EJERCICIO 5

costo por ordenes de fabricacion


V. High Desert Potteryworks makes a variety of pottery products that it sells to retailers such as
Home Depot. The company uses a job-order costing system in which predetermined overhead
rates are used to apply manufacturing overhead cost to jobs. The predetermined overhead
rate in the Molding Department is based on machine-hours, and the rate in the Painting
Department is based on direct labour cost. At the beginning of the year, the companys
management made the following estimates:

Job 205 was started on August 1 and completed on August 10. The companys cost records
show the following information concerning the job:

Required:
a. Compute the predetermined overhead rate used during the year in the Molding
Department. Compute the rate used in the Painting Department.
b. Compute the total overhead cost applied to Job 205.
c. What would be the total cost recorded for Job 205? If the job contained 50 units, what
would be the unit product cost?
d. At the end of the year, the records of High Desert Potteryworks revealed the following
actual cost and operating data for all jobs worked on during the year:

DEPARTAMENTO DE MOLDEADO
BASE REAL
110
CIFP
602,000
BASAP
70,000

TASA
CIFA
CIFATOTAL
CIF
MD
MOD
TOTAL COSTO
COSTO UNITARIO

8.6
946
2136
946
470
290

1190
332
680

78.16

it sells to retailers such as


predetermined overhead
determined overhead
rate in the Painting
ar, the companys

st records

DEPARTAMENTO DE PINTURA
BASE REAL
680
CIFP
735,000
BASAP
420,000

TASA
CIFA

1.75
1190

TOTAL
2136
802
970
3908

EJERCICIO 6

Produccion real: 142575 unidades


Total CIFV = (costo variable unitario * nivel de produccion)
CIFV = 0.54*175000 = 94500
El total de CIFV = 94500
CIF Fijos = 36500
CIF semivariables = 30000
Total CIF Presupuestal = 94500 + 36500 + 30000 = 161000
CIFP = base real * tasa presupuestal
Tasa presupuestal =
1) Unidades de producto
Tasa presupuestal
CIFA = 142575 * 0.92 = 131169
2) Horas maquinas
Tasa presupuestal =
CIFA = 62000 * 2.61 = 161820

3) Horas de mano de obra directa


Tasa presupuestal =
CIFA = 96720 * 1.6 = 160555

4) Costo de los materiales


Tasa Presupuestal =
CIFA = 120000 * 1.28 = 153600
5) Costo de la mano de obra directa
Tasa Presupuestal =
CIFA = 220000 * 0.75 = 165000

EJERCICIO 8
A:
EMPRESA

COMPAA CVY

PEDIDO

5000 UNDS PRODUCTO X

FECHA
DIA 1
DIA 5

MATERIALES
Q
PRECIO
TOTAL
HORAS
50
30000
1500000
10
100000
1000000
= 2500000

COSTO MD=
COSTO MOD=
COSTO CIF=
TOTAL

ORDEN

H1
MOD
TASA
200
100

2500000
2701260
450000

tasa= costo mod /horas efectivaS


salarios=
aux trans=
subtotal
prestaciones=
# total mod=

5651260

COSTO UNITARIO:

TOTAL
9004.2
1800840
9004.2
900420
= 2701260

1130.252

4070000
72000
4286000
2143000
6429000
horas

#horas efectivas

tasa =

9004.2

CIF PRESUPUESTADOS
TASA A=
TASA B=

B:
EMPRESA

COMPAA CVY

PEDIDO

1000 UNDS PRODUCTO Y

FECHA
DIA 1
DIA 5

MATERIALES
Q
PRECIO
TOTAL
HORAS
200
30000
6000000
5
100000
500000
= 11000000

MOD
TASA= costos mod / horas efectivas

ORDEN

8.5

1000
2500

H2
MOD
TASA
500
50

TOTAL
9004.2
4502100
9004.2
450210
= 4952310

salario
aux trans
subtotal
prestaciones
total mod

4070000
216000
4286000
2143000
6429000

COSTO MD
COSTO MOD
COSTO CIF
TOTAL

horas
horas efectivas
horas efectivas=
tasa=

dias del mes dias de la semana


8.5
21
4
714
9004.2

CIF
TASA= CIF PRESUPUESTADO / BASE PRESUPUESTAL
TASA A:
TASAB:

400
5000

COSTO UNITARIO=

CIF
TASA

HORAS
200
100

TOTAL
1000
200000
2500
250000
= 450000

A
B

216000

total de dias dias a la semana


21
4=

CIF
TASA

HORAS
500
50

TOTAL
400
200000
5000
250000
= 450000

714

A
B

11000000
4952310
450000
16402310

OSTO UNITARIO=

16402.31

EJERCICIO 9
INV.
COMPRA
COMPRA

ENTRADA
$
TOTAL
Q
600
5000
3000000
100
5500
550000
150
5600
840000

orden 1:
orden 2:
orden 3:

50
230
280

5164.7
5164.7
5164.7

280

devolucion
10

SALIDA
$

TOTAL

258235
1187882
1446118

entonces
orden 3:

COSTO TOTAL DE MATERIALES


orden 1:
1000000
orden 2:
1800000
orden 3:
1394469

258235
1187950

270
270

22000000

15400000
13090000

(15%) MOI:

(13%) orden 901


(44%) orden 902
(43%) orden 903

2310000

CIF
TASA (corte y soldadura)
TASA (pintura y niquelado)

1394469

1258235
2987950

LA EMPRESA A LOS TRABAJADORES LA SUMA DE :


(70%) Trabajadores de la fabrica:
(85%) MOD:

5164.7

118000000
100000000

17000
16800

CIFA (corte y soldadura)


CIFA= tasa * base real
orden 901
200
orden 902
100
orden 903
300

6941.2
6941.2
6941.2

1388235.3
694117.6
2082352.9

CIFA (pintura y niquelado)


CIFA=tasa*base real
orden 901
250
orden 902
250
orden 903
200

5952.4
5952.4
5952.4

1488095.2
1488095.2
1190476.2

6941.2
5952.4

CIFA TOTAL
901
902
903
TOTAL

2876330.5
2182212.9
3272829.1
8331372.5

A: COSTO TOTAL 901


MOD
MD
CIF
TOTAL

1701700.0
1258235.0
2876330.5
5836265.5

COSTO UNITARIO:

194542.184

B: COSTO TOTAL 902


MOD
MD
CIF
TOTAL

5759600
2987950
2182212.9
10929762.9

COSTO UNITARIO:

57525.1

C: COSTO TOTAL 903


MOD
MD
CIF
TOTAL

5628700
1394469
3272829.1
10295998.1

COSTO UNITARIO:

857999.8

D: VARIACION NETA
CIRF VS CIFA

3105000 VS 8331210
3105000 < 8331210

Es favorable porque se consume menos CIF que el valor cargado a la

SALDO
$

Q
600
700
850

1701700
5759600
5628700

TOTAL
5,000
3000000
5071.4
3550000
5164.7
4390000

e menos CIF que el valor cargado a la produccion

XI. En el cuadro siguiente se muestran los cargos, salarios y tiempo suplementario laboradoe durante
el mes de septiembre por los trabajadores de la empresa el triunfo.

Operario 1
300,000
Operario 2
310,000
Operario 3
320,000
Operario 4
315,000
Operario 5
316,000
Operario 6
310,000
Operario 7
320,000
Operario 8
320,000
Operario 9
330,000
Operario 10
296,000
Operario 11
300,000
Operario 12
310,000
Operario 13
300,000
Secretaria Produccion
350,000
Supervisor N1 520,000
Supervisor N2 520,000
Supervusir N3 520,000
Jefe de produccion
1,200,000

9d, 4n
7d, 3n
9d, 6n
12d, 5n
18d, 8n
16d, 4n
17d, 3n
9d, 4fn
4d, 3n
3d, 4n
1d, 3fn

Donde:
d: Hora extra diurna
n: Hora extra nocturna
fn: Hora extra festiva normal
La empresa labora de Lunes a Viernes, en un horario establecido de 7:30 a.m a 12:30 p.my de 1:00 p.m a 5:30 p.m.
hay 15 minutos de descanso en la maana y en la tarde.
El consumo real de horas hombre por orden de produccion durante el periodo de estudio fue:
Orden 101
Orden 103

400
Orden 102
700
Orden 104

720
468

Determine: El costo de MOD para cada orden asuma que el salario auxilio de transporte
para todos los trabajadores directos (MOD) es de $578.500

SOLUCION
Operario 1
Operario 3
VHO= 300.000/240
VHO=320.000/240
VHO= $1250
VHO= 1333
VHD= $1250 * 1,25 = 1562,5*9
VHD=
= 14062
1333*1.25 = 1666*9= 14994
VHN= $1250 * 1,75= 2187,5*4=
VHN=
8750
1333*1.75 = 2333*3= 6999

Operario 5
VHO= 316.000/240 = 1317
VHD= 1317*1,25 = 1646*18 = 29.628
VHN= 1317*1.75 = 2305*8=18440
Salario Operador 5 = 364.068

Salario Operario 1 = 322.812Salario Operador 3= 341.993


Operario 2
Operario 4
VHO= 310.000/240 = 1292 VHO= 315.000/240= 1312
VHD= 1292*1.25= 1615*7= 11.305
VHD= 1312*1.25 = 1640*12 = 19680
VHN=1292*1,75= 2261*3= 6.783
VHN= 1312*1.75 = 2296*5 = 11480

Operario 6
VHO= 310.000/240 = 1292
VHD= 1292*1.25= 1615*16 = 25840
VHN= 1292*1.75= 2261*4= 9044

Salario Operario 2= 328.088 Salario Operador 4= 346.160

Salario Operador 6 = 344.884

Operario 7
Operario 8
VHO= 320000/240= 1333 VHO= 320.000/ 240 = 1333
VHD= 1333*1.25= 1666*17 =VHD=
28.322
1333*1.25 = 1666*9 = 14.994
VHN= 1333*1.75 = 2333*3 = VHFN=
6999 1333*2 = 2666*4 = 10664

Operario 9
VHO= 330.000/240 = 1375
VHD= 1375* 1.25 = 1719*4 = 6876
VHN= 1375*1.75 = 2406*3 = 7218

Salario Operario 7 = 355.321 Salario Operario 8 = 345.658

Salario Operario 9 = 344.093

Operario 10
Operario 11
VHO= 296.000 / 240 = 1233 VHO = 300.000/240 = 1250
VHD = 1233*1.25 = 1541* 3 =VHD
4623
= 1250 * 1.25 = 1562 * 1 = 1562
VHN= 1233*1.75 = 2158* 4 =VHFN=
8632 1250 * 2500*3
2=
= 7500
Salario Operario 10 = 309. 255
Salario Operario 11 = 309.062

SALARIO TOTAL DE LOS 13 OPERARIOS


4,321,394
=

SALARIO MOD 4,321,394


AUX. TRANS. MOD 578,500
Sub Total
4,899,894
Prestaciones (52,72,582,244
%)
Total
7,482,138

Efectivamente Laboradas
Dias habiles
22
Horas Ordinarias
9
N Operarios
13
Total Horas
2574 (22*9*13)

Tarifa MO = 7.482.138 / 2574 = 2907


Orden
101
102
103

Tarifa MO
2907
2907
2907

NHoras
400
720
700

Costo MO
1,162,800
1,509,840
2,034,900

Salario Operario 12 = 310.000


Salario Operario 13 = 300.000

104

2907

468

1,360,476

doe durante

my de 1:00 p.m a 5:30 p.m.

= 1646*18 = 29.628
= 2305*8=18440
5 = 364.068

= 1615*16 = 25840
= 2261*4= 9044
6 = 344.884

5 = 1719*4 = 6876
5 = 2406*3 = 7218

9 = 344.093

12 = 310.000

13 = 300.000

EJERCICIO 13
A:
PRODUCCION

COSTO
23000
13000
10000

COSTO VARIABLE:

$ 39,000
$ 25,000
$ 14,000

COSTO
# UNDS

$ 14,000 $
10000

1.4

HALLO LA PORCION FIJA


PUNTO ALTO

23000
1.4
32200

$ 39,000
32200
$ 6,800

PARTE FIJA

B:
X

Y
20000
20000
19000
17000
16000
15000
13000
16000
18000
20000
23000
22000
219000

Y=
XY=

X
XY
$ 33,750
$ 675,000,000
$ 32,500
$ 650,000,000
$ 30,000
$ 570,000,000
$ 29,000
$ 493,000,000
$ 29,000
$ 464,000,000
$ 27,500
$ 412,500,000
$ 25,000
$ 325,000,000
$ 31,000
$ 496,000,000
$ 30,500
$ 549,000,000
$ 36,000
$ 720,000,000
$ 39,000
$ 897,000,000
$ 38,000
$ 836,000,000
$ 381,250 $ 7,087,500,000

na + bX
aX + bX

400000000
400000000
361000000
289000000
256000000
225000000
169000000
256000000
324000000
400000000
529000000
484000000
4093000000

381250=12a+219000b
(-186894)
7087500000=219000a+4093000000b

multiplico a e1 por -18689.4


(-7125333750) =

(-224272.8a)

- 4093000000(b)

7087500000 =
-37833750 =

a=

a= 85,35

REEMPLAZO EL VALOR DE a EN LA (e2)


7087500000=219000(85,35)+4093000000b
7087500000=18691650+4093000000b
7087500000-18691.650=4093000000b
7068808350=4093000000b
b=7068808350/4093000000
b=1,72
ECUACION
y=85,35+1,72x

219000a
(-443272.8)(a)

-37833750
(-443272.8)

+ 4093000000(b)

(e1)
(e2)

93000000(b)

93000000(b)

Das könnte Ihnen auch gefallen