DATE:

WELL No.
Time
interval
W/H Pressure
05 Min. 15 Bar 05 Min. 15 Bar
10 Min. 15 Bar 10 Min. 15 Bar
15 Min. 15 Bar 15 Min. 15 Bar
20 Min. 15 Bar 20 Min. 15 Bar
25 Min. 15 Bar 25 Min. 15 Bar
30 Min. 15 Bar 30 Min. 15 Bar
Time
interval
W/H Pressure
05 Min.
15 Bar
05 Min.
15 Bar
10 Min.
15 Bar
10 Min.
15 Bar
15 Min.
15 Bar
15 Min.
15 Bar
20 Min.
15 Bar
20 Min.
15 Bar
25 Min.
15 Bar
25 Min.
15 Bar
30 Min.
15 Bar
30 Min.
15 Bar
Remarks Actions are inhibited as per SIMOPS instructions
Prior to start operation inforn control room to depresurised flow line
No leak of SCSSV and SSV
Obervations
Obervations
Performer Field Supervisor Production Supdt.
SSV LEAK TEST / HOLD TEST
Up stream Pressure
Well Shut in Pressure
145 Bar
SCSSV Closed
SSV Open
SSV Closed
SCSSV Open
Status
RSES
145 Bar 15 Bar
Observations
W/H pressure
after
depresuriseing
SCSSV LEAK / HOLD TEST
SIMOPS TEST
LEAK / HOLD TEST FOR SCSSV / SSV
North East Cluster
25th August 05
Status
Flow line pressure
During test
D - 121 P
W/H pressure
after
depresuriseing
Flow line pressure Up stream Pressure
Well Shut in Pressure During test
15 Bar