0 Bewertungen0% fanden dieses Dokument nützlich (0 Abstimmungen)
23 Ansichten1 Seite
1) Maharshi Dayanand University Rohtak has issued a notification regarding changes to the dates of some M.E./M.Tech examination papers due to clashes in the schedule.
2) The dates of 2 papers (Design of Pollution Control Equip. and Mechanical Design – I) have been changed from their previous dates of July 9th and 12th respectively to new dates of July 12th and 14th.
3) The date of another paper (Simulation & Analysis) has also been changed from July 6th to July 13th. However, the time and centre of the exams will remain the same.
1) Maharshi Dayanand University Rohtak has issued a notification regarding changes to the dates of some M.E./M.Tech examination papers due to clashes in the schedule.
2) The dates of 2 papers (Design of Pollution Control Equip. and Mechanical Design – I) have been changed from their previous dates of July 9th and 12th respectively to new dates of July 12th and 14th.
3) The date of another paper (Simulation & Analysis) has also been changed from July 6th to July 13th. However, the time and centre of the exams will remain the same.
1) Maharshi Dayanand University Rohtak has issued a notification regarding changes to the dates of some M.E./M.Tech examination papers due to clashes in the schedule.
2) The dates of 2 papers (Design of Pollution Control Equip. and Mechanical Design – I) have been changed from their previous dates of July 9th and 12th respectively to new dates of July 12th and 14th.
3) The date of another paper (Simulation & Analysis) has also been changed from July 6th to July 13th. However, the time and centre of the exams will remain the same.
It is hereby notified for information of all concerned that to avoid clash the following papers of M.E./ M.Tech. Examination will be held as under:-
Sr. No. Subject Branch Id no. Previous Date Revised Date
2 nd Semester 1. Design of Pollution Control Equip., M-839 ME (Machine Design) 22236 09.07.2012 12.07.2012 2. Mechanical Design I, 906 MTA 23010 12.07.2012 14.07.201
3 rd Semester 1. Simulation & Analysis, 953 M & A 23125 06.07.2012 13.07.2012
Copy of the above is forwarded to the following for information and necessary action:-
1. The Chief Co-ordinators of Nodal Centres M.D.U. Rohtak. They are requested to intimate the Centre Supdts. of the Colleges concerned. 2. Centre Supdts. of the Colleges concerned. 3. Asstt. Registrar (R-III/ Secrecy), MDU, Rohtak 4. CPA to C.O.E., MDU, Rohtak 5. University Website