Sie sind auf Seite 1von 1

Trainers

Methodology
Level I

Templates

QUALIFICATION
UNIT OF COMPETENCY
MODULE TITLE
MODULE DESCRIPTOR:
This module covers the outcomes required in installing, assembling and
testing computers and common peripherals
NOMINAL DURATION:
INTRODUCTION: This module covers the outcomes required in installing,
assembling and testing compu
LEARNING OUTCOMES:
At the end of this module you MUST be able to:
LO1. Plan and prepare for installation
LO2. Install equipment/device system
LO3. Conduct test
ASSESSMENT CRITERIA:
1. Occupational health and safety policies an
installing computer systems and network devices followed.
2. Circuits and systems checked as being isolated where necessary
using specified testing procedures
3. Parts or connections of the installation or service that removed in
order to conduc
and in accordance with established procedures
4. Unplanned events or conditions responded to in accordance with
the industry requirements
5. Approval obtained in accordance with established procedures from
appropriate personnel before any contingencies are implemented
6. Devices/systems and/or installation tested to terminated in
accordance with the industry requirements
7. Parts and/or connections removed for testing returned to pre
conditions in accordance with
8. Final inspections undertaken to ensure that the installed
devices/systems conforms to requirements
9. Documents in relation to the test forwarded to appropriate
personnel and/or authority in accordance with requirements
Trainers
Methodology
Templates
Date Developed:
July 2010
Date Revised:
June 2014
Document No.
Issued by:

NTTA
Developed by:
Carmelito M. Lauron, Sr.
Revision # 01
MODULE CONTENT
COMPUTER HARDWARE SERVICING NC II
UNIT OF COMPETENCY INSTALL COMPUTER SYSTEMS AND NETWORKS
INSTALLING COMPUTER SYSTEMS AND
NETWORKS
LE DESCRIPTOR:
This module covers the outcomes required in installing, assembling and
testing computers and common peripherals
NOMINAL DURATION: 60 Hours
This module covers the outcomes required in installing,
assembling and testing computers and common peripherals
LEARNING OUTCOMES:
At the end of this module you MUST be able to:
Plan and prepare for installation
Install equipment/device system
ASSESSMENT CRITERIA:
Occupational health and safety policies and procedures for
installing computer systems and network devices followed.
Circuits and systems checked as being isolated where necessary
using specified testing procedures
Parts or connections of the installation or service that removed in
order to conduct the test stored to protect against loss or damage
and in accordance with established procedures
Unplanned events or conditions responded to in accordance with
the industry requirements
Approval obtained in accordance with established procedures from
opriate personnel before any contingencies are implemented
Devices/systems and/or installation tested to terminated in
accordance with the industry requirements
Parts and/or connections removed for testing returned to pre
conditions in accordance with established procedures
Final inspections undertaken to ensure that the installed
devices/systems conforms to requirements
Documents in relation to the test forwarded to appropriate
personnel and/or authority in accordance with requirements
Document No. NTTA-TM1-07
Page 3 of 61

COMPUTER HARDWARE SERVICING NC II
INSTALL COMPUTER SYSTEMS AND NETWORKS
INSTALLING COMPUTER SYSTEMS AND
This module covers the outcomes required in installing, assembling and
This module covers the outcomes required in installing,
d procedures for
installing computer systems and network devices followed.
Circuits and systems checked as being isolated where necessary
Parts or connections of the installation or service that removed in
t the test stored to protect against loss or damage
Unplanned events or conditions responded to in accordance with
Approval obtained in accordance with established procedures from
opriate personnel before any contingencies are implemented
Devices/systems and/or installation tested to terminated in
Parts and/or connections removed for testing returned to pre-test
established procedures
Final inspections undertaken to ensure that the installed
Documents in relation to the test forwarded to appropriate
personnel and/or authority in accordance with requirements

Das könnte Ihnen auch gefallen