DATE:

WELL No.
Time
interval
W/H Pressure (
barg)
05 Min. 25 05 Min. 42
10 Min. 25 10 Min. 42
15 Min. 25 15 Min. 42
20 Min. 25 20 Min. 42
25 Min. 25 Min.
30 Min. 30 Min.
Time
interval
W/H Pressure
(barg)
05 Min. 25 05 Min. 45
10 Min. 25 10 Min. 45
15 Min. 25 15 Min. 45
20 Min. 25 20 Min. 45
25 Min. 25 Min.
30 Min. 30 Min.
Remarks
No leak on the SCSSV and SSV as bothare holding
S Shetty M Loubet
Pascal
Status
Flow line pressure
During test (barg)
Production Supdt.
W/H pressure
after
depresuriseing
(barg)
Flow line pressure Up stream Pressure
Well Shut in Pressure
(barg)
Observations
During test (barg)
Field Supervisor
SIMOPS TEST
LEAK / HOLD TEST FOR SCSSV / SSV
North East Cluster
03/03/2006
D120P
Obervations
Obervations
SCSSV Closed
SSV Open
SSV Closed
SCSSV Open
Status
42
80 45
SSV LEAK TEST / HOLD TEST
SCSSV LEAK / HOLD TEST
Up stream Pressure
Well Shut in Pressure
(barg)
80
W/H pressure
after
depresuriseing
(barg)
RSES
Performer
Majid/Daneil

DATE:
WELL No.
Time
interval
W/H Pressure
(barg)
05 Min. 24 05 Min. 52
10 Min. 24 10 Min. 52
15 Min. 24 15 Min. 52
20 Min. 24 20 Min. 52
25 Min. 25 Min.
30 Min. 30 Min.
Time
interval
W/H Pressure
(barg)
05 Min. 24 05 Min. 52
10 Min. 24 10 Min. 52
15 Min. 24 15 Min. 52
20 Min. 24 20 Min. 52
25 Min. 25 Min.
30 Min. 30 Min.
Remarks
No leak on the SCSSV and SSV as bothare holding
S Shetty M Loubet
Pascal
SCSSV Open
Status
102
SSV LEAK TEST / HOLD TEST
SCSSV LEAK / HOLD TEST
RSES
52
102
Majid/Daneil
Up stream Pressure Obervations
Obervations
W/H pressure
after
depresuriseing
(barg)
SCSSV Closed
SSV Open
SSV Closed
Status
Flow line pressure
During test (barg)
Well Shut in Pressure
(barg)
Observations
SIMOPS TEST
LEAK / HOLD TEST FOR SCSSV / SSV
North East Cluster
3/3/2006
D - 121 P
Production Supdt.
W/H pressure
after
depresuriseing
(barg)
Flow line pressure Up stream Pressure
Well Shut in Pressure
(barg)
During test (barg)
Field Supervisor
52
Performer

DATE:
WELL No.
Time
interval
W/H Pressure
(barg)
05 Min. 25 05 Min. 55
10 Min. 25 10 Min. 55
15 Min. 25 15 Min. 55
20 Min. 25 20 Min. 55
25 Min. 25 Min.
30 Min. 30 Min.
Time
interval
W/H Pressure
(barg)
05 Min. 25 05 Min. 50
10 Min. 25 10 Min. 50
15 Min. 25 15 Min. 50
20 Min. 25 20 Min. 50
25 Min. 25 Min.
30 Min. 30 Min.
Remarks
No leak on the SCSSV and SSV as bothare holding
S Shetty M Loubet
Pascal
SCSSV Open
Status
105
SSV LEAK TEST / HOLD TEST
SCSSV LEAK / HOLD TEST ( NO SCSSV ONLY SLEEVE)
RSES
55
105
Majid/Daneil
Up stream Pressure Obervations
Obervations
W/H pressure
after
depresuriseing
(barg)
SCSSV Closed
SSV Open
SSV Closed
W/H pressure
after
depressurising
(barg)
Status
Flow line pressure
During test (barg)
Well Shut in Pressure
(barg)
Observations
SIMOPS TEST
LEAK / HOLD TEST FOR SCSSV / SSV
North East Cluster
3/3/2006
D - 122P
Field Supervisor
50
Performer
Flow line pressure Up stream Pressure
Well Shut in Pressure
(barg)
During test (barg)
Production Supdt.