This document provides quotations for plumbing work and chamber work at Grishma Enclave E-Type III in Mira Road East Thane. For the plumbing work, it details the prices and quantities for installing new 4" PVC soil pipes from the ground to the 5th floor, along with fittings like 'Y' bends and elbows at each junction. For the chamber work, it provides pricing for increasing the height of 3 chambers by 2 feet using brickwork, plastering, and connecting pipes. It specifies payment terms of 40%, 30%, 20%, and 10% at different stages of completion and includes contact information.
This document provides quotations for plumbing work and chamber work at Grishma Enclave E-Type III in Mira Road East Thane. For the plumbing work, it details the prices and quantities for installing new 4" PVC soil pipes from the ground to the 5th floor, along with fittings like 'Y' bends and elbows at each junction. For the chamber work, it provides pricing for increasing the height of 3 chambers by 2 feet using brickwork, plastering, and connecting pipes. It specifies payment terms of 40%, 30%, 20%, and 10% at different stages of completion and includes contact information.
This document provides quotations for plumbing work and chamber work at Grishma Enclave E-Type III in Mira Road East Thane. For the plumbing work, it details the prices and quantities for installing new 4" PVC soil pipes from the ground to the 5th floor, along with fittings like 'Y' bends and elbows at each junction. For the chamber work, it provides pricing for increasing the height of 3 chambers by 2 feet using brickwork, plastering, and connecting pipes. It specifies payment terms of 40%, 30%, 20%, and 10% at different stages of completion and includes contact information.
MIRA ROAD (EAST) THANE 401107. QUATATION PLUMBING WORK NO. DESCRIPTION UNIT PRICE NOS. AMOUNT 1. 4 PVC SOIL PIPE FROM GR TO 5 TH FLOOR WITH FOUL AIR PIPE FITTED WITH PVC COUL AND EVERY PIPE WOULD BE HOLD BY TWO PLASTIC CLIP. 2150/- 05 10750/- 2. 4 PVC SINGLE Y BEND AT EVERY JUNCTION WITH WATER PROOF ELEMENT. 1650/- 05 8250/- 3. 4 PVC ELBOW WILL BE FITTED TO EVERY P TRAP WITH WATER PROOF. 1850/- 05 9250/- TOTAL 28250/- WITH MATERIAL AND LABOUR. WHILE WORKING ONLY SINGLE MAN WILL BE INTERRECT WITH US. ALL PLUMBING WORK WILL DONE BY SKILED LABOUR ALL PIPE WILL BE REMOVED AND RESTALL NEW PIPE WITH PERFECT FITTING. IF REQUIRED OLD PIPE WILL BE CLEAN AND REUSE AT CERTAIN PLACE. THIS QUATION IS VALID FOR ONE SIDE, 5 TOILET WILL BE COVERED. WATER AND ELECTRIC SHOULD PROVIDE BY SOCIETY. THE SOCIETY MEMBER SHOULD CORPORATE WHILE WORKING FOR BETTER RESULT. PAYMENT PERIOD. 40% OF TOTAL AMOUNT IN STARTING. 30% OF AMOUNT LESS THE EARLIER WHEN MATERIALS IS BROUGHT AND WORK STARTED. 20% OF AMOUNT LESS THE EARLIER WHEN HALF WORK IS FINISHED. AND REMANING AMOUNT WILL BE RECIVED AFTER COMPLITION OF WORK. MOB NO:- 9892234282 To, Secreatry /Chairman, Grishma Enclave E-Type III, Mira Road East Thane CHAMBER WORK NO. DESCRIPTION UNIT PRICE Nos. AMOUNT 1. INCREASE THE HIGHT OF A CHAMBER BY 2FT FROM GROUND LEVEL BY 9 BRICK WORK 3550/- 03 10650/- 2. 2 COAT PLASTER OF ALL FOUR SIDE OF CHAMBER OUT SIDE. 950/- 03 2850/- 3. THE MAIN CHAMBER WILL BE CONNECTED BY 6 DIA CHINI PIPE AND OTHER TWO WILL BE CONNECTED BY 4 DIA PIPE. 12800/- 01 12800/- TOTAL 26300/- WITH MATERIAL AND LABOUR. WHILE WORKING ONLY SINGLE MAN WILL BE INTERRECT WITH US. ALL CIVIL WORK WILL DONE BY SKILED LABOUR. THIS QUATION WILL COVER 3 CHAMBER BRICK WORK AND CONNECTION PIPE. THE OLD CHAMBER COVER WILL BE USE. WATER AND ELECTRIC SHOULD PROVIDE BY SOCIETY. THE SOCIETY MEMBER SHOULD CORPORATE WHILE WORKING FOR BETTER RESULT. PAYMENT PERIOD. 40% OF TOTAL AMOUNT IN STARTING. 30% OF AMOUNT LESS THE EARLIER WHEN MATERIALS IS BROUGHT AND WORK STARTED. 20% OF AMOUNT LESS THE EARLIER WHEN HALF WORK IS FINISHED. AND REMANING AMOUNT WILL BE RECIVED AFTER COMPLITION OF WORK. KHOKAR MARBLE SHOP NO : - 01 KHOKAR HOUSE NAYA NAGAR, MIRA ROAD (EAST) THANE 401107. To, Secreatry /Chairman, Grishma Enclave E-Type III, Mira Road East Thane QUATATION MOB NO:- 9892234282 1. THE PVC COWL WILL BE FITTED AT THE HIGHT OF 3 FROM PEREPIT WALL ON SOIL PIPE TO PREVENT VACCUM IN PIPE. 2. 4 DIA PVC PIPE HOLDED WITH THE HELP OF PVC CLIP. 3. PVC SINGLE Y BEND WILL BE FIXED BY HEAVY AMOUNT OF FIXING PAST.(CAMICAL) WITH WATER PROOFING. 4. PVC ELBOW BEND WILL BE FIXED TO THE P TRAPE FIRST CHISEL AROUND THE BEND ANE FILLED WITH HIGH GRADE OF CEMENT BEST WATER PROOFING.
DETAIL EXPLANATION NEW BRICK WORK CEMENT COVER GROUND LEVEL PCC CONCRETE OLD 6 CHINI PIPE PCC CONCRETE NEW 6 CHINI PIPE DETAIL EXPLANATION 1. THE HIGHT OF CHAMBER WILL BE INCREASE BY 2 FROM GROUND LEVEL BY 9 BRICK WALL SO THAT THE OUTER WATER WIL NOT ENTER IN CHAMBER 2. 6 DIA CHINI PIPE WILL BE CONNETTED TO CHAMBER TO CHAMBER IF IN CASE THE OLD PIPE MIGHT BE GET CHOCK UP THE NEW PIPE WILL TAKE WATER. 3. THE CEMENT COVER WILL BE FIXED BY HIGH GRADE OF CEMENT.