Sie sind auf Seite 1von 4

STANDARD OPERATION PRACTICE FOR TURBINE ROLLING - COLD START-

UP PROCEDURE.
PUTTING THE TURBINE ON BARRING GEAR:
IMPORTANT: - Minimum period o !"rrin# re$uired or %&i' %ur!ine i' ( &our'.
En'ure Oi) )e*e) in MOT +M"in Oi) T"n,- i' He")%&..
Ener#i/e He"%er' in MOT %o r"i'e %&e Oi) Temp %o 01-023C.
S%"r% O4EF +Oi) 4"por E5%r"6%ion F"n- !eore '%"r%in# AOP.
S%"r% AOP +Au5i)i"r. Oi) Pump- "nd pu% EOP +Emer#en6. Oi) Pump- in AUTO
mode.
A%er S%"r%in# AOP En'ure OHOT +O*er He"d Oi) T"n,- L*) i' r"i'ed up %o %&e
re$uired L*).
En'ure Lu!e Oi) He"der Pre''ure i' "' per re6ommended !. OEM.
En'ure Lu!e Oi) Ou%)e% )o7 %&rou#& Si#&% G)"''e' pro*ided.
S%"r% B"rrin# Ge"r Mo%or.
PUTTING SURFACE CONDENSER IN TO SER4ICE:
Beore '%"r%in# C8P9 Conden'er "ir *en%' '&ou)d !e ,ep% open %o re)e"'e "ir
po6,e%'.
Coo)in# To7er Sump 7"%er )e*e) '&ou)d !e r"i'ed %o N8L.
I:L ; O:L *")*e' o %&e Conden'er '&ou)d !e ,ep% OPEN.
En'ure O:L MO4 o C8P i' in CLOSED 6ondi%ion.
En'ure R"i'er' o Coo)in# To7er "re p"r%i")). ,ep% OPEN or %&e re$uired CELL.
S%"r% C8P "nd ')o7). +B. in6&in#- open %&e O:L Mo*.
CLOSE %&e *en%' o %&e Conden'er "%er En'urin# %&"% 8"%er i' 6omin# ou% rom
%&e Conden'er *en%'.
R"i'er 4")*e' '&ou)d !e %&ro%%)ed %o #e% %&e re$uired )o79 ; "% %&e '"me %ime
7"%6& He"der Pre''ure ")'o.
<eep %&e '%"nd-!. C8P in AUTO mode.

PUTTING CEP IN TO SER4ICE:
To T",e CEP in %o Ser*i6e9 Pro6eed "' '%"%ed !e)o7
Impor%"n% No%e: Beore '%"r%in# %&e Ro))in# o Tur!ine9 S%"r% CEP "nd ,eep i% in Re-
6ir6u)"%ion mode.
En'ure 6)e"r"n6e rom m"in%en"n6e "nd #e% 6)e"r"n6e rom Fie)d Oper"%or %o
'%"r%.
En'ure HOT-8EL )e*e) i' =u'% "!o*e N8L.
En'ure G)"nd 6oo)in# 7"%er )ine *")*e' "re OPEN.
En'ure G)"nd Se")in# 8"%er )ine *")*e' "re OPEN.
Conden'"%e Sump Air E*"6u"%ion )ine *")*e 7"' in OPEN 6ondi%ion.
En'ure Su6%ion ; Di'6&"r#e 4")*e' "re in OPEN Condi%ion.
En'ure Di'6&"r#e +Ho% 7e)) Le*e) Con%ro) 4")*e- 7"' in CLOSED 6ondi%ion.
C&e6, Su6%ion S%r"iner Dieren%i") Pre''ure +DP - > 1.0 ,#:6m?-.
START pump ei%&er rom LPB +LCS- or DCS.
Pu% %&e pump in Re-6ir6u)"%ion +Ho% 7e)) )*) 6n%r) *")*e po'i%ion @1A- mode9 i
p"''in# %&rou#& &o% 7e)) )*) 6on%ro) *")*e i' o!'er*ed 6)o'e i'o)"%ion *")*e !eore
&o% 7e)) )*) 6n%r) *")*e.
A%er '%"r%in# CEP "d=u'% Di'6&"r#e pre''ure !. openin# Re6ir6u)"%ion
B.-p"'' *")*e.
TURBINE ROLLING.
BEFORE OPENING THE BOILER MSS4 B.-P"'' 4AL4E ENSURE ALL THE
DRAINS IN THE MAIN STEAM LINE AFTER MSS4 ARE IN OPEN
CONDITION.
ENSURE TURBINE 8ARM UP 4ENT 8AS IN OPEN CONDITION.
ENSURE ALL THE DRAINS GI4EN BELO8 ARE IN OPEN CONDITION
Dr"in' "' "))o7':
No//)e C&e'% dr"in'.
C"'in# dr"in.
M"in '%e"m )ine dr"in.
M"in '%e"m )ine *en%.
G)"nd '%e"m dr"in.
PRDS dr"in.
Ho##er dr"in.
P)e"'e en'ure E=e6%or "nd G4C %r"p' "re open po'i%ion.
ES4 dr"in'.
AFTER GETTING THE REBUIRED TEMP +CD13C- ; PRESSURE AT
BOILER O:L OPEN THE BOILER MSS4 B.-P"'' 4AL4E SLO8LE.
AFTER SUFFICIENTLE 8ARMING UP THE MAIN STEAM LINE AND
AFTER GETTING SUFFICIENT PRESSURE AT BOILER O:L OPEN MSS4
OF BOILER 4ERE SLO8LE.
CLOSE THE MSS4 B.-P"'' 4AL4E OF BOILER AFTER OPENING MSS4.
CLOSE THE DRAINS IN THE MAIN STEAM LINE AFTER MSS4 TO
Min.
CHARGE PRDS SLO8LE AND RAISE THE PRESSURE AND MAINTAIN
THE TEMP AS PER RECOMMENDATION OF OEM.
AFTER CHARGING THE PRDS TA<E HOGGER IN TO SER4ICE9 8HILE
DOING THIS MA<E SURE THE REBUIRED PRDS PRESSURE.
AFTER TA<ING HOGGER IN TO SER4ICE OBSER4E 4ACCUM.
AFTER GETTING 4ACUUME ATLEAST -1.C <G:CM29 START GLAND
SEALING 4APOR EFHAUST FAN AND THEN OPEN GLAND SEALING
STEAM TO TURBINE AND MAINTAIN IT AROUND 1.G1 <#:Cm?.
OPEN TSS4 BE-PASS OF TURBINE +TEMP CD1 3C-.
AFTER SUFFICIENTLE 8ARMING THE MAIN STEAM LINE UP TO
TURBINE I:L AND 8ITH RECOMMENDED PRESSURE ; TEMP AT
BOILER O:L9 OPEN TURBINE TSS4 4ERE SLO8LE.
ENSURE TURBINE REMOTE TRIP IS HEALTHE AND ALSO ENSURE ALL
OTHER INTERLOC<S IN TCP ARE IN HEALTHE CONDITION.
IF ALL THE INTERLOC<S ARE FOUND TO BE NORMAL9
PRESS ES4 RESET BUTTON +RED COLOR- IN TCP +TURBINE CONTROL
PANEL- AND CHEC< FOR ES49 BC NR4HS OPEN +FREE- INDICATION IN
THE TCP +INDICATION COLOR MUST TURN TO RED FROM GREEN-.
PRESS START BUTTON +RED COLOR- IN TCP.
AFTER PRESSING THE START BUTTON OBSER4E ACTUATOR OPENING
PERCENTAGE IN 8OOD8ARD D1D9 IT 8ILL RISE UP TO AS
PROGRAMMED BE OEM. AFTER THAT TURBINE RPM 8ILL RISE AND
REACH IDLE SPEED.
HOLD THIS RPM AS RECOMMENDATION OF OEM.
IN THE MEAN TIME TA<E MAIN EIECTOR IN TO SER4ICE BEFORE
DOING THIS RAISE UP TO REBUIRED PRDS PRESSURE.
OBSER4E 4ACCUM9 IF NORMAL9 CLOSE HOGGER.
MAINTAIN HOT 8ELL L4L AT 0C1 mm76 BE OPERATING HOT 8ELL
L4L Con%ro) 4")*e +HOT 8ELL MA<E-UP LINE 4AL4E IS IN OPEN
CONDITION-.
NOTE: AFTER TA<ING MAIN EIECTOR IN TO SER4ICE HOT 8ELL L*)
8ILL STABILIJE.
AFTER HOLDING THE RPM9 GI4E THE COMMAND FOR RATED SPEED
+RED COLOR- IN TCP.
8ATCH FOR THE RPM TO RAISE AND IT 8ILL REACH FULL RPM AS
PROGRAMMED BE OEM +8ATCH HOT 8ELL L4L AND MAINTAIN IT TO
THE REBUIREMENT-.
LOAD THE GENERATOR AS PER LOAD CUR4E.
CLOSE ALL THE DRAINS AND 8ARM-UP 4ENT.
TA<E EFTRACTIONS IN TO LINE 8.R.T LOAD.

Das könnte Ihnen auch gefallen