Sie sind auf Seite 1von 1

DATE:

Time
interval
W/H Pressure
05 Min. 15 05 Min. 23
10 Min. 15 10 Min. 25
15 Min. 15 15 Min. 25
20 Min. 15 20 Min. 27
25 Min. 25 Min.
30 Min. 30 Min.
Time
interval
W/H Pressure
05 Min.
14
05 Min.
25
10 Min.
14
10 Min.
25
15 Min.
14
15 Min.
25
20 Min.
14
20 Min.
25
25 Min. 25 Min.
30 Min. 30 Min.

SSV Test has been done by closing wing valve - no leak.
SCSSV found passing - 7 bar in 20 Minutes informed to compaany man and well completion.
E Daneil S Shetty M Loubet
RSES
Laurent
Production Supdt.
D-124P
Obervations
Obervations
SSV LEAK TEST / HOLD TEST
Up stream Pressure
Well Shut in Pressure
130
130 25
Observations
Performer Field Supervisor
SCSSV Closed
SSV Open
SSV Closed
SCSSV Open
Status
20
W/H pressure
after
depresuriseing
SIMOPS TEST
MONTHLY LEAK / HOLD TEST FOR SCSSV / SSV
South Cluster
11/14/2005
Status
Flow line pressure
During test
Flow line pressure Up stream Pressure
Well Shut in Pressure During test
W/H pressure
after
depresuriseing
SCSSV LEAK / HOLD TEST

Das könnte Ihnen auch gefallen