TIL ID CODE

TIL 956-R2
TIL 1581
TIL 1627R2
TIL 1629-R1
TIL 1706-R1
TIL 1725-R1
TIL 1745
TIL 1777
TIL 1790
TIL 1809
TIL 1810
TIL 1847
TIL 1861
TIL 1862
TIL 1882
TIL 1886
TIL 1889
TIL 1903
TIL 1903-R1
TIL 1925
TIL 1405-1
DESCRIPTION
RECOMMENDATIONS FOR NDT AND EVALUATION OF STEAM TURBINE ROTORS AND GENERATOR FIELDS
VIBRATION FROM CARBON BRUSH SHAFT GROUNDING ASSEMBLIES
STEAM TURBINE N2 PACKING HEAD MAIN FIT CRACKING
COMBINED STOP AND CONTROL VALVE SEAT STELLITE LIBERATION
INPUT OUTPUT FREEZES FOR MARK VIE AND MARK VE I / O PACKS
DISTRIBUTION OF TECHNICAL COMMUNICATIONS
INSPECTION AND MAINTENANCE OF HYDRAULIC POWER UNIT FLEX HOSES
TURBINE CONTROL SYSTEM VULNERABILITY TO VIRUSES AND MALWARE
ONLINE DOWNLOAD TO PMVE PCAA MAY CAUSE INADVERTENT CONTROL VALVE MOVEMENT
INSPECTION RECOMMENDATIONS FOR STEAM FLOW GUIDE LOCKING MECHANISM
TRIP RISK FROM SINGLE POINT FAILURE
INSPECTION AND RECOMMENDATIONS FOR 34,5 IN LAST STAGE BUCKET
CONTROLLER WATCHDOG AND STALE SPEED PARAMETERS
EX2100 DE-EXCITATION AND CROWBAR TRIPS
ADMISSION STOP VALVE PARTIAL STROKE TEST FAILURE
INSPECTION OF LOW PRESSURE ROTOR WHEEL DOVETAILS ON STEAM TURBINES WITH FOSSIL FUELED DRUM BOILERS
GLAND STEAM CONDENSER EXHAUSTER BLOWER IMPELLER FAILURE
LUBE OIL SYSTEM EMERGENCY STANDBY PUMP OUTLET CHECK VALVE MODIFICATION AND PERIODIC SYSTEM TESTING
LUBE OIL SYSTEM EMERGENCY STANDBY PUMP OUTLET CHECK VALVE MODIFICATION AND PERIODIC SYSTEM TESTING
GUIDANCE OF OPERATION OF DUAL STOP CONTROL VALVES AND OR INTERCEPT REHEAT STOP VALVES
STEAM BYPASS OPERATION DURING STARTING & LOADING OF COMBINED CYCLE STEAM TURBINES
DATE Compliance Category Timing Code COMMENTS
07 OCTOBER 2013 S 6 FOR STEAM TURBINE UNITS HAVING 10 YEARS IN SERVICE ON AVERAGE. IT IS NOT MANDATORY FOR OUR UNIT YET
31 AUGUST 2007 O 7 IT IS OPTIONAL. THERE IS CURRENTLY AN OIL LEAK THAT MAY GENERATE A SIMILAR SITUATION
3 FEBRUARY 2011 C 4 ENERSUR CONTROL ROOM OPERATORS MUST HAVE A SAY AND LET US KNOW IF N2 PACKING HEAD MAIN FIT IS EXHIBITING TROUBLESOME BEHAVIOUR
31 DECEMBER 2010 C 2 GE WILL INSPECT THEM DURING NEXT UPCOMING OUTAGE
25 JUNE 2010 C 6 INSTRUMENTATION & CONTROL ASSESSMENT ( ERNESTO & JEANCARLO HAVE A SAY ON THIS )
25 MAY 2012 C 2 FOR INFORMATION PURPOSES ONLY
22 JULY 2010 M 6 I AM CURRENTLY CHECKING THIS OUT FOR SPARE PARTS AND FOR INSPECTION SERVICE. WE MAY DO IT BY OURSELVES
31 DECEMBER 2010 M 7 INSTRUMENTATION & CONTROL ASSESSMENT ( ERNESTO & JEANCARLO HAVE A SAY ON THIS )
20 JUNE 2011 C 4 INSTRUMENTATION & CONTROL ASSESSMENT ( ERNESTO & JEANCARLO HAVE A SAY ON THIS )
8 AUGUST 2011 M 6 GE WILL INSPECT THEM DURING NEXT UPCOMING OUTAGE
14 OCTOBER 2011 C 6 INSTRUMENTATION & CONTROL ASSESSMENT ( ERNESTO & JEANCARLO HAVE A SAY ON THIS )
15 JUNE 2012 S 5 IT IS NOT MANDATORY FOR UNITS LIKE OURS THAT RUNS MOSTLY BASE LOAD. IT IS OPTIONAL.
8 OCTOBER 2012 C 6 INSTRUMENTATION & CONTROL ASSESSMENT ( ERNESTO & JEANCARLO HAVE A SAY ON THIS )
8 OCTOBER 2012 C 6 INSTRUMENTATION & CONTROL ASSESSMENT ( ERNESTO & JEANCARLO HAVE A SAY ON THIS )
28 OCTOBER 2013 S 4 WE HAVE HAD PROBLEMS WITH THIS COMPONENTS IN THE PAST. ENERSUR MAY CONDUCT THIS TEST. IT TAKES NO MORE THAN 5 DAYS TO IMPLEMENT IT WHILE IN OUTAGE CONDITION.
02 OCTOBER 2013 S 5 FOR STEAM TURBINE UNITS HAVING MORE THAN 22 YEARS IN SERVICE. IT TAKES 4 WEEKS AND SOME TOOLS TO DO IT. IT WILL NOT BE POSSIBLE TO IMPLEMENT IT DURING THIS OUTAGE.
8 MARCH 2013 S 3 I AM CURRENTLY CHECKING THIS OUT FOR SPARE PARTS AND FOR INSPECTION SERVICE. WE MAY DO IT BY OURSELVES
21 AUGUST 2013 (OBSOLETE-SUPERSEDED BY TIL 1903-R1)
19 NOVEMBER 2013 A 4 ENERSUR CONTROL ROOM OPERATORS MUST HAVE A SAY. IT TAKES 2 TEN-HOUR SHIFTS TO IMPLEMENT REQUESTED MODIFICATIONS.
15 APRIL 2014 M 3 ENERSUR CONTROL ROOM OPERATORS MUST HAVE A SAY
04 APRIL 2003 ENERSUR CONTROL ROOM OPERATORS MUST HAVE A SAY
FOR STEAM TURBINE UNITS HAVING 10 YEARS IN SERVICE ON AVERAGE. IT IS NOT MANDATORY FOR OUR UNIT YET
IT IS OPTIONAL. THERE IS CURRENTLY AN OIL LEAK THAT MAY GENERATE A SIMILAR SITUATION
ENERSUR CONTROL ROOM OPERATORS MUST HAVE A SAY AND LET US KNOW IF N2 PACKING HEAD MAIN FIT IS EXHIBITING TROUBLESOME BEHAVIOUR
GE WILL INSPECT THEM DURING NEXT UPCOMING OUTAGE
INSTRUMENTATION & CONTROL ASSESSMENT ( ERNESTO & JEANCARLO HAVE A SAY ON THIS )
FOR INFORMATION PURPOSES ONLY
I AM CURRENTLY CHECKING THIS OUT FOR SPARE PARTS AND FOR INSPECTION SERVICE. WE MAY DO IT BY OURSELVES
INSTRUMENTATION & CONTROL ASSESSMENT ( ERNESTO & JEANCARLO HAVE A SAY ON THIS )
INSTRUMENTATION & CONTROL ASSESSMENT ( ERNESTO & JEANCARLO HAVE A SAY ON THIS )
GE WILL INSPECT THEM DURING NEXT UPCOMING OUTAGE
INSTRUMENTATION & CONTROL ASSESSMENT ( ERNESTO & JEANCARLO HAVE A SAY ON THIS )
IT IS NOT MANDATORY FOR UNITS LIKE OURS THAT RUNS MOSTLY BASE LOAD. IT IS OPTIONAL.
INSTRUMENTATION & CONTROL ASSESSMENT ( ERNESTO & JEANCARLO HAVE A SAY ON THIS )
INSTRUMENTATION & CONTROL ASSESSMENT ( ERNESTO & JEANCARLO HAVE A SAY ON THIS )
WE HAVE HAD PROBLEMS WITH THIS COMPONENTS IN THE PAST. ENERSUR MAY CONDUCT THIS TEST. IT TAKES NO MORE THAN 5 DAYS TO IMPLEMENT IT WHILE IN OUTAGE CONDITION.
FOR STEAM TURBINE UNITS HAVING MORE THAN 22 YEARS IN SERVICE. IT TAKES 4 WEEKS AND SOME TOOLS TO DO IT. IT WILL NOT BE POSSIBLE TO IMPLEMENT IT DURING THIS OUTAGE.
I AM CURRENTLY CHECKING THIS OUT FOR SPARE PARTS AND FOR INSPECTION SERVICE. WE MAY DO IT BY OURSELVES
(OBSOLETE-SUPERSEDED BY TIL 1903-R1)
ENERSUR CONTROL ROOM OPERATORS MUST HAVE A SAY. IT TAKES 2 TEN-HOUR SHIFTS TO IMPLEMENT REQUESTED MODIFICATIONS.
ENERSUR CONTROL ROOM OPERATORS MUST HAVE A SAY
ENERSUR CONTROL ROOM OPERATORS MUST HAVE A SAY
FOR STEAM TURBINE UNITS HAVING 10 YEARS IN SERVICE ON AVERAGE. IT IS NOT MANDATORY FOR OUR UNIT YET
ENERSUR CONTROL ROOM OPERATORS MUST HAVE A SAY AND LET US KNOW IF N2 PACKING HEAD MAIN FIT IS EXHIBITING TROUBLESOME BEHAVIOUR
I AM CURRENTLY CHECKING THIS OUT FOR SPARE PARTS AND FOR INSPECTION SERVICE. WE MAY DO IT BY OURSELVES
WE HAVE HAD PROBLEMS WITH THIS COMPONENTS IN THE PAST. ENERSUR MAY CONDUCT THIS TEST. IT TAKES NO MORE THAN 5 DAYS TO IMPLEMENT IT WHILE IN OUTAGE CONDITION.
FOR STEAM TURBINE UNITS HAVING MORE THAN 22 YEARS IN SERVICE. IT TAKES 4 WEEKS AND SOME TOOLS TO DO IT. IT WILL NOT BE POSSIBLE TO IMPLEMENT IT DURING THIS OUTAGE.
I AM CURRENTLY CHECKING THIS OUT FOR SPARE PARTS AND FOR INSPECTION SERVICE. WE MAY DO IT BY OURSELVES
ENERSUR CONTROL ROOM OPERATORS MUST HAVE A SAY. IT TAKES 2 TEN-HOUR SHIFTS TO IMPLEMENT REQUESTED MODIFICATIONS.
WE HAVE HAD PROBLEMS WITH THIS COMPONENTS IN THE PAST. ENERSUR MAY CONDUCT THIS TEST. IT TAKES NO MORE THAN 5 DAYS TO IMPLEMENT IT WHILE IN OUTAGE CONDITION.
FOR STEAM TURBINE UNITS HAVING MORE THAN 22 YEARS IN SERVICE. IT TAKES 4 WEEKS AND SOME TOOLS TO DO IT. IT WILL NOT BE POSSIBLE TO IMPLEMENT IT DURING THIS OUTAGE.