Km 9+040,00 CONSOLIDARE DRUM I-1 -ZID SPRIJIN PE ELEMENTE FISATE (MINIPILOTI FORATI); L ZID = 100,00 m; L MINIPILOTI = 8,00 m; D = 250 mm AC3988 PAG: 1 =============================================================== =NR. SIMBOL ART. CANTITATE UM = = D E N U M I R E = = A R T I C O L = = = =============================================================== CAP. A PLATFORMA MINIPILOTI FORATI 01 TSC03G1 SAPAT.MEC.CU EXC.DE 0,41-0,7 MC IN PAM C U UMIDITATE NATURAL DESC.AUTO.TEREN CAT 3 -amplasare: 120,00x3,50x1,00X1/2= 210,00 210,00:100= 2,10 Cantitate= 2.100 100 MC. 02 TSC19C1 SAPAT.CU BULDOZ.PE TRACT.81-180CP INCL.I MPING.PAMINTULUI LA 10 M TEREN CAT.3 -platforma minipiloti: 100,00x3,50x0,50= 175,00 175,00:100= 1,75 Cantitate= 1.800 100 MC. 03 TSC22E1 SPOR PT. FIECARE 10 M IN PLUS LA TSC19C 1 BULDOZER DE 81-180 CP TEREN CATEGORIA 3 1x1,75= 1,75 Cantitate= 1.800 100 MC. 04 TRA04A TRANSPORT RUTIER MATER.SEMIFABR. CU AUTO REMORCHERE CU REMORCI TREILER SUB 20T PE DIS. KM.* -buldozer : 2x20 t= 40 t -excavator: 2x20 t= 40 t ----------------------- TOTAL = 80 t Cantitate= 80.000 TONA 05 TRI1AA01C2 INCARCAREA MATERIALELOR,GRUPA A-GRELE SI MARUNTE,PRIN ARUNCARE RAMPA SAU TEREN-A UTO CATEG.2 175,00x1,24x1,8x50%= 195,30 Cantitate= 195.000 TONA 06 TRA01A TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF ABRICATELOR CU AUTOBASCULANTA PE DIST.= KM. 210,00x1,24x1,8+195,30= 664,02 Cantitate= 664.000 TONA CAP. B MINIPILOTI FORATI 07 TSJ08C1 FORAJ ROTATIV CU CIRCULATIE DIRECT.TUBAT T.CAT.3 20 trons.x10 buc./trons.x8,40 m/buc.= 1680,00 Cantitate= 1680.000 M 08 TSA02C1 SAP.MAN.IN SPATII LIMIT.SUB 1M CU TALUZ VERT.NESPR.IN PAM.NECOEZ.SI SL.COEZ.ADIN C.<0,75M T.TARE -amplasare: 100,00x3,50x0,10= 35,00 Cantitate= 35.000 M.C. 09 TRI1AA01C2 INCARCAREA MATERIALELOR,GRUPA A-GRELE SI MARUNTE,PRIN ARUNCARE RAMPA SAU TEREN-A UTO CATEG.2 -material din sapatura: 35,00x1,24x1,8= 78,12 -material din forare minipiloti: 1680,00x3,14x0,25x0,25/4x1,24x1,8= 183,97 ---------------------------------------- TOTAL = 262,09 Cantitate= 262.000 TONA 10 TRA01A TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF ABRICATELOR CU AUTOBASCULANTA PE DIST.= KM. 262,09 Cantitate= 262.000 TONA
11 CZ0301G1 CONFECT.ARMAT.FASONARE BARE PT.FUNDATII IZOL.CONTINUI SI RADIERE IN ATEL.SANT.OB 37 D=6-8 MM -D=6 mm, freta, conf. plansa: 20 trons.x10 piloti/trons.x(8,00:0,10)x0,70x0,222 kg/m = 2486,40 kg -D=8 mm, patine de ghidare, conf. plansa: 20 trons.x10 piloti/trons.x12 buc./pilot x0,20x0,395 kg/m= 189,60 kg --------------------------------------------------------------------- TOTAL = 2676,00 kg Cantitate= 2676.000 KG 12 CZ0301I1 CONFECT.ARMAT.FASONARE BARE PT.FUNDATII IZOL.CONTINUI SI RADIERE IN ATEL.SANT.OB 37 D>16 MM -D=20 mm, inel de rigidizare, conf. plansa: 20 trons.x10 piloti/trons.x4 buc./pilot x0,65x2,460 kg/m= 1279,20 kg Cantitate= 1279.000 KG 13 CZ0301L1 CONFECT.ARMAT.FASONARE BARE PT.FUNDATII IZOL.CONTINUI SI RADIERE IN ATEL.SANT.PC 52 D> 16MM -D=22 mm, conf. plansa: 20 trons.x10 piloti/trons.x4x8,70 m/buc.x2,980 kg/m= 20740,80 kg Cantitate= 20741.000 KG 14 PD09C1 TAIEREA CU FLACARA OXIACETILENICA A BARE LOR DE OTEL CU D DELA 18 PINA LA 22MM 20 trons.x10 buc./trons.x4= 800,00 800,00:100= 8,00 Cantitate= 8.000 100 BUC. 15 PD05A1 CONFECTIONAREA CENTRALIZATA A CARCASELOR SUDATE DIN OTEL BETON PT.COLOANE FORATE 2676,00+1279,20+20740,80= 24696,00 kg Cantitate= 24696.000 KG 16 TRA01A TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF ABRICATELOR CU AUTOBASCULANTA PE DIST.= KM. -otel beton OB 37 (Furnizor-Atelier): (2676,00+1279,20)x1,015= 4014,53 kg Cantitate= 4.100 TONA 17 TRA04A TRANSPORT RUTIER MATER.SEMIFABR. CU AUTO REMORCHERE CU REMORCI TREILER SUB 20T PE DIS. KM.* -otel beton PC 52 (Furnizor-Atelier): 20740,80x1,015= 21051,91 kg Cantitate= 21.100 TONA 18 TRI1AC03E2 INCARCARE MAT.GR.C-AMBALATE,50-100KG DEP LAS.PRIN PURTARE PINA LA 10M,ASEZARE RAM PA,TEREN-AUTO CT -carcase: 24696,00 kg Cantitate= 24.700 TONA 19 TRA01A TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF ABRICATELOR CU AUTOBASCULANTA PE DIST.= KM. -carcase (Atelier-Lucrare): 24696,00 kg Cantitate= 24.700 TONA 20 TRI1AC14E2 DESCARCARE MAT.GR.C-AMBALATE,50-100KG DE PLAS.PRIN PURTARE PINA LA 10M,ASEZ.AUTO- RAMPA,TEREN CTG. -carcase: 24696,00 kg Cantitate= 24.700 TONA 21 PD11A1 MONTAREA CARCASELOR DE ARMATURI GATA CON F.IN COL.BA SI LANSAREA LA ADINCIME 24696,00 kg Cantitate= 24.700 TONA 22 TSJ11A1 PREPARAREA SUSPENSIEI PT.INJECTARE IN FO RAJE DIN: CIMENT SI SILICAT DE SODIU IN RAPORTUL 50:1 20 trons.x10 buc./trons.x8,00 m/buc.x3,14x0,25x0,25/4= 78,50 -spor pierderi infiltratii teren fracturat: 78,50x20%= 15,70 ----------------------------------------------------------- TOTAL = 94,20 Cantitate= 94.200 M.C.
23 TSJ16A1 INJECTARE DE UMPLERE CU SUSPENSIE CIMENT A FORAJULUI PT.TIRANTI DE ANCORARE FIXA TI IN TEREN 20 trons.x10 buc./trons.x8,00 m/buc.= 1600,00 Cantitate= 1600.000 M 24 TRA06A TRANSPORTUL RUTIER AL BETONULUI-MORTARUL UI CU AUTOBETONIERA DE 5,5 MC DIST.= KM -suspensie injectare: 94,20x2,00 t/mc= 188,40 Cantitate= 188.000 TONA 25 TSJ13A1 EXTRAGEREA TUBAJULUI DE PROTECTIE CU EXT RACTOR 20 trons.x10 buc./trons.x8,00 m/buc.= 1600,00 Cantitate= 1600.000 M 26 TRA01A TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF ABRICATELOR CU AUTOBASCULANTA PE DIST.= KM. -materiale: 3,68 Cantitate= 4.000 TONA CAP. C RADIERE BETON 27 TSA02C1 SAP.MAN.IN SPATII LIMIT.SUB 1M CU TALUZ VERT.NESPR.IN PAM.NECOEZ.SI SL.COEZ.ADIN C.<0,75M T.TARE 100,00x1,80x0,50= 90,00 Cantitate= 90.000 M.C. 28 TRI1AA01C2 INCARCAREA MATERIALELOR,GRUPA A-GRELE SI MARUNTE,PRIN ARUNCARE RAMPA SAU TEREN-A UTO CATEG.2 90,00x1,24x1,8= 200,88 Cantitate= 201.000 TONA 29 TRA01A TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF ABRICATELOR CU AUTOBASCULANTA PE DIST.= KM. 200,88 Cantitate= 201.000 TONA 30 CZ0302H1 CONFECT ARMAT PT PERETI GRINZI STILPI DI AFRAGME LACONST OBIS IN ATELIERE SANTIE R OB 37 D=10-16M -conf. plansa: 20 trons.x439,09 kg/trons.= 8781,80 kg Cantitate= 8782.000 KG 31 CZ0302K1 CONFECT ARMAT PT PERETI GRINZI STILPI DI AFRAGME LACONST OBIS IN ATELIERE SANTIE R PC 52 D=10-16M -conf. plansa: 20 trons.x508,72 kg/trons.= 10174,40 kg Cantitate= 10174.000 KG 32 TRA01A TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF ABRICATELOR CU AUTOBASCULANTA PE DIST.= KM. -otel beton OB 37 (Furnizor-Atelier): 8781,80x1,015= 8913,53 kg Cantitate= 8.900 TONA 33 TRA04A TRANSPORT RUTIER MATER.SEMIFABR. CU AUTO REMORCHERE CU REMORCI TREILER SUB 20T PE DIS. KM.* -otel beton PC 52 (Furnizor-Atelier): 10174,40x1,015= 10327,02 kg Cantitate= 10.400 TONA 34 TRI1AC01E2 INCARCARE MAT.GR.C-AMBALATE,SUB 10KG,DEP LAS.PRIN PURTARE PINA LA 10M,ASEZ..RAMPA ,TEREN-AUTO CTG. -armaturi: 8781,80+10174,40= 18956,20 kg Cantitate= 19.000 TONA 35 TRA01A TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF ABRICATELOR CU AUTOBASCULANTA PE DIST.= KM. -armaturi (Atelier-Lucrare): 18956,20 kg Cantitate= 19.000 TONA
36 TRI1AC12E2 DESCARCARE MAT.GR.C-AMBALATE,SUB 10KG DE PLAS.PRIN PURTARE PINA LA 10M,ASEZ..AUTO -RAMPA,TEREN CTG -armaturi: 18956,20 kg Cantitate= 19.000 TONA 37 CC01D1 MONTARE ARMATURI DIN OTEL BETON IN GRINZ I DE RADI ERE CU DISTANTIERI DIN MASE PL ASTICE 18956,20 kg Cantitate= 18956.000 KG 38 CB02A1 COFRAJE PT.BETON IN ELEVATIE DIN PANOURI REFOL.DIN SCINDURI LA ZIDURI DREPTE INC L.SPRIJINIRILE.0 100,00x(2x1,00+1,27+1,20)+21x[1,20x(0,50+0,90)/2+1,00x1,80]= 407,84 Cantitate= 408.000 MP. 39 PB01A1 TURNARE BETON SIMPLU B50 IN COMPLETARI N IVELARI UMPLUTURI SI BET.PANTA EXEC.IN S TRAT DE 5-20CM. -beton egalizare : 100,00x1,80x0,10= 18,00 -beton panta dren: 100,00x0,45x0,10= 4,50 ----------------------------------------- TOTAL = 22,50 Cantitate= 22.500 M.C. 40 PB09A1 TURN.BET.ARMAT B150 IN FUND.TALPI RADIER E MANUAL 100,00x1,80x0,90= 162,00 Cantitate= 162.000 M.C. 41 PB10A1 TURN.BET.ARMAT B150 IN ELEV.INFR.DE POD PILE CASETCHESOANE FUNDATII ZID SPRIJIN ETC.MANUAL 100,00x1,20x(0,50+0,90)/2= 84,00 Cantitate= 84.000 M.C. 42 2100933 BETON DE CIMENT B 100 STAS 3622 22,50x1,008= 22,68 Cantitate= 22.700 M.C. 43 2100969 BETON DE CIMENT B 250 STAS 3622 (162,00+84,00)x1,008= 247,97 Cantitate= 248.000 M.C. 44 TRA06A TRANSPORTUL RUTIER AL BETONULUI-MORTARUL UI CU AUTOBETONIERA DE 5,5 MC DIST.= KM -beton C 6/7,5 (B 100): 22,68x2,27= 51,48 -beton C 16/20 (B 250): 247,97x2,51= 622,40 ------------------------------------------ TOTAL = 673,88 Cantitate= 674.000 TONA 45 SB16E1 TEAVA PVC-U NEPLASTIF.PT.CANALIZARE,MONT .APARENT IN NISA,INGROP.PAMINT,SUSPEND.P LANSEU,CU D=110 -barbacane: 20 trons.x2 buc./trons.x1,15 m/buc.= 46,00 Cantitate= 46.000 M 46 PE01D1 ZIDARIE USCATA IN DREN.LA CULEI SI ZID.S PRIJ.DIN BOLOVANI DE RIU 100,00x0,45x0,95x2/3= 28,50 Cantitate= 29.000 M.C. 47 TRA01A TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF ABRICATELOR CU AUTOBASCULANTA PE DIST.= KM. -bolovani de rau: 28,50x1,160x1,50= 49,59 Cantitate= 50.000 TONA 48 PE02D1 UMPLUTURA DE PIATRA IN CHESOANE,CASOAIE SPARG.DIN BALAST 100,00x0,45x0,95x1/3= 14,25 Cantitate= 14.000 M.C. 49 TRA01A TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF ABRICATELOR CU AUTOBASCULANTA PE DIST.= KM. -balast: 14,25x1,145x1,7= 27,74 Cantitate= 28.000 TONA
50 PF10A1 ROST VERTICAL DE SEPAR. INTRE DOUA ZIDAR II ALATUR 99 rost.x[1,20x(0,50+0,90)/2+0,90x1,80]= 243,54 Cantitate= 244.000 MP.
51 TRA01A TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF ABRICATELOR CU AUTOBASCULANTA PE DIST.= KM. -materiale: 2,00 Cantitate= 2.000 TONA 52 TRA05A TRANSPORT RUTIER MATERIALE,SEMIFABRICATE CU AUTOVEHIC.SPECIALE(CISTERNA,BETON.ET C)PE DIST.DE -apa: 26,86 Cantitate= 27.000 TONA CAP. D PARAPET METALIC 53 DF09A1 PARAP METALIC DEFORMABIL (FLEXIBIL) TIP A CU LISA SI STILPI METALICI 96,00 Cantitate= 96.000 M 54 6304525 PARAPET METALIC TIP A CU LISA SIMPLA PROD INDU STR. 96,00x16,41 kg/m= 1575,36 kg Cantitate= 1575.000 KG 55 TRI1AC04E2 INCARCARE MAT.GR.C-AMBALATE,PESTE 100KG DEPLAS.PRIN PURTARE PINA LA 10M,ASEZ.RAM PA,TEREN-AUTO CT -parapet metalic: 1575,36 kg Cantitate= 1.600 TONA 56 TRA01A TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF ABRICATELOR CU AUTOBASCULANTA PE DIST.= KM. -parapet metalic: 1575,36 kg Cantitate= 1.600 TONA 57 TRI1AC15E2 DESCARCARE MAT.GR.C-AMBALATE,PESTE 100KG DEP.PRIN PURTARE PINA LA 10M,ASEZ.AUTO- RAMPA,TEREN CTG. -parapet metalic: 1575,36 kg Cantitate= 1.600 TONA 58 CL21A1 MONTAREA CONFECTIILOR METALICE DIVERSE I NGLOBATE IN BETON -conf. plansa: -ancora A1: 33 buc.x0,77 m/buc.x3,850 kg/m= 97,83 -placa P1 : 33 buc.x0,25 m/buc.x1,96 kg/m = 16,17 -placa P2 : 33 buc.x0,25 m/buc.x2,94 kg/m = 24,26 ------------------------------------------------- TOTAL = 138,26 kg Cantitate= 138.000 KG 59 6309886 CONFECTII METALICE INGLOBATE IN BETON 138,26 kg Cantitate= 138.000 KG CAP. E RIGOLA PEREATA 60 TSA19E1 SAP.MAN.SANTURI SI RIGOLE PT.SCURGEREA A PELOR RIGOLE TRIUNGHIULARE CU ADINC.<0,3 5M,T.TARE 100,00x[(0,15+0,57+0,72+1,00)x0,15+1,00x0,40/2]= 56,60 Cantitate= 57.000 M.C. 61 TRI1AA01C2 INCARCAREA MATERIALELOR,GRUPA A-GRELE SI MARUNTE,PRIN ARUNCARE RAMPA SAU TEREN-A UTO CATEG.2 -material din sapatura: 56,60x1,24x1,8= 126,33 Cantitate= 126.000 TONA 62 TRA01A TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF ABRICATELOR CU AUTOBASCULANTA PE DIST.= KM. 126,33 Cantitate= 126.000 TONA 63 IFB09A1 STRAT DRENANT GROSIME 5 CM DIN NISIP 100,00x(0,75+0,50+0,57+0,72)= 254,00 Cantitate= 254.000 MP. 64 IFA03C1 PEREU PLACI B 200 TURNAT IN CIMPURI 2 M SUPR IMPARTIT CU ROST 2,5 CM LAT GROS 10 CM. 100,00x(0,15+0,57+0,72+1,00)= 244,00 Cantitate= 244.000 MP. 65 2100957 BETON DE CIMENT B 200 STAS 3622 244,00x0,10= 24,40 Cantitate= 24.400 M.C. 66 TRA06A TRANSPORTUL RUTIER AL BETONULUI-MORTARUL UI CU AUTOBETONIERA DE 5,5 MC DIST.= KM -beton C 12/15 (B 200): 24,40x2,45= 59,78 Cantitate= 60.000 TONA 67 IFA07B1 ROSTUIRE PEREU DALE MORTAR CIMENT ADINC 4 CM SI NISIP PE REST ADINC. PT DALE 6 C M. 4x100,00+(100,00:2,00)x(0,15+0,57+0,72+1,00)= 522,00 Cantitate= 522.000 M 68 CZ0204G1 PREPARARE MORTAR DE CIMENT PT.ZIDARIE M1 00-Z CU CIMENT M30 MANUAL FARA ADAOS VAR 522,00x0,00063= 0,33 Cantitate= .400 M.C. 69 TRA01A TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF ABRICATELOR CU AUTOBASCULANTA PE DIST.= KM. -nisip: 244,00x0,052x1,35= 17,13 522,00x0,00095x1,35= 0,67 0,33x1,210x1,35= 0,54 -------------------------- TOTAL = 18,34 Cantitate= 18.000 TONA 70 TRA05A TRANSPORT RUTIER MATERIALE,SEMIFABRICATE CU AUTOVEHIC.SPECIALE(CISTERNA,BETON.ET C)PE DIST.DE -apa: 244,00x0,030= 7,32 0,33x0,320= 0,11 ------------------ TOTAL = 7,43 Cantitate= 7.000 TONA
Intocmit, Verificat,
A N T E M A S U R A T O A R E CONSOLIDARE DRUM DJ 100 H - JUGURENI Km 9+040,00 PODET D=800 MM I-2 AC3998 PAG: 1 =============================================================== =NR. SIMBOL ART. CANTITATE UM = = D E N U M I R E = = A R T I C O L = = = =============================================================== 01 TSA07C1 SAP.MAN.IN SPATII LIMIT.PESTE 1M CU SPRI J.SI EVAC.MAN.IN PAM.CU UMID.NAT.ADINC.0 ,0-2M,T.TARE -tub: 8,40x1,50x1,80= 22,68 22,68x80%= 18,14 -camera: 3,54x2,52x1,27+2,74x2,12x0,85= 16,27 18,14+16,27= 34,41 Cantitate= 34.400 M.C. 02 TSA07D1 SAP.MAN.IN SPATII LIMIT.PESTE 1M CU SPRI J.SI EVAC.MAN.IN PAM.CU UMID.NAT.ADINC.0 ,0-2M,T.F.TARE -tub: 22,68x20%= 4,54 Cantitate= 4.500 M.C. 03 TSA04C1 SAP.MAN.IN SPATII LIMIT.SUB 1M CU SPRIJ. SI EVAC.MAN.IN PAM.CU UMID.NAT.LA ADINC. 0,0-1,5M T.TARE -fudatii tub: 8,40x1,00x0,40= 3,36 -timpane 2x4,00x0,87x1,50= 10,44 ------------ Total= 13,80 Cantitate= 14.000 M.C. 04 TSA04F1 SAP.MAN.IN SPATII LIMIT.SUB 1M CU SPRIJ. SI EVAC.MAN.IN PAM.CU UMID.NAT.LA ADINC. 1,51-3M T.TARE -timpane: 2x4,00x0,87x0,80= 5,57 Cantitate= 5.600 M.C. 05 TRB01C15 TRANSPORTUL MATERIALELOR CU ROABA PE PNE URI INC ARUNCARE DESC RASTURNARE GRUP1-3 DISTANTA 50M 34,41+4,54+13,80+5,57= 58,32 58,32x20%= 11,66 11,66x1,24x1,8= 26,03 Cantitate= 26.000 TONA 06 TSD01C1 IMPRASTIEREA CU LOPATA A PAMINT.AFINAT,S TRAT UNIFORM 10-30CM.GROS CU SFARIM.BULG. TEREN TARE 11,66x1,24= 14,46 Cantitate= 14.500 M.C. 07 TRI1AA01C2 INCARCAREA MATERIALELOR,GRUPA A-GRELE SI MARUNTE,PRIN ARUNCARE RAMPA SAU TEREN-AUTO CATEG.2 58,32x80%= 46,66 46,66x1,24x1,8= 104,15 Cantitate= 104.000 TONA 08 TRA01A TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF ABRICATELOR CU AUTOBASCULANTA PE DIST.= KM. 104,15 Cantitate= 104.000 TONA 09 TSF06B1 SPRIJ.MAL.CU DULAPI MET.ASEZ.ORIZ.,LAT.I NTRE MAL.1,51-2,5M,LA ADINC.SUB 4M;0,21- 0,6M INTRE DULAP -camera: 2x(1,27+0,85)x3,54= 15,01 -tub: 2x8,40x1,50= 25,20 ------------------------- Total= 40,21 Cantitate= 40.000 MP. 10 TSF05B1 SPRIJ.MAL.CU DULAPI MET.ASEZ.ORIZ.,LAT.I NTRE MAL.<1,5M LA ADINC.SUB 4M; 0,21-0,6 M INTRE DULAPI -fundatii tub: 2x8,40x0,40= 6,72 -timpane: 2x2x4x2,30 = 36,80 ------------------ Total= 43,52 Cantitate= 44.000 MP. 11 PB02A1 TURNARE BETON SIMPLU B75 IN FUNDATII OBI SNUITE,ZIDDE SPRIJIN PEREURI ETC.MANUAL -Tub: 8,40x1,00x0,40= 3,36 -timpane: 2x4,00x0,87x0,80= 5,57 -camera: 2,74x2,12x0,50= 2,90 -dren tub: 2x8,40x(0,40+0,90)/2x0,25= 2,73 -dren camera: (3,54+2x2,12)x0,40x0,25= 0,78 ------------------------------ Total= 15,34 Cantitate= 15.400 M.C. 12 PB06A1 TURN.BET.SIMP.B100 IN ELEV.CULEI,ARIPI,Z ID,TIMPAN MANUAL -timpane:2x(0,30+0,87)/2x1,50x4,00-2x3,14x0,50x0,50x0,68= 5,95 -camera : 2,74x2,12x1,62-1,62/3x(1,5x1,5+1,82x2,14+)= 4,49 ---------------------------------------------------------------- Total= 10,44 Cantitate= 10.500 M.C. 13 PB14A1 TURN. BET.ARMAT B200 IN PARAPET SI COMPLETARI -cap timpane: 2x4,00x0,40x0,40= 1,28 Cantitate= 1.300 M.C. 14 2100945 BETON DE CIMENT B 150 STAS 3622 (15,34+10,44)x1,008= 25,99 Cantitate= 26.000 M.C. 15 2100957 BETON DE CIMENT B 200 STAS 3622 1,28x1,008= 1,29 Cantitate= 1.300 M.C. 16 TRA06A TRANSPORTUL RUTIER AL BETONULUI-MORTARUL UI CU AUTOBETONIERA DE 5,5MC DIST. = KM 25,99x2,46 = 63,94 1,29x2,47 = 3,19 ------------------ Total= 67,13 Cantitate= 67.000 TONA 17 PC02A1 COFRAJE PT.BETON ELEVATIE SI ZIDURI SPRI J.DIN PANOURI CU PLACAJ P CU SUPRAFETE PLANE -timpane: 2x(4,00x1,50+4,00x1,60+2x1/2(0,30+0,87)x1,50- -2x3,14x0,50x0,50)= 25,17 -camera: 2x1/2x(1,50+1,82)x1,65+1/2x(1,50+2,14)x1,65+ +2,74x1,27+2x2,12x1,27= 17,35 ------------------------------------------------------------- Total= 42,52 Cantitate= 43.000 MP. 18 PC04A1 COFRAJE PANOU. PLACAJ P PT. B. A. SUPRA. POD. CU GRINZI DREPTE,PLATELAJE B. A.,CHESOANE,PARAPET -cap timpane: 2x2x(4,00x0,40+0,40x0,40)= 7,04 Cantitate= 7.000 MP. 19 CZ0302G1 CONFECT ARMAT PT PERETI GRINZI STILPI DI AFRAGME LACONST OBIS IN ATELIERE SANTIER OB 37 D=6-8MM -cap timpane: 8 mm 2 timpane x17 buc./timpan x1,30 m/buc x0,396 kg/m= 17,50 kg Cantitate= 18.000 KG 20 CZ0302H1 CONFECT ARMAT PT PERETI GRINZI STILPI DI AFRAGME LACONST OBIS IN ATELIERE SANTIE R OB 37 D=10-16M -cap timpane: 12 mm 2 timpane x 4,00 buc/timpan x 4,10 m/buc. x 0,888 kg/m= 29,13 kg Cantitate= 29.000 KG 21 PD02A1 MONT.ARMATURI PT.BETON ARMAT IN SUPRASTR UCTURA PODURILOR BOLTITE IN ARC SI PARAP ET 17,50+29,13= 46,63 Cantitate= 47.000 KG 22 TRA01A TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF ABRICATELOR CU AUTOBASCULANTA PE DIST.= KM. -armaturi furnizor-atelier: 46,63x1,015= 47,33 kg Cantitate= .050 TONA 23 TRI1AC01E2 INCARCARE MAT.GR.C-AMBALATE,SUB 10KG,DEP LAS.PRIN PURTARE PINA LA 10M,ASEZ..RAMPA, TEREN-AUTO CTG. -armaturi: 46,63 kg Cantitate= .050 TONA 24 TRA01A TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF ABRICATELOR CU AUTOBASCULANTA PE DIST.= KM. -armaturi atelier-lucrare: 46,63 kg Cantitate= .050 TONA 25 TRI1AC12E2 DESCARCARE MAT.GR.C-AMBALATE,SUB 10KG DE PLAS.PRIN PURTARE PINA LA 10M,ASEZ..AUTO -RAMPA,TEREN CTG -armaturi: 46,63 kg Cantitate= .050 TONA 26 6420680 TUB CANAL.BUCOV D= 800 S 6315 3 buc. Cantitate= 3.000 BUC. 27 TRA01A TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF ABRICATELOR CU AUTOBASCULANTA PE DIST.= KM. -tuburi 800 : 3 buc. x 2,16 t/buc.= 6,48 Cantitate= 6.500 TONA 28 PI06C1 MONTAREA ELEM.PREF.DIN BETON ARMAT CU MA CARAUA PE PNEURI DE 20-29,9 TF -incarcare teava metal= 1 buc. -descarcare in depozit= 3 buc. -montare = 3 buc. -------------- Total= 7 buc. Cantitate= 7.000 BUC. 29 AUT1106 ORA PR MACARA PE PNEURI CU BRAT CU ZABRE LE 20,0-29,9 TF 1 SCHIMB -deplasare macara: -incarcare teava: 2x4 ore= 8 ore -descare tuburi : 2x4 ore= 8 ore -montare tuburi : 2x4 ore= 8 ore ---------------- Total= 24 ore Cantitate= 24.000 ORA 30 PF05A1 HIDROIZOLATII LA LUCRARI DE ARTA DIN BIT UM FILERIZAT APLICATA LA RECE IN DOUA ST RATURI -tub: 8,40x3,14x0,50+2x8,40x0,25= 17,39 -timpane: 2x(4,00x1,35-1/2x3,14x0,50x0,50-0,25x1,00)= 9,52 ------------------ Total= 26,91 Cantitate= 27.000 MP. 31 SB16E1 TEAVA PVC-U NEPLASTIF.PT.CANALIZARE,MONT .APARENT IN NISA,INGROP.PAMINT,SUSPEND.P LANSEU,CU D=110 -barbacane: timpane: 2 timpane x2 buc./timpan x 0,80 m/buc.= 3,20 camera: 4 buc x0,70 m/buc.= 2,80 ------------------------ Total= 6,00 Cantitate= 6.000 M 32 PE01D1 ZIDARIE USCATA IN DREN.LA CULEI SI ZID.S PRIJ.DIN BOLOVANI DE RIU -dren tub: 8,40x1,80x0,50-1/2x3,14x0,5x0,50+2x8,40x0,40x0,25= 8,85 -dren camera: (3,54+2x2,12)x0,40x1,02= 3,17 ------------------------------------------------------------------- Total= 12,02 12,02x2/3= 8,01 Cantitate= 8.000 M.C. 33 PE02D1 UMPLUTURA DE PIATRA IN CHESOANE,CASOAIE SPARG.DIN BALAST 12,02x1/3= 4,01 Cantitate= 4.000 M.C. 34 DA06A1 STRAT AGREG NAT(BALAST)CILINDR CU FUNCT REZIST FILTRANT IZOL AERISIRE ANTCAP CU ASTERNERE MANUAL -umplutura peste tuburi: 9,64x1,80x0,50= 8,68 Cantitate= 9.000 M.C. 35 TRA01A TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF ABRICATELOR CU AUTOBASCULANTA PE DIST.= KM. -bolovani de rau: 8,01x1,13x1,6= 14,48 Cantitate= 15.000 TONA
36 TRA01A TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF ABRICATELOR CU AUTOBASCULANTA PE DIST.= KM. -balast: 4,01x1,145x1,7= 7,81 8,68x1,311x1,7= 19,35 ---------------------- TOTAL = 27,16 Cantitate= 27.000 TONA 37 TRA05A TRANSPORT RUTIER MATERIALE,SEMIFABRICATE CU AUTOVEHIC.SPECIALE(CISTERNA,BETON.ETC)PE DIST.DE -apa: 4,75 Cantitate= 5.000 TONA 38 TRA01A TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF ABRICATELOR CU AUTOBASCULANTA PE DIST.= KM. -materiale: 0,51 Cantitate= 0.500 TONA
Intocmit, Verificat,
A N T E M A S U R A T O A R E CONSOLIDARE DRUM DJ 100 H - JUGURENI Km 9+040,00 REFACERE SISTEM RUTIER I-3 (RANFORSARE SISTEM RUTIER) L = 120,00 m; l = 6,00 m; S = 120,00x6,00= 720,00 mp AC3408 PAG: 1 =============================================================== =NR. SIMBOL ART. CANTITATE UM = = D E N U M I R E = = A R T I C O L = = = =============================================================== 01 DH09XD1 CURATIREA MANUALA A SUPRAFETELOR DE ASFA LT IN VEDEREA APLICARII IMBRACAMINTII AS FALTICE 2x720,00= 1440,00 1440,00:10= 144,00 Cantitate= 144.000 10 MP. 02 DB02D1 AMORS SUPRAF STRAT BAZA SAU IMBRAC EXIST IN VEDER APLIC STRAT UZ MIX ASF CU EMUL SIE CATIONICA 2x720,00= 1440,00 1440,00:100= 14,40 Cantitate= 14.400 100 MP. 03 TRA05A TRANSPORT RUTIER MATERIALE,SEMIFABRICATE CU AUTOVEHIC.SPECIALE(CISTERNA,BETON,ET C) PE DIST DE -emulsie cationica: 14,40x45,500 kg/100 mp= 655,20 kg Cantitate= 0.700 TONA 04 TRA05A TRANSPORT RUTIER MATERIALE,SEMIFABRICATE CU AUTOVEHIC.SPECIALE(CISTERNA,BETON.ET C)PE DIST.DE -apa: 14,40x0,045= 0,65 Cantitate= 0.700 TONA 05 DB12A1 STRAT LEGAT BINDER DE CRIB EXEC LA CALD CU ASTERNERE MANUALA 720,00x0,06x2,37= 102,38 -spor: 720,00x0,010= 7,20 -------------------------- TOTAL = 109,58 Cantitate= 110.000 TONA 06 2600249 @BETON ASFALTIC (BINDER) BAD 25 109,58x1,003= 109,91 Cantitate= 110.000 TONA 07 DB16D1 IMBRAC BET ASF CU AGREGAT MARUNT EXEC LA CALD IN GROS DE 4,0CM ASTERN MANUALA 720,00 Cantitate= 720.000 MP. 08 2600246 @BETON ASFALTIC (BA 16) 720,00x0,094= 67,68 Cantitate= 68.000 TONA 09 2600248 @NISIP BITUMAT (DRESSING) 720,00x0,003= 2,16 Cantitate= 2.200 TONA 10 TRA01A TRANSPORTUL RUTIER AL MATERIALELOR,SEMIF ABRICATELOR CU AUTOBASCULANTA PE DIST.= KM. -beton asfaltic BA 16 = 68,00 -binder de cribl. BAD 25= 110,00 -dressing gras = 2,20 ------------------------------- TOTAL = 180,20 Cantitate= 180.000 TONA