1. If A can finish work in X time and B can finish work in Y time
then both together can finish work in (X*Y)/ (X+Y) time. 2. If A can finish work in X time and A and B together can finish work in S time then B can finish work in (XS)/(X-S) time. 3. If A can finish work in X time and B in Y time and C in Z time then they all working together will finish the work in (XYZ)/ (XY +YZ +XZ) time 4. If A can finish work in X time and B in Y time and A,B and C together in S time then : C can finish work alone in (XYS)/ (XY-SX-SY) B+C can finish in (SX)/(X-S) and A+ C can finish in (SY)/(Y-S)
A, B and C can do a piece of work in 20, 30 and 60 days respectively. In how many days can A do the work if he is assisted by B and C on every third day? A. 12 days B. 15 days C. 16 days D. 18 days
Answer: Option B Explanation: A's 2 day's work =
1 x 2
= 1 . 20 10 (A + B + C)'s 1 day's work = 1 + 1 + 1
= 6 = 1 . 20 30 60 60 10 Work done in 3 days =
1 + 1
= 1 . 10 10 5 Now, 1 work is done in 3 days. 5 Whole work will be done in (3 x 5) = 15 days.