1 10.

00 UN
2 107.53 KG
3 294.42 Soles
4 2.07 M3
5 23.65 M2
6 232.05 KG
7 434.72 Soles
8 11.20 M2
DIMENSIONES DE LA LOSA
LARGO 3.25 2.25 5.50
ANCHO 4.30
ALTO 0.20
DIMENSIONES DE LAS VIGAS
VA (20x30)
LARGO 3.55 2.55 6.10
ANCHO 0.20
PERALTE 0.30
V101 (20x30)
LARGO (DESCONTANDO NUDO) 4.30
ANCHO 0.20
PERALTE 0.30
1 NUMERO DE VIGUETAS EN LA LOSA ALIGERADA 10.00 UN
L= 4.30
N= 10.75
2 METRADO DE ACERO EN LOSA ALIGERADA 107.53 KG
1/4" 3/8" 1/2"
0.25 0.56 0.994
ACERO SUPERIOR IZQ 3/8" 10 1.00 0.92 9.20
ACERO SUPERIOR DER 3/8" 10 1.00 0.72 7.20
ACERO SUPERIOR CENT 3/8" 10 1.00 1.30 13.00
ACERO INFERIOR 1/2" 10 1.00 6.24 62.40
ACERO TEMPERATURA 1/4" 1 24.00 4.84 116.16
ML 116.16 29.40 62.40
KG 29.04 16.46 62.03
TOTAL 107.53
3 COSTO DE LADRILLOS EN LOSA ALIGERADA 294.42 Soles
LARGO 5.50
ANCHO 4.30
REA 23.65
NUMERO DE LADRILLOS POR M2 8.33
TOTAL DE LADRILLOS (REA x N LADRILLOS) 197.00 UN
COSTO UNITARIO S/. 1.49
COSTO TOTAL = METRADO x COSTO UNITARIO S/. 294.42
EJERCICIO LOSAS ALIGERADAS (SOLUCION)
Metrado de encofrado en vigas
Respuesta.
Costo de la partida ladrillos en losa aligerada 0.30x0.30x.15
Costo de concreto en vigas
Descripcin Partida
Diseo de fierro
Grafico
Diametro
()
N
elementos
iguales
Longitud x
Metrado de acero en vigas
Longitud
x Pieza
Numero de viguetas en la losa aligerada
Metrado de acero en losa aligerada
Metrado de concreto en losa aligerada
Metrado de encofrado en losa aligerada
N de
Pzas x
elemento
4 METRADO DE CONCRETO EN LOSA ALIGERADA 2.07 M3
LARGO 5.50
ANCHO 4.30
ALTO 0.20
VOLUMEN LOSA 4.73
VOLUMEN LADRILLOS 2.66
METRADO DE VOLUMEN DE CONCRETO 2.07 M3
5 METRADO DE ENCOFRADO EN LOSA ALIGERADA 23.65 M2
LARGO 5.50
ANCHO 4.30
METRADODE ENCOFRADO EN LOSA ALIGERADA 23.65 M2
6 METRADO DE ACERO EN VIGAS 232.05 KG
3/8" 1/2" 5/8"
0.56 0.99 1.55
VIGA VA
ACERO REFUERZO 1/2" 2 4 6.24 49.92
ESTRIBOS
Tramo A-B 3/8" 2 22.00 1.06 46.64
Tramo B-C 3/8" 2 17.00 1.06 36.04
VIGA V101
ACERO REFUERZO 5/8" 3 4 4.84 58.08
ESTRIBOS
Tramo 1-2 3/8" 3 26.00 1.06 82.68
ML 165.36 49.92 58.08
KG 92.60 49.42 90.02
TOTAL 232.05
VIGA VA
TRAMO A-B Luz 3.25
1 @ 0.05 2.00
5 @ 0.10 10.00
Resto @ 0.20 10.00
22.00
TRAMO B-C Luz 2.25
1 @ 0.05 2.00
5 @ 0.10 10.00
Resto @ 0.20 5.00
17.00
VIGA V101
TRAMO 1-2 Luz 4.10
1 @ 0.05 2.00
5 @ 0.10 10.00
Resto @ 0.20 14.00
26.00
Longitud
x Pieza
N
elementos
iguales
Diseo de fierro
Grafico
Descripcin Partida
Longitud x N de
Pzas x
elemento
Diametro
()
7 COSTO DE CONCRETO EN VIGAS 434.72 Soles
LARGO ANCHO ALTURA
VA (20x30)
EJE 1: TRAMO A-
B
M3 2.00 3.55 0.20 0.30 0.43
EJE 1: TRAMO B-
C
M3 2.00 2.55 0.20 0.30 0.31
V101 (20x30)
EJE A, B y C M3 3.00 4.30 0.20 0.30 0.77
1.51
COSTO UNITARIO S/. 288.66
COSTO TOTAL = METRADO x COSTO UNITARIO S/. 434.72
8 METRADO DE ENCOFRADO EN VIGAS 11.20 M2
LARGO ANCHO ALTURA
VA (20x30)
M2 2.00 6.10 0.30 3.66
M2 2.00 3.25 0.10 0.65
M2 2.00 2.25 0.10 0.45
M2 2.00 3.25 0.05 0.33
M2 2.00 3.25 0.05 0.33
V101 (20x30)
M2 2.00 4.70 0.30 2.82
M2 2.00 4.30 0.10 0.86
M2 2.00 4.30 0.05 0.43
M2 2.00 4.30 0.10 0.86
M2 1.00 4.10 0.20 0.82
11.20
DESCRIPCION UN N VECES MEDIDAS PARCIAL TOTAL
TOTAL PARCIAL DESCRIPCION UN N VECES MEDIDAS
EJE B (FONDO)
EJE A y C (TAPA EXTERIOR)
EJE A y C (TAPA INTERIOR)
EJE B (TAPA INTERIOR)
EJE 1 y 2: TRAMO A-B (FONDO)
EJE 1 y 2: TRAMO B-C (FONDO)
EJE A y C (FONDO)
EJE 1 y 2 (TAPA EXTERIOR)
EJE 1 y 2: TRAMO A-B (TAPA INTERIOR)
EJE 1 y 2: TRAMO B-C (TAPA INTERIOR)
LADRILLO DE TECHO DE 15X30X30
UNIDAD pz
CUADRILLA: 0.1 Cp + 1.0 Op + 1.0 Of +
RENDIMIENTO 1600 pz/Da
HH 0.00050 16.97
HH 0.00500 14.14
HH 0.00500 12.40
HH 0.04500 11.21
% 3% 0.65
PZ 1.0500 0.79
CONCRETO VIGAS F'c = 210 Kg/cm2
UNIDAD m3
ESPECIFICACIONES: Preparado con mezcladora de 9-11p3, vibrador a gasolina de 2.0", 4 HP, winche elctrico, cap. 0.15 m3/balde y 4.8 HP
CUADRILLA: 0.2 Cp + 2.0 Op + 2.0 Of +
RENDIMIENTO 20 m3/Da
MANO DE OBRA
CAPATAZ HH 0.0800 16.97
OPERARIO HH 0.8000 14.14
OFICIAL HH 0.8000 12.40
PEON HH 4.0000 11.21
OPERADOR EQUIPO LIVIANO HH 1.2000 14.14
HERRAMIENTAS Y EQUIPO
HERRAMIENTAS MANUALES(% MANO DE OBRA) % 3% 84.40
MEZCLADORA CONCRETO 9 A 11 P3- 20 HP HM 0.4000 15.05
VIBRADOR DE CONCRETO GASOL 1"-18PL-4HP HM 0.4000 8.50
WINCHE ELECTRICO DE DOS TAMBORES HM 0.4000 15.76
MATERIALES
CEMENTO PORTLAND TIPO I Bl 9.7300 14.12
ARENA GRUESA M3 0.5200 37.82
PIEDRA CHANCADA DE 1/2 M3 0.5300 54.63
10.0 Pe
MANO DE OBRA
CAPATAZ
OPERARIO
OFICIAL
ANALISIS DE PRECIOS UNITARIOS
9.0 Pe
UNID CANT P.U.
PEON
HERRAMIENTAS Y EQUIPO
HERRAMIENTAS MANUALES(% MANO DE OBRA)
UNID CANT P.U.
LADRILLO TECHO
MATERIALES
0.65
0.01
0.07
0.06
0.50
0.02
0.02
0.83
0.83
S/. 1.49
Preparado con mezcladora de 9-11p3, vibrador a gasolina de 2.0", 4 HP, winche elctrico, cap. 0.15 m3/balde y 4.8 HP
84.40
1.36
11.31
9.92
44.84
16.97
18.26
2.53
6.02
3.40
6.30
186.01
137.39
19.67
28.95
S/. 288.66
PARCIAL TOTAL