Preliminary Costing

PCC

15
15

4.1
4.1

0.3
0.3
m3

Foundation

18.45
18.45

PCC
PCC

36.9

2.2
1.5
1.5
1.5

3.4
3.4
3.4
3.4

0.3
0.3
0.3
0.3

2.244
1.53
1.53
1.53
6.834

2.4
0.8
0.8
0.8

4
0.6
0.6
0.6

0.3
0.5
0.5
0.5

2.88
0.24
0.24
0.24
3.6

Buffer tank
Chiller-01
Chiller-02
Chiller-03

DM EXPANSION & Make-Up Water


Pump
DM Water
Pump
cable
Pump

HUME Pipe

mtr
mtr

40
20

hume pipe
hume pipe

Excavation

m3

135

Excavation

Shed

no

50

Sheet (1.2 X2.745- tata Shakti)

ISMB150 2@3
2@3

Column

mtr/shed
mtr/shed

40
40

(4 mtr height)
(4 mtr height)

5X2X4

ISMC 100

Beam

9X5

Angle

25
25
25

(5 mtr length each)


(5 mtr length each)

ISA 50X50X6

Mtr/shed
Mtr/shed
Mtr/shed

Shed
no

Total
Rate
Amount
Net

PCC
M3
47.334
3500
165669
198802.8

Steel-ISMB
kg
1192
125
149000
178800

Total material

Hume
mtr
60
900
54000
64800

Excavation
m3
135
300
40500
48600
660877.8

50
1400
70000
84000

ISMC
Kg
460
125
57500
69000

Angle
kg
112.5
125
14062.5
16875