Sie sind auf Seite 1von 2

Qatar Petroleum Report No.

: _______________
Contract No.: GTC 151/ED/02
Job. : EPIC of Mesaieed Tank Farm
Upgrade. Phase-II Location: __________________
Drawing No.: ____________________________ Rev.:______________________
1 Voltage at incoming terminals of DB N/A
R-Y Y - B B-R
2 Earth resistance of DB to grid N/A
3 Check phase N/A
4 Checkout voltage
5 Check loop impedence
Neutral to earth N/A
Line to earth N/A
6 Operation of MCB's/ELCB's N/A
7 Availibility of power at end terminals & Sockets N/A
8 Operation of light fittings N/A
9 Control sequence of switches N/A
10 Operation of ceiling fans / exhaust fans N/A
11 Polarity and Interlocks N/A
Remarks :
Name
Signature
Date
Signature
Manco QP
Test Equipment Details Model Type & Sl. No. Range
Accept Ohms
Checked
Accept
Accept
Accept
Checked Accept
Accept
Accept Ohms
Accept Ohms
Ohms
Ohms
Ohms
QATAR PETROLEUM
Checked
Volts
Ohms Accept Checked
Ohms
Accept Ohms
Ohms
FORMAT NO. QCF-018-E04
SMALL POWER CIRCUITS TEST SHEET
DB TAG No.:---------------------
Checked
Checked
Checked
Doc. No. 1793-9569
Rev. 1
Checked
Note: One Sheet for each circuit as a minimum shall be used
Date of Calibration Validity
MANCO
Checked
Checked
Checked
QCF-18E/151
QATAR PETROLEUM
FORMAT NO. QCF-018-E04
SMALL POWER CIRCUITS TEST SHEET
DB TAG No.:---------------------
Note: One Sheet for each circuit as a minimum shall be used
Validity
QCF-18E/151

Das könnte Ihnen auch gefallen