Sie sind auf Seite 1von 4

DATE:

WELL No.
Time
interval
W/H Pressure
(barg)
05 Min. 24 05 Min. 27
10 Min. 24 10 Min. 27
15 Min. 24 15 Min. 27
20 Min. 20 Min.
25 Min. 25 Min.
30 Min. 30 Min.
Time
interval
W/H Pressure
(barg)
05 Min. 24 05 Min. 27
10 Min. 24 10 Min. 27
15 Min. 24 15 Min. 27
20 Min. 20 Min.
25 Min. 25 Min.
30 Min. 30 Min.
Remarks
SCSSV and SSV both are holding.
Bijani Rashid S.A M. Loubet
F. Paille Barrere
27
Performer
Flow line pressure Up stream Pressure
Well Shut in Pressure
(barg)
During test (barg)
Obervations
Obervations
W/H pressure
after
depresuriseing
(barg)
SCSSV Closed
Status
Flow line pressure
During test (barg)
Well Shut in Pressure
(barg)
SSV Open
SSV Closed
SCSSV Open
Status
Observations
SIMOPS TEST
LEAK / HOLD TEST FOR SCSSV / SSV
North East Cluster
9/7/2006
D - 130P
RSES
51
SSV LEAK TEST / HOLD TEST
SCSSV LEAK / HOLD TEST ( NO SCSSV ONLY SLEEVE)
27
51
Up stream Pressure
Production Supdt.
W/H pressure
after
depressurising
(barg)
Field Supervisor

DATE:
WELL No.
Time
interval
W/H Pressure (
barg)
05 Min. 24.5 05 Min. 42
10 Min. 24.5 10 Min. 42
15 Min. 24.5 15 Min. 42
20 Min. 20 Min.
25 Min. 25 Min.
30 Min. 30 Min.
Time
interval
W/H Pressure
(barg)
05 Min. 24.5 05 Min. 48
10 Min. 24.5 10 Min. 48
15 Min. 24.5 15 Min. 48
20 Min. 20 Min.
25 Min. 25 Min.
30 Min. 30 Min.
Remarks
SCSSV and SSV both are holding.
Bijani Rashid S.A M. Loubet
F Paille Barrere
RSES
Performer
Status
Flow line pressure
During test (barg)
Production Supdt.
W/H pressure
after
depresuriseing
(barg)
Flow line pressure Up stream Pressure
Well Shut in Pressure
(barg)
During test (barg)
Field Supervisor
SIMOPS TEST
LEAK / HOLD TEST FOR SCSSV / SSV
North East Cluster
9/07/2006
D120P
Obervations
Obervations
SSV LEAK TEST / HOLD TEST
100 48
Observations
SCSSV Closed
SSV Open
SSV Closed
SCSSV Open
Status
SCSSV LEAK / HOLD TEST
Up stream Pressure
Well Shut in Pressure
(barg)
100
W/H pressure
after
depresuriseing
(barg)
42

DATE:
WELL No.
Time
interval
W/H Pressure
(barg)
05 Min. 25 05 Min. 40
10 Min. 25 10 Min. 40
15 Min. 25 15 Min. 40
20 Min. 20 Min.
25 Min. 25 Min.
30 Min. 30 Min.
Time
interval
W/H Pressure
(barg)
05 Min. 25 05 Min. 38
10 Min. 25 10 Min. 38
15 Min. 25 15 Min. 38
20 Min. 20 Min.
25 Min. 25 Min.
30 Min. 30 Min.
Remarks
SCSSV and SSV both are holding.
Bijani Rashid S.A M. Loubet
F Paille Barrere
SCSSV Closed
Status
74
SSV LEAK TEST / HOLD TEST
40
SIMOPS TEST
LEAK / HOLD TEST FOR SCSSV / SSV
North East Cluster
10/7/2006
RSES
SSV Open
SSV Closed
SCSSV Open
Status
Observations
D - 121 P
Obervations
Obervations
W/H pressure
after
depresuriseing
(barg)
Flow line pressure
During test (barg)
Well Shut in Pressure
(barg)
Up stream Pressure
SCSSV LEAK / HOLD TEST
Production Supdt.
W/H pressure
after
depresuriseing
(barg)
Flow line pressure Up stream Pressure
Well Shut in Pressure
(barg)
During test (barg)
Field Supervisor
38
Performer
79

DATE:
WELL No.
Time
interval
W/H Pressure
(barg)
05 Min. 25 05 Min. 50
10 Min. 25 10 Min. 50
15 Min. 25 15 Min. 50
20 Min. 20 Min.
25 Min. 25 Min.
30 Min. 30 Min.
Time
interval
W/H Pressure
(barg)
05 Min. 25 05 Min. 59
10 Min. 25 10 Min. 59
15 Min. 25 15 Min. 59
20 Min. 20 Min.
25 Min. 25 Min.
30 Min. 30 Min.
Remarks
SCSSV and SSV both are holding.
Bijani Rashid S.A M. Loubet
F Paille Barrere
SCSSV Open
Status
RSES
105
SSV LEAK TEST / HOLD TEST
SCSSV LEAK / HOLD TEST
50
114
Up stream Pressure
Production Supdt.
Obervations
Obervations
W/H pressure
after
depresuriseing
(barg)
SCSSV Closed
SSV Open
SSV Closed
W/H pressure
after
depressurising
(barg)
Status
Flow line pressure
During test (barg)
Well Shut in Pressure
(barg)
Observations
SIMOPS TEST
LEAK / HOLD TEST FOR SCSSV / SSV
North East Cluster
10/7/2006
D - 122P
59
Performer
Flow line pressure Up stream Pressure
Well Shut in Pressure
(barg)
During test (barg)
Field Supervisor