DATE:

Cluster
Well

Time
interval
WH pressure
Barg
Time
interval
FL pressure
barg
Time
interval
FL pressure
01mn 22 02mn
02mn
22.5 02mn 15 04mn
03mn
22.5 03mn 15 06mn
04mn
23 04mn 15 10mn
05mn
23 5mn 15 16mn
22mn
28mn
Remarks :
2 manifold valves closed
Time
interval
FL pressure
Barg
02mn 19 02mn 14
04mn 19.2 04mn 14
05mn 19.5 05mn 14
06mn 19.5 06mn 14
Remarks:
Procedure
n/a
1/ Loose plug nut of wire line connector
2/ Open slowly valve BBB-2
n/a
\\vboxsrv\conversion_tmp\scratch_1\[246902282.xls.ms_office.xls]D-120P
Field supervisor Operator (IOOC) SPDT / RSES
Control line integrity control line backflow checking
Check pressure gauge P-2 Pressure value
SSVpassing, test on
FL,wing valve opened
In case of valve passing,
do the test again & fill
Flowline table
Up stream Pressure
Barg
ESDV manifold valve &
manual valve closed
FL pressure raised during
test
NORTH EAST
Pressure after
depressurizing
Upstream- 25 barg
Non Critical flow = 0.14 SM3D, Status Proof (Acceptance < or = 25 SM3D)
Reading
61
JL. Uzabiaga
2 manifold valves closed
Perform test on flowline
SSV/Lower Master Valve
pressure holding
Length
of FL
Status
Check if gas flow is coming Back gas flow comments
Non Critical flow = 0.13 SM3D, Status Proof (Acceptance < or = 25 SM3D)
SSV passing Fill table SSV passing
Perform test on flowline
Flowline
Wellhead
22
Status
SSV Closed
Lower Master
valve open
LEAK TEST FOR SCSSV / SSV
SSV LEAK TEST / HOLD TEST
Action Manifold valve status
14-May-08
D120P
Flow line
Stop test after 5mn
Reading only for test
time
Lower Master Valve LEAK / HOLD TEST
Flowline
Status
Upstream Pressure
Barg
Pressure after
depressurizing
Upstream- 25 barg
WH pressure Wing valve
closed
Barg
District Manager / RSESG
F. Paille-Barrere
Lower Master
Valve Closed
62 19
SSV Open
Medhi JC. Schneider

DATE:
Cluster
Well

Time
interval
WH pressure
Time
interval
FL pressure
Time
interval
FL pressure
01mn 02mn
02mn
02mn 04mn
03mn
06mn
04mn
04mn 10mn
05mn
16mn
15mn
15mn 22mn
28mn
Remarks :
Perform test on flowline 2 manifold valves closed
Time
interval
FL pressure
02mn
04mn 04mn
06mn 06mn
08mn 08mn
15mn 15mn
20mn 20mn
30mn 30 Min.
Remarks:
Procedure
0
1/ Loose plug nut of wire line connector
2/ Open slowly valve BBB-2
No
Operator Field supervisor SPDT / RSES
Check if gas flow is coming Back gas flow comments
Control line integrity control line backflow checking
SCSSV Closed
SSV Open
SSV LEAK TEST / HOLD TEST
NORTH EAST
D-121P
Check pressure gauge P-2 Pressure value
LEAK TEST FOR SCSSV / SSV
SSV/SCSSV pressure
holding
Upstream Pressure
SCSSV LEAK / HOLD TEST
Flowline
Reading only for test
time
SCSSV Open
WH pressure Wing valve
closed
Pressure after
depressurizing
Upstream- 25
barg
Status
SSV passing
Stop test after 10mn
Perform test on flowline 2 manifold valves closed
Status
FL pressure raise during
test
SSVpassing, test on
FL,wing valve opened
In case of valve passing,
do the test again & fill
Flowline table
Wellhead
ESDV manifold valve &
manual valve closed
Status
SSV Closed
Pressure after
depressurizing
Upstream- 25
barg
Up stream Pressure
Manifold valve status Action
Fill table SSV passing
Flow line
Length
of FL
Reading
Flowline

DATE:
Cluster
Well

Time
interval
WH pressure
Time
interval
FL pressure
Time
interval
FL pressure
01mn 02mn
02mn
02mn 04mn
03mn
06mn
04mn
04mn 10mn
05mn
16mn
15mn
15mn 22mn
28mn
Remarks :
Perform test on flowline 2 manifold valves closed
Time
interval
FL pressure
02mn
04mn 04mn
06mn 06mn
08mn 08mn
15mn 15mn
20mn 20mn
30mn 30 Min.
Remarks:
Procedure
1/ Loose plug nut of wire line connector
2/ Open slowly valve BBB-2
\\vboxsrv\conversion_tmp\scratch_1\[246902282.xls.ms_office.xls]D-120P
Operator Field supervisor SPDT / RSES
Check if gas flow is coming Back gas flow comments
Control line integrity control line backflow checking
SCSSV Closed
SSV Open
SSV LEAK TEST / HOLD TEST
NORTH EAST
D-122P
Check pressure gauge P-2 Pressure value
LEAK TEST FOR SCSSV / SSV
SSV/SCSSV pressure
holding
Upstream Pressure
SCSSV LEAK / HOLD TEST
Flowline
Reading only for test
time
SCSSV Open
WH pressure Wing valve
closed
Pressure after
depressurizing
Upstream- 25
barg
Status
SSV passing
Stop test after 10mn
Perform test on flowline 2 manifold valves closed
Status
FL pressure raise during
test
SSVpassing, test on
FL,wing valve opened
In case of valve passing,
do the test again & fill
Flowline table
Wellhead
ESDV manifold valve &
manual valve closed
Status
SSV Closed
Pressure after
depressurizing
Upstream- 25
barg
Up stream Pressure
Manifold valve status Action
Fill table SSV passing
Flow line
Length
of FL
Reading
Flowline

DATE:
Cluster
Well

Time
interval
WH pressure
Time
interval
FL pressure
Time
interval
FL pressure
01mn 02mn
02mn
02mn 04mn
03mn
06mn
04mn
04mn 10mn
05mn
16mn
15mn
15mn 22mn
28mn
Remarks :
Perform test on flowline 2 manifold valves closed
Time
interval
FL pressure
02mn 02mn
04mn 04mn
06mn 06mn
08mn 08mn
15mn 15mn
20mn 20mn
30mn 30 Min.
Remarks:
Procedure
1/ Loose plug nut of wire line connector
2/ Open slowly valve BBB-2
\\vboxsrv\conversion_tmp\scratch_1\[246902282.xls.ms_office.xls]D-120P
Check pressure gauge P-2 Pressure value
Control line integrity control line backflow checking
SCSSV LEAK / HOLD TEST
Fill table SSV passing
Status
SCSSV Closed
D-130P
Pressure after
depressurizing
Upstream- 25
barg
Stop test after 10mn
LEAK TEST FOR SCSSV / SSV
SSV Open
SSV Closed
SCSSV Open
Status
SSV LEAK TEST / HOLD TEST
FL pressure raise during
test
SSV/SCSSV pressure
holding
NORTH EAST
Reading
Reading only for test
time
Perform test on flowline 2 manifold valves closed
Manifold valve status Action
Flow line
SSVpassing, test on
FL,wing valve opened
In case of valve passing,
do the test again & fill
Flowline table
Wellhead Flowline
Up stream Pressure
ESDV manifold valve &
manual valve closed
Length
of FL
Flowline
Upstream Pressure
WH pressure Wing valve
closed
Pressure after
depressurizing
Upstream- 25
barg
Status
SSV passing
Back gas flow comments
Operator Field supervisor SPDT / RSES
Check if gas flow is coming

DATE:
Cluster
Well

Time
interval
WH pressure
Barg
Time
interval
FL pressure
barg
Time
interval
FL pressure
01mn 02mn
02mn
02mn 04mn
03mn
06mn
04mn
04mn 10mn
05mn
16mn
15mn
15mn 22mn
28mn
Remarks :
Perform test on flowline 2 manifold valves closed
Time
interval
FL pressure
Barg
02mn
04mn 04mn
06mn
08mn 08mn
15mn 15mn
20mn 20mn
30mn 30 Min.
Remarks:
Procedure
1/ Loose plug nut of wire line connector
2/ Open slowly valve BBB-2
Check pressure gauge P-2 Pressure value
Check if gas flow is coming Back gas flow
Operator Field supervisor SPDT / RSES
Flowline
Upstream Pressure
Barg
WH pressure Wing valve
closed
Barg
Pressure after
depressurizing
Upstream- 25
barg
Status
SSV passing
Flow line
SSVpassing, test on
FL,wing valve opened
In case of valve passing,
do the test again & fill
Flowline table
Wellhead
Length
of FL
Flowline
Reading
Reading only for test
time
Perform test on flowline 2 manifold valves closed
Manifold valve status Action
Up stream Pressure
Barg
ESDV manifold valve &
manual valve closed
SCSSV Closed
SSV Open
SSV Closed
SCSSV Open
Status
SSV LEAK TEST / HOLD TEST
FL pressure raise during
test
SSV/SCSSV pressure
holding
NORTH EAST
D120P
Pressure after
depressurizing
Upstream- 25
barg
Stop test after 10mn
Control line integrity control line backflow checking
LEAK TEST FOR SCSSV / SSV
SCSSV LEAK / HOLD TEST
Fill table SSV passing
Status