Sie sind auf Seite 1von 1

IV.

Testing and Implementing

In this phase, testing and implementing was done to check if the


proposed system runs well or would behave as expected before it is
introduce to the clients, so that problems can costly to be avoid. The
proponents explained how does the system goes, how it works, its
functions and limitations as well, if the prototype system does not perform
as expected, it will return to the first phase and followed by the next for
more proper analysis and correction until the design criteria are properly
met and the prototype system perform as planned.

V. Support and Maintenance

In this phase, monitoring and filtering out errors for connection were
done on the prototype system. The system may gain enhancements or
upgrades if needed, it depends on the management if they want to adapt
the changes in the environment and for some more advanced system and
conversion to a more innovative and faster system.

Das könnte Ihnen auch gefallen