Sie sind auf Seite 1von 1

TAXAN

3
2
1
0
REV.
No. Qty Qty
Initial Release
QA
Approval
Engineering
Materials Jigs/ Fixtures/ Equipments
Prepared by
Dept. Head
Description
Reviewed by
WORK INSTRUCTION
MODEL
PART NAME
WI-PRO-T1053-R1-00
Production
24-Jul-2014
REV. DATE
Part No. Description
CUSTOMER TOTO
EFFECTIVE
DATE
KAGA COMPONENTS (MALAYSIA)SDN. BHD.
TRC0900/ TRC0901/
TRC0902/ TRC0903
STATION BT01-2 NO SOLDER CHECKING
REWORK FLOW
TITLE
DOC. NO.
CONTROLLER 24-Jul-2014
Originator
HS TEO
Rework
REVISE CONTENT
PAGE 1 of 1
START
1) Remove set from carton.
2) Arrange set into tray (12pcs/tray).

Rework end.
Process Flow
Start
Unpack
Process Description Time Use
0 sec.
15 sec.
15 sec.
END
0 sec.
1) Load the tray into x-ray machine.
2) Start the X-ray inspection on soldering position BT01-2 & BT02-2.
X - Ray
Total: 262sec
55 sec.
1) To perform functional test.
FCT
40 sec.
1) To perform final apperance check.
Apperance
Check
12 sec. 1) Packing.
2) Dot Marking on carton.
Packing
Repair
NG
NG
15 sec.
1) Unload the tray from x-ray machine.
2) Marking dot on wire harness connector if soldering condition OK.
Marking dot
Repair
NG
10 sec.
1) Packing the set into original carton.
Packing

10 sec.
Unpack

1) Remove set from carton.
2) Remove set from bubble bag.
MARKING selepas rework
90 sec.
1) QC sampling perform FCT and apperance checking.
OQC inspection
REV DATE: 12 DECEMBER 2005 FM-ENG-0004-REV-00

Das könnte Ihnen auch gefallen