Sie sind auf Seite 1von 13

PDS Training

December 2009 2010 Plan


Schedule

Trainee
December 2009 2010 Plan
PDS Software 3D Modeling
HVAC
Pipe Stress
Analysis I/F
Interference
Chkr/ Mgr
Civil Engineering
Drawing
Civil MTO
Elect. Raceway
Environment
Frameworks
Environment Piping Designer
Eqp. Modeling
Ref.
Database
Isometric
Extraction
Drawing Manager Equipment Report Report Manager
Design Review
3D Model
December 2009 2010 Plan
Interference
Review
P & ID
Plot Plan
Piping
Instrument
Electrical
Equipment
Civil
Project
Database
Constructibility
Maintenance
Process Req.
Operability
Safety
Konsep Desain 3D
Integrasi antar departemen
dengan satu data base
gabungan (unified data
base)

December 2009 2010 Plan
3D Model
3D Graphics:
1. Equipment
2. Piping
3. Steel/ Structure
4. Foundation
5. Electrical Raceway
6. Instrument
Design Database:
1. Piping Segment
2. Piping Component
3. Piping/ Tubing
4. Instrument
5. Pipe Support
6. Equipment Group
7. Equipment Nozzle
December 2009 2010 Plan
Log-On
December 2009 2010 Plan
PDS WORK PROCESS
OVERVIEW
EQUIPMENT MODELING
DRAWING SETUP
PIPING MODELING
DRAWING ANNOTATION
DESIGN REVIEW
INTERFERENCE DETECTION
ISOMETRIC EXTRACTION
INTERNAL REVIEW/CHECK
RE-RUN INTERFERENCES
RE-RUN ISOMETRIC
COMPLETE ANNOTATION
ISSUE FOR FABRICATION AND/OR CONSTRUCTION
APPROVE PIPING

December 2009 2010 Plan
Equipment Modeling Commands
December 2009 2010 Plan
Equipment Modeling Commands
December 2009 2010 Plan
Building Equipment
Primitives
Parametrics
Nozzle Manipulation
Davit
December 2009 2010 Plan
Piping Model Anatomy
Component and Segment
Component Graphics (Green Lines)
Material
Component Category (shop, field)
Reporting condition
Physical Dimension
Weight, etc
Segment (Blue Lines)
Line Number
Design & Operation Condition
Paint requirement
I nsulation type
December 2009 2010 Plan
Piping Model Anatomy
Component Placement Point
Connection Point 1 (CP1)
Connection Point 2 (CP2)
Component Center
December 2009 2010 Plan
Thank you