Sie sind auf Seite 1von 16

Project Name: Ninh Binh Fine Coal Based Urea Plant

Doc.:
Page:

50061-00-02-430-0004-001
1/15

LINE LIST

FOR
INTERCONNECTION PIPE RACK

2009-5-14

ISSUED FOR DETAIL DESIGN

ZHAO HONGXIA

MA MINGYAN

LUO JINGREN

2009-3-20

ISSUED FOR APPROVAL

ZHAO HONGXIA

MA MINGYAN

LUO JINGREN

REV.

DATE

STATUS

WRITTEN BY

CHECKED BY

APPROV. BY

DOCUMENT REVISIONS

No.7 Yinghuayuan Dongjie, Chaoyang Distr., Beijing 100029, P.R.China

AUTHOR. BY

PROJ.MAN

LINE LIST FOR


INTERCONNECTION PIPE
RACK
FLUID
LINE No.

SIZE
DN CLASS
(inch)

LINE ROUTINE

OPERATION
TEMP. ()

MEDIUM

PHASE

FROM

TO

Project Name:
Project No. :

50061

TEMP.

INSIDE & OUTSIDE PROTECTION

TEST

PRESS.
MATERIAL

NORM. MAX. NORM. MAX.

Revision

Doc No.: 50061-00-02-430-0004-001


DESIGN

PRESS. (MPa G)

Ninh Binh Fine Coal Based Urea Plant

THK. OF INSIDE & MEDIU


INSUL. OUTSIDE
M
(mm)
PROT.

FLUSH
MEDIU
M

P & I DWG No.

FLUID
EARTHING CATEGO
RY
REQUIREME
NT
U
T

()

(MPaG)

0.003

-40/70

2.5

Rigid Foam
Polyurethane

50

50061-00-02-310-0004-01

GC2

25

2.4

75

3.3

Rigid Foam
Polyurethane

30

50061-00-02-310-0004-01

GC2

Liquid Ammonia Storage


Unit 84

-33

0.49

-40/75

2.5

Rigid Foam
Polyurethane

50

50061-00-02-310-0004-01

GC2

Liquid Ammonia Storage


Unit 84

4"-AL1601

25

2.65

-40/70

3.3

Rigid Foam
Polyurethane

30

50061-00-02-310-0004-01

GC2

8"-BW5044

Gasification Unit 10

134

7.5

175

9.2

Glass Fiber

60

50061-00-02-310-0004-02

GC2

MP Boiler Feed Water

8"-BW5044

Air Seperation Unit 40

134

7.5

175

9.2

Glass Fiber

50

50061-00-02-310-0004-02

GC2

D2A

MP Boiler Feed Water

Power Station Unit 50

CO Shift and Sulfur


Recovery Unit 14

134

7.5

175

9.2

Glass Fiber

60

50061-00-02-310-0004-02

GC2

B2A

LP Boiler Feed Water

Power Station Unit 50

CO Shift and Sulfur


Recovery Unit 14

134

1.2

175

1.64

Glass Fiber

60

50061-00-02-310-0004-02

GC2

1 1/2

E1A

HP Boiler Feed Water

Power Station Unit 50

CO Shift Unit 14

134

14

175

17

Glass Fiber

50

50061-00-02-310-0004-02

GC1(3)

10

B1Q

Gaseous Ammonia

Liquid Ammonia Storage Ammonia Synthesis Unit


16
Unit 84

-33

AL1601

B1A

Liquid Ammonia

Ammonia Synthesis Unit


16

UREA Unit 30

AL8401

B1Q

Liquid Ammonia

Ammonia Refrigeration
Unit 16

AL8407

B1A

Liquid Ammonia

BW1001

D2A

MP Boiler Feed Water

BW4001

D2A

BW5044

BW5047

BW5055

AG

AG8401

AL

BW

CD

2 of 16

LINE LIST FOR


INTERCONNECTION PIPE
RACK
FLUID
LINE No.

SIZE
DN CLASS
(inch)

LINE ROUTINE

OPERATION
TEMP. ()

MEDIUM

PHASE

FROM

TO

Project Name:
Project No. :

50061

TEMP.

NORM. MAX. NORM. MAX.

TEST

PRESS.

()

(MPaG)

15.7

130

16.8

118

0.6

150

1.2

UREA Unit 30

AMB.

0.8

65

14"-DW7309

Air Seperation Unit 40


PA & IA Unit 65

AMB.

0.8

Demineralized Water Unit


73

CO Shift & Sulfur


Recovery Unit 14

AMB.

Demineralized Water

Ammonia Synthesis and


Refrigeration Unit 16

End Cap

A1A

Fuel Gas

TSA & NWU Unit 13

A1A

Fuel Gas

B1A

Diesel Oil

CD3001

E1A

Carbon Dioxide

Compressor House Unit


16

UREA Unit 30

120

DW1404

12

A3K

Demineralized Water

CO Shift Unit 14

Power Station Unit 50

DW3001

A3K

Demineralized Water

4"-DW7380

DW4001

A3K

Demineralized Water

DW7309

14

A3K

Demineralized Water

DW7380

A3K

FG1301

FG9301

INSIDE & OUTSIDE PROTECTION

MATERIAL

Revision

Doc No.: 50061-00-02-430-0004-001


DESIGN

PRESS. (MPa G)

Ninh Binh Fine Coal Based Urea Plant

THK. OF INSIDE & MEDIU


INSUL. OUTSIDE
M
(mm)
PROT.

FLUSH
MEDIU
M

P & I DWG No.

FLUID
EARTHING CATEGO
RY
REQUIREME
NT
U
T

50061-00-02-310-0004-01

GC1(3)

50061-00-02-310-0004-04

GC2

1.2

50061-00-02-310-0004-04

GC2

65

1.2

50061-00-02-310-0004-04

0.8

65

1.2

50061-00-02-310-0004-04

GC2

AMB.

0.8

65

1.2

50061-00-02-310-0004-04

GC2

CMD

35

0.11

65

0.7

50061-00-02-310-0004-03

GC2

8"-FG1301

Flare Unit 93

35

0.11

65

0.7

50061-00-02-310-0004-03

GC2

Gasification Unit 10

Power Station Unit 50

AMB.

2.36

70

50061-00-02-310-0004-04

GC2

DW

Glass Fiber

70

FG

FO

FO5001

3 of 16

LINE LIST FOR


INTERCONNECTION PIPE
RACK
FLUID
LINE No.

A
FO5002

SIZE
DN CLASS
(inch)
B
2

LINE ROUTINE

OPERATION
TEMP. ()

MEDIUM

PHASE

FROM

TO

B1A

Diesel Oil

Power Station Unit 50

Gasification Unit 10

AMB.

Project Name:
Project No. :

50061

TEMP.

TEST

PRESS.

()

(MPaG)

2.36

70

INSIDE & OUTSIDE PROTECTION

MATERIAL

NORM. MAX. NORM. MAX.

Revision

Doc No.: 50061-00-02-430-0004-001


DESIGN

PRESS. (MPa G)

Ninh Binh Fine Coal Based Urea Plant

THK. OF INSIDE & MEDIU


INSUL. OUTSIDE
M
(mm)
PROT.

FLUSH
MEDIU
M

P & I DWG No.

FLUID
EARTHING CATEGO
RY
REQUIREME
NT
U
T

50061-00-02-310-0004-04

GC2

50061-00-02-310-0004-03

GC2

50061-00-02-310-0004-03

GC2

HN

HN4001

C1A

HP Nitrogen

Air Seperation Unit 40

Gasification Unit 10

90

5.4

120

Glass Fiber

50

HN4002

10

C1A

HP Nitrogen

Air Seperation Unit 40

CO Shift & Sulfur


Recovery Unit 14

45

5.4

65

HS1401

F1C

HP Steam

12"-HS5001

CO Shift Unit 14

535

9.3

550

10.6

Aluminum
Silicate

130

50061-00-02-310-0004-02

GC1(3)

HS5001

12

F1C

HP Steam

Power Station Unit 50

Air Seperation Unit 40

535

9.3

550

10.6

Aluminum
Silicate

190

50061-00-02-310-0004-02

GC1(3)

IA1001

A1X

Instrument Air

6"-IA6501

Gasification Unit 10

AMB.

0.8

65

50061-00-02-310-0004-03

GC3

IA3001

A1X

Instrument Air

2"-IA8401

UREA Unit 30

AMB.

0.8

65

50061-00-02-310-0004-03

GC3

IA5001

A1X

Instrument Air

3"-IA7201

Power Station Unit 50

AMB.

0.8

65

50061-00-02-310-0004-03

GC3

IA6501

A1X

Instrument Air

PA & IA Unit 65

CO Shift & Sulfur


Recovery Unit 14

AMB.

0.8

65

50061-00-02-310-0004-03

GC3

IA6502

A1X

Instrument Air

Ammonia Synthesis and


Refrigeration Unit 16

End Cap

AMB.

0.8

65

50061-00-02-310-0004-03

GC3

HS

IA

4 of 16

LINE LIST FOR


INTERCONNECTION PIPE
RACK
FLUID
LINE No.

SIZE
DN CLASS
(inch)

LINE ROUTINE

OPERATION
TEMP. ()

MEDIUM

PHASE

FROM

TO

Project Name:
Project No. :

50061

TEMP.

NORM. MAX. NORM. MAX.

IA7201

A1X

Instrument Air

6"-IA6501

Raw Water Treatment


Unit 72

AMB.

INSIDE & OUTSIDE PROTECTION

TEST

PRESS.
MATERIAL

Revision

Doc No.: 50061-00-02-430-0004-001


DESIGN

PRESS. (MPa G)

Ninh Binh Fine Coal Based Urea Plant

THK. OF INSIDE & MEDIU


INSUL. OUTSIDE
M
(mm)
PROT.

FLUSH
MEDIU
M

P & I DWG No.

FLUID
EARTHING CATEGO
RY
REQUIREME
NT
U
T

()

(MPaG)

0.8

65

50061-00-02-310-0004-03

GC3

IA7301

A1X

Instrument Air

6"-IA6501

Demineralized Water Unit


AMB.
73

0.8

65

50061-00-02-310-0004-03

GC3

IA8401

A1X

Instrument Air

6"-IA6502

Liquid Ammonia Storage


Unit 84

AMB.

0.8

65

50061-00-02-310-0004-03

GC3

A1X

Instrument Air

3"-IA7201

Flare Unit 93

AMB.

0.8

65

50061-00-02-310-0004-03

GC3

A1X

Instrument Air

6"-IA6501

LPG and Methanol


Storage Facility Unit 94

AMB.

0.8

65

50061-00-02-310-0004-03

IW1001

A4A

Industrial Water

4"-IW9401

Gasification Unit 10

AMB.

0.4

65

0.75

50061-00-02-310-0004-04

IW3001

A4A

Industrial Water

3"-IW8401

UREA Unit 30

AMB.

0.4

65

0.75

50061-00-02-310-0004-04

IW4001

16

A4A

Industrial Water

18"-IW7219

Air Seperation Unit 40


PA & IA Unit 65

AMB.

0.15

65

0.75

50061-00-02-310-0004-04

IW5006

A4A

Industrial Water

14"-IW7220

Power Station Unit 50

AMB.

0.4

65

0.75

50061-00-02-310-0004-04

IW7219

18

A4A

Industrial Water

Raw Water Treatment


Unit 72

Cooling Water Unit 75

AMB.

0.25

65

0.75

50061-00-02-310-0004-04

IA9301

2
1

IA9401

IW

5 of 16

LINE LIST FOR


INTERCONNECTION PIPE
RACK
FLUID
LINE No.

SIZE
DN CLASS
(inch)

LINE ROUTINE

OPERATION
TEMP. ()

MEDIUM

PHASE

FROM

TO
G

Project Name:
Project No. :

50061

TEMP.

INSIDE & OUTSIDE PROTECTION

TEST

PRESS.
MATERIAL

NORM. MAX. NORM. MAX.

Revision

Doc No.: 50061-00-02-430-0004-001


DESIGN

PRESS. (MPa G)

Ninh Binh Fine Coal Based Urea Plant

THK. OF INSIDE & MEDIU


INSUL. OUTSIDE
M
(mm)
PROT.

FLUSH
MEDIU
M

P & I DWG No.

FLUID
EARTHING CATEGO
RY
REQUIREME
NT
U
T

()

(MPaG)

0.4

65

0.75

50061-00-02-310-0004-04

AMB.

0.4

65

0.75

50061-00-02-310-0004-04

End Cap

AMB.

0.4

65

0.75

50061-00-02-310-0004-04

4"-IW9301

Waste Water Treatment


Unit 74

AMB.

0.4

65

0.75

50061-00-02-310-0004-04

4"-IW9301

Cooling Water Unit 75

AMB.

0.4

65

0.75

50061-00-02-310-0004-04

Industrial Water

6"-IW7222

Liquid Ammonia Storage


Unit 84

AMB.

0.4

65

0.75

50061-00-02-310-0004-04

A4A

Industrial Water

14"-IW7220

Flare Unit 93

AMB.

0.4

65

0.75

50061-00-02-310-0004-04

A4A

Industrial Water

14"-IW7220

LPG and Methanol


Storage Facility Unit 94

AMB.

0.4

65

0.75

50061-00-02-310-0004-04

A1K

Liquid Nitrogen

Air Seperation Unit 40

CO Shift & Sulfur


Recovery Unit 14

-180

0.5

-196

0.7

50061-00-02-310-0004-04

GC2

IW7220

14

A4A

Industrial Water

Raw Water Treatment


Unit 72

IW7221

A4A

Industrial Water

14"-IW7220

CO Shift & Sulfur


Recovery Unit 14

IW7222

A4A

Industrial Water

Ammonia Synthesis and


Refrigeration Unit 16

IW7401

A4A

Industrial Water

IW7501

A4A

Industrial Water

IW8401

A4A

Demineralized Water Unit


AMB.
73

IW9301

2
4

IW9401

4
1

LIN

LIN4001

LLN

6 of 16

Cellular Glass

130

LINE LIST FOR


INTERCONNECTION PIPE
RACK
FLUID
LINE No.

SIZE
DN CLASS
(inch)

LINE ROUTINE

OPERATION
TEMP. ()

MEDIUM

PHASE

FROM

TO

Project Name:
Project No. :

50061

TEMP.

NORM. MAX. NORM. MAX.

TEST

PRESS.

THK. OF INSIDE & MEDIU


INSUL. OUTSIDE
M
(mm)
PROT.

()

(MPaG)

0.53

130

0.7

Glass Fiber

50

45

0.9

65

UREA Unit 30

45

0.9

Air Seperation Unit 40

CO Shift & Sulfur


Recovery Unit 14

45

Ammonia Synthesis and


Refrigeration Unit 16

End Cap

LP Nitrogen

2"-LN9301

A4A

LP Nitrogen

A4A

LP Nitrogen

A4A

LP Nitrogen

LLN4001

10

A4A

Very Low Pressure Nitrogen

Air Seperation Unit 40

Gasification Unit 10

100

LN1101

10

A4A

LP Nitrogen

12"-LN4001

CMD

LN3001

A4A

LP Nitrogen

2"-LN8401

LN4001

12

A4A

LP Nitrogen

LN4002

A4A

LP Nitrogen

LN5001

A4A

LN8401

INSIDE & OUTSIDE PROTECTION

MATERIAL

Revision

Doc No.: 50061-00-02-430-0004-001


DESIGN

PRESS. (MPa G)

Ninh Binh Fine Coal Based Urea Plant

FLUSH
MEDIU
M

P & I DWG No.

FLUID
EARTHING CATEGO
RY
REQUIREME
NT
U
T

50061-00-02-310-0004-03

GC3

50061-00-02-310-0004-03

GC3

65

50061-00-02-310-0004-03

GC3

0.9

65

50061-00-02-310-0004-03

GC3

45

0.9

65

50061-00-02-310-0004-03

GC3

Power Station Unit 50

45

0.9

65

50061-00-02-310-0004-03

6"-LN4002

Liquid Ammonia Storage


Unit 84

45

0.9

65

50061-00-02-310-0004-03

GC3

12"-LN4001

Flare Unit 93

45

0.9

65

50061-00-02-310-0004-03

GC3

12"-LN4001

LPG ang Methanol


Storage Facility Unit 94

45

0.9

65

50061-00-02-310-0004-03

GC3

LN

LN9301

2
1

LN9401

1 1/2
3/4

LPG

7 of 16

LINE LIST FOR


INTERCONNECTION PIPE
RACK
FLUID
LINE No.

SIZE
DN CLASS
(inch)

LINE ROUTINE

OPERATION
TEMP. ()

MEDIUM

PHASE

FROM

TO

Project No. :

50061

NORM. MAX. NORM. MAX.

Revision

Doc No.: 50061-00-02-430-0004-001


DESIGN

PRESS. (MPa G)

Ninh Binh Fine Coal Based Urea Plant

TEMP.

INSIDE & OUTSIDE PROTECTION

TEST

PRESS.
MATERIAL

THK. OF INSIDE & MEDIU


INSUL. OUTSIDE
M
(mm)
PROT.

FLUSH
MEDIU
M

P & I DWG No.

FLUID
EARTHING CATEGO
RY
REQUIREME
NT
U
T

()

(MPaG)

0.35

70

0.7

50061-00-02-310-0004-03

GC2

25

0.35

70

0.7

50061-00-02-310-0004-03

GC2

LPG1001

A1A

Liquid Petroleum Gas

4"-LPG9401

Gasification Unit 10

25

LPG8401

A1A

Liquid Petroleum Gas

Ammonia Synthesis and Liquid Ammonia Storage


Refrigeration Unit 16
Unit 84

Project Name:

LPG9301

A1A

Liquid Petroleum Gas

3"-LPG9401

Flare Unit 93

25

0.35

70

0.7

50061-00-02-310-0004-03

GC2

LPG9401

A1A

Liquid Petroleum Gas

LPG and Methanol


Storage Facility Unit 94

CO Shift & Sulfur


Recovery Unit 14

25

0.35

70

0.7

50061-00-02-310-0004-03

GC2

LS

LS1001

10

A3A

LP Steam

12"-LS1401

Gasification Unit 10

158

0.5

260

0.8

Glass Fiber

80

50061-00-02-310-0004-02

GC2

LS1401

16

A3A

LP Steam

CO Shift & Sulfur


Recovery Unit 14

End Cap

158

0.5

260

0.8

Glass Fiber

80

50061-00-02-310-0004-02

GC2

12

80

10

80

LS1601

10

A3A

LP Steam

Ammonia Synthesis and


Refrigeration Unit 16

End Cap

158

0.5

260

0.8

Glass Fiber

80

50061-00-02-310-0004-02

GC2

LS4001

A3A

LP Steam

16"-LS1401

Air Seperation Unit 40

158

0.5

260

0.8

Glass Fiber

70

50061-00-02-310-0004-02

GC2

LS5006

16

A3A

LP Steam

16"-LS1401

Power Station Unit 50

158

0.5

260

0.8

Glass Fiber

80

50061-00-02-310-0004-02

GC2

8 of 16

LINE LIST FOR


INTERCONNECTION PIPE
RACK
FLUID
LINE No.

SIZE
DN CLASS
(inch)
B

LINE ROUTINE

OPERATION
TEMP. ()

MEDIUM

PHASE

FROM

TO

H
158

Project Name:
Project No. :

50061

TEMP.

INSIDE & OUTSIDE PROTECTION

TEST

PRESS.
MATERIAL

NORM. MAX. NORM. MAX.

Revision

Doc No.: 50061-00-02-430-0004-001


DESIGN

PRESS. (MPa G)

Ninh Binh Fine Coal Based Urea Plant

THK. OF INSIDE & MEDIU


INSUL. OUTSIDE
M
(mm)
PROT.

FLUSH
MEDIU
M

P & I DWG No.

FLUID
EARTHING CATEGO
RY
REQUIREME
NT
U
T

()

(MPaG)

0.5

260

0.8

Glass Fiber

70

50061-00-02-310-0004-02

GC2

LS8401

A3A

LP Steam

10"-LS1601

Liquid Ammonia Storage


Unit 84

LS9301

A3A

LP Steam

16"-LS5006

Flare Unit 93

158

0.5

260

0.8

Glass Fiber

60

50061-00-02-310-0004-02

GC2

A3A

LP Steam

12"-LS1401

LPG and Methanol


Storage Facility Unit 94

158

0.5

260

0.8

Glass Fiber

60

50061-00-02-310-0004-02

GC2

MA1222

B1A

Methanol

CO Shift & Sulfur


Recovery Unit 14

LPG and Methanol


Storage Facility Unit 94

45

0.4

100

1.5

50061-00-02-310-0004-01

GC2

MA9401

B1A

Methanol

LPG and Methanol


Storage Facility Unit 94

CO Shift & Sulfur


Recovery Unit 14

45

0.4

100

1.5

50061-00-02-310-0004-01

GC2

MS1001

C1C

MP Steam

14"-MS5001

Gasification Unit 10

390

4.2

420

4.84

Aluminum
Silicate

130

50061-00-02-310-0004-02

GC1(3)

MS1401

12

C1C

MP Steam

Gasification Unit 10

CO Shift Unit 14

255

4.2

300

4.84

Glass Fiber

100

50061-00-02-310-0004-02

GC2

MS3001

C1C

MP Steam

18"-MS3002

UREA Unit 30

390

4.2

420

4.84

Aluminum
Silicate

120

50061-00-02-310-0004-02

GC1(3)

MS3002

18

C1C

MP Steam

Ammonia Synthesis and


Refrigeration Unit 16

END CAP

390

4.2

420

4.84

Aluminum
Silicate

160

50061-00-02-310-0004-02

GC1(3)

MS4001

C1C

MP Steam

Air Seperation Unit 40

18"-MS5001

390

4.2

420

4.84

Aluminum
Silicate

140

50061-00-02-310-0004-02

GC1(3)

LS9401

MA

MS

9 of 16

LINE LIST FOR


INTERCONNECTION PIPE
RACK
FLUID
LINE No.

A
MS5001

SIZE
DN CLASS
(inch)
B
14

C
C1C

LINE ROUTINE

OPERATION
TEMP. ()

MEDIUM

PHASE

FROM

TO

Power Station Unit 50

CO Shift & Sulfur


Recovery Unit 14

PRESS. (MPa G)

Ninh Binh Fine Coal Based Urea Plant

Project No. :

50061

TEMP.

390

J
4.2

INSIDE & OUTSIDE PROTECTION

TEST

PRESS.
MATERIAL

Revision

Doc No.: 50061-00-02-430-0004-001


DESIGN

NORM. MAX. NORM. MAX.

MP Steam

Project Name:

THK. OF INSIDE & MEDIU


INSUL. OUTSIDE
M
(mm)
PROT.

FLUSH
MEDIU
M

P & I DWG No.

FLUID
EARTHING CATEGO
RY
REQUIREME
NT
U
T

()

(MPaG)

4.84

Aluminum
Silicate

150

50061-00-02-310-0004-02

GC1(3)

420

18

160

NF

NF1001

24

A1A

Flare Gas

Gasification Unit 10

28"-NF1601

0.03

300

0.07

Glass Fiber

50

50061-00-02-310-0004-03

GC2

NF1601

28

A1A

Flare Gas

CO Shift & Sulfur


Recovery Unit 14

Flare Unit93

0.03

300

0.07

Glass Fiber

60

50061-00-02-310-0004-03

GC2

NF1602

20

A1Q

Ammonia Gas

CO Shift & Sulfur


Recovery Unit 14

Flare Unit93

0.03

-40/100

0.07

50061-00-02-310-0004-03

GC3

NF1603

12

A5A

Sour Gas

CO Shift & Sulfur


Recovery Unit 14

Flare Unit93

0.03

300

0.07

50061-00-02-310-0004-03

GC2

NF9401

A1A

Flare Gas

LPG and Methanol


Storage Facility Unit 94

24"-NF1001

60

0.03

300

0.07

50061-00-02-310-0004-03

GC2

10

C1K

Oxygen

Air seperation Unit 40

Gasification Unit 10

AMB.

4.62

65

5.1

50061-00-02-310-0004-01

GC1(2)

PA1001

A4A

Plant Air

6"-PA6501

Gasification Unit 10

AMB.

0.8

65

50061-00-02-310-0004-03

GC3

PA3001

A4A

Plant Air

2"-PA8401

UREA Unit 30

AMB.

0.8

65

50061-00-02-310-0004-03

GC3

OG

OG4001

PA

10 of 16

LINE LIST FOR


INTERCONNECTION PIPE
RACK
FLUID
LINE No.

SIZE
DN CLASS
(inch)

LINE ROUTINE

OPERATION
TEMP. ()

MEDIUM

PHASE

FROM

TO

Project Name:
Project No. :

50061

TEMP.

INSIDE & OUTSIDE PROTECTION

TEST

PRESS.
MATERIAL

NORM. MAX. NORM. MAX.

Revision

Doc No.: 50061-00-02-430-0004-001


DESIGN

PRESS. (MPa G)

Ninh Binh Fine Coal Based Urea Plant

THK. OF INSIDE & MEDIU


INSUL. OUTSIDE
M
(mm)
PROT.

FLUSH
MEDIU
M

P & I DWG No.

FLUID
EARTHING CATEGO
RY
REQUIREME
NT
U
T

()

(MPaG)

0.8

65

50061-00-02-310-0004-03

GC3

AMB.

0.8

65

50061-00-02-310-0004-03

GC3

AMB.

0.8

65

50061-00-02-310-0004-03

GC3

Demineralized Water Unit


AMB.
73

0.8

65

50061-00-02-310-0004-03

GC3

AMB.

0.8

65

50061-00-02-310-0004-03

Liquid Ammonia Storage


Unit 84

AMB.

0.8

65

50061-00-02-310-0004-03

GC3

6"-PA6501

Flare Unit 93

AMB.

0.8

65

50061-00-02-310-0004-03

GC3

6"-PA6501

LPG and Methanol


Storage Facility Unit 94

AMB.

0.8

65

50061-00-02-310-0004-03

GC3

Process Condensate

CO Shift Unit 14

Gasification Unit 10

170

4.5

190

4.8

50061-00-02-310-0004-01

GC2

A1A

Process Condensate

UREA Unit 30

Ammonia Synthesis and


Refrigeration Unit 16

70

0.5

100

0.75

Glass Fiber

30

50061-00-02-310-0004-01

GC3

A1A

Process Condensate

CO Shift & Sulfur


Recovery Unit 14

Demineralizer Water Unit


73

70

0.5

100

0.75

Glass Fiber

30

50061-00-02-310-0004-01

GC3

PA5004

A4A

Plant Air

PA & IA Unit 65

Power Station Unit 50

AMB.

PA6501

A4A

Plant Air

PA & IA Unit 65

CO Shift & Sulfur


Recovery Unit 14

PA6502

A4A

Plant Air

Ammonia Synthesis and


Refrigeration Unit 16

End Cap

PA7301

A4A

Plant Air

6"-PA6501

PA7401

A4A

Plant Air

2"-PA9301

Waste Water Treatment


Unit 74

PA8401

A4A

Plant Air

6"-PA6502

A4A

Plant Air

A4A

Plant Air

PC1405

C3K

PC3001

PC3002

PA9301

2
1

PA9401

PC

11 of 16

LINE LIST FOR


INTERCONNECTION PIPE
RACK
FLUID
LINE No.

SIZE
DN CLASS
(inch)

LINE ROUTINE

OPERATION
TEMP. ()

MEDIUM

PHASE

FROM

TO

Project Name:
Project No. :

TEMP.

TEST

PRESS.
MATERIAL

NORM. MAX. NORM. MAX.

(MPaG)

3.7

180

4.1

AMB.

0.35

65

7000-04

AMB.

0.35

7000-04

CO Shift & Sulfur


Recovery Unit 14

AMB.

Ammonia Synthesis and


Refrigeration Unit 16

End Cap

Potable Water

8"-PW0013

A1X

Potable Water

A1X

Potable Water

PW4001

A1X

PW5001

A1X

16

C1C

Process Gas

Gasification Unit 10

CO Shift Unit 14

161

PW0008

A1X

Potable Water

8"-PW0014

7000-04

PW0011

A1X

Potable water

4"-PW9401

PW0012

A1X

Potable Water

PW0013

A1X

Potable Water

PW0014

A1X

PW1001

PW3001

Revision

INSIDE & OUTSIDE PROTECTION

()

50061

Doc No.: 50061-00-02-430-0004-001


DESIGN

PRESS. (MPa G)

Ninh Binh Fine Coal Based Urea Plant

THK. OF INSIDE & MEDIU


INSUL. OUTSIDE
M
(mm)
PROT.

FLUSH
MEDIU
M

P & I DWG No.

FLUID
EARTHING CATEGO
RY
REQUIREME
NT
U
T

PG

PG1401

TS

50061-00-02-310-0004-01

GC1(2)

0.75

50061-00-02-310-0004-04

65

0.75

50061-00-02-310-0004-04

0.35

65

0.75

50061-00-02-310-0004-04

AMB.

0.35

65

0.75

50061-00-02-310-0004-04

End Cap

AMB.

0.35

65

0.75

50061-00-02-310-0004-04

4"-PW9401

Gasification Unit 10

AMB.

0.35

65

0.75

50061-00-02-310-0004-04

8"-PW0014

UREA Unit 30

AMB.

0.35

65

0.75

50061-00-02-310-0004-04

Potable Water

8"-PW0012

Air Seperation Unit 40


PA & IA Unit 65

AMB.

0.35

65

0.75

50061-00-02-310-0004-04

Potable Water

8"-PW0012

Power Station Unit 50

AMB.

0.35

65

0.75

50061-00-02-310-0004-04

PW

12 of 16

LINE LIST FOR


INTERCONNECTION PIPE
RACK
FLUID
LINE No.

SIZE
DN CLASS
(inch)
B

LINE ROUTINE

OPERATION
TEMP. ()

MEDIUM

PHASE

FROM

TO

Project Name:
Project No. :

50061

TEMP.

Demineralized Water Unit


AMB.
73

INSIDE & OUTSIDE PROTECTION

TEST

PRESS.
MATERIAL

NORM. MAX. NORM. MAX.

Revision

Doc No.: 50061-00-02-430-0004-001


DESIGN

PRESS. (MPa G)

Ninh Binh Fine Coal Based Urea Plant

THK. OF INSIDE & MEDIU


INSUL. OUTSIDE
M
(mm)
PROT.

FLUSH
MEDIU
M

P & I DWG No.

FLUID
EARTHING CATEGO
RY
REQUIREME
NT
U
T

()

(MPaG)

0.35

65

0.75

50061-00-02-310-0004-04

PW7301

A1X

Potable Water

8"-PW0012

PW7401

A1X

Potable Water

8"-PW0012

Waste Water Treatment


Unit 74

AMB.

0.35

65

0.75

50061-00-02-310-0004-04

PW7501

A1X

Potable Water

4"-PW7401

Cooling Water Unit 75

AMB.

0.35

65

0.75

50061-00-02-310-0004-04

PW8401

A1X

Potable Water

8"-PW0014

Liquid Ammonia Storage


Unit 84

AMB.

0.35

65

0.75

50061-00-02-310-0004-04

PW9401

A1X

Potable Water

8"-PW0012

LPG and Methanol


Storage Facility Unit 94

AMB.

0.35

65

0.75

50061-00-02-310-0004-04

SC

SC1001

A3A

Turbine Condensate

6"-SC7301

Gasification Unit 10

60

0.5

100

0.75

Glass Fiber

30

50061-00-02-310-0004-02

GC3

SC1101

A3A

Steam Condensate

CMD

6"-SC7302

158

0.5

190

0.75

Glass Fiber

30

50061-00-02-310-0004-02

GC2

SC1601

A3A

Turbine Condensate

CO Shift & Sulfur


Recovery Unit 14

10"-SC7301

60

0.5

100

0.75

Glass Fiber

30

50061-00-02-310-0004-02

GC3

SC3001

A3A

Steam Condensate

UREA Unit 30

6"-SC8401

158

0.5

190

0.75

Glass Fiber

30

50061-00-02-310-0004-02

GC2

SC4001

A3A

Turbine Condensate

Air Seperation Unit 40

10"-SC7301

60

0.5

100

0.75

Glass Fiber

30

50061-00-02-310-0004-02

GC3

SC4002

A3A

Steam Condensate

Air Seperation Unit 40

3"-SC1101

158

0.5

190

0.75

Glass Fiber

30

50061-00-02-310-0004-02

GC2

13 of 16

LINE LIST FOR


INTERCONNECTION PIPE
RACK
FLUID
LINE No.

SIZE
DN CLASS
(inch)

LINE ROUTINE

OPERATION
TEMP. ()

MEDIUM

PHASE

FROM

TO

Project Name:
Project No. :

50061

TEMP.

INSIDE & OUTSIDE PROTECTION

TEST

PRESS.
MATERIAL

NORM. MAX. NORM. MAX.

Revision

Doc No.: 50061-00-02-430-0004-001


DESIGN

PRESS. (MPa G)

Ninh Binh Fine Coal Based Urea Plant

THK. OF INSIDE & MEDIU


INSUL. OUTSIDE
M
(mm)
PROT.

FLUSH
MEDIU
M

P & I DWG No.

FLUID
EARTHING CATEGO
RY
REQUIREME
NT
U
T

()

(MPaG)

0.5

100

0.75

Glass Fiber

30

50061-00-02-310-0004-02

GC3

60

0.5

100

0.75

Glass Fiber

30

50061-00-02-310-0004-02

GC3

SC5001

A3A

Turbine Condensate

Power Station Unit 50

6"-SC7301

60

SC7301

10

A3A

Turbine Condensate

End Cap

Demineralized Water Unit


73

SC7302

A3A

Steam Condensate

CO Shift & Sulfur


Recovery Unit 14

Demineralized Water Unit


73

158

0.5

190

0.75

Glass Fiber

30

50061-00-02-310-0004-02

GC2

SC8401

A3A

Steam Condensate

Liquid Ammonia Storage


Unit 84

6"-SC8403

158

0.5

190

0.75

Glass Fiber

30

50061-00-02-310-0004-02

GC2

SC8403

A3A

Steam Condensate

END CAP

Ammonia Synthesis and


Refrigeration Unit 16

158

0.5

190

0.75

Glass Fiber

30

50061-00-02-310-0004-02

GC2

SC9401

A3A

Steam Condensate

LPG and Methanol


Storage Facility Unit 94

3"-SC1101

158

0.5

190

0.75

Glass Fiber

30

50061-00-02-310-0004-02

10

B2A

Subaltern MP Steam

Gasification Unit 10

CO Shift & Sulfur


Recovery Unit 14

260

1.2

320

1.6

Glass Fiber

100

50061-00-02-310-0004-02

GC2

SMS

SMS1001

12

100

SMS4001

B2A

Subaltern MP Steam

12"-SMS1001

Air Seperation Unit 40


PA & IA Unit 65

260

1.2

320

1.6

Glass Fiber

90

50061-00-02-310-0004-02

GC2

SMS5001

10

B2A

Subaltern MP Steam

12"-SMS1001

Power Station Unit 50

260

1.2

320

1.6

Glass Fiber

100

50061-00-02-310-0004-02

GC2

SG

14 of 16

LINE LIST FOR


INTERCONNECTION PIPE
RACK
FLUID
LINE No.

SIZE
DN CLASS
(inch)

LINE ROUTINE

OPERATION
TEMP. ()

MEDIUM

PHASE

FROM

TO

Project Name:
Project No. :

50061

TEMP.

NORM. MAX. NORM. MAX.

TEST

PRESS.

()

(MPaG)

0.14

130

0.5

AMB.

0.4

65

SG1469

A5A

Sour Gas

Gasification Unit 10

Sulfur Recovery Unit 14

100

A4A

Sanitary Wastewater

CO Shift & Sulfur


Recovery Unit 14

Waste Water Treatment


Unit 74

INSIDE & OUTSIDE PROTECTION

MATERIAL

Revision

Doc No.: 50061-00-02-430-0004-001


DESIGN

PRESS. (MPa G)

Ninh Binh Fine Coal Based Urea Plant

THK. OF INSIDE & MEDIU


INSUL. OUTSIDE
M
(mm)
PROT.

TS

FLUSH
MEDIU
M

P & I DWG No.

FLUID
EARTHING CATEGO
RY
REQUIREME
NT
U
T

50061-00-02-310-0004-01

GC2

0.6

50061-00-02-310-0004-04

SW

SW0001

SW0002

A4A

Sanitary Wastewater

7000-05

Ammonia Synthesis and


Refrigeration Unit 16

AMB.

0.4

65

0.6

50061-00-02-310-0004-04

SW0004

A4A

Sanitary Wastewater

7000-05

6"-SW0001

AMB.

0.4

65

0.6

50061-00-02-310-0004-04

SW0006

A4A

Sanitary Wastewater

7000-05

6"-SW0001

AMB.

0.4

65

0.6

50061-00-02-310-0004-04

SW0007

A4A

Sanitary Wastewater

7000-05

RWU Unit 12 TSA &


NWU Unit 13

AMB.

0.4

65

0.6

50061-00-02-310-0004-04

SW5002

A4A

Sanitary Wastewater

Power Station Unit 50

6"-SW0001

AMB.

0.4

65

0.6

50061-00-02-310-0004-04

Tail Gas

Sulfur Recovery Unit 14

Power Station Unit 50

223

0.1

255

0.35

50061-00-02-310-0004-01

GC2

Very High Pressure Nitrogen

Air Seperation Unit 40

Gasification Unit 10

90

8.2

120

8.9

50061-00-02-310-0004-03

GC2

TG

TG/LS1457

10/14 A1A/A3A

VHN

VHN4001

D1A

15 of 16

Glass Fiber

50

LINE LIST FOR


INTERCONNECTION PIPE
RACK
FLUID
LINE No.

SIZE
DN CLASS
(inch)

LINE ROUTINE

OPERATION
TEMP. ()

MEDIUM

PHASE

FROM

TO

Project Name:
Project No. :

50061

TEMP.

NORM. MAX. NORM. MAX.

TEST

PRESS.

THK. OF INSIDE & MEDIU


INSUL. OUTSIDE
M
(mm)
PROT.

()

(MPaG)

8.2

120

8.9

Glass Fiber

40

AMB.

0.15

65

Waste Water Treatment


Unit 74

AMB.

0.15

8"-WW1416

AMB.

0.15

VHN4002

D1A

Very High Pressure Nitrogen

Air Seperation Unit 40

CO Shift & Sulfur


Recovery Unit 14

90

WW1001

A4A

Waste Water

Gasification Unit 10

8"-WW1416

WW1416

A4A

Waste Water

CO Shift & Sulfur


Recovery Unit 14

A4A

Waste Water

Power Station Unit 50

INSIDE & OUTSIDE PROTECTION

MATERIAL

Revision

Doc No.: 50061-00-02-430-0004-001


DESIGN

PRESS. (MPa G)

Ninh Binh Fine Coal Based Urea Plant

FLUSH
MEDIU
M

P & I DWG No.

FLUID
EARTHING CATEGO
RY
REQUIREME
NT
U
T

50061-00-02-310-0004-03

GC2

0.6

50061-00-02-310-0004-04

GC3

65

0.6

50061-00-02-310-0004-04

GC3

65

0.6

50061-00-02-310-0004-04

GC3

WW

WW5004

16 of 16

Das könnte Ihnen auch gefallen