, plumbing, fire safety items, kitchen finishes, floor tiles, gas line installation, sink fitting, door hardware, and sanitary fittings.
This document contains a list of 21 pending work items for a model flat on the first floor, including internal and ceiling painting, carpentry, electrical wiring and switch fixing, window and door installation, balcony grill fixing, plumbing, fire safety items, kitchen finishes, floor tiles, gas line installation, sink fitting, door hardware, and sanitary fittings.
This document contains a list of 21 pending work items for a model flat on the first floor, including internal and ceiling painting, carpentry, electrical wiring and switch fixing, window and door installation, balcony grill fixing, plumbing, fire safety items, kitchen finishes, floor tiles, gas line installation, sink fitting, door hardware, and sanitary fittings.
2 Ceiling painting work 3 Carpentry work 4 Window gril fixing 5 Electrical wireing work 6 Electrical switch fixing work 7 UPVC windows fixing work 8 UPVC french door fixing work 9 Balcony gril fixing work 10 Plumbing shaft door fixing 11 Fall ceiling work @ toilet /utility 12 Fall ceiling work @ rooms 13 Fire fighting work 14 Fire fighting bulb fixing work 15 Utility window grils fixing 16 Kitchen dado 17 Floor tiles 18 Piped gas line fixing 19 Sink fixing 20 Door hardware fixing 21 Sanitary fitting fixing work . Block 1 DESCPTIONOF ITEM S.No. Model Flat pending work List- First Floor Block 2 D Model Flat pending work List- First Floor