Sie sind auf Seite 1von 1

Client Name: ABC Power & Light

Date of Inspection: July 10, 2008


Picture Number: 31
Time of Inspection: 14:38z
Located on Video: 071008-001
Anomaly Description: Bottom Phase, Low Side Jumper Loop Non-Tension Splice
Structure 391
Anomaly Location: Line XYZ-123
Additional Information: None


Problem Area Temperature:
76
C
Ambient Area Temperature:
24
C
Total Temperature Rise: 52 C

Severity of Problem: II (Serious)


CONFIDENTIAL
Infrared Trouble Shooting Report

Weather Conditions Sunny
Wind Velocity (Knots) 230 @ 7
Line Load (Amps) 126
Distance to Target (Feet) 25

Prepared By: Christopher M. Cox Certification: 3422
Repaired By:________________________________ Comment:_______________________ Date: ___/___/___

Das könnte Ihnen auch gefallen