Advanced Turbine Technologies for

High Efficiency Coal-Fired Power Plants


2nd India-Japan Energy Forum
Promoting cooperation in energy efficiency
4-5 February 2008

Mitsubishi Business Confidential

CONTENTS
1. THERMAL EFFICIENCY & STEAM
CONDITIONS
2. MITSUBISHI 500 1000MW
CLASS TURBINE

3. MHI ADVANCED TECHNOLOGY FOR


HIGH EFFICIENCY
4. CONCLUSION
Mitsubishi Business Confidential

1. THERMAL EFFICIENCY &


STEAM CONDITIONS

Mitsubishi Business Confidential






/ C K P          
4 G J G C V
$ C U  G        


CO2 Reduction

Net Efficiency

Inlet Steam Temperature

Steam Temperature (

Mitsubishi Business Confidential



 
 

 

CO2 Reduction (%)

Net Efficiency (%LHV)

STEAM CONDITON & EFFICIENCY

Heat Rate difference of Turbine

THERMAL EFFICIENCY & HEAT RATE


MPa x degC

(%)

600/600

0.9

566/593

0.8

566/566

0.9

538/566

0.8

538/538

1.7
BASE
16.7

24.2

Steam Pressure (MPa abs.)

Mitsubishi Business Confidential

HISTORY OF MHI LARGE STEAM TURBINES


DEVELOPMENT OF TURBINE CAPACITY
1371 MW

MW

1180 MW

1175 MW

1050 MW

1000 MW

1000

NUCLEAR
SUPERCRITICAL
600 MW

SUPERCRITICAL
1000 MW
SUPERCRITICAL
1050MW

FOSSIL

500
75 MW REHEAT
STEAM TURBINE

NUCLEAR
340 MW
156 MW

0
1950

1960

Mitsubishi Business Confidential

1970
1980
OPERATION YEAR

1990

2000

HISTORY OF MHI LARGE STEAM TURBINES


DEVELOPMENT OF STEAM PRESSURE & TEMPERATURE

WAKAMATSU
STEP2 (649/593 )
TACHIBANAWAN #2
50MW MATSUURA #2
(600/610 )
(593/593 )
1050MW
1000MW
WAKAMATSU

650
600

OSAKA #3
(566/538 )
156.25MW

kg/cm2g
400
350

566

TEMPERATURE

HEKINAN #3
(538/593 )
700MW

538

510

250
200

STEP1 (593/593
50MW

550 300
500

GOI #5
(566/566 )
350MW

SHIN-TOKYO #4
(538/538 )
75MW

480

169

190

246
PRESSURE

MISUMI #1
(600/600 )
1000MW

250

255

450 150

127
102
88
100
400
59 60
50 42

350

1950

1960

Mitsubishi Business Confidential

1970
1980
1990
OPERATION YEAR

2000

2010

MHI EXPERIENCE OF SUPER


CRITICAL LARGE STEAM TURBINE
LARGE CAPACITY ( 600MW)

28 UNITS
(ALL UNITS IN SERVICE)

LONG TERM OPERATION


EXPERIENCE

MORE THAN 34 YEARS

ADVANCED STEAM CONDITION


HEKINAN

#3

700MW

24.1MPa

538/593 C

NANAO-OTA

#1

500MW

24.1MPa

566/593 C

MATSUURA

#2

1000MW

24.1MPa

593/593 C

MISUMI

#1

1000MW

24.5MPa

600/600 C

TACHIBANAWAN

#2

1050MW

25.0MPa

600/610 C

HIRONO

#5

600MW

24.5MPa

600/600 C

MAIZURU

#1

900MW

24.5MPa

595/595 C

Mitsubishi Business Confidential

HIGHEST STEAM TURBINE


THERMAL PERFORMANCE
J-POWER TACHIBANAWAN #2 1050MW

Turbine Type
Steam Condition
YEAR IN OPERATION
Mitsubishi Business Confidential

: CC4F-46
: 25.1MPa 600/610
: DEC. 2000

HIGH EFFICIENCY AND ECONOMICAL DESIGN


600MW CLASS with 3000rpm 48inch ISB
TOKYO ELEC. HIRONO #5 600MW
2 pad
journal bearing

12Cr HIP Rotor

Advanced
flow guide
Advanced direct
support LP frame
600C class advanced
HP-IP combined frame
3000rpm 48inch Steel ISB

Mitsubishi Business Confidential

TURBINE TYPE
STEAM CONDITON
YEAR IN OPERATION

: TC2F-48
: 24.6MPa 600/600
: Jul.2004



2. MITSUBISHI 500MW 1000MW


Class Turbine

Mitsubishi Business Confidential



OPTIMIZED COMBINATION OF TURBINE


COMPONENTS FOR VARIOUS POWER OUTPUT

Application Range (MW)

1200
1100

4 Casings

(Cross Compound)

2 Casings
1000MW

1000
900

1LP+HIP

800
700

660MW

4 Casings
3 Casings

600
500

800MW

500MW

400

Mitsubishi Business Confidential

2LP+HP+IP
2LP+HIP



OPTIMIZED COMBINATION OF TURBINE


COMPONENTS FOR VARIOUS POWER OUTPUT

 /96WTDKPG%NCUU
HIP Turbine

 /9 %NCUU 6WTDKPG


HIP Turbine

 6WTDKPG
/9 %NCUU
Generator
Mitsubishi Business Confidential

LP Turbine

IP Turbine

HP Turbine



HP-IP Combined Turbine


F3D ISB
Reaction Blade

Features of HP-IP Combined Turbine


Shorter longitudinal span
Smaller differential expansion
Easy maintenance

IP Inlet Cooling

Advanced 12Cr Rotor Forging


Mitsubishi Business Confidential



F3D ISB REACTION BLADE

F3D blades are now applied to all new orders since 1991
Advanced steam path design
by fully 3-D CFD analysis methodologies

Stationary Blades
Rotating Blades
EFFICIENCY VERIFICATION TEST IN LABORATORY
Test Result of Static Pressure

Mitsubishi Business Confidential

CFD Analysis



ROTOR COOLING ARRANGEMENT


Rotor surface around IP inlet is cooled by the HP exhaust steam
COOLING
STEAM
FROM HP
EXHAUST

Cooling
Steam Path

Mitsubishi Business Confidential



ISB FLEET FOR LAST BLADE (For 50Hz)

+0    +0   T+0 R O   +0   +0 6 K V C P K W O   +0  T R O +0




Mitsubishi Business Confidential

ADVANTAGES OF ISB LP END BLADES



Larger damping is generated by the
contact at the shrouds and snubbers,
which is caused by the twist-back
deformation due to centrifugal force.

Reduction
in Vibration Stress
Mitsubishi Business Confidential

ISB

GB

Damping

ISB

Conventional
Grouped Blade



3. MHI ADVANCED TECHNOLOGY FOR


HIGH EFFICIENCY

Mitsubishi Business Confidential



LATEST CFD ANALYSIS


Steady Flow
Tip

Measured
Blade Exit

Base

CFD

Mitsubishi Business Confidential

Unsteady Flow
Tip

Measured
Blade Exit

Base

CFD



COLLABORATION WITH CAMBRIDGE UNIV.


Test Equipment

Test of MHI blade


at Cambridge Univ.

Measurement

Stationary blade

CFD
Sectional View

Mitsubishi Business Confidential Rotating blade

Loss Coefficient



COLLABORATION WITH ETH


Measuring at MHI Model Test Turbine
with Fast Response Aerodynamic Probe (FRAP)

Model Test Turbine


ETH: Eidgenossische Technische Hochschule Zurich
Swiss Federal Institute of Technology Zurich
Mitsubishi Business Confidential

Measurement Result
(Total pressure at blade exit)



CFD APPLICATION TO ENTIRE TURBINE

Mitsubishi Business Confidential



NEW HEAT-RESISTANT ALLOY DEVELOPMENT


Steam
Temp
Turbine Parts

566

610

630

650

HP/IP Rotor

CrMoV

12CrMoVNb
(TMK-1)

3Co12CrMoWVNbB
(MTR10A)

Modified
A286

Inner
Casing
Nozzle Box

2.25CrMo

12CrMoVNb
(MJC-12)

3Co12CrMoWVNbB
(MTC10A)

Type 316H

Blade

12CrMoWV
(Type 422)

12CrMoWVNb
(10705MBU)

3Co12CrMoWVNbB
(MTB10A)

W545

Valve

2.25CrMo

Super 9Cr
(T91)

3Co12CrMoWVNbB
(MTV10A)

Type 316H

Developed by MHI
Mitsubishi Business Confidential



WAKAMATSU HIGH TEMPERATURE TURBINE

J-POWER

New heat-resistant material were tested in the actual turbine in 1986-91

STEP

102kg/cm2g x 593/593
FERRITIC MATERIAL

STEP

102kg/cm2g x 649/593
AUSTENITIC MATERIAL

NEW 12Cr Rotor Forging TMK1


Modified A286 Rotor Forging

NEW 12Cr Cast Steel MJC12


SUSF316H Forged Steel

9Cr2Mo Forged Steel HCM9M

Mitsubishi Business Confidential

SUSF316H Forged Steel



LP TURBINE TEST FACILITY


Turbine Casing

Control Room

Condenser

400ton/h steam can be applied to test facility.


Mitsubishi Business Confidential



VERIFICATION TEST RESULT


(3000RPM 48-INCH BLADE)

High Efficiency Confirmed

Low Stress in All Range

Turbine Efficiency

Blade Vibratory Stress

Model Turbine Test


Field Telemetry Test (700mmHg)
Field Telemetry Test (722mmHg)

Design Value

=MIOO?

Vibratory Stress

Exhaust flow (t/h)

500mmHg

600mmHg

722mmHg

Test Result

150

300

450

600

Exhaust Volumetric Flow

Load (MW)

Mitsubishi Business Confidential



ROTATING VIBRATORY TEST RESULT


(3000RPM 48-INCH BLADE)

Frequency (Hz)

2nd Mode

1st Mode

Rotating speed (rpm)


Rated Speed

Rotating vibratory test rotor


with 48-inch steel blades
Mitsubishi Business Confidential

Test results of the vibratory


Characteristics



IN-HOUSE POWER PLANT


(T-Point)

ACC
HRSG

Steam Turbine

Gas Turbine

ST Type

: SRT-36
(Single Cylinder Reheat Turbine)
ST Output : 105MW
Steam Condition : 139 kg/cm2g 566 / 410
Commercial Operation : JULY 1997

Mitsubishi Business Confidential

Execute the Verification Program


in Order to Confirm the Reliability
of New Technology



NEW TECHNOLOGY VERIFICATION


(IN-HOUSE POWER PLANT)

WIRING

WIRING

(LOWER CASING & ROTOR INSTALLATION)

(UPPER CASING INSTALLATION)

Mitsubishi Business Confidential



4. CONCLUSION
1. MHIs abundant experience of super-critical turbines
with high temperature represents that the technologies
are innovative and reliable.
2. MHI achieves a high level of technologies, especially for
steam flow optimization with CFD and heat-resistance
material development, which are regarded as the key
technology.
3. Comprehensive verification, utilizing world-class facility
and full-scale test turbine, ensures the performance and
reliability of the latest technologies, even which are
innovative ones.
Mitsubishi Business Confidential



L&T-MHI Turbine Generator Private Limited


-Indigenized Domestic Company-

JV has been established on Nov.5th, 2007 by


L&T (LARSEN & TOUBRO LIMITED) of 51% share,
MHI (Mitsubishi Heavy Industries, Ltd.) of 49% share
(MELCO takes 10% share from 49%)

Surat
(Factory)

<Investment > 1,030 Crores


<Capability> 4,000MW
per annum
<Employee> 900
<Location>
Mumbai and
Surat (Hazira)
!
!" #

Mitsubishi Business Confidential



L&T-MHI Turbine Generator Private Limited


-Indigenized Domestic Company-

<Line up of Products >


500/600/800/1000MW
Supercritical Steam Turbine
Generator
and
150/300MW Steam Turbine
Generator for
Gas Turbine
Combined Cycle
Assembly of 1000MW Turbine in MHI Nagasaki

Mitsubishi Business Confidential



L&T-MHI Turbine Generator Private Limited


-Indigenized Domestic CompanyRotor Assembly Shop in MHI Nagasaki

JV can;
(1) Solve Huge Electric
Demand

JV factory will have the same


capability as of MHI Nagasaki

(2)

Achieve Customer
Satisfaction in
Maintenance

(3)

Produce Lots of
Employment in India

High Speed Balance Machine


Mitsubishi Business Confidential



L&T-MHI Turbine Generator Private Limited


-Indigenized Domestic Company-

(1)

(2)

(3)

JV Should be Qualified,
Because;
Fully Supported by MHI, MELCO and L&T Financially and
Technically
Transferring Mitsubishis Most Advanced Technology for
Steam Turbine Generator
Of Course, Indigenized Domestic Company

Mitsubishi Business Confidential



Das könnte Ihnen auch gefallen